CN101126255B CN2007100093792A CN200710009379A CN101126255B CN 101126255 B CN101126255 B CN 101126255B CN 2007100093792 A CN2007100093792 A CN 2007100093792A CN 200710009379 A CN200710009379 A CN 200710009379A CN 101126255 B CN101126255 B CN 101126255B
Authority
CN
China
Prior art keywords
cement
wall
keel
mortar
wire lath
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2007100093792A
Other languages
Chinese (zh)
Other versions
CN101126255A (en
Inventor
谌丽莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Wangkunshun Engineering Technology Co., Ltd.
Original Assignee
FUJIAN WANKUNSHUN BUILDING ENERGY-SAVING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJIAN WANKUNSHUN BUILDING ENERGY-SAVING Co Ltd filed Critical FUJIAN WANKUNSHUN BUILDING ENERGY-SAVING Co Ltd
Priority to CN2007100093792A priority Critical patent/CN101126255B/en
Publication of CN101126255A publication Critical patent/CN101126255A/en
Application granted granted Critical
Publication of CN101126255B publication Critical patent/CN101126255B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Abstract

The invention provides a wire netting multifunctional wall and the construction method thereof, and relates to a building wall. The wall provided by the invention has high rigidity, good crack resistance and stability, fast construction speed, strong bulking property and good fireproof, waterproof and soundproof performance; also, the wall can have any radian flection and has strong molding performance, and is suitable for the wire netting multifunctional wall and the construction method thereof of the non-bearing internal partition wall, separation wall and outdoor heat-insulating wall of the industrial and civilian buildings. The wall is provided with a skeleton and a cement-coal ash mortar layer. The skeleton consists of two pieces of wire netting which have the same shape and metal keels, the cement-coal ash mortar layer is bonded on the skeleton and is fixed by the wedge section and the mesh of the wire netting; the keels are provided with an edge keel and a vertical keel, the edge keel is connected with the vertical keel through a structural bearing surface. When in the building operation, the construction preparation and the wire are firstly made, an L-shaped edge keel and a wall side fixing piece are arranged, then wire netting pieces are put together to be assembled and be fixed, the filling for the outdoor heat-heating l wall is made after the tubes for the water and electricity are arranged and the last procedure is to plastering for acceptance inspection.

Description

Metal mesh multifunctional wall and construction techniques thereof
Technical field
The present invention relates to a kind of wall of building, especially relate to a kind of metal mesh multifunctional wall and construction techniques thereof.
Background technology
In industry and civilian construction, nonweight-bearing internal partition wall, party wall and heat preserving exterior wall etc. are its important ingredients.Along with development of science and technology, the construction wall with performances such as light-duty, insulation, heat insulation, de-noising, fire prevention and environmental protection obtains development and application rapidly.
Chinese patent CN2469086 provides a kind of wall structure of building, constitute by skeleton and cement paste curing, skeleton is by most wire laths and close, form the hollow channel that connects therebetween, the dual side-edge of wire lath is embedded at supporter, and the body sealing of can being contracted of the limit, upper end of wire lath can be contracted body into strips, it has fitting portion and convex body, and the limit, lower end of wire lath is located by the keeper clamping.Has the effect that easy construction reached and reduced the construction cost expense.
Chinese patent CN2530996 provides a kind of wire lath wall base plate, and being harmonious by corresponding relation by the indentation metal otter board more than two layers forms, and forms hollow or vertical passage; The upper end of metal otter board is provided with the surplus draw-in groove, and L shaped iron is established in the lower end of metal otter board, and a side or two sides of metal otter board are received bar and link slot.After the present invention has adopted these technical schemes, not only improved construction quality, and low cost of manufacture, walling is convenient.
Summary of the invention
The object of the present invention is to provide a kind of body of wall rigidity higher, crack resistance and stability are better, speed of application is fast, globality is strong, fire prevention, waterproof and sound insulation value are good, there is any bending curvature shape formative nature strong, is applicable to the metal mesh multifunctional wall and the construction techniques thereof of the metopes such as non-bearing internal partition wall, party wall and heat preserving exterior wall in industry and the civilian construction.
Metal mesh multifunctional wall of the present invention is provided with skeleton and cement-flying ash mortar layer (the cement-flying ash mortar layer also claims the hanging layer), skeleton is made up of two identical shaped wire laths and metal keel (hereinafter to be referred as keel), the cement-flying ash mortar layer is coated on outside the skeleton, the cement-flying ash mortar layer is fixed by the wedge section and the mesh of wire lath, keel are provided with along keelson and vertical keel, link by structure support face and vertical keel along keelson.
In the middle of being preferably, two identical shaped wire laths become I-shaped wire lath.Wire lath can adopt (0.6~0.8) mm, is preferably the thick cold-rolled steel coils of 0.8mm, and is netted towards pulling into punch press, through roller machine backfin waviness net sheet.It is that 9mm * major diameter is 18mm that the mesh specification of wire lath can be minor axis, minor axis is that 12mm * major diameter is that 25mm or minor axis are that 15mm * major diameter is 30mm, the mesh specification is that the wire lath of minor axis 9mm * major diameter 18mm is suitable for internal partition wall and uses, and the mesh specification is that minor axis 12mm * major diameter 25mm or mesh specification are that the wire lath of minor axis 15mm * major diameter 30mm uses as heat preserving exterior wall.Because the planeness of wire lath directly has influence on the quality of body of wall, so allowable error and presentation quality require and should strictly control.The width of each sheet wire lath of internal partition wall that 90mm is thick is 540mm, and hollow thickness is 55mm; The width of each sheet wire lath of heat preserving exterior wall that 160mm is thick is 430mm, and hollow thickness is 100mm.The groove of wire lath can adopt filling mortar (cement, flyash and mortar) to fill and lead up, with mechanical shotcrete construction or manual smearing.
In the cavity in body of wall, promptly can insert heat preserving and insulating material in the mesh of wire lath, with as thermal insulation outer wall; Or insert solid concrete, make body of wall bear big loading in the part; Or penetrate pipeline, with passage as pipeline.Though metal mesh multifunctional wall strength of wall body of the present invention is that rigidity is better, still can not be used as load bearing wall, also stipulated the certain altitude restriction in the scope of application.When heavier suspender member and equipment are hung or born to need, can before plastering, disconnect local web plate hollow parts, fill out, can bear big loading in the part with solid concrete.When doing thermal insulation outer wall, owing in the body of wall cavity is arranged, can directly fill heat preserving and insulating material, need not to do insulation layer in addition at wall face, thus also can drawing-in wire, be the built-in heat insulation heat insulation exterior of innovating most at present.
Press mass ratio, the proportioning of cement-flying ash mortar is a cement: flyash: mortar=(0.8~1.0): (0.1~0.15): 2.5, be preferably cement: flyash: mortar=0.9: 0.1: 2.5, its water/binder ratio (weight ratio of water and cement) is preferably 0.37~0.40, and consistency of mortar (being the denseness of whole hanging) is preferably 80~90mm.But fill groove mechanically spraying or manual smearing.
Be preferably L shaped keel along keelson, be mainly used in the link structure of vertical keel and structure support face.When L shaped keel are used in when doing the radian wall, can be with accessory crooked or cut out and be combined into arc.Vertical keel are preferably the vertical keel of C shape, strengthen the glacing flatness rigidity of metal otter board when being mainly used in construction, the operation of being convenient to plaster.
Keel also can be provided with the reinforcement keel, and the reinforcement keel can comprise the willfully strong keel of C shape or/and the willfully strong keel of U-shaped are strengthened the reinforcement that keel can be used for other keel, door and window hole etc.Along keelson, vertical keel with strengthen can being provided with the hole on the keel, described hole is used for the effective cohesion between wire lath, keel, the cement-flying ash mortar three, makes the fixing more firm of door and window hole.
On cement-flying ash mortar layer (being the hanging layer), be provided with the middle level screed, the middle level screed is as the levelling crack-resistant layer, the middle level screed is made up of cement, flyash and mortar or cement, sand and polyethylene defend and split fibre, press mass ratio, cement: flyash: mortar=(0.8~1.0): (0.1~0.15): 2.5, be preferably cement: flyash: mortar=0.9: 0.1: 2.5; Or cement: sand: polyethylene defend and split fibre=(0.1~0.15): (2.5~3.5): 0.003, be preferably cement: sand: polyethylene defend and split fibre=0.1: 3: 0.003.The denseness of middle level screed is preferably 50~70mm, and the thickness of internal partition wall middle level screed is preferably 15~20mm; The thickness of outer partition wall middle level screed is 25mm~35mm.
Be provided with the surface layer screed on the screed of middle level, the surface layer screed adopts cement, lime and yellow ground composite mortar, presses mass ratio, preferably cement: lime: yellow ground=1: 1: 4, surface layer screed can adopt and whitewash technology, and paper strip mixed lime mortar is criticized flat.The length of polyethylene defend and split fibre that is used for the middle level screed of anticracking is preferably 12~19mm, and diameter should≤50 μ m, and diameter is preferably 40~50 μ m.
The construction techniques of metal mesh multifunctional wall of the present invention may further comprise the steps:
1) preparation of construction: carry out in-site measurement according to fixed drawing, calculation Design also prepares required keel, wire lath sheet and Hardware fitting; The establishment constructure scheme.
2) the construction line-putting: measure the body of wall axis according to reference line, and the body of wall that draws is installed control line and door and window hole position.
3) install L shaped along keelson and wall limit fixture: by the setting-out line of ink marker, install and fix L shaped along keelson with the self-tapping screw of nailing or band plastic expansion sleeve pipe.
4) wire lath sheet assembly assembling and reinforcing: with the assembly unit of two wire lath sheets, the vertical keel of C shape are set in the centre, and are connected back installation and reinforcing with the wire lath sheet.
5) water power pipe arrangement: after wire lath sheet assembling finishes, when carrying out the water power pipe arrangement, the water power pipe arrangement is laid in the wire lath sheet groove, and fixing.
6) heat preserving exterior wall inserts construction: in the merging space of wire lath, carry out the filling of sound-insulating material.
7) plaster: plastering mainly is divided into three steps: the first step: fill out groove, second step: bottoming, the 3rd step: floating screed is wiped one's face.
8) final acceptance of construction: wall plastering is in time filled out and is decided completion report of construction work after finishing, and asks Party A, management to carry out final acceptance of construction, and carry out the final acceptance of construction record.
In preparation of construction, can carry out in-site measurement according to fixed drawing, calculation Design also prepares required keel, wire lath sheet and Hardware fitting, work out constructure scheme again, according to engineering specifications, determine on-the-spot water supply, power supply and means of transportation, the establishment labour need plan and definite in advance construction team.
In the construction line-putting, can measure and eject according to the body of wall axis of the reference line that provides the needs construction with the line of ink marker, measure body of wall according to the body of wall axis to both sides again and control line is installed and is ejected, with plumb bob bottom line is caused on ceiling and original wall and the post and eject with ink line; The position of door and window hole should mark, also indicate size and height simultaneously when unwrapping wire.
L shaped along in keelson and the wall limit fixture in installation, described fixing spacing is preferably 400~500mm.
In the wire lath sheet is pieced together assembling and is reinforced, the wire lath sheet is stitched together two wire lath sheets on operating platform before installing in advance, fix with No. 22 Zha Silian between the two wire lath sheets during assembly unit of wire lath sheet, spacing 300~400mm, the spacing of the vertical keel of C shape is 450~550mm, is preferably 500mm.
In the water power pipe arrangement, after wire lath sheet assembling finishes, in the wire lath sheet groove that should be laid at once when carrying out the water power pipe arrangement, and prick a colligation with No. 22, spacing is preferably 500mm.
When metal mesh multifunctional wall is used for indoor nonbearing partition, around the partition wall reliable structure support should be arranged.
Body of wall T, L shaped node and cross node should be set up keel reinforcement and reinforcement metal net, must fix with staple or iron wire between keel and wire lath.
During the assembling metal net, along keelson and vertical keel junction up and down, wire lath can be cut off, be fixed on along the keelson outside, the other parts wire lath inserts to be gone up in the keelson of lower edge.Also can all put into, and fix with iron wire along keelson.
The present invention is applicable to nonweight-bearing internal partition wall, party wall and heat preserving exterior wall in the industry of newly-built or reorganization and expansion and the civilian construction, also applicable to the metope of damp rooms and plane arc.With the existing non-bearing internal partition wall that is applicable in industry and the civilian construction, party wall is compared with the body of wall and the construction techniques thereof of metopes such as heat preserving exterior wall, the present invention is owing to the skeleton that adopts is made up of two identical shaped middle I-shaped wire lath of one-tenth and metal keel (hereinafter to be referred as keel), the cement-flying ash mortar layer is coated on outside the skeleton, the cement-flying ash mortar layer is fixed by the wedge section and the mesh of wire lath, keel are provided with along keelson and vertical keel, link by structure support face and vertical keel along keelson, therefore not only to have globality strong for metal mesh multifunctional wall of the present invention, rigidity is strong, fire-resistant and good waterproof performance, thermal insulation and sound insulation are good, be easy to construction, quick construction, outstanding advantage such as operation with traditional, and can reduce construction cost significantly, simultaneously can make curved wall, applicable surface is wider.
Description of drawings
Fig. 1 is the section structure schematic diagram of the embodiment of the invention.
Fig. 2 is that the wall limit of Fig. 1 reinforces schematic diagram.
Fig. 3 is a partition wall T type connected node structural representation.
Fig. 4 connects the node structure schematic diagram for " L " type.
Fig. 5 is " ten " type connected node structural representation.
Fig. 6 is the unitary piece of metal net sheet contour structures schematic diagram of the embodiment of the invention.
Fig. 7 is the sectional drawing of Fig. 2.
Fig. 8 is the mesh enlarged drawing of Fig. 2.
Fig. 9 is the reinforcement keel structure schematic diagram (the willfully strong keel of U-shaped are called ST-1 type keel) of the embodiment of the invention.
Figure 10 be the embodiment of the invention along keelson structural representation (L shaped horizontal stroke is called ST-2 type keel along keelson).
Figure 11 is the vertical keel structure schematic diagram (the vertical keel of C shape are called ST-3 type keel) of the embodiment of the invention.
Figure 12 is the reinforcement keel structure schematic diagram (the willfully strong keel of C shape are called ST-4 type keel) of the embodiment of the invention.
Figure 13 is the reinforcement keel structure schematic diagram (the willfully strong keel of U-shaped are called ST-5 type keel) of the embodiment of the invention.
Figure 14 be the embodiment of the invention along keelson structural representation (L shaped horizontal stroke is called ST-6 type keel along keelson).
Figure 15 is the vertical keel structure schematic diagram (the vertical keel of C shape are called ST-7 type keel) of the embodiment of the invention.
Figure 16 is the reinforcement keel structure schematic diagram (the willfully strong keel of C shape are called ST-8 type keel) of the embodiment of the invention.
Figure 17 is the lightgage steel joist of the embodiment of the invention and the scheme of installation of wire lath.In Figure 17, A is willfully strong keel (ST-1 type keel) of U-shaped and wire lath fixed point, and B is along keelson and structure fixed point, and wire lath splicing place constant spacing D≤250,3 are vertical keel.
Figure 18 and Figure 19 are that the wire lath of the embodiment of the invention inserts the schematic diagram of going up the lower edge keelson.In Figure 18 and 19,51 is the willfully strong keel of U-shaped, is called ST-1 type keel (referring to Fig. 9), and 31 is the vertical keel of C shape, is called ST-3 type keel (referring to Figure 11).
Figure 20 is the heat preserving exterior wall inserts construction schematic diagram of the embodiment of the invention.
The specific embodiment
Following examples will the present invention is further illustrated in conjunction with the accompanying drawings.
Present embodiment is applicable to indoor nonbearing partition, around the partition wall reliable structure support should be arranged.
Metal mesh multifunctional wall of the present invention is provided with skeleton and cement-flying ash mortar layer (the cement-flying ash mortar layer also claims the hanging layer), skeleton is made up of two identical shaped middle I-shaped wire lath of one-tenth and keel, the cement-flying ash mortar layer is coated on outside the skeleton, the cement-flying ash mortar layer is fixed by the wedge section and the mesh of wire lath, keel are provided with along keelson and vertical keel, along keelson is L shaped keel, be mainly used in the link structure of vertical keel and structure support face, vertical keel are the vertical keel of C shape, strengthen the glacing flatness rigidity of metal otter board when being mainly used in construction, the operation of being convenient to plaster.
Referring to Fig. 1, skeleton is formed by vertical keel 3 and wire lath 1 in metal mesh multifunctional wall inside, covers cement-flying ash mortar layer 2 outward, and the partition wall technical indicator should meet the regulation of table 1.
Table 1 internal partition wall and heat preserving exterior wall technical indicator
Figure S07109379220070914D000051
The partition wall height should≤4500mm, when height〉during 4500mm, answer otherwise designed.When the body of wall lateral length〉during 6000mm, should establish the shrinkage joint.Except that wire lath, the hardware of all ferrous metal all should zinc-plated or antirust processing.
When this partition wall was used for moist room such as lavatory and kitchen, height should be established in the partition wall bottom〉the C20 pea gravel concreten wall pad of 120mm.Last lower support along keelson and flooring should be fixed with cement steel nailing, and constant spacing is suitable≤500mm.The member that bears down on one of lateral resisting should be arranged at the half wall top of not having supporting up and down, and bear down on one member and side direction body junction member should fixedly secure, and wall length is answered<6000mm.Door and window perforate and horizontal unsettled marginal portion on the body of wall are all used the vertical keel 31 of light steel and are reinforced, and strengthen with wire lath 1 outsourcing.Referring to Fig. 2.
It is firm with the metal otter board colligation that inner pre-buried utility line of body of wall and junction box etc. are used iron wire, and it is firm in time to crouch with cement mortar, does not make loosening.The horizontal tube spool of embedding wall footpath must not 25mm, horizontal length must not 500mm, and, cover expanded metal lath outward and strengthen in time with the cement mortar jail of crouching.Wire lath exterior rendering structure by the hanging layer, fill out groove, middle level leveling layer and surface layer four parts and form.The middle level leveling layer should adopt the anticracking mortar.
Below provide joint structure.Body of wall T, L shaped node and cross node should be set up and strengthen keel and reinforcement metal net 4, and 1 of keel 31 and wire lath must be fixed with staple or iron wire.Referring to Fig. 3~5.
Below provide the structure design of wire lath sheet.
The profile of wire lath 1 is referring to Fig. 6~8, and the steel plate thickness that wire lath 1 adopts is the cold-reduced sheet of 0.8mm, also can adopt hot cold-rolled steel sheet and steel band, and mesh 11 specifications are 9mm * 18mm or 12mm * 25mm.The specification of wire lath 1 and technical indicator should meet the regulation of table 2 and 3.
Table 2 wire lath sheet specification (1 type)
Sequence number Project Size (mm) Tolerance (mm)
1 Wire lath length By customer requirement ±20
2 The wire lath width 540 ±10
3 The hollow width 55 ±5
4 The wire lath mesh Major diameter: 18, minor axis: 9 ±0.5
5 Internal mold wire lath sheet line stalk thickness 0.6~0.8 ±0.1
Table 3 wire lath sheet specification (2 type)
Sequence number Project Size (mm) Tolerance (mm)
1 The wire lath leaf length By customer requirement ±20
2 The metal netting width 430 ±20
3 The hollow width 100 ±10
4 Wire lath sheet mesh Major diameter: 25 (30), minor axis: 12 (15) ±0.5
5 Internal mold wire lath sheet line stalk thickness 0.8 ±0.1
Annotate: 1 type is as the internal partition wall use of plastering, and 2 types are as the heat preserving exterior wall use of plastering.
Below provide the structure design of keel.
1) the willfully strong keel of U-shaped: become C shape (ST-1 by cold rolling or hot rolled steel plate clod wash; ST-5), the willfully strong keel of U-shaped are a kind of horizontal reinforcement keel, as a kind of dead joint member up and down.Fig. 9 provides the willfully strong keel 51 (ST-1 type) of U-shaped, and Figure 13 provides the willfully strong keel 53 (ST-5 type) of U-shaped.
2) along keelson: by the cold rolling or L shaped (ST-2 of hot rolled steel sheet rolling; ST-6), as the connecting elements of vertical keel and support structure face.Figure 10 provides L shaped horizontal stroke along keelson 61 (ST-2 type), and Figure 14 provides L shaped horizontal stroke along keelson 62 (ST-6 type).
3) vertical keel: roll into C shape (ST-3 by cold rolling or hot rolled steel sheet; ST-7), constitute rack, the rigidity of expanded metal lath when constructing to increase with the profiled sheet net.Figure 11 provides the vertical keel 31 of C shape (ST-3 type), and Figure 15 provides the vertical keel 32 of C shape (ST-7 type).
4) strengthen keel: as the usefulness of door and window hole and reservation hole reinforcement.Become C shape (ST-4 by cold rolling or hot rolled steel plate clod wash; ST-8).Figure 12 provides the willfully strong keel 52 (ST-4 type) of C shape, and Figure 16 provides the willfully strong keel 54 (ST-8 type) of C shape.
The willfully strong keel of U-shaped, along keelson, vertical keel and the shape of strengthening keel referring to Fig. 9~16, specification sees Table 4.
Table 4 keel specification (mm)
Figure S07109379220070914D000071
Annotate: ab respectively is the model of steel plate thickness 0.4mm and 0.5mm, and b type keel are as the superelevation body of wall.
Below provide the design scheme of cement-flying ash mortar layer (hanging layer).
1) hanging layer proportioning is preferably cement: flyash: mortar=0.9: 0.1: 2.5, and its water/binder ratio is preferably 0.37~0.40, and consistency of mortar is preferably 80~90mm.
2) fill mortar: be used to fill and lead up the wire lath groove,, adopt cement: flyash with mechanical shotcrete construction or manual smearing: the cement-flying ash mortar of mortar=0.9: 0.1: 3, water/binder ratio is 0.37~0.40, filling groove consistency of mortar is 80~90mm.
3) middle level screed: as the levelling crack-resistant layer, can adopt cement: flyash: mortar=0.9: 0.1: 3 cement-flying ash mortar, or cement: sand: the anticracking mortar of polyethylene defend and split fibre=0.1: 3: 0.003, consistency of mortar is 50~70mm, mortar thickness should be less than 20mm.
4) surface layer screed: adopt cement: flyash: mortar=mixed powder coal ash mortar whitewashed in 1: 1: 4, and paper strip mixed lime mortar is criticized flat.
5) the polyethylene defend and split fibre length that is used for the anticracking mortar is preferably 12~19mm, and diameter should≤50 its technical indicators of μ m. should meet the regulation of table 5.
Table 5 defend and split fibre technical indicator
Project Unit Index
Proportion kg/m 3 0.91
Length mm 12~19
Tensile strength MPa ≤400
Modulus of elasticity Gpa ≥3.0
Fibre diameter μm ≤50
Below provide construction machinery required for the present invention, professional equipment whitewashing important technological parameters should meet following provisions.
1) whitewashing main frame: the mortar amount of telling is 60L/min, and the fan-out capability level is 200m, is 87m vertically, and the pressure that spues is 30kg/cm to the maximum 2, power is 5HP.
2) mortar mixer cone capacity is 160L, and the joint screen distance is 3mm, and power is 1HP.
3) the mixer capacity is 360L, and power is 3HP.
4) the air compressor machine capacity is 150L, and working pressure is 7kg/cm 2, power is 3HP.
The wire lath fixing machine is portable special-purpose machines and tools.By hand can during colligation.Ail gun is portable general utility tool.
Below provide concrete construction techniques.
1) preparation of construction: the wire lath of marching into the arena, keel, and building materials such as Hardware fitting, cement, flyash, sand should in time check and accept; Construction equipments such as mortar mixer, air pump, pulp shooting machine should be debugged normally; Consumer should have the safety ground system.At the bottom of ground, beam slab, mark body of wall center line and sideline by designing requirement, and mark door and window and openings position, check pipeline position through walls and the mistake wall.Be equipped with the mortar of the different proportionings of different levels by technological requirement.
2) installation of lightgage steel joist and wire lath: by on-the-spot scribing position install, the lower edge keelson, fixedly the cement nail spacing should≤500mm.By designing requirement and wire lath waveform spacing, vertical steel joist is installed, and is done temporary fixed.Vertical keel spacing is answered≤500mm.The fixed point spacing of vertical keel and wire lath is answered≤500mm, assembly unit between wire lath, lap length is answered 〉=20mm, wire lath splicing place constant spacing is mutually answered≤250mm, upper and lower along keelson and flooring constant spacing should≤500mm, fixing in construction between keel and the wire lath should adopt dedicated fixed part or iron wire colligation.Referring to Figure 17.
When the assembling metal net, along keelson and vertical keel junction up and down, wire lath can be cut off, be fixed on along the keelson outside, the other parts wire lath inserts to be gone up in the keelson of lower edge.Also can all put into, and fix with iron wire along keelson.Referring to Figure 18 and 19.
Online perforate should utilize web plate can cut out the advantage of folding, cut the hole with the iron wire pincers and cut out the folding part branch, and wire lath folds in the hollow hole up or down up and down.Seal vertical up and down hole.At door and window hole, should adopt and strengthen the keel reinforcement.Width〉door and window hole of 600mm uses vertical keel and reinforces.
Wire lath and keel erection sequence should extend to both sides from body of wall corner or hole beginning, guarantee that joint structure is complete.
3) heat preserving exterior wall inserts construction: referring to Figure 20, wire lath 1 connects the back and installs and reinforce, in the merging space of wire lath 1, carry out the filling of sound-insulating material 7, carry out the floating (cement: flyash: mortar=0.9: 0.1: 2.5) of whole cement-flying ash mortar layer 2 again.
4) plastering construction:
1, plaster and mainly be divided into three steps: the first step: fill out groove, second step: bottoming, the 3rd step: floating screed is wiped one's face.
2, web plate is filled out groove and adopted cement: flyash: the hanging of mortar=0.9: 0.1: 2.5 with pulp shooting machine or carry out the wire lath hanging by hand, mainly is that the web plate groove is filled and led up, and the unsuitable high ejecting plate face of mortar when filling out groove is in order to avoid mortar is blocked up when wiping one's face.
3, fill out trough end after, answer water seasoning to be no less than 24 hours, the bottoming of can plastering, adopt cement: flyash: the cement-flying ash mortar or the anti-crack fiber mortar (cement: flyash: sand: polyethylene anti-crack fiber=0.9: 0.1: 3: 0.003) do the middle level levelling, the manual plucking that flattens of mortar=0.9: 0.1: 3.
4, after bottoming finishes, answer maintenance to be no less than 24 hours, can carry out surface construction when putting down by no sharp trace, plastering mortar adopts cement: flyash: the hanging of mortar=0.9: 0.1: 2.5, or adopt cement, lime and yellow ground composite mortar, press mass ratio, cement: lime: yellow ground=1: 1: 4, the surface layer screed can adopt and whitewash technology, and paper strip mixed lime mortar is criticized flat.
5, must not carry out other operation in 7 days after the wall plaster, and the maintenance of should sprinkling water, maintenance every day should be no less than twice.
Bathe lavatory and equipment need establish support bracket with the room metope time, when the single-point hanging force〉during 800N, metope one side wire lath can be removed, cavity is filled out concrete, does load-bearing and supports.Can directly beat setscrew during as single-point hanging force<500N fixes.
Deformation of wall seam two ends are used vertical keel and are strengthened.Stitch wide 20mm, in fill out the PU blowing agent, the sealing of seam external application fluid sealant.
Can reach Coefficient K≤2.0w/m2K as in wall cavity, inserting fire-retardant heat-insulation materials such as mineral wool or poly-stupid ethene insulation slurry, the requirement of the residential building party wall of sound insulation value 〉=45db, fire resistance period 〉=2h can reach the requirement of exterior wall built-in heat insulation again, can save the cost of doing exterior-wall heat insulation.

Claims (5)

1. metal mesh multifunctional wall, it is characterized in that being provided with skeleton and cement-flying ash mortar layer, skeleton is made up of two identical shaped wire laths and metal keel, the cement-flying ash mortar layer is coated on outside the skeleton, the cement-flying ash mortar layer is fixed by the wedge section and the mesh of wire lath, keel are provided with along keelson and vertical keel, link by structure support face and vertical keel along keelson, and two identical shaped wire laths are that the centre becomes I-shaped wire lath;
Described is L shaped keel along keelson, along being provided with the hole on the keelson; Described vertical keel are the vertical keel of C shape; Keel also are provided with the reinforcement keel, and strengthening keel is that the willfully strong keel of C shape are or/and the willfully strong keel of U-shaped are strengthening being provided with the hole on the keel;
On the cement-flying ash mortar layer, be provided with the middle level screed, the middle level screed is as the levelling crack-resistant layer, the middle level screed is made up of cement, flyash and mortar or cement, sand and polyethylene defend and split fibre, press mass ratio, cement: flyash: mortar=0.8~1.0: 0.1~0.15: 2.5, or cement: sand: polyethylene defend and split fibre=0.1~0.15: 2.5~3.5: 0.003; The denseness of middle level screed is 50~70mm; The thickness of internal partition wall middle level screed is 15~20mm; The thickness of outer partition wall middle level screed is 25~35mm;
In the cavity in body of wall, promptly insert heat preserving and insulating material in the mesh of wire lath, or insert solid concrete, or penetrate pipeline;
Wire lath is the thick cold-rolled steel coils wire lath of 0.6~0.8mm, and the mesh specification of wire lath is minor axis 9mm * major diameter 18mm, minor axis 12mm * major diameter 25mm or minor axis 15mm * major diameter 30mm;
The cement-flying ash mortar water/binder ratio is 0.37~0.40;
The length of polyethylene defend and split fibre that is used for the middle level screed of anticracking is 12~19mm, diameter≤50 μ m.
2. metal mesh multifunctional wall as claimed in claim 1 is characterized in that being provided with the surface layer screed on the screed of middle level, the surface layer screed adopts cement, lime and yellow ground composite mortar, presses mass ratio, cement: lime: yellow ground=1: 1: 4.
3. the construction techniques of a metal mesh multifunctional wall is characterized in that may further comprise the steps:
1) preparation of construction: carry out in-site measurement according to fixed drawing, calculation Design also prepares required keel, wire lath and Hardware fitting; The establishment constructure scheme;
2) the construction line-putting: measure the body of wall axis according to reference line, and the body of wall that draws is installed control line and door and window hole position;
3) install along keelson and wall limit fixture: by the setting-out line of ink marker, install and fix along keelson with the self-tapping screw of nailing or band plastic expansion sleeve pipe, described is L shaped along keelson along keelson, and fixed L shape is 400~500mm along the spacing of keelson;
4) wire lath assembly assembling and reinforcing: with two wire lath assembly units, 1 vertical keel of C shape is set in the middle of two wire laths, the vertical keel of C shape are connected the back installation and fix with the iron wire colligation with wire lath, and the spacing of two wire laths is 300~400mm;
5) water power pipe arrangement: after wire lath assembling finishes, when carrying out the water power pipe arrangement, the water power pipe arrangement is laid in the wire lath groove, and with iron wire water power pipe arrangement and the colligation of wire lath groove is fixed, the spacing of water power pipe arrangement is 500mm;
6) heat preserving exterior wall inserts construction: carry out the filling of sound-insulating material in the merging space of wire lath, the sound-insulating material is the granules of polystyrene cement paste; Press mass ratio, granules of polystyrene: cement=1: 12.5, granules of polystyrene size are 8~10mm, carry out the floating of whole cement-flying ash mortar layer again, press mass ratio, the proportioning of cement-flying ash mortar layer is a cement: flyash: mortar=0.9: 0.1: 2.5;
7) plaster: plastering mainly is divided into three steps: the first step: fill out groove, second step: bottoming, and the 3rd step: floating screed is wiped one's face; The described groove of filling out adopts by quality than cement: flyash: the hanging of mortar=0.9: 0.1: 2.5, with pulp shooting machine or carry out the wire lath hanging by hand, the wire lath groove to be filled and led up, and mortar should not exceed the wire lath surface when filling out groove, in order to avoid mortar is blocked up when wiping one's face;
After filling out trough end, answer water seasoning to be no less than 24 hours, the bottoming of plastering again, adopt by quality than cement: flyash: the cement-flying ash mortar or the anti-crack fiber mortar of mortar=0.9: 0.1: 3 are done the middle level levelling, the manual plucking that flattens, the mass ratio of described anti-crack fiber mortar is a cement: flyash: sand: polyethylene anti-crack fiber=0.9: 0.1: 3: 0.003;
After bottoming finishes, answer maintenance to be no less than 24 hours, carry out surface construction when putting down again by no sharp trace, it is cement that plastering mortar adopts mass ratio: flyash: the hanging of mortar=0.9: 0.1: 2.5, or adopt cement, lime and yellow ground composite mortar, press mass ratio, cement: lime: yellow ground=1: 1: 4, the surface layer screed adopts and whitewashes technology, and paper strip mixed lime mortar is criticized flat;
8) final acceptance of construction: wall plastering is in time filled out and is decided completion report of construction work after finishing, and asks Party A, management to carry out final acceptance of construction, and carry out the final acceptance of construction record.
4. the construction techniques of a kind of metal mesh multifunctional wall as claimed in claim 3, it is characterized in that body of wall T, L shaped node and cross node should be set up strengthens keel and reinforcement metal net, strengthens must fixing with staple or iron wire between keel and reinforcement metal net.
5. the construction techniques of a kind of metal mesh multifunctional wall as claimed in claim 3, when it is characterized in that the assembling metal net, along keelson and vertical keel junction up and down, wire lath is cut off, and the wire lath after will cutting off is fixed on along the keelson outside, and the other parts wire lath inserts to be gone up in the keelson of lower edge.
CN2007100093792A 2007-08-16 2007-08-16 Metal mesh multifunctional wall and construction method for building thereof Expired - Fee Related CN101126255B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2007100093792A CN101126255B (en) 2007-08-16 2007-08-16 Metal mesh multifunctional wall and construction method for building thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2007100093792A CN101126255B (en) 2007-08-16 2007-08-16 Metal mesh multifunctional wall and construction method for building thereof

Publications (2)

Publication Number Publication Date
CN101126255A CN101126255A (en) 2008-02-20
CN101126255B true CN101126255B (en) 2010-12-01

Family

ID=39094376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2007100093792A Expired - Fee Related CN101126255B (en) 2007-08-16 2007-08-16 Metal mesh multifunctional wall and construction method for building thereof

Country Status (1)

Country Link
CN (1) CN101126255B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321328A (en) * 2013-06-25 2013-09-25 深圳市建艺装饰集团股份有限公司 Double-layer light-steel-keel sound-insulating wall and construction method thereof

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101725196B (en) * 2008-10-23 2013-09-11 上海同济城市规划设计研究院 Functional wall with user customized furniture and manufacturing method thereof
CN102182318A (en) * 2011-04-06 2011-09-14 中国建筑第八工程局有限公司 Construction method of cement internal partition wall with hollow internal mould steel mesh
CN102674766A (en) * 2011-11-16 2012-09-19 宝钢建筑系统集成有限公司 Mortar suitable for base-free metal net plastering and construction method for mortar
CN103541465B (en) * 2012-07-10 2016-04-13 重庆前鼎金属材料有限公司 A kind of jump ring for web plate
CN103541515B (en) * 2012-07-10 2016-12-21 重庆前鼎金属材料有限公司 A kind of method utilizing jump ring to connect web plate
CN103541464B (en) * 2012-07-10 2016-05-11 重庆前鼎金属材料有限公司 A kind of web plate with boss and walling method thereof
CN102733508A (en) * 2012-07-13 2012-10-17 韦作友 Internal parting wall for hollow internal template steel screen type cement anti-seismic thermal insulation wall
CN104032865B (en) * 2014-06-25 2016-06-22 山东万隆建材科技有限公司 In building heat preservation contrary sequence method infilled wall cast-in-place foamed concrete use keel component and construction method
CN104631662A (en) * 2015-01-09 2015-05-20 岑升 Hollow steel mesh keel inner formwork cement partition wall construction method
CN104695661A (en) * 2015-02-12 2015-06-10 深圳市卓宝科技股份有限公司 Steel structure integrated system
CN106380134B (en) * 2016-09-22 2018-10-16 河北科莱电梯有限公司 Elevator counterweight block and its production method
CN106592824B (en) * 2016-12-27 2019-02-01 北京建筑大学 Thin wall concrete shear wall in a kind of prefabricated hollow formula
CN109020425B (en) * 2018-08-31 2020-09-22 马鞍山十七冶工程科技有限责任公司 Self-heat-insulation anti-cracking mortar for ferromagnetic building formwork net wall and preparation method thereof
CN109296117B (en) * 2018-09-10 2023-07-28 深圳市建艺装饰集团股份有限公司 Composite hollow inner template light partition wall and construction method
CN109457838B (en) * 2018-12-25 2023-09-22 贵州建工集团第四建筑工程有限责任公司 Ecological green wall structure of building and assembling and installing method thereof
CN109577523A (en) * 2018-12-26 2019-04-05 北京绿城易筑科技有限公司 For spraying the template and construction method of walling body
CN109914654A (en) * 2019-03-28 2019-06-21 云南联固建筑材料有限公司 A kind of walling technique engineering method
CN110792231A (en) * 2019-11-12 2020-02-14 阜阳晶宫宝能节能建筑有限责任公司 Energy-saving hollow heat-insulating net wall and construction method thereof
CN111530922A (en) * 2020-04-09 2020-08-14 鞍钢建设集团有限公司 Metal truss for wall assembly plate
CN113565231A (en) * 2021-07-08 2021-10-29 安徽联固技研新材料科技有限公司 Hollow internal mold metal mesh special-shaped wall with shock-proof and heat-preservation functions

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1295163A (en) * 1999-11-05 2001-05-16 张福长 Combined wall keel
CN2469086Y (en) * 2001-03-20 2002-01-02 郭胜雄 Wall structure of buildings
CN2530996Y (en) * 2002-03-04 2003-01-15 良固建筑材料(上海)有限公司 Metal net wall base plate
CN1844603A (en) * 2006-05-25 2006-10-11 合肥筑友轻钢建筑板网有限责任公司 Net formwork of non-bearing external enclosure thermal-insulating wall
CN201099933Y (en) * 2007-08-16 2008-08-13 谌丽莉 Metal net wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1295163A (en) * 1999-11-05 2001-05-16 张福长 Combined wall keel
CN2469086Y (en) * 2001-03-20 2002-01-02 郭胜雄 Wall structure of buildings
CN2530996Y (en) * 2002-03-04 2003-01-15 良固建筑材料(上海)有限公司 Metal net wall base plate
CN1844603A (en) * 2006-05-25 2006-10-11 合肥筑友轻钢建筑板网有限责任公司 Net formwork of non-bearing external enclosure thermal-insulating wall
CN201099933Y (en) * 2007-08-16 2008-08-13 谌丽莉 Metal net wall

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
JP特开2004-238987A 2004.08.26
于海延,朱毅.中空内模金属网水泥内隔墙施工的质量控制.工程质量 2006年第12期.2006,(2006年第12期),第25-28页.
于海延,朱毅.中空内模金属网水泥内隔墙施工的质量控制.工程质量 2006年第12期.2006,(2006年第12期),第25-28页. *
沃坚敏.LG中空内模金属网水泥内隔墙施工技术.建筑施工第27卷 第10期.2005,第27卷(第10期),第47-51页.
沃坚敏.LG中空内模金属网水泥内隔墙施工技术.建筑施工第27卷 第10期.2005,第27卷(第10期),第47-51页. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321328A (en) * 2013-06-25 2013-09-25 深圳市建艺装饰集团股份有限公司 Double-layer light-steel-keel sound-insulating wall and construction method thereof

Also Published As

Publication number Publication date
CN101126255A (en) 2008-02-20

Similar Documents

Publication Publication Date Title
CN101126255B (en) Metal mesh multifunctional wall and construction method for building thereof
CN201099933Y (en) Metal net wall
CN109322392B (en) Light steel house and construction method thereof
RU2549948C2 (en) External insulation system for buildings
US20200232205A1 (en) System, method and apparatus for integrated portable building foundation platform with modular components
CN102518301A (en) Prefab house made of autoclaved aerated concrete slabs and assembly method for prefab house
CN111561074B (en) Light ultrahigh sound-insulation fireproof steel partition wall and construction method thereof
CN107355077A (en) A kind of basement barricade single side formwork reinforcing device and method
CN111926910A (en) Installation method of fabricated building
CN102199949A (en) Installation construction process of honeycomb lightweight partition wall boards
RU92037U1 (en) QUICK BUILDING BUILDING
CN204081148U (en) Assembled wall panels
CN209397798U (en) A kind of compound water-proof thermal-insulation curtain wall
CN104088481B (en) The construction method of the composite glass fiber reinforced plenum chamber of a kind of auditorium sandwich
CN208039610U (en) Assembled integrated heat-insulation wall plate
CN113123487A (en) Construction method of internal mold supporting heat-insulation sound-insulation wall
CN113585541A (en) Fast-assembling type indoor partition wall and construction method thereof
CN208618710U (en) Heat-insulation wall plate and assembled are without heat bridge peripheral structure combined wall board
CN203961350U (en) The composite glass fiber reinforced plenum chamber of a kind of auditorium sandwich
CN112609871A (en) Dense rib wall body replacing traditional stiffening beams and constructional columns and construction method
CN208650387U (en) A kind of Prefabricated heat-insulation wall plate
CN105649240A (en) Folded plate type inorganic high-strength keel light wall
RU124274U1 (en) MONOLITHIC CONSTRUCTION DESIGN OF THE BUILDING OR STRUCTURE "GENESIS-RUS" - "VEFT"
CN108425472A (en) Heat-insulation wall plate and assembled are without heat bridge peripheral structure combined wall board
CN111519813A (en) MF heat-preservation sound-insulation assembled concrete laminated slab

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: XIAMEN WANGKUNSHUN TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: CHEN LILI

Effective date: 20100611

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 361012 ROOM 1905, NO.106, CHANGQINGBEILI, HUBIN NORTH ROAD, SIMING DISTRICT, XIAMEN CITY, FUJIAN PROVINCE TO: 361009 ROOM 203, CHUANGYE BUILDING, XIAMEN NATIONAL HIGH-TECH. VENTURE CENTER, XIAMEN CITY, FUJIAN PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20100611

Address after: 361009 Room 203, building of Xiamen national hi tech innovation center, Xiamen, Fujian

Applicant after: Xiamen Wangkunshun Engineering Technology Co., Ltd.

Address before: Siming District of Xiamen city of Fujian Province, North Hubin Road 361012, room 1905 No. 106 Changqing

Applicant before: Chen Lili

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101201

Termination date: 20170816