CN100503408C - 电梯设备的工作方法 - Google Patents
电梯设备的工作方法 Download PDFInfo
- Publication number
- CN100503408C CN100503408C CNB2004100068227A CN200410006822A CN100503408C CN 100503408 C CN100503408 C CN 100503408C CN B2004100068227 A CNB2004100068227 A CN B2004100068227A CN 200410006822 A CN200410006822 A CN 200410006822A CN 100503408 C CN100503408 C CN 100503408C
- Authority
- CN
- China
- Prior art keywords
- lift facility
- usefulness
- working parameter
- specified
- record
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000011017 operating method Methods 0.000 title 1
- 238000000034 method Methods 0.000 claims abstract description 43
- 238000004088 simulation Methods 0.000 claims abstract description 30
- 238000004590 computer program Methods 0.000 claims description 10
- 238000004458 analytical method Methods 0.000 claims description 8
- 238000005457 optimization Methods 0.000 claims description 4
- 230000001133 acceleration Effects 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract 4
- 239000008186 active pharmaceutical agent Substances 0.000 description 3
- 238000009826 distribution Methods 0.000 description 3
- 238000003860 storage Methods 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- GOLXNESZZPUPJE-UHFFFAOYSA-N spiromesifen Chemical compound CC1=CC(C)=CC(C)=C1C(C(O1)=O)=C(OC(=O)CC(C)(C)C)C11CCCC1 GOLXNESZZPUPJE-UHFFFAOYSA-N 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 230000001154 acute effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000008676 import Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B1/00—Control systems of elevators in general
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B1/00—Control systems of elevators in general
- B66B1/34—Details, e.g. call counting devices, data transmission from car to control system, devices giving information to the control system
Landscapes
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Computer Networks & Wireless Communication (AREA)
- Indicating And Signalling Devices For Elevators (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Maintenance And Inspection Apparatuses For Elevators (AREA)
- Elevator Control (AREA)
- Debugging And Monitoring (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Stored Programmes (AREA)
- Jib Cranes (AREA)
Abstract
本发明涉及一种电梯设备的工作方法,其中通过对电梯设备工作的模拟求出实现额定效能(1.1)的工作参数,工作参数和额定效能被记录在一个记录(2.1)内,用工作参数对电梯设备进行运行,对由电梯设备实现的实际效能(4.1)进行测量,和将实际效能与额定效能进行比较。
Description
技术领域
本发明涉及一种电梯设备的工作方法、一种存储的数据组、一种计算机可读介质和一种用于保证电梯设备工作的额定效能的方法。
背景技术
通常由客户对有待新建或有待技术改造的电梯设备工程进行招标,例如用下述不同的指标要求对所述电梯设备工程加以描述:
-电梯提供服务的停靠楼层的数量
-由一停靠楼层到下一停靠楼层之间的距离,
-在一个停靠楼层有待服务的人员的数量
-在所考虑的电梯设备中的电梯的数量,
-电梯控制和乘客接口种类,
-乘客流量,例如根据在一停靠楼层有待服务的人员的数量、每个楼层的呼唤数量和随机的目的楼层选择的数量加以确定,
-和每部电梯:
-提供服务的停靠楼层,
-驱动种类(例如最大速度、有关通过加速或振动的运行曲线数据或停靠楼层或特定距离段之间的运行时间),
-轿厢的种类(例如轿厢层数、尺寸、最大载货重量、最多载客人数),
-电梯轿厢门的种类(例如宽度、开启时间、开启保持时间和关闭时间)。
这类指标要求对电梯设备的工作参数加以定义,所述工作参数系影响和决定电梯设备的工作和性能的物理条件和关系。
客户对电梯设备的要求是很高的。可以根据目前的现有技术在乘客流量给定的情况下对电梯设备的各种效能特性进行测量,或利用模拟或其它计算方法求出,例如:
-在一特定的时间段内被服务的乘客数量,
-每名乘客:
-乘客利用电梯设备从其启始停靠楼层到达目标停靠楼层所需的时间(目的时间),
-从乘客发出呼唤或从其到达电梯设备直至为其提供服务的电梯轿厢到达的时间(候梯时间),
-从启始停靠楼层到目的楼层运行期间的停靠次数,
-上述参数的统计推导数值(例如平均值)。
这类效能特性的整体构成电梯设备的额定效能,所述额定效能通常在对电梯设备开工建设前几个月与客户谈妥和在技术和商业方面议定。
不利的是,对通常许诺给客户的额定性能在建成的电梯设备中是否得到满足很难进行检验。
发明内容
本发明的目的在于对电梯设备的工作的方法的改进,其中在建成电梯设备后可以对在电梯设备建设前确定和规定的额定效能以明确规定的方式进行检验,其中提出一种电梯设备的工作方法、一种存储的数据组、一种计算机可读介质和一种用于保证电梯设备工作的额定效能的方法。
实现所述目的的技术方案如下:
一种电梯设备的工作方法,其中在安装电梯设备之前通过对电梯设备工作的模拟和/或计算求出至少一个用于实现额定效能的工作参数,在电梯设备安装之后用所述工作参数对电梯设备进行运行,对至少一个由电梯设备产生的实际效能进行测量,和将实际效能与额定效能进行比较,并且其中在一记录中包括工作参数和目标效能,在安装电梯设备之前提供电子文档和/或书写文件形式的所述记录。
一种存储的数据组,用于对电梯设备的工作效能进行验证,所述存储的数据形成一个记录,所述记录包括用于实现目标效能的所述电梯设备的至少一个工作参数,通过对电梯设备工作的模拟和/或计算确定出所述工作参数,
其中电梯设备根据所述记录提供的工作参数进行工作和
其中所述记录还包括与工作参数相对应的额定效能。
一种计算机可读介质,包括一存储的数据组,用于对电梯设备的工作效能进行验证,所述存储的数据形成一个记录,所述记录包括用于实现目标效能的所述电梯设备的至少一个工作参数,通过对电梯设备工作的模拟和/或计算确定出所述工作参数,
其中电梯设备根据所述记录提供的工作参数进行工作和
其中所述记录还包括与工作参数相对应的额定效能。
一种存储的数据组,包括保证电梯设备的工作的额定效能的担保数值,所述存储数据组采用如下方式获得:
通过对电梯设备工作的模拟和/或计算求出实现额定效能的至少一个工作参数,其中电梯设备的额定效能与工作参数相对应,和
通过将数值相对于额定效能减小一个预定的系数形成担保数值。
一种计算机可读介质,包括一存储的数据组,所述数据组包括保证电梯设备工作的额定效能的担保数值,采用如下方式获得存储数据组:
通过对电梯设备工作的模拟和/或计算求出实现额定效能的至少一个工作参数,其中电梯设备的额定效能与工作参数相对应,和
通过将数值相对于额定效能减小一个预定的系数形成担保数值。
一种用于保证电梯设备工作的额定效能的方法,所述方法包括如下步骤:
通过对电梯设备工作的模拟和/或计算求出实现额定效能的至少一个工作参数,其中电梯设备的额定效能与工作参数相对应,和
为电梯设备的用户提供担保数值,其中所述担保数值对担保效能加以定义,并通过将数值相对于额定效能减小一个预定的系数形成担保数值。
在对电梯设备招标时,利用对电梯设备工作的模拟或通过一种其它的计算方法求出相应的效能特性,所述效能特性例如用于对电梯设备的定量设计和用于作为咨询或销售理由的市场营销。已知有多种用于对电梯设备模拟的可以在市场上购置到的软件程序或通常计算出的电梯设备工作的图样。
根据本发明的电梯设备工作的方法,首先通过对电梯设备的模拟和/或通过计算和利用额定效能求出实现额定效能的至少一个工作参数。对此加以记录。
所述记录是以电子文件和/或文件形式产生的对电梯设备工作的模拟或计算的输出,所述记录将确定出的、计算出的和/或模拟出的工作参数和电梯设备的预定的额定效能结合在一起。
在根据指标要求建成电梯设备后,用预先模拟出的工作参数或乘客流量对电梯设备进行运行和对由电梯设备产生的实际效能进行测量并与预定的额定效能进行比较。采用此方式可以明确地判定和检查额定效能是否与实际效能一致,是否电梯设备有效地满足建筑工程的要求,或是否模拟和/或计算可以准确地预测出电梯设备的工作状况。
额定性能由性能特性构成,所述性能特性在此也被称作担保数值,所述担保数值被收集和优选保存在一个电子文件和/或一份文件中,例如在一份担保文书中。
由于对是否履行了合同规定是很明确的,所以在任何情况下都可以避免来自客户方的不满和纠纷。
根据一优选的实施方式,采用存储在计算机设备的存储器中的计算机程序利用计算机设备的处理器在一个计算机设备中对工作进行模拟或计算,所述处理器执行计算机程序,其中额定效能通过模拟-和/或计算规则与工作参数和乘客流量逻辑连接。因此可以迅速地、以高精确度和可重复性地提供通过模拟和/或计算得出的结果。
根据另一优选的实施方式,所述记录具有防伪保护,所述防伪保护防止工作参数、指标要求、乘客流量和/或额定性能被更改,而不被觉察。根据另一优选实施方式,所述记录包括一个失效日期,所述失效日期可靠地表明根据记录衍生出的权利仅在有限的时间段内有效。根据另一优选的实施方式,部分工作参数,例如乘客流量,或记录不被公开或仅被部分公开;采用此方式例如可以对电梯设备控制的细节保密或对客户不重要的信息不必全面地加以描述。
附图说明
下面将对照附图对本发明的实施例做进一步的说明。图中示出:
图1为电梯设备工作的方法的示意图,和
图2在一记录中的工作参数组的示意图。
具体实施方式
图1示出本发明的电梯设备工作的方法步骤的顺序。
在方法步骤1中首先采集电梯设备的必要的指标要求,并确定乘客流量。对此可以采用模拟或其它的计算方法。可以通过对电梯设备工作的模拟求出实现额定效能的工作参数1.2。优选对步骤重复进行,以便实现对工作参数的确定。对电梯设备的启始工作参数和指标要求进行确定和通过模拟对电梯设备的相应的效能进行计算。当所述效能与电梯设备的额定效能相符时,则获得了实现额定效能1.1的工作参数1.2。另外,确定电梯设备的其它启始工作参数和指标要求和再次通过模拟计算电梯设备的相应的效能。继续进行“逐次逼近”过程,直至满足额定效能的要求。
根据优选的实施方式,在方法步骤1中根据指标要求和乘客流量利用存储在计算机设备中的计算机程序用一个执行计算机程序的计算机设备的处理器在计算机设备中进行电梯设备的工作的模拟和/或计算,其中被模拟或计算的效能特性通过模拟和/或计算规则与工作参数、指标要求和乘客流量逻辑连接。例如进行至少一个工作参数的反复变化,以便用计算机程序实现所需的额定效能。优选实现最佳化,其中根据多种可能性仅采用一个或少许几个优选的,例如根据预定的目标标准尽可能好的变化的工作参数。反复进行最佳化,直至工作参数满足额定效能的要求。
当例如模拟表明每组三部电梯不足以满足希望数量的被服务的乘客的要求时,则继续进行对每组四部电梯的模拟。当该模拟重新表明用每组四部电梯不能满足希望数量的被服务的乘客的要求时,则还可以对其它方式的电梯控制,例如对目标呼唤控制继续进行模拟。
在方法步骤2中通过调取一相应的功能生成一担保证书,其中根据指标要求、乘客流量和模拟或计算出的效能:
-为一个根据指标要求建立的设备的效能特性求出担保数值,例如其中将指标要求或效能特性的模拟或计算出的数值减少一个特定相对的和/或绝对的分量(系数);
-生成记录2.1形式的一个或多个文件,所述文件包括指标要求、乘客流量、推导出的效能-特性以及担保数值。
记录2.1如图2所示由多组工作参数2.2,即由指标要求、乘客流量、推导出的效能特性以及担保数值构成。
为客户颁发担保证书。其中规定失效期只在有效的时间内使由担保证书衍生出的权利要求有效。
当实现了根据指标要求的电梯设备时,担保证书对客户起着证明文件的作用。
在方法步骤3中,由记录2.1中选出一组工作参数3.1,由预定的乘客流量对所述工作参数组加以定义。
然后在方法步骤3中用工作参数3.1在一基准工作中对电梯设备进行运行。乘客流量作为工作参数是预先已知的。所有记录在相应的乘客流量中的乘客呼唤并不是通过设置在轿厢中或楼层上的键盘输入的,而是由记录直接输入控制单元中的。
在方法步骤4中对电梯设备的实际效能4.1进行测量。
乘客呼唤以及轿厢和门的移动被记录在测量记录中。同时由客户直接对轿厢和门的移动进行观察并独立地对轿厢和门的移动进行记录。然后对测量记录进行评价,优选利用一个记录分析器进行评价。
记录分析器是一个通常以计算机程序编程的预定的方法,所述记录分析器对测量记录和担保证书进行阅读、比较和最后输出有关实际效能是否与额定效能一致的信息。
通常记录分析器对在测量记录中含有的数据和工作参数进行阅读,所述数据和工作参数以文本文件内的表格或excel表格形式存在和在电梯设备基准工作时可以有效地对其进行测量。记录-分析器首先对这些数据的一致性进行检查和检查是否有效地保证了电梯设备工作的运行和物理条件。记录分析器接着根据测量记录计算出电梯设备的效能特性(候梯时间、目的时间等)。记录分析器还对担保证书中含有的与电梯设备的额定效能相符的数据和工作参数进行阅读和对这些数值与从测量记录推导出的数值进行比较。所述记录分析器最后输出一个总结果,并确认电梯设备的实际效能满足额定效能中预定的条件。
在方法步骤5中,电梯设备的实际效能4.1与额定效能1.1进行比较或测出的效能特性和测出的数值与包含在担保证证书中的担保声明进行比较。
比较5.1的结果可以就是否电梯设备满足在额定效能中规定的技术指标和要求做出定义的、可检查的、可靠的和明确的结论。
优选对乘客流量以如下方式加以确定,为电梯设备规定一个高的效能,但不要太高,以便使模拟与实现的设备之间的偏差不致于对效能特性的数值产生剧烈的影响。可以由一相应的模拟和/或计算方法对此加以支持,所述模拟和/或计算方法根据技术指标生成一个相应的合理的乘客流量。
担保声明建立在利用模拟和/或计算求出的数值基础上,例如所述数值涉及:
-每5分钟被服务人员的最小数量,
-最大的平均目的时间,
-最大的平均候梯时间
或其它可测量出的或计算出的量值和由所述量值统计推导出的数值。
其中由于存在在实现的设备中不能满足模拟出的数值的风险,所以必须添加一个安全范围(风险容限)。对该安全范围不得选得太大,从而不致使担保证书大幅度地降低。给出作为最佳的评价的利用模拟求出的数值和对被略有减少的数值加以担保。
减少量和最佳评价的安全范围的宽度取决于所考虑的参数和根据经验值或统计考虑和/或方法加以确定,其中对额定效能与实际效能之间可能出现的偏差或其原因在模拟或其它的计算方法中加以考虑。例如对诸如轿厢或门的移动慢于在工作参数中规定值的移动等可能的干扰模拟或计算出对效能特性的影响。对剧烈变化的效能特性进行大幅度的减小。此点也可以分别根据工作参数有很大的区别,例如取决于电梯控制。
担保证书优选具有防伪保护,所述防伪保护可以保证担保证书不致被更改,而不被觉察。可以利用通常可以获得的方法明确地对记录的真伪进行检验。所述防伪保护例如是一个根据一个或多个电子文件计算出的字符序列,所述字符序列固定在一个书面文件中。其中用于计算字符序列的方法优选具有如下特性,所述方法是公知的和用不同的初始文件很难或不可能实现相同的字符序列。这类已知的一种方法例如是MD5算法(RFC1321)。
担保证书至少部分是被加密的,从而使客户不会或不必了解有关电梯设备特性的所有信息。由于工作参数的细节有可能涉及商业秘密,所以此点对电梯制造厂家是重要的。对公开的信息的选择应能充分地保证对担保的效能的检查。
该问题的优选的解决方案如下:
担保证书由一个电子文件和由一个书面文件构成,所述文件都具有防伪保护,所述防伪保护对文件的归属加以确认。
电子文件包括技术指标、担保声明以及作为每个时刻和每种方式的电梯呼唤表的乘客流量,例如在目的楼层呼唤控制时的“在时刻T点在启始停靠楼层x目标楼层为y的目的楼层呼唤”。在文件内没有存储对轿厢的呼唤分配和轿厢移动/门移动。
书面文件包括与电子文件相同的内容,但只有一部分乘客流量,例如从所有电梯呼唤随机选择的15%的电梯呼唤。
在验证时,利用电子文件将乘客流量,即将电梯呼唤输入电梯设备的控制单元中。在测量记录中建立设备特性,所述测量记录还对向轿厢的呼唤分配和轿厢和门的移动加以描述。
书面文件例如作为购买合同一式两份加以签署和在电梯制造厂家与客户之间交换。分别根据防伪保护的设计和/或加密用计算机程序对担保证书的真伪或完好进行检验。必要时可以将这种检验程序或检验程序的部分提供给客户,以便使客户自己随时可以对真伪或完好加以确定,而客户并不会因此打开加密的部分。
在某些情况下,客户不会完全地得到测量记录。客户获得所有轿厢移动和门移动的清单以及在文件中记载的与乘客流量的部分相符的对轿厢的呼唤分配。客户本人可以对轿厢和门的移动进行观察。
电梯公司根据测量记录针对乘客总体流量以及在文件中记载的部分乘客流量求出在担保声明中描述的效能特性。客户可以亲自对记载在文件中的该部分加以验证,对此例如利用相应的辅助手段,例如Excel程序对客户加以支持。
检验协议书例如规定不仅涉及总客流量,而且涉及部分客流量的效能特性必须在担保声明的范围之内。在该情况下,对担保声明的选择应可以以最大的几率满足甚至相应的部分客流量的要求。
所述的方法步骤仅旨在举例加以说明,因此并不排除对所述主题类似的或通常的置换。
Claims (8)
1.一种电梯设备的工作方法,其特征在于,在安装电梯设备之前通过对电梯设备工作的模拟和/或计算求出至少一个用于实现额定效能的工作参数,在电梯设备安装之后用所述工作参数对电梯设备进行运行,对至少一个由电梯设备产生的实际效能进行测量,和将实际效能与额定效能进行比较,并且其中在一记录中包括工作参数和目标效能,在安装电梯设备之前提供电子文档和/或书写文件形式的所述记录。
2.按照权利要求1所述的方法,其特征在于,工作参数包括下述参数中的至少一种参数:
采用电梯提供服务的停靠楼层的数量;
停靠楼层之间的距离;
在一个停靠楼层有待服务的人员的数量;
在所考虑的电梯设备的电梯的数量;
由一部电梯提供服务的停靠楼层;
包括最大速度、有关加速或振动的运行曲线数据或在停靠楼层或特定距离段之间的运行时间的电梯的驱动方式;
包括轿厢层数、尺寸、最大载货重量、最多载客人数的电梯轿厢的种类;
包括宽度、开启时间、开启保持时间和关闭时间的电梯轿厢门的种类;
电梯控制和乘客接口种类;
乘客流量。
3.按照权利要求1所述的方法,其特征在于,分别求出至少一种下述额定效能和实际效能:
乘客的到达目的楼层的时间;
乘客的候梯时间;
加速度;
速度;
被服务的乘客的数量;
平均每名乘客的停靠数量。
4.按照权利要求1所述的方法,其特征在于,在一个计算机设备上采用一个计算机程序对工作进行计算和/或模拟,所述计算机程序存储在计算机设备的一个存储器内,利用计算机设备的一个处理器执行计算机程序,其中额定效能通过模拟规则与工作参数逻辑连接。
5.按照权利要求4所述的方法,其特征在于,用至少一个变化的工作参数对电梯设备的工作的计算和/或模拟进行最佳化,重复进行最佳化过程,直至工作参数满足额定效能的要求。
6.按照权利要求1至5中任一项所述的方法,其特征在于,工作参数和额定效能被记录在一个记录(2.1)中,和以电子文件和/或书面文件方式形成所述记录。
7.按照权利要求6所述的方法,其特征在于,为电梯设备的额定效能确定担保数值,和对应于额定效能将担保数值减小一个预定的系数。
8.按照权利要求7所述的方法,其特征在于,利用记录分析器对额定效能和实际效能进行比较。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP03405163 | 2003-03-10 | ||
EP03405163.1 | 2003-03-10 |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100058514A Division CN101475109B (zh) | 2003-03-10 | 2004-02-24 | 电梯设备的工作方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1530313A CN1530313A (zh) | 2004-09-22 |
CN100503408C true CN100503408C (zh) | 2009-06-24 |
Family
ID=32946978
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2004100068227A Expired - Lifetime CN100503408C (zh) | 2003-03-10 | 2004-02-24 | 电梯设备的工作方法 |
CN2009100058514A Expired - Lifetime CN101475109B (zh) | 2003-03-10 | 2004-02-24 | 电梯设备的工作方法 |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009100058514A Expired - Lifetime CN101475109B (zh) | 2003-03-10 | 2004-02-24 | 电梯设备的工作方法 |
Country Status (16)
Country | Link |
---|---|
US (2) | US7314117B2 (zh) |
JP (1) | JP5128046B2 (zh) |
KR (1) | KR101098806B1 (zh) |
CN (2) | CN100503408C (zh) |
AR (1) | AR043524A1 (zh) |
AU (1) | AU2004200995B2 (zh) |
BR (1) | BRPI0400189A (zh) |
CA (1) | CA2459997C (zh) |
MX (1) | MXPA04002200A (zh) |
MY (1) | MY136122A (zh) |
NO (1) | NO20041016L (zh) |
NZ (1) | NZ531464A (zh) |
PL (1) | PL215877B1 (zh) |
SG (1) | SG126743A1 (zh) |
TW (1) | TWI315290B (zh) |
ZA (1) | ZA200401532B (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1795481A1 (de) * | 2005-12-07 | 2007-06-13 | Inventio Ag | Beförderungsanlage und Verfahren zur Inbetriebnahme einer Beförderungsanlage |
CN101802825A (zh) | 2007-05-21 | 2010-08-11 | 奥蒂斯电梯公司 | 用于新建筑物和现有建筑物中的电梯布置的设计方法 |
KR100977752B1 (ko) * | 2008-12-11 | 2010-08-24 | 한국철도기술연구원 | 역사내 시설물 고장 판단 시스템 |
KR101775167B1 (ko) | 2009-01-27 | 2017-09-05 | 인벤티오 아게 | 엘리베이터 시스템 작동 방법 |
GB2507216A (en) | 2011-07-15 | 2014-04-23 | Otis Elevator Co | Elevator car assignment strategy that limits a number of stops per passenger |
WO2016109231A2 (en) * | 2014-12-29 | 2016-07-07 | Otis Elevator Company | System and method of maintaining performance of a system |
CN114728759B (zh) * | 2019-11-20 | 2023-02-28 | 三菱电机楼宇解决方案株式会社 | 判定装置、判定方法和计算机能读取的记录介质 |
CN111994748B (zh) * | 2020-08-04 | 2022-02-25 | 广州广日电梯工业有限公司 | 一种高峰期电梯客流量模拟方法及系统 |
CN115246605B (zh) * | 2021-08-30 | 2023-09-19 | 菱王电梯有限公司 | 电梯控制方法、装置和存储介质 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4401192A (en) * | 1981-10-06 | 1983-08-30 | Westinghouse Electric Corp. | Method of evaluating the performance of an elevator system |
US4458788A (en) * | 1982-05-24 | 1984-07-10 | Delta Elevator Equipment Corporation | Analyzer apparatus |
US5248860A (en) * | 1991-04-29 | 1993-09-28 | Otis Elevator Company | Using fuzzy logic to determine elevator car assignment utility |
JP2002109446A (ja) * | 2000-09-29 | 2002-04-12 | Toshiba Corp | シミュレーション方法、シミュレーション・システムおよびシミュレーション・プログラムを記録した記録媒体 |
JP3297764B2 (ja) * | 1993-04-22 | 2002-07-02 | 鐘淵化学工業株式会社 | 常温硬化性組成物 |
Family Cites Families (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5511418A (en) * | 1978-07-07 | 1980-01-26 | Hitachi Ltd | Test operating apparatus of elevator |
JPS58172177A (ja) * | 1982-04-02 | 1983-10-08 | 株式会社日立製作所 | エレベ−タ−の性能評価装置 |
US5307903A (en) * | 1988-01-29 | 1994-05-03 | Hitachi, Ltd. | Method and system of controlling elevators and method and apparatus of inputting requests to the control system |
JPH01226678A (ja) * | 1988-03-04 | 1989-09-11 | Hitachi Ltd | エレベーター制御装置 |
JP2740978B2 (ja) * | 1990-04-02 | 1998-04-15 | 株式会社日立製作所 | エレベータの設置計画支援装置及び方法 |
JPH03297764A (ja) | 1990-04-13 | 1991-12-27 | Hitachi Ltd | エレベーターのサービス性能予測装置およびサービス性能予測方法 |
JP2846102B2 (ja) * | 1990-11-05 | 1999-01-13 | 株式会社日立製作所 | 群管理エレベーターシステム |
KR960013181B1 (en) * | 1993-08-23 | 1996-09-30 | L G Ind Systems Co Ltd | Elevator group control method & device |
JP3215426B2 (ja) * | 1994-05-17 | 2001-10-09 | 三菱電機株式会社 | エレベータ群管理システム |
JP3221795B2 (ja) | 1994-06-03 | 2001-10-22 | 株式会社日立ビルシステム | エレベータの制動性監視装置 |
JP3305166B2 (ja) * | 1994-06-27 | 2002-07-22 | キヤノン株式会社 | 電子線装置 |
US5750946A (en) * | 1995-11-30 | 1998-05-12 | Otis Elevator Company | Estimation of lobby traffic and traffic rate using fuzzy logic to control elevator dispatching for single source traffic |
US5760350A (en) | 1996-10-25 | 1998-06-02 | Otis Elevator Company | Monitoring of elevator door performance |
JP4312392B2 (ja) | 1999-08-03 | 2009-08-12 | 三菱電機株式会社 | エレベーター群管理装置 |
US6325179B1 (en) | 2000-07-19 | 2001-12-04 | Otis Elevator Company | Determining elevator brake, traction and related performance parameters |
-
2004
- 2004-02-11 SG SG200400598A patent/SG126743A1/en unknown
- 2004-02-20 JP JP2004044084A patent/JP5128046B2/ja not_active Expired - Fee Related
- 2004-02-20 TW TW093104271A patent/TWI315290B/zh not_active IP Right Cessation
- 2004-02-24 CN CNB2004100068227A patent/CN100503408C/zh not_active Expired - Lifetime
- 2004-02-24 CN CN2009100058514A patent/CN101475109B/zh not_active Expired - Lifetime
- 2004-02-25 ZA ZA200401532A patent/ZA200401532B/xx unknown
- 2004-02-26 US US10/787,428 patent/US7314117B2/en active Active
- 2004-02-26 MY MYPI20040632A patent/MY136122A/en unknown
- 2004-03-01 NZ NZ531464A patent/NZ531464A/en not_active IP Right Cessation
- 2004-03-03 KR KR1020040014373A patent/KR101098806B1/ko active IP Right Grant
- 2004-03-08 MX MXPA04002200A patent/MXPA04002200A/es active IP Right Grant
- 2004-03-08 CA CA2459997A patent/CA2459997C/en not_active Expired - Lifetime
- 2004-03-09 PL PL366019A patent/PL215877B1/pl unknown
- 2004-03-09 AU AU2004200995A patent/AU2004200995B2/en not_active Ceased
- 2004-03-09 AR ARP040100754A patent/AR043524A1/es active IP Right Grant
- 2004-03-09 NO NO20041016A patent/NO20041016L/no unknown
- 2004-03-10 BR BR0400189-3A patent/BRPI0400189A/pt not_active Application Discontinuation
-
2007
- 2007-07-12 US US11/776,768 patent/US7546907B2/en not_active Expired - Lifetime
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4401192A (en) * | 1981-10-06 | 1983-08-30 | Westinghouse Electric Corp. | Method of evaluating the performance of an elevator system |
US4458788A (en) * | 1982-05-24 | 1984-07-10 | Delta Elevator Equipment Corporation | Analyzer apparatus |
US5248860A (en) * | 1991-04-29 | 1993-09-28 | Otis Elevator Company | Using fuzzy logic to determine elevator car assignment utility |
JP3297764B2 (ja) * | 1993-04-22 | 2002-07-02 | 鐘淵化学工業株式会社 | 常温硬化性組成物 |
JP2002109446A (ja) * | 2000-09-29 | 2002-04-12 | Toshiba Corp | シミュレーション方法、シミュレーション・システムおよびシミュレーション・プログラムを記録した記録媒体 |
Also Published As
Publication number | Publication date |
---|---|
PL366019A1 (en) | 2004-09-20 |
BRPI0400189A (pt) | 2004-12-28 |
US7314117B2 (en) | 2008-01-01 |
ZA200401532B (en) | 2004-08-30 |
CN101475109A (zh) | 2009-07-08 |
JP5128046B2 (ja) | 2013-01-23 |
TW200422244A (en) | 2004-11-01 |
KR20040080991A (ko) | 2004-09-20 |
US20040178021A1 (en) | 2004-09-16 |
MXPA04002200A (es) | 2005-02-17 |
AU2004200995A1 (en) | 2004-09-30 |
NZ531464A (en) | 2006-02-24 |
CN1530313A (zh) | 2004-09-22 |
CN101475109B (zh) | 2011-05-18 |
SG126743A1 (en) | 2006-11-29 |
JP2004338943A (ja) | 2004-12-02 |
US20080017453A1 (en) | 2008-01-24 |
AR043524A1 (es) | 2005-08-03 |
MY136122A (en) | 2008-08-29 |
PL215877B1 (pl) | 2014-02-28 |
CA2459997C (en) | 2012-07-24 |
AU2004200995B2 (en) | 2007-05-24 |
KR101098806B1 (ko) | 2011-12-27 |
CA2459997A1 (en) | 2004-09-10 |
NO20041016L (no) | 2004-09-13 |
US7546907B2 (en) | 2009-06-16 |
TWI315290B (en) | 2009-10-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Szeto et al. | Reliability‐based transit assignment for congested stochastic transit networks | |
US8887008B2 (en) | Maintenance planning and failure prediction from data observed within a time window | |
US9530256B2 (en) | Generating cumulative wear-based indicators for vehicular components | |
CN108959934A (zh) | 安全风险评估方法、装置、计算机设备和存储介质 | |
Vileiniskis et al. | Quantitative risk prognostics framework based on Petri Net and Bow-Tie models | |
CN100503408C (zh) | 电梯设备的工作方法 | |
Lee et al. | Usage context as key driver for feature selection | |
Xie et al. | Forecasting the Short‐Term Passenger Flow on High‐Speed Railway with Neural Networks | |
Thürer et al. | Card-based delivery date promising in high-variety manufacturing with order release control | |
CN108290707A (zh) | 电梯管理系统 | |
Stasko et al. | Time-expanded network model of train-level subway ridership flows using actual train movement data | |
Zuting et al. | A synchronized strategy to minimize vehicle dispatching time: a real example of steel industry | |
Mazurenko et al. | Development of a simulation model of a cargo customs complex operation as a link of a logistic supply chain | |
Noorossana et al. | System reliability with multiple failure modes and time scales | |
Regattieri et al. | Designing production and service systems using queuing theory: principles and application to an airport passenger security screening system | |
Bannikov et al. | Development of innovative railway rolling stock technologies | |
Jappsen et al. | Difficulties in Comparing the Results of Lift-Traffic-Simulations. | |
CN114677065A (zh) | 数据处理方法和数据处理装置 | |
Zeng et al. | A transient queuing model for analyzing and optimizing gate congestion of railway container terminals | |
Tabesh et al. | Discrete Event Simulation of Truck-Shovel Operations in Open Pit Mines1 | |
Yang et al. | Level of service analysis based on maximum number of passengers in waiting room of railway passenger station using arena simulation | |
Alodhaibi et al. | An analytical optimisation framework for airport terminal capacity expansion | |
Ladier et al. | Issues in the complementary use of simulation and optimization modeling | |
CN112632634A (zh) | 签名数据的处理方法、装置、计算机设备和存储介质 | |
Giuseppe et al. | A Simulation Approach in Process Mining Conformance Analysis. The Introduction of a Brand New BPMN Element. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20231201 Address after: No. 555 Xingshun Road, Jiading District, Shanghai Patentee after: SCHINDLER (CHINA) ELEVATOR Co.,Ltd. Address before: Swiss Helge Sitwell Patentee before: Inventio AG |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20090624 |