CN104878917A - Movable construction platform and application method thereof - Google Patents

Movable construction platform and application method thereof Download PDF

Info

Publication number
CN104878917A
CN104878917A CN201510271260.7A CN201510271260A CN104878917A CN 104878917 A CN104878917 A CN 104878917A CN 201510271260 A CN201510271260 A CN 201510271260A CN 104878917 A CN104878917 A CN 104878917A
Authority
CN
China
Prior art keywords
fence
cat ladder
operation platform
building operation
movable building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510271260.7A
Other languages
Chinese (zh)
Inventor
胡源
胡兴旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201510271260.7A priority Critical patent/CN104878917A/en
Publication of CN104878917A publication Critical patent/CN104878917A/en
Pending legal-status Critical Current

Links

Landscapes

  • Ladders (AREA)

Abstract

The invention discloses a movable construction platform and an application method thereof. The movable construction platform comprises a ladder and a fence detachably arranged on the top of the ladder. A center hole is formed in the center of the fence, main fulcrum bars are arranged on the two sides of a bottom plate of the fence, an auxiliary fulcrum bar is arranged between the main fulcrum bars on the two sides, and a footboard is laid on the tops of the main fulcrum bars and the top of the auxiliary fulcrum bar. A ladder through hole is formed in the footboard, and the ladder is arranged at the bottom of the ladder through hole. By means of the movable construction platform and the application method thereof, the quality and efficiency of steel structure column installing and welding can be effectively improved, and the possibility of accidents in the steel structure column installing and welding process can be effectively reduced. The working process of scaffold installing is omitted, the working efficiency is improved, and the construction period is shortened.

Description

A kind of movable building operation platform and using method thereof
Technical field
The present invention relates to a kind of operation platform and using method thereof, be specially a kind of movable building operation platform and using method thereof.
Background technology
Because of the needs of economic development, the building of many modernization of architecture now, building now all has certain height, all needs to use the operation platforms such as double ladder, support body and scaffold in the process of building constructure.The scaffold used in daily life needs to build from bottom, just there is larger danger when highly higher, and in use, be easy to the component that comes off, not only make the safety factor of scaffold reduce and also can cause throwing object in high sky, fatefulue threat is existed to building downstairs or people etc.
In the installation process of steel structure column under construction, will will carry out accurate abutting joint and welding to steel structure column according to designing requirement, welding quality directly has influence on the safety of whole building primary structure.Common way is: after in steel structure column installation and welding process, constructor will carry out setting up scaffold in advance, constructor could carry out installation and the welding job of steel column on scaffold, also to remove scaffold after having worked, the method gives up work when giving up, badly influence construction quality and the efficiency of steel structure column installation and welding, and there is potential safety hazard.
Summary of the invention
The present invention will solve the aesthetic problem how protected fetal hair and solve in protection fetal hair process, proposes a kind of movable building operation platform and using method thereof, effectively can improve efficiency of construction, to solve the technical problem in background technology.
In order to solve the problems of the technologies described above, the invention provides following technical scheme:
The invention provides a kind of movable building operation platform and using method thereof, comprise cat ladder and be detachably arranged on the fence at cat ladder top, described fence center is provided with centre bore and the base plate both sides of described fence are provided with main strut, and being provided with secondary pole between the described main strut of both sides, described main strut and described secondary pole top are equipped with pedal; Described pedal is provided with cat ladder through hole, described cat ladder via bottoms is provided with cat ladder.
As a preferred technical solution of the present invention, described pedal outer ledge place is provided with and the baseboard contacted bottom described fence; Corner, described fence top is provided with suspension rod.
As a preferred technical solution of the present invention, the fence cross bar that described fence comprises fence montant and intersects vertically with described fence montant.
As a preferred technical solution of the present invention, described cat ladder by several cat ladder montants and and the cat ladder cross bar that intersects vertically of several and described cat ladder montant form, and cat ladder montant described in several is connected by junction steel plate and fixes.
As a preferred technical solution of the present invention, described fence bottom inside is provided with supporting steel plate.
Using method of the present invention and step thereof:
1), within the scope of distance steel column construction place 1-2 rice, supporting steel plate is welded in steel column surrounding;
2), by cat ladder on 1.5-2.5m place steel wire bundle and steel column;
3), on the basis of 1 and 2, fence 8 to be lifted on steel column and to contact with supporting steel plate 1 and weld, now can construct on pedal 4;
4), treat step 3 terminate after, fence is hung construction place, is convenient to reuse next time.
Compared with prior art, the beneficial effect that the present invention has is: the present invention is a kind of movable building operation platform and using method thereof, effectively can improve the quality in steel structure column installation, welding procedure process and efficiency, effectively reduce the generation of security incident in steel structure column installation, welding job.Eliminate the workflow of installation foot hand cradle, improve operating efficiency, shorten the construction period.
Accompanying drawing explanation
Accompanying drawing is used to provide a further understanding of the present invention, and forms a part for manual, together with embodiments of the present invention for explaining the present invention, is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is a kind of movable building operation platform described in the embodiment of the present invention and using method overall schematic thereof;
Fig. 2 is a kind of movable building operation platform described in the embodiment of the present invention and using method fence schematic top plan view thereof;
Fig. 3 is a kind of movable building operation platform described in the embodiment of the present invention and user's connection diagram thereof;
In figure: 1, supporting steel plate; 2, main strut; 3, secondary pole; 4, pedal; 5, baseboard; 6, cat ladder through hole; 7, suspension rod; 8, fence; 801, fence montant; 802, fence cross bar; 803, centre bore; 10, cat ladder; 1001, cat ladder montant; 1002, cat ladder cross bar; 11, junction steel plate.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are described, should be appreciated that preferred embodiment described herein is only for instruction and explanation of the present invention, is not intended to limit the present invention.
As shown in Figure 1 to Figure 3, a kind of movable building operation platform of the present invention and using method thereof, comprise cat ladder 10 and be detachably arranged on the fence 8 at cat ladder 10 top, described fence 8 center is provided with centre bore 803 and the base plate both sides of described fence 8 are provided with main strut 2, and being provided with secondary pole 3 between the described main strut 2 of both sides, described main strut 2 is equipped with pedal 4 with described secondary pole 3 top; Described pedal 4 is provided with cat ladder through hole 6, bottom described cat ladder through hole 6, is provided with cat ladder 10.
Described pedal 4 outer ledge place is provided with and the baseboard 5 contacted bottom described fence 8; Corner, described fence 8 top is provided with suspension rod 7.Pedal 4 choice for use wooden form or checkered steel plate can be laid on fence 8 and forms working platform, and is provided with baseboard 5 for preventing the unexpected landing of constructor at the avris of pedal; The suspension rod 7 that fence 8 edge is arranged is convenient to the operation of tower crane.
The fence montant 801 that described fence 8 comprises fence montant 801 and intersects vertically with described fence montant 801.Be welded to connect between fence montant 801 and fence montant 801.Described cat ladder 10 by several cat ladder montants 1001 and and the cat ladder cross bar 1002 that intersects vertically of several and described cat ladder montant 1001 form, and cat ladder montant 1001 described in several is connected by junction steel plate 11 and fixes.Wherein cat ladder 10 top is also welded with on fence 8, and cat ladder 10 is that several short and small cat ladders assemble, easy to carry, and can use the multiple construction site of convenient transfer rapidly, it is convenient to facilitate.Described fence 8 bottom inside is provided with supporting steel plate 1.Supporting steel plate 1 is one of main support component of the present invention.
Using method of the present invention and step thereof:
1), within the scope of distance steel column construction place 1-2 rice, supporting steel plate 1 is welded in steel column surrounding;
2), by cat ladder 10 on 1.5-2.5m place steel wire bundle and steel column;
3), on the basis of 1 and 2, fence 8 to be lifted on steel column and to contact with supporting steel plate 1 and weld,
Now can construct on pedal 4;
4), treat step 3 terminate after, fence is hung construction place, is convenient to reuse next time.
The present invention is a kind of movable building operation platform and using method thereof, effectively can improve the quality in steel structure column installation, welding procedure process and efficiency, effectively reduces the generation of security incident in steel structure column installation, welding job.Eliminate the workflow of installation foot hand cradle, improve operating efficiency, shorten the construction period.
Last it is noted that the foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, although with reference to previous embodiment to invention has been detailed description, for a person skilled in the art, it still can be modified to the technical scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature.Within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (6)

1. a movable building operation platform and using method thereof, comprise cat ladder (10) and be detachably arranged on the fence (8) at cat ladder (10) top, it is characterized in that, described fence (8) center is provided with centre bore (803) and the base plate both sides of described fence (8) are provided with main strut (2), and being provided with secondary pole (3) between the described main strut (2) of both sides, described main strut (2) and described secondary pole (3) top are equipped with pedal (4); Described pedal (4) is provided with cat ladder through hole (6), described cat ladder through hole (6) bottom is provided with cat ladder (10).
2. a kind of movable building operation platform according to claim 1 and using method thereof, is characterized in that, described pedal (4) outer ledge place is provided with the baseboard (5) contacted with described fence (8) bottom; Described fence (8) napex corner is provided with suspension rod (7).
3. a kind of movable building operation platform according to claim 1 and 2 and using method thereof, it is characterized in that, the fence cross bar (802) that described fence (8) comprises fence montant (801) and intersects vertically with described fence montant (801).
4. a kind of movable building operation platform according to claim 1 and using method thereof, it is characterized in that, described cat ladder (10) by several cat ladder montants (1001) and and the cat ladder cross bar (1002) that intersects vertically of several and described cat ladder montant (1001) form, and described in several, cat ladder montant (1001) is connected by junction steel plate (11) and is fixed.
5. a kind of movable building operation platform according to claim 3 and using method thereof, is characterized in that, described fence (8) bottom inside is provided with supporting steel plate (1).
6. a kind of movable building operation platform according to claim 1 and using method thereof, is characterized in that, using method of the present invention and step thereof:
1), within the scope of distance steel column construction place 1-2 rice, supporting steel plate (1) is welded in steel column surrounding;
2), by cat ladder (10) on 1.5-2.5m place steel wire bundle and steel column;
3), 1) and 2) basis on, fence (8) to be lifted on steel column and to contact with supporting steel plate (1) and weld, now can construct on pedal (4);
4), treat step 3) terminate after, fence is hung construction place, is convenient to reuse next time.
CN201510271260.7A 2015-05-22 2015-05-22 Movable construction platform and application method thereof Pending CN104878917A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510271260.7A CN104878917A (en) 2015-05-22 2015-05-22 Movable construction platform and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510271260.7A CN104878917A (en) 2015-05-22 2015-05-22 Movable construction platform and application method thereof

Publications (1)

Publication Number Publication Date
CN104878917A true CN104878917A (en) 2015-09-02

Family

ID=53946574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510271260.7A Pending CN104878917A (en) 2015-05-22 2015-05-22 Movable construction platform and application method thereof

Country Status (1)

Country Link
CN (1) CN104878917A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476617A (en) * 2017-10-16 2017-12-15 山东电力建设第工程公司 A kind of indirect cool tower lifting broadening platform support and installation method
CN108386127A (en) * 2018-05-10 2018-08-10 中国恩菲工程技术有限公司 Vertical ladder component
CN110029804A (en) * 2019-04-10 2019-07-19 中铁建设集团有限公司 A kind of sizing steel operating platform

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2288074A1 (en) * 2005-06-24 2007-12-16 Jose Luis Antuña Suarez Shaping device for annular and adjustable working platform, has multiple supports, which are radially hooked to cable that surrounds chimney, where each support has stringer with upper clamp, hooking to cable and inferior roller
CN201125524Y (en) * 2007-11-12 2008-10-01 上海市安装工程有限公司 Construction site climbing mobile platform
CN101435270A (en) * 2007-11-13 2009-05-20 上海宝冶建设有限公司 High layer post subsection butt-joint operating method
CN101858139A (en) * 2010-06-22 2010-10-13 中国核工业华兴建设有限公司 Concrete casting platform
CN201722909U (en) * 2010-04-22 2011-01-26 华泰(南通)船务有限公司 Simple hanging pick of steel open caisson
CN203034773U (en) * 2012-11-12 2013-07-03 中建钢构有限公司 Assembly type operating platform with variable diameter
CN204040439U (en) * 2014-09-10 2014-12-24 北京建工四建工程建设有限公司 A kind of reducing operation platform installed for steel rectangle column

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2288074A1 (en) * 2005-06-24 2007-12-16 Jose Luis Antuña Suarez Shaping device for annular and adjustable working platform, has multiple supports, which are radially hooked to cable that surrounds chimney, where each support has stringer with upper clamp, hooking to cable and inferior roller
CN201125524Y (en) * 2007-11-12 2008-10-01 上海市安装工程有限公司 Construction site climbing mobile platform
CN101435270A (en) * 2007-11-13 2009-05-20 上海宝冶建设有限公司 High layer post subsection butt-joint operating method
CN201722909U (en) * 2010-04-22 2011-01-26 华泰(南通)船务有限公司 Simple hanging pick of steel open caisson
CN101858139A (en) * 2010-06-22 2010-10-13 中国核工业华兴建设有限公司 Concrete casting platform
CN203034773U (en) * 2012-11-12 2013-07-03 中建钢构有限公司 Assembly type operating platform with variable diameter
CN204040439U (en) * 2014-09-10 2014-12-24 北京建工四建工程建设有限公司 A kind of reducing operation platform installed for steel rectangle column

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476617A (en) * 2017-10-16 2017-12-15 山东电力建设第工程公司 A kind of indirect cool tower lifting broadening platform support and installation method
CN108386127A (en) * 2018-05-10 2018-08-10 中国恩菲工程技术有限公司 Vertical ladder component
CN110029804A (en) * 2019-04-10 2019-07-19 中铁建设集团有限公司 A kind of sizing steel operating platform

Similar Documents

Publication Publication Date Title
CN205501837U (en) Steel case roof beam becomes bridge welding simple platform
CN204040439U (en) A kind of reducing operation platform installed for steel rectangle column
CN204781887U (en) Prefabricated assembly type structure's no outrigger construction platform
CN104878917A (en) Movable construction platform and application method thereof
CN103774838B (en) A kind of construction of lift well assembling safe operation platform and using method
CN103912128A (en) Construction method of high-altitude one-piece steel truss
CN103291116B (en) For the netted shuttering supporting operating platform of construction of water tank on top of inverted-cone water tower
CN202990427U (en) Climbing discharging platform
CN208716713U (en) A kind of overhanging steel structure lifting auxiliary device
CN202706495U (en) Ladder type air basket
CN206385463U (en) A kind of anchor ear construction auxiliary hanging basket instrument
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN207739607U (en) A kind of elevator well crosshead
CN206220484U (en) A kind of template suspension centre spandrel girder of steel platform
CN203361600U (en) Transfer-free material-transferring platform
CN102733612B (en) Mounting method of electric hoist orbit
CN203905432U (en) Hydraulic lifting retractable type platform device
CN204626931U (en) In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform
CN104652829A (en) Construction method for self-lifting folding positioning operation system
CN109944428A (en) The work in combination platform and its installation method of steel structural overhead installation
JP3202588U (en) Structure of safety scaffold with handrail
CN211142829U (en) Hanging flower basket operation construction platform
CN208166511U (en) A kind of construction roof beam structure
CN214658680U (en) Stiffness type steel reinforced concrete beam lower hanging operation platform
CN204040595U (en) Cross-arm armrest assembly

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150902