CN204040439U - A kind of reducing operation platform installed for steel rectangle column - Google Patents

A kind of reducing operation platform installed for steel rectangle column Download PDF

Info

Publication number
CN204040439U
CN204040439U CN201420516598.5U CN201420516598U CN204040439U CN 204040439 U CN204040439 U CN 204040439U CN 201420516598 U CN201420516598 U CN 201420516598U CN 204040439 U CN204040439 U CN 204040439U
Authority
CN
China
Prior art keywords
steel
platform
underframe
lower link
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420516598.5U
Other languages
Chinese (zh)
Inventor
殷豪
许文涛
梁权
郭永旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Fourth Construction & Engineering Co Ltd
Original Assignee
Beijing Fourth Construction & Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Fourth Construction & Engineering Co Ltd filed Critical Beijing Fourth Construction & Engineering Co Ltd
Priority to CN201420516598.5U priority Critical patent/CN204040439U/en
Application granted granted Critical
Publication of CN204040439U publication Critical patent/CN204040439U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of reducing operation platform installed for steel rectangle column, comprise four L shape platform master units that capable assembling is hollow rectangle, connect four pairs of lower links between adjacent two platform master units and four upper connecting rods, platform master unit is by underframe, upper people's steel plate and steel guard rail composition, the length of upper connecting rod and the distance that be all greater than adjacent two platform master units between identical with the length of lower link, the junction, end of underframe is inserted and pin joint respectively in the two ends of lower link, the two ends of upper connecting rod are inserted within the major diameter upper ledge steel pipe at steel guard rail top respectively, at least one platform adjustment unit is provided with between adjacent two platform master units.The utility model is by platform master unit and platform adjustment unit, by the shift position of connecting rod in major diameter upper ledge steel pipe and the number of platform adjustment unit in the pinned locations of adjustment lower link in underframe, adjustment, make platform can realize the effect of reducing at any time according to steel column size adjustment internal diameter width, easy to use being easy to mounts and dismounts.

Description

A kind of reducing operation platform installed for steel rectangle column
Technical field
The utility model relates to steel-structure beam-column node construction in multi and tall steel building installation.
Background technology
During high-rise steel structure is installed, steel column butt joint joint area has the work such as a large amount of location, welding, bolt, faces limit operation because joint location belongs to high-altitude, now needs to set up operating platform as personnel and material tool work plane.The existing common practice sets up the Turnoverplatform of scaffolding platform or improvement, but all exist and set up inconvenience, and the number of turnover is few, narrow application range, and protection effect is poor, personnel's inconvenient walking, the defects such as unadjustable size.
Utility model content
The purpose of this utility model is to provide a kind of reducing operation platform installed for steel rectangle column, and solve the inconvenience of usual putting up platform, the number of turnover is low, unadjustable, narrow application range, and protection effect is poor, and personnel circulate the shortcoming such as inconvenient.
For achieving the above object, the utility model adopts following technical scheme:
A kind of reducing operation platform installed for steel rectangle column, enclose in steel rectangle column and steel beam connecting joint upside surrounding, be located on girder steel, comprise four L shape platform master units that capable assembling is hollow rectangle, and connect four pairs of lower links and four upper connecting rods of adjacent two platform master units, the length of described upper connecting rod and the distance that be all greater than adjacent two platform master units between identical with the length of lower link
The underframe that described platform master unit is welded by major diameter rectangular tube, full to spread and the upper people's steel plate be fixed on underframe and the steel guard rail that is arranged in underframe surrounding form,
The junction, end of the underframe of adjacent two platform master units has underframe pin hole,
Described lower link is provided with the lower link pin hole corresponding with the underframe pin hole on underframe that a row arranges along lower link length direction, and the two ends of lower link are inserted the junction, end of both sides underframe respectively and are fixedly connected with underframe with the fixing pin in lower beam pin hole by being inserted in underframe pin hole;
Described steel guard rail is made up of framework and the space enclosing structure be fixedly connected on outside framework, described framework comprises the vertical rod be fixedly connected with the spaced surface of upper people's steel plate and the major diameter upper ledge steel pipe connected as one on the top of each vertical rod, and the junction, both ends of the major diameter upper ledge steel pipe of both sides is inserted at the two ends of described upper connecting rod respectively.
At least one platform adjustment unit is provided with between adjacent two platform master units, the length of described platform adjustment unit is identical with the width of platform master unit, the width summation of all platform adjustment units is less than the distance between adjacent two platform master units, described platform adjustment unit is by bracing frame, completely spread and be fixed on the adjustment steel plate on bracing frame, be welded on the round steel anchorage head composition on the downside of bracing frame both ends, the diameter of described round steel anchorage head and the diameter in lower link pin hole adapt, the two ends of platform adjustment unit are vertically snapped onto on often pair of lower link respectively.
Support frame as described above is the rectangle rack be relatively welded between two by four angle steel, and minor face angle steel supporting back is inside, and long corner angle supporting back is all outside.
Described lower link is minor diameter rectangular tube, and upper connecting rod is minor-diameter steel-tube.
The termination milling of the major diameter rectangular tube of described underframe is put down, for fillet weld weld all around connects between pipe fitting.
Described vertical rod is made up of mobile jib and secondary bar, be provided with the connecting rod of level between the bottom of secondary bar, described mobile jib is distributed in the end of underframe, bight and edge, and secondary bar is disposed between mobile jib, setting space is not more than 300mm, the top of described vertical rod all with major diameter upper ledge steel-pipe welding.
Described space enclosing structure comprises peripheral board and baseboard.
Compared with prior art the utility model has following characteristics and beneficial effect:
Personnel's operation platform when the utility model is a kind of multi and tall steel building construction and installation, by installing adjustable operation platform at steel column column cap, for constructing operation personnel provide good working space.This operation platform has durable, and the number of turnover is high; Can be used for different engineering, applied widely; Simple structure, easy installation and removal; Personnel are current convenient, and protection effect is good, safe and reliable; The features such as in construction, adjustable size and platform are arranged, adapt to multiple section and job position, easy to use.
The platform adjustment unit of the utility model by setting up between the surrounding design platform master unit and master unit of steel rectangle column, by the shift position of connecting rod in major diameter upper ledge steel pipe and the number of platform adjustment unit in the pinned locations of adjustment lower link in underframe, adjustment, make platform can realize the effect of reducing at any time according to steel column size adjustment internal diameter width.
The utility model can also be removed part rod member and circulate up and down for personnel, and easy to use being easy to mounts and dismounts, and operating efficiency is high, time saving and energy saving, has protection safety effective, the feature that number of turnover high universalizable is strong.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in more detail.
Fig. 1 is the fractionation schematic diagram not installing major diameter upper ledge steel pipe and upper connecting rod of structure of the present utility model.
Fig. 2 is the side-looking structural representation of Fig. 1.
Fig. 3 is the structural representation of platform master unit.
Fig. 4 is the side-looking structural representation of Fig. 3.
Fig. 5 is the structural representation of lower link.
Fig. 6 is the structural representation of upper connecting rod.
Fig. 7 is the plan structure schematic diagram of platform adjustment unit.
Fig. 8 is the side-looking structural representation of Fig. 7.
Fig. 9 is using state schematic diagram of the present utility model.
Figure 10 is the side-looking structural representation of Fig. 9.
Reference numeral: 1-steel rectangle column, 2-girder steel, 3-platform master unit, 3.1-underframe, 3.11-underframe pin hole, the upper people's steel plate of 3.2-, 3.3-steel guard rail, 3.3a-vertical rod, 3.3b-major diameter upper ledge steel pipe, 3.3c-mobile jib, the secondary bar of 3.3d-, 3.3e-connecting rod, 3.32-peripheral board, 3.33-baseboard, 4-lower link, 4.1-lower link pin hole, the upper connecting rod of 5-, 6-platform adjustment unit, 6.1-bracing frame, 6.11-minor face angle steel, 6.12-long corner angle, 6.2-adjusts steel plate, 6.3-round steel anchorage head, 7-fixes pin.
Detailed description of the invention
Embodiment is see shown in Fig. 1-2, Fig. 9-10, a kind of reducing operation platform installed for steel rectangle column, enclose in steel rectangle column 1 and steel beam connecting joint upside surrounding, be located on girder steel 2, described operation platform comprises four L shape platform master units 3 that capable assembling is hollow rectangle, connect four pairs of lower links 4 between adjacent two platform master units and four upper connecting rods 5, the length of described upper the connecting rod 5 and distance that be all greater than adjacent two platform master units 3 between identical with the length of lower link 4
Shown in Fig. 3-4, the underframe 3.1 that described platform master unit 3 is welded by major diameter rectangular tube, full to spread and the upper people's steel plate 3.2 be fixed on underframe and the steel guard rail 3.3 that is arranged in underframe surrounding form,
The junction, end of the underframe 3.1 of adjacent two platform master units has underframe pin hole 3.11,
Shown in Figure 5, described lower link 4 is minor diameter rectangular tube, lower link total length is evenly arranged the lower link pin hole 4.1 corresponding with the underframe pin hole 3.11 of both sides, the junction, end of both sides underframe is inserted at the two ends of lower link 4 respectively, underframe pin hole 3.11 and lower beam pin hole 4.1 are by fixing pin 7 pin joint
Described steel guard rail 3.3 is made up of framework and the space enclosing structure be fixedly connected on outside framework, described framework comprises the vertical rod 3.3a be fixedly connected with the spaced surface of upper people's steel plate 3.2 and major diameter upper ledge steel pipe 3.3b connected as one on the top of each vertical rod 3.3a
Shown in Figure 6, described upper connecting rod 5 is minor-diameter steel-tube, and the junction, both ends of the major diameter upper ledge steel pipe 3.3b of both sides is inserted at the two ends of upper connecting rod 5 respectively.
Shown in Fig. 7-8, at least one platform adjustment unit 6 is provided with between adjacent two platform master units 3, the length of described platform adjustment unit 6 is identical with the width of platform master unit 3, the width summation of all platform adjustment units 6 is less than the distance between adjacent two platform master units 3, described platform adjustment unit 6 is by bracing frame 6.1, completely spread and be fixed on the adjustment steel plate 6.2 on bracing frame, the round steel anchorage head 6.3 be welded on the downside of bracing frame both ends forms, the diameter of described round steel anchorage head 6.3 and the diameter in lower link pin hole 4.1 adapt, the two ends of platform adjustment unit 6 are vertically snapped onto on often pair of lower link 4 respectively.
Support frame as described above 6.1 is the rectangle racks be relatively welded between two by four angle steel, and minor face angle steel supporting back is inside, and long corner angle supporting back is all outside.
The termination milling of the major diameter rectangular tube of described underframe 3.1 is put down, and for fillet weld weld all around connects between pipe fitting, in the present embodiment, Size of welds is 6mm.
Described vertical rod 3.3a is made up of mobile jib 3.3c and secondary bar 3.3d, the connecting rod 3.3e of level is provided with between the bottom of secondary bar, described mobile jib 3.3c is distributed in the end of underframe 3.1, bight and edge, secondary bar 3.3c is disposed between mobile jib, setting space is not more than 300mm, and the top of described vertical rod 3.3a is all welded with major diameter upper ledge steel pipe 3.3b.
Described space enclosing structure comprises peripheral board 3.32 and baseboard 3.33.
In the present embodiment, in underframe 3.1, the specification of rectangular tube is the seamless pipe of 100mm × 4mm, material is Q235B, two seamless pipe distances that underframe is parallel to each other are not more than 800mm, in underframe, the connector of rectangular tube respectively arranges two underframe pin holes 3.11, and the diameter in underframe pin hole 3.11 is 24mm.
Upper people's steel plate 3.2 is the thick checkered steel plate of 6mm, and material Q235B, is connected with underframe intermittent weld, forms stressed platform;
Lower link 4 is the seamless rectangular pipe of 90mm × 6mm, and the lower link pin hole 4.1 on most limit is 60mm with the distance of lower link termination, and pitch of holes is 100mm.The diameter of fixing pin 7 is 22mm, and length is 150mm.
The height of framework is 1500mm, mobile jib 3.3c is that scaffolding steel pipe is distributed in steel guard rail end, bight and edge, setting space is not more than 800mm, the round steel of secondary bar 3.3d to be diameter be 25mm, setting space is not more than 300mm, the bottom of mobile jib 3.3c adopts fillet weld weld all around to be welded on people's steel plate 3.2, and the top of Size of welds 4mm, vertical rod 3.3a is all welded with major diameter upper ledge steel pipe 3.3b.
The color steel of peripheral board 3.32 to be thickness be 1mm, height 1400mm, is connected with framework with pulling rivet by color steel bar.
Upper connecting rod 5 is the seamless rectangular pipe of 40mm × 2mm.
The checkered steel plate of adjustment steel plate 6.2 to be thickness be 6mm, long 790mm, wide 180mm, be interrupted with bracing frame 6.1 and weld.
Bracing frame 6.1 forms for angle steel assembly welding, and minor face angle steel 6.11 can adopt 80mm × 5mm, long 180mm, and angle steel supporting back is inside; Long corner angle 6.12 is 50mm × 5mm, and long 640mm, angle steel supporting back is outside.Connect between angle steel and adopt fillet weld full weld, Size of welds 6mm.
The diameter of round steel anchorage head 6.3 is 22mm, and length is 80mm, is welded on the downside of minor face angle steel 6.11, and the spacing 100mm of anchorage head is identical with the pitch of holes of link pin keyhole 4.1, and the distance of anchorage head elongation steel end is 40mm.
The checkered steel plate of baseboard 3.33 to be thickness be 6mm, height 100mm, adopts intermittent weld to be connected with framework and stressed platform.
Using method of the present utility model is as follows:
Step 1: according to steel column changes of section in concrete engineering, selects the length that lower link is suitable, enables its excursion adapt to steel column change.
Step 2: according to the steel column sectional dimension of platform installation position, platform master unit, lower link, upper connecting rod are assembled into entirety by latching, and then integral hoisting is in place.
Step 3: rear constructor in place enters platform, by platform regulon installation in position, then can use.

Claims (7)

1. the reducing operation platform installed for steel rectangle column, enclose in steel rectangle column (1) and steel beam connecting joint upside surrounding, be located on girder steel (2), it is characterized in that: comprise four L shape platforms master unit (3) that capable assembling is hollow rectangle, and connect four pairs of lower links (4) and four upper connecting rods (5) of adjacent two platform master units, the length of described upper connecting rod (5) and the distance that be all greater than adjacent two platform master units (3) between identical with the length of lower link (4)
The underframe (3.1) that described platform master unit (3) is welded by major diameter rectangular tube, full to spread and upper people's steel plate (3.2) of being fixed on underframe and the steel guard rail (3.3) that is arranged in underframe surrounding form,
The junction, end of the underframe (3.1) of adjacent two platform master units has underframe pin hole (3.11),
Described lower link (4) is provided with the lower link pin hole (4.1) corresponding with the underframe pin hole (3.11) on underframe (3.1) that a row arranges along lower link length direction, and the two ends of lower link (4) are inserted the junction, end of both sides underframe respectively and are fixedly connected with underframe with the fixing pin (7) in lower beam pin hole (4.1) by being inserted in underframe pin hole (3.11);
Described steel guard rail (3.3) is made up of framework and the space enclosing structure be fixedly connected on outside framework, described framework comprises the vertical rod (3.3a) be fixedly connected with the spaced surface of upper people's steel plate (3.2) and the major diameter upper ledge steel pipe (3.3b) connected as one on the top of each vertical rod (3.3a), and the junction, both ends of the major diameter upper ledge steel pipe (3.3b) of both sides is inserted at the two ends of described upper connecting rod (5) respectively.
2. a kind of reducing operation platform installed for steel rectangle column according to claim 1, it is characterized in that: between adjacent two platform master units (3), be provided with at least one platform adjustment unit (6), the length of described platform adjustment unit (6) is identical with the width of platform master unit (3), the width summation of all platform adjustment units (6) is less than the distance between adjacent two platform master units (3), described platform adjustment unit (6) is by bracing frame (6.1), completely spread and be fixed on the adjustment steel plate (6.2) on bracing frame, be welded on round steel anchorage head (6.3) composition on the downside of bracing frame both ends, the diameter of described round steel anchorage head (6.3) and the diameter in lower link pin hole (4.1) adapt, the two ends of platform adjustment unit (6) are vertically snapped onto on often pair of lower link (4) respectively.
3. a kind of reducing operation platform installed for steel rectangle column according to claim 2, it is characterized in that: support frame as described above (6.1) is the rectangle rack be relatively welded between two by four angle steel, minor face angle steel (6.11) supporting back is inside, and long corner angle (6.12) supporting back is all outside.
4. a kind of reducing operation platform installed for steel rectangle column according to claim 1, is characterized in that: described lower link (4) is minor diameter rectangular tube, and upper connecting rod (5) is minor-diameter steel-tube.
5. a kind of reducing operation platform installed for steel rectangle column according to claim 1, is characterized in that: the termination milling of the major diameter rectangular tube of described underframe (3.1) is put down, for fillet weld weld all around connects between pipe fitting.
6. a kind of reducing operation platform installed for steel rectangle column according to claim 1, it is characterized in that: described vertical rod (3.3a) is made up of mobile jib (3.3c) and secondary bar (3.3d), the connecting rod (3.3e) of level is provided with between the bottom of secondary bar, described mobile jib (3.3c) is distributed in the end of underframe (3.1), bight and edge, secondary bar (3.3c) is disposed between mobile jib, setting space is not more than 300mm, and the top of described vertical rod (3.3a) is all welded with major diameter upper ledge steel pipe (3.3b).
7. a kind of reducing operation platform installed for steel rectangle column according to claim 1, is characterized in that: described space enclosing structure comprises peripheral board (3.32) and baseboard (3.33).
CN201420516598.5U 2014-09-10 2014-09-10 A kind of reducing operation platform installed for steel rectangle column Expired - Fee Related CN204040439U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420516598.5U CN204040439U (en) 2014-09-10 2014-09-10 A kind of reducing operation platform installed for steel rectangle column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420516598.5U CN204040439U (en) 2014-09-10 2014-09-10 A kind of reducing operation platform installed for steel rectangle column

Publications (1)

Publication Number Publication Date
CN204040439U true CN204040439U (en) 2014-12-24

Family

ID=52241122

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420516598.5U Expired - Fee Related CN204040439U (en) 2014-09-10 2014-09-10 A kind of reducing operation platform installed for steel rectangle column

Country Status (1)

Country Link
CN (1) CN204040439U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104878917A (en) * 2015-05-22 2015-09-02 中国十七冶集团有限公司 Movable construction platform and application method thereof
CN107081550A (en) * 2017-05-03 2017-08-22 中国建筑第八工程局有限公司 Draw and insert-type overhead welding platform and its installation method
CN107503473A (en) * 2017-08-30 2017-12-22 云南工程建设总承包公司 A kind of tool-type rectangular column steel bar positioning fixture
CN108396950A (en) * 2016-08-15 2018-08-14 吴小再 Safe frame, the construction techniques of construction scaffold
CN109314009A (en) * 2016-05-30 2019-02-05 彼扎特电气有限公司 Safety switch for channel control
CN110043019A (en) * 2019-05-16 2019-07-23 中建钢构有限公司 A kind of operating platform
CN110159285A (en) * 2019-06-14 2019-08-23 中铁工程服务有限公司 A kind of rectangular pipe jacking machine modularization cutterhead of reducing
CN110359734A (en) * 2019-07-23 2019-10-22 重庆锦森腾建筑工程咨询有限公司 A kind of adjustable wallboard of length-width ratio and actual measurement room
CN117306837A (en) * 2023-11-30 2023-12-29 北京建工集团有限责任公司 Operating platform for truss of column building and installation method thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104878917A (en) * 2015-05-22 2015-09-02 中国十七冶集团有限公司 Movable construction platform and application method thereof
CN109314009A (en) * 2016-05-30 2019-02-05 彼扎特电气有限公司 Safety switch for channel control
CN108396950A (en) * 2016-08-15 2018-08-14 吴小再 Safe frame, the construction techniques of construction scaffold
CN107081550A (en) * 2017-05-03 2017-08-22 中国建筑第八工程局有限公司 Draw and insert-type overhead welding platform and its installation method
CN107503473A (en) * 2017-08-30 2017-12-22 云南工程建设总承包公司 A kind of tool-type rectangular column steel bar positioning fixture
CN110043019A (en) * 2019-05-16 2019-07-23 中建钢构有限公司 A kind of operating platform
CN110159285A (en) * 2019-06-14 2019-08-23 中铁工程服务有限公司 A kind of rectangular pipe jacking machine modularization cutterhead of reducing
CN110159285B (en) * 2019-06-14 2023-12-15 中铁工程服务有限公司 Modularized cutter head of rectangular pipe jacking machine with variable diameter
CN110359734A (en) * 2019-07-23 2019-10-22 重庆锦森腾建筑工程咨询有限公司 A kind of adjustable wallboard of length-width ratio and actual measurement room
CN117306837A (en) * 2023-11-30 2023-12-29 北京建工集团有限责任公司 Operating platform for truss of column building and installation method thereof
CN117306837B (en) * 2023-11-30 2024-04-05 北京建工集团有限责任公司 Operating platform for truss of column building and installation method thereof

Similar Documents

Publication Publication Date Title
CN204040439U (en) A kind of reducing operation platform installed for steel rectangle column
CN204040435U (en) High-altitude steel structure welding Hanging Basket
CN204212399U (en) Flip-shell is to clasp
CN204126230U (en) Assembly scaffold unit
CN103774838B (en) A kind of construction of lift well assembling safe operation platform and using method
CN211470603U (en) Telescopic tower crane passageway
CN211689948U (en) Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge
CN208618838U (en) A kind of safety device
CN204590556U (en) With the steel pipe lifting scaffold of steel sash net safeguard structure
CN205356232U (en) Dismantle convenient solar rack
CN204623801U (en) A kind of scaffold clamp
CN211596431U (en) Railway bridge pad stone construction operation protector
CN103287722A (en) Holder special for cold-rolled steel pipes
CN208718346U (en) Building engineering outer scaffold wall connector
CN210032670U (en) Mounting device for steel truss
CN204112503U (en) A kind of heating furnace steel structure frame beam column shock-resistant node
CN209855215U (en) Safe type combination formula scaffold frame
CN207739607U (en) A kind of elevator well crosshead
CN212078772U (en) Cutting unloading device for building steel structure engineering
CN201620592U (en) Scaffold double-steel-pipe welding base
CN103758334A (en) Scaffold structure for constructing exterior wall of building
CN103114712B (en) Buckle steel platform support system and construction method thereof
CN203640245U (en) Scaffold structure for building exterior wall construction
CN203475791U (en) Scaffold erecting device for cornice in platform area
CN213806524U (en) Protective net frame for scaffold

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141224