CN115176669A - Revegetation structure and method for mine slope of waste limestone - Google Patents
Revegetation structure and method for mine slope of waste limestone Download PDFInfo
- Publication number
- CN115176669A CN115176669A CN202210965159.1A CN202210965159A CN115176669A CN 115176669 A CN115176669 A CN 115176669A CN 202210965159 A CN202210965159 A CN 202210965159A CN 115176669 A CN115176669 A CN 115176669A
- Authority
- CN
- China
- Prior art keywords
- layer
- slag
- vegetation
- mine
- slope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G24/00—Growth substrates; Culture media; Apparatus or methods therefor
- A01G24/40—Growth substrates; Culture media; Apparatus or methods therefor characterised by their structure
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01B—SOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
- A01B79/00—Methods for working soil
- A01B79/02—Methods for working soil combined with other agricultural processing, e.g. fertilising, planting
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G24/00—Growth substrates; Culture media; Apparatus or methods therefor
- A01G24/10—Growth substrates; Culture media; Apparatus or methods therefor based on or containing inorganic material
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G24/00—Growth substrates; Culture media; Apparatus or methods therefor
- A01G24/20—Growth substrates; Culture media; Apparatus or methods therefor based on or containing natural organic material
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Environmental Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Inorganic Chemistry (AREA)
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Soil Sciences (AREA)
- Cultivation Of Plants (AREA)
Abstract
本发明涉及矿山修复技术领域,具体涉及一种废弃石灰石矿山边坡植被恢复构造体及方法。废弃石灰石矿山边坡植被恢复构造体包括基面、渣石层、有机质保水层、覆土层、喷播层、苔藓层。利用削坡后取运商用石料后的剩余部分石料自然形成渣石层,以及当地石灰石矿的上层排土,节省土方的施工量和运量。覆土层采用采用气力喷散排土的方式构建,喷薄层采用喷播方式播洒种子,避免对渣石层进行平整工作,进一步节约工作量。利用当地石灰石矿的上层排土与当地环境的种子构建植被群落与当地自然植被相近,适应当地的气候,容易生长存活,可以减少后期的维护。降低植被恢复构造体的构建成本并尽量减少后期的维护,在保证植被恢复的情况下减少人工参与。
The invention relates to the technical field of mine restoration, in particular to a structure and method for restoring vegetation on the slope of an abandoned limestone mine. The vegetation restoration structure of the abandoned limestone mine slope includes the base surface, the slag layer, the organic water-retaining layer, the overburden layer, the spray layer, and the moss layer. Use the remaining part of the stone after the slope cut to pick up and transport the commercial stone to naturally form a slag layer, as well as the upper layer of the local limestone mine to dump soil, saving the construction and transportation volume of earthwork. The overburden layer is constructed by means of pneumatic spraying and soil removal, and the spraying layer is sprayed by spraying seeds to avoid the leveling of the slag layer and further save the workload. The vegetation community constructed by using the upper dump of the local limestone mine and the seeds of the local environment is similar to the local natural vegetation, adapting to the local climate, easy to grow and survive, and can reduce later maintenance. Reduce the construction cost of vegetation restoration structures and minimize later maintenance, and reduce manual participation while ensuring vegetation restoration.
Description
技术领域technical field
本发明涉及矿山修复技术领域,具体涉及一种废弃石灰石矿山边坡植被恢复构造体及方法。The invention relates to the technical field of mine restoration, in particular to a structure and method for restoring vegetation on the slope of an abandoned limestone mine.
背景技术Background technique
石灰石矿在开采后形成的边坡具有坍塌、滑塌、落石的风险,并且影响环境。现有的废弃石灰石矿山边坡很多处于仅进行削坡处理的状态,其植被的恢复往往依靠自然过程,需要经年累月的表层土壤化和植被群落缓慢滋长才能完成。石灰石矿山边坡植被修复开展的阻力主要来源于其植被恢复成本大,企业推进的意愿小。在植被恢复在达到一定要求的情况下,如何降低植被恢复的成本是植被恢复技术能否被广泛应用的关键。Slopes formed after limestone mines are mined have the risk of collapse, slumps, rock fall, and environmental impact. Many of the existing abandoned limestone mine slopes are only in the state of cutting slope treatment, and the restoration of vegetation often relies on natural processes, which require years of surface soilization and slow growth of vegetation communities to complete. The resistance to vegetation restoration on limestone mine slopes is mainly due to the high cost of vegetation restoration and the small willingness of enterprises to advance. Under the condition that vegetation restoration meets certain requirements, how to reduce the cost of vegetation restoration is the key to whether vegetation restoration technology can be widely used.
现有的灰石矿山边坡植被修复一般需要考虑如何固定植被(如CN113303059A-一种石灰石矿山废弃地植被恢复装置)、如何改良土壤成分以有利于植被生长(如CN110454165B-一种用于石灰石采石场废弃矿山矿坑的修复基质及其制备方法和填埋方法),完整的植被恢复方案如CN216839500U-矿山边坡修复绿化结构。上述方案中,无论是植被固定还是填充改良土壤,以及后续的维护,均会产生大量的工作量,植被恢复的成本很高。Existing limestone mine slope vegetation restoration generally needs to consider how to fix vegetation (such as CN113303059A-a vegetation restoration device for limestone mine wasteland), how to improve soil composition to facilitate vegetation growth (such as CN110454165B-a kind of limestone mining Restoration matrix of abandoned mine pit in quarry and its preparation method and landfill method), a complete vegetation restoration scheme such as CN216839500U - Mine Slope Restoration Greening Structure. In the above scheme, whether it is vegetation fixation, filling and improving soil, and subsequent maintenance, a large amount of work will be generated, and the cost of vegetation restoration will be very high.
发明内容SUMMARY OF THE INVENTION
本发明针对现有技术弃石灰石矿山边坡植被恢复成本高的问题,提供一种废弃石灰石矿山边坡植被恢复构造体及构造方法,对边坡植被恢复进行较少的人工介入,以降低成本,有利于推广。Aiming at the problem of high cost of vegetation restoration on abandoned limestone mine slopes in the prior art, the present invention provides a structure and a method for restoring vegetation on abandoned limestone mine slopes. conducive to promotion.
为实现上述目的,本发明第一个方面提供了一种废弃石灰石矿山边坡植被恢复构造体,包括:In order to achieve the above purpose, the first aspect of the present invention provides a kind of abandoned limestone mine slope vegetation restoration structure, including:
基面,其为削坡后形成的基础表面;Base surface, which is the base surface formed after sloping;
渣石层,其由削坡后取运商用石料后的剩余部分石料铺于所述基面形成;A slag layer, which is formed by laying the remaining part of the stone material after picking and transporting the commercial stone material on the base surface after cutting the slope;
有机质保水层,其分布于所述渣石层的渣石之间的空隙;an organic water-retaining layer, which is distributed in the spaces between the slag stones of the slag stone layer;
覆土层,其采用当地石灰石矿的表层排土,覆盖在所述有机质保水层上部;an overlying soil layer, which adopts the surface dumping soil of a local limestone mine and covers the upper part of the organic water-retaining layer;
喷播层,其在所述覆土层之上,含有植被种子;a spray layer, on top of the overburden, containing vegetation seeds;
所述基面和渣石层的渣石表面,部分的附着有苔藓层;Part of the slag surface of the base surface and the slag layer is attached with a moss layer;
所述渣石层的坡底位置设有带状阻隔区,由渣石紧密堆砌形成,阻隔谷壳层和土层的流失,并允许水流渗出。The bottom position of the slag rock layer is provided with a band-shaped blocking area, which is formed by tightly stacking the slag rock, which blocks the loss of the husk layer and the soil layer, and allows the water flow to seep out.
利用苔藓层,以及渣石自然分布形成的缝隙填充有机质形成是有机质保水层来达到储水效果,较多的保留自然降雨,可以减少后期的洒水维护。The moss layer and the gaps formed by the natural distribution of slag are filled with organic matter to form an organic water-retaining layer to achieve the effect of water storage. More natural rainfall can be retained, which can reduce later watering maintenance.
进一步的改进,所述有机质保水层含有谷壳和\或锯末。A further improvement, the organic water retention layer contains chaff and/or sawdust.
进一步的改进,所述覆土层中掺有炭灰及根瘤菌粉。炭灰的加入可以添加钾元素,同时使土壤颜色加深有利于吸热,以及起到部分提高保温作用和透气性。根瘤菌粉的加入可以使根瘤菌与豆科植物相配合,起到固氮作用。In a further improvement, the soil covering layer is mixed with charcoal ash and rhizobia powder. The addition of charcoal ash can add potassium element, and at the same time make the soil color darker, which is conducive to heat absorption, as well as partially improve thermal insulation and air permeability. The addition of rhizobia powder can make rhizobia cooperate with legumes and play a role in nitrogen fixation.
进一步的改进,所述植被种子包括当地石灰石矿周边植被种子。周围植被土层成分相近,并采集石灰石矿周围的当地植物种子进行喷播,有利于建立与周围环境相近的植被种群。In a further improvement, the vegetation seeds include vegetation seeds around local limestone mines. The composition of the surrounding vegetation and soil layer is similar, and the local plant seeds around the limestone mine are collected and sprayed, which is conducive to the establishment of vegetation populations similar to the surrounding environment.
当经过有一段时间后,所述覆土层的下层会与所述有机质保水层混合,形成混合层。After a period of time, the lower layer of the covering soil layer will be mixed with the organic water-retaining layer to form a mixed layer.
本发明第二个方面提供了一种废弃石灰石矿山边坡植被恢复方法,包括:A second aspect of the present invention provides a method for restoring vegetation on an abandoned limestone mine slope, comprising:
步骤一、将削坡后取运商用石料后的剩余部分石料自然形成渣石层,渣石层下方为削坡后的基面;Step 1. The remaining part of the stone material after the commercial stone material is taken and transported after the slope is cut to naturally form a slag layer, and the bottom of the slag layer is the base surface after the slope is cut;
步骤二、在所述渣石层的坡底位置用渣石紧密排列,形成带状阻隔区;
步骤三、在所述渣石层喷洒含有苔藓孢子的苔藓混合液,使渣石层和基面部分的生成苔藓层;
步骤四、在所述渣石层的渣石间的空隙填充有机质颗粒料或粉料,形成有机质保水层;
步骤五、将当地石灰石矿的表层排土,覆盖在所述有机质保水层上部,形成覆土层,并对其进行洒水作业;Step 5: Drain the surface layer of the local limestone mine, cover the upper part of the organic water-retaining layer to form an overburden layer, and carry out watering operations on it;
步骤六、在所述覆土层之上进行喷播作业,喷播植被种子混合液,形成喷薄层。In
可选的,所述步骤二中,所用堆砌材料的粒径与渣石层中的渣石相同,人工砌筑而成。Optionally, in the second step, the particle size of the stacking material used is the same as that of the slag in the slag layer, and it is artificially built.
可选的,所述步骤二中,所用堆砌材料的粒径小于渣石层中的渣石粒径,采用堆放的方式形成。Optionally, in the second step, the particle size of the stacking material used is smaller than the particle size of the slag in the slag layer, and is formed by stacking.
进一步的改进,所述步骤三中,所述苔藓混合液的喷洒时间为夏天到来之前,苔藓的生长时间为一个夏季或两个夏季。A further improvement, in the third step, the spraying time of the moss mixed solution is before the arrival of summer, and the growth time of the moss is one summer or two summers.
进一步的改进,所述步骤四种,将所述有机质颗粒料或粉料吹散在渣石的表面,而后洒水,借助水流将麦糠带到渣石层的渣石缝隙。For a further improvement, in the fourth step, the organic particles or powder are blown on the surface of the slag, and then sprinkled with water to bring the wheat bran to the slag gap of the slag layer by means of water flow.
本发明的有益效果是:The beneficial effects of the present invention are:
(1)通过利用削坡后取运商用石料后的剩余部分石料自然形成渣石层,以及当地石灰石矿的上层排土,节省土方的施工量和运量。(1) The slag layer is naturally formed by using the remaining part of the stone after slashing and transporting the commercial stone, and the upper layer of the local limestone mine is dumped, so as to save the construction and transportation volume of earthwork.
(2)覆土层采用采用气力喷散排土的方式构建,喷薄层采用喷播方式进行种子的播洒,可以避免对渣石层进行平整工作,进一步节约构建的工作量。(2) The overburden layer is constructed by pneumatic spraying and soil removal, and the spraying layer is used for seed sowing, which can avoid the leveling of the slag layer and further save the construction workload.
(3)利用当地石灰石矿的上层排土和当地环境的种子,构建的植被群落与当地自然植被相近,更能适应当地的气候,容易生长存活,可以减少后期的维护。减少工作量。(3) Utilizing the upper dump of the local limestone mine and the seeds of the local environment, the constructed vegetation community is similar to the local natural vegetation, which is more adaptable to the local climate, easy to grow and survive, and can reduce later maintenance. reduce workload.
(4)通过苔藓层与有机质保水层的构建,解决前期矿山边坡渣石保水能力差的问题,有利于前期植被的养护与生长。(4) Through the construction of moss layer and organic water-retaining layer, the problem of poor water-retention capacity of slag on mine slope in the early stage is solved, which is beneficial to the maintenance and growth of vegetation in the early stage.
附图说明Description of drawings
图1是本发明实施例1中废弃石灰石矿山边坡植被恢复构造体的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the vegetation restoration structure body of abandoned limestone mine slope in the embodiment 1 of the present invention;
图2是本发明图1中A处局部放大图,显示的为苔藓层生长时的结构;Fig. 2 is a partial enlarged view of the place A in Fig. 1 of the present invention, showing the structure when the moss layer grows;
图3是本发明图1中A处局部放大图,显示的为填充有机质保水层时的结构;Fig. 3 is a partial enlarged view of the place A in Fig. 1 of the present invention, showing the structure when the organic water-retaining layer is filled;
图4是是本发明实施例2提供的废弃石灰石矿山边坡植被恢复方法的流程图。FIG. 4 is a flowchart of a method for restoring vegetation on a slope of an abandoned limestone mine provided in
图中:In the picture:
1.基面;1. Base surface;
2.渣石层;2. Slag layer;
3.有机质保水层;3. Organic water retention layer;
4.覆土层;4. Overburden layer;
5.喷播层;5. Spray layer;
6.苔藓层;6. Moss layer;
7.带状阻隔区。7. Ribbon barrier.
具体实施方式Detailed ways
以下将配合附图及实施例来详细说明本申请的实施方式,借此对本申请如何应用技术手段来解决技术问题并达成技术功效的实现过程能充分理解并据以实施。The embodiments of the present application will be described in detail below with reference to the accompanying drawings and examples, so as to fully understand and implement the implementation process of how to apply technical means to solve technical problems and achieve technical effects in the present application.
实施例1Example 1
本发明第一个实施例提供一种废弃石灰石矿山边坡植被恢复构造体,本实施例以济南市平阴县当地水泥厂的石灰石矿山为例进行介绍。植被恢复的气候条件为东亚季风气候,地质土壤条件为山东丘陵地带。恢复的目标为建立与当地植被群落相近的恢复植被,方案为:The first embodiment of the present invention provides a structure for restoring vegetation on the slope of an abandoned limestone mine. This embodiment is described by taking the limestone mine of a local cement factory in Pingyin County, Jinan City as an example. The climatic conditions for vegetation restoration are the East Asian monsoon climate, and the geological soil conditions are Shandong hilly areas. The goal of restoration is to establish restoration vegetation similar to the local vegetation community. The plan is:
一种废弃石灰石矿山边坡植被恢复构造体,如图1-3所示,包括基面1、渣石层2、有机质保水层3、覆土层4、喷播层5、苔藓层6。An abandoned limestone mine slope vegetation restoration structure, as shown in Figure 1-3, includes a base surface 1, a
其中,基面1为削坡后形成的基础表面。图中显示的为平面,实际上可以是凹凸不平的表面。Among them, the base surface 1 is the base surface formed after the slope is cut. Shown as a flat surface, it can actually be a bumpy surface.
渣石层2由削坡后取运商用石料后的剩余部分石料铺展在基面1形成,堆积状态为自然堆积状态。渣石层2中渣石的粒径分布取决于取运走的商用石料的大小,没有严格要求,粒径一般可以在3cm-7m之间。The
苔藓层6附着在基面1、渣石层2的渣石上的部分表面。苔藓层6由向渣石层喷洒含有苔藓孢子的苔藓混合液,喷洒量要去能够浸润大部分的渣石层的渣石。苔藓混合液主要有苔藓孢子粉和水混合而成,可以适当加营养液。一般在夏季前喷洒,喷洒后培养一个到两个夏季,在基面1、渣石层2的渣石上的部分表面形成苔藓层。所谓的培养就是不在上面覆盖其他层,搁置即可。也可在第二个夏季到来前增加喷洒一次苔藓混合液。The
苔藓层的存在,可以降低渣石表面的光滑度,增加水流阻力,有利于保水。苔藓生长在渣石的连接处,具有一定粘结作用,有利于渣石之间的固定。苔藓可以固定将灰尘固定成为一小层泥土在渣石及基面的表面,自身生命周期结束时可以提供有机质,有利于改良土壤。The existence of the moss layer can reduce the smoothness of the surface of the slag, increase the resistance of water flow, and is conducive to water retention. Moss grows at the connection of the slag and has a certain bonding effect, which is conducive to the fixation between the slag. Moss can fix the dust into a small layer of soil on the surface of the slag and the base surface, and can provide organic matter at the end of its own life cycle, which is conducive to improving the soil.
有机质保水层3分布于所述渣石层的渣石之间的空隙,起到存水及腐化提供有机质的作用。有机质保水层的材料可以采用颗粒料,比如谷壳、麦糠等;也可以采用粉末料,如锯末等。其中麦糠在当地容易获得,以麦糠为例,将麦糠吹散在渣石的表面,而后洒水,借助水流将麦糠带到渣石层的渣石缝隙。The organic matter water-retaining
覆土层4采用当地石灰石矿的表层排土,覆盖在所述有机质保水层上部。覆土层4采用的地石灰石矿表层排土需要在采矿石与商品石料分离后不再混合,存放在一处供边坡植被恢复使用。覆土层采用当地石灰石矿表层排土使用一方面可以满足植被恢复需要,不需要再从外部运土,减少了土方运量,另一方面也可以提高商品石料的品质,提升钙含量。覆土层4的厚度可以根据当地石灰石矿实际排土量的条件越厚越好,一般也不要低于10cm厚度。The
覆土层在还可以掺入部分炭灰,重量比占可在5%左右。炭灰的加入可以添加钾元素,同时使土壤颜色加深有利于吸热,以及起到部分提高保温作用和透气性。The covering soil layer can also be mixed with some charcoal ash, and the weight ratio can be about 5%. The addition of charcoal ash can add potassium element, and at the same time make the soil color darker, which is conducive to heat absorption, as well as partially improve thermal insulation and air permeability.
覆土层在还可以掺入部分根瘤菌粉,重量比占可在2%左右。根瘤菌粉的加入可以使根瘤菌与豆科植物相配合,起到固氮作用。Some rhizobia powder can also be mixed into the covering soil layer, and the weight ratio can be about 2%. The addition of rhizobia powder can make rhizobia cooperate with legumes and play a role in nitrogen fixation.
喷播层5在所述覆土层之上,含有植被种子。通过喷射机械将混合有草种、化肥、土壤改良剂、土壤稳定剂、辅料、水等的混合物喷洒到覆土层上面,厚度在2-3cm。The
其中,草种宜选用本地容易生长的豆科、禾科植物,如苕子、狗尾草等。也可以添加在当地石灰石矿附近就地采集的多种草本植物种子、灌木种子,灌木可采集如山东丘陵地带的优势灌木植被黄荆的种子,土壤稳定剂可选木纤维,土壤改良剂可采用泥炭土。泥炭土是森林下层富含有机肥料的疏松土壤,可以改善土壤结构,提高透气性。肥料采用复合肥。具体重量配比可选,水:木纤维:复合肥:泥炭土:种子为100:3:10:150:7。Among them, the grass species should choose legumes and grasses that are easy to grow locally, such as saffron, foxtail, etc. It is also possible to add a variety of herb seeds and shrub seeds collected locally near the local limestone mine. The shrubs can be collected such as the seeds of the dominant shrub vegetation in the hilly areas of Shandong Province. The soil stabilizer can be selected from wood fiber, and the soil conditioner can be used Peat. Peat soil is loose soil rich in organic fertilizers in the lower layers of the forest, which can improve soil structure and improve air permeability. The fertilizer is compound fertilizer. The specific weight ratio is optional, water: wood fiber: compound fertilizer: peat soil: seed is 100:3:10:150:7.
在渣石层2的坡底位置设有带状阻隔区7,带状阻隔区7由渣石紧密排布形成,以阻隔有机质层和覆土层的流失,并允许水流渗出,以保持养分并防止积水。A band-shaped barrier area 7 is provided at the bottom of the slope of the
本实施例中,利用苔藓层,以及渣石自然分布形成的缝隙填充有机质形成是有机质保水层来达到储水效果,较多的保留自然降雨,可以减少后期的洒水维护,以减少工作量。渣石的自然分布不需要专门对渣石进行平整,也减少了工作量。In this embodiment, the moss layer and the gaps formed by the natural distribution of slag are filled with organic matter to form an organic water-retaining layer to achieve the water storage effect, and more natural rainfall can be retained, which can reduce later watering maintenance and reduce workload. The natural distribution of the slag does not require special leveling of the slag, which also reduces the workload.
覆土层采用当地石灰石矿的表层排土,可以满足植被恢复需要,不需要再从外部运土,减少了土方运量。同时与周围植被土层成分相近,并采集石灰石矿周围的当地植物种子进行喷播,有利于建立与周围环境相近的植被种群。由于本地植被能够适应当地气候条件,植被易于存活生长,可以减少后期维护的工作量。The overburden layer adopts the surface dumping of the local limestone mine, which can meet the needs of vegetation restoration, and does not need to transport soil from the outside, which reduces the amount of soil transportation. At the same time, it is similar to the surrounding vegetation soil layer, and the local plant seeds around the limestone mine are collected and sprayed, which is conducive to the establishment of vegetation populations similar to the surrounding environment. Because the native vegetation can adapt to local climatic conditions, the vegetation is easy to survive and grow, which can reduce the workload of later maintenance.
实施例2Example 2
本发明第二个实施例提供一种废弃石灰石矿山边坡植被恢复方法。以济南市平阴县当地水泥厂的石灰石矿山为例进行介绍,植被恢复的气候条件为东亚季风气候,地质土壤条件为山东丘陵地带。The second embodiment of the present invention provides a method for restoring vegetation on the slope of an abandoned limestone mine. Taking the limestone mine of a local cement factory in Pingyin County, Jinan City as an example, the climatic conditions for vegetation restoration are the East Asian monsoon climate, and the geological soil conditions are hilly areas in Shandong.
一种废弃石灰石矿山边坡植被恢复方法,如图4所示,包括以下步骤:A method for restoring vegetation on the slope of an abandoned limestone mine, as shown in Figure 4, includes the following steps:
步骤1、将削坡后取运商用石料后的剩余部分石料自然形成渣石层,渣石层下方为削坡后的基面;Step 1. A slag layer is naturally formed from the remaining part of the stone after the commercial stone is taken and transported after the slope is cut, and the bottom of the slag layer is the base surface after the slope is cut;
步骤2、在所述渣石层的坡底位置用渣石紧密排列,形成带状阻隔区;
步骤3、在所述渣石层喷洒含有苔藓孢子的苔藓混合液,使渣石层和基面部分的生成苔藓层;
步骤4、在所述渣石层的渣石间的空隙填充有机质颗粒料或粉料,形成有机质保水层;
步骤5、将当地石灰石矿的表层排土,覆盖在所述有机质保水层上部,形成覆土层,并对其进行洒水作业;
步骤6、在所述覆土层之上进行喷播作业,喷播植被种子混合液,形成喷薄层。
具体的,在步骤1中,渣石层2由削坡后取运商用石料后的剩余部分石料铺展在基面1形成,堆积状态为自然堆积状态。渣石层2中渣石的粒径分布取决于取运走的商用石料的大小,没有严格要求,粒径一般可以在3cm-7m之间。Specifically, in step 1, the
具体的,在步骤2中,在渣石层2的坡底位置设有带状阻隔区7,带状阻隔区7由渣石紧密排布形成,以阻隔有机质层和覆土层的流失,并允许水流渗出。Specifically, in
带状阻隔区7的形成方式有两种,一种是利用与渣石层相同的渣石进行人工砌筑,使渣石之间紧密排列,形成较小的缝隙,形成带状阻隔区。这种方式的好处是可以就地取材,节省了搬运工作量,但增加了砌筑工作量。另一种方式是采用更小的粒径的渣石直接堆放成带状阻隔区,渣石间缝隙较小,起到阻隔机质层和覆土层以及渗水的作用。这种方式使不用人工砌筑节省了人工,但需要从其他地方运输来小粒径石料,增加了运量。实际应用中可根据具体情况进行选择。There are two ways to form the band-shaped barrier area 7. One is to use the same slag stone as the slag layer to perform artificial masonry, so that the slag stones are closely arranged to form smaller gaps and form the band-shaped barrier area. The advantage of this method is that materials can be obtained locally, which saves the workload of handling, but increases the workload of masonry. Another way is to directly stack the slag with smaller particle size into a band-shaped barrier area, and the gap between the slag is small, which plays the role of blocking the organic layer and the overburden layer and water seepage. This method saves labor without manual masonry, but needs to transport small-sized stones from other places, which increases the transportation volume. In practical applications, it can be selected according to the specific situation.
具体的,在步骤3中,苔藓层6由向渣石层喷洒含有苔藓孢子的苔藓混合液,喷洒量要去能够浸润大部分的渣石层的渣石。苔藓混合液主要有苔藓孢子粉和水混合而成,可以适当加营养液。一般在夏季前喷洒,喷洒后培养一个到两个夏季,在基面1、渣石层2的渣石上的部分表面形成苔藓层。所谓的培养就是不在上面覆盖其他层,搁置即可。也可在第二个夏季到来前增加喷洒一次苔藓混合液。Specifically, in
苔藓层的存在,可以降低渣石表面的光滑度,增加水流阻力,有利于保水。苔藓生长在渣石的连接处,具有一定粘结作用,有利于渣石之间的固定。苔藓可以固定将灰尘固定成为一小层泥土在渣石及基面的表面,自身生命周期结束时可以提供有机质,有利于改良土壤。The existence of the moss layer can reduce the smoothness of the surface of the slag, increase the resistance of water flow, and is conducive to water retention. Moss grows at the connection of the slag and has a certain bonding effect, which is conducive to the fixation between the slag. Moss can fix the dust into a small layer of soil on the surface of the slag and the base surface, and can provide organic matter at the end of its own life cycle, which is conducive to improving the soil.
具体的,在步骤4中,有机质以麦糠为例,将麦糠吹散在渣石的表面,而后洒水,借助水流将麦糠带到渣石层的渣石缝隙。麦糠分布于所述渣石层的渣石之间的空隙,起到存水及腐化提供有机质的作用。需要注意的是,有机质保水层的构造是在苔藓层生长达到一定要求之后进行的。Specifically, in
具体的,在步骤5中,覆土层4采用当地石灰石矿的表层排土。采用气力喷散的方式使当地石灰石矿的表层排土覆盖在所述有机质保水层上部。Specifically, in
覆土层4采用的地石灰石矿表层排土需要在采矿石与商品石料分离后不再混合,存放在一处供边坡植被恢复使用。覆土层采用当地石灰石矿表层排土使用一方面可以满足植被恢复需要,不需要再从外部运土,减少了土方运量,另一方面也可以提高商品石料的品质,提升钙含量。覆土层4的厚度可以根据当地石灰石矿实际排土量的条件越厚越好,一般也不要低于10cm厚度。The surface dumping soil of the limestone mine used in the
覆土层在还可以掺入部分炭灰,重量比占可在5%左右。炭灰的加入可以添加钾元素,同时使土壤颜色加深有利于吸热,以及起到部分提高保温作用和透气性。覆土层在还可以掺入部分根瘤菌粉,重量比占在2%左右。根瘤菌粉的加入可以使根瘤菌与豆科植物相配合,起到固氮作用。The covering soil layer can also be mixed with some charcoal ash, and the weight ratio can be about 5%. The addition of charcoal ash can add potassium element, and at the same time make the soil color darker, which is conducive to heat absorption, as well as partially improve thermal insulation and air permeability. The covering soil layer can also be mixed with some rhizobia powder, and the weight ratio is about 2%. The addition of rhizobia powder can make rhizobia cooperate with legumes and play a role in nitrogen fixation.
具体的,在步骤6中,通过喷射机械将混合有草种、化肥、土壤改良剂、土壤稳定剂、辅料、水等的混合物喷洒到覆土层上面,厚度在2-3cm,形成喷播层。Specifically, in
其中,草种宜选用本地容易生长的豆科和禾科植物,如苕子、狗尾草等。也可以添加在当地石灰石矿附近就地采集的多种草本植物种子、灌木种子。土壤稳定剂可选木纤维。土壤改良剂可采用泥炭土。泥炭土是森林下层富含有机肥料的疏松土壤,可以改善土壤结构,提高透气性。肥料采用复合肥。具体重量配比可选,水:木纤维:复合肥:泥炭土:种子为100:3:10:150:7。Among them, the grass species should be leguminous and grassy plants that are easy to grow locally, such as saffron, foxtail, etc. You can also add a variety of herb seeds and shrub seeds collected locally near the local limestone mine. Soil stabilizer optional wood fiber. The soil conditioner can be peat soil. Peat soil is loose soil rich in organic fertilizers in the lower layers of the forest, which can improve soil structure and improve air permeability. The fertilizer is compound fertilizer. The specific weight ratio is optional, water: wood fiber: compound fertilizer: peat soil: seed is 100:3:10:150:7.
植被的恢复进程:Vegetation restoration process:
第一年或第二年,苔藓生长,覆盖在大部分的基面的渣石层的渣石表面,起到一定程度的阻水和固定渣石的作用。In the first or second year, moss grows and covers the slag surface of the slag layer of most of the base surface, which plays a role of blocking water and fixing the slag to a certain extent.
之后草本植物与灌木共同发芽生长,草本植物为优势植被,苔藓层逐渐枯萎凋亡。有机质保水层逐渐腐化提供养分,覆土层底层部分向下坠落,填充有机质保水层腾出的空间。植被的地表植株起到阻水、保护土壤的作用,植被根系伸入渣石层,起到固定土壤作用,一年生草本植物的凋亡植株及多年生灌木的落叶在地表起到阻水和减少水分蒸发的作用。After that, herbs and shrubs germinate and grow together, herbs are the dominant vegetation, and the moss layer gradually withers and dies. The organic water-retaining layer gradually decays to provide nutrients, and the bottom part of the overlying soil falls down to fill the space vacated by the organic water-retaining layer. The surface plants of vegetation play the role of blocking water and protecting the soil. The roots of the vegetation extend into the slag layer and play a role in fixing the soil. The apoptotic plants of annual herbs and the fallen leaves of perennial shrubs play the role of blocking water and reducing water evaporation on the surface. effect.
再之后草本植物与灌木取得平衡,生态环境与周围近似,达到植被恢复的目的。After that, the herbs and shrubs are balanced, and the ecological environment is similar to the surrounding area, so as to achieve the purpose of vegetation restoration.
通过本实施提供的废弃石灰石矿山边坡植被恢复方法可以看出,本实施例从两个方面考虑在达到植被恢复目的的情况下尽可能的降低人工的参与,以降低植被恢复的成本。一方面是降低植被恢复构造体的构建成本,另一方是尽量减少后期的维护。It can be seen from the method for vegetation restoration of abandoned limestone mine slopes provided in this embodiment that this embodiment reduces manual participation as much as possible while achieving the purpose of vegetation restoration, so as to reduce the cost of vegetation restoration. On the one hand, it is to reduce the construction cost of the vegetation restoration structure, and the other is to minimize the maintenance in the later period.
通过利用削坡后取运商用石料后的剩余部分石料自然形成渣石层,以及当地石灰石矿的上层排土,节省土方的施工量和运量。The slag layer is naturally formed by using the remaining part of the stone after slashing and transporting the commercial stone, and the upper layer of the local limestone mine is dumped, so as to save the construction and transportation volume of earthwork.
覆土层采用采用气力喷散排土的方式构建,喷薄层采用喷播方式进行种子的播洒,可以避免对渣石层进行平整工作,进一步节约构建的工作量。The overburden layer is constructed by means of pneumatic spraying and soil removal, and the spraying layer is used for seed sowing, which can avoid the leveling of the slag layer and further save the construction workload.
利用当地石灰石矿的上层排土与当地环境的种子构建植被群落与当地自然植被相近,更能适应当地的气候,容易生长存活,可以减少后期的维护。The use of the upper dump of the local limestone mine and the seeds of the local environment to build a vegetation community is similar to the local natural vegetation, which is more adaptable to the local climate, easy to grow and survive, and can reduce later maintenance.
通过苔藓层与有机质保水层的构建,解决前期矿山边坡渣石保水能力差的问题,有利于前期植被的养护与生长。Through the construction of moss layer and organic water-retaining layer, the problem of poor water-retention capacity of slag on mine slope in the early stage is solved, which is beneficial to the maintenance and growth of vegetation in the early stage.
最后应说明的是:以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present invention, but not to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand: it can still be Modifications are made to the technical solutions described in the foregoing embodiments, or some technical features thereof are equivalently replaced; and these modifications or replacements do not make the essence of the corresponding technical solutions depart from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210965159.1A CN115176669A (en) | 2022-08-12 | 2022-08-12 | Revegetation structure and method for mine slope of waste limestone |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202210965159.1A CN115176669A (en) | 2022-08-12 | 2022-08-12 | Revegetation structure and method for mine slope of waste limestone |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115176669A true CN115176669A (en) | 2022-10-14 |
Family
ID=83523417
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202210965159.1A Pending CN115176669A (en) | 2022-08-12 | 2022-08-12 | Revegetation structure and method for mine slope of waste limestone |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115176669A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118000044A (en) * | 2024-01-24 | 2024-05-10 | 中冶沈勘工程技术有限公司 | Artificially configured planting soil for mine reclamation |
Citations (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101268740A (en) * | 2008-04-15 | 2008-09-24 | 四川省交通厅公路规划勘察设计研究院 | Ecological protection method of shale side slope |
| CN101663941A (en) * | 2009-09-27 | 2010-03-10 | 四川大学 | Method for recovering vegetation in rock-soil residue field |
| CN101748719A (en) * | 2009-12-23 | 2010-06-23 | 南京大学 | Method of vegetation restoration and reconstruction of bare rock slope in East China |
| CN103026891A (en) * | 2013-01-14 | 2013-04-10 | 中国林业科学研究院亚热带林业研究所 | Method for recovering vegetations through directly seeding nitrogen fixing plants on waste tailings |
| CN205088628U (en) * | 2015-10-20 | 2016-03-16 | 江西三禾生态混凝土有限公司 | Plant and give birth to ecological concrete slope protection structure |
| CN106900322A (en) * | 2017-02-24 | 2017-06-30 | 西北农林科技大学 | The engineering wound-surface Ecological recovery technology of moss crust |
| CN107964963A (en) * | 2017-08-16 | 2018-04-27 | 河南景绣绘远生态科技有限公司 | High gradient slope surface of a wound fiber reinforcement crumb structure recovery technique and its construction method |
| CN107964961A (en) * | 2017-08-16 | 2018-04-27 | 轻工业环境保护研究所 | High gradient slope surface of a wound top layer moss preventing rain wash technology and its construction method |
| CN108330913A (en) * | 2018-04-09 | 2018-07-27 | 美丽国土(北京)生态环境工程技术研究院有限公司 | The ecological restoring method of falling zone side slope |
| CN108532580A (en) * | 2018-05-31 | 2018-09-14 | 山西智德安全技术股份有限公司 | A kind of hillock eco-environment restoration comprehensive processing method |
| CN109463254A (en) * | 2018-12-07 | 2019-03-15 | 昆明理工大学 | A method of using moss to accelerate waste rock formation into soil |
| CN109526292A (en) * | 2017-08-04 | 2019-03-29 | 美丽国土(北京)生态环境工程技术研究院有限公司 | A method of it is degenerated using moss and sowing plant in conjunction with high order granule technology prevention turf |
| CN109526654A (en) * | 2017-08-04 | 2019-03-29 | 美丽国土(北京)生态环境工程技术研究院有限公司 | A kind of moss plants generating apparatus and preparation method thereof |
| CN109601273A (en) * | 2018-12-29 | 2019-04-12 | 西藏俊富环境恢复有限公司 | A kind of soil-free broken stone surface vegetation restoration methods |
| CN109601272A (en) * | 2018-12-29 | 2019-04-12 | 西藏俊富环境恢复有限公司 | A kind of slag, gravel texture slope vegetation restoration method |
| CN110637668A (en) * | 2019-11-13 | 2020-01-03 | 江西省环境保护科学研究院 | Three-dimensional restoration structure and method for ionic rare earth abandoned mining area slope soil |
| CN110735438A (en) * | 2019-10-28 | 2020-01-31 | 华北水利水电大学 | high stability ecological landscape slope protection structure |
| CN210031859U (en) * | 2019-04-02 | 2020-02-07 | 广东中绿园林集团有限公司 | A greening system for reinforcing slopes |
| CN110984188A (en) * | 2019-12-06 | 2020-04-10 | 安徽师范大学 | Comprehensive treatment process for waste rock hill |
| CN112616580A (en) * | 2020-12-31 | 2021-04-09 | 大连地拓环境科技有限公司 | Spray-seeding repair method for loose stone side slope |
| CN112934944A (en) * | 2021-01-28 | 2021-06-11 | 山西大学 | Method for using coal-based solid waste for repairing and treating coal gangue dump |
-
2022
- 2022-08-12 CN CN202210965159.1A patent/CN115176669A/en active Pending
Patent Citations (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101268740A (en) * | 2008-04-15 | 2008-09-24 | 四川省交通厅公路规划勘察设计研究院 | Ecological protection method of shale side slope |
| CN101663941A (en) * | 2009-09-27 | 2010-03-10 | 四川大学 | Method for recovering vegetation in rock-soil residue field |
| CN101748719A (en) * | 2009-12-23 | 2010-06-23 | 南京大学 | Method of vegetation restoration and reconstruction of bare rock slope in East China |
| CN103026891A (en) * | 2013-01-14 | 2013-04-10 | 中国林业科学研究院亚热带林业研究所 | Method for recovering vegetations through directly seeding nitrogen fixing plants on waste tailings |
| CN205088628U (en) * | 2015-10-20 | 2016-03-16 | 江西三禾生态混凝土有限公司 | Plant and give birth to ecological concrete slope protection structure |
| CN106900322A (en) * | 2017-02-24 | 2017-06-30 | 西北农林科技大学 | The engineering wound-surface Ecological recovery technology of moss crust |
| CN109526654A (en) * | 2017-08-04 | 2019-03-29 | 美丽国土(北京)生态环境工程技术研究院有限公司 | A kind of moss plants generating apparatus and preparation method thereof |
| CN109526292A (en) * | 2017-08-04 | 2019-03-29 | 美丽国土(北京)生态环境工程技术研究院有限公司 | A method of it is degenerated using moss and sowing plant in conjunction with high order granule technology prevention turf |
| CN107964963A (en) * | 2017-08-16 | 2018-04-27 | 河南景绣绘远生态科技有限公司 | High gradient slope surface of a wound fiber reinforcement crumb structure recovery technique and its construction method |
| CN107964961A (en) * | 2017-08-16 | 2018-04-27 | 轻工业环境保护研究所 | High gradient slope surface of a wound top layer moss preventing rain wash technology and its construction method |
| CN108330913A (en) * | 2018-04-09 | 2018-07-27 | 美丽国土(北京)生态环境工程技术研究院有限公司 | The ecological restoring method of falling zone side slope |
| CN108532580A (en) * | 2018-05-31 | 2018-09-14 | 山西智德安全技术股份有限公司 | A kind of hillock eco-environment restoration comprehensive processing method |
| CN109463254A (en) * | 2018-12-07 | 2019-03-15 | 昆明理工大学 | A method of using moss to accelerate waste rock formation into soil |
| CN109601273A (en) * | 2018-12-29 | 2019-04-12 | 西藏俊富环境恢复有限公司 | A kind of soil-free broken stone surface vegetation restoration methods |
| CN109601272A (en) * | 2018-12-29 | 2019-04-12 | 西藏俊富环境恢复有限公司 | A kind of slag, gravel texture slope vegetation restoration method |
| CN210031859U (en) * | 2019-04-02 | 2020-02-07 | 广东中绿园林集团有限公司 | A greening system for reinforcing slopes |
| CN110735438A (en) * | 2019-10-28 | 2020-01-31 | 华北水利水电大学 | high stability ecological landscape slope protection structure |
| CN110637668A (en) * | 2019-11-13 | 2020-01-03 | 江西省环境保护科学研究院 | Three-dimensional restoration structure and method for ionic rare earth abandoned mining area slope soil |
| CN110984188A (en) * | 2019-12-06 | 2020-04-10 | 安徽师范大学 | Comprehensive treatment process for waste rock hill |
| CN112616580A (en) * | 2020-12-31 | 2021-04-09 | 大连地拓环境科技有限公司 | Spray-seeding repair method for loose stone side slope |
| CN112934944A (en) * | 2021-01-28 | 2021-06-11 | 山西大学 | Method for using coal-based solid waste for repairing and treating coal gangue dump |
Non-Patent Citations (2)
| Title |
|---|
| 刘金山,张兴疗主编: "生态修复重塑美丽河南", 31 December 2019, 郑州:黄河水利出版社, pages: 199 - 200 * |
| 陈景河主编;汪贻副主编: "紫金矿业矿山地质工作成就", 31 March 2011, 北京:冶金工业出版社, pages: 251 - 255 * |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118000044A (en) * | 2024-01-24 | 2024-05-10 | 中冶沈勘工程技术有限公司 | Artificially configured planting soil for mine reclamation |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| KR102868709B1 (en) | Method for Restoration and Management of Coal Waste Rock Pileups Using Coal-Based Solid Waste | |
| CN103636404B (en) | Method for conversing water and earth of high-altitude large-temperature difference drought and dry-hot valley high-abrupt slope waste slag body | |
| CN105714836B (en) | Oxidized ore waste-rock yard ecological restoring method based on phosphate fertilizer control acid | |
| CN110984188B (en) | A kind of comprehensive treatment technology of gangue mountain | |
| CN113243279A (en) | Coal gangue hill matrix improvement method | |
| CN102652480A (en) | Vegetation recovery method for acid metal mine solid waste stock dump | |
| CN101507391B (en) | Rock slope-surface ecology treatment method | |
| CN109328518A (en) | A kind of ecological restoring method of Gangue Hill | |
| Friedrich | Selecting the proper components for a green roof growing media | |
| CN113931204B (en) | Method for restoring slope vegetation by utilizing biomass powder crusting | |
| LU505442B1 (en) | Method for turf transplantation and artificial granssland planting in alpine area soil material field | |
| CN108967063A (en) | A kind of high steep limestone slope replies immediately green method fastly | |
| CN116868841A (en) | A method of ecological construction on exposed rock surfaces | |
| CN115997582A (en) | A planting bag for ecological restoration of copper mine waste rock field and ecological restoration method | |
| CN112012229A (en) | Ecological restoration system for high steep slope rock slope of limestone mine stope | |
| CN114223467A (en) | Rapid ecological restoration method for rock-soil slope in alpine region | |
| CN107586219B (en) | A kind of preparation method of manure puddle in mountain apple orchard | |
| CN108739255A (en) | A kind of solid waste resource recovery is applied to side slope and repairs method in matrix | |
| CN107905208B (en) | Water and soil conservation structure for accelerating rock weathering in stony desertification region and construction method thereof | |
| CN113016509A (en) | Ecological construction method for plateau meadow area | |
| CN112753530A (en) | Mountain slope protection matrix enhancer, mountain slope protection matrix and mountain slope enhancement method | |
| CN109964718A (en) | A kind of barren region planting structure of falling zone soil property and method | |
| JPH08308376A (en) | Construction method of vegetation growth base on rock slope | |
| CN120500944A (en) | Restoration method for ecological structure of side slope based on forest burning background | |
| CN118318548B (en) | A rapid ecological restoration system and method for residual smelting waste. |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |