CN101824895B - Drily hung vitrolite wall surface decoration system and construction method thereof - Google Patents

Drily hung vitrolite wall surface decoration system and construction method thereof Download PDF

Info

Publication number
CN101824895B
CN101824895B CN2010103013541A CN201010301354A CN101824895B CN 101824895 B CN101824895 B CN 101824895B CN 2010103013541 A CN2010103013541 A CN 2010103013541A CN 201010301354 A CN201010301354 A CN 201010301354A CN 101824895 B CN101824895 B CN 101824895B
Authority
CN
China
Prior art keywords
keel
porcelain plate
bolt
vitrolite
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010103013541A
Other languages
Chinese (zh)
Other versions
CN101824895A (en
Inventor
郑直
刘伟
牛志平
朱文键
于志洋
闵捷
郝学峰
杨希
韩明远
谢群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JIANGONG GROUP Co Ltd
Beijing Construction Engineering Group Co Ltd
Original Assignee
BEIJING JIANGONG GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JIANGONG GROUP Co Ltd filed Critical BEIJING JIANGONG GROUP Co Ltd
Priority to CN2010103013541A priority Critical patent/CN101824895B/en
Publication of CN101824895A publication Critical patent/CN101824895A/en
Application granted granted Critical
Publication of CN101824895B publication Critical patent/CN101824895B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention relates to a drily hung vitrolite wall surface decoration system and a construction method thereof. A main building wall body is connected with a preembedded piece; the preembedded piece is connected with vertical keels through floor connecting pieces; the vertical keels are vertically connected with a transverse keel; the transverse keel is provided with a dilatation joint at each floor; a steel lock pin is inserted between the two vertical keels of the upper part and the lower part of the dilatation joint, one end of the steel lock pin is fixedly connected with a vertical keel through bolts, and the other end is in flexible connection with an oblong hole of the other vertical keel; the back of the vitrolite is provided with at least a pair of dovetail grooves; the dovetail grooves are connected with anchoring pieces in an embedded mode; the heads of the anchoring pieces are clamped into the dovetail grooves at the back of the vitrolite; a cavity for penetrating and anchoring the head of a T-shaped hanging piece is formed between an anchoring plate and the back of the vitrolite; the head of the T-shaped hanging piece extends to the cavity; the cavity is filled with epoxide resin anchoring glue; and a pectoral plate of the T-shaped hanging piece is fixedly connected with the transverse keel through a stainless steel bolt. The invention solves the problem of dry hanging vitrolite wall surface decoration systems on high rise buildings.

Description

Drily hung vitrolite wall surface decoration system and job practices thereof
Technical field
The present invention relates to the wall decoration system and the job practices thereof of a kind of wall decoration system, particularly a kind of dry suspension ceramic board.
Background technology
Wall decoration is the bright spot part of each building already, and more popular now curtain wall, stone curtain wall, metal plate curtain wall etc. have had ripe relatively construction technology, are able to utilizations a large amount of in building operations.And dry suspension ceramic board and traditional stone material, glass or metal plate curtain wall technology are compared, the porcelain plate decorative colour is abundant, color and luster is nature evenly, no color differnece, after being coated with the composite bed processing, the back of the body has favorable durability, impact resistance and frost resistance, and price is cheaper, the job practices of this kind curtain wall is that the body of wall with porcelain plate and main building thing fixedly articulates, because the main building thing is generally reinforced concrete structure, and the keel that Vitrolite curtain wall and main building thing are connected and fixed are generally steel, steel are different with concrete linear expansion coeffcient, keel self dilatation and the major structure of construction that make difference variation bring are asynchronous, cause main building thing and Vitrolite curtain wall steel joist to differ greatly, and make structural element produce the crack distortion because of expanding with heat and contract with cold.Particularly on high-rise building, drily hung vitrolite wall surface decoration system more is difficult to carry out.
Summary of the invention
The purpose of this invention is to provide a kind of drily hung vitrolite wall surface decoration system and job practices thereof, solve main building thing and dry suspension ceramic board metope and differ greatly because of expanding with heat and contract with cold and produce the technical problem of crack distortion; And solution is embodied in the problem of the construction technology of drily hung vitrolite wall surface decoration system on the high-rise building.
For achieving the above object, the present invention adopts following technical scheme:
A kind of drily hung vitrolite wall surface decoration system, comprise the porcelain plate that is connected with main building thing body of wall, it is characterized in that: described main building thing body of wall is connected with built-in fitting, built-in fitting is connected with centre keel through the connector of every floor, centre keel is connected with horizontal keel are vertical, described centre keel stays the shrinkage joint at vertical direction, each floor stays a place, clearance of expansion rail is 5~20mm, that locates at the shrinkage joint inserts the steel lock pin between two centre keels up and down, one end of steel lock pin is connected with bolt with a centre keel, and the other end is flexibly connected by the slotted hole of bolt and another root centre keel; There is at least one pair of dovetail groove at the back side of porcelain plate, described dovetail groove is connected with anchoring piece is embedded, described anchoring piece has a pair of anchorage head that matches with dovetail groove porcelain plate, anchorage head snaps in the dovetail groove at the porcelain plate back side, form a cavity that is used to penetrate with anchoring T shape suspension member head between the anchor plate between two anchorage heads and the porcelain plate back side, the head of T shape suspension member stretches in the cavity at the porcelain plate back side, be filled with the epoxy resin anchor adhesive in the cavity, the web of T shape suspension member is fixedlyed connected by stainless steel bolt with horizontal keel.
Described horizontal keel also can stay the shrinkage joint in the horizontal direction, the gap at shrinkage joint is 5~20mm, insert the steel lock pin between two horizontal keel at place, shrinkage joint, an end of steel lock pin is connected with bolt with horizontal keel, and the other end is flexibly connected by the slotted hole of bolt and the horizontal keel of another root.
Described horizontal keel can be angle with equal legs or square steel, and the specification of angle with equal legs is not less than ∠ 30 * 30 * 3.
Described centre keel can be square steel, channel-section steel or H shaped steel.
The base angle angle of described dovetail groove can be between the 45-60 degree.
The job practices of drily hung vitrolite wall surface decoration system is characterized in that step is as follows:
Step 1, the horizontal axis of main building thing body of wall and vertical absolute altitude are checked, checked its baseline, control line, determine the position of rearmounted built-in fitting or check the built-in fitting position, and play the porcelain plate frame bar;
Step 2, according to the horizontal axis and the vertical absolute altitude of the main building thing body of wall of actual measurement, carry out porcelain plate composing figure design;
Step 3, carry out the centre keel location and install according to the porcelain plate composing figure that determines in the step 2; During installation, at first be connected with built-in fitting with the connector of bolt with every floor, and then centre keel is fixed on the connector of every floor with bolt, described centre keel stays the shrinkage joint at vertical direction, each floor stays a place, and clearance of expansion rail is 5~20mm, and that locates at the shrinkage joint inserts the steel lock pin between two centre keels up and down, one end of steel lock pin is connected with bolt with a centre keel, and the other end is flexibly connected by the slotted hole of bolt and another root centre keel;
Step 4, carry out horizontal keel location and install according to the porcelain plate composing figure that determines in the step 2; The position line with horizontal keel is bound on the centre keel earlier, according to the determined horizontal keel of snap the line position, horizontal carinal dot is welded on the centre keel then;
Step 5, installation porcelain plate; With stainless steel bolt T shape suspension member is fixed on the horizontal keel earlier, adjust the position of T shape suspension member, make it to align with the plate seam of porcelain plate, fill up glue in the cavity with the anchoring piece at the porcelain plate back side then, porcelain plate and anchoring piece are blocked by the dovetail groove of porcelain plate behind and the anchorage head of anchoring piece, the head of T shape suspension member penetrates in the cavity of anchoring piece, connects firmly with gluing, tightens the stainless steel bolt that connects T shape suspension member and horizontal keel;
Step 6, install a facade after, in porcelain plate plate seam, break fluid sealant, beat that fluid sealant is preceding to be filled in foam rods in the porcelain plate plate stitches, to control the thickness of fluid sealant;
Step 7, with the contact surface of cleaning fluid clean seal glue, then along same direction with glue small of the stock fluid sealant equably in the injection plate seam porcelain plate plate seam, and wipe off with packing element or grey cutter immediately, remove protection sheet.
The installation angle of rotation place of above-mentioned porcelain plate begins, and presses order from bottom to top.
Horizontal keel also can stay the shrinkage joint in the horizontal direction described in the above-mentioned steps 4, the gap at shrinkage joint is 5~20mm, between two horizontal keel at place, shrinkage joint, insert the steel lock pin, one end of steel lock pin is connected with bolt with horizontal keel, and the other end is flexibly connected by the slotted hole of bolt and the horizontal keel of another root.
Institute's filler can be the epoxy resin anchor adhesive in the anchoring piece at the porcelain plate back side described in the above-mentioned steps 5.
Compared with prior art the present invention has following characteristics and beneficial effect:
The keel that the present invention adopts are according to the shrinkage joint is set in the certain limit, and at one end fixing, the movable connected mode of the other end of employing steel lock pin, framework deformation adjusting needs in the construction both be convenient to, guarantee the verticality of column center line, avoid between upper and lower column producing, can satisfy keel self dilatation that difference variation causes and the requirement of relative storey displacement variable quantity again than big shearing.Solve main building thing and dry suspension ceramic board metope and differed greatly because of expanding with heat and contract with cold and produce the technical problem of crack distortion, and solved the problem of the construction technology of drily hung vitrolite wall surface decoration system on high-rise building.
The present invention not only can take the on-the-spot mounting means of adjusting of producer's preprocessing, has also shortened the length overall of steel lock pin, uses material thereby reduce, and saves cost.
The porcelain plate of drily hung vitrolite wall surface decoration system of the present invention can only be changed damaged a slice, and needn't large tracts of land change when breakage occurring, saves production cost.
The present invention compares with stone curtain wall, rich color, and color and luster is nature, no color differnece evenly, can need not on-site cutting in process plants, and speed of application is faster.Porcelain plate is coated with through the back of the body has favorable durability, impact resistance and frost resistance after composite bed is handled, and price is cheaper.
Of the present invention having wide range of applications can be applied on the body of wall of various form of structure, and exterior wall, interior wall all can use.Both the form that frame construction does not have infilled wall can be used for, also metopes such as steel work metope and hollow brick, building block can be used for.The present invention can be used with heat insulating material, can have good insulation, sound insulation function when beautifying building.
Description of drawings
The present invention will be further described in detail below in conjunction with accompanying drawing.
Fig. 1 is the vertical section schematic diagram that dry suspension ceramic board is installed node;
Fig. 2 is the structural representation that centre keel vertically connects;
Fig. 3 is the schematic cross section that dry suspension ceramic board is installed node;
Fig. 4 is that the master of the embodiment of the invention looks schematic diagram;
Fig. 5 is the A-A generalized section of Fig. 4;
Fig. 6 is the B-B generalized section of Fig. 4.
Reference numeral: the connector of 1-porcelain plate, 2-T shape suspension member, 3-anchoring piece, the every floor of 4-, 5-stainless steel bolt, the horizontal keel of 6-, 7-centre keel, 8-built-in fitting, 9-main building thing body of wall, 10-insulation layer, 11-epoxy resin anchor adhesive, 12-shrinkage joint, 13-steel lock pin, 14-bolt, 15-slotted hole, 16-fluid sealant, 17-dovetail groove.
The specific embodiment
Embodiment is referring to Fig. 1, shown in Figure 3, a kind of drily hung vitrolite wall surface decoration system, comprise the porcelain plate 1 that is connected with main building thing body of wall 9, it is characterized in that: described main building thing body of wall 9 is connected with built-in fitting 8, built-in fitting 8 is connected with centre keel 7 by the connector 4 that is positioned at every floor, and the connector of every floor can be angle steel or square steel, centre keel 7 and horizontal 6 vertical connections of keel, there is at least one pair of dovetail groove at the back side of porcelain plate 1, and the base angle angle of dovetail groove 17 is between the 45-60 degree.Described dovetail groove and 3 embedded connections of anchoring piece, described anchoring piece 3 has a pair of anchorage head that matches with dovetail groove porcelain plate, anchorage head snaps in the dovetail groove at the porcelain plate back side, form a cavity that is used to penetrate with anchoring T shape suspension member head between the anchor plate between two anchorage heads and the porcelain plate back side, the head of T shape suspension member 2 stretches in the cavity at porcelain plate 1 back side, be filled with epoxy resin anchor adhesive 11 in the cavity, the web of T shape suspension member 2 is fixedlyed connected by stainless steel bolt 5 with horizontal keel 6.
Joint between described two horizontal keel can be for being welded to connect.But when meeting the metope overlength, then need look actual conditions, keep somewhere a pair of slotted hole between two horizontal keel in the horizontal direction, flexibly connect with bolt.Two horizontal keel stay the shrinkage joint in the horizontal direction, the gap at shrinkage joint is 20mm, insert the steel lock pin between two horizontal keel at place, shrinkage joint, an end of steel lock pin is connected with bolt with horizontal keel, and the other end is flexibly connected by the slotted hole of bolt and the horizontal keel of another root.Horizontal keel 6 are angle with equal legs or square steel, and the specification of angle with equal legs is not less than ∠ 30 * 30 * 3.
Referring to shown in Figure 2, centre keel 7 of the present invention can be square steel, channel-section steel or H shaped steel.Centre keel stays shrinkage joint 12 at vertical direction, each floor stays a place, clearance of expansion rail is 20mm, that locates at the shrinkage joint inserts steel lock pin 13 between two centre keels up and down, one end of steel lock pin 13 is connected with bolt with a centre keel, and the other end is flexibly connected by the slotted hole 15 of bolt 14 with another root centre keel.
Referring to Fig. 3-shown in Figure 6, the job practices of drily hung vitrolite wall surface decoration system, step is as follows:
Step 1, horizontal axis and vertical absolute altitude that main building thing body of wall 9 intend to be installed are checked, checked its baseline, control line, determine the position of rearmounted embedded part 8 or check the built-in fitting position, and play the porcelain plate frame bar; In snap the line setting-out process, the numbering figure of contrast embedded part checks successively one by one, with the structural deviation at each numbering place, notes with the deviate of embedded part, feeds back to the designer and analyzes, and must handle greater than the embedded part more than the 45mm off normal.The plan of drily hung vitrolite wall surface decoration system is installed body of wall also can be provided with insulation layer 10 outward.
Step 2, the horizontal axis and the vertical absolute altitude of main building thing body of wall 9 are installed, are carried out porcelain plate composing figure design according to the plan of actual measurement.
Step 3, carry out centre keel 7 location and install according to the porcelain plate composing figure that determines in the step 2; The angle of rotation place begins and bottom-up installation, the building rotation angle position is arranged wire, at first be connected with built-in fitting with the connector of bolt with every floor, and then centre keel is fixed on the connector of every floor with bolt, the connector of every floor can be angle steel, square steel or channel-section steel, mainly calculate, deepen the design back on concrete condition and decide, bolt all wouldn't be tightened fully, stays some adjustable leeway.Described centre keel stays the shrinkage joint at vertical direction, and each floor stays a place, and clearance of expansion rail is 5~20mm.That locates at the shrinkage joint inserts the steel lock pin between two centre keels up and down, and an end of steel lock pin is connected with bolt with a centre keel, and the other end is flexibly connected by the slotted hole of bolt and another root centre keel; After centre keel is preliminary in place, regulate, carry out installation check, mainly check verticality and big surface evenness, guarantee the vertical missing≤2mm of centre keel, the body of wall error is adjusted to Min. as far as possible according to working drawing according to the wire that survey crew is arranged.When the porcelain plate of installing angle position, vertical absolute altitude carries out follow-up investigations from start to finish with level gauge, and vertical steel wire location adopts plumb aligner to position, and the Founder of guaranteeing rotation angle position is with vertical.After carrying out the connector of every floor and centre keel inspection, adjusting, again all bolts are tightened, guaranteed the installation quality of centre keel.
Step 4, carry out horizontal keel location and install according to the porcelain plate composing figure that determines in the step 2; The position line with horizontal keel 6 is bound on the centre keel 7 earlier, according to the determined horizontal keel of snap the line position, horizontal carinal dot is welded on the centre keel then; Should check its big vertical and planeness when horizontal keel install the height of one deck, adjust to proofread and correct and horizontal keel and centre keel are welded after making it meet quality specifications.But when meeting the metope overlength, then need look actual conditions, keep somewhere a pair of slotted hole between two horizontal keel in the horizontal direction, flexibly connect with bolt.
Step 5, installation porcelain plate; With stainless steel bolt 5 T shape suspension member 2 is fixed on the horizontal keel 6 earlier, adjust the position of T shape suspension member 2, make it to align with the plate seam of porcelain plate 1, fill up glue in the cavity with the anchoring piece 3 at the porcelain plate back side then, institute's filler is the epoxy resin anchor adhesive in the anchoring piece at the porcelain plate back side, again porcelain plate 1 and the anchorage head of anchoring piece 3 by porcelain plate dovetail groove and anchoring piece are blocked, the head of T shape suspension member 2 penetrates in the cavity of anchoring piece, connect firmly with gluing, tighten the stainless steel bolt 5 that connects T shape suspension member 2 and horizontal keel 6.After treating the whole installation in position of one deck porcelain plate, check the planeness and the verticality on porcelain plate surface, then adjust if any being uneven, check porcelain plate plate seam then, the plate seam should be horizontal vertically flat, and width adheres to specification, and stitches wide uniformity.
Step 6, install a facade after, in porcelain plate plate seam, break fluid sealant, beat that fluid sealant is preceding to be filled in foam rods in the porcelain plate plate stitches, to control the thickness of fluid sealant; Firmly want evenly when playing glue, walk rifle and want that steady glue-line should be tight and slow, width is wanted evenly, forbids submersible.
Step 7, with the contact surface of cleaning fluid clean seal glue, then along same direction with glue small of the stock fluid sealant equably in the injection plate seam porcelain plate plate seam, and wipe off with packing element or grey cutter immediately, remove protection sheet.After porcelain plate installation, the plate seam of facade are broken fluid sealant, also need Vitrolite curtain wall is once comprehensively checked, repaired and clears up.
The foregoing description is that typical case of the present invention implements, and enforcement of the present invention is not limited thereto.

Claims (7)

1. drily hung vitrolite wall surface decoration system, comprise the porcelain plate (1) that is connected with main building thing body of wall (9), it is characterized in that: described main building thing body of wall (9) is connected with built-in fitting (8), built-in fitting (8) is connected with centre keel (7) through floor connector (4), centre keel (7) and vertical connection of horizontal keel (6), described centre keel stays shrinkage joint (12) at vertical direction, each floor stays a place, clearance of expansion rail is 5~20mm, that locates at the shrinkage joint inserts steel lock pin (13) between two centre keels up and down, one end of steel lock pin (13) is connected with bolt with a centre keel, and the other end is flexibly connected by the slotted hole (15) of bolt (14) with another root centre keel; There is at least one pair of dovetail groove at the back side of porcelain plate (1), described dovetail groove and embedded connection of anchoring piece (3), described anchoring piece (3) has a pair of anchorage head that matches with dovetail groove porcelain plate, anchorage head snaps in the dovetail groove at the porcelain plate back side, form a cavity that is used to penetrate with anchoring T shape suspension member head between the anchor plate between two anchorage heads and the porcelain plate back side, the head of T shape suspension member (2) stretches in the cavity at porcelain plate (1) back side, be filled with epoxy resin anchor adhesive (11) in the cavity, the web of T shape suspension member (2) is fixedlyed connected by stainless steel bolt (5) with horizontal keel (6);
Described horizontal keel (6) are angle with equal legs or square steel, and the specification of angle with equal legs is not less than ∠ 30 * 30 * 3;
Described centre keel (7) is square steel, channel-section steel or H shaped steel.
2. drily hung vitrolite wall surface decoration system according to claim 1, it is characterized in that: described horizontal keel stay the shrinkage joint in the horizontal direction, the gap at shrinkage joint is 5~20mm, between two horizontal keel at place, shrinkage joint, insert the steel lock pin, one end of steel lock pin is connected with bolt with horizontal keel, and the other end is flexibly connected by the slotted hole of bolt and the horizontal keel of another root.
3. drily hung vitrolite wall surface decoration system according to claim 1 and 2 is characterized in that: the base angle angle of described dovetail groove (17) is between the 45-60 degree.
4. according to the job practices of one of claim 1-3 described drily hung vitrolite wall surface decoration system, it is characterized in that: step is as follows:
Step 1, the horizontal axis of main building thing body of wall (9) and vertical absolute altitude are checked, checked its baseline, control line, determine the position of rearmounted built-in fitting (8) or check the built-in fitting position, and play the porcelain plate frame bar;
Step 2, according to the horizontal axis and the vertical absolute altitude of the main building thing body of wall (9) of actual measurement, carry out porcelain plate composing figure design;
Step 3, carry out centre keel (7) location and install according to the porcelain plate composing figure that determines in the step 2; During installation, at first floor connector (4) is connected with built-in fitting (8) with bolt, and then centre keel is fixed on the floor connector with bolt, described centre keel stays the shrinkage joint at vertical direction, each floor stays a place, clearance of expansion rail is 5~20mm, that locates at the shrinkage joint inserts steel lock pin (13) between two centre keels up and down, one end of steel lock pin (13) is connected with bolt with a centre keel, and the other end is flexibly connected by the slotted hole (15) of bolt (14) with another root centre keel;
Step 4, carry out horizontal keel location and install according to the porcelain plate composing figure that determines in the step 2; The position line with horizontal keel (6) is bound on the centre keel (7) earlier, according to the determined horizontal keel of snap the line position, horizontal carinal dot is welded on the centre keel then;
Step 5, installation porcelain plate; With stainless steel bolt (5) T shape suspension member (2) is fixed on the horizontal keel (6) earlier, adjust the position of T shape suspension member (2), make it to align with the plate seam of porcelain plate (1), fill up glue in the cavity with the anchoring piece (3) at the porcelain plate back side then, porcelain plate (1) and anchoring piece (3) are blocked by the dovetail groove of porcelain plate behind and the anchorage head of anchoring piece, the head of T shape suspension member (2) penetrates in the cavity of anchoring piece, connect firmly with gluing, tighten the stainless steel bolt (5) that connects T shape suspension member (2) and horizontal keel (6);
Step 6, install a facade after, in porcelain plate plate seam, break fluid sealant (16), beat that fluid sealant is preceding to be filled in foam rods in the porcelain plate plate stitches, to control the thickness of fluid sealant;
Step 7, with the contact surface of cleaning fluid clean seal glue, then along same direction with glue small of the stock fluid sealant equably in the injection plate seam porcelain plate plate seam, and wipe off with packing element or grey cutter immediately, remove protection sheet.
5. the job practices of drily hung vitrolite wall surface decoration system according to claim 4, it is characterized in that: the installation angle of rotation place of above-mentioned porcelain plate begins, and by from bottom to top order.
6. the job practices of drily hung vitrolite wall surface decoration system according to claim 4, it is characterized in that: horizontal keel stay the shrinkage joint in the horizontal direction described in the above-mentioned steps 4, the gap at shrinkage joint is 5~20mm, between two horizontal keel at place, shrinkage joint, insert the steel lock pin, one end of steel lock pin is connected with bolt with horizontal keel, and the other end is flexibly connected by the slotted hole of bolt and the horizontal keel of another root.
7. the job practices of drily hung vitrolite wall surface decoration system according to claim 6 is characterized in that: institute's filler is the epoxy resin anchor adhesive in the anchoring piece at the porcelain plate back side described in the above-mentioned steps 5.
CN2010103013541A 2010-02-08 2010-02-08 Drily hung vitrolite wall surface decoration system and construction method thereof Expired - Fee Related CN101824895B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010103013541A CN101824895B (en) 2010-02-08 2010-02-08 Drily hung vitrolite wall surface decoration system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010103013541A CN101824895B (en) 2010-02-08 2010-02-08 Drily hung vitrolite wall surface decoration system and construction method thereof

Publications (2)

Publication Number Publication Date
CN101824895A CN101824895A (en) 2010-09-08
CN101824895B true CN101824895B (en) 2011-08-10

Family

ID=42689041

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010103013541A Expired - Fee Related CN101824895B (en) 2010-02-08 2010-02-08 Drily hung vitrolite wall surface decoration system and construction method thereof

Country Status (1)

Country Link
CN (1) CN101824895B (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102287037A (en) * 2011-06-20 2011-12-21 山东宁建建设集团有限公司 Large-area back-bolt ceramic tile dry hanging construction method
CN102312497B (en) * 2011-09-09 2016-03-16 北京大运龙腾科技有限公司 Building integration curtain wall system and construction method of installation thereof
CN102383508A (en) * 2011-09-20 2012-03-21 沈阳远大铝业工程有限公司 Split clamping and fixing type ceramic tile curtain wall
CN102535702B (en) * 2012-02-21 2013-10-30 沈阳远大铝业工程有限公司 Sideslip inserting core structure of unit curtain wall
CN102839805B (en) * 2012-10-11 2014-06-18 北京建工集团有限责任公司 Dry-hanging resin plate wall surface decoration system and construction method thereof
CN103541477B (en) * 2013-11-06 2016-01-13 上海市建筑装饰工程集团有限公司 For keel and the mounting method thereof of dry-hang stone curtain wall
CN103526866B (en) * 2013-11-06 2016-03-09 上海市建筑装饰工程集团有限公司 Dry-hang stone curtain wall and mounting method thereof
CN103758317B (en) * 2014-01-13 2016-04-13 新疆德力亚节能科技有限公司 A kind of ultra-thin heat insulation decoration integrated plate installation system
CN104047406A (en) * 2014-07-01 2014-09-17 李忠玉 Construction process for ultra-thin stone-facing heat-preserving decorative plate
CN104563349B (en) * 2015-01-12 2017-04-05 上海卓欧建筑装饰工程有限公司 The attached steelframe of curtain wall back is installed on the connecting assembly in agent structure and installation method
CN106351371A (en) * 2016-10-13 2017-01-25 北京港源幕墙有限公司 Manufacturing and construction process of curtain keel
CN107620442A (en) * 2017-08-21 2018-01-23 广州市名晋机电设备技术有限公司 A kind of novel unit formula exterior wall panel cladding system
CN107518683A (en) * 2017-08-29 2017-12-29 许昌市建安区第实验学校 A kind of Multifunctional stool for child
CN107587635A (en) * 2017-10-10 2018-01-16 海天建设集团有限公司 The vertical bolt-type construction technique of exterior wall ceramic plate
CN110424642A (en) * 2019-07-01 2019-11-08 中国十七冶集团有限公司 A kind of abnormal shape metal Roof bolts the construction method of keel with spigot-and-socket
CN110528721A (en) * 2019-07-31 2019-12-03 上海宝冶建筑装饰有限公司 The construction method of gabion decorative wall
CN110453925A (en) * 2019-09-07 2019-11-15 吉林建筑大学 It constructs between assembled architecture PCF plate and prefabricated outer wall panel adjusting method
CN111395680A (en) * 2020-03-24 2020-07-10 浙江世贸装饰股份有限公司 Installation method for solving installation gap of wall ceramic plate
CN114876144A (en) * 2021-06-08 2022-08-09 上海牛元工贸有限公司 Dry-hanging installation process for rock plate
CN113738050B (en) * 2021-10-08 2022-08-05 北京城建亚泰建筑装饰工程设计有限公司 Dry hanging construction method for decoration panels of interior and exterior walls

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2523825Y (en) * 2002-02-05 2002-12-04 海口南光幕墙装饰工程有限公司 Dry adhering device for stone screen walls
CN201007050Y (en) * 2007-02-08 2008-01-16 沈英 Mounting structure pottery clay plate curtain wall
CN201649524U (en) * 2010-02-08 2010-11-24 北京建工集团有限责任公司 Wall decoration system for dry-hanging porcelain plate

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2523825Y (en) * 2002-02-05 2002-12-04 海口南光幕墙装饰工程有限公司 Dry adhering device for stone screen walls
CN201007050Y (en) * 2007-02-08 2008-01-16 沈英 Mounting structure pottery clay plate curtain wall
CN201649524U (en) * 2010-02-08 2010-11-24 北京建工集团有限责任公司 Wall decoration system for dry-hanging porcelain plate

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开平6-341184A 1994.12.13

Also Published As

Publication number Publication date
CN101824895A (en) 2010-09-08

Similar Documents

Publication Publication Date Title
CN101824895B (en) Drily hung vitrolite wall surface decoration system and construction method thereof
CN108797847B (en) Assembled steel frame infilled wall structure system and construction method thereof
CN101302782B (en) Dried hanging thermal insulation decorative curtain wall and mounting process thereof
CN201292587Y (en) Connecting piece for tall building combined stone curtain wall
CN111305410B (en) Anti-cracking wall and construction method thereof
CN109853800B (en) Assembled low-energy-consumption curtain wall system and construction method thereof
CN101775862A (en) Composite heat preserving template and building main body integrated construction heat preserving system
CN105484391A (en) Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks
CN208934190U (en) A kind of assembled steel frame wall filled with masonry structural system
CN104499614B (en) Wall heat-preservation integration point hanging system and mounting method thereof
CN108457409A (en) A kind of string hangs the external decoration facade and its installation method of clay brick
CN201649524U (en) Wall decoration system for dry-hanging porcelain plate
CN114046041B (en) Template reinforcing structure of bare concrete wall post-pouring strip and construction method thereof
CN102677858B (en) Back hanging piece for installing decorative inorganic tetrafluoromethane veneer and construction method of back hanging piece
CN202520153U (en) Door and window steel sub-frame installation and construction structure
CN110805185A (en) Installation method of large-span curved surface special-shaped stone curtain wall
CN116104224A (en) External wall heat insulation integrated gap spliced construction node and construction method
CN115182496A (en) Transverse-through and vertical-breaking type multi-element combined curtain wall system and construction method thereof
CN103015656B (en) Component type exterior wall heat insulating decorative board and preparation method thereof and exterior wall mounting method
KR20190078792A (en) Multi system bracket
CN114991469A (en) Mounting structure and mounting method of wall column template
CN106088620B (en) Super thick EPS mouldings are slotted or construction technique is thinned in hole
CN213297123U (en) Assembly type disassembly-free composite integrated template
CN208219946U (en) A kind of string hangs the external decoration facade of clay brick
CN113266091A (en) Construction process of space torsional curved-surface wood grain fair-faced concrete wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110810

Termination date: 20120208