CN108360521A - The method for removing offshore platform pile foundation is pulled out in a kind of torsion - Google Patents

The method for removing offshore platform pile foundation is pulled out in a kind of torsion Download PDF

Info

Publication number
CN108360521A
CN108360521A CN201810211739.5A CN201810211739A CN108360521A CN 108360521 A CN108360521 A CN 108360521A CN 201810211739 A CN201810211739 A CN 201810211739A CN 108360521 A CN108360521 A CN 108360521A
Authority
CN
China
Prior art keywords
pile foundation
offshore platform
tugboat
torsion
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810211739.5A
Other languages
Chinese (zh)
Other versions
CN108360521B (en
Inventor
王腾
张玉哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
Original Assignee
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China filed Critical China University of Petroleum East China
Priority to CN201810211739.5A priority Critical patent/CN108360521B/en
Publication of CN108360521A publication Critical patent/CN108360521A/en
Application granted granted Critical
Publication of CN108360521B publication Critical patent/CN108360521B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • E02D9/02Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing

Abstract

The present invention provides the method for removing offshore platform pile foundation is pulled out in a kind of torsion, belong to offshore platform Demolishing Technology field.It avoids the disadvantage that imderwater cutting pile foundation task difficulty is big, risk is high, long in time limit, and offshore platform pile foundation is quickly and effectively removed on the water surface.This method for dismounting applies torque by long horizontal beam by sea-going tug to stake top, and the loop wheel machine on tugboat is combined to apply vertical uplift force, and entire pile foundation is extracted completely.The method of the present invention significantly reduces the twisting resistance applied using lever principle, while the torque and uplift force applied reduces the anti-pulling capacity of pile foundation.The method of the present invention includes following step:A, tugboat at the top of horizontal just beam and pile foundation by being connected;B, apply torsional moment in stake top;C, apply vertical tension in stake top.This method for dismounting has the advantages that entirely to extract pile foundation under smaller pulling force.

Description

The method for removing offshore platform pile foundation is pulled out in a kind of torsion
Technical field
The present invention relates to offshore platform demolition technique methods, especially the Demolishing Technology side of ocean offshore platform pile foundation Method.
Background technology
It is that the exploitation of China's offshore oil is made that there are up to a hundred jacket offshore platforms, these platforms in China marine site at present Significant contribution.Expire with being on active service, platform puts halt production aside as useless.It is provided in accordance with international practices with state's laws, stopping production, it is flat to put aside as useless Platform will be removed.International regulations pro-gaze jacket is all removed, and this mode requires discarded offshore platform pile foundation that should cut to Sea bed mud face 4m or less.The dismounting of jacket pile foundation is that longest, the maximum work of cost are taken in entire offshore platform demolishing process Journey.Which kind of Demolition Scheme no matter is taken, a large amount of imderwater cutting operation is always related to.Pile foundation is cut at 4m under mud line, is needed It to be required for blowing mud operation in the inside and outside patterning method of pile foundation, the former is in spud leg;The latter blows mud depth in the outside of spud leg Not less than 5m dells.Imderwater cutting mode is very limited, and operation difficulty is big, risk is high, and underwater when completing primary cutting Between it is longer, up to more than ten or twenties hours, be susceptible to engineering problem.
The dismounting that fast and effeciently carry out offshore platform pile foundation, avoid imderwater cutting Job Operations difficulty is big, risk is high, Disadvantage long in time limit, this patent propose to pull out the method for removing offshore platform pile foundation in a kind of torsion.This method is led to by sea-going tug Long horizontal beam applies torque to stake top, and the loop wheel machine on tugboat is combined to apply vertical uplift force, and entire pile foundation is pulled out completely Go out.This method Job Operations on the water surface, can significantly improve operating efficiency, have the advantages that completely reliable, short time limit.
Invention content
Research Literature shows:In the case that pile foundation bears twisting resistance and uplift force at the same time, anti-pulling capacity will be notable It reduces, applying smaller uplift force can integrally extract pile foundation.Its principle can be extracted by torsion grape wine stopper this One existence general knowledge explains that only applying pulling force, we are difficult to extract stopper, but if we apply pulling force while rotating, then very It is easy to extract stopper.
Based on this theoretical foundation, the present invention provides a kind of method pulled out in torsion and remove offshore platform pile foundation, this side Method can be applied to the Demolition Construction operation of offshore platform pile foundation scene, fast and effeciently extract pile foundation, meet the requirement of specification.
The method of the present invention includes following step:
A:Sea-going tug at the top of horizontal just beam and pile foundation by being connected
The horizontal just beam one end length 10m-20m is connected by flexural pivot with tugboat tail portion;The other end is fixed on water by fixture At the top of pile foundation on face;
B:Apply torsional moment
Tugboat applies torsional forces by horizontal just beam to pile foundation, and pile foundation is made to rotate;
C:Loop wheel machine applies vertical tension pile pulling to pile foundation
Loop wheel machine on tugboat is connected by wirerope with the lifting lug that stake top is arranged, and applies vertical uplift force to stake top, by pile foundation It is entire to extract.
Illustrate advantages of the present invention below according to the working mechanism of the present invention:This method operation on the water surface need not appoint What imderwater cutting operation improves operating efficiency;This method applies torque by long horizontal beam to pile foundation, is similar to and is twisted with spanner Turn nut, using lever principle, the arm of force is longer, and the twisting resistance of application is smaller.Example:When pile foundation radius (0.5m) and horizontal beam length When (10m) compares equal to 20, it is the 1/20 of pile foundation side-friction force so that pile foundation rotation is needed the twisting resistance applied;This method is right simultaneously Offshore platform pile foundation applies torque and uplift force, significantly reduces the vertically pulling-resistant bearing capacity of pile foundation, can be under smaller pulling force Pile foundation is entirely removed.
In short, the present invention provides a kind of method of economical and efficient for fast and effeciently removing for offshore platform pile foundation, profit It is significantly reduced pile foundation anti-pulling capacity with lever principle, the common torque and uplift force of applying and entire pile foundation demolition is avoided into water The technical barrier of lower cutting, good effect have substantive distinguishing features outstanding considerably beyond the prior art.
Description of the drawings
Fig. 1 is the schematic side view that the method for removing offshore platform pile foundation is pulled out in a kind of torsion of the present invention;
Fig. 2 is the schematic top plan view that the method for removing offshore platform pile foundation is pulled out in a kind of torsion of the present invention;
Specific implementation mode
The present invention is described in further detail below in conjunction with the accompanying drawings.
As shown in the figure:It is pulled out in a kind of torsion of the present invention in the method for removing offshore platform pile foundation, the rigid beam 2 of pile foundation 1, level, Tugboat 3, fixture 4, lifting lug 5, loop wheel machine 6, wirerope 7, flexural pivot 8.
The method for removing offshore platform pile foundation is pulled out in a kind of torsion of the present invention, is included the following steps:
A:Sea-going tug 3 is connected by horizontal just beam 2 with 1 top of pile foundation
The size of horizontal just beam 2 is determined according to the horsepower of the diameter of pile foundation 1 and side friction and existing tugboat 3, it is horizontal Rigid beam 2 is fixed on 1 top of pile foundation by fixture 4, and the other end is connected with flexural pivot 8 with 3 tail portion of tugboat;
B:Tugboat 3 applies torsional moment
Tugboat 3 applies torsional forces by horizontal just beam 2 to pile foundation 1, and pile foundation 1 is made to rotate;
C:Loop wheel machine 6 applies vertical tension pile pulling to pile foundation 1
Loop wheel machine 6 on tugboat is connected by wirerope 7 with the lifting lug 5 that stake top is arranged, and applies vertical tension to pile foundation 1.It is turning round Under the collective effect of square and pulling force, pile foundation 1 is byed entirely to extract while rotating.
The method for removing offshore platform pile foundation is pulled out in a kind of torsion of the present invention to turn round pile foundation collective effect using lever principle Square and pulling force significantly reduce the vertically pulling-resistant bearing capacity of pile foundation, can entirely extract pile foundation under smaller pulling force.The present invention A kind of method of economical and efficient is provided for the dismounting of offshore platform pile foundation.

Claims (5)

1. pulling out the method for removing offshore platform pile foundation in a kind of torsion, which is characterized in that include the following steps:
A:Sea-going tug (3) at the top of horizontal just beam (2) and pile foundation (1) by being connected
The size of horizontal just beam (2) is determined according to the diameter of pile foundation (1) and side friction and existing tugboat (3) horsepower, it is horizontal Rigid beam (2) is fixed on by fixture (4) at the top of pile foundation (1), and the other end is connected with flexural pivot (8) with tugboat (3) tail portion;
B:Tugboat (3) applies torsional moment
Tugboat (3) applies torsional forces by horizontal just beam (2) to pile foundation (1), and pile foundation (1) is made to rotate;
C:Loop wheel machine (6) applies vertical tension pile pulling to pile foundation (1)
Loop wheel machine (6) on tugboat is connected by wirerope (7) with the lifting lug (5) that stake top is arranged, and applies vertical tension to pile foundation (1), Byed entirely to extract while rotating by pile foundation (1) under the collective effect of torque and vertical tension.
2. pulling out the method for removing offshore platform pile foundation in a kind of torsion according to claim 1, which is characterized in that described The torsional moment that tugboat (3) applies pile foundation (1).
3. pulling out the method for removing offshore platform pile foundation in a kind of torsion according to claim 1, which is characterized in that described Pile foundation (1) while bearing torque and vertical tension.
4. pulling out the method for removing offshore platform pile foundation in a kind of torsion according to claim 1, which is characterized in that described Pile foundation (1) is pulled out in rotation.
5. pulling out the method for removing offshore platform pile foundation in a kind of torsion according to claim 1, which is characterized in that described Horizontal just beam (2) applies torsional moment as the arm of force.
CN201810211739.5A 2018-03-15 2018-03-15 Method for dismounting offshore platform pile foundation by twisting and pulling up Active CN108360521B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810211739.5A CN108360521B (en) 2018-03-15 2018-03-15 Method for dismounting offshore platform pile foundation by twisting and pulling up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810211739.5A CN108360521B (en) 2018-03-15 2018-03-15 Method for dismounting offshore platform pile foundation by twisting and pulling up

Publications (2)

Publication Number Publication Date
CN108360521A true CN108360521A (en) 2018-08-03
CN108360521B CN108360521B (en) 2021-07-06

Family

ID=63000319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810211739.5A Active CN108360521B (en) 2018-03-15 2018-03-15 Method for dismounting offshore platform pile foundation by twisting and pulling up

Country Status (1)

Country Link
CN (1) CN108360521B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101358452A (en) * 2007-07-30 2009-02-04 王薇 Construction method and construction equipment of total rotary rapid cutting barrier clearance and pile extracting
CN101858083A (en) * 2010-06-22 2010-10-13 天津第三市政公路工程有限公司 Low spatial pile pulling construction method and device of steel pipe pile in water
KR20120139895A (en) * 2011-06-20 2012-12-28 광명기업주식회사 Excavating agitation rod for piling with backfilling soil and method of piling thereof
CN103174141A (en) * 2013-03-26 2013-06-26 青岛宝基利工程技术咨询有限公司 Intertidal zone beam lower supporting frame steel pipe pile pulling-out device and method
CN205557520U (en) * 2016-04-11 2016-09-07 冯仁良 Novel pile -drawing machine
KR20160109674A (en) * 2015-03-12 2016-09-21 한국가스공사 Drawing apparatus for phc pile and drawing method for for phc pile thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101358452A (en) * 2007-07-30 2009-02-04 王薇 Construction method and construction equipment of total rotary rapid cutting barrier clearance and pile extracting
CN101858083A (en) * 2010-06-22 2010-10-13 天津第三市政公路工程有限公司 Low spatial pile pulling construction method and device of steel pipe pile in water
KR20120139895A (en) * 2011-06-20 2012-12-28 광명기업주식회사 Excavating agitation rod for piling with backfilling soil and method of piling thereof
CN103174141A (en) * 2013-03-26 2013-06-26 青岛宝基利工程技术咨询有限公司 Intertidal zone beam lower supporting frame steel pipe pile pulling-out device and method
KR20160109674A (en) * 2015-03-12 2016-09-21 한국가스공사 Drawing apparatus for phc pile and drawing method for for phc pile thereof
CN205557520U (en) * 2016-04-11 2016-09-07 冯仁良 Novel pile -drawing machine

Also Published As

Publication number Publication date
CN108360521B (en) 2021-07-06

Similar Documents

Publication Publication Date Title
CN206203754U (en) A kind of safe anchor winch peculiar to vessel
CN200985742Y (en) Wire cable pressurization hoisting type rotary digging drill
CN200985744Y (en) Spiral drilling type rotary digging drill
CN203814154U (en) Machine for digging holes during tree planting
CN201031390Y (en) Tools type enlarged footing plucking resistance pile
CN104863525A (en) Deep-hole spiral pile hammer
CN108360521A (en) The method for removing offshore platform pile foundation is pulled out in a kind of torsion
CN111005381A (en) Bottom-pocket type vibration hammer profile steel pile extractor and pile extracting method thereof
CN103373446A (en) Jacket removing ship and removing method
CN207260148U (en) Service sleeve pile crown integrally abolishes device
CN207277336U (en) A kind of locking device for playing concrete-pile with clearing
CN101713201A (en) Underground hole-forming device of hydraulic grab bucket
CN103174141A (en) Intertidal zone beam lower supporting frame steel pipe pile pulling-out device and method
CN205838317U (en) There is the torsion-bending ratio auxiliary hoisting device of orientation
CN102979465A (en) Multifunctional maritime workover rig and operation method thereof
CN208681474U (en) A kind of fluid pressure type piping lane anchorage core model inner circumferential fastener
CN203652080U (en) Trident type high speed icebreaker
CN101509265A (en) Pull-type soil shifter smoothing technique for soft foundation field and pull-type soil shifter
CN201180499Y (en) Apparatus for clearing soil adhered on auger stem
CN212452554U (en) Cement cleaning device in broken pick type ocean platform steel pile
CN201458627U (en) Traction structure of cable compression device
CN102815632A (en) Hoisting method during maintenance of main hinge point assembly of bridge of cutter suction dredger
CN203793570U (en) Anchoring device for floating dock
CN202544792U (en) Novel casing back-off positioning and finishing device
CN105110228A (en) Winch braking device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant