CN204898672U - Discard device of pulling out of pile foundation - Google Patents

Discard device of pulling out of pile foundation Download PDF

Info

Publication number
CN204898672U
CN204898672U CN201520642151.7U CN201520642151U CN204898672U CN 204898672 U CN204898672 U CN 204898672U CN 201520642151 U CN201520642151 U CN 201520642151U CN 204898672 U CN204898672 U CN 204898672U
Authority
CN
China
Prior art keywords
machine
pile foundation
pull out
reaction frame
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520642151.7U
Other languages
Chinese (zh)
Inventor
武建军
柯冬法
易卫东
施迪峰
王树高
李宝柱
傅海明
蒋传兵
俞剑辉
蒋金宛
胡日升
陆杭平
林小攀
黄福青
黄磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Xinya Construction Co Ltd
Original Assignee
Ningbo Xinya Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Xinya Construction Co Ltd filed Critical Ningbo Xinya Construction Co Ltd
Priority to CN201520642151.7U priority Critical patent/CN204898672U/en
Application granted granted Critical
Publication of CN204898672U publication Critical patent/CN204898672U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model provides a discard device of pulling out of pile foundation includes the reaction frame, pushes up the machine that pulls out, the top pull out the machine and constitute by staple bolt and perpendicular jack, its characterized in that, the top pull out the machine wale perpendicular jack through the staple bolt, the top pull out lay on the machine reaction frame and with wait to pull out pile foundation welded steel. Wait to pull out the pile foundation both sides and lay the road bed board, the top pull out the machine and install on the road bed board. The reaction frame cross -section be I -shapedly. The utility model discloses beneficial effect: utilizing ground to link wall fore shaft nose and pulling out the machine, need not use large -scale professional equipment, no equipment advances the fee for showing up, reduces construction cost. Especially to only pulling out a small amount of several when abolishing pile foundations, can greatly reduced construction cost.

Description

A kind of plucking device of waste pile
Art
The utility model relates to a kind of pile foundation plucking device.
Background technology
The full circle swinging engineering method obstacle cleaning machine of usual pile pulling or water jetting pile pulling, these 2 kinds of construction technologies all need large-scale special equipment of marching into the arena, only to enter fee for showing up just very high for special equipment, construction construction cost is higher, particularly for only need to pull out on a small quantity several abolish pile foundation time, often equipment enters fee for showing up just far away higher than practice of construction cost.
Utility model content
In order to solve the problem, the utility model utilizes ground-connecting-wall locking notch pipe to pull machine, uses reaction frame, jack, 80T mobile crane to extract pile foundation successively, does not need to use large-scale special equipment, reduces construction cost.
The utility model solves the technical scheme that its technical problem adopts
A kind of plucking device of waste pile comprises reaction frame, pulls machine, the described machine that pulls is made up of with vertical jack anchor ear, it is characterized in that, the described machine that pulls wales vertical jack by anchor ear, described pull machine lays reaction frame and with pile foundation reinforcement welding to be pulled out.Pile foundation both sides to be pulled out roadbed paving plate, the described machine of pulling is arranged on base board.Described reaction frame cross section is I-shaped.
The utility model beneficial effect
Utilize ground-connecting-wall locking notch pipe to pull machine, do not need to use large-scale special equipment, enter fee for showing up without equipment, reduce construction cost.Particularly for only need to pull out on a small quantity several abolish pile foundation time, greatly can reduce construction cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model pile body when not extracting;
Fig. 2 is the structural representation after the utility model pile body extracts 2-3 rice.
Detailed description of the invention
A kind of plucking device of waste pile comprises reaction frame 1, pulls machine, the described machine that pulls is made up of with vertical jack 2 anchor ear 3, it is characterized in that, the described machine that pulls wales vertical jack 2 by anchor ear 3, described pull machine lays reaction frame 1 and with pile foundation 5 reinforcement welding to be pulled out.Pile foundation both sides to be pulled out roadbed paving plate 4, the described machine of pulling is arranged on base board 4.Described reaction frame 1 cross section is I-shaped, and this structure is more firm.
Pile foundation to be pulled out digs out anchor bar, and anchor bar all welds same specification reinforcing bar spreading.The long 60# i iron of 6m is utilized to make reaction frame 1.Stake both sides roadbed paving plate 4, to improve bearing capacity of foundation soil, base board 4 is placed ground-connecting-wall locking notch pipe and is pulled machine, pulls and machine lays reaction frame and welds with the new connecting reinforcement of pile foundation to be pulled out, then jacking reaction frame pulls out pile foundation 5 to be pulled out.When locking notch pipe pull the vertical jack 2 of machine reach range can not jacking time, oil return pad establishes support member, jacking again, so circulate jacking, and gradation jacking to pile foundation stake 5 body to be pulled out bassets 2-3 rice.
After pile body bassets 2-3 rice, recycling pulls the horizontal 150T jack 2 of 2, machine and promotes anchor ear and embrace jail pile foundation to be pulled out, and recycling pulls 2, machine vertical 150T jack, 2 liters, top pile foundation 5 to be pulled out.Use 80 tons of mobile cranes to hang pile body, guarantee that when jack 2 oil return pile body is stablized, the machine gradation of pulling pulls, and final pile body just has after being all unearthed, and completes pile pulling.
When jack cannot go up pile pulling base 5, adopt jet grouting pile driving machine spray pressure-air+high-pressure water cutting old stake position surrounding soil, reduce frictional force in side-pile, dark 2 meters of depth of cut ratio pile foundation to be pulled out, every 4 points of around constructing.

Claims (3)

1. the plucking device of a waste pile, comprise reaction frame, pull machine, the described machine that pulls is made up of with vertical jack anchor ear, it is characterized in that, the described machine that pulls wales vertical jack by anchor ear, described pull machine lays reaction frame and with pile foundation reinforcement welding to be pulled out.
2. the plucking device of a kind of waste pile as claimed in claim 1, is characterized in that, pile foundation both sides to be pulled out roadbed paving plate, described in the machine of pulling be arranged on base board.
3. the plucking device of a kind of waste pile as claimed in claim 1, is characterized in that, described reaction frame cross section is I-shaped.
CN201520642151.7U 2015-08-20 2015-08-20 Discard device of pulling out of pile foundation Expired - Fee Related CN204898672U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520642151.7U CN204898672U (en) 2015-08-20 2015-08-20 Discard device of pulling out of pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520642151.7U CN204898672U (en) 2015-08-20 2015-08-20 Discard device of pulling out of pile foundation

Publications (1)

Publication Number Publication Date
CN204898672U true CN204898672U (en) 2015-12-23

Family

ID=54920861

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520642151.7U Expired - Fee Related CN204898672U (en) 2015-08-20 2015-08-20 Discard device of pulling out of pile foundation

Country Status (1)

Country Link
CN (1) CN204898672U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836223A (en) * 2017-04-11 2017-06-13 国强建设集团有限公司 A kind of pile extracting method
CN108266144A (en) * 2018-02-08 2018-07-10 浙江绩丰岩土技术股份有限公司 It is a kind of to pull system and its application method for multiaxis drilling rod
CN108330973A (en) * 2018-02-02 2018-07-27 无锡地铁集团有限公司 Pile pulling device under low clearance height and quick pile extracting method
CN110424393A (en) * 2019-08-28 2019-11-08 天津建岩岩土工程有限公司 Discarded stake pull-up and its method
CN115030158A (en) * 2022-05-27 2022-09-09 中铁第六勘察设计院集团有限公司 Assembly type device for lifting large-diameter cast-in-place pile and green construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836223A (en) * 2017-04-11 2017-06-13 国强建设集团有限公司 A kind of pile extracting method
CN106836223B (en) * 2017-04-11 2022-06-21 国强建设集团有限公司 Pile pulling method
CN108330973A (en) * 2018-02-02 2018-07-27 无锡地铁集团有限公司 Pile pulling device under low clearance height and quick pile extracting method
CN108266144A (en) * 2018-02-08 2018-07-10 浙江绩丰岩土技术股份有限公司 It is a kind of to pull system and its application method for multiaxis drilling rod
CN110424393A (en) * 2019-08-28 2019-11-08 天津建岩岩土工程有限公司 Discarded stake pull-up and its method
CN115030158A (en) * 2022-05-27 2022-09-09 中铁第六勘察设计院集团有限公司 Assembly type device for lifting large-diameter cast-in-place pile and green construction method

Similar Documents

Publication Publication Date Title
CN204898672U (en) Discard device of pulling out of pile foundation
CN101509261B (en) Method for pile plate base for ultra-high voltage electric power line steel tower on soft foundation
CN104179204B (en) Building contiguous deep foundation ditch basis pile underpinning method
CN201232194Y (en) Anti-deformation power transmission tower
CN101718098B (en) Micro-pile combined dug composite foundation and construction method thereof
CN201172830Y (en) Anchor rod static-pressing pile foundation in tower crane
CN202689009U (en) Steel sheet pile and tubular pile combined foundation pit supporting structure
CN101691760B (en) Composite foundation combining anchor rods with excavation and construction method thereof
CN202247942U (en) Overhanging type lifter foundation
CN203741848U (en) Steel tube plate type retaining structure
CN204780975U (en) A four return circuit terminal steel pipe poles are drawn and are dug compound basis of anchor log for medium voltage electric distribution circuit
CN210106749U (en) Counter-force structure of soft soil foundation super large section push pipe jacking operation
CN204282388U (en) A kind of pile foundation reinforcement structure adopting compound pile to construct
CN208803460U (en) A kind of enhancing cement mixing method intercepts water the Prefabricated Concrete sheet pile of effect
CN201502065U (en) Anchor rod joint excavation compound basis
CN204199296U (en) Based on the foundation pit supporting construction of old outer wall of basement structure
CN106498957A (en) Steel sheet pile cofferdam construction platform and integral construction method
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile
CN203099080U (en) Protecting device of buried gas pipeline
CN201588222U (en) Superposed digging/embedding foundation
CN103274329B (en) A kind of top draws jack for the construction method of pile-anchor retaining
CN102155015A (en) Barbed implanted steel pipe anchor rod
CN100591861C (en) Stirring pile pit supporting construction
CN201162217Y (en) Construction equipment for concrete pedestal pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151223

Termination date: 20190820