CN101409143A - 变压器铁心的中心定位叠装方法 - Google Patents

变压器铁心的中心定位叠装方法 Download PDF

Info

Publication number
CN101409143A
CN101409143A CNA2008100215559A CN200810021555A CN101409143A CN 101409143 A CN101409143 A CN 101409143A CN A2008100215559 A CNA2008100215559 A CN A2008100215559A CN 200810021555 A CN200810021555 A CN 200810021555A CN 101409143 A CN101409143 A CN 101409143A
Authority
CN
China
Prior art keywords
partially
closed assembly
center
yoke
center pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2008100215559A
Other languages
English (en)
Other versions
CN101409143B (zh
Inventor
蔡子祥
王向阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Putian Iron Core Co Ltd
Original Assignee
Wuxi Putian Iron Core Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Putian Iron Core Co Ltd filed Critical Wuxi Putian Iron Core Co Ltd
Priority to CN2008100215559A priority Critical patent/CN101409143B/zh
Publication of CN101409143A publication Critical patent/CN101409143A/zh
Application granted granted Critical
Publication of CN101409143B publication Critical patent/CN101409143B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacturing Cores, Coils, And Magnets (AREA)

Abstract

本发明涉及一种变压器铁心的生产技术,具体地说是一种变压器铁心的中心定位叠装方法。按照本发明提供的技术方案,所述变压器铁心的中心定位叠装方法,包括位于铁心上下两端的上、下轭,位于铁心左、右两侧的边柱及位于铁心中部的中柱,其中所述边柱与中柱平行,其特征在于,所述方法包括如下步骤:步骤一、定位:先在定位支架上定位中柱、边柱及上下轭的位置;步骤二、叠装中柱:将若干片中柱依次叠装在定位支架上;步骤三、插片:在将若干片中柱全部叠装好以后,再开始叠装上下轭与边柱,在叠装上下轭与边柱的时候,按照先叠装一片上下轭、再叠装一片边柱的顺序,将上下轭与边柱逐片叠装在定位支架上。本发明可以方便铁心的包装与包装后的插片。

Description

变压器铁心的中心定位叠装方法
技术领域
本发明涉及一种变压器铁心的生产技术,具体地说是一种变压器铁心的中心定位叠装方法。
背景技术
原叠片方法为平铺叠法,具体的流程为:铁心由0.23~0.35mm厚的冷轧取向硅钢片叠积而成。其基本片形一般有以下三种:即1.中柱;2.上、下轭,所述上轭2位于变压器铁心的上端,下轭2位于变压器铁心的下端,一般上轭与下轭的片型相同,在上轭与下轭上设置与中柱1上的尖角10吻合的豁口;3.边柱,所述边柱3包括位于变压器铁心左侧的边柱与位于变压器铁心右侧的边柱,一般位于左右侧的边柱的形状相同。其中的中柱1对应不同的步进有不同的片形,对于五步进的变压器铁心而言有大偏中、小偏中及正中三种,对于三步进的变压器铁心来说只有一种偏中和一个正中两种片形。中柱的基本形状是在一片长条形薄片状的中柱的两端分别对称的设置尖角10,该尖角10由切掉原来呈矩形的两个边角形成。当切掉的两侧切角一样大时,所述尖角10位于中间位置,称之为正中;当一侧的切角较大,另一侧的切角较小,使尖角10明显偏向于某一侧时,称之为大偏中,当一侧的切角略大于另一侧的切角,使尖角略微偏向于某一侧时,称之为小偏中,见图6。
传统的叠积方式是一个平面一个平面进行叠装的,硅钢片的叠积顺序为:左大偏中-上、下轭-边柱-左小偏中-上、下轭-边柱-正中-上、下轭-边柱-右小偏中-上、下轭-边柱-右大偏中-上、下轭-边柱的循环。见图5-a、图5-b、图5-c、图5-d、图5-e。这种叠积方法存在的问题是:1.铁心套包困难。2.套包后插片困难。
发明内容
本发明的目的在于设计一种变压器铁心的中心定位叠装方法,以方便铁心的叠装与套装线圈后的插片。
按照本发明提供的技术方案,所述变压器铁心的中心定位叠装方法,包括位于铁心上下两端的上、下轭,位于铁心左、右两侧的边柱及位于铁心中部的中柱,其中所述边柱与中柱平行,其特征在于,所述方法包括如下步骤:
步骤一、定位:先在定位支架上定位中柱、边柱及上下轭的位置;
步骤二、叠装中柱:将若干片中柱依次叠装在定位支架上;
步骤三、插片:在将若干片中柱全部叠装好以后,再开始叠装上下轭与边柱,在叠装上下轭与边柱的时候,按照先叠装一片上下轭、再叠装一片边柱的顺序,将上下轭与边柱逐片叠装在定位支架上。
所述中柱的两端为尖角,形成尖角的左右侧两条边分别为左侧边与右侧边;所述中柱包括左大偏中、左小偏中、正中、右小偏中、右大偏中;
其中,左大偏中的左侧边长度小于其右侧边长度的一半;
左小偏中的左侧边长度大于其右侧边长度的一半,小于其右侧边长度;
正中的左侧边长度等于其右侧边长度;
右小偏中的形状与左小偏中的形状对称;
右大偏中的形状与左大偏中的形状对称;
在叠装中柱时,按照左大偏中、左小偏中、正中、右小偏中、右大偏中的顺序依次叠装,在叠装完一个循环后,再重复依次叠装。
本发明的优点是:先运用定位支架确定中柱的位置,定位完毕后叠积中柱,叠积顺序按左大偏中-左小偏中-正中-右小偏中-右大偏中的循环,等所有中柱叠积完成后,对中柱进行整理,从而避免了传统的在整个铁心全部完成后难以整理的问题。彻底解决了中柱参差不齐的缺陷,不但便于插片,提高叠积速度,而且减少了铁心柱面直径φ的偏差。各个柱面直径及中心线一致,确保了铁心窗口的整齐。
这种叠装法,降低了叠片过程中的技术难度,缩短了新上岗员工的培训周期。经过长期的应用及跟踪,本方法远优于传统的叠积方法,且无其它弊端,因此有效提高了产品质量和工作效率。
附图说明
图1是叠装后的铁心示意图。
图2是图1中I的放大图。
图3是图1中II的放大图。
图4是图1的A-A剖视图。
图5是传统的叠装方式示意图。
其中的图5-a是叠装左大偏中、上下轭及边柱的示意图。
图5-b是叠装左小偏中、上下轭及边柱的示意图。
图5-c是叠装正中、上下轭及边柱的示意图。
图5-d是叠装右小偏中、上下轭及边柱的示意图。
图5-e是叠装右大偏中、上下轭及边柱的示意图。
图6是五步进时各种中柱的示意图。
其中的图6-a是左大偏中的结构示意图。
图6-b是左小偏中的结构示意图。
图6-c是左正中的结构示意图。
图6-d是右小偏中的结构示意图。
图6-e是右大偏中的结构示意图。
具体实施方式
所述变压器铁心的中心定位叠装方法,包括位于铁心上下两端的上、下轭2,位于铁心左、右两侧的边柱3及位于铁心中部的中柱1,其中所述边柱3与中柱1平行,其特征在于,所述方法包括如下步骤:
步骤一、定位:先在定位支架上定位中柱1、边柱3及上下轭2的位置;
步骤二、叠装中柱:将若干片中柱1依次叠装在定位支架上;
步骤三、插片:在将若干片中柱1全部叠装好以后,再开始叠装上下轭2与边柱3,在叠装上下轭2与边柱3的时候,按照先叠装一片上下轭2、再叠装一片边柱3的顺序,将上下轭2与边柱3逐片叠装在定位支架上。
所述中柱2的两端为尖角10,形成尖角10的左右侧两条边分别为左侧边11与右侧边12;所述中柱2包括左大偏中4、左小偏中5、正中6、右小偏中7、右大偏中8;
其中,左大偏中4的左侧边长度β2小于其右侧边长度α2的一半;
左小偏中5的左侧边长度β1大于其右侧边长度α1的一半,小于其右侧边长度α1;
正中6的左侧边长度β等于其右侧边长度α;
右小偏中7的形状与左小偏中5的形状对称;
右大偏中8的形状与左大偏中4的形状对称;
在叠装中柱2时,按照左大偏中4、左小偏中5、正中6、右小偏中7、右大偏中8的顺序依次叠装,在叠装完一个循环后,再重复依次叠装。
由于本发明的叠积方式为先叠积中柱2,叠积顺序为左大偏中4-左小偏中5-正中6-右小偏中7-右大偏中8的循环,等所有中柱1叠积完成后,通过整理,使叠装的所有中柱平整对齐,一般在叠完中柱1后就可以对中柱1进行整理,且整理过程是在叠积的过程中,避免了传统的将所有中柱1、上下轭2及边柱3全部完成后难以整理的问题。
本发明的原理是:改变了原来的平面加平面组成立体的叠片方法,采用先确定中柱平面加平面,而后形成中柱立面的叠积方法,再依靠中柱1的立面标准,确定上、下轭2和边柱3的立面。从源头上解决了原来的叠片偏移的问题,中柱1叠积完成后,进行一步整理工作,保持了中柱1的立面不偏移,避免了中柱1立面的参差不齐,进一步保证了铁心柱面直径φ的尺寸。

Claims (2)

1、变压器铁心的中心定位叠装方法,包括位于铁心上下两端的上、下轭(2),位于铁心左、右两侧的边柱(3)及位于铁心中部的中柱(1),其中所述边柱(3)与中柱(1)平行,其特征在于,所述方法包括如下步骤:
步骤一、定位:先在定位支架上定位中柱(1)、边柱(3)及上下轭(2)的位置;
步骤二、叠装中柱:将若干片中柱(1)依次叠装在定位支架上;
步骤三、插片:在将若干片中柱(1)全部叠装好以后,再开始叠装上下轭(2)与边柱(3),在叠装上下轭(2)与边柱(3)的时候,按照先叠装一片上下轭(2)、再叠装一片边柱(3)的顺序,将上下轭(2)与边柱(3)逐片叠装在定位支架上。
2、如权利要求1所述变压器铁心的中心定位叠装方法,其特征是:中柱(2)的两端为尖角(10),形成尖角(10)的左右侧两条边分别为左侧边(11)与右侧边(12);所述中柱(2)包括左大偏中(4)、左小偏中(5)、正中(6)、右小偏中(7)、右大偏中(8);
其中,左大偏中(4)的左侧边长度(β2)小于其右侧边长度(α2)的一半;
左小偏中(5)的左侧边长度(β1)大于其右侧边长度(α1)的一半,小于其右侧边长度(α1);
正中(6)的左侧边长度(β)等于其右侧边长度(α);
右小偏中(7)的形状与左小偏中(5)的形状对称;
右大偏中(8)的形状与左大偏中(4)的形状对称;
在叠装中柱(2)时,按照左大偏中(4)、左小偏中(5)、正中(6)、右小偏中(7)、右大偏中(8)的顺序依次叠装,在叠装完一个循环后,再重复依次叠装。
CN2008100215559A 2008-08-05 2008-08-05 变压器铁心的中心定位叠装方法 Active CN101409143B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2008100215559A CN101409143B (zh) 2008-08-05 2008-08-05 变压器铁心的中心定位叠装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2008100215559A CN101409143B (zh) 2008-08-05 2008-08-05 变压器铁心的中心定位叠装方法

Publications (2)

Publication Number Publication Date
CN101409143A true CN101409143A (zh) 2009-04-15
CN101409143B CN101409143B (zh) 2011-04-13

Family

ID=40572103

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2008100215559A Active CN101409143B (zh) 2008-08-05 2008-08-05 变压器铁心的中心定位叠装方法

Country Status (1)

Country Link
CN (1) CN101409143B (zh)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103050238A (zh) * 2012-12-31 2013-04-17 吴江市变压器厂有限公司 一种变压器铁芯的拼片结构
CN104810140A (zh) * 2015-05-15 2015-07-29 东莞市光华实业有限公司 可提高组装效率的变压器铁芯
CN104810144A (zh) * 2015-05-20 2015-07-29 江苏汇安隆电器有限公司 一种铁芯叠装工艺
CN107946048A (zh) * 2017-12-31 2018-04-20 江苏天奇新能源集成有限公司 110kV树脂浇注干式变压器
CN108831705A (zh) * 2018-06-25 2018-11-16 无锡巨龙硅钢股份有限公司 变压器铁芯的叠片方法和由该叠片方法制备的变压器铁芯
CN112382496A (zh) * 2020-11-16 2021-02-19 无锡普天铁心股份有限公司 一种主变铁心叠装装置
CN112397302A (zh) * 2020-12-16 2021-02-23 南通睿驰智能科技有限公司 一种变压器铁心批量自动叠装产线
CN113130197A (zh) * 2021-03-24 2021-07-16 无锡普天铁心股份有限公司 一种三相三柱不叠上轭铁心的叠积方法
CN113130198A (zh) * 2021-03-24 2021-07-16 无锡普天铁心股份有限公司 一种三相三柱不叠上轭铁心的固定方法
CN113539635A (zh) * 2021-07-20 2021-10-22 无锡普天铁心股份有限公司 一种压紧装置及变压器用铁心压紧方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4200854A (en) * 1979-01-04 1980-04-29 Westinghouse Electric Corp. Core with step-lap joints
CN2705865Y (zh) * 2004-03-18 2005-06-22 特变电工股份有限公司 一种变压器铁心心柱拼接结构

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103050238A (zh) * 2012-12-31 2013-04-17 吴江市变压器厂有限公司 一种变压器铁芯的拼片结构
CN103050238B (zh) * 2012-12-31 2016-04-20 吴江变压器有限公司 一种变压器铁芯的拼片结构
CN104810140A (zh) * 2015-05-15 2015-07-29 东莞市光华实业有限公司 可提高组装效率的变压器铁芯
CN104810144A (zh) * 2015-05-20 2015-07-29 江苏汇安隆电器有限公司 一种铁芯叠装工艺
CN107946048A (zh) * 2017-12-31 2018-04-20 江苏天奇新能源集成有限公司 110kV树脂浇注干式变压器
CN108831705A (zh) * 2018-06-25 2018-11-16 无锡巨龙硅钢股份有限公司 变压器铁芯的叠片方法和由该叠片方法制备的变压器铁芯
CN112382496A (zh) * 2020-11-16 2021-02-19 无锡普天铁心股份有限公司 一种主变铁心叠装装置
CN112397302A (zh) * 2020-12-16 2021-02-23 南通睿驰智能科技有限公司 一种变压器铁心批量自动叠装产线
CN112397302B (zh) * 2020-12-16 2022-01-28 南通睿驰智能科技有限公司 一种变压器铁心批量自动叠装产线
CN113130197A (zh) * 2021-03-24 2021-07-16 无锡普天铁心股份有限公司 一种三相三柱不叠上轭铁心的叠积方法
CN113130198A (zh) * 2021-03-24 2021-07-16 无锡普天铁心股份有限公司 一种三相三柱不叠上轭铁心的固定方法
CN113130198B (zh) * 2021-03-24 2022-11-08 无锡普天铁心股份有限公司 一种三相三柱不叠上轭铁心的固定方法
CN113539635A (zh) * 2021-07-20 2021-10-22 无锡普天铁心股份有限公司 一种压紧装置及变压器用铁心压紧方法
CN113539635B (zh) * 2021-07-20 2024-07-02 无锡普天铁心股份有限公司 一种压紧装置及变压器用铁心压紧方法

Also Published As

Publication number Publication date
CN101409143B (zh) 2011-04-13

Similar Documents

Publication Publication Date Title
CN101409143B (zh) 变压器铁心的中心定位叠装方法
CN108831705B (zh) 变压器铁芯的叠片方法和由该叠片方法制备的变压器铁芯
WO2019210803A1 (zh) 光伏组件及其制造方法
CN202455169U (zh) 一种电机铁芯冲片
CN206509643U (zh) 一种用于薄膜切割的定位工装
CN103051074A (zh) 一种新型交叉叠扣式无刷直流变频电机的直绕式定子冲片结构
KR20170132599A (ko) 스택 제조용 정렬지그
CN201242936Y (zh) 铁心叠片定位模
CN216443063U (zh) 一种金属幕墙生产用贴膜装置
ATE329398T1 (de) Verfahren zur herstellung eines ringförmigen blechpakets für den stator eines linearmotors sowie ringförmiges blechpaket
JP4366103B2 (ja) 積層鉄心の製造方法
CN102570734B (zh) 高起动推力径向磁场直线旋转电机定子双片叠压法
CN202586527U (zh) 一种分段斜槽口集中绕组电机、发电机及电动机
CN202285189U (zh) 变压器的三相等磁路铁心
CN204304635U (zh) 一种条形定子冲片及其应用的电机
WO2021135936A1 (zh) 一种布匹自动化包装线主机架榫卯结构
JP2009207240A (ja) リニアモータの電機子コアユニット、電機子ユニット及び電機子
CN211908506U (zh) 一种直流电机出线骨架
JP2003284268A5 (zh)
CN102938302A (zh) 铁心下轭拼片工艺
CN202111593U (zh) 一种电机铁芯叠压自扣结构
CN217606640U (zh) 一种综合步进铁芯叠片结构
CN207459846U (zh) 一种转定子铁芯结构
CN202178133U (zh) 一种电感镇流器或变压器磁芯体的结构
CN214755774U (zh) 一种新型嵌线结构的硅钢片组件

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 214194, 19, Jing Xiang Road, tin Beizhen Zhang Jing Industrial Zone, Xishan District, Jiangsu, Wuxi

Patentee after: WUXI PUTIAN IRON CORE CO., LTD.

Address before: 214194, Xishan District, Jiangsu City, Wuxi province Beizhen Zhang Jing Jing industrial concentration area, Wuxi Putian iron core Co., Ltd.

Patentee before: Wuxi Putian Iron Core Co., Ltd.