CN104878917A - Movable construction platform and application method thereof - Google Patents
Movable construction platform and application method thereof Download PDFInfo
- Publication number
- CN104878917A CN104878917A CN201510271260.7A CN201510271260A CN104878917A CN 104878917 A CN104878917 A CN 104878917A CN 201510271260 A CN201510271260 A CN 201510271260A CN 104878917 A CN104878917 A CN 104878917A
- Authority
- CN
- China
- Prior art keywords
- fence
- cat ladder
- operation platform
- building operation
- movable building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Ladders (AREA)
Abstract
The invention discloses a movable construction platform and an application method thereof. The movable construction platform comprises a ladder and a fence detachably arranged on the top of the ladder. A center hole is formed in the center of the fence, main fulcrum bars are arranged on the two sides of a bottom plate of the fence, an auxiliary fulcrum bar is arranged between the main fulcrum bars on the two sides, and a footboard is laid on the tops of the main fulcrum bars and the top of the auxiliary fulcrum bar. A ladder through hole is formed in the footboard, and the ladder is arranged at the bottom of the ladder through hole. By means of the movable construction platform and the application method thereof, the quality and efficiency of steel structure column installing and welding can be effectively improved, and the possibility of accidents in the steel structure column installing and welding process can be effectively reduced. The working process of scaffold installing is omitted, the working efficiency is improved, and the construction period is shortened.
Description
Technical field
The present invention relates to a kind of operation platform and using method thereof, be specially a kind of movable building operation platform and using method thereof.
Background technology
Because of the needs of economic development, the building of many modernization of architecture now, building now all has certain height, all needs to use the operation platforms such as double ladder, support body and scaffold in the process of building constructure.The scaffold used in daily life needs to build from bottom, just there is larger danger when highly higher, and in use, be easy to the component that comes off, not only make the safety factor of scaffold reduce and also can cause throwing object in high sky, fatefulue threat is existed to building downstairs or people etc.
In the installation process of steel structure column under construction, will will carry out accurate abutting joint and welding to steel structure column according to designing requirement, welding quality directly has influence on the safety of whole building primary structure.Common way is: after in steel structure column installation and welding process, constructor will carry out setting up scaffold in advance, constructor could carry out installation and the welding job of steel column on scaffold, also to remove scaffold after having worked, the method gives up work when giving up, badly influence construction quality and the efficiency of steel structure column installation and welding, and there is potential safety hazard.
Summary of the invention
The present invention will solve the aesthetic problem how protected fetal hair and solve in protection fetal hair process, proposes a kind of movable building operation platform and using method thereof, effectively can improve efficiency of construction, to solve the technical problem in background technology.
In order to solve the problems of the technologies described above, the invention provides following technical scheme:
The invention provides a kind of movable building operation platform and using method thereof, comprise cat ladder and be detachably arranged on the fence at cat ladder top, described fence center is provided with centre bore and the base plate both sides of described fence are provided with main strut, and being provided with secondary pole between the described main strut of both sides, described main strut and described secondary pole top are equipped with pedal; Described pedal is provided with cat ladder through hole, described cat ladder via bottoms is provided with cat ladder.
As a preferred technical solution of the present invention, described pedal outer ledge place is provided with and the baseboard contacted bottom described fence; Corner, described fence top is provided with suspension rod.
As a preferred technical solution of the present invention, the fence cross bar that described fence comprises fence montant and intersects vertically with described fence montant.
As a preferred technical solution of the present invention, described cat ladder by several cat ladder montants and and the cat ladder cross bar that intersects vertically of several and described cat ladder montant form, and cat ladder montant described in several is connected by junction steel plate and fixes.
As a preferred technical solution of the present invention, described fence bottom inside is provided with supporting steel plate.
Using method of the present invention and step thereof:
1), within the scope of distance steel column construction place 1-2 rice, supporting steel plate is welded in steel column surrounding;
2), by cat ladder on 1.5-2.5m place steel wire bundle and steel column;
3), on the basis of 1 and 2, fence 8 to be lifted on steel column and to contact with supporting steel plate 1 and weld, now can construct on pedal 4;
4), treat step 3 terminate after, fence is hung construction place, is convenient to reuse next time.
Compared with prior art, the beneficial effect that the present invention has is: the present invention is a kind of movable building operation platform and using method thereof, effectively can improve the quality in steel structure column installation, welding procedure process and efficiency, effectively reduce the generation of security incident in steel structure column installation, welding job.Eliminate the workflow of installation foot hand cradle, improve operating efficiency, shorten the construction period.
Accompanying drawing explanation
Accompanying drawing is used to provide a further understanding of the present invention, and forms a part for manual, together with embodiments of the present invention for explaining the present invention, is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is a kind of movable building operation platform described in the embodiment of the present invention and using method overall schematic thereof;
Fig. 2 is a kind of movable building operation platform described in the embodiment of the present invention and using method fence schematic top plan view thereof;
Fig. 3 is a kind of movable building operation platform described in the embodiment of the present invention and user's connection diagram thereof;
In figure: 1, supporting steel plate; 2, main strut; 3, secondary pole; 4, pedal; 5, baseboard; 6, cat ladder through hole; 7, suspension rod; 8, fence; 801, fence montant; 802, fence cross bar; 803, centre bore; 10, cat ladder; 1001, cat ladder montant; 1002, cat ladder cross bar; 11, junction steel plate.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the present invention, is not intended to limit the present invention.
As shown in Figure 1 to Figure 3, a kind of movable building operation platform of the present invention and using method thereof, comprise cat ladder 10 and be detachably arranged on the fence 8 at cat ladder 10 top, described fence 8 center is provided with centre bore 803 and the base plate both sides of described fence 8 are provided with main strut 2, and being provided with secondary pole 3 between the described main strut 2 of both sides, described main strut 2 is equipped with pedal 4 with described secondary pole 3 top; Described pedal 4 is provided with cat ladder through hole 6, bottom described cat ladder through hole 6, is provided with cat ladder 10.
Described pedal 4 outer ledge place is provided with and the baseboard 5 contacted bottom described fence 8; Corner, described fence 8 top is provided with suspension rod 7.Pedal 4 choice for use wooden form or checkered steel plate can be laid on fence 8 and forms working platform, and is provided with baseboard 5 for preventing the unexpected landing of constructor at the avris of pedal; The suspension rod 7 that fence 8 edge is arranged is convenient to the operation of tower crane.
The fence montant 801 that described fence 8 comprises fence montant 801 and intersects vertically with described fence montant 801.Be welded to connect between fence montant 801 and fence montant 801.Described cat ladder 10 by several cat ladder montants 1001 and and the cat ladder cross bar 1002 that intersects vertically of several and described cat ladder montant 1001 form, and cat ladder montant 1001 described in several is connected by junction steel plate 11 and fixes.Wherein cat ladder 10 top is also welded with on fence 8, and cat ladder 10 is that several short and small cat ladders assemble, easy to carry, and can use the multiple construction site of convenient transfer rapidly, it is convenient to facilitate.Described fence 8 bottom inside is provided with supporting steel plate 1.Supporting steel plate 1 is one of main support component of the present invention.
Using method of the present invention and step thereof:
1), within the scope of distance steel column construction place 1-2 rice, supporting steel plate 1 is welded in steel column surrounding;
2), by cat ladder 10 on 1.5-2.5m place steel wire bundle and steel column;
3), on the basis of 1 and 2, fence 8 to be lifted on steel column and to contact with supporting steel plate 1 and weld,
Now can construct on pedal 4;
4), treat step 3 terminate after, fence is hung construction place, is convenient to reuse next time.
The present invention is a kind of movable building operation platform and using method thereof, effectively can improve the quality in steel structure column installation, welding procedure process and efficiency, effectively reduces the generation of security incident in steel structure column installation, welding job.Eliminate the workflow of installation foot hand cradle, improve operating efficiency, shorten the construction period.
Last it is noted that the foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, although with reference to previous embodiment to invention has been detailed description, for a person skilled in the art, it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.
Claims (6)
1. a movable building operation platform and using method thereof, comprise cat ladder (10) and be detachably arranged on the fence (8) at cat ladder (10) top, it is characterized in that, described fence (8) center is provided with centre bore (803) and the base plate both sides of described fence (8) are provided with main strut (2), and being provided with secondary pole (3) between the described main strut (2) of both sides, described main strut (2) and described secondary pole (3) top are equipped with pedal (4); Described pedal (4) is provided with cat ladder through hole (6), described cat ladder through hole (6) bottom is provided with cat ladder (10).
2. a kind of movable building operation platform according to claim 1 and using method thereof, is characterized in that, described pedal (4) outer ledge place is provided with the baseboard (5) contacted with described fence (8) bottom; Described fence (8) napex corner is provided with suspension rod (7).
3. a kind of movable building operation platform according to claim 1 and 2 and using method thereof, it is characterized in that, the fence cross bar (802) that described fence (8) comprises fence montant (801) and intersects vertically with described fence montant (801).
4. a kind of movable building operation platform according to claim 1 and using method thereof, it is characterized in that, described cat ladder (10) by several cat ladder montants (1001) and and the cat ladder cross bar (1002) that intersects vertically of several and described cat ladder montant (1001) form, and described in several, cat ladder montant (1001) is connected by junction steel plate (11) and is fixed.
5. a kind of movable building operation platform according to claim 3 and using method thereof, is characterized in that, described fence (8) bottom inside is provided with supporting steel plate (1).
6. a kind of movable building operation platform according to claim 1 and using method thereof, is characterized in that, using method of the present invention and step thereof:
1), within the scope of distance steel column construction place 1-2 rice, supporting steel plate (1) is welded in steel column surrounding;
2), by cat ladder (10) on 1.5-2.5m place steel wire bundle and steel column;
3), 1) and 2) basis on, fence (8) to be lifted on steel column and to contact with supporting steel plate (1) and weld, now can construct on pedal (4);
4), treat step 3) terminate after, fence is hung construction place, is convenient to reuse next time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510271260.7A CN104878917A (en) | 2015-05-22 | 2015-05-22 | Movable construction platform and application method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510271260.7A CN104878917A (en) | 2015-05-22 | 2015-05-22 | Movable construction platform and application method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104878917A true CN104878917A (en) | 2015-09-02 |
Family
ID=53946574
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510271260.7A Pending CN104878917A (en) | 2015-05-22 | 2015-05-22 | Movable construction platform and application method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104878917A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107476617A (en) * | 2017-10-16 | 2017-12-15 | 山东电力建设第工程公司 | A kind of indirect cool tower lifting broadening platform support and installation method |
CN108386127A (en) * | 2018-05-10 | 2018-08-10 | 中国恩菲工程技术有限公司 | Vertical ladder component |
CN110029804A (en) * | 2019-04-10 | 2019-07-19 | 中铁建设集团有限公司 | A kind of sizing steel operating platform |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2288074A1 (en) * | 2005-06-24 | 2007-12-16 | Jose Luis Antuña Suarez | Shaping device for annular and adjustable working platform, has multiple supports, which are radially hooked to cable that surrounds chimney, where each support has stringer with upper clamp, hooking to cable and inferior roller |
CN201125524Y (en) * | 2007-11-12 | 2008-10-01 | 上海市安装工程有限公司 | Construction site climbing mobile platform |
CN101435270A (en) * | 2007-11-13 | 2009-05-20 | 上海宝冶建设有限公司 | High layer post subsection butt-joint operating method |
CN101858139A (en) * | 2010-06-22 | 2010-10-13 | 中国核工业华兴建设有限公司 | Concrete casting platform |
CN201722909U (en) * | 2010-04-22 | 2011-01-26 | 华泰(南通)船务有限公司 | Simple hanging pick of steel open caisson |
CN203034773U (en) * | 2012-11-12 | 2013-07-03 | 中建钢构有限公司 | Assembly type operating platform with variable diameter |
CN204040439U (en) * | 2014-09-10 | 2014-12-24 | 北京建工四建工程建设有限公司 | A kind of reducing operation platform installed for steel rectangle column |
-
2015
- 2015-05-22 CN CN201510271260.7A patent/CN104878917A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ES2288074A1 (en) * | 2005-06-24 | 2007-12-16 | Jose Luis Antuña Suarez | Shaping device for annular and adjustable working platform, has multiple supports, which are radially hooked to cable that surrounds chimney, where each support has stringer with upper clamp, hooking to cable and inferior roller |
CN201125524Y (en) * | 2007-11-12 | 2008-10-01 | 上海市安装工程有限公司 | Construction site climbing mobile platform |
CN101435270A (en) * | 2007-11-13 | 2009-05-20 | 上海宝冶建设有限公司 | High layer post subsection butt-joint operating method |
CN201722909U (en) * | 2010-04-22 | 2011-01-26 | 华泰(南通)船务有限公司 | Simple hanging pick of steel open caisson |
CN101858139A (en) * | 2010-06-22 | 2010-10-13 | 中国核工业华兴建设有限公司 | Concrete casting platform |
CN203034773U (en) * | 2012-11-12 | 2013-07-03 | 中建钢构有限公司 | Assembly type operating platform with variable diameter |
CN204040439U (en) * | 2014-09-10 | 2014-12-24 | 北京建工四建工程建设有限公司 | A kind of reducing operation platform installed for steel rectangle column |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107476617A (en) * | 2017-10-16 | 2017-12-15 | 山东电力建设第工程公司 | A kind of indirect cool tower lifting broadening platform support and installation method |
CN108386127A (en) * | 2018-05-10 | 2018-08-10 | 中国恩菲工程技术有限公司 | Vertical ladder component |
CN110029804A (en) * | 2019-04-10 | 2019-07-19 | 中铁建设集团有限公司 | A kind of sizing steel operating platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205501837U (en) | Steel case roof beam becomes bridge welding simple platform | |
CN204040439U (en) | A kind of reducing operation platform installed for steel rectangle column | |
CN204781887U (en) | Prefabricated assembly type structure's no outrigger construction platform | |
CN104878917A (en) | Movable construction platform and application method thereof | |
CN103774838B (en) | A kind of construction of lift well assembling safe operation platform and using method | |
CN103912128A (en) | Construction method of high-altitude one-piece steel truss | |
CN103291116B (en) | For the netted shuttering supporting operating platform of construction of water tank on top of inverted-cone water tower | |
CN202990427U (en) | Climbing discharging platform | |
CN208716713U (en) | A kind of overhanging steel structure lifting auxiliary device | |
CN202706495U (en) | Ladder type air basket | |
CN206385463U (en) | A kind of anchor ear construction auxiliary hanging basket instrument | |
CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
CN207739607U (en) | A kind of elevator well crosshead | |
CN206220484U (en) | A kind of template suspension centre spandrel girder of steel platform | |
CN203361600U (en) | Transfer-free material-transferring platform | |
CN102733612B (en) | Mounting method of electric hoist orbit | |
CN203905432U (en) | Hydraulic lifting retractable type platform device | |
CN204626931U (en) | In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform | |
CN104652829A (en) | Construction method for self-lifting folding positioning operation system | |
CN109944428A (en) | The work in combination platform and its installation method of steel structural overhead installation | |
JP3202588U (en) | Structure of safety scaffold with handrail | |
CN211142829U (en) | Hanging flower basket operation construction platform | |
CN208166511U (en) | A kind of construction roof beam structure | |
CN214658680U (en) | Stiffness type steel reinforced concrete beam lower hanging operation platform | |
CN204040595U (en) | Cross-arm armrest assembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150902 |