CN2695510Y - Building body assembling frame structure - Google Patents

Building body assembling frame structure Download PDF

Info

Publication number
CN2695510Y
CN2695510Y CN 200420040380 CN200420040380U CN2695510Y CN 2695510 Y CN2695510 Y CN 2695510Y CN 200420040380 CN200420040380 CN 200420040380 CN 200420040380 U CN200420040380 U CN 200420040380U CN 2695510 Y CN2695510 Y CN 2695510Y
Authority
CN
China
Prior art keywords
reinforcement concrete
steel bar
frame structure
concrete
building body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200420040380
Other languages
Chinese (zh)
Inventor
刘志峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200420040380 priority Critical patent/CN2695510Y/en
Application granted granted Critical
Publication of CN2695510Y publication Critical patent/CN2695510Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A building body assembling frame structure comprises reinforcement concrete pillars, reinforcement concrete longitudinal beams and reinforcement concrete transverse beams which are used for assembling the building body frame structure of each layer. The reinforcement concrete pillars are butt joined with the base and the reinforcement concrete pillars, and the reinforcement concrete pillars are overlapping joined with the reinforcement concrete transverse beams and the concrete longitudinal beams. Connecting steel castings are provided on the butt-joint point and the overlapping point of the reinforcement concrete pillars, the reinforcement concrete transverse beams and the reinforcement concrete longitudinal beams. Welding grooves are arranged on the steel casting edge, and the reinforcement concrete pillar cross-sections are in shape of a rectangle or a cylinder. The lifting combined manner is used to install and assemble from layer to layer to realize the purpose of the integral combination of the building body frame means, which reduces the operation difficulty brought by the high-lift operation. The utility model has the advantages that the project quality is guaranteed, the project progress is accelerated, the construction efficiency is improved and the building cost is reduced.

Description

Building body group frame structure
Affiliated technical field:
The utility model relates to a kind of building body group frame structure.
Background technology:
Existing building body framework steel bar concrete column, steel bar concrete longeron, steel bar concrete crossbeam all are to form with the concrete cast-in-site, buildings is high more and cast and maintenance difficulty are big more, and vertical precision deviation that work high above the ground occurs and meteorologic factor cause the hidden danger of quality safety aspect often to be difficult to discovery to the influence of member.
Summary of the invention:
In order to overcome the deficiency of said frame structure in architectural process, the purpose of this utility model is to provide a kind of building body group frame structure, and this building body group frame structure can make whole building operation simplify, raise the efficiency, the reduction of erection time, use manpower and material resources sparingly, reduce construction costs, ensure the quality of products.
The technical scheme that its technical problem that solves the utility model adopts is: body group frame structure in building comprises steel bar concrete column, steel bar concrete longeron, the steel bar concrete crossbeam of combination building each floor framework of body, the steel bar concrete column docks combination with base, steel bar concrete column with the steel bar concrete column, steel bar concrete column and steel bar concrete crossbeam, the combination of steel bar concrete longeron overlap joint.Steel bar concrete column, steel bar concrete crossbeam, the butt joint of steel bar concrete longeron, lap-joint are provided with the connection steel part, and the steel part edge is provided with bevel for welding, and the steel bar concrete column cross-section is rectangular or cylindrical.
The beneficial effects of the utility model are, it had both had the raising efficiency of construction, shorten the duration of a project, reduce the characteristics of construction costs, have the beneficial effect that guarantees workmanship safety again,
Description of drawings:
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is a facade organigram of the present utility model;
Fig. 2 is a planar configuration schematic diagram of the present utility model.
Among the figure, 1, the steel bar concrete crossbeam, 2, the steel bar concrete column, 3, column butt joint steel part, 4, the steel bar concrete longeron.
The specific embodiment:
In Fig. 1, steel bar concrete crossbeam 1 two ends are overlapped in the connection platform of steel bar concrete column 2, and the junction is provided with steel part, and the back firm welding is installed.
In Fig. 2, steel bar concrete longeron 4 is identical with the steel bar concrete crossbeam with the method for attachment of steel bar concrete column 2, and column butt joint steel part 3 is provided with respectively at the two ends of column, is used for column and docks with column with base, column.Steel bar concrete column 2 cross sections are rectangular or cylindrical, are provided with as required.
During use, at first dwindle the building body group frame tectonic model of producing this project and to its test of tectonic loading technical application and demonstration according to the ratio of project blue print, according to result of the test the technological deficiency that exists is corrected change, then by after changing object of construction production plan processing building each floor of body group frame steel bar concrete column independently, the steel bar concrete crossbeam, the steel bar concrete longeron, the reinforced concrete floor prefabricated units, overall process enforcement column under the surveyor's transit monitoring is installed to be docked with pedestal, column docks with column, column and longeron, column and crossbeam overlap joint, the member junction all is provided with steel part, the steel part edge is provided with bevel for welding, steel part and weld bond are all done preservative treatment, successively install, realize the purpose of building body group frame entire combination.

Claims (3)

1, a kind of building body group frame structure, the steel bar concrete column, steel bar concrete longeron, the steel bar concrete crossbeam that comprise combination building each floor framework of body, it is characterized in that concrete column docks combination with base, concrete column with concrete column, concrete column and concrete crossbeam, the combination of concrete longeron overlap joint.
2, body group frame structure in building according to claim 1 is characterized in that concrete column, concrete crossbeam, the butt joint of concrete longeron, lap-joint are provided with the connection steel part, and the steel part edge is provided with bevel for welding.
3, according to claim 1 and the described building of claim 2 body group frame structure, it is characterized in that the steel bar concrete column cross-section is rectangular or cylindrical.
CN 200420040380 2004-05-08 2004-05-08 Building body assembling frame structure Expired - Fee Related CN2695510Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200420040380 CN2695510Y (en) 2004-05-08 2004-05-08 Building body assembling frame structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200420040380 CN2695510Y (en) 2004-05-08 2004-05-08 Building body assembling frame structure

Publications (1)

Publication Number Publication Date
CN2695510Y true CN2695510Y (en) 2005-04-27

Family

ID=34774284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200420040380 Expired - Fee Related CN2695510Y (en) 2004-05-08 2004-05-08 Building body assembling frame structure

Country Status (1)

Country Link
CN (1) CN2695510Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101435270B (en) * 2007-11-13 2012-04-04 上海宝冶建设有限公司 High layer post subsection butt-joint operating method
TWI669252B (en) * 2017-01-25 2019-08-21 神州企業股份有限公司 Box skeleton structure and manufacturing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101435270B (en) * 2007-11-13 2012-04-04 上海宝冶建设有限公司 High layer post subsection butt-joint operating method
TWI669252B (en) * 2017-01-25 2019-08-21 神州企業股份有限公司 Box skeleton structure and manufacturing method thereof

Similar Documents

Publication Publication Date Title
CN102127930B (en) Net die member for steel-concrete building and method for constructing enclosure by combining net die members and filling into a frame shear wall
CN102493603B (en) Prefabricated column of reserved concealed column channel, concealed column type complete assembled earthquake-resistant building and its method
CN103114681B (en) High-altitude long-span reinforced concrete beam treat pouring structure
CN106088326B (en) Assembling frame rod structure based on 3D printing
CN103572708B (en) Large-span concrete continuous girder bridge side span folding device and method
CN102154988B (en) Arch-after-girder construction method of large-span steel box tacked arch bridge
CN105332417B (en) The construction method of the pre-manufactured steel framework combined structure of external wrapping concrete
CN105143570A (en) Building structure and construction method for same
CN107574924A (en) The component and construction method of a kind of assembly concrete framework for the connection of steel joint
CN102003074B (en) Construction method for indoor long-span steel connecting bridge
CN107268417A (en) A kind of highway steel reinforced concrete combined beam structure based on assembling
CN105401960B (en) A kind of mould bases and its construction method for the construction of railway tunnel inverted arch
CN208415293U (en) Integral prefabricated assembled main transformer foundation for indoor substation
CN212582721U (en) Bearing platform of tower crane for vertical tower of top plate of foundation garage
CN202401667U (en) Prefabricated column with reserved embedded column porous channel and embedded column type full-assembly anti-seismic building
CN2695510Y (en) Building body assembling frame structure
CN108952002B (en) Oversized and ultra-wide double-spliced combined I-shaped steel beam and sectional division and installation method thereof
CN114263275B (en) Construction method for same-layer construction of high-rise assembled steel structure-core tube
CN102383376B (en) Ground moulding and integral hoisting method for large-tonnage steel bar bound finished product member
CN210636590U (en) Super-huge assembled steel structure supporting framework
CN211947883U (en) Integrally-assembled large-span steel truss overbridge
CN211473320U (en) Tool type external hanging rack for corridor
CN210288878U (en) Precast concrete Y type roof beam subassembly
CN207210930U (en) A kind of highway steel reinforced concrete combined beam structure based on assembling
CN206846097U (en) A kind of Men Gangyu frameworks separately-loaded pipeline support structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee