CN101619602B - 自稳型高强薄壁管内模现浇砼空心板施工方法 - Google Patents
自稳型高强薄壁管内模现浇砼空心板施工方法 Download PDFInfo
- Publication number
- CN101619602B CN101619602B CN2009101821372A CN200910182137A CN101619602B CN 101619602 B CN101619602 B CN 101619602B CN 2009101821372 A CN2009101821372 A CN 2009101821372A CN 200910182137 A CN200910182137 A CN 200910182137A CN 101619602 B CN101619602 B CN 101619602B
- Authority
- CN
- China
- Prior art keywords
- internal mold
- reinforcing bar
- colligation
- steel
- floating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
本发明公开了一种自稳型高强薄壁管内模现浇砼空心板施工方法,包括安装模板、弹线定位、安装底层钢筋、预留孔洞及预埋管线、绑扎肋间钢筋、安装自稳型高强薄壁管内模、绑扎固定抗浮钢筋、安装绑扎顶层钢筋、浇筑混凝土、混凝土的养护、拆模等步骤。本发明自稳抗浮性能好,安装简便、定位准确,且重量轻、工效高、节约成本、节能环保,节约用工。
Description
技术领域:
本发明涉及一种自稳型高强薄壁管内模现浇砼空心板施工方法。
背景技术:
自稳型高强薄壁管内模(又称CBM内模)施工中,在自稳抗浮性能、安装定环保节能等方面存在缺陷。
发明内容:
本发明的目的在于提供一种自稳抗浮性能好、安装定位简便准确的自稳型高强薄壁管内模现浇砼空心板施工方法。
本发明的技术解决方案是:
一种自稳型高强薄壁管内模(简称内模)现浇砼空心板施工方法,其特征是:包括下列步骤:
(1)安装模板:根据室内水平线,用水平仪抄测楼面底板标高,采用碗扣式钢管脚手架或采用脚手钢管为水平支撑、可调托钢管为竖向支撑,50mm×100mm木方为受力龙骨,上铺竹胶板或多层胶合板,模板双向起拱0.1~0.3%跨度;
(2)弹线定位:模板安装完毕后,弹出自稳型高强薄壁管内模的位置中心线和端头线,再弹出暗梁、预留洞口、预埋管线、底层钢筋的标识线;
(3)安装底层钢筋:按设计布置底层钢筋,先绑扎不参与内模固定的钢筋,安排好暗梁、预留洞口、预埋管线,垫好钢筋保护层垫块;
(4)预留孔洞及预埋管线:底层钢筋绑扎好后埋设各种管、盒,固定预留孔洞的模具,管、盒及管的交叉点布置在空心板的肋间或暗梁位置,穿过楼面的垂直管线,应将模板开洞埋设套管;
(5)绑扎肋间钢筋:肋间钢筋的下端先与底层钢筋绑扎固定,上端待内模安装并固定好后再与顶层钢筋绑扎固定;
(6)安装自稳型高强薄壁管内模:利用内模两端的板底上层横筋作抗浮钢筋,穿过内模支架沟槽绑扎固定,;环垂内模两端用14#或12#铁丝拉结固定在抗浮钢筋上,再在内模两端间,等距离用14#或12#铁丝拉结固定在底层钢筋上作辅助抗浮;
(7)绑扎固定抗浮钢筋:
沿筒芯内模两端的抗浮钢筋,在模板上打孔,用双股14#或12#铁丝穿过板底模,将抗浮钢筋绑扎固定在模板龙骨上或水平支撑系统上;
(8)安装绑扎顶层钢筋:
内模准确定位后,安装绑扎顶层筋,在安装绑扎钢筋前,要设置马凳或钢筋支架,支撑顶层钢筋,校核各预留洞和预埋件的位置是否准确,确认无误后,再将顶层钢筋安装绑扎成型;
(9)浇筑混凝土:
浇筑混凝土时,粗骨料粒径≤空心板肋宽和板底厚度的1/2,且不得大于31.5mm,塌落度应控制在160~180mm之间,沿内模管长度方向的肋间进行布料,布料与振捣同时进行,采用直径≤30mm的插入式振动棒振捣,待板肋的混凝土密实后,再浇筑上层混凝土,用平板振动器进行振捣,振捣结束后,用刮杠刮平,然后用木抹子搓浆抹平;
(10)混凝土的养护:
混凝土终凝后,用塑料薄膜覆盖保水养护,防止干缩裂缝,养护不少于14天,然后拆模。
本发明自稳抗浮性能好,安装简便、定位准确,且重量轻、工效高、节约成本、节能环保,节约用工。
附图说明:
下面结合附图和实施例对本发明作进一步说明。
图1是绑扎抗浮钢筋的示意图。
图2是图1的A-A视图。
图3是绑扎辅助抗浮筋的示意图。
图中1、自稳型高强薄壁管内模 2、板顶层钢筋 3、内模支架4、抗浮钢筋 5、板底层钢筋 6、肋间钢筋 7、辅助抗浮筋
具体实施方式:
一种自稳型高强薄壁管内模(简称内模)现浇砼空心板施工方法,其特征是:包括下列步骤:
(1)安装模板:根据室内水平线,用水平仪抄测楼面底板标高,采用碗扣式钢管脚手架或采用脚手钢管为水平支撑、可调托钢管为竖向支撑,50mm×100mm木方为受力龙骨,上铺竹胶板或多层胶合板,模板双向起拱0.1~0.3%跨度;
(2)弹线定位:模板安装完毕后,弹出自稳型高强薄壁管内模的位置中心线和端头线,再弹出暗梁、预留洞口、预埋管线、底层钢筋的标识线;
(3)安装底层钢筋:按设计布置底层钢筋,先绑扎不参与内模固定的钢筋,安排好暗梁、预留洞口、预埋管线,垫好钢筋保护层垫块;
(4)预留孔洞及预埋管线:底层钢筋绑扎好后埋设各种管、盒,固定预留孔洞的模具,管、盒及管的交叉点布置在空心板的肋间或暗梁位置,穿过楼面的垂直管线,应将模板开洞埋设套管;
(5)绑扎肋间钢筋:肋间钢筋的下端先与底层钢筋绑扎固定,上端待内模安装并固定好后再与顶层钢筋绑扎固定;
(6)安装自稳型高强薄壁管内模:利用内模两端的板底上层横筋作抗浮钢筋,穿过内模支架沟槽绑扎固定,;环垂内模两端用14#或12#铁丝拉结固定在抗浮钢筋上,再在内模两端间,等距离用14#或12#铁丝拉结固定在底层钢筋上作辅助抗浮筋;
(7)绑扎固定抗浮钢筋:
沿筒芯内模两端的抗浮钢筋,在模板上打孔,用双股14#或12#铁丝穿过板底模,将抗浮钢筋绑扎固定在模板龙骨上或水平支撑系统上;
(8)安装绑扎顶层钢筋:
内模准确定位后,安装绑扎顶层筋,在安装绑扎钢筋前,要设置马凳或钢筋支架,支撑顶层钢筋,校核各预留洞和预埋件的位置是否准确,确认无误后,再将顶层钢筋安装绑扎成型;
(9)浇筑混凝土:
浇筑混凝土时,粗骨料粒径≤空心板肋宽和板底厚度的1/2,且不得大于31.5mm,塌落度应控制在160~180mm之间,沿内模管长度方向的肋间进行布料,布料与振捣同时进行,采用直径≤30mm的插入式振动棒振捣,待板肋的混凝土密实后,再浇筑上层混凝土,用平板振动器进行振捣,振捣结束后,用刮杠刮平,然后用木抹子搓浆抹平;预留试压块;
(10)混凝土的养护:
混凝土终凝后,用塑料薄膜覆盖保水养护,防止干缩裂缝,养护不少于14天;当同条件的试压块强度达到设计强度的70%,跨度≥8m的强度达到100%时拆模。
Claims (1)
1.一种自稳型高强薄壁管内模现浇砼空心板施工方法,其特征是:包括下列步骤:
(1)安装模板:根据室内水平线,用水平仪抄测楼面底板标高,采用碗扣式钢管脚手架为水平支撑、可调托钢管为竖向支撑,50mm×100mm木方为受力龙骨,上铺竹胶板或多层胶合板,模板双向起拱0.1~0.3%跨度;
(2)弹线定位:模板安装完毕后,弹出自稳型高强薄壁管内模的位置中心线和端头线,再弹出暗梁、预留洞口、预埋管线、底层钢筋的标识线;
(3)安装底层钢筋:按设计布置底层钢筋,先绑扎不参与内模固定的钢筋,安排好暗梁、预留洞口、预埋管线,垫好钢筋保护层垫块;
(4)预留孔洞及预埋管线:底层钢筋绑扎好后埋设各种管、盒,固定预留孔洞的模具,管与盒的交叉点、管与管的交叉点均布置在空心板的肋间或暗梁位置,穿过楼面的垂直管线,应将模板开洞埋设套管;
(5)绑扎肋间钢筋:肋间钢筋的下端先与底层钢筋绑扎固定,上端待内模安装并固定好后再与顶层钢筋绑扎固定;
(6)安装自稳型高强薄壁管内模:利用内模两端的板底上层横筋作抗浮钢筋,穿过内模支架沟槽绑扎固定;环垂内模两端用14#或12#铁丝拉结固定在抗浮钢筋上,再在内模两端间,等距离用14# 或12#铁丝拉结固定在底层钢筋上作辅助抗浮;
(7)绑扎固定抗浮钢筋:
沿内模两端的抗浮钢筋,在模板上打孔,用双股14#或12#铁丝穿过板底模,将抗浮钢筋绑扎固定在模板龙骨上或水平支撑系统上;
(8)安装绑扎顶层钢筋:
内模准确定位后,安装绑扎顶层筋,在安装绑扎钢筋前,要设置马凳或钢筋支架,支撑顶层钢筋,校核各预留洞和预埋件的位置是否准确,确认无误后,再将顶层钢筋安装绑扎成型;
(9)浇筑混凝土:
浇筑混凝土时,粗骨料粒径≤空心板肋宽、粗骨料粒径≤板底厚度的1/2,且不得大于31.5mm,塌落度应控制在160~180mm之间,沿内模管长度方向的肋间进行布料,布料与振捣同时进行,采用直径≤30mm的插入式振动棒振捣,待板肋的混凝土密实后,再浇筑上层混凝土,用平板振动器进行振捣,振捣结束后,用刮杠刮平,然后用木抹子搓浆抹平;
(10)混凝土的养护:
混凝土终凝后,用塑料薄膜覆盖保水养护,防止干缩裂缝,养护不少于14天,然后拆模。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101821372A CN101619602B (zh) | 2009-07-14 | 2009-07-14 | 自稳型高强薄壁管内模现浇砼空心板施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009101821372A CN101619602B (zh) | 2009-07-14 | 2009-07-14 | 自稳型高强薄壁管内模现浇砼空心板施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101619602A CN101619602A (zh) | 2010-01-06 |
CN101619602B true CN101619602B (zh) | 2011-12-07 |
Family
ID=41512997
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009101821372A Expired - Fee Related CN101619602B (zh) | 2009-07-14 | 2009-07-14 | 自稳型高强薄壁管内模现浇砼空心板施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101619602B (zh) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101781932A (zh) * | 2010-03-09 | 2010-07-21 | 韩方早 | 现浇结构主梁断面及次梁钢筋保护层施工方法 |
CN101818574A (zh) * | 2010-03-23 | 2010-09-01 | 南通宏华建筑安装有限公司 | 自稳型高强薄壁管内模现浇空心板施工方法 |
CN103174293A (zh) * | 2011-12-23 | 2013-06-26 | 五冶集团上海有限公司 | 空心楼板自稳式内模安装方法 |
CN102765132A (zh) * | 2012-07-06 | 2012-11-07 | 中元建设集团股份有限公司 | 空心板梁充气胶囊抗浮筋 |
CN104234432B (zh) * | 2012-09-06 | 2016-09-14 | 山东聊建集团有限公司 | 车库顶板结构施工方法 |
CN103266704B (zh) * | 2013-05-31 | 2015-05-27 | 佛山市班高得节能建工科技有限公司 | 一种空心楼板及其施工方法 |
CN104405069B (zh) * | 2014-10-11 | 2016-02-24 | 上海建工四建集团有限公司 | 一种曲面中空顶板及其施工方法 |
CN105220807A (zh) * | 2015-10-28 | 2016-01-06 | 龙元建设集团股份有限公司 | 用于现浇砼空心楼盖的箱体空心抗浮装置及方法 |
CN106193406B (zh) * | 2016-08-07 | 2018-05-25 | 中铁十九局集团第二工程有限公司 | 先张法空心板抽芯式方钢内模施工方法 |
CN108396900A (zh) * | 2018-03-23 | 2018-08-14 | 中国十七冶集团有限公司 | 一种双层壳体屋面板及其施工方法 |
CN111485910B (zh) * | 2019-11-25 | 2022-03-15 | 上海申通地铁集团有限公司 | 钢-砼复合管节顶管通道二次内衬的施工方法 |
CN113789898B (zh) * | 2021-09-28 | 2022-11-11 | 中能建西北城市建设有限公司 | 一种大跨度缓粘结预应力楼盖板施工方法 |
-
2009
- 2009-07-14 CN CN2009101821372A patent/CN101619602B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN101619602A (zh) | 2010-01-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101619602B (zh) | 自稳型高强薄壁管内模现浇砼空心板施工方法 | |
CN101818574A (zh) | 自稳型高强薄壁管内模现浇空心板施工方法 | |
CN102127968B (zh) | 楼板套管孔洞预留预埋模具灌浆施工方法及灌浆模具 | |
CN104631512A (zh) | 吊模法后浇带梁板施工方法 | |
CN204249054U (zh) | 一种混凝土预制检查井的制作模具 | |
CN103015719A (zh) | 钻前工程钢筋混凝土废水池整体浇筑工艺 | |
CN101182773A (zh) | 铁路大断面隧道椭圆台面帽檐斜切式洞门施工方法 | |
CN102383593A (zh) | 厨卫间翻边混凝土一次成型支模装置及施工方法 | |
CN103397729A (zh) | Nz内模抗浮施工方法 | |
CN1644835A (zh) | 现浇钢筋砼空心楼盖的施工方法 | |
CN107237492A (zh) | 定型圆柱形模板的安装方法 | |
CN102352690B (zh) | 现浇混凝土空心楼板的钢管抗浮定位系统的施工方法 | |
CN201908439U (zh) | 楼板套管孔洞预留预埋灌浆模具 | |
CN112031237A (zh) | 一种现浇混凝土空心楼盖板埋入式芯模抗浮固定装置 | |
CN203373963U (zh) | 电梯井剪力墙内侧模板安装结构 | |
CN106639099B (zh) | 植物纤维型保温免拆模板支模体系表面平整度控制方法 | |
CN112112193B (zh) | 一种带暗柱双面叠合管廊侧墙及其制作方法 | |
CN103485465B (zh) | Cbm内模及cbm高强薄壁管现浇空心楼板施工工艺 | |
CN104878926A (zh) | 一种悬挂模板体系施工方法及可周转支托 | |
KR20120069263A (ko) | 중공재를 구비한 하프 슬래브 시공방법 및 하프 슬래브 | |
CN213952987U (zh) | 空心楼盖泡沫盒抗浮装置 | |
CN111576638A (zh) | 一种墙板预埋件成套施工方法 | |
CN204357121U (zh) | 新型填充墙圈梁模板系统 | |
CN110258341B (zh) | 一种提高桥梁人行道曲线段纵肋平顺性施工方法 | |
CN203347232U (zh) | 一种异型混凝土结构成型模板加固装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20111207 Termination date: 20140714 |
|
EXPY | Termination of patent right or utility model |