CN101850928A - 大型总段专用的稳定性桁架起吊工具 - Google Patents

大型总段专用的稳定性桁架起吊工具 Download PDF

Info

Publication number
CN101850928A
CN101850928A CN201010187948A CN201010187948A CN101850928A CN 101850928 A CN101850928 A CN 101850928A CN 201010187948 A CN201010187948 A CN 201010187948A CN 201010187948 A CN201010187948 A CN 201010187948A CN 101850928 A CN101850928 A CN 101850928A
Authority
CN
China
Prior art keywords
main frame
lifting tool
complete cross
frame
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201010187948A
Other languages
English (en)
Other versions
CN101850928B (zh
Inventor
王匀
李炳男
陈永明
张朝阳
庄建军
张永康
许桢英
唐盛弢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong COSCO Shipping Engineering Co., Ltd.
Jiangsu University
Original Assignee
Jiangsu University
Cosco Shipyard Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu University, Cosco Shipyard Group Co Ltd filed Critical Jiangsu University
Priority to CN2010101879484A priority Critical patent/CN101850928B/zh
Publication of CN101850928A publication Critical patent/CN101850928A/zh
Application granted granted Critical
Publication of CN101850928B publication Critical patent/CN101850928B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种大型总段专用的稳定性桁架起吊工具,包括四边形主框架和菱形内框架,菱形内框架由四根圆管组成,菱形内框架内切于外部主框架,每根圆管的中心处连接有两两垂直的支撑管的一端,支撑管的另一端连接在主框架上,且支撑管与所对应的主框架相垂直,主框架每个角的上下部分别安装相应吊耳,主框架每个角的上部分别安装两个用于起吊该桁架吊具的上吊耳,主框架每个角的下部分别安装一个用于吊挂被吊物的吊挂板,吊挂板下端两边布置两个吊挂环,吊挂板上端通过焊接固定于主框架上,四个吊挂板分别固定在主框架的两个长边的两端。本发明保持了整个吊运过程的稳定性,也使得各个吊点的受力比较均匀,保证了施工的安全性。

Description

大型总段专用的稳定性桁架起吊工具
技术领域:
本发明涉及吊机吊装工具,特指一种大型的总段专用的稳定性桁架起吊工具,适用于多数大型模块的吊运过程,稳定性强,安全可靠,适应性强。
背景技术:
目前,在工厂里,吊机吊运大型模块尤其是大而重的机构或模块时,通常采用单个大型吊机或是多个吊机同时作用来完成吊运过程,前者虽然稳定性好但吊钩少所分配的吊绳数目也较少且在吊运过程中各个吊点的受力不均匀,后者采用多个吊机同时吊运各个吊点受力比较均匀但由于多台吊机同时操作协调性差,使吊运过程的安全性降低,延长了工期,影响工厂效益。
发明内容:
本发明的目的是为了克服以上的不足,提供一种大型的总段专用的稳定性桁架起吊工具,使得吊机在吊运大而重的机构或模块时,既保持了整个吊运过程的稳定性也使得各个吊点的受力比较均匀,其中通过大型的总段专用的稳定性桁架起吊工具的八个吊挂环将吊机吊钩的力均匀施加到被吊物体上,使得分散后的各个吊点受力均匀,保证了施工的安全性。
本发明的目的通过以下技术方案来实现:一种大型总段专用的稳定性桁架起吊工具,起吊工具包括四边形主框架和菱形内框架,菱形内框架由四根圆管组成,菱形内框架内切于外部主框架,每根圆管的中心处连接有两两垂直的两个支撑管的一端,每两个支撑管的另一端分别连接在主框架的相邻边框上,且每个支撑管与所对应连接的主框架的边框相垂直,主框架每个角的上表面分别安装两个上吊耳,两个上吊耳相对于主框架对角线对称,主框架每个角的下部分别安装一个用于吊挂被吊物的吊挂板,吊挂板下端两边布置两个吊挂环,吊挂板上端通过焊接固定于主框架上,四个吊挂板分别固定在主框架的两个长边的两端。
本发明的进一步改进在于:主框架由底板、筋板和上板,底板上焊接筋板,筋板上焊接上板。
本发明的进一步改进在于:四根圆管分别通过弹性板与主框架相连接,弹性板插进主框架内,弹性板与主框架通过焊接连接,每根支撑管均通过弹性板与主框架连接,弹性板与主框架通过焊接连接。
本发明的进一步改进在于:两个上吊耳之间的距离为500mm-1000mm。
本发明的进一步改进在于:两个吊挂环之间的距离为1500mm-1800mm。
本发明的进一步改进在于:主框架四角处采用工字钢进行角加强。
本发明与现有技术相比具有以下有点:
1、在对大而重的机构或模块的吊装过程中,成功避免了由于吊点过少而带来的受力不均的问题,同时具有非常好的稳定性,安全性能高,经济效益好。
2、通过弹性板的设计,允许大型总段专用的稳定性桁架起吊工具有一定的变形量,提高了吊运过程的安全性以及对大型总段专用的稳定性桁架起吊工具的维护有一定的积极作用。
附图说明:
图1是本发明的俯视图;
图2是本发明的外部框架剖视图;
图3是本发明吊运时的侧视图;
图4是本发明中弹性板一种连接方式的结构示意图;
图5是本发明中弹性板另一种连接方式的结构示意图;
图6是本发明中外部框架下的吊挂板的结构示意图。
图中标号:1-大型总段专用的稳定性桁架起吊工具、2-外部框架、3-圆管、4-支撑管、5-上吊耳、6-工字钢、7-弹性板、8-连接索具、9-底板、10-筋板、11-上板、12-吊挂板、13-被吊物、14-加强筋板、15-吊挂环。
具体实施方式:
为了加深对本发明的理解,下面将结合实施例和附图对本发明作进一步详述,该实施例仅用于解释本发明,并不构成对本发明保护范围的限定。
如图1至图5示出了本发明大型总段专用的稳定性桁架起吊工具的一种实施方式,大型总段专用的稳定性桁架起吊工具1由外部主框架2和菱形内框架组成,其中菱形内框架由四根圆管3组成并且内切于外部主框架,由每根圆管中心位置引出的两根相互垂直的支撑管4分别与所对应的外部框架相垂直,在矩形框架四角处采用工字钢6进行角加强,外部主框架每个角的上下表面分别安装相应吊耳。外部主框架在制造时的过程是先进行底板9的焊接,再在底板上焊接筋板10,最后焊接上板11。组成菱形的四根圆管分别通过弹性板与主框架相连接,其中弹性板是插进主框架内与主框架进行焊接的。由每根圆管中心位置引出的两根相互垂直的支撑管与圆管通过焊接连接,与主框架的连接是通过弹性板7连接的,其中弹性板是插进主框架内与主框架进行焊接的。外部主框架每个角的上表面分别安装两个用于起吊该桁架吊具的上吊耳5,其位置是:两个上吊耳关于主框架对角线对称,且其距离保持在500mm~1000mm间。外部主框架每个角的下部分别安装一个用于吊挂吊运对象的吊挂板12,吊挂板12由底板9、加强筋板14和上板10,底板上焊接加强筋板,加强筋板上焊接上板,该吊挂板下端两边布置两个吊挂环15,上端通过焊接固定于主框架上。吊挂板的布置:四个吊挂板分别固定在主框架的两个长边的两端,并且吊挂环之间的距离为1500mm~1800mm间。主框架上的上吊耳与连接索具8连接,所述吊挂板与被吊物13相连。

Claims (6)

1.一种大型总段专用的稳定性桁架起吊工具,其特征在于:所述起吊工具包括四边形主框架和菱形内框架,所述菱形内框架由四根圆管组成,所述菱形内框架内切于外部主框架,每根所述圆管的中心处连接有两两垂直的两个支撑管的一端,每两个所述支撑管的另一端分别连接在所述主框架的相邻边框上,且每个所述支撑管与所对应连接的所述主框架的边框相垂直,所述主框架每个角的上表面分别安装两个上吊耳,两个所述上吊耳相对于所述主框架对角线对称,主框架每个角的下部分别安装一个用于吊挂被吊物的吊挂板,所述吊挂板下端两边布置两个吊挂环,所述吊挂板上端通过焊接固定于主框架上,四个所述吊挂板分别固定在所述主框架的两个长边的两端。
2.根据权利要求1所述大型总段专用的稳定性桁架起吊工具,其特征在于:所述主框架由底板、筋板和上板,所述底板上焊接所述筋板,所述筋板上焊接所述上板。
3.根据权利要求1或2所述大型总段专用的稳定性桁架起吊工具,其特征在于:四根所述圆管分别通过弹性板与所述主框架相连接,所述弹性板插进所述主框架内,所述弹性板与所述主框架通过焊接连接,每根所述支撑管均通过弹性板与所述主框架连接,所述弹性板与所述主框架通过焊接连接。
4.根据权利要求3所述大型总段专用的稳定性桁架起吊工具,其特征在于:两个所述上吊耳之间的距离为500mm-1000mm。
5.根据权利要求4所述大型总段专用的稳定性桁架起吊工具,其特征在于:两个所述吊挂环之间的距离为1500mm-1800mm。
6.根据权利要求5所述大型总段专用的稳定性桁架起吊工具,其特征在于:所述主框架四角处采用工字钢进行角加强。
CN2010101879484A 2010-05-31 2010-05-31 大型总段专用的稳定性桁架起吊工具 Active CN101850928B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101879484A CN101850928B (zh) 2010-05-31 2010-05-31 大型总段专用的稳定性桁架起吊工具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101879484A CN101850928B (zh) 2010-05-31 2010-05-31 大型总段专用的稳定性桁架起吊工具

Publications (2)

Publication Number Publication Date
CN101850928A true CN101850928A (zh) 2010-10-06
CN101850928B CN101850928B (zh) 2012-07-04

Family

ID=42802646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101879484A Active CN101850928B (zh) 2010-05-31 2010-05-31 大型总段专用的稳定性桁架起吊工具

Country Status (1)

Country Link
CN (1) CN101850928B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102001579A (zh) * 2010-11-18 2011-04-06 中广核工程有限公司 用于核电站安全壳钢衬里吊装的吊具
CN102795532A (zh) * 2012-08-17 2012-11-28 中国核工业华兴建设有限公司 重心偏离几何中心一侧大型重物吊装工装及其吊装方法
CN103058046A (zh) * 2012-12-28 2013-04-24 大连中远船务工程有限公司 深水钻井船钻井模块吊运专用吊架
CN103588085A (zh) * 2013-10-16 2014-02-19 长江南京航道工程局 双工字型透水框架专用吊具
CN105197775A (zh) * 2015-10-28 2015-12-30 衡阳市大成锅炉有限公司 一种起吊钢板的辅助装置

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1974936A (zh) * 2006-12-08 2007-06-06 大连船舶重工集团有限公司 大型桁架式桩腿结构的装配方法
CN101570234A (zh) * 2008-04-29 2009-11-04 江南造船(集团)有限责任公司 一种机舱总段组装方法以及机舱总段的吊装方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1974936A (zh) * 2006-12-08 2007-06-06 大连船舶重工集团有限公司 大型桁架式桩腿结构的装配方法
CN101570234A (zh) * 2008-04-29 2009-11-04 江南造船(集团)有限责任公司 一种机舱总段组装方法以及机舱总段的吊装方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102001579A (zh) * 2010-11-18 2011-04-06 中广核工程有限公司 用于核电站安全壳钢衬里吊装的吊具
CN102795532A (zh) * 2012-08-17 2012-11-28 中国核工业华兴建设有限公司 重心偏离几何中心一侧大型重物吊装工装及其吊装方法
CN103058046A (zh) * 2012-12-28 2013-04-24 大连中远船务工程有限公司 深水钻井船钻井模块吊运专用吊架
CN103588085A (zh) * 2013-10-16 2014-02-19 长江南京航道工程局 双工字型透水框架专用吊具
CN105197775A (zh) * 2015-10-28 2015-12-30 衡阳市大成锅炉有限公司 一种起吊钢板的辅助装置

Also Published As

Publication number Publication date
CN101850928B (zh) 2012-07-04

Similar Documents

Publication Publication Date Title
CN101850928B (zh) 大型总段专用的稳定性桁架起吊工具
CN203845664U (zh) 锅炉大板梁吊装专用吊具
CN105460774A (zh) 一种陆地模块吊装用吊排
CN206088755U (zh) 吊梁
CN103058045B (zh) 大型吊车试车吊架
CN206088728U (zh) 一种新型大型试车吊架
CN101780916B (zh) 大型容器及内部重型设备异步整合吊装方法及一种定位支架
CN103231982B (zh) 一种双铸造桥式起重机抬吊超大型物件用的扁担梁
CN201746222U (zh) 炉壳冷却壁安装吊具
CN211992810U (zh) 一种专用车轮粗加工吊具的摆放工装
CN211034888U (zh) 吊具
CN210438256U (zh) 一种80吨模块单元吊排
CN204251194U (zh) 一种新型吊装工具
CN203199869U (zh) 履带起重机组合吊具
CN103434926A (zh) 型钢的吊装装置
CN106013819A (zh) 一种吊装系统及基于空中换勾的预制外墙挂板吊装方法
CN201925597U (zh) 一种管线下沟器
CN220549920U (zh) 一种钢结构箱体翻转装置
CN205023729U (zh) 一种龙门吊架
CN110577146A (zh) 吊具和拆除老桥梁体的方法
CN214031383U (zh) 扩展式吊框
CN202245682U (zh) 行列线管道吊装装置
CN202625650U (zh) 一种造船龙门起重机的配件
CN213171077U (zh) 吊装用的铁扁担
CN219860090U (zh) 一种ccpp余热锅炉受热面模块吊运工装

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 226000 No. 1, COSCO Road, Jiangsu, Nantong

Co-patentee after: jiangsu university

Patentee after: Nantong COSCO Shipping Engineering Co., Ltd.

Address before: 226000 Jiangsu Province, Nantong City Chongchuan District COSCO Road No. 1

Co-patentee before: jiangsu university

Patentee before: COSCO Shipyard Group Co., Ltd.

CP03 Change of name, title or address