A kind of deep foundation pit reinforced concrete waist rail detaching device and job practices
Technical field
The present invention relates to a kind of deep foundation pit reinforced concrete waist rail detaching device and job practices.
Background technology
In the reinforced concrete waist rail detaching engineering of Metro Deep Excavation support system, often relate to the execution conditions complexity, difficulty is big, the duration is nervous and problem such as quality safety.When constructing, reinforced concrete waist rail considers the device of a kind of pre-buried pvc pipe and i iron, so that remove the reinforced concrete waist rail of support system fast, safely.Yet, dismounting to reinforced concrete waist rail all is a method of utilizing the wind original text to cut and cut at present, and its ubiquity such problem: one, execution conditions complexity, and construction environment is narrow and small, be unfavorable for cutting the reinforced concrete waist rail construction, and have very big potential safety hazard with the wind original text; Two, it is slow to cut progress, big to the programming influence of duration anxiety; Three, the fragment that cuts of reinforced concrete waist rail damages base plate, side wall and side wall reinforcing bar etc.; Four, the fragment that cuts of reinforced concrete waist rail is cleared up difficulty under deep foundation ditch.
The objective of the invention is to solve above-mentioned existing problems, provide a kind of construction and installation to make simple and easy, easy-to-operate, reinforced concrete waist rail to the deep pit support support system can be removed quickly and safely, to the deep foundation pit reinforced concrete waist rail detaching device and the job practices of construction safety and the effective control of duration progress.
The objective of the invention is to be achieved through the following technical solutions: a kind of deep foundation pit reinforced concrete waist rail detaching device, its characteristics are to comprise reinforced concrete waist rail detaching, the hanging apparatus of being made up of the pvc pipe and the i iron of pre-buried some.Wherein the horizontal connecting reinforcement of reinforced concrete waist rail and diaphragm wall is inserted in the pvc pipe that half-and-half cuts, and by the pvc pipe of 2.4 meters pre-buried Φ 100 of spacing, reinforced concrete waist rail is by 1.6 meters pre-buried 14 i iron of spacing in the middle of the reinforced concrete waist rail.Utilize pre-buried pvc pipe and 14 i iron that reinforced concrete waist rail and diaphragm wall are broken away from, reach make the reinforced concrete waist rail engineering fast, the safety purpose of removing.
The job practices of reinforced concrete waist rail detaching device of the present invention comprises the steps:
(1) earlier the pvc pipe of Φ 160 is cut into a section by the height of reinforced concrete waist rail, and Φ 160PVC pipe is half-and-half cut, hole according to the size and the spacing of reinforced concrete waist rail and the horizontal connecting reinforcement of diaphragm wall;
(2) pvc pipe that will half-and-half cut before the reinforced concrete waist rail reinforcement installation is inserted on reinforced concrete waist rail and the horizontal connecting reinforcement of diaphragm wall, and is close to diaphragm wall;
(3) when reinforced concrete waist rail reinforcing bar system peace finish the back in the reinforced concrete waist rail centre pvc pipe by 2 meters pre-buried Φ 100 of spacing, as the reinforced concrete waist rail detaching hole for hoist, press 2 meters pre-buried 14 i iron of spacing in 1/3rd positions, the outer limit of reinforced concrete waist rail, 14 i iron length 60cm, imbed 40cm in the reinforced concrete waist rail concrete, 20cm stretches out outside the reinforced concrete waist rail;
(4) before the reinforced concrete waist rail concreting, fill up the pvc pipe hole closely knit with fine sand;
(5) when will removing, reinforced concrete waist rail below reinforced concrete waist rail, uses Φ 48 steel pipe proping bearing bar concrete breast beams, and water flushing pvc pipe hole;
(6) the Φ 100PVC pore of reserving with steel wire penetrating hangs tight reinforced concrete waist rail, reinforced concrete waist rail is cut off by 4 meters one section with cutting machine;
(7) cut the horizontal connecting reinforcement that cuts off reinforced concrete waist rail and diaphragm wall from semicircle Φ 160PVC pore with oxygen-acetylene, withstand on pre-buried 14 i iron with two jack, two jack slowly eject reinforced concrete waist rail simultaneously;
(8) hang outside the foundation ditch with crane or straddle truck after reinforced concrete waist rail and diaphragm wall break away from fully.
The present invention adopts the pvc pipe of pre-buried some and reinforced concrete waist rail detaching, the hanging apparatus that i iron is formed.Wherein the horizontal connecting reinforcement of reinforced concrete waist rail and diaphragm wall is inserted in the pvc pipe that half-and-half cuts, utilize the pvc pipe that half-and-half cuts to make the level binding reinforcing bar between reinforced concrete waist rail and diaphragm wall that certain space be arranged, can cut the horizontal connecting reinforcement that cuts off reinforced concrete waist rail and diaphragm wall from semicircle Φ 160PVC pore with oxygen-acetylene, make the topmost binding of reinforced concrete waist rail and diaphragm wall cut off fast; By the pvc pipe of 2.4 meters pre-buried Φ 100 of spacing, utilize 4 meters reinforced concrete waist rails of pvc pipe lifting of the pre-buried Φ 100 of steel wire penetrating in the middle of the reinforced concrete waist rail; Reinforced concrete waist rail is by 1.6 meters pre-buried 14 i iron of spacing.Utilize pre-buried pvc pipe and 14 i iron that reinforced concrete waist rail and diaphragm wall are broken away from, reach make the reinforced concrete waist rail engineering fast, the safety purpose of removing.
The present invention is further illustrated below in conjunction with accompanying drawing.
Description of drawings
Fig. 1 is that structure of the present invention is formed floor map;
Fig. 2 is that structure of the present invention is formed the full-page proof schematic diagram.
The specific embodiment
As Fig. 1, Fig. 2 and shown in Figure 3, deep foundation pit reinforced concrete waist rail detaching device of the present invention is included in pvc pipe pre-buried between reinforced concrete waist rail and the diaphragm wall and reaches pvc pipe, 14 i iron pre-buried on reinforced concrete waist rail; Pre-buried pvc pipe adopts the pvc pipe of Φ 160 and half-and-half cuts use between described reinforced concrete waist rail and the diaphragm wall, and pvc pipe, 14 i iron pre-buried on the described reinforced concrete waist rail adopt the pvc pipe of Φ 100 and 14 i iron of 60cm degree.Wherein the horizontal connecting reinforcement of reinforced concrete waist rail and diaphragm wall is inserted in the pvc pipe that half-and-half cuts, and by the pvc pipe of 2.4 meters pre-buried Φ 100 of spacing, reinforced concrete waist rail is by 1.6 meters pre-buried 14 i iron of spacing in the middle of the reinforced concrete waist rail.Utilize pre-buried pvc pipe and 14 i iron that reinforced concrete waist rail and diaphragm wall are broken away from, reach make the reinforced concrete waist rail engineering fast, the safety purpose of removing.Wherein, described jack is general jack, and described crane gear is for satisfying equipment such as the overweight machine hang reinforced concrete waist rail or straddle truck.
The job practices of reinforced concrete waist rail detaching device of the present invention comprises the steps:
(1) earlier the pvc pipe of Φ 160 is cut into a section by the height of reinforced concrete waist rail, and Φ 160PVC pipe is half-and-half cut, hole according to the size and the spacing of reinforced concrete waist rail and the horizontal connecting reinforcement of diaphragm wall;
(2) pvc pipe that will half-and-half cut before the reinforced concrete waist rail reinforcement installation is inserted on reinforced concrete waist rail and the horizontal connecting reinforcement of diaphragm wall, and is close to diaphragm wall;
(3) when reinforced concrete waist rail reinforcing bar system peace finish the back in the reinforced concrete waist rail centre pvc pipe by 2 meters pre-buried Φ 100 of spacing, as the reinforced concrete waist rail detaching hole for hoist, press 2 meters pre-buried 14 i iron of spacing in 1/3rd positions, the outer limit of reinforced concrete waist rail, 14 i iron length 60cm, imbed 40cm in the reinforced concrete waist rail concrete, 20cm stretches out outside the reinforced concrete waist rail;
(4) before the reinforced concrete waist rail concreting, fill up the pvc pipe hole closely knit with fine sand;
(5) when will removing, reinforced concrete waist rail below reinforced concrete waist rail, uses Φ 48 steel pipe proping bearing bar concrete breast beams, and water flushing pvc pipe hole;
(6) the Φ 100PVC pore of reserving with steel wire penetrating hangs tight reinforced concrete waist rail, reinforced concrete waist rail is cut off by 4 meters one section with cutting machine;
(7) cut the horizontal connecting reinforcement that cuts off reinforced concrete waist rail and diaphragm wall from semicircle Φ 160PVC pore with oxygen-acetylene, withstand on pre-buried 14 i iron with two jack, two jack slowly eject reinforced concrete waist rail simultaneously;
(8) hang outside the foundation ditch with crane or straddle truck after reinforced concrete waist rail and diaphragm wall break away from fully.