CN101781932A - 现浇结构主梁断面及次梁钢筋保护层施工方法 - Google Patents

现浇结构主梁断面及次梁钢筋保护层施工方法 Download PDF

Info

Publication number
CN101781932A
CN101781932A CN 201010120372 CN201010120372A CN101781932A CN 101781932 A CN101781932 A CN 101781932A CN 201010120372 CN201010120372 CN 201010120372 CN 201010120372 A CN201010120372 A CN 201010120372A CN 101781932 A CN101781932 A CN 101781932A
Authority
CN
China
Prior art keywords
girder
cast
situ
section
protecting layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201010120372
Other languages
English (en)
Inventor
韩方早
韩科
韩凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 201010120372 priority Critical patent/CN101781932A/zh
Publication of CN101781932A publication Critical patent/CN101781932A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

一种现浇结构主梁断面及次梁钢筋保护层施工方法,包括对主梁及次梁进行整体现浇,其特征在于:先将主梁钢筋骨架整体下降一定的尺寸,再将次梁钢筋骨架安装在主梁钢筋骨架上,再对主梁、次梁及楼板进行整体现浇。主梁钢筋骨架整体下降,对主梁断面无任何影响,主梁上部留有足够的空间,从而使次梁上部主筋获得符合要求的混凝土保护层,既确保工程的施工质量,又确保了建筑物的使用寿命,还具有施工简单等优点。

Description

现浇结构主梁断面及次梁钢筋保护层施工方法
技术领域
本发明涉及现浇结构主梁及次梁的施工方法,特别是涉及主梁断面及次梁钢筋保护层现浇施工方法,属建筑技术领域。
背景技术
在现浇钢筋混凝土结构施工过程中,按图纸设计要求,对主梁及次梁进行整体现浇时,会出现次梁上部主筋混凝土保护层不足或没有混凝土保护层。以图1为例,主梁断面700X950,主梁上部筋8
Figure GSA00000052119700011
32/2
Figure GSA00000052119700012
28,下部筋1832、9/9;次梁断面300X700,上部主筋428下部主筋4
Figure GSA00000052119700015
32。按国标《GB50204-2002》规范规定,梁主筋混凝土保护层为25mm,按图纸要求安装次梁主筋为428,则次梁主筋没有混凝土保护层。按现有习惯施工方法是:在主、次梁钢筋安装、验收完毕后,把主梁上部主筋,从上往下砸一定尺寸(视次梁上部主筋大小而定)后,再进行整体现浇。此法缺点有二:第一就是施工难度大,劳动强度大,费时费力;第二就是对主梁断面的有效高度减少,致使主梁的承载能力降低。由此将导致工程质量问题,使建筑物的使用寿命也会受到影响。
发明内容
本发明的目的就是针对上述现有施工方法存在之不足,提供一种现浇结构确保主梁断面不受损害,次梁上部主筋有足够厚度的混凝土保护层,并具有施工简单,保证施工质量的现浇结构施工方法。
本发明技术问题解决的方案是:一种现浇结构主梁断面及次梁钢筋保护层施工方法,包括对主梁及次梁进行整体现浇,其特征在于:先将主梁钢筋骨架整体下降一定的尺寸,即在主梁模板安装时把主梁标高降低一定高度,然后再将次梁钢筋骨架安装在主梁钢筋骨架上,再对主梁、次梁及楼板进行混凝土整体浇筑。
由于主梁整体下降了一定的尺寸,在主梁上方就有了足够的空间来安装次梁主筋,在进行主梁及次梁整体现浇时,就会使次梁主筋获得符合要求的混凝土保护层厚度。主梁整体下降的具体尺寸应由每项具体工程的设计参数,即次梁上部主筋直径大小,对照国标规范规定标准来确定。
本发明的有益效果是显而易见的,主梁整体下降,对主梁断面不产生任何影响,并给主梁上方留有足够的空间,从而使次梁上部主筋获得足够厚度的混凝土保护层,既确保了工程施工质量,又确保了建筑物的使用寿命,还具有施工简单等优点。
附图说明
图1是本发明具体工程结构平面布置图
图2是本发明具体工程/①~②轴AKL5与AL16设计节点示意图
图3是本发明具体工程
Figure GSA00000052119700022
/①~②轴AKL5与AL16施工节点示意图
图中:1、主梁上部主筋 2、次梁上部主筋 3、保护层
具体实施方式
以下将结合附图对本发明加以详细的描述:
图1是本发明具体工程结构平面布置图,图2是本发明具体施工
Figure GSA00000052119700023
/①~②轴AKL5与AL16设计节点示意图,如照设计图,按习惯施工方法,施工就会产生前面所述的情况。图3是本发明具体工程
Figure GSA00000052119700031
/①~②轴AKL5与AL16施工节点示意图,其中主梁AKL5断面为700X900,主梁上部主筋8
Figure GSA00000052119700032
32/228,下部筋18
Figure GSA00000052119700034
32、9/9;次梁AL16断面300X700,上部主筋428,下部主筋4
Figure GSA00000052119700036
32。将AKL5梁顶标高下降28mm,即是将主梁钢筋骨架整体下降28mm,再安装好次梁钢筋骨架后,进行整体现浇。从图中就明显看出主梁上部主筋1与次梁上部主筋2均在混凝土保护层3内,且次梁上部主筋获得符合要求的混凝土保护层。

Claims (1)

1.一种现浇结构主梁断面及次梁钢筋保护层施工方法,包括对主梁及次梁进行整体现浇,其特征在于:先将主梁钢筋骨架整体下降一定的尺寸,再将次梁钢筋骨架安装在主梁钢筋骨架上,再对主梁、次梁及楼板进行整体现浇。
CN 201010120372 2010-03-09 2010-03-09 现浇结构主梁断面及次梁钢筋保护层施工方法 Pending CN101781932A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201010120372 CN101781932A (zh) 2010-03-09 2010-03-09 现浇结构主梁断面及次梁钢筋保护层施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201010120372 CN101781932A (zh) 2010-03-09 2010-03-09 现浇结构主梁断面及次梁钢筋保护层施工方法

Publications (1)

Publication Number Publication Date
CN101781932A true CN101781932A (zh) 2010-07-21

Family

ID=42522078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201010120372 Pending CN101781932A (zh) 2010-03-09 2010-03-09 现浇结构主梁断面及次梁钢筋保护层施工方法

Country Status (1)

Country Link
CN (1) CN101781932A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102174855A (zh) * 2011-03-30 2011-09-07 吉林大学 加设弧形预应力钢绞线提高板柱节点承载能力的方法
CN114215348A (zh) * 2021-12-21 2022-03-22 浙江恒鸿建设有限公司 屋面现浇钢梁混凝土栅顶及施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0734712A (ja) * 1993-07-20 1995-02-03 Nkk Corp Lng地下タンクの屋根構造およびその施工方法
MXPA06001343A (es) * 2006-02-02 2007-08-01 Rivera Jorge Mauricio Pena Mejoras en el proceso constructivo de un sistema tipo vigueta y bovedilla para su aplicacion en la construccion de losas de entrepiso y azoteas.
CN101619602A (zh) * 2009-07-14 2010-01-06 南通宏华建筑安装有限公司 自稳型高强薄壁管内模现浇砼空心板施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0734712A (ja) * 1993-07-20 1995-02-03 Nkk Corp Lng地下タンクの屋根構造およびその施工方法
MXPA06001343A (es) * 2006-02-02 2007-08-01 Rivera Jorge Mauricio Pena Mejoras en el proceso constructivo de un sistema tipo vigueta y bovedilla para su aplicacion en la construccion de losas de entrepiso y azoteas.
CN101619602A (zh) * 2009-07-14 2010-01-06 南通宏华建筑安装有限公司 自稳型高强薄壁管内模现浇砼空心板施工方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《山西建筑》 20091010 张磊 钢筋混凝土框架结构施工总结 125-126 第35卷, 第29期 *
《广西城镇建设》 20060928 孔繁华等 浅谈混凝土保护层的作用及其厚度的控制 , 第09期 *
《建筑工人》 20090315 苏晓潭 钢筋保护层 , 第03期 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102174855A (zh) * 2011-03-30 2011-09-07 吉林大学 加设弧形预应力钢绞线提高板柱节点承载能力的方法
CN102174855B (zh) * 2011-03-30 2012-05-02 吉林大学 加设弧形预应力钢绞线提高板柱节点承载能力的方法
CN114215348A (zh) * 2021-12-21 2022-03-22 浙江恒鸿建设有限公司 屋面现浇钢梁混凝土栅顶及施工方法

Similar Documents

Publication Publication Date Title
Kannan et al. Constructability assessment of climbing formwork systems using building information modeling
CN201217898Y (zh) 混凝土预制楼梯
CN103362317B (zh) 既有砌体建筑加层、加梯结构及其施工方法
CN103991773A (zh) 装配式模块化钢结构电梯井道的设计与安装方法
CN104213717A (zh) 多层住宅一体化改造建造方法
Mota Voided Slabs Then and now.
CN101781932A (zh) 现浇结构主梁断面及次梁钢筋保护层施工方法
CN205557951U (zh) 一种新型局部现浇的装配式叠合楼屋面板
CN105220792A (zh) 一种预制暗支撑耗能剪力墙及其组装方法
CN202689536U (zh) 超高混凝土梁板结构支模体系
CN201942994U (zh) 一种桥梁支座垫块
CN203922362U (zh) 装配式模块化钢结构电梯井道
CN108612244A (zh) 整体预制楼板及其构筑方法
CN103061514A (zh) 大跨度钢结构连廊施工方法
CN211898502U (zh) 施工电梯高位转换基础
CN111335530A (zh) 一种集块建筑叠合板用变截面单向预制空心板
CN108204131A (zh) 一种预制隔墙建造法
CN203782984U (zh) 可控制板面标高及平整度的马凳筋
CN215406744U (zh) 一种预制装配式轻质填充墙
CN103541478B (zh) 格构式叠合梁与板及其施工方法
CN208830462U (zh) 一种住宅楼预制装配式阳台施工结构
CN208884728U (zh) 钢-混凝土组合预制梁和预制柱连接结构
CN204983723U (zh) 一种增强型低层建筑加层结构
CN217378995U (zh) 一种地下室外墙半逆作法施工结构
CN204401642U (zh) 一种彩钢板房预制装配式基础

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20100721