CN101435334B - 盾构法隧道进出洞段管片连接结构及其施工方法 - Google Patents
盾构法隧道进出洞段管片连接结构及其施工方法 Download PDFInfo
- Publication number
- CN101435334B CN101435334B CN2008102046644A CN200810204664A CN101435334B CN 101435334 B CN101435334 B CN 101435334B CN 2008102046644 A CN2008102046644 A CN 2008102046644A CN 200810204664 A CN200810204664 A CN 200810204664A CN 101435334 B CN101435334 B CN 101435334B
- Authority
- CN
- China
- Prior art keywords
- jurisdiction
- section
- fitting
- built
- short
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
本发明公开了一种盾构法隧道进出洞段管片连接结构,其包括短预埋件、长预埋件和连接板,所述短预埋件和长预埋件埋固于每一管片的内弧面上,部分连接板的两端分别与同环相接管片上的相邻短预埋件固定连接起来,另外部分连接板的两端分别与邻环相接管片上的相邻长预埋件或短预埋件固定连接起来,以形成管片的环向连接及纵向连接。本发明还提供了一种上述进出洞段管片连接结构的施工方法。本发明具有结构简单、便于施工,强度高、刚度大、质量可靠,形式美观、施工后不用拆卸等优点,能够适用于错缝拼装的大型盾构隧道施工,特别是适用于直径大于14米的超大直径盾构进出洞段管片的连接施工。
Description
技术领域:
本发明涉及盾构法隧道的施工,尤其涉及一种盾构法隧道进出洞段管片的连接结构及其施工方法,属于建筑工程技术领域。
背景技术:
盾构进出洞段管片的拼装是盾构法建造隧道的重要环节,该工序施工的优劣将直接影响建成后隧道的轴线质量以及进出洞口处环境保护的成效。与正常掘进段不同,出洞段管片兼具导向和负环管片拆除时特殊受力要求,进洞段管片则要求在盾构反向顶力逐渐卸载的情况下具有良好的整体性和稳定性,所以进出洞段管片拼装完成后,必须在螺栓连接的基础上进行管片的加强连接,以增加其整体刚度。
经检索发现,中国专利申请“用于盾构法隧道中衬砌管片与内层衬砌间的连接方法”(专利申请号200710037447.6)涉及了一种用于盾构法隧道中衬砌管片与内层衬砌间的连接方法,该方法通过在衬砌管片与内层衬砌间的接合面之间设置锚筋,使二者有效地连成一体。申请号为200610024898.1的中国专利申请“衬砌隧道管片拼装限位的方法”在管片分块面上设置远小于现有技术中凹凸榫的尺寸的凹槽,以及在凹槽中设置定位棒,用于管片拼装时的限位。然而以上专利均未涉及管片与管片之间的连接。
目前,在已经实施的地铁盾构进出洞段管片的连接工程中,管片纵向通常采用通长的槽钢进行连接,而环向一般采用环向螺栓的连接方式或者剪力销的连接方式。在小直径隧道中采用上述方式尚能满足管片连接的需要,但在直径大于14m的超大型盾构的管片连接中,由于空间的增大以及管片自重的原因,若采用槽钢或定位棒连接,则容易出现以下问题:
(1)在纵向连接上,采用整根槽钢连接在施工过程中操作不便;此外由于槽钢整体刚度较小,且环向难以采用该方式连接,因而无法达到加强成环隧道管片整体刚度的要求,容易引起环间错台;再者,当施工完成后,从内部施工需要以及整体美观方面考虑,需要拆除前期焊接的槽钢,因此工序较为繁琐。
(2)在环向连接上,定位棒无法起到加强隧道成环管片整体刚度的要求,容易引起管片碎裂现象。
发明内容:
本发明所要解决的技术问题是克服现有盾构进出洞段管片连接的缺陷,提供一种盾构法隧道进出洞段管片连接结构,其能够适应错缝拼装的管片,施工后不用拆卸,具有结构形式简单美观、强度高、刚度大和便于施工的优点。本发明还提供一种上述进出洞段管片连接结构的施工方法。
本发明解决其技术问题所采取的技术方案如下:
一种盾构法隧道进出洞段管片连接结构,设置于隧道进出洞段的管片上,该管片内弧面的两侧边处设置有穿置纵向螺栓的手孔,其特征在于:该管片连接结构包括短预埋件、长预埋件和连接板,所述短预埋件埋固于每一管片内弧面的四角处,所述长预埋件埋固于每一管片内弧面两侧边的纵向螺栓手孔旁边,部分连接板一端固定连接于管片的短预埋件上,其另一端固定连接于与该管片同环相接的另一管片上相邻的短预埋件上,以形成管片的环向连接,另外部分连接板一端固定连接于管片的短预埋件或长预埋件上,其另一端固定连接于与该管片邻环相接的另一管片上相邻的长预埋件上,以形成管片的纵向连接。
本发明所述盾构法隧道进出洞段管片连接结构的短预埋件和长预埋件各自包括有平板和锚筋,所述锚筋垂直地固定连接于平板的下面,其埋入管片的内部,所述平板暴露在管片的内弧面上;该短预埋件、长预埋件和连接板均由钢材制成,其相互间的固定连接方式为焊接。
一种建造上述盾构法隧道进出洞段管片连接结构的施工方法,其按照下列步骤进行施工:
(1)盾构推进前预先准备好连接板;
(2)出洞阶段前10环管片采用内弧面四角处固埋有短预埋件和内弧面两侧边的纵向螺栓手孔旁边固埋有长预埋件的管片进行拼接,每两环管片拼装完毕后,首先将连接板的两端分别与同环相接管片上的相邻短预埋件焊接固定起来,然后再将另外连接板的一端固定连接于管片的短预埋件或长预埋件上,其另一端固定连接于与该管片邻环相接的另一管片上相邻的长预埋件上,以形成管片的环向连接及纵向连接;
(3)进洞阶段最后10环管片同样采用内弧面四角处固埋有短预埋件和内弧面两侧边的纵向螺栓手孔旁边固埋有长预埋件的管片进行拼接,重复上述第(2)项所述的施工内容。
与现有进出洞段管片的连接方式相比较,本发明所述的盾构法隧道进出洞段管片连接结构采用内弧面固埋有短预埋件和长预埋件的管片进行拼接,并通过连接板将预埋件之间固定连接起来,使各环管片的纵向及环向有效地连成一体,作为一整体叠合构件共同受力,大大改善了结构受力状态,从而使其接合面能传递压力、剪力及弯矩,满足连接刚度的要求,增加了环与环之间以及管片与管片之间的抗拉和抗剪能力,有效地防止了两者之间的错动移位,保证了进出洞段隧道管片成环和轴线的成型质量。此外,所述盾构法隧道进出洞段管片连接结构的构件简单实用,可就地取材加工制作,便于现场施工;同时该连接结构的外观可以作为永久结构形式予以保留,不影响结构的整体美观性。总之,本发明的优点是,结构简单、便于施工,强度高、刚度大、质量可靠,形式美观、施工后不用拆卸,其能够适用于错缝拼装的大型盾构隧道施工,特别是适用于直径大于14米的超大直径盾构进出洞段管片的连接施工。
附图说明:
图1为本发明的结构示意图。
图2为本发明管片的结构示意图。
图3为图2的仰视图。
图4为本发明短预埋件和长预埋件的横截面示意图。
具体实施方式:
现结合附图和具体实施例对本发明作进一步详细说明。
首先请参阅图1本发明的结构示意图,图示盾构法隧道进出洞段管片连接结构设置于隧道进出洞段10环的管片上,其包括:短预埋件1、长预埋件2和连接板4,该短预埋件1、长预埋件2和连接板4均由钢材制成。再请参阅图4短预埋件1和长预埋件2的横截面示意图,所述短预埋件1和长预埋件2各自包括有平板8和锚筋9,该锚筋9为一弯曲构件,其垂直地固定连接于平板8的下面,例如与平板8相焊接。再请结合参阅图2和图3管片的结构示意图,该管片内弧面的两侧边处设置有若干穿置纵向螺栓11的手孔10,其内弧面的四角处设置有穿置环向螺栓13的手孔12。所述短预埋件1埋入并固定于每一管片内弧面的四角处,从而靠近环向螺栓手孔12,所述长预埋件2埋入并固定于每一管片内弧面两侧边的纵向螺栓手孔的旁边,该短预埋件1和长预埋件2的锚筋9埋入管片的内部,该平板8暴露在管片的内弧面上(见图2),埋入工作可以在管片浇筑的阶段进行。
再请参阅图1,当隧道进出洞段的管片拼成环之后,其错缝拼装的状况即如图1所示,前环管片3与后环管片5纵向拼接于接缝7上,后环两管片5的同环接缝7恰好对应于前环管片3的中部。部分连接板4(一块或多块,下同)的一端固定连接(例如焊接,下同)于一管片5的短预埋件1上,其另一端固定连接于与该管片5同环相接的另一管片5上相邻的位于环向螺栓手孔12旁边的短预埋件1上,从而形成管片5的环向连接。另外的部分连接板4的一端固定连接于管片5的短预埋件1上,其另一端固定连接于与该管片5邻环相接的另一管片3上相邻的长预埋件2上;还有部分连接板4的一端固定连接于管片5的长预埋件2上,其另一端固定连接于与该管片5邻环相接的另一管片3上相邻的长预埋件2上,从而形成管片3与5的纵向连接。所述短预埋件1和长预埋件2与连接板4固定连接的部位都是其平板8的板面,固定连接的方式一般为焊接。
建造本发明所述盾构法隧道进出洞段管片连接结构的施工方法按照下列步骤进行:
(1)盾构推进前预先准备好连接板4,由于该连接板4的结构简单,因此可以就地取材,用钢板的边角料加工制作,也可以在预制件工厂中制成后运至现场。
(2)出洞阶段前10环管片采用内弧面四角处固埋有短预埋件1和内弧面两侧边的纵向螺栓手孔10旁边固埋有长预埋件2的管片进行拼接,以保证盾构进出洞过程中后续管片的纵向和环向稳定,避免拼装好的管片出现错缝或错台现象。请结合参阅图1,每前后两环管片3和5拼装完毕后,首先将连接板4的两端分别与同环相接管片5上的相邻短预埋件1的平板8搭接起来,随后进行焊连,形成焊缝6将两相邻短预埋件1焊固起来,也就是将两同环相接的管片5连接固定起来,以形成管片的环向连接;焊缝6沿短预埋件1与连接板4的搭接边线均匀布置,其饱满度应符合工艺要求。然后再将另外的连接板4的两端分别与前后邻环相接的管片3和5上的相邻长预埋件2或者相邻短预埋件1和长预埋件2搭接并焊接起来,也就是将两邻环相接的管片3和5连接固定起来,以形成管片的纵向连接;对焊缝6的工艺要求与上述一致。
(3)进洞阶段最后10环管片同样采用内弧面四角处固埋有短预埋件1和内弧面两侧边的纵向螺栓手孔10旁边固埋有长预埋件2的管片进行拼接,其拼接方法重复上述第(2)项所述的施工内容。
本发明所述盾构法隧道进出洞段管片连接结构适用于错缝拼装的大型盾构隧道施工,特别是适用于直径大于14米的超大直径盾构进出洞段管片的连接施工。
Claims (4)
1.一种盾构法隧道进出洞段管片连接结构,设置于隧道进出洞段的管片上,该管片内弧面的两侧边处设置有穿置纵向螺栓的手孔,其特征在于:该管片连接结构包括短预埋件、长预埋件和连接板,所述短预埋件埋固于每一管片内弧面的四角处,所述长预埋件埋固于每一管片内弧面两侧边的纵向螺栓手孔旁边,部分连接板一端固定连接于管片的短预埋件上,其另一端固定连接于与该管片同环相接的另一管片上相邻的短预埋件上,以形成管片的环向连接,另外部分连接板一端固定连接于管片的短预埋件或长预埋件上,其另一端固定连接于与该管片邻环相接的另一管片上相邻的长预埋件上,以形成管片的纵向连接。
2.根据权利要求1所述的盾构法隧道进出洞段管片连接结构,其特征在于:所述短预埋件和长预埋件各自包括有平板和锚筋,所述锚筋垂直地固定连接于平板的下面,其埋入管片的内部,所述平板暴露在管片的内弧面上。
3.根据权利要求2所述的盾构法隧道进出洞段管片连接结构,其特征在于:所述短预埋件、长预埋件和连接板均由钢材制成,其相互间的固定连接方式为焊接。
4.一种建造权利要求3所述盾构法隧道进出洞段管片连接结构的施工方法,其特征在于:按照下列步骤进行施工:
(1)盾构推进前预先准备好连接板;
(2)出洞阶段前10环管片采用内弧面四角处固埋有短预埋件和内弧面两侧边的纵向螺栓手孔旁边固埋有长预埋件的管片进行拼接,每两环管片拼装完毕后,首先将连接板的两端分别与同环相接管片上的相邻短预埋件焊接固定起来,然后再将另外连接板的一端固定连接于管片的短预埋件或长预埋件上,其另一端固定连接于与该管片邻环相接的另一管片上相邻的长预埋件上,以形成管片的环向连接及纵向连接;
(3)进洞阶段最后10环管片同样采用内弧面四角处固埋有短预埋件和内弧面两侧边的纵向螺栓手孔旁边固埋有长预埋件的管片进行拼接,重复上述第(2)项所述的施工内容。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102046644A CN101435334B (zh) | 2008-12-16 | 2008-12-16 | 盾构法隧道进出洞段管片连接结构及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008102046644A CN101435334B (zh) | 2008-12-16 | 2008-12-16 | 盾构法隧道进出洞段管片连接结构及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101435334A CN101435334A (zh) | 2009-05-20 |
CN101435334B true CN101435334B (zh) | 2010-10-06 |
Family
ID=40709948
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008102046644A Expired - Fee Related CN101435334B (zh) | 2008-12-16 | 2008-12-16 | 盾构法隧道进出洞段管片连接结构及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101435334B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593891A (zh) * | 2019-09-11 | 2019-12-20 | 中铁时代建筑设计院有限公司 | 一种进行能量交换的盾构隧道及其施工方法 |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102094650B (zh) * | 2009-12-14 | 2014-03-26 | 上海市基础工程集团有限公司 | 复杂工况条件下的盾构进洞施工方法 |
CN102345299B (zh) * | 2011-11-11 | 2013-08-07 | 上海市隧道工程轨道交通设计研究院 | 用于沉管隧道可重复使用的装配式端封方法 |
CN104453940B (zh) * | 2014-11-28 | 2016-09-21 | 中铁第四勘察设计院集团有限公司 | 盾构隧道纵向预警连接结构 |
CN104632232B (zh) * | 2015-02-04 | 2016-12-28 | 北京市政建设集团有限责任公司 | 一种扩挖大直径盾构隧道建造地铁车站的管片拆除方法 |
CN105178984B (zh) * | 2015-09-29 | 2017-06-06 | 中国石油天然气集团公司 | 一种应用于隧道管片的锁紧装置 |
CN106014420A (zh) * | 2016-05-17 | 2016-10-12 | 上海市城市建设设计研究总院 | 装配式竖井管片结构 |
CN106194205A (zh) * | 2016-10-10 | 2016-12-07 | 张青富 | 盾构管片及盾构管道 |
CN106499436A (zh) * | 2016-11-25 | 2017-03-15 | 上海市政工程设计研究总院(集团)有限公司 | 有内水压的盾构隧道接头预埋件及盾构隧道环内拼装方法 |
CN106703831A (zh) * | 2016-11-30 | 2017-05-24 | 上海市政工程设计研究总院(集团)有限公司 | 一种用于有内水压的盾构隧道的管片拼装方法 |
CN108104825B (zh) * | 2018-01-12 | 2019-07-19 | 中国铁路设计集团有限公司 | 一种盾构隧道隧底回填装配式施工方法 |
CN111997649A (zh) * | 2020-09-15 | 2020-11-27 | 中铁隧道局集团有限公司 | 先隧后站暗挖车站管片拆除施工方法及其所使用的管片拆除工装 |
CN112943272B (zh) * | 2021-03-24 | 2023-01-24 | 上海市基础工程集团有限公司 | 小直径盾构隧道f块限位器 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1818341A (zh) * | 2006-03-21 | 2006-08-16 | 上海市隧道工程轨道交通设计研究院 | 衬砌隧道管片拼装定位的方法 |
CN101012750A (zh) * | 2007-02-12 | 2007-08-08 | 上海市隧道工程轨道交通设计研究院 | 用于盾构法隧道中衬砌管片与内层衬砌间的组合连接方法 |
CN201080827Y (zh) * | 2007-07-17 | 2008-07-02 | 西安理工大学 | 可伸缩式衬砌管片 |
-
2008
- 2008-12-16 CN CN2008102046644A patent/CN101435334B/zh not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1818341A (zh) * | 2006-03-21 | 2006-08-16 | 上海市隧道工程轨道交通设计研究院 | 衬砌隧道管片拼装定位的方法 |
CN101012750A (zh) * | 2007-02-12 | 2007-08-08 | 上海市隧道工程轨道交通设计研究院 | 用于盾构法隧道中衬砌管片与内层衬砌间的组合连接方法 |
CN201080827Y (zh) * | 2007-07-17 | 2008-07-02 | 西安理工大学 | 可伸缩式衬砌管片 |
Non-Patent Citations (2)
Title |
---|
张嘉俊等.上海长江隧道盾构出洞施工技术.《地下工程施工与风险防范技术——2007第三届上海国际隧道工程研讨会文集》.2007, * |
李章林等.上中路隧道工程盾构出洞施工技术.《上海建设科技》.2006,(第4期), * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110593891A (zh) * | 2019-09-11 | 2019-12-20 | 中铁时代建筑设计院有限公司 | 一种进行能量交换的盾构隧道及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN101435334A (zh) | 2009-05-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101435334B (zh) | 盾构法隧道进出洞段管片连接结构及其施工方法 | |
CN202108119U (zh) | 一种插板加强型相贯节点 | |
CN105863051B (zh) | 一种可恢复功能的装配式端板连接节点连接装置 | |
CN107761957A (zh) | 新型套筒式方钢管柱与h型钢梁装配式节点及其施工方法 | |
CN205976001U (zh) | 一种可恢复功能的装配式l形件节点连接装置 | |
JP5999749B2 (ja) | 鉄骨構造物柱梁接合部の梁と突起付き内ダイアフラム直結工法 | |
CN105863167A (zh) | 一种可拆卸装配式圆钢管混凝土柱 | |
CN105625585A (zh) | 屈曲约束钢结构梁柱连接节点和钢结构建筑 | |
CN107023076A (zh) | 一种装配式混凝土柱‑钢梁连接节点及其制作方法 | |
CN105569184A (zh) | 一种矩形钢管混凝土柱与h型钢梁单向螺栓连接节点 | |
CN107100269A (zh) | 一种带拼接套管的钢管柱间连接的节点及其制作方法 | |
CN105239787B (zh) | 全拼接式混凝土框架加固装置及其施工方法 | |
CN103835374A (zh) | 新型方钢管柱-h型钢梁拼接外套筒式连接方法 | |
CN106638990A (zh) | 一种可恢复功能的端板装配式蜂窝腹板梁柱节点连接装置 | |
CN103104038A (zh) | 矩形管柱拼接内套管螺栓连接节点 | |
CN114108810A (zh) | Frp管材桁架拼装用复合增强型钢套管节点及安装方法 | |
CN217998414U (zh) | 一种用于多腔钢管水平缝快捷拼装的连接装置 | |
CN218969809U (zh) | 一种快速拼装式闭合箱涵结构 | |
CN207609090U (zh) | 一种可更换的装配式钢管混凝土构件 | |
CN111188462A (zh) | 钢筋连接用拼接式灌浆套筒及制作方法 | |
CN206529890U (zh) | 一种可恢复功能的装配式蜂窝腹板梁柱节点连接装置 | |
CN206360087U (zh) | 一种冷弯多腔钢管混凝土异形柱与h型钢梁的刚性节点 | |
CN115341655A (zh) | 一种装配式钢结构内外套筒柱拼接节点和施工方法 | |
CN112372231B (zh) | 一种控制管桁架节点法兰盘焊接变形的方法 | |
CN104695598A (zh) | T型钢龙骨横竖框连接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101006 Termination date: 20101216 |