CN101644928B - Mine trackless rubber tire vehicle transport monitoring device and dispatching method therefor - Google Patents

Mine trackless rubber tire vehicle transport monitoring device and dispatching method therefor Download PDF

Info

Publication number
CN101644928B
CN101644928B CN2009101444649A CN200910144464A CN101644928B CN 101644928 B CN101644928 B CN 101644928B CN 2009101444649 A CN2009101444649 A CN 2009101444649A CN 200910144464 A CN200910144464 A CN 200910144464A CN 101644928 B CN101644928 B CN 101644928B
Authority
CN
China
Prior art keywords
section
rubber
way
tired cart
teleseme
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2009101444649A
Other languages
Chinese (zh)
Other versions
CN101644928A (en
Inventor
魏臻
陆阳
程运安
鲍红杰
程磊
徐自军
胡敏
彭震
李谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei GOCOM Information & Technology Co., Ltd.
Original Assignee
HEFEI GONGDA GAOKE INFORMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEFEI GONGDA GAOKE INFORMATION TECHNOLOGY Co Ltd filed Critical HEFEI GONGDA GAOKE INFORMATION TECHNOLOGY Co Ltd
Priority to CN2009101444649A priority Critical patent/CN101644928B/en
Publication of CN101644928A publication Critical patent/CN101644928A/en
Application granted granted Critical
Publication of CN101644928B publication Critical patent/CN101644928B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Train Traffic Observation, Control, And Security (AREA)

Abstract

The invention relates to a mine trackless rubber tire vehicle transport monitoring device and a dispatching method therefor; RS232 bus communication is adopted between a main control computer and an intelligent communicator, FSK bus communication is adopted between the intelligent communicator and a control substation, RS485 bus communication is adopted between the control substation and a signal machine and between the control substation and a card reader, and radio communication is adopted between the card reader and an electronic tag. The card reader sends the recognized electronic tag identity information including rubber tire license plate number, model and the like into the control substation, the control substation transmits the information into the main control computer by the intelligent communicator, the main control computer can judge the position of a rubber tire vehicle through operation according to the system control regulation, and then the signal machine is controlled to display different colors to guide the driver to drive. The invention can ensure the mine trackless rubber tire vehicle to be safer in transport operation and higher in transport efficiency.

Description

Mine railless free-wheeled vehicle transport monitoring dispatching method
Technical field
The present invention relates to the device and the monitoring and scheduling method thereof of vehicle transport condition monitoring, be specifically related to mine vehicle transport supervising device and control dispatching method thereof.
Background technology
In recent years, in the assistant conveyance of China's coal-mine down-hole, railless free-wheeled vehicle is used more and more.This car is because the restriction of no track, and has characteristics such as maneuverability, adaptability are strong, safe and efficient, applied range, more and more come into one's own, and be a kind of advanced person's the assistant conveyance vehicle that transports material, equipment, personnel.When integral body is transported with mounting bracket, can realize from ground that until the exploiting field workplace without the through transportation of reprinting, its superiority is more outstanding.Rubber-tired cart obtains application and popularization more and more widely in the down-hole, be the main developing direction of colliery assistant conveyance.
But for the most of mines of China, the assistant conveyance situation is backward relatively, the assistant conveyance span length is narrower, it is current generally can only to hold a car, and along with the growth of production and transport task, increasing gradually of mine down-hole haulage vehicle, do not establish under the situation of signal lamp at each fork or a mouth of giving another the right of way, especially under the tunnel exists certain slope and the situation that has bend to exist, often can not see clearly mutually between the vehicle that travels mutually, thereby cause that easily vehicle blocks in certain zone, cause the frequent reversing of vehicle, brake, caused the waste of transportation oil plant, the spare part loss, conevying efficiency is hanged down inferior negative issue, and more serious some security incident that also will cause takes place.Therefore, in the hauling operation of mine rubber-tired cart, be necessary to install and use transportation telltale and Dispatching Control System.
Summary of the invention
The present invention is for solving the problem that has potential safety hazard and inefficiency in the above-mentioned mine rubber-tired cart transportation, mine railless free-wheeled vehicle transport monitor system and dispatching method thereof are provided, can carry out sacurity dispatching to the transportation of mine rubber-tired cart, improve the conevying efficiency of system simultaneously.
Technical scheme of the present invention is as follows:
Mine railless free-wheeled vehicle transport monitoring device is made up of main control computer, intelligent communication device, control substation, teleseme, card reader and electronic tag; Adopt the RS232 bus communication between main control computer and the intelligent communication device, adopt the FSK bus communication between intelligent communication device and the control substation, adopt the RS485 bus communication between control substation and the teleseme, adopt the RS485 bus communication between control substation and the card reader, between card reader and the electronic tag by radio communication.
Write license plate number, the type information of rubber-tired cart in the electronic tag in advance, be installed in the pilothouse of rubber-tired cart, teleseme and card reader are installed on the wall; Effective communication distance between electronic tag and the card reader is between 10~15 meters.
Mine railless free-wheeled vehicle transport monitoring dispatching method is as follows:
1) down-hole is transported the zone and be divided into give another the right of way district and section, give another the right of way to distinguish to comprise and keep away car chamber and crossing, tunnel, two adjacent tunnels of giving another the right of way between the district are referred to as section; Only allow simultaneously in each section by a rubber-tired cart, according to the area in each district that gives another the right of way, determine that maximum that each Qu Suoneng that gives another the right of way the holds quantity of giving another the right of way is Cmax (i), wherein i is the sequence number in district of giving another the right of way; Be 2 by keeping away district Cmax (i) value of giving another the right of way that the car chamber constitutes, district Cmax (i) value of giving another the right of way that constitutes in the T-shaped road junction is 3, and district Cmax (i) value of giving another the right of way that the crossroad constitutes is 4;
2) at the two ends of each section a teleseme is set respectively, in the center in the district that gives another the right of way a card reader is set, 20 meters place respectively is provided with a card reader at section inner distance two ends; When the card reader of section both sides had detected vehicle and enters section, the teleseme that system should control both sides was red light simultaneously, forbids that any side of section has locomotive to sail into again;
3) when being in idle condition without any rubber-tired cart in the section, rubber-tired cart for fear of the section both sides enters same section simultaneously, and can allow the rubber-tired cart of section both sides pass through this section in order, take the form of in turn open green light to control to the teleseme of both sides, prevent from simultaneously to take place in the situation that the moment that the teleseme state switches has the rubber-tired cart mistake to swarm into section, between teleseme is in turn open, leave certain prevention off time, allow the both sides teleseme send out a warning simultaneously, its step is as follows, T1=T3 wherein, T2=T4:
1. section left and right sides teleseme is controlled to be red light phase, forbids that the both sides rubber-tired cart sails into;
2. delay time T1 opens section left-side signal machine, allows the left side rubber-tired cart to sail into;
3. delay time T2 controls section left-side signal machine and right-side signal machine and sends out a warning simultaneously, forbids that the both sides rubber-tired cart sails into;
4. delay time T3 opens section right-side signal machine, allows the right side rubber-tired cart to sail into;
5. 1. delay time T4 forwards step to;
4) a transportation zone of establishing the down-hole is made up of M section, the individual district that gives another the right of way of N, M 〉=2, and N 〉=1, the border in zone all is made up of section, and the quantity of establishing the border section is L, and promptly this zone has L teleseme to protect; Only allow simultaneously in each section in the zone by a rubber-tired cart, can hold Cmax (i) rubber-tired cart in each district that gives another the right of way, i=1......N, Cmax (i) 〉=1, then when the total quantity of rubber-tired cart in this zone reaches quantity X, only allow maximum L-1 section to advance car simultaneously in transportation network, otherwise will cause the scheduling deadlock, wherein the computing formula of X value is
The invention has the beneficial effects as follows: the present invention can effectively dispatch the transportation of down-hole rubber-tired cart, has avoided the transportation safety and the inefficiency problem that occur under the situation of scheduling signals not being provided with.
Description of drawings
Fig. 1 is an organization chart of the present invention.
Fig. 2 is the principle schematic of intelligent communication device among the present invention.
Fig. 3 is the principle schematic of control substation among the present invention.
Fig. 4 is the principle schematic of teleseme among the present invention.
Fig. 5 is the principle schematic of card reader among the present invention.
Fig. 6 is the principle schematic of electronic tag among the present invention.
Fig. 7 is a underground equipment arrangenent diagram synoptic diagram among the present invention.
Fig. 8 and Fig. 9 are same section two ends teleseme flow for displaying synoptic diagram among the present invention.
Embodiment
As Fig. 1, the present invention is divided into ground subsystem and partly implements partly to implement with the down-hole subsystem when implementing.
Ground subsystem mainly is included in the main control computer 1 and intelligent communication device 2 in the Control Room, adopts the RS232 bus to connect between the two, and mine rubber-tired cart transportation dispatching software is installed on main control computer 1.
The down-hole subsystem mainly comprises control substation 3, teleseme 4, card reader 5, electronic tag 6 formations.In the specific implementation, as Fig. 7, the zone is transported in the down-hole be divided into give another the right of way district 7 and section 8, the district 7 that gives another the right of way comprises and keeps away car chamber and crossing, tunnel, comprises T-shaped road junction and crossroad, and two adjacent tunnels of distinguishing between 7 of giving another the right of way are referred to as section 8.At the two ends of each section 8 a guard signal machine 4 is set respectively, is used to protect rubber-tired cart and enters this section; Whether the center in the district 7 that gives another the right of way is provided with a card reader 5, be used to detect rubber-tired cart and be in this zone; 20 meters place respectively is provided with a card reader 5 at section 8 inner distance two ends, is used to detect rubber-tired cart and whether enters into section 8 inside.The guard signal machine 4 of down-hole directly links to each other with control substation 3 with card reader 5, and each control substation 3 can articulate 4,4 card reader 5 of 4 telesemes at most.All control substations 3 are interconnected by the intelligent communication device 2 on FSK bus and ground.
Be equipped with an electronic tag 6 on each rubber-tired cart of down-hole, each electronic tag 6 storage inside has unique ID number, and ID number corresponding one by one with the license plate number of rubber-tired cart.When electronic tag 6 is flat regularly by wireless mode regularly outwards ID number of broadcast transmission self, after being installed in card reader 5 on the wall and receiving ID number of electronic tag 6, be transmitted to ground main control computer 1 to ID number that receives by control substation 3 and communicator 2, ground main control computer 1 is extrapolated the residing position of rubber-tired cart according to the information that receives, control the different pattern of teleseme 4 demonstrations at each section 8 two ends then according to scheduling rule, the safe operation of dispatching buses.
Ground monitoring software in advance with specific data relation typing, store following information:
1) the mine down-hole is all give another the right of way district 7, section 8 and annexation each other, promptly the both sides of each section link to each other with certain district that gives another the right of way respectively;
2) according to each area of giving another the right of way and distinguishing, determine each district 7 maximums that can hold quantity Cmax (i) that gives another the right of way that gives another the right of way, wherein i is the sequence number of giving another the right of way and distinguishing, the value of Cmax (i) is decided according to the area in the district 7 that gives another the right of way, be 2 generally by keeping away district Cmax (i) value of giving another the right of way that the car chamber constitutes, district Cmax (i) value of giving another the right of way that constitutes in the T-shaped road junction is 3, and district Cmax (i) value of giving another the right of way of formations such as crossroad is 4.
3) all telesemes 4 of mine down-hole, card reader 5 positions and with the incidence relation of each give another the right of way district 7 or section 8;
4) electronic tag 6 and the license plate number of rubber-tired cart and the mapping table of model;
Transportation dispatching software is got in touch with by 2 timings of intelligent communication device and each the control substation 3 under the mine at ordinary times, collect the vehicle number information that each card reader 5 reads, judge that rubber-tired cart is to be in certain section 8, still be in certain district 7 that gives another the right of way, determination methods is: if the card reader 5 of installing in the district 7 that gives another the right of way receives the information that certain rubber-tired cart electronic tag 6 sends, think that then rubber-tired cart is in this gives another the right of way district 7, if the card reader 5 of installing in section 8 districts receives the information that certain rubber-tired cart electronic tag 6 sends, think that then rubber-tired cart is in this gives another the right of way district 7.When not having new card reader 5 to read the information that rubber-tired cart electronic tag 6 sends, think that the residing zone of rubber-tired cart is constant.
When dispatcher software is judged each regional rubber-tired cart quantity, then according to the display mode of following 3 kinds of different situation control signal lamps:
If one or above rubber-tired cart are arranged in certain section
According to the rule of " only allowing simultaneously by a rubber-tired cart operation in each section ", the teleseme of system control both sides is a red light simultaneously, forbids that any side of section has rubber-tired cart to sail into again.
If two certain section inside do not have rubber-tired cart
When being in idle condition without any rubber-tired cart in the section, in order to allow the rubber-tired cart of section both sides pass through this section in order, the teleseme of both sides is taked the form control of in turn open green light, prevent from simultaneously to take place in the situation that the teleseme state switches moment and has the rubber-tired cart mistake to swarm into section, teleseme in turn open between leave certain prevention off time, allow the both sides teleseme send out a warning simultaneously.Its step following (as Fig. 8 and 9):
1) section left and right sides teleseme X1, X2 are controlled to be red light phase, forbid that the both sides rubber-tired cart sails into;
2) delay time T1, open section left-side signal machine X1 allows the left side rubber-tired cart to sail into;
3) delay time T2, control section left and right sides teleseme X1, X2 send out a warning simultaneously, forbid that the both sides rubber-tired cart sails into;
4) delay time T3, open section right-side signal machine X2 allows the right side rubber-tired cart to sail into;
5) delay time T4 forwards step 1) to.
T1=T3 wherein, T2=T4;
Three, prevent to dispatch deadlock
In order to prevent that many cars from pouring in certain transportation zone of down-hole simultaneously, thereby cause that the situation that scheduling is blocked up takes place, computing machine also should be followed following principle when scheduling:
If (M 〉=2, N 〉=1) is formed by M section, the individual district that gives another the right of way of N in a transportation zone of down-hole, the border in zone all is made up of section, and the quantity of establishing the border section is L, and promptly there is L inlet guard signal machine in this zone.Only allow simultaneously in each section in the zone by a rubber-tired cart, can hold Cmax (i) rubber-tired cart (i=1......N in each district that gives another the right of way, Cmax (i) 〉=1), then when the total quantity of rubber-tired cart in this zone reaches quantity X, only allow maximum L-1 section to advance car simultaneously in transportation network, the situation that produces the scheduling deadlock to prevent many cars from pouring in this zone takes place.Wherein the value of X is calculated as follows:
X = Σ i = 1 N C max ( i ) + M - L
Driver for driving rubber-tired cart, should follow following dispatching principle:
1) driver only when the segment entry teleseme gives a green light, just can sail into, when the entry signal machine of section is red light, and the wait of should stopping;
2) driver does not under normal circumstances allow reversing in section, tune, but can give another the right of way, reverse end for end in the district that gives another the right of way;
When 3) teleseme in the segment entry gave a green light, a rubber-tired cart did not allow immediately following enter this section after another car, and the running interval of two cars is more than 10 meters.
The equipment principle of compositionality is as follows among the present invention:
As Fig. 2, wherein intelligent communication device 2 comprises microcontroller, power module, RS232 communication interface circuit and FSK communication interface circuit.The work of the whole intelligent communication device 2 of microprocessor controls, RS232 communication interface circuit be used for and main control computer between communication, FSK communication interface circuit be used for 4 road FSK buses on the communication of control substation.
As Fig. 3, control substation 3 comprises microcontroller, power module, FSK communication interface circuit, RS485 communication interface circuit.The microprocessor controls teleseme shows different mode of operations, be used to monitor the equipment state of each card reader 5 and teleseme 4 simultaneously, the FSK interface circuit be used for and intelligent communication device 2 between interface, the RS485 interface circuit be used for and teleseme 4 and card reader 5 between interface communication.
As Fig. 4, teleseme 4 comprises microcontroller, power module, RS485 communication interface circuit, signal display module.Microcontroller receives the display command that the control substation sends, and the control display module shows different colors, gives control substation 3 the self working state timed sending simultaneously.
As Fig. 5, card reader 5 comprises microcontroller, power module, RS485 communication interface circuit, radio transceiver chip and antenna.Microcontroller is controlled on the one hand between rf chip and the electronic tag 6 and is carried out communication, simultaneously electronic tag 6 identity informations that recognize is reported control substation 3 by the RS485 bus.The radio transceiver chip operation is in the 2.4GHz working frequency range, and antenna adopts the column antenna structure.
As Fig. 6, electronic tag 6 is made up of single-chip microcomputer, rf chip, 2.4G ceramic antenna, power supply chip.Rf chip establishes a communications link with single-chip microcomputer, 2.4G ceramic antenna respectively, and power supply chip provides working power for rf chip, single-chip microcomputer.The radio transceiver chip operation is in the 2.4GHz working frequency range, and electronic tag 6 antennas adopt small-sized ceramic package antenna.Electronic tag 6 is installed on the rubber-tired cart, has unique ID number, has one-to-one relationship between the license plate number of its ID number and rubber-tired cart.

Claims (1)

1. mine railless free-wheeled vehicle transport monitoring dispatching method, supervising device is made up of main control computer, intelligent communication device, control substation, teleseme, card reader and electronic tag; Adopt the RS232 bus communication between main control computer and the intelligent communication device, adopt the FSK bus communication between intelligent communication device and the control substation, adopt the RS485 bus communication between control substation and the teleseme, adopt the RS485 bus communication between control substation and the card reader, between card reader and the electronic tag by radio communication;
Write license plate number, the type information of rubber-tired cart in the described electronic tag in advance, be installed in the pilothouse of rubber-tired cart, teleseme and card reader are installed on the wall; Effective communication distance between described electronic tag and the card reader is between 10~15 meters;
Described mine railless free-wheeled vehicle transport monitoring dispatching method is characterized in that:
1) down-hole is transported the zone and be divided into give another the right of way district and section, give another the right of way to distinguish to comprise and keep away car chamber and crossing, tunnel, two adjacent tunnels of giving another the right of way between the district are referred to as section; Only allow simultaneously in each section by a rubber-tired cart, according to the area in each district that gives another the right of way, determine that maximum that each Qu Suoneng that gives another the right of way the holds quantity of giving another the right of way is Cmax (i), wherein i is the sequence number in district of giving another the right of way; Be 2 by keeping away district Cmax (i) value of giving another the right of way that the car chamber constitutes, district Cmax (i) value of giving another the right of way that constitutes in the T-shaped road junction is 3, and district Cmax (i) value of giving another the right of way that the crossroad constitutes is 4;
2) at the two ends of each section a teleseme is set respectively, in the center in the district that gives another the right of way a card reader is set, 20 meters place respectively is provided with a card reader at section inner distance two ends; When the card reader of section both sides had detected vehicle and enters section, the teleseme that system should control both sides was red light simultaneously, forbids that any side of section has locomotive to sail into again;
3) when being in idle condition without any rubber-tired cart in the section, rubber-tired cart for fear of the section both sides enters same section simultaneously, and can allow the rubber-tired cart of section both sides pass through this section in order, take the form of in turn open green light to control to the teleseme of both sides, prevent from simultaneously to take place in the situation that the moment that the teleseme state switches has the rubber-tired cart mistake to swarm into section, between teleseme is in turn open, leave certain prevention off time, allow the both sides teleseme send out a warning simultaneously, its step is as follows, T1=T3 wherein, T2=T4:
1. section left and right sides teleseme is controlled to be red light phase, forbids that the both sides rubber-tired cart sails into;
2. delay time T1 opens section left-side signal machine, allows the left side rubber-tired cart to sail into;
3. delay time T2 controls section left-side signal machine and right-side signal machine and sends out a warning simultaneously, forbids that the both sides rubber-tired cart sails into;
4. delay time T3 opens section right-side signal machine, allows the right side rubber-tired cart to sail into;
5. 1. delay time T4 forwards step to;
4) a transportation zone of establishing the down-hole is made up of M section, the individual district that gives another the right of way of N, M 〉=2, and N 〉=1, the border in zone all is made up of section, and the quantity of establishing the border section is L, and promptly this zone has L teleseme to protect; Only allow simultaneously in each section in the zone by a rubber-tired cart, can hold Cmax (i) rubber-tired cart in each district that gives another the right of way, i=1......N, Cmax (i) 〉=1, then when the total quantity of rubber-tired cart in this zone reaches quantity X, only allow maximum L-1 section to advance car simultaneously in transportation network, otherwise will cause the scheduling deadlock, wherein the computing formula of X value is
Figure DEST_PATH_F2009101444649C00021
CN2009101444649A 2009-08-10 2009-08-10 Mine trackless rubber tire vehicle transport monitoring device and dispatching method therefor Active CN101644928B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101444649A CN101644928B (en) 2009-08-10 2009-08-10 Mine trackless rubber tire vehicle transport monitoring device and dispatching method therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101444649A CN101644928B (en) 2009-08-10 2009-08-10 Mine trackless rubber tire vehicle transport monitoring device and dispatching method therefor

Publications (2)

Publication Number Publication Date
CN101644928A CN101644928A (en) 2010-02-10
CN101644928B true CN101644928B (en) 2011-07-27

Family

ID=41656845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101444649A Active CN101644928B (en) 2009-08-10 2009-08-10 Mine trackless rubber tire vehicle transport monitoring device and dispatching method therefor

Country Status (1)

Country Link
CN (1) CN101644928B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102591304B (en) * 2012-03-07 2015-04-15 河北钢铁集团矿业有限公司 Operation monitoring system for underground electric locomotive of mine
CN103075194A (en) * 2012-12-28 2013-05-01 江西稀有稀土金属钨业集团有限公司 Monorail haulage roadway signalling device and control method thereof
CN105204475A (en) * 2015-10-10 2015-12-30 西安思源学院 Mining tunnel traffic safety collision avoidance system
CN105303667A (en) * 2015-11-20 2016-02-03 金川 Mine trackless rubber-tired vehicle transportation signal and lock management system
CN106959434A (en) * 2017-03-03 2017-07-18 合肥工业大学 A kind of mine unmanned plane overall height Accuracy Positioning and method based on UWB
CN107780970B (en) * 2017-10-18 2020-06-16 兖州煤业股份有限公司 Method and system for avoiding and scheduling vehicles under mine
CN110288065A (en) * 2019-07-16 2019-09-27 西双版纳中化橡胶有限公司 A kind of control system and processing method of the identity of natural rubber drying vehicle
CN110329311B (en) * 2019-08-07 2021-04-20 合肥工大高科信息科技股份有限公司 Mine transport locomotive monitoring method and system
CN110884528A (en) * 2019-12-06 2020-03-17 大连重矿设备制造有限公司 Electric locomotive collision avoidance system and method
CN111596258B (en) * 2020-05-25 2022-06-14 合肥工大高科信息科技股份有限公司 Mine rubber-tyred vehicle position detection and scheduling system, method and device
CN112002122B (en) * 2020-07-14 2023-03-24 中国人民解放军63653部队 Intelligent meeting scheduling method in underground open cut tunnel
CN112282846A (en) * 2020-09-10 2021-01-29 苏州安视讯通信设备有限公司 Underground emergency road system and travel guiding method
CN113898401B (en) * 2021-09-09 2024-01-26 上海申传电气股份有限公司 Cloud-vehicle-rail cooperative intelligent management and control system for underground motor vehicle
CN114827889A (en) * 2022-04-13 2022-07-29 中煤科工集团重庆研究院有限公司 System and method for positioning mine personnel and monitoring and scheduling vehicle flow
CN114973707B (en) * 2022-04-25 2023-12-01 天地(常州)自动化股份有限公司 Combined control method for coal mine underground roadway intersections
CN115294772B (en) * 2022-09-29 2023-01-17 长沙迪迈数码科技股份有限公司 Underground mine bidirectional single-lane vehicle scheduling optimization method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6988591B2 (en) * 2002-09-04 2006-01-24 Komatsu Ltd. Mine transportation management system and method using separate ore vessels and transport vehicles managed via communication signals
CN2856425Y (en) * 2005-07-15 2007-01-10 刘立 Safety dynamic monitoring management system of mine
CN201198760Y (en) * 2007-12-28 2009-02-25 山西潞安环保能源开发股份有限公司王庄煤矿 Safe high-efficiency integrative matching equipment of large excavating high automatic fully mechanized working face
CN101457653A (en) * 2008-12-23 2009-06-17 张兴莲 Security control system with burst reduction and fireproofing function

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6988591B2 (en) * 2002-09-04 2006-01-24 Komatsu Ltd. Mine transportation management system and method using separate ore vessels and transport vehicles managed via communication signals
CN2856425Y (en) * 2005-07-15 2007-01-10 刘立 Safety dynamic monitoring management system of mine
CN201198760Y (en) * 2007-12-28 2009-02-25 山西潞安环保能源开发股份有限公司王庄煤矿 Safe high-efficiency integrative matching equipment of large excavating high automatic fully mechanized working face
CN101457653A (en) * 2008-12-23 2009-06-17 张兴莲 Security control system with burst reduction and fireproofing function

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
伍东亮.射频识别装置与单片机之间的串行通讯在车号识别中的应用.《中国科技信息》.2007, *
赵子轩.基于射频识别技术的车辆路口通行系统设计.《电子测量技术》.2008,第31卷(第9期), *
陈青等.FSK移频键控在矿用监控系统分站中的应用.《煤矿安全》.2008, *

Also Published As

Publication number Publication date
CN101644928A (en) 2010-02-10

Similar Documents

Publication Publication Date Title
CN101644928B (en) Mine trackless rubber tire vehicle transport monitoring device and dispatching method therefor
CN107780970B (en) Method and system for avoiding and scheduling vehicles under mine
CN110329311B (en) Mine transport locomotive monitoring method and system
CN2906786Y (en) Interactive intelligent spike and its road net information system
CN101071526A (en) Interactive intelligent road nail and its road net information system
CN108622145B (en) Suspension type monorail locomotive transportation system
CN112419703B (en) Intelligent unmanned mine card crossing traffic scheduling system and method
CN101833866A (en) Mine slope ramp traffic signal monitoring system based on radio frequency identification technology
CN216623479U (en) Mine vehicle avoidance management system
CN113602323A (en) Method and system for realizing train occupation and integrity check and train control by using transponder
CN201716871U (en) Vehicle-road communication system with safety early-warning function
CN204695574U (en) A kind of bicycle road meeting pre-warning device
CN109523789A (en) The electric vehicle road occupying managing and control system and crossing management-control method coordinated based on bus or train route interaction
CN214170608U (en) Underground mining monorail crane collision early warning device based on UWB and RFID
CN201845440U (en) Traffic command system
CN203346749U (en) One-way slope mine tunnel capable of realizing bidirectional movement
CN201732476U (en) Traffic signal monitoring system for slope ramp of mine based on radio frequency identification technology
CN211081984U (en) Collision avoidance system for rubber-tyred vehicle in mine
CN205103915U (en) Mine trackless rubber -tyred car transportation signal and shutting management system
CN202904890U (en) GPS-based bus signal priority control system
CN104916147B (en) Road traffic emergency passage control system based on GSM network
CN201867932U (en) Infrared vehicle induction early warning system used for construction road section
CN201851160U (en) Traffic lamp under mining well
CN103129582A (en) Intelligent monitoring system of metal mine underground ramp transportation
CN212423147U (en) Traveling section signal blocking system for travel track line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: HEFEI HFUT HIGH-TECH. INFORMATION TECHNOLOGY CO.,

Free format text: FORMER NAME: HEFEI GONGDA GAOKE INFORMATION TECHNOLOGY CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: High tech Zone Hefei city Anhui province 230088 Tianzhi Road No. 27

Patentee after: Hefei GOCOM Information & Technology Co., Ltd.

Address before: High tech Zone Hefei city Anhui province 230088 Tianzhi Road No. 27

Patentee before: Hefei Gongda Gaoke Information Technology Co., Ltd.