CN101519875A - 复杂地层的组合式成桩方法 - Google Patents
复杂地层的组合式成桩方法 Download PDFInfo
- Publication number
- CN101519875A CN101519875A CN200910094302A CN200910094302A CN101519875A CN 101519875 A CN101519875 A CN 101519875A CN 200910094302 A CN200910094302 A CN 200910094302A CN 200910094302 A CN200910094302 A CN 200910094302A CN 101519875 A CN101519875 A CN 101519875A
- Authority
- CN
- China
- Prior art keywords
- construction
- machine
- combined type
- stratum
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
复杂地层的组合式成桩方法。本发明涉及的是地层工程中混凝土成桩的施工方法,特别是在复杂的地层状况下完成混凝土成桩的施工方法。本发明的方法为组合的,即对于地下的坚硬障碍物层采用全套管钻机成孔,并且钢套管在施工中保持摇动与压入同时进行或回转与压入同时进行;而对于地下普通地层,则采用常规的旋挖机、长螺旋桩机、钻/冲孔桩机、人工挖孔来完成成孔施工。本发明的方法可在复杂地层状况下进行成桩施工,并且成桩质量好、效率较高、施工成本低。
Description
技术领域
本发明涉及的是地层工程中混凝土成桩的施工方法,特别是在复杂的地层状况下完成混凝土成桩的施工方法。
背景技术
常规的地层状况下的桩孔成孔方法有采用旋挖机、长螺旋桩机、钻(冲)孔桩机、人工挖孔等方法。这些常规的方法在理想的普通地层状况下具有施工成本较低的优点,但在实际的操作中,地下的构造是很复杂的,有时会遇到砾石、卵石、漂石等,有时会遇到地下水,特别是在城市的旧城改造中,地质情况更加复杂,常规方法就很难以施工,有时是不能施工。例如当地下的砾石、卵石、漂石等坚硬障碍物厚度大于30cm时,采用旋挖机或长螺旋桩机几乎难成孔;采用钻(冲)孔桩机则会大大降低工作效率,比常规的普通地层施工降要低效率达1/2以上,从而使建筑成本上升;若采用人工挖孔的方式效率也很低,并且存在很大的安全隐患。
近年在国内已有使用的贝诺特全套管施工法,虽然能较好地解决上述地下地层的砾石、卵石、漂石和城市的砖渣、石渣和混凝土块等坚硬障碍物,但全套管施工法也存在着一定弱点。例如,全套管钻机属于大型设备,需要较大的场地,运行成本也较高,因此在城市的旧城改造中存在一定的困难,并会加大施工费用;又如,桩孔中的地下水位下带有一定厚度的细砂层时,拉拔管较困难,会影响降低施工效率,增加施工成本;再如,该方法的桩长不适合大于50m,但在目前的城市建设中,楼房越来越高,常常有增加设计桩长的需要。
发明内容
本发明所要解决的技术问题是提供一种复杂地层的组合式成桩方法,它可在复杂地层状况下进行成桩施工,并且成桩质量好、效率较高、施工成本低。
解决本发明的技术问题所采用的方案是:对于地下的坚硬障碍物层采用全套管钻机成孔,并且钢套管在施工中保持摇动与压入同时进行或回转与压入同时进行;而对于地下普通地层,则采用常规的旋挖机、长螺旋桩机、钻/冲孔桩机、人工挖孔来完成成孔施工。
本发明的具体施工步骤为:
(1)定桩位,制作混凝土井圈;
(2)全套管钻机就位,压入钢套管,用配套的冲抓器和破碎工具清除孔内/管内的坚硬地下障碍物;
(3)钢套管中注入浆液或回填砂、土,稳定孔壁;
(4)拔出钢套管,全套管钻机移位;
(5)常规的成孔装置旋挖机、长螺旋桩机或钻/冲孔桩机再次就位,进行成孔作业;
(6)清孔,安装钢筋笼;
(7)灌注混凝土,成桩。
本发明的上述步骤(1)的制作混凝土井圈后,当地表地层为普通土层时,先预成孔,采用常规的旋挖机、长螺旋桩机或钻/冲孔桩机装置,在土层范围先进行首次成孔作业,然后设备移位;当地表地层为坚硬障碍物时,则可直接用全套管钻机进行成孔作业。
在本发明上述的对坚硬障碍物清除成孔中,当遇到粒径大于300mm的砾石、卵石或漂石坚硬障碍物层时,应使全套管钻机就位,采用一边摇动,一边清除,一边压入的方式压入钢套管,通过反复该操作突破坚硬障碍物层。
在对坚硬障碍物清除成孔中,若当遇到的障碍物粒径大于2倍桩径时,应在钢套管内结合人工爆破予以清除。
本发明的有益效果是:(1)对于常规的旋挖机、长螺旋桩机、钻/冲孔桩机、人工挖孔所不能完成的地下坚硬障碍物层的成孔作业,本方法则可以采用全套管钻机来完成;(2)由于采用组合辅助清障的方式,可大大较高效率,降低施工成本,比对于普通地层采用旋挖机、长螺旋桩机、钻/冲孔桩机或人工挖孔的方式,工效提高1~2倍,比贝诺特全套管施工法成本降低1/3以上;(3)桩孔中的地下水位下带有一定厚度(大约为6m)的细砂层时,不再采用全套管钻机施工,解决了拉拔管困难问题,因此成桩质量好;(4)组合辅助成孔的方式,可使桩长达到50m以上,从而本方法的适应性更强。
附图说明
图1是本发明的施工流程图。
图中(a)~(g)为本发明施工中各步骤的顺序。
具体实施方式
实施例1:
地表浅地层带有坚硬障碍物的地层成孔作业
(1)定桩位,制作混凝土井圈。
(2)全套管钻机就位,采用一边摇动,一边压入的方式压入钢套管,用配套的冲抓器和破碎工具清除孔内/管内的坚硬地下障碍物,当遇到粒径大于300mm的砾石、卵石或漂石坚硬障碍物层作业时,则采用一边摇动,一边清除,一边压入的方式压入钢套管,通过反复该操作突破坚硬障碍物层;当遇到的障碍物粒径大于2倍桩径时,在钢套管内应结合人工爆破予以清除。
(3)钢套管中注入浆液或回填砂、土,稳定孔壁。
(4)拔出钢套管,全套管钻机移位。
(5)常规的成孔装置旋挖机、长螺旋桩机或钻/冲孔桩机再次就位,进行成孔作业。
(6)清孔,安装钢筋笼。
(7)灌注混凝土,成桩。
实施例2:
地表浅地层为普通的地层地复杂基成孔作业
(1)定桩位,制作混凝土井圈。
(2)预成孔,采用常规的旋挖机、长螺旋桩机或钻/冲孔桩机装置,在地层范围先进行首次成孔作业,然后设备移位。
(3)全套管钻机就位,在预成孔基础上压入钢套管,用实施例1相同方法清除桩孔内的坚硬障碍物层。
(4)钢套管中注入浆液或回填砂、土,稳定孔壁,无地下水时可不灌注浆液或回填砂、土。
(5)拔出钢套管,全套管钻机移位。
(6)常规的成孔装置旋挖机、长螺旋桩机或钻/冲孔桩机再次就位,进行二次成孔作业。
(7)清孔,然后安装钢筋笼。
(8)灌注混凝土,成桩。
Claims (5)
1、一种复杂地层的组合式成桩方法,其特征是:对于地下的坚硬障碍物层采用全套管钻机成孔,并且钢套管在施工中保持摇动与压入同时进行或回转与压入同时进行;而对于地下普通土质地层,则采用常规的旋挖机、长螺旋桩机、钻/冲孔桩机、人工挖孔来完成成孔施工。
2、如权利要求1所述的复杂地层的组合式成桩方法,其特征是具体施工步骤为:
(1)定桩位,制作混凝土井圈;
(2)全套管钻机就位,压入钢套管,用配套的冲抓器和破碎工具清除孔内/管内的坚硬地下障碍物;
(3)钢套管中注入浆液或回填砂、土,稳定孔壁;
(4)拔出钢套管,全套管钻机移位;
(5)常规的成孔装置旋挖机、长螺旋桩机或钻/冲孔桩机再次就位,进行成孔作业;
(6)清孔,安装钢筋笼;
(7)灌注混凝土,成桩。
3、如权利要求2所述的复杂地层的组合式成桩方法,其特征是:在制作混凝土井圈后,当地表地层为普通地层时,先预成孔,采用常规的旋挖机、长螺旋桩机或钻/冲孔桩机装置,在地层范围先进行首次成孔作业,然后设备移位;当地表地层为坚硬障碍物时,则直接用全套管钻机进行成孔作业。
4、如权利要求3所述的复杂地层的组合式成桩方法,其特征是:当遇到在粒径大于300mm的砾石、卵石或漂石坚硬障碍物层时,全套管钻机就位,采用一边摇动,一边清除,一边压入的方式压入钢套管,通过反复该操作突破坚硬障碍物层。
5、如权利要求3所述的复杂地层的组合式成桩方法,其特征是:当遇到坚硬障碍物的粒径大于2倍桩径时,在钢套管内结合人工爆破予以清除。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910094302A CN101519875A (zh) | 2009-04-08 | 2009-04-08 | 复杂地层的组合式成桩方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN200910094302A CN101519875A (zh) | 2009-04-08 | 2009-04-08 | 复杂地层的组合式成桩方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN101519875A true CN101519875A (zh) | 2009-09-02 |
Family
ID=41080661
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN200910094302A Pending CN101519875A (zh) | 2009-04-08 | 2009-04-08 | 复杂地层的组合式成桩方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101519875A (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102434097A (zh) * | 2011-08-23 | 2012-05-02 | 谢清光 | 快速成桩工艺 |
CN101713278B (zh) * | 2009-11-19 | 2012-09-05 | 江苏扬建集团有限公司 | 钻孔灌注桩成孔一桩双机施工方法 |
CN102839653A (zh) * | 2012-08-02 | 2012-12-26 | 天津二十冶建设有限公司 | 软土内有块石层地基混凝土灌注桩施工方法 |
CN103614999A (zh) * | 2013-11-06 | 2014-03-05 | 中铁十六局集团第五工程有限公司 | 一种用于复杂地质条件下群桩深孔施工的方法和支架 |
CN105239564A (zh) * | 2015-10-28 | 2016-01-13 | 上海十三冶建设有限公司 | 全套管组合泥浆护壁的灌注桩施工方法 |
CN106284349A (zh) * | 2015-05-18 | 2017-01-04 | 五冶集团上海有限公司 | 辅助成孔锤击沉桩施工方法 |
CN107701109A (zh) * | 2017-09-08 | 2018-02-16 | 浙江江南春建设集团有限公司 | 含块石粉砂土地基灌注桩钻孔预处理方法 |
CN110144886A (zh) * | 2019-05-16 | 2019-08-20 | 深圳市工勘岩土集团有限公司 | 深厚软弱地层长螺旋跟管、旋挖钻成孔灌注桩施工方法 |
-
2009
- 2009-04-08 CN CN200910094302A patent/CN101519875A/zh active Pending
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101713278B (zh) * | 2009-11-19 | 2012-09-05 | 江苏扬建集团有限公司 | 钻孔灌注桩成孔一桩双机施工方法 |
CN102434097A (zh) * | 2011-08-23 | 2012-05-02 | 谢清光 | 快速成桩工艺 |
CN102839653A (zh) * | 2012-08-02 | 2012-12-26 | 天津二十冶建设有限公司 | 软土内有块石层地基混凝土灌注桩施工方法 |
CN103614999A (zh) * | 2013-11-06 | 2014-03-05 | 中铁十六局集团第五工程有限公司 | 一种用于复杂地质条件下群桩深孔施工的方法和支架 |
CN103614999B (zh) * | 2013-11-06 | 2016-08-17 | 中铁十六局集团第五工程有限公司 | 一种用于复杂地质条件下群桩深孔施工的方法 |
CN106284349A (zh) * | 2015-05-18 | 2017-01-04 | 五冶集团上海有限公司 | 辅助成孔锤击沉桩施工方法 |
CN105239564A (zh) * | 2015-10-28 | 2016-01-13 | 上海十三冶建设有限公司 | 全套管组合泥浆护壁的灌注桩施工方法 |
CN107701109A (zh) * | 2017-09-08 | 2018-02-16 | 浙江江南春建设集团有限公司 | 含块石粉砂土地基灌注桩钻孔预处理方法 |
CN110144886A (zh) * | 2019-05-16 | 2019-08-20 | 深圳市工勘岩土集团有限公司 | 深厚软弱地层长螺旋跟管、旋挖钻成孔灌注桩施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101519875A (zh) | 复杂地层的组合式成桩方法 | |
Zhou et al. | Engineering issues on karst | |
CN110344400B (zh) | 旋挖钻机遇坚硬岩成孔成桩施工工艺 | |
CN103046931B (zh) | 一种竖井/导井冲击式钻机冲击成孔施工方法 | |
CN102704873A (zh) | 自带泥浆池及泥浆分离装置钻/冲孔灌注桩的施工设备 | |
CN102182399B (zh) | 反循环钻机钻孔、锤击成孔、扩孔、清渣的施工法及设备 | |
CN1657711A (zh) | 旋喷锚杆桩施工工艺 | |
CN104963346A (zh) | 复杂地质的深基坑围护施工方法 | |
CN105239564A (zh) | 全套管组合泥浆护壁的灌注桩施工方法 | |
CN106837382A (zh) | 一种地铁隧道围岩地面预注浆加固工艺 | |
CN108071110A (zh) | 复杂地质条件下旋挖钻机嵌岩桩施工方法 | |
CN105040705A (zh) | 多溶洞地质条件下地基基础处理施工工艺 | |
CN105113976A (zh) | 钢丝刷钻头回旋钻机及解决埋钻、掉钻、卡钻的方法 | |
CN104631479B (zh) | 换土搅拌的止水帷幕的施工方法 | |
CN202611632U (zh) | 自带泥浆池及泥浆分离装置钻/冲孔灌注桩的施工设备 | |
CN103556641A (zh) | 一种既有地下室坑内地下连续墙成槽辅助方法 | |
CN204782730U (zh) | 钢丝刷钻头回旋钻机 | |
KR100701885B1 (ko) | 비개착 관로 건설공법 | |
CN201158823Y (zh) | 可回收式冲击钻钢管降水井 | |
CN104032736B (zh) | 珊瑚礁灰岩地层中水泥土搅拌桩的施工方法 | |
CN105113511A (zh) | 砂岩结合土层的基坑综合支护施工方法 | |
CN105156017A (zh) | 一种运用于塌孔地层的高压冲击喷浆钻机及施工方法 | |
CN107012865A (zh) | 锚杆防塌孔的施工方法 | |
CN209429151U (zh) | 钢管降水井辅助装置 | |
CN116906055B (zh) | 控制隧道下穿铁路路基变形的施工方法及棚架支护结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20090902 |