CN115788782A - A floating wind turbine offshore installation process - Google Patents
A floating wind turbine offshore installation process Download PDFInfo
- Publication number
- CN115788782A CN115788782A CN202211595550.3A CN202211595550A CN115788782A CN 115788782 A CN115788782 A CN 115788782A CN 202211595550 A CN202211595550 A CN 202211595550A CN 115788782 A CN115788782 A CN 115788782A
- Authority
- CN
- China
- Prior art keywords
- floating
- mooring
- floating platform
- foundation
- fan
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/727—Offshore wind turbines
Landscapes
- Wind Motors (AREA)
Abstract
Description
技术领域technical field
本发明涉及海洋工程技术领域,具体来说,涉及一种漂浮式风机海上安装工艺。The invention relates to the technical field of ocean engineering, in particular to an offshore installation process for a floating fan.
背景技术Background technique
海上风力发电是世界上快速发展的绿色能源技术,我国也在不断加快海上风电的投入及开发力度。特别是漂浮式海上风机的发展迅猛,大型漂浮式风机正在不断涌现。但漂浮式风机的高效、安全的安装运输问题一直是工程施工的一个难点。因此长距离的海上运输,通常是浮式浮台基础与风机分体运输,然后到达目的地进行风机的海上安装,最后运送到风场定位系泊。因此风机的海上安装是整个施工工程的一个难点也是关键点。现有的技术方案有的是在浅水区建造基础,将浮式浮台基础在浅水区坐底。因此对基础的建造提出了很高的要求,且施工周期长,环境要求限制多。Offshore wind power generation is a rapidly developing green energy technology in the world, and my country is also accelerating the investment and development of offshore wind power. In particular, the development of floating offshore wind turbines is rapid, and large floating wind turbines are emerging. However, the efficient and safe installation and transportation of floating wind turbines has always been a difficult point in engineering construction. Therefore, for long-distance sea transportation, the foundation of the floating platform and the wind turbine are usually transported separately, and then they arrive at the destination for offshore installation of the wind turbine, and finally transported to the wind field for positioning and mooring. Therefore, the offshore installation of the wind turbine is a difficult and also a key point of the entire construction project. Existing technical schemes have a lot of building foundations in shallow water areas, and the floating floating platform foundation is placed on the bottom in shallow water areas. Therefore, high requirements are put forward for the construction of the foundation, and the construction period is long, and the environmental requirements are more restrictive.
针对相关技术中的问题,目前尚未提出有效的解决方案。Aiming at the problems in the related technologies, no effective solution has been proposed yet.
发明内容Contents of the invention
针对相关技术中的问题,本发明提出一种漂浮式风机海上安装工艺,以克服现有相关技术所存在的上述技术问题。Aiming at the problems in the related technologies, the present invention proposes an offshore installation process for floating wind turbines to overcome the above-mentioned technical problems in the existing related technologies.
为此,本发明采用的具体技术方案如下:For this reason, the concrete technical scheme that the present invention adopts is as follows:
一种漂浮式风机海上安装工艺,包括以下步骤:An offshore installation process for a floating wind turbine, comprising the following steps:
预制好的海底系重块提前坐底于安装海域,上部连接张力缆,张力缆上部连接浮球一形成垂直张力系统;The prefabricated submarine system weights sit on the bottom of the installation sea area in advance, the upper part is connected to the tension cable, and the upper part of the tension cable is connected to the floating ball to form a vertical tension system;
同样提前铺设多组锚桩,锚桩上连接有系泊锚链,系泊锚链底部设有若干个配重,系泊锚链的上端与引缆连接,引缆的上端与浮球二连接,进而形成系泊单元,多个系泊单元形成临时系泊系统;Also lay multiple groups of anchor piles in advance, the mooring anchor chains are connected to the anchor piles, several counterweights are arranged at the bottom of the mooring anchor chains, the upper end of the mooring anchor chains is connected with the leading cable, and the upper end of the leading cable is connected with the second floating ball , and then form a mooring unit, and multiple mooring units form a temporary mooring system;
浮台基础由通用三用工程船拖运到安装海域后,就位后,对浮台基础压载,然后,将临时系泊系统上的多个系泊单元连接在浮台基础上;After the foundation of the floating platform is towed by the general-purpose three-purpose engineering ship to the installation sea area, after it is in place, the foundation of the floating platform is ballasted, and then multiple mooring units on the temporary mooring system are connected to the foundation of the floating platform;
将海底系重块与浮台基础连接,然后对浮台基础排载,在满足安装海域海况下,浮台基础不产生升沉,同时要满足风机安装到浮台基础上后要求的吃水深度;Connect the weight of the seabed system to the foundation of the floating platform, and then discharge the load on the foundation of the floating platform. Under the conditions of the installation sea area, the foundation of the floating platform will not heave, and at the same time, it must meet the required draft after the fan is installed on the foundation of the floating platform;
收紧浮台基础周围的临时锚缆系泊单元,完成对浮台基础的定位;Tighten the temporary mooring unit around the foundation of the floating platform to complete the positioning of the foundation of the floating platform;
漂浮式风机其余部件运输到位后,通过自升式风电安装平台将风机吊装到浮台基础进行安装;After the remaining parts of the floating wind turbine are transported in place, the wind turbine is hoisted to the foundation of the floating platform through the self-elevating wind power installation platform for installation;
风机安装完成后,对浮式风机进行压载,解除系泊单元和海底系重块;After the installation of the wind turbine is completed, ballast the floating wind turbine, and release the mooring unit and the bottom mooring weight;
通过三用工程船缓慢拖带整体浮式风机,离开到安全区域,而后拖带到风场址就位。Slowly tow the integral floating wind turbine by the three-purpose engineering ship, leave it to a safe area, and then tow it to the wind site and put it in place.
优选的,所述风机在浮台基础上安装的过程中,所述自升式风电安装平台可以选择整体吊装或分体吊装两种安装方式中的一种。Preferably, during the installation of the wind turbine on the foundation of the floating platform, the self-elevating wind power installation platform can choose one of the two installation methods of integral hoisting or split hoisting.
优选的,所述浮台基础上设有三个立柱,所述垂直张力单元与所述系泊单元两者均与所述立柱对应相连。Preferably, the foundation of the floating platform is provided with three uprights, and both the vertical tension unit and the mooring unit are correspondingly connected to the uprights.
本发明的有益效果为:The beneficial effects of the present invention are:
海底系重块为钢筋混凝土结构,其目的在于降低施工成本;The submarine weight is a reinforced concrete structure, the purpose of which is to reduce construction costs;
浮球一的作用在于张力缆与浮台基础连接时,便于打捞;The function of the first floating ball is to facilitate salvage when the tension cable is connected to the foundation of the floating platform;
引缆的作用在于浮台基础定位时辅助拉紧锚链;The function of the leading cable is to assist in tensioning the anchor chain when the foundation of the floating platform is positioned;
浮球二的作用在于当锚链与浮台基础连接时便于打捞以及调节锚链的张力及角度;The function of the second floating ball is to facilitate salvage and adjust the tension and angle of the anchor chain when the anchor chain is connected to the foundation of the floating platform;
配重的作用在于调节锚链的重量及角度,锚桩的作用在于使锚链与海底相连为锚链提供足够的抓地力;The role of the counterweight is to adjust the weight and angle of the anchor chain, and the role of the anchor pile is to connect the anchor chain to the seabed to provide sufficient grip for the anchor chain;
三条三用工程船的作用:一是拖运浮台基础,二是当浮台基础进入安装海域后辅助临时定位浮台基础。The functions of the three three-purpose engineering ships: one is to tow the foundation of the floating platform, and the other is to assist in temporarily positioning the foundation of the floating platform when the foundation of the floating platform enters the installation sea area.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the accompanying drawings required in the embodiments. Obviously, the accompanying drawings in the following description are only some of the present invention. Embodiments, for those of ordinary skill in the art, other drawings can also be obtained based on these drawings without any creative effort.
图1是根据本发明实施例的一种漂浮式风机海上安装工艺的整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of a floating fan offshore installation process according to an embodiment of the present invention;
图2是根据本发明实施例的一种漂浮式风机海上安装工艺中的垂直张力系统和临时系泊系统位置关系结构示意图;Fig. 2 is a schematic structural diagram of the positional relationship between the vertical tension system and the temporary mooring system in the offshore installation process of a floating wind turbine according to an embodiment of the present invention;
图3是根据本发明实施例的一种漂浮式风机海上安装工艺中的垂直张力系统的单组张力单元结构示意图;Fig. 3 is a schematic structural diagram of a single group of tension units of a vertical tension system in a floating wind turbine offshore installation process according to an embodiment of the present invention;
图4是根据本发明实施例的一种漂浮式风机海上安装工艺中的临时临时系泊系统的单组系泊单元结构示意图;4 is a schematic structural diagram of a single group of mooring units of a temporary temporary mooring system in a floating wind turbine offshore installation process according to an embodiment of the present invention;
图5是根据本发明实施例的一种漂浮式风机海上安装工艺的风机基础拖运过程示意图;Fig. 5 is a schematic diagram of the wind turbine foundation hauling process of a floating wind turbine offshore installation process according to an embodiment of the present invention;
图6是根据本发明实施例的一种漂浮式风机海上安装工艺为浮台基础的辅助系泊定位结构示意图;Fig. 6 is a schematic diagram of an auxiliary mooring positioning structure for a floating platform foundation in an offshore installation process of a floating wind turbine according to an embodiment of the present invention;
图7是根据本发明实施例的一种漂浮式风机海上安装工艺的风机吊装安装过程示意图;Fig. 7 is a schematic diagram of the fan hoisting and installation process of a floating fan offshore installation process according to an embodiment of the present invention;
图8是根据本发明实施例的一种漂浮式风机海上安装工艺的步骤流程示意图。Fig. 8 is a schematic flowchart of a process for offshore installation of a floating wind turbine according to an embodiment of the present invention.
图中:In the picture:
1、风机;2、浮台基础;3、垂直张力系统;31、垂直张力单元;311、海底系重块;3111、吊挂装置;312、张力缆;313、浮球一;4、临时系泊系统;41、系泊单元;411、系泊锚链;412、引缆;413、浮球二;414、配重;415、锚桩;5、三用工程船;6、自升式风电安装平台。1. Fan; 2. Floating platform foundation; 3. Vertical tension system; 31. Vertical tension unit; 311. Submarine heavy block; 3111. Hanging device; 312. Tension cable; 313. Floating ball one; 4. Temporary system Mooring system; 41. Mooring unit; 411. Mooring anchor chain; 412. Leading cable; 413. Two floating balls; 414. Counterweight; 415. Anchor pile; 5. Three-purpose engineering ship; 6. Jack-up wind power Install the platform.
具体实施方式Detailed ways
为进一步说明各实施例,本发明提供有附图,这些附图为本发明揭露内容的一部分,其主要用以说明实施例,并可配合说明书的相关描述来解释实施例的运作原理,配合参考这些内容,本领域普通技术人员应能理解其他可能的实施方式以及本发明的优点,图中的组件并未按比例绘制,而类似的组件符号通常用来表示类似的组件。In order to further illustrate the various embodiments, the present invention provides accompanying drawings, which are part of the disclosure of the present invention, and are mainly used to illustrate the embodiments, and can be used in conjunction with the relevant descriptions in the specification to explain the operating principles of the embodiments, for reference Those of ordinary skill in the art should be able to understand other possible implementations and advantages of the present invention. The components in the figures are not drawn to scale, and similar component symbols are generally used to represent similar components.
根据本发明的实施例,提供了一种漂浮式风机海上安装工艺。According to an embodiment of the present invention, an offshore installation process of a floating wind turbine is provided.
实施例一;Embodiment one;
如图1-8所示,本实施例包括:风机1、浮台基础2、垂直张力系统3以及临时系泊系统4。As shown in FIGS. 1-8 , this embodiment includes: a wind turbine 1 , a floating
本实施例浮台基础2为三立柱半潜式浮台基础,浮台基础2本身能完成压载下潜,排载上浮作业。The floating
本实施例垂直张力系统3包括3组垂直张力单元31,每组垂直张力单元31均与浮台基础2的立柱相连。The
本实施例临时系泊系统4包括3组系泊单元41,每组系泊单元41均与对应风机立柱相连。The temporary mooring system 4 of this embodiment includes 3 groups of
如图2所示,垂直张力系统3的根据风机1的三立柱结构配了3组垂直单元31;临时系泊系统4对应于风机1的三个立柱同样配了3组系泊单元41。As shown in Figure 2, the
如图3所示,每组垂直张力单元31包括1个海底系重块311及若干张力缆312及每根张力缆312顶部的浮球一313。张力缆312下部与海底系重块311相连,顶部与浮球一313相连。本实施例的海底系重块311为钢筋混凝土结构,其目的在于降低施工成本。浮球一313的作用在于张力缆312与浮台基础2连接时,便于打捞。As shown in FIG. 3 , each group of
如图4所示,临时系泊系统4的每组系泊单元41包括系泊锚链411、浮球二413、引缆412、配重414及锚桩415;锚链411上部与引缆412相连,引缆412上部与浮球二413相连,锚链411下部连接多组配重414,最底端与锚桩415相连,引缆412的作用在于浮台基础2定位时辅助拉紧锚链411;浮球二413的作用在于当锚链411与浮台基础2连接时便于打捞以及调节锚链411的张力及角度;配重414的作用在于调节锚链411的重量及角度;锚桩415的作用在于使锚链411与海底相连为锚链411提供足够的抓地力。As shown in Figure 4, each group of
如图5所示,浮台基础2拖运就位时,由3条三用工程船5共同完成;三条三用工程船5的作用为:一是拖运浮台基础2,二是当浮台基础2进入安装海域后辅助临时定位浮台基础2,三是海底系重块311可以与浮台基础2相连。As shown in Figure 5, when the floating
如图6所示,为浮台基础2的辅助系泊定位结构示意图。浮台基础2在垂直张力系统3和临时系泊系统4配合浮台基础2的浮力调节,实现了浮台基础2的定位,使浮台基础2满足风机吊装安装的条件。As shown in FIG. 6 , it is a schematic diagram of the auxiliary mooring positioning structure of the floating
如图7所示,为风机1的海上安装过程示意图。本实施例所使用的安装设备为自升式风电安装平台6,其特点是桩腿坐底固定,因此吊装平稳。其次起吊高度高,起吊重量大,能够实现对大功率风机的吊装安装。As shown in FIG. 7 , it is a schematic diagram of the offshore installation process of the wind turbine 1 . The installation equipment used in this embodiment is a self-elevating wind power installation platform 6, which is characterized in that the legs are fixed on the bottom, so the hoisting is stable. Secondly, the hoisting height is high and the hoisting weight is large, which can realize the hoisting and installation of high-power fans.
实施例二;Embodiment two;
如图1-7所示,根据本发明的实施例,还提供了一种漂浮式风机海上安装工艺,包括以下步骤;As shown in Figures 1-7, according to an embodiment of the present invention, an offshore installation process for a floating wind turbine is also provided, including the following steps;
步骤S1:见图2及图3,根据风机1的重量载荷、浮式浮台基础2的三立柱型式及整体尺寸,结合安装海域海况参数计算,将垂直张力单元31预先布置于海底,其安装位置在浮式浮台基础2的立柱下方;此时海底系重块311做底于海底定位,浮球一313牵引张力缆312位于海面上方。Step S1: As shown in Figure 2 and Figure 3, according to the weight load of the wind turbine 1, the type of three columns and the overall size of the floating
步骤S2:见图2及图4,根据风机1的重量载荷、浮式浮台基础2的三立柱型式及整体尺寸,结合安装海域海况参数计算,将临时系泊系统4的 3组系泊单元41预置于浮台基础2的每个立柱周围,此时,锚链411上端连接引缆412,引缆412上端连接浮球413,浮球413漂浮与海面上方,锚链411下部连接多组配重块411,锚链411的尾端连接锚桩415,锚桩415沉入海底。Step S2: see Figure 2 and Figure 4, according to the weight load of the wind turbine 1, the type of three columns and the overall size of the floating
步骤S3:见图5,浮式浮台基础2在三条三用工程船5进入安装海域,此时,已经安装好垂直张力系统3和临时系泊系统4。Step S3: As shown in Fig. 5, the floating
步骤S4:见图6,浮台基础2压载吃水,并用3条三用工程船5精确定位,然后,打捞浮球一313将3组垂直张力单元31的张力缆312与对应的浮式浮台基础2立柱连接并收紧。Step S4: see Fig. 6, the draft of the floating
步骤S5:见图6,打捞浮球二413,收紧引缆412,将3组系泊单元41的锚链411与浮台基础2对应立柱连接并收紧,调节浮球二413位置及每根锚链411的张力,减小浮台基础2水平方向内摆动幅度,使能满足风机1的向浮体基础2上安装的条件Step S5: As shown in Figure 6, salvage the second floating
步骤S6:见图6,浮台基础2排载增大浮力及张力缆312张力,满足消除浪涌对浮式浮台基础2的影响,并能满足风机1安装到浮式浮台基础2上后的吃水深度。Step S6: As shown in Figure 6, the floating
步骤S7:见图7,自升式风电安装平台6就位后,桩腿深处到海底定位,风机1运输到安装海域,自升式风电安装平台6将风机1吊装到定位好的浮台基础2上进行安装,图示为风机整体吊装状态图,根据风机1的重量及尺寸条件,也可选择分段吊装,完成安装。Step S7: As shown in Figure 7, after the self-elevating wind power installation platform 6 is in place, the pile legs are positioned deep in the seabed, the wind turbine 1 is transported to the installation sea area, and the self-elevating wind power installation platform 6 lifts the wind turbine 1 to the positioned floating platform Install on the
步骤S8:风机1完成安装后,浮台基础2压载,解除张力缆311和锚链411,安装好的风机1和浮台基础2即可由三用工程船5拖离安装海域到风场就位。Step S8: After the installation of the wind turbine 1 is completed, the foundation of the floating
实施例三;Embodiment three;
如图1-5所示,所述风机1在浮台基础2上安装的过程中,所述自升式风电安装平台6可以选择整体吊装或分体吊装两种安装方式中的一种;所述浮台基础2上设有三个立柱,所述垂直张力单元31与所述系泊单元41两者均与所述立柱对应相连。As shown in Figures 1-5, during the installation process of the fan 1 on the floating
综上所述,借助于本发明的上述技术方案,海底系重块311为钢筋混凝土结构,其目的在于降低施工成本,海底系重块311采用钢筋混凝土结构,钢筋混凝土结构系重块可提前预制,运输到安装海域后,沉入安装海域指定位置,系重块自身自带吊挂装置3111,能够承受自身重力载荷,便于吊装、安装方便,并可系挂张力缆312。当然任意满足重量及系固要求的其他重物都可作为系重块使用;In summary, with the help of the above technical solution of the present invention, the
浮球一313的作用在于张力缆312与浮台基础2连接时,便于打捞;The effect of the floating
引缆412的作用在于浮台基础2定位时辅助拉紧锚链411;The function of the
浮球二413的作用在于当锚链411与浮台基础2连接时便于打捞以及调节锚链411的张力及角度;The function of the second floating
配重414的作用在于调节锚链411的重量及角度,锚桩415的作用在于使锚链411与海底相连为锚链411提供足够的抓地力;The role of the
三条三用工程船5的作用:一是拖运浮台基础2,二是当浮台基础2进入安装海域后辅助临时定位浮台基础2。The functions of the three three-
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the scope of the present invention. within the scope of protection.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211595550.3A CN115788782A (en) | 2022-12-13 | 2022-12-13 | A floating wind turbine offshore installation process |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211595550.3A CN115788782A (en) | 2022-12-13 | 2022-12-13 | A floating wind turbine offshore installation process |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115788782A true CN115788782A (en) | 2023-03-14 |
Family
ID=85419556
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211595550.3A Pending CN115788782A (en) | 2022-12-13 | 2022-12-13 | A floating wind turbine offshore installation process |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115788782A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116443197A (en) * | 2023-05-18 | 2023-07-18 | 国华能源投资有限公司 | Floating type offshore photovoltaic platform |
| CN116620514A (en) * | 2023-03-30 | 2023-08-22 | 大连理工大学 | Method for Batch Assembly and Transportation of Supporting Structure for Floating Offshore Wind Power Equipment |
| CN117028157A (en) * | 2023-10-09 | 2023-11-10 | 中国电力工程顾问集团有限公司 | Installation method of mud floating offshore wind turbine system |
| CN117028159A (en) * | 2023-10-09 | 2023-11-10 | 中国电力工程顾问集团有限公司 | Transportation method and working height adjustment method of mud-floating offshore wind turbine system |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106638651A (en) * | 2016-12-29 | 2017-05-10 | 江苏海上龙源风力发电有限公司 | Sea fan buoyant foundation integral installing technology |
| CN107697238A (en) * | 2017-09-25 | 2018-02-16 | 中国海洋石油总公司 | A kind of dry tree semi-submerged platform of deep water floating type multifunctional and its offshore installation method |
| CN107738730A (en) * | 2017-09-06 | 2018-02-27 | 哈尔滨工业大学深圳研究生院 | A kind of three column semi-submersible type offshore wind turbine foundations |
| CN207998856U (en) * | 2018-01-14 | 2018-10-23 | 龙源黄海如东海上风力发电有限公司 | A kind of offshore wind turbine buoyant foundation |
| CN110671280A (en) * | 2019-10-16 | 2020-01-10 | 上海电气风电集团股份有限公司 | Floating type fan foundation |
| CN111765049A (en) * | 2020-07-10 | 2020-10-13 | 大连理工大学 | Structure and method of use for wind turbine replacement in reservoirs or lakes |
| CN212454692U (en) * | 2020-07-10 | 2021-02-02 | 上海电气风电集团股份有限公司 | Floating type fan foundation and wind driven generator |
| CN113955029A (en) * | 2021-11-03 | 2022-01-21 | 长江勘测规划设计研究有限责任公司 | Shallow water floating type fan mooring system on sea |
| CN216034989U (en) * | 2021-09-27 | 2022-03-15 | 长江勘测规划设计研究有限责任公司 | Semi-submersible type floating fan foundation and shallow water mooring system |
| CN114604379A (en) * | 2022-03-28 | 2022-06-10 | 中海石油(中国)有限公司 | Semi-submersible floating type fan foundation with anti-collision isolation cabin on stand column |
| CN114771759A (en) * | 2022-05-12 | 2022-07-22 | 中海石油(中国)有限公司 | Buoyancy eccentric semi-submerged floating type fan foundation suitable for large megawatt unit |
| CN115929561A (en) * | 2022-12-13 | 2023-04-07 | 研海能源科技(上海)有限公司 | An auxiliary mooring positioning device for offshore installation of floating wind turbines |
-
2022
- 2022-12-13 CN CN202211595550.3A patent/CN115788782A/en active Pending
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106638651A (en) * | 2016-12-29 | 2017-05-10 | 江苏海上龙源风力发电有限公司 | Sea fan buoyant foundation integral installing technology |
| CN107738730A (en) * | 2017-09-06 | 2018-02-27 | 哈尔滨工业大学深圳研究生院 | A kind of three column semi-submersible type offshore wind turbine foundations |
| CN107697238A (en) * | 2017-09-25 | 2018-02-16 | 中国海洋石油总公司 | A kind of dry tree semi-submerged platform of deep water floating type multifunctional and its offshore installation method |
| CN207998856U (en) * | 2018-01-14 | 2018-10-23 | 龙源黄海如东海上风力发电有限公司 | A kind of offshore wind turbine buoyant foundation |
| CN110671280A (en) * | 2019-10-16 | 2020-01-10 | 上海电气风电集团股份有限公司 | Floating type fan foundation |
| CN111765049A (en) * | 2020-07-10 | 2020-10-13 | 大连理工大学 | Structure and method of use for wind turbine replacement in reservoirs or lakes |
| CN212454692U (en) * | 2020-07-10 | 2021-02-02 | 上海电气风电集团股份有限公司 | Floating type fan foundation and wind driven generator |
| CN216034989U (en) * | 2021-09-27 | 2022-03-15 | 长江勘测规划设计研究有限责任公司 | Semi-submersible type floating fan foundation and shallow water mooring system |
| CN113955029A (en) * | 2021-11-03 | 2022-01-21 | 长江勘测规划设计研究有限责任公司 | Shallow water floating type fan mooring system on sea |
| CN114604379A (en) * | 2022-03-28 | 2022-06-10 | 中海石油(中国)有限公司 | Semi-submersible floating type fan foundation with anti-collision isolation cabin on stand column |
| CN114771759A (en) * | 2022-05-12 | 2022-07-22 | 中海石油(中国)有限公司 | Buoyancy eccentric semi-submerged floating type fan foundation suitable for large megawatt unit |
| CN115929561A (en) * | 2022-12-13 | 2023-04-07 | 研海能源科技(上海)有限公司 | An auxiliary mooring positioning device for offshore installation of floating wind turbines |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116620514A (en) * | 2023-03-30 | 2023-08-22 | 大连理工大学 | Method for Batch Assembly and Transportation of Supporting Structure for Floating Offshore Wind Power Equipment |
| CN116620514B (en) * | 2023-03-30 | 2023-10-24 | 大连理工大学 | Method for batch assembly and transportation of floating type offshore wind power equipment supporting structure |
| CN116443197A (en) * | 2023-05-18 | 2023-07-18 | 国华能源投资有限公司 | Floating type offshore photovoltaic platform |
| CN117028157A (en) * | 2023-10-09 | 2023-11-10 | 中国电力工程顾问集团有限公司 | Installation method of mud floating offshore wind turbine system |
| CN117028159A (en) * | 2023-10-09 | 2023-11-10 | 中国电力工程顾问集团有限公司 | Transportation method and working height adjustment method of mud-floating offshore wind turbine system |
| CN117028159B (en) * | 2023-10-09 | 2023-12-08 | 中国电力工程顾问集团有限公司 | Method for transporting mud floating type offshore wind turbine system and method for adjusting working height |
| CN117028157B (en) * | 2023-10-09 | 2023-12-15 | 中国电力工程顾问集团有限公司 | Method for installing mud floating type offshore wind turbine system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN111661273B (en) | Installation and construction method of a deep-sea semi-submersible fan | |
| CN103332269B (en) | Backpack complete offshore wind power machine transport installation ship | |
| CN108016575B (en) | Floating type fan and TLP platform transportation and installation integrated ship and transportation and installation method thereof | |
| CN206071798U (en) | Wind turbines marine transportation installation ship | |
| CN111469993A (en) | Self-installation floating type fan foundation anchored by bucket foundation and self-installation method | |
| CN105151236B (en) | Floating pier and tower type submersible floating mobile carrying platform device and working method thereof | |
| CN107021190A (en) | Can be from the floating tension leg type offshore floating wind turbine foundation installed and its installation method | |
| CN207089600U (en) | Can be from the tension leg type offshore floating wind turbine foundation of floating installation | |
| CN103422483B (en) | The method that the floating holder of shallow water jacket is installed | |
| EP3209548B1 (en) | Method for transporting a buoyant structure with a vessel, and the vessel associated with the method | |
| CN112726548B (en) | Construction method for split jacket foundation of deep-open sea converter station | |
| CN208085949U (en) | A kind of floating wind turbine and TLP platforms transport installation integrated ship | |
| WO2023156474A1 (en) | A method and system of installing a floating foundation, assembly of floating foundation and ballasting frame, and ballasting frame | |
| JP2012112370A (en) | Ship for installing offshore wind turbine and method for installing offshore wind turbine using the same | |
| CN115285317A (en) | Offshore wind turbine-foundation integrated installation vessel and installation method | |
| CN115929561A (en) | An auxiliary mooring positioning device for offshore installation of floating wind turbines | |
| CN104554639A (en) | Installation equipment for large offshore wind power equipment | |
| CN102923261A (en) | A bottom-mounted offshore wind turbine installation barge | |
| CN106638530A (en) | Process for lifting offshore booster station jacket in shallow water | |
| CN212243734U (en) | Self-installation floating type fan foundation anchored by bucket foundation | |
| HK1213532A1 (en) | A specified lifting and piling barge for cellular arc cell construction | |
| CN102206938A (en) | Novel method for installing upper part block of offshore platform | |
| CN204456044U (en) | Mixing floating offshore booster station structure | |
| CN115258092A (en) | Integral installation method of floating type water photovoltaic | |
| CN115432599A (en) | Overwater photovoltaic integral installation method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |