CN101435270B - High layer post subsection butt-joint operating method - Google Patents

High layer post subsection butt-joint operating method Download PDF

Info

Publication number
CN101435270B
CN101435270B CN2007100481726A CN200710048172A CN101435270B CN 101435270 B CN101435270 B CN 101435270B CN 2007100481726 A CN2007100481726 A CN 2007100481726A CN 200710048172 A CN200710048172 A CN 200710048172A CN 101435270 B CN101435270 B CN 101435270B
Authority
CN
China
Prior art keywords
pillar
security platform
subsection
catladder
high layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN2007100481726A
Other languages
Chinese (zh)
Other versions
CN101435270A (en
Inventor
周金国
龚卫星
钟龙发
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Construction Co Ltd filed Critical Shanghai Baoye Construction Co Ltd
Priority to CN2007100481726A priority Critical patent/CN101435270B/en
Publication of CN101435270A publication Critical patent/CN101435270A/en
Application granted granted Critical
Publication of CN101435270B publication Critical patent/CN101435270B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The invention relates to high attitude work, especially a high-rise pillar segment work method. The high-rise pillar segment work method comprises a plurality of double pipe string pillars having lifting lugs, and includes the following steps: the first step, arranging steel bar straight ladder along the length direction from down to up on the surfaces of the pillars; the second step, arranging a safe platform on the top ends of the double pipes of the pillars provided with the straight ladder; the third step, vertically arranging the pillars provided with the safe platform by lifting equipment through the lifting lugs, and the worker can get on the safe platform through the straight ladder; the fourth step, lifting the other pillars which are not provided with the safe platform, and the worker can butt joint the two segments of pillars on the safe platform; and the fifth step, dismounting the safe platform, and repeating the second to the fourth steps to complete the butt joint work for all the pillars.

Description

High layer post subsection butt joint operational method
Technical field
The present invention relates to senior engineer's operation, relate in particular to a kind of high layer post subsection operational method.
Background technology
To the lifting of superelevation overlength, ultra wide, overweight member, the construction safety technical difficulty that is faced is: 1. the overlength member can't transport in heavy (high level) mill construction; 2. town road restriction transportation; 3. site condition can't satisfy the lifting ability restriction that the requirement of large-scale loop wheel machine erect-position causes; 4. the member appearance can not be provided with too much complementary temporory structure; 5. work high above the ground is used frequent and is removed difficulty.When being installed in the past, this type structure is difficult to satisfy safe and reliable technical requirements.Like installation for the cold rolling factory building four tubing string segmentations of certain unit butt joint (long 54.5 meters, wide 4 meters, weigh 113 tons); Adopt conventional technical safety measures; Consider that large-scale loop wheel machine can't use, town road transports situation such as restriction because of the site condition restriction causes; Can only segmentation install; Every section pillar needs butt welding to be connected to design height, and how weld job guarantees that operating personnel's personal safety does not have good solution for a long time in the high-altitude, and the high-level placement of welding equipment simultaneously also is a problem.
Summary of the invention
The present invention is intended to address the above problem, and a kind of high layer post subsection butt joint operational method is provided.Job platform of the present invention is the strong scheme of a kind of feasibility really for technical safety measures, not only simple science, and also practical, convenient.High-rise member must the segmentation butt joint and safety measure formulate under the difficult situation realization constructor from ground to the high-altitude the safe vestibule of docking operation point, flexible, workable, safe and efficient, economize on resources to reach.
The present invention is achieved in that a kind of high layer post subsection docking calculation; It comprises some to having the dual string pillar of hanger, and it comprises the following steps:
Step 1, on the surface of some pillars, the elongated along its length from bottom to up reinforcing bar catladder that is provided with;
Step 2 is provided with security platform on the said two-tube top that is provided with the pillar of catladder;
Step 3 is utilized lifting appliance, uprightly is provided with being provided with the security platform pillar through hanger, and the operating personnel climbs up security platform through catladder;
Step 4, the pillar of security platform is not established in lifting, and the operating personnel welds two sections pillar butt joints on the security platform platform;
Step 5 is removed security platform, and repeating step two to four is accomplished the mating operation of all high-rise pillars.
Described high layer post subsection docking calculation; In the said step 1; Said catladder is provided with the cage that protects of corresponding semicircle cover shape, and the said two ends of protecting cage are fixedly connected the dual-side of catladder, and and catladder common form one from ground to escape way said security platform.
Described high layer post subsection docking calculation; Said security platform comprises a flat board, is provided with railing around the flat board, is provided with through hole in the flat board to hold high-rise pillar; Dull and stereotyped bottom is provided with clamp near the pillar position; In the said step 2, the buckle of some and said clamp respective numbers is set on the pillar side face, platform is fixedly connected with pillar thereby said clamp inserts buckle.
Described high-altitude pillar segmentation docking calculation, said security platform bottom also is provided with triangular support bracket, and the plumbing bar of said triangular support bracket is fixed on the said pillar.
Described high-altitude pillar segmentation docking calculation, in the said step 2, said security platform bottom also is connected with safety net.
Described high-altitude pillar segmentation docking calculation in the said step 3, draws in the pillar aperture and to establish the life rope, directly is bundled on the dual string pillar; The operating personnel all need hang up properly safety belt when decoupling device, butt joint connection, welding procedure, buckle of safety belt point is being arranged on the life rope at man-hole opening place.
The method that the present invention adopts is to adopt special-purpose temporary platform, through from being arranged on the guarding cage vertical ladder on the pillar, begins from ground until temporary platform is provided with a little, even arrives pillar top and crane girder etc. frequent point is installed, and can form a safe corridor.After being used to complete, temporary platform can conveniently be removed again, is convenient to second use, and convenient and swift also the meaning during dismounting reduced potential safety hazard.Installation and removal are all very convenient, and with the elongated reinforcing bar catladder of pillar with protect the cage supplementary measures, form a safe corridor fast and easily.In the actual security control of engineering construction, easy for installation, flexible operation has reduced construction cost, plays remarkable result, is applicable to the frequent lifting of factory building work high above the ground of the same type.
Description of drawings
Below, in conjunction with accompanying drawing the present invention is further described:
Fig. 1 is a sketch map of the present invention;
Fig. 2 is an A-A sectional view among Fig. 1.
The specific embodiment
A kind of high layer post subsection docking calculation; It comprises some to having the dual string pillar 1 of hanger, and it comprises the following steps:
Step 1 sees also Fig. 1, at the elongated along its length from bottom to up reinforcing bar catladder 3 that is provided with of some pillars 1; What said catladder 3 was provided with corresponding semicircle cover shape protects cage 4, and the said two ends of protecting cage 4 are fixedly connected the dual-side of catladder 3, and and catladder 3 is common forms an escape way between 1 top from ground to the pillar; This passage is the current up and down security protection passages of convenient working personnel.The decoupling device of epimere pillar will be accomplished through this catladder.
Step 2; On the said two-tube top that is provided with the pillar 1 of catladder 3 security platform 2 is set; The function of platform must be diversified, and this is determined by multiple restrictions such as pillar waypoint place spatial dimension is narrow and small, hypervelocity construction operation task is various, the pillar appearance should not be welded multifunction structure.See also Fig. 1 and combine Fig. 2; Said security platform 2 is provided with railing 21 around comprising one dull and stereotyped 20, dull and stereotyped 20, is provided with through hole to hold high-rise pillar 1 in the flat board 20; Dull and stereotyped 20 bottoms are provided with three clamps 22 near pillar 1 position; Correspondingly, on the side face of pillar waypoint bottom, three buckles 11 are set, are fixedly connected with pillar 1 thereby said clamp 22 inserts buckle 11; In order to guarantee the firm of security platform 2, said security platform 2 bottoms also are provided with triangular support bracket 23, and the plumbing bar of said triangular support bracket 23 is fixed on the said pillar 1; Said security platform 2 bottoms also are connected with safety net 5 to prevent falling of operating personnel and construction equipment.
Step 3 utilizes lifting appliance uprightly to be provided with the pillar 1 that is provided with security platform 2 through hanger, and the operating personnel climbs up security platform 2 through catladder 3;
Step 4, the pillar 1 of security platform is not established in lifting, and the operating personnel welds 1 butt joint of two sections pillars on security platform 2; In order to ensure safety, draw in pillar 1 aperture and to establish the life rope, directly be bundled on the dual string pillar 1; The operating personnel all need hang up properly safety belt when decoupling device, butt joint connection, welding procedure, buckle of safety belt point is being arranged on the life rope at man-hole opening place;
Step 5 is removed security platform 2, and repeating step two to four is accomplished the mating operation of all pillars 1.

Claims (6)

1. high layer post subsection docking calculation; It comprises some to having the dual string pillar of hanger, it is characterized in that it comprises the following steps:
Step 1 is at some pillars surface, the elongated along its length from bottom to up reinforcing bar catladder that is provided with;
Step 2 is provided with security platform on the two-tube top of the pillar that is provided with catladder;
Step 3 is utilized lifting appliance, uprightly is provided with being provided with the security platform pillar through hanger, and the operating personnel climbs up security platform through catladder;
Step 4 is lifted by crane the pillar that other does not establish security platform, and the operating personnel welds two sections pillar butt joints on the security platform platform;
Step 5 is removed security platform, and repeating step two to four is accomplished the mating operation of all pillars.
2. high layer post subsection docking calculation according to claim 1; It is characterized in that; In the said step 1; Said catladder is provided with the cage that protects of corresponding semicircle cover shape, and said right ends of protecting cage is fixedly connected the dual-side of catladder, and and catladder common form one from ground to escape way said security platform.
3. high layer post subsection docking calculation according to claim 1 is characterized in that, in the said step 2; Said security platform comprises a flat board; Be provided with railing around dull and stereotyped, be provided with through hole in the flat board to hold high-rise pillar, dull and stereotyped bottom is provided with clamp near the pillar position; The buckle of some and said clamp respective numbers is set on the pillar side face, said platform is fixedly connected with pillar thereby said clamp inserts buckle.
4. high layer post subsection docking calculation according to claim 3 is characterized in that, said security platform bottom also is provided with triangular support bracket, and the plumbing bar of said triangular support bracket is fixed on the said pillar.
5. high layer post subsection docking calculation according to claim 3 is characterized in that, in the said step 2, said security platform bottom also is connected with safety net.
6. high layer post subsection docking calculation according to claim 1 is characterized in that, in the said step 3; Draw in the pillar aperture and to establish the life rope, directly be bundled on the dual string pillar; The operating personnel all need hang up properly safety belt when decoupling device, butt joint connection, welding procedure, buckle of safety belt point is being arranged on the life rope at pillar man-hole opening place.
CN2007100481726A 2007-11-13 2007-11-13 High layer post subsection butt-joint operating method Active CN101435270B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100481726A CN101435270B (en) 2007-11-13 2007-11-13 High layer post subsection butt-joint operating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100481726A CN101435270B (en) 2007-11-13 2007-11-13 High layer post subsection butt-joint operating method

Publications (2)

Publication Number Publication Date
CN101435270A CN101435270A (en) 2009-05-20
CN101435270B true CN101435270B (en) 2012-04-04

Family

ID=40709890

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100481726A Active CN101435270B (en) 2007-11-13 2007-11-13 High layer post subsection butt-joint operating method

Country Status (1)

Country Link
CN (1) CN101435270B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102912996B (en) * 2012-11-19 2015-03-18 广州机施建设集团有限公司 Steel tube concrete column high-altitude construction safety protection system
CN104878917A (en) * 2015-05-22 2015-09-02 中国十七冶集团有限公司 Movable construction platform and application method thereof
CN105971265A (en) * 2016-05-26 2016-09-28 黄标城 Movable double-layer safety net device used for building scaffold
CN107542273B (en) * 2016-06-24 2020-05-26 中国二十冶集团有限公司 Core column type high-rise mast construction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1256344A (en) * 1998-12-10 2000-06-14 日立工程设备建设株式会社 Construction method for laying main beam and main beam centering adjusting device
CN1261638A (en) * 1999-12-30 2000-08-02 王康强 Mounting method for high-rise building steel structure
CN2695510Y (en) * 2004-05-08 2005-04-27 刘志峰 Building body assembling frame structure

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1256344A (en) * 1998-12-10 2000-06-14 日立工程设备建设株式会社 Construction method for laying main beam and main beam centering adjusting device
CN1261638A (en) * 1999-12-30 2000-08-02 王康强 Mounting method for high-rise building steel structure
CN2695510Y (en) * 2004-05-08 2005-04-27 刘志峰 Building body assembling frame structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开平9-112037A 1997.04.28

Also Published As

Publication number Publication date
CN101435270A (en) 2009-05-20

Similar Documents

Publication Publication Date Title
CN101435270B (en) High layer post subsection butt-joint operating method
CN101876209B (en) Supertall building core tube construction safety fire protection system and device
AU2009219109A1 (en) A height safety system
CN208009277U (en) A kind of short sliding installation system of land-based area large-tonnage steel box beam
CN103775734B (en) Gas drainage pipeline system construction method under large-diameter well
CN205444961U (en) Tool room safety protection canopy with double -deck shed roof structure
CN202391136U (en) Concrete pumping equipment and safety positioning device for end hose of concrete pumping equipment
CN201169922Y (en) Safety device of high layer posts subsection butt-joint operation
CN101818576B (en) Safe escape device for ultra-high-rise building core tube construction
KR101552102B1 (en) Fall prevention device and tank for floating body structure
CN108625874A (en) A kind of tunnel reinforcing steel bar-binding bench frame
US7987794B2 (en) Side shift raise climbing system
KR20140023496A (en) Scaffolding apparatus for installing beam and method for installing beam using the same
JP6873435B2 (en) Suspended scaffolding and its erection method
CN113309002A (en) Light movable assembled hanging basket for bridge maintenance
CN209129618U (en) Tunnel reinforcing steel bar-binding bench frame
CN201778498U (en) Safe escape device for super-high-rise building core wall construction
CN208586515U (en) Moveable Roadway Construction hanging basket
CN207032001U (en) A kind of bridge structure
KR200419382Y1 (en) Post assembly for inspecting cable way
CN205711585U (en) Anti-for massif slope type buried pipeline buries frame
CN205400106U (en) Instrument formula construction stair safety protective guard
CN204059900U (en) The dull and stereotyped scaffold in a kind of colliery
KR100929311B1 (en) Dabbit device
CN203742189U (en) Cable fixing type hoistway protection device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 200941 Shanghai City, Baoshan District Road, No. four yuan, 168

Patentee after: Shanghai Baoye Group Corp., Ltd.

Address before: 200941, four Yuan Road, Shanghai, No. 168

Patentee before: Baoye Construction Co., Ltd., Shanghai

CP03 Change of name, title or address