CN101818576B - Safe escape device for ultra-high-rise building core tube construction - Google Patents
Safe escape device for ultra-high-rise building core tube construction Download PDFInfo
- Publication number
- CN101818576B CN101818576B CN2010101562224A CN201010156222A CN101818576B CN 101818576 B CN101818576 B CN 101818576B CN 2010101562224 A CN2010101562224 A CN 2010101562224A CN 201010156222 A CN201010156222 A CN 201010156222A CN 101818576 B CN101818576 B CN 101818576B
- Authority
- CN
- China
- Prior art keywords
- core tube
- bolt hole
- building core
- escape device
- safe escape
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Ladders (AREA)
Abstract
The invention discloses a safe escape device for ultra-high-rise building core tube construction, which comprises a construction elevator standard section. The standard section comprises a stand column and a transverse beam; the transverse beam is fixedly connected with a steel ladder; and a retainer is fixedly connected outside the steel ladder. The steel ladder comprises a step stanchion and pedals in welded connection; a connecting piece is arranged between the step stanchion and the transverse beam; and the step stanchion is welded with the connecting piece. A first bolt hole is formed on the transverse beam; a second bolt hole is formed on the connecting piece; and the first bolt hole and the second bolt hole realize detachable connection between the steel ladder and the standard section through bolts and nuts. The retainer comprises an iron ring and a longitudinal rib; the end part of the iron ring is in a fork shape; a third bolt hole is respectively formed on two forked ends; the two forked ends are clamped on the stand column; the third bolt holes realize detachable connection between the retainer and the steel ladder through bolts and nuts; and the top of the uppermost retainer is provided with a sealed cover. The safe escape device for the ultra-high-rise building core tube construction solves the problem of fire-escaping channels during performing unequal height construction in the ultra-high-rise building core tube by adopting shear walls and floors, and has the advantages of fast escape, convenient construction and low cost.
Description
Technical field
The present invention relates to a kind of safe escape device of super highrise building core tube construction.
Background technology
The super highrise building core tube construction adopts the construction of technologies such as climbing form frame, integrally hoisting steel platform usually, has that speed of application is fast, operation is succinct, a good engineering quality, the characteristics that reduce cost.But, when adopting these technology constructions, the phenomenon that floor lags behind shear wall construction can occur, thereby produce the problem of a fire drill.Because constructor's only approach of operation layer up and down is a construction elevator, and operation layer need carry out works with torches such as arc welding and gas cutting, placing combustible materials such as flammable explosive gas such as oxygen cylinder and acetylene cylinder and template, wood chip on the material platform, site operation exists disaster hidden-trouble.In case breaking out of fire, the construction elevator outage is stopped transport, and the core tube construction layer operating personnel can't escape.With regard to the construction status of present domestic super highrise building, rarely have construction enterprises to consider the escape problem of constructor on the shear wall construction layer.
The construction elevator of shear wall construction layer generally adopts the high speed construction elevator of single cage about considering, escape face can be reserved in one or two side of cage (near haul passage one side).If dismountable steel ladder can be installed, in these sides just can be the fire drill that the construction layer operating personnel provides a safety.
Summary of the invention
The object of the present invention is to provide a kind of safe escape device of super highrise building core tube construction, in the time of can solving the breaking out of fire of super highrise building core tube construction layer effectively, the problem of operation layer constructor's escape difficulty.
In order to solve the problems of the technologies described above, the present invention adopts following technical scheme: a kind of safe escape device of super highrise building core tube construction, comprise the construction elevator standard knot, and standard knot comprises column and crossbeam, it is characterized in that: crossbeam is fixedly connected with steel ladder, and the steel ladder outside is fixedly connected with guard ring.
Further, steel ladder comprises the cleat stanchion that is welded to connect and marks time, be provided with connector between cleat stanchion and the crossbeam, cleat stanchion is welded to connect part, and crossbeam is provided with first bolt hole, connector is provided with second bolt hole corresponding with first bolt hole, first bolt hole realizes that by screw bolt and nut steel ladder is connected with the dismounting of standard knot with second bolt hole, and the constructor can rely on the steel ladder escape, and escape is quick, the steel ladder cost is low simultaneously, and dismounting is easy.
Preferably, connector is connected on 1/4 and 3/4 node of crossbeam, is about to steel ladder and is symmetrically distributed on the crossbeam center line, makes crossbeam stressed evenly, avoids producing deformation and influences fixed effect.
Preferably, connector adopts angle steel, and the angle steel cost is low.
Preferably, cleat stanchion adopts band steel, convenient fixing with the guard ring divergent ends of band steel, and cost is low simultaneously.
Preferably, the employing round steel of marking time, the constructor is foot-operated during the convenient steel ladder up and down of round steel, and cost is low simultaneously.
Further, guard ring comprises iron ring and vertical rib, and the iron ring end is forked, be equipped with the 3rd bolt hole on two divergent ends, two divergent ends are sandwiched on the column, and the 3rd bolt hole realizes that by screw bolt and nut guard ring is connected with the dismounting of steel ladder, guard ring and band steel cleat stanchion are fixing reliable, and dismounting simultaneously is easy.
Further, the position of guard ring and crossbeam is corresponding one by one, improves the protection of guard ring to the constructor.
Further, the top of the top guard ring is provided with capping, capping is provided with first pin shaft hole, guard ring is provided with second pin shaft hole corresponding with first pin shaft hole, first pin shaft hole and second pin shaft hole realize that by latch capping is connected with the dismounting of guard ring, and capping can be avoided foreign material to fall the constructor is damaged.
The present invention has solved super highrise building effectively and has examined the fire drill problem of bringing when the core tube adopts shear wall and floor is not contour constructs owing to adopted technique scheme.The present invention has utilized mounted construction elevator standard knot dexterously, and it is carried out local flow improvement, near haul passage one or both sides dismountable steel ladder is installed at it, as passway for escaping; The syndeton of steel ladder, guard ring and capping is safe and reliable, and escape is quick, and easy construction, and cost is also relatively low, is worthy of popularization.
Description of drawings
The invention will be further described below in conjunction with accompanying drawing:
Fig. 1 is the structural representation of the safe escape device of a kind of super highrise building core tube construction of the present invention;
Fig. 2 is the syndeton schematic diagram of steel ladder among the present invention and standard knot;
Fig. 3 is the syndeton schematic diagram of guard ring among the present invention and steel ladder;
Fig. 4 is the structural representation of capping among the present invention.
The specific embodiment
As shown in Figures 1 to 4, safe escape device for a kind of super highrise building core tube construction of the present invention, comprise column 4 and crossbeam 5, be provided with diagonal brace 6 between column 4 and the crossbeam 5, be used for the reinforcing to standard knot 1, crossbeam 5 is fixedly connected with steel ladder 2, and steel ladder 2 comprises the cleat stanchion 15 that is welded to connect and marks time 16, cleat stanchion 15 adopts band steel, the 16 employing round steel of marking time.Be provided with connector 8 between cleat stanchion 15 and the crossbeam 5, connector 8 adopts angle steel, and connector 8 is connected on 1/4 and 3/4 node of crossbeam 5; Cleat stanchion 15 is welded to connect part 8, and crossbeam 5 is provided with first bolt hole 11, and connector 8 is provided with second bolt hole 12, the first bolts hole 11 corresponding with first bolt hole 11 and realizes that by screw bolt and nut steel ladder 2 is connected with the dismounting of standard knot 1 with second bolt hole 12.Steel ladder 2 outsides are fixedly connected with guard ring 3, the position of guard ring 3 and crossbeam 5 is corresponding one by one, guard ring 3 comprises iron ring 9 and vertical rib 10, iron ring 9 ends are forked, be equipped with the 3rd bolt hole 13 on two divergent ends 14, two divergent ends 14 are sandwiched on the cleat stanchion 15, and the 3rd bolt hole 13 realizes that by screw bolt and nut guard ring 3 is connected with the dismounting of steel ladder 2.The top of the top guard ring 3 is provided with capping 18, capping 18 is provided with first pin shaft hole 19, guard ring 3 is provided with second pin shaft hole 17, the first pin shaft holes 19 corresponding with first pin shaft hole 19 and realizes that by latch capping 18 is connected with the dismounting of guard ring 3 with second pin shaft hole 17.
Claims (9)
1. the safe escape device of a super highrise building core tube construction, comprise construction elevator standard knot (1), described standard knot (1) comprises column (4) and crossbeam (5), it is characterized in that: described crossbeam (5) is fixedly connected with steel ladder (2), and described steel ladder (2) outside is fixedly connected with guard ring (3).
2. the safe escape device of a kind of super highrise building core tube construction according to claim 1, it is characterized in that: described steel ladder (2) comprises the cleat stanchion (15) that is welded to connect and mark time (16), be provided with connector (8) between described cleat stanchion (15) and the crossbeam (5), described cleat stanchion (15) is welded to connect part (8), described crossbeam (5) is provided with first bolt hole (11), described connector (8) is provided with second bolt hole (12) corresponding with first bolt hole (11), and described first bolt hole (11) realizes that by screw bolt and nut steel ladder (2) is connected with the dismounting of standard knot (1) with second bolt hole (12).
3. the safe escape device of a kind of super highrise building core tube construction according to claim 2 is characterized in that: described connector (8) is connected on 1/4 and 3/4 node of crossbeam (5).
4. the safe escape device of a kind of super highrise building core tube construction according to claim 2 is characterized in that: described connector (8) adopts angle steel.
5. the safe escape device of a kind of super highrise building core tube construction according to claim 2 is characterized in that: described cleat stanchion (15) adopts band steel.
6. the safe escape device of a kind of super highrise building core tube construction according to claim 2 is characterized in that: described marking time (16) adopted round steel.
7. the safe escape device of a kind of super highrise building core tube construction according to claim 1, it is characterized in that: described guard ring (3) comprises iron ring (9) and vertical rib (10), described iron ring (9) end is forked, be equipped with the 3rd bolt hole (13) on two divergent ends (14), described two divergent ends (14) are sandwiched on the cleat stanchion (15), and described the 3rd bolt hole (13) realizes that by screw bolt and nut guard ring (3) is connected with the dismounting of steel ladder (2).
8. the safe escape device of a kind of super highrise building core tube construction according to claim 7 is characterized in that: the position of described guard ring (3) and crossbeam (5) is corresponding one by one.
9. the safe escape device of a kind of super highrise building core tube construction according to claim 7, it is characterized in that: the top of described the top guard ring (3) is provided with capping (18), described capping (18) is provided with first pin shaft hole (19), described guard ring (3) is provided with second pin shaft hole (17) corresponding with first pin shaft hole (19), and described first pin shaft hole (19) realizes that by latch capping (18) is connected with the dismounting of guard ring (3) with second pin shaft hole (17).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101562224A CN101818576B (en) | 2010-04-23 | 2010-04-23 | Safe escape device for ultra-high-rise building core tube construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010101562224A CN101818576B (en) | 2010-04-23 | 2010-04-23 | Safe escape device for ultra-high-rise building core tube construction |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101818576A CN101818576A (en) | 2010-09-01 |
CN101818576B true CN101818576B (en) | 2011-07-06 |
Family
ID=42653830
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010101562224A Active CN101818576B (en) | 2010-04-23 | 2010-04-23 | Safe escape device for ultra-high-rise building core tube construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101818576B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104695848B (en) * | 2015-02-12 | 2017-07-21 | 国家电网公司 | A kind of novel silo emergency staircase |
CN105152103A (en) * | 2015-08-11 | 2015-12-16 | 中建三局集团有限公司 | Hydraulic self-climbing escape ladder device of super high-rise building |
CN105401737B (en) * | 2015-12-03 | 2018-03-13 | 上海建工一建集团有限公司 | The evacuation passway for escaping and its construction method of steel platform formwork system |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6328129B1 (en) * | 2000-06-23 | 2001-12-11 | Don Ferguson | Fire escape system |
CN2910265Y (en) * | 2006-06-12 | 2007-06-13 | 彭告真 | Emergency lifesaving device for high building fire disaster |
CN200946456Y (en) * | 2006-09-15 | 2007-09-12 | 应爱民 | Escaping device from fire hazard of building |
-
2010
- 2010-04-23 CN CN2010101562224A patent/CN101818576B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN101818576A (en) | 2010-09-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206144172U (en) | Equipment standard platform of unloading of encorbelmenting | |
CN101818576B (en) | Safe escape device for ultra-high-rise building core tube construction | |
CN201420385Y (en) | Overhanging type unloading platform for building construction | |
CN209568685U (en) | A kind of overhanging frame support structure | |
CN101876209B (en) | Supertall building core tube construction safety fire protection system and device | |
CN201778498U (en) | Safe escape device for super-high-rise building core wall construction | |
CN204626930U (en) | A kind of integrated form crane operating platform | |
CN207191310U (en) | One kind is used for ship plank construction portable unit | |
CN201908429U (en) | Assembly integral building overhanging discharging platform | |
CN211689948U (en) | Suspension operation platform device for construction of suspension cable at tower part of cable-stayed bridge | |
CN203188942U (en) | Novel multifunctional racking platform | |
CN103510718B (en) | Automatic lifting Emergency Ladder is used in super high rise structure construction | |
CN105019360B (en) | A kind of construction method based on high-altitude crawler crane trestle | |
CN204850048U (en) | Overlap joint structure of quick hoist and mount of supplementary high -rise girder steel | |
CN101435270A (en) | High layer post subsection butt-joint operating method | |
CN205932883U (en) | Pitshaft driving cage | |
CN202073303U (en) | Overhanging type main beam of unloading platform | |
CN205838319U (en) | A kind of integral lifting device of emergency mobile diesel generating set | |
CN205975613U (en) | Steel trestle steel -pipe pile construction leading truck | |
CN204040442U (en) | A kind of integral lifting elevator hoistways operating platform | |
CN108868192A (en) | Short distance overcrossing railway both wired transom pier overarm brace Demolition Construction engineering method | |
CN208965999U (en) | A kind of packaged type lighting roof operating platform | |
CN205116685U (en) | Can dismantle shaped steel of encorbelmenting platform of unloading | |
CN113605659A (en) | Elevator shaft tool type safe operation platform and construction method thereof | |
CN202450782U (en) | Erecting structure for inhaul cable-type overhang discharging platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |