CN101268740A - Ecological protection method of shale side slope - Google Patents
Ecological protection method of shale side slope Download PDFInfo
- Publication number
- CN101268740A CN101268740A CNA2008100442139A CN200810044213A CN101268740A CN 101268740 A CN101268740 A CN 101268740A CN A2008100442139 A CNA2008100442139 A CN A2008100442139A CN 200810044213 A CN200810044213 A CN 200810044213A CN 101268740 A CN101268740 A CN 101268740A
- Authority
- CN
- China
- Prior art keywords
- side slope
- seed
- shale
- pig blood
- shrubby
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/22—Improving land use; Improving water use or availability; Controlling erosion
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P60/00—Technologies relating to agriculture, livestock or agroalimentary industries
- Y02P60/40—Afforestation or reforestation
Abstract
The invention discloses a bionomic control method for the shale side slope. The method can ensure that a shrubby seed is embedded into the small opening of a shale side slope body to take root and grow through afforestation spray-sowing, thereby improving the bionomic control effect of the side slope. The method includes the following steps: (1) the side slope is napped, rubble, detritus and sundries are cleaned up, and the slope surface is brushed; (2) a soil substrate layer sprays on the side slope, and the soil substrate layer is a mixed material containing the shrubby seed and the pig blood; (3) the maintenance is performed. The invention adopts a method of food attraction and insect insemination, namely, the soil substrate layer is sprayed with the mixed material containing the shrubby seed and the pig blood, by utilizing the biologic dependence relationship of ants to the pig blood, when collecting food, the ants draw the pig blood with the seed into the small opening of the side slope, so as to ensure that the shrubby seed is embedded into the small opening of the shale side slope body to take root and grow, to quickly reforest and stabilize the side slope, thereby effectively improving the bionomic control effect of the side slope. The latter curing for the shrubbery growing is not needed, thereby greatly saving the cost for reforesting and maintaining the side slope.
Description
Technical field
The present invention relates to the ecological protection of slope of highway, particularly a kind of ecological protection method of shale side slope.
Background technology
Along with developing rapidly of China's highway, people have higher requirement to the expressway construction quality, usually adopted in the past and paved protection and sealing safeguard procedures, but since construction complicated, involve great expense and influence the environment of both sides of highway and ecoscape being eliminated gradually, and the side slope retaining anti-with afforest the ecological protection system that combines and obtained application more and more widely.
At present, the ecological protection of rocky slope adopts the method for sowing grass seeds by duster of afforesting more, and the core of this method is to build one at slope of rock mass can allow growth and development of plants and plant the porous rock-steady structure that matrix is not washed away.It utilizes special spray to mix and is ejected on the scar after machinery adds water with mixed dry materials such as soil, fertilizer, organic matter, water-keeping material, plant seed, cement, because the cementation of cement, said mixture can form the hardenite that one deck has continuous gap at rock surface.Sclerosis to a certain degree makes plantation exempt from erosion, and is filled with seed, soil, water-keeping material etc. in the space, and the space is the packing space of plantation matrix, is again the growing space of root system of plant.Because the thickness of plantation matrix is limited, only the preferential species grass can not form abundant ecoscape with arbor or shrub miscegenation usually.And shale side slope is loosely organized, physical weathering is strong, side slope is subjected to the rain drop erosion meeting to produce a large amount of water and soil loss, and traditional greening method of sowing grass seeds by duster can't make the seed of arbor or shrub be deep in the hole of shale side slope body to take root and grow, be unfavorable for the protecting slope ecology effect that reaches stable.
Summary of the invention
Technical problem to be solved by this invention provides a kind of ecological protection method of shale side slope, is deep in the hole of shale side slope body and takes root and grow by the sow grass seeds by duster seed that can make shrub of greening, thereby improve the effect of protecting slope ecology.
The technical solution adopted for the present invention to solve the technical problems is: the ecological protection method of shale side slope of the present invention, comprise the steps: 1. to repair side slope, and cleaning slabstone, rubble and foreign material are brushed domatic clearly; 2. to domatic injection soil matrix layer, this soil matrix layer is the compound that contains shrub seed and pig blood; 3. maintenance.
The thickness of described soil matrix layer is 7~8cm.
Shrub seed consumption is 10~20g/m in the described compound
2, the weight ratio of shrub seed and fresh pig blood is 1: 15~20.
After shrub seeds growth 20~30 days, again to the soil matrix layer grass-seed compound of sowing grass seeds by duster.
The invention has the beneficial effects as follows, adopt the method for " food is lured, insect sow ", promptly on the soil matrix layer, spray the compound that contains shrub seed and pig blood is arranged, utilize the biological dependence of ant to pig blood, when searching for food, ant the pig blood of band seed can be dragged in the side slope hole in the lump, the seed of shrub is deep in the hole of shale side slope body takes root and grow, but fast greening and stable side slope, thus improve the effect of protecting slope ecology effectively; The shrub growth is saved the cost of greening side slope maintenance in a large number without the later stage maintenance.
The present invention is equally applicable to the ecological protection of porous crack side slopes such as husky mud stone and verrucano.
Embodiment
The present invention is further illustrated below in conjunction with embodiment.
The present invention has arrived application in domestic section part side slope (the about 110 kilometers) afforestation project of national highway 319 lines (G319) Ziyang, Sichuan Province.This project side slope lithology has argillaceous siltstoue folder mud stone, argillaceous siltstoue and thin layers of mudstone alternating layers, sandstone etc. based on thin layers of mudstone, argillaceous siltstoue, has a small amount of high slope to exist on the way.Side slope protection is avoided ecological closed protection as far as possible, and adopt open plant ecological protection system, promptly under the situation of geological conditions permission, replace stiff bricklaying bank protection with the natural vegetation protection, the artificial engineering vestige that weakens reaches and the harmony of natural environment on every side.
According to slope height and the gradient, geology and soil condition, selecting for use respectively directly sows grass seeds by duster irritates grass, dibbling arbor linked network is sowed grass seeds by duster and irritated grass etc.See table 1 for details.
Table 1 protecting slope ecology form
The step of shale, husky mud stone and the construction of verrucano highway section greening side slope is specific as follows:
1. finishing side slope, cleaning slabstone, rubble and foreign material, brush domatic clearly, to guarantee stablizing of side slope, simultaneously for pave three dimensional network, wire netting is laid a solid foundation.
2. to domatic injection soil matrix layer.
Preparation soil matrix layer compound, soil, shrub seed, pig blood, cement, wood fibre, composite fertilizer etc. are added water by a certain percentage mix and stir the formation compound, artificial earthing or with pulp shooting machine equably sprayed coating on domatic as the soil matrix layer, the about 7~8cm of thickness.Shrub seed consumption is 10~20g/m in this compound
2, the weight ratio of shrub seed and fresh pig blood is 1: 15~20.
To embankment and cut slope, the shrub seed compound of should sowing grass seeds by duster is earlier treated the shrub seeds growth after 20~30 days, the grass-seed compound of sowing grass seeds by duster again.Grass seed selection and being configured to: 50% Bermuda grass+40% clover+10% Festuca Arundinacea.
3. injection back covering nonwoven, straw screen or mat, shading screen, straw etc. are preserved moisture and are prevented rain drop erosion.
5. maintenance management.Phase maintenance before, during and after dividing, the maintenance in early stage is 30d, based on the water of spraying, often keeps ground moistening, with short seed sprouting and growth covering fast.The number of times that waters behind the Cheng Ping of lawn can suitably reduce, and notes arid and damage by disease and insect 1 year planted agent, enters the maintenance in mid-term through behind the winter and summer.The maintenance in mid-term is by the maintenance of nature rainwater, if the drought of chance, 3~4 the later stage maintenances of watering in every month were watered 1~2 time in every month, and dressing fertilizer, and short Miao Zhuanqing pays and checks and accepts.
After adopting the ecological protection method of shale side slope of the present invention to carry out greening side slope,, find that the slope stability protection effect is all better, the landslide of appearance or water and soil loss phenomenon, reached the purpose of ecological protection preferably through the observation more than 1 year.。
Claims (4)
1. the ecological protection method of shale side slope comprises the steps: 1. to repair side slope, and cleaning slabstone, rubble and foreign material are brushed domatic clearly; 2. to domatic injection soil matrix layer, this soil matrix layer is the compound that contains shrub seed and pig blood; 3. maintenance.
2. the ecological protection method of shale side slope as claimed in claim 1, it is characterized in that: the thickness of described soil matrix layer is 7~8cm.
3. the ecological protection method of shale side slope as claimed in claim 1 or 2, it is characterized in that: shrub seed consumption is 10~20g/m in the described compound
2, the weight ratio of shrub seed and fresh pig blood is 1: 15~20.
4. the ecological protection method of shale side slope as claimed in claim 3 is characterized in that: described step 2. after, in the shrub seeds growth after 20~30 days, again to the soil matrix layer grass-seed compound of sowing grass seeds by duster.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100442139A CN101268740B (en) | 2008-04-15 | 2008-04-15 | Ecological protection method of shale side slope |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2008100442139A CN101268740B (en) | 2008-04-15 | 2008-04-15 | Ecological protection method of shale side slope |
Publications (2)
Publication Number | Publication Date |
---|---|
CN101268740A true CN101268740A (en) | 2008-09-24 |
CN101268740B CN101268740B (en) | 2010-08-04 |
Family
ID=40003163
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2008100442139A Expired - Fee Related CN101268740B (en) | 2008-04-15 | 2008-04-15 | Ecological protection method of shale side slope |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN101268740B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104160860A (en) * | 2014-08-07 | 2014-11-26 | 深圳市和景园林绿化有限公司 | Method for greening side slopes with greening brick cages |
CN104782383A (en) * | 2015-05-15 | 2015-07-22 | 黄石市园林花木有限责任公司 | High and steep side slope ecological retrieved green spray-seeding base material and preparation method and application of base material |
CN107964961A (en) * | 2017-08-16 | 2018-04-27 | 轻工业环境保护研究所 | High gradient slope surface of a wound top layer moss preventing rain wash technology and its construction method |
CN115176669A (en) * | 2022-08-12 | 2022-10-14 | 李善刚 | Revegetation structure and method for mine slope of waste limestone |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1111344C (en) * | 2000-10-27 | 2003-06-18 | 四川省励自生态与环境工程技术有限公司 | Bed for planting vegetation on rock slope to protect it |
CN1526266A (en) * | 2003-03-04 | 2004-09-08 | 成都四海岩土工程有限公司 | Ecological side slope protecting method |
-
2008
- 2008-04-15 CN CN2008100442139A patent/CN101268740B/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104160860A (en) * | 2014-08-07 | 2014-11-26 | 深圳市和景园林绿化有限公司 | Method for greening side slopes with greening brick cages |
CN104782383A (en) * | 2015-05-15 | 2015-07-22 | 黄石市园林花木有限责任公司 | High and steep side slope ecological retrieved green spray-seeding base material and preparation method and application of base material |
CN104782383B (en) * | 2015-05-15 | 2017-06-13 | 黄石市园林花木有限责任公司 | A kind of high, gradient slope zoology green-recovery is sowed grass seeds by duster base material and its preparation method and application |
CN107964961A (en) * | 2017-08-16 | 2018-04-27 | 轻工业环境保护研究所 | High gradient slope surface of a wound top layer moss preventing rain wash technology and its construction method |
CN115176669A (en) * | 2022-08-12 | 2022-10-14 | 李善刚 | Revegetation structure and method for mine slope of waste limestone |
Also Published As
Publication number | Publication date |
---|---|
CN101268740B (en) | 2010-08-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104782383B (en) | A kind of high, gradient slope zoology green-recovery is sowed grass seeds by duster base material and its preparation method and application | |
CN102197726B (en) | Method for improving seriously saline-alkali land of oasis area and planting high-quality lawn | |
CN107382608A (en) | A kind of vegetation is multiple green to sow grass seeds by duster auxiliary material, sow grass seeds by duster material and the multiple green construction method of vegetation without native composite fibre | |
WO2021175263A1 (en) | Fully-ecological slope spray-seeding structure and construction method | |
CN102204434B (en) | Method for preventing water erosion desertification by using biological crust | |
CN105926533B (en) | A kind of embedded type ecology consolidates beach method | |
CN102379201B (en) | Method of quick restoration of vegetation in reservoir hydro-fluctuation belt | |
CN102138508B (en) | Method for greening and protecting steep road side slope by using biological crust | |
CN101317523A (en) | Shrub and grass mix seeding type side slope ecological renovation method | |
CN101692769A (en) | Grass blanket with soil | |
CN104770257B (en) | Method for recovering vegetation through micropore thin films | |
CN110485441A (en) | It repairs with leaching net formula ecological slope protection structure and its construction method of sowing grass seeds by duster in mine | |
CN208266847U (en) | Quickly repair structure in Gullied suitable for Canal in Loess Area | |
CN108093729A (en) | Side-slope greening and protection method | |
CN108547307A (en) | Protecting slope ecology method based on artificial loam | |
CN106576790A (en) | Spray-seeding substrate for ecological reafforestation of high and steep side slopes, preparation method for spray-seeding substrate and application of spray-seeding substrate | |
CN109757146A (en) | A method of the saline and alkaline sand ground zoology green-recovery in beach is carried out using salt-tolerant plant | |
CN109328808A (en) | A kind of the Northwest's ecological treatment of slope method | |
CN108476649A (en) | A kind of gardens abrupt slope plant landscape method | |
CN108739118A (en) | A kind of method of fast quick-recovery side slope vegetation | |
CN113330967A (en) | Method for improving germination rate of rhus chinensis seeds on vegetation concrete restoration slope | |
CN210946834U (en) | Immersed net type ecological slope protection structure for mine restoration | |
CN109328805A (en) | A kind of Rocky Desertification Region ecological treatment of slope method | |
CN101268740B (en) | Ecological protection method of shale side slope | |
CN102067776B (en) | Method for constructing vegetation in ecological concrete spheres on river bank protection slope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100804 Termination date: 20110415 |