CN100417606C - Biological adsorption and artificial wetland combined town sewage treatment system and method - Google Patents

Biological adsorption and artificial wetland combined town sewage treatment system and method Download PDF

Info

Publication number
CN100417606C
CN100417606C CNB2006101440269A CN200610144026A CN100417606C CN 100417606 C CN100417606 C CN 100417606C CN B2006101440269 A CNB2006101440269 A CN B2006101440269A CN 200610144026 A CN200610144026 A CN 200610144026A CN 100417606 C CN100417606 C CN 100417606C
Authority
CN
China
Prior art keywords
section
water
artificial swamp
sewage
aeration tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006101440269A
Other languages
Chinese (zh)
Other versions
CN1966424A (en
Inventor
张鸿涛
白庆中
高用贵
黄守斌
王卓艺
许卫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Guohuan Tsinghua Environmental Engineering Design & Research Institute
Original Assignee
Beijing Guohuan Tsinghua Environmental Engineering Design & Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Guohuan Tsinghua Environmental Engineering Design & Research Institute filed Critical Beijing Guohuan Tsinghua Environmental Engineering Design & Research Institute
Priority to CNB2006101440269A priority Critical patent/CN100417606C/en
Publication of CN1966424A publication Critical patent/CN1966424A/en
Application granted granted Critical
Publication of CN100417606C publication Critical patent/CN100417606C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Biological Treatment Of Waste Water (AREA)
  • Purification Treatments By Anaerobic Or Anaerobic And Aerobic Bacteria Or Animals (AREA)
  • Activated Sludge Processes (AREA)

Abstract

The invention relates to the cities sewage system and treating method which combines biological adsorbing and artificial wet land, and it belongs to city-government and environmental-protection domain. The system includes coarse and fine racks, sedimentation basin, and aerator and depositing tank of a stage in AB technology, underflow gallet beds artificial wet land and pipes connecting all devices. The method includes the following steps: removing the floating substances and fine sands through the coarse and fine racks, sendiment basin; removing the suspended particulate and organics, nitrogen and phosphorous through aerator of A stage; precipitating the floccular active sludge and organic suspended particulate through the depositing tank of A stage; the water entering the underflow gallet beds artificial wet land; contacting sterilizing to discharge the water. The invention has combined the biological adsorption and artificial wet land which can remove some organics in advance to increase the possibility of bio-treating the water so that it has solved many problems in wet land treating technology such as large occupying area, easy to be blocked and poor treatment efficiency in winter.

Description

Town sewage treatment system and method thereof that biological absorption and artificial swamp combine
Technical field:
The invention belongs to municipal administration and field of environmental engineering, be specifically related to the town sewage New Process for Treatment that a kind of biological absorption combines with artificial swamp.
Background technology
Artificial swamp originates from the seventies in 20th century, is one of development in recent years ecological wastewater processing technology rapidly.Artificial swamp is meant the ecosystem artificial design-build, simulating nature wetland structure and function, utilize the physics, chemistry of system's mesostroma-plant-microorganism, biological triple coordinative roles, realize efficient purification sewage by matrix filtration, absorption, precipitation, ion-exchange, plant absorbing and microbiological degradation.Characteristics such as treatment effect that artificial swamp is good and investment and working cost are low, operational administrative is simple and convenient make it obtain in the whole world using widely.
According to its water stream characteristics, artificial swamp can be divided into surface current wetland and current wetland two classes.Surface current wetland and natural wetland are similar, and sewage has advantages such as less investment, simplicity of design from wetland surface current mistake, but floor space is bigger, hydraulic load is too small, and the water surface exposed easily and froze winter, easily multiplies shortcoming such as mosquitos and flies summer it is seldom adopted in design.Current wetland does not have the free-water level of exposure, and sewage is seepage flow under filling surface, can overcome the shortcoming of above surface current.In actual applications, drowned flow artificial wet land occupies main status.The U.S. has 600 many places artificial wet land systems to be used for handling municipal administration, agricultural and trade effluent at present, most of undercurrent type system that adopts; In the underground undercurrent of the many employings system of some countries in Europe, the multiple wetland plants such as reed, calamus and cattail of planting of this type systematic adopt gravel to make filler; In addition, also obtained using widely in other national artificial swamp technology.
Though the application of artificial swamp is more extensive at present, but also exist weak point, it is bigger to be mainly reflected in floor space, stop up easily, particularly the dormancy phenomenon appears in wetland plant under cold condition, the root system microbial metabolism is slow, and the wetland processing efficiency is descended significantly, thereby has limited the promotion and application of artificial swamp technology.
AB method sewage treatment process is the abbreviation of absorption-biological degradation (Adsorption-Biodegration) technology.The AB method is made up of biological absorbing unit of A section and B section biological degradation unit.The biological absorbing unit of A section is made up of A section aeration tank and A section settling tank, and B section biological degradation unit is made up of B section aeration tank and secondary sedimentation basins.This method is not established preliminary sedimentation tank, make the A section have higher load, and can make full use of, utilize the stronger adsorptive power of mud through the preferred microbial population of water exhaust system, reach removal, alleviated the load of B section greatly holophytic nutrition materials such as some hardly degraded organic substance and nitrogen, phosphorus.Shortcomings such as but complete adsorption biodegradation sludge output is bigger, and B section biological degradation cell process is more have also limited its development.
Summary of the invention:
The objective of the invention is in order to overcome the weak point of above-mentioned artificial swamp technology in sewage disposal, the sewage water treatment method that a kind of biological absorption and artificial swamp combine is proposed, biological absorbing unit is set before artificial swamp, can remove a part of organism in advance, improve the biodegradability of sewage, thus solved effectively that the artificial swamp floor space more greatly, is easily stopped up and winter poor processing effect problem.
The town sewage treatment system that a kind of biological absorption that the present invention proposes and artificial swamp combine, it is characterized in that, this Sewage treatment systems comprises thickness grid and settling pit, the A section aeration tank and the A section settling tank of the biological absorbing unit of the A section of adsorption biodegradation, the undercurrent gravel bed artificial swamp, and the pipeline that is used to connect each equipment, its annexation is: thickness grid and settling pit are provided with sewage inlet and water outlet, the water outlet of thickness grid and settling pit links to each other with the water-in of A section aeration tank, the water outlet of A section aeration tank links to each other with the water-in of A section settling tank, the water outlet of A section settling tank links to each other with the water-in of undercurrent gravel bed artificial swamp, the sludge outlet that is arranged on this A section settling tank bottom links to each other with the mud import of A section aeration tank, and this sludge outlet links to each other with device for dehydrating sladge waste by pipeline simultaneously.
The sewage water treatment method of the employing said system that the present invention proposes is characterized in that this method may further comprise the steps:
1) pending sewage carries out pre-treatment through thickness grid and settling pit, removes floating matter and fine sand particle, to guarantee the normal operation of follow-up processing flow;
2) this water enters the A section aeration tank of the biological absorbing unit of A section of adsorption biodegradation then, removes suspended particle (SS) and organism (BOD) in this water, the while denitrogenation dephosphorizing;
3) this sewage continues the A section settling tank by the biological absorbing unit of A section of adsorption biodegradation, and (summer, A section aeration tank is aeration or a small amount of aeration not in order to save energy consumption to make cotton-shaped active sludge in this water and inorganic suspended particles precipitation; Winter, normal aeration was biological absorbing unit operation according to the A section of adsorption biodegradation in order to ensure running effect);
4) water outlet of this settling tank enters into the undercurrent gravel bed artificial swamp; The water outlet of artificial swamp is through qualified discharge behind the contact sterilizing.
Characteristics of the present invention and effect:
The biological absorbing process that the present invention adopts is the A section that adopts in conventional absorption-biological degradation (Adsorption-Biodegration is called for short AB) technology.Adopt biological absorbing process not establish preliminary sedimentation tank, under the situation of the residence time, utilize the stronger adsorptive power of active sludge to reach higher organic matter removal effect than weak point.Biological absorbing process has that load is high, mud age is short, bacterial reproduction speed is fast, sludge settling property good, capacity of resisting impact load is strong, stable, pH and toxic substance are had very big characteristics such as shock absorption.Sewage wherein non-solubility organism (comprising suspended matter and colloidalmaterial) after biological absorbing process is handled is removed in a large number, not only alleviated the operating load of subsequent technique greatly, greatly reduce the residence time of follow-up artificial wetland process, effectively reduced its floor space, biodegradability can also be improved.Especially in the winter of northern area, low temperature causes the artificial swamp treatment effect relatively poor, with biological absorbing process as pre-treatment after, can effectively improve processing efficiency.
Artificial swamp of the present invention is a undercurrent type gravel bed system artificial swamp, does not have the adding of soil can reduce possibility of jamming like this, and can improve the utilization ratio of oxygen.
The sewage treatment process that the present invention combines biology absorption and artificial swamp combines traditional activated sludge process with novel ecological wastewater processing technology, learn from other's strong points to offset one's weaknesses acting in conjunction.Biological absorbing unit is set before artificial swamp, can remove a part of BOD in advance, improve the biodegradability of sewage, thus solved effectively that the artificial swamp floor space more greatly, is easily stopped up and winter poor processing effect problem, be applied at present obtain good effect in the engineering.
Description of drawings
Fig. 1 is water treatment system structure of the present invention and treatment scheme synoptic diagram.
Embodiment
Below in conjunction with drawings and Examples content of the present invention is specifically described.
Town sewage treatment system and sewage water treatment method that a kind of biological absorption that the present invention proposes and artificial swamp combine, as shown in Figure 1, this Sewage treatment systems comprises thickness grid and settling pit, the A section aeration tank and the A section settling tank of the biological absorbing unit of the A section of adsorption biodegradation, the undercurrent gravel bed artificial swamp, and the pipeline that is used to connect each equipment, its annexation is: thickness grid and settling pit are provided with sewage inlet and water outlet, the water outlet of thickness grid and settling pit links to each other with the water-in of A section aeration tank, the water outlet of A section aeration tank links to each other with the water-in of A section settling tank, the water outlet of A section settling tank links to each other with the water-in of undercurrent gravel bed artificial swamp, the sludge outlet that is arranged on this A section settling tank bottom links to each other with the mud import of A section aeration tank, links to each other with device for dehydrating sladge waste by pipeline simultaneously.
In addition,, in A section aeration tank, be provided with the aerating apparatus that links to each other with the air blast machine room, and be provided with water contact sterilizing unit at the water outlet of artificial swamp for reaching better treatment effect.
The water treating equipment that each equipment in the said system all can adopt conventional ripening to produce
Utilize the water treatment method of this system may further comprise the steps:
1) pending sewage carries out pre-treatment through thickness grid and settling pit, removes floating matter and fine sand particle, to guarantee the normal operation of follow-up processing flow;
2) this water enters the A section aeration tank of the biological absorbing unit of A section of adsorption biodegradation then, removes suspended particle (SS) and organism (BOD) in this water, the while denitrogenation dephosphorizing;
3) this sewage continues the A section settling tank by the biological absorbing unit of A section of adsorption biodegradation, and (summer, A section aeration tank is aeration or a small amount of aeration not in order to save energy consumption to make cotton-shaped active sludge in this water and inorganic suspended particles precipitation; Winter, normal aeration was biological absorbing unit operation according to the A section of adsorption biodegradation in order to ensure running effect);
4) water outlet of this settling tank enters into the undercurrent gravel bed artificial swamp; The water outlet of artificial swamp is through qualified discharge behind the contact sterilizing.
The hydraulic detention time of above-mentioned A section aeration tank is 30min~50min, and sludge loading reaches 4.0kgBOD 5/ kgMLSSd~6.0kgBOD 5/ kgMLSSd, dissolved oxygen are 0.5mg/l~1.5mg/l; A section settling tank hydraulic surface loading is 1.1m 3/ m 2H~1.3m 3/ m 2H, hydraulic detention time are 1.4h~2.0h.
Above-mentioned steps 3) comprise also in that the sedimentary mud of a part that will produce is back to A section aeration tank, return sludge ratio is 50%~75%; Excess sludge is drained (but landfill or fertile as farming) after handling through belt thickening all-in-one.
Effective gravel bed system degree of depth of undercurrent type gravel bed system artificial swamp of the present invention is 0.8~1.0m, and hydraulic detention time is 1.0d~1.5d, and the water inlet volumetric loading is 0.07kgBOD 5/ m 2D~0.10kgBOD 5/ m 2D.
Embodiment 1
The sewage disposal scale of present embodiment is 2.0 ten thousand m 3/ d, intaking is the sanitary sewage in cities and towns.
The sewage water treatment method of present embodiment may further comprise the steps:
1) pending sewage at first carries out pre-treatment through thickness grid and settling pit, removes floating matter and fine sand particle (thickness grid and settling pit are the conventional equipment of water treatment) in this sewage;
2) this water enters the A section aeration tank of the biological absorbing unit of A section of adsorption biodegradation then, removes suspended particle (SS) and organism (BOD) in this water, the while denitrogenation dephosphorizing; The parameter that adopt the A section aeration tank of present embodiment is: hydraulic detention time 30min, sludge loading 6.0kgBOD 5/ kgMLSSd, dissolved oxygen are 0.5mg/l;
3) this sewage continues the A section settling tank by the A section of adsorption biodegradation, makes cotton-shaped active sludge and inorganic suspended particles precipitation in this water; Its hydraulic surface loading of A section settling tank of present embodiment is 1.3m 3/ m 2H, hydraulic detention time are 1.4h;
Comprise also that in step 3) the sedimentary mud of a part that will produce is back to A section aeration tank, return sludge ratio is 50%~75%; Excess sludge is drained after handling through belt thickening all-in-one, but landfill or fertile as farming;
4) water outlet of this settling tank enters into the undercurrent gravel bed artificial swamp; The water outlet of artificial swamp gets final product qualified discharge through contact sterilizing; The artificial swamp degree of depth of present embodiment is 1.0m, and hydraulic detention time is 1.5d, and the water inlet volumetric loading is 0.07kgBOD 5/ m 2D.
Behind this engineering operation, obtain good operating performance.A section aeration tank aeration not during summer is pressed the design variable operation winter.After testing, the water outlet in summer and winter all reaches the one-level B standard among " urban wastewater treatment firm pollutant emission standard " GB18918-2002.
Embodiment 2
The sewage disposal scale of present embodiment is 8000m 3/ d, intaking is sanitary sewage and trade effluent, trade effluent accounts for 20% of sewage total amount.
The sewage water treatment method of present embodiment may further comprise the steps:
1) pending sewage at first passes through thickness grid and settling pit, removes floating matter and fine sand particle in this sewage;
2) this water A section of entering adsorption biodegradation is the A section aeration tank of biological absorbing unit then, removes suspended particle (SS) and organism (BOD) in this water, and the parameter that adopt the A section aeration tank of present embodiment is: hydraulic detention time 40min, sludge loading 4.0kgBOD 5/ kgMLSSd, dissolved oxygen are 1.5mg/l;
3) sewage continues the A section settling tank by the A section of adsorption biodegradation, makes cotton-shaped active sludge and inorganic suspended particles precipitation in this water; Its hydraulic surface loading of A section settling tank of present embodiment is 1.1m 3/ m 2H, hydraulic detention time are 2.0h; Sludge handling process is identical with embodiment 1
4) water outlet of settling tank enters into the undercurrent gravel bed artificial swamp, and the water outlet of artificial swamp gets final product qualified discharge through contact sterilizing.The artificial swamp degree of depth of present embodiment is 0.8m, and hydraulic detention time is 1.2d, and the water inlet volumetric loading is 0.08kgBOD 5/ m 2D.
After this engineering debug operation, obtain good operating performance.Aeration rate is reduced in A section aeration tank during summer, presses the design variable operation winter.After testing, water outlet all reaches the one-level A standard among " urban wastewater treatment firm pollutant emission standard " GB18918-2002.
Embodiment 3
The sewage disposal scale is 6000m 3/ d, intaking is sanitary sewage.
The sewage water treatment method of present embodiment may further comprise the steps:
1) pending sewage at first carries out pre-treatment through thickness grid and settling pit, removes floating matter and fine sand particle in this sewage;
2) this water enters the A section aeration tank of the biological absorbing unit of A section of adsorption biodegradation then, removes suspended particle (SS) and organism (BOD) in this water, the while denitrogenation dephosphorizing; The design variable that adopt the A section aeration tank of present embodiment is hydraulic detention time 50min, sludge loading 4.5kgBOD 5/ kgMLSSd, dissolved oxygen are 1.2mg/l;
3) this sewage continues the A section settling tank by the A section of adsorption biodegradation, makes cotton-shaped active sludge and inorganic suspended particles precipitation in this water; The A section settling tank of present embodiment, its hydraulic surface loading is 1.3m 3/ m 2H, hydraulic detention time are 2.0h;
4) water outlet of this settling tank enters into the undercurrent gravel bed artificial swamp; The water outlet of artificial swamp gets final product qualified discharge through contact sterilizing; The artificial swamp degree of depth of present embodiment is 0.8m, and hydraulic detention time is 1.0d, and the water inlet volumetric loading is 0.10kgBOD 5/ m 2D; The water outlet of artificial swamp gets final product qualified discharge through contact sterilizing.Sludge handling process is identical with embodiment 1.
After this engineering debug operation, obtain good operating performance.After testing, water outlet all reaches the one-level A standard among " urban wastewater treatment firm pollutant emission standard " GB18918-2002.

Claims (7)

1. the town sewage treatment system that combines of biological absorption and artificial swamp, it is characterized in that, this Sewage treatment systems comprises thickness grid and settling pit, the A section aeration tank and the A section settling tank of the biological absorbing unit of the A section of adsorption biodegradation, the undercurrent gravel bed artificial swamp, and the pipeline that is used to connect each equipment, its annexation is: thickness grid and settling pit are provided with sewage inlet and water outlet, the water outlet of thickness grid and settling pit links to each other with the water-in of A section aeration tank, the water outlet of A section aeration tank links to each other with the water-in of A section settling tank, the water outlet of A section settling tank links to each other with the water-in of undercurrent gravel bed artificial swamp, the sludge outlet that is arranged on this A section settling tank bottom links to each other with the mud import of A section aeration tank, and this sludge outlet links to each other with device for dehydrating sladge waste by pipeline simultaneously.
2. town sewage treatment system as claimed in claim 1 is characterized in that, is provided with the aerating apparatus that links to each other with the air blast machine room in described A section aeration tank, and is provided with water contact sterilizing unit at the water outlet of artificial swamp.
3. sewage water treatment method that adopts town sewage treatment system as claimed in claim 1 is characterized in that this method may further comprise the steps:
1) pending sewage carries out pre-treatment through thickness grid and settling pit, removes floating matter and fine sand particle;
2) this water enters the A section aeration tank of the biological absorbing unit of A section of adsorption biodegradation then, removes suspended particle and organism in this water, simultaneously denitrogenation dephosphorizing;
3) this sewage continues the A section settling tank by the biological absorbing unit of A section of adsorption biodegradation, makes cotton-shaped active sludge and inorganic suspended particles precipitation in this water;
4) water outlet of this settling tank enters into the undercurrent gravel bed artificial swamp; The water outlet of artificial swamp is through qualified discharge behind the contact sterilizing.
4. method as claimed in claim 3 is characterized in that, the hydraulic detention time of described A section aeration tank is 30min~50min, and sludge loading reaches 4.0kgBOD 5/ kgMLSSd~6.0kgBOD 5/ kgMLSSd, dissolved oxygen are 0.5mg/l~1.5mg/l.
5. method as claimed in claim 3 is characterized in that, described A section settling tank hydraulic surface loading is 1.1m 3/ m 2H~1.3m 3/ m 2H, hydraulic detention time are 1.4h~2.0h.
6. method as claimed in claim 3 is characterized in that, also comprises the sedimentary mud of a part that will the produce full A section aeration tank of refluxing in the described step 3), and return sludge ratio is 50%~75%; Excess sludge is drained after handling through belt thickening all-in-one.
7. method as claimed in claim 3 is characterized in that, effective gravel bed system degree of depth of described undercurrent type gravel bed system artificial swamp is 0.8m~1.0m, and hydraulic detention time is 1.0d~1.5d, and the water inlet volumetric loading is 0.07kgBOD 5/ m 2D~0.10kgBOD 5/ m 2D.
CNB2006101440269A 2006-11-24 2006-11-24 Biological adsorption and artificial wetland combined town sewage treatment system and method Expired - Fee Related CN100417606C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006101440269A CN100417606C (en) 2006-11-24 2006-11-24 Biological adsorption and artificial wetland combined town sewage treatment system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006101440269A CN100417606C (en) 2006-11-24 2006-11-24 Biological adsorption and artificial wetland combined town sewage treatment system and method

Publications (2)

Publication Number Publication Date
CN1966424A CN1966424A (en) 2007-05-23
CN100417606C true CN100417606C (en) 2008-09-10

Family

ID=38075442

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006101440269A Expired - Fee Related CN100417606C (en) 2006-11-24 2006-11-24 Biological adsorption and artificial wetland combined town sewage treatment system and method

Country Status (1)

Country Link
CN (1) CN100417606C (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100398466C (en) * 2007-07-20 2008-07-02 北京市水利科学研究所 North low-temperature area undercurrent artificial wetland winter operation method
JP5443059B2 (en) * 2009-05-29 2014-03-19 株式会社東芝 Water treatment equipment
CN102603116B (en) * 2012-03-07 2013-07-24 光大环保科技发展(北京)有限公司 Distribution treatment combination technological method for domestic sewage of small-sized towns
CN106045208A (en) * 2016-07-12 2016-10-26 佛山杰致信息科技有限公司 Domestic sewage treatment method
CN108147624A (en) * 2018-01-25 2018-06-12 南昌工程学院 A kind of processing method of country sewage
CN108483827B (en) * 2018-06-15 2023-10-27 王一然 Treatment and purification system for urban rain water channel main channel effluent
CN109179907B (en) * 2018-10-27 2023-09-26 河北雄安德荫源环境科技有限公司 Domestic sewage ecological treatment system for summer
CN109354206A (en) * 2018-12-10 2019-02-19 佛山科学技术学院 A kind of method of Sewage treatment in constructed wetland
CN112811734A (en) * 2021-01-14 2021-05-18 山东大学 Biological-ecological coupling sewage treatment device and method
CN113845233A (en) * 2021-11-04 2021-12-28 盐城师范学院 Adjustable anti-blocking wetland system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002094719A1 (en) * 2001-05-21 2002-11-28 Mitsubishi Denki Kabushiki Kaisha Process and apparatus for treating nitrogen compound containing water
CN1392108A (en) * 2002-07-22 2003-01-22 吴桐 Ecological treating method of waste water in wet land for residential area
US20050082222A1 (en) * 2003-10-20 2005-04-21 Dharma Living Systems, Lc Tidal vertical flow wastewater treatment system and method
CN1752033A (en) * 2004-09-23 2006-03-29 袁伟刚 High efficiency method of treating household sewage by artificial wet land

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002094719A1 (en) * 2001-05-21 2002-11-28 Mitsubishi Denki Kabushiki Kaisha Process and apparatus for treating nitrogen compound containing water
CN1392108A (en) * 2002-07-22 2003-01-22 吴桐 Ecological treating method of waste water in wet land for residential area
US20050082222A1 (en) * 2003-10-20 2005-04-21 Dharma Living Systems, Lc Tidal vertical flow wastewater treatment system and method
CN1752033A (en) * 2004-09-23 2006-03-29 袁伟刚 High efficiency method of treating household sewage by artificial wet land

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
AB法污水处理工艺. 刘晓强等.科技情报开发与经济,第15卷第16期. 2005
AB法污水处理工艺. 刘晓强等.科技情报开发与经济,第15卷第16期. 2005 *

Also Published As

Publication number Publication date
CN1966424A (en) 2007-05-23

Similar Documents

Publication Publication Date Title
CN100417606C (en) Biological adsorption and artificial wetland combined town sewage treatment system and method
CN210825844U (en) Compound sewage treatment system
CN100400438C (en) Nutrient-rich river-lake water body and initial rainwater composite artificial wet land treating system
CN104176880B (en) Plural serial stage modularity domestic sewage processing system and domestic sewage processing method
CN101928097B (en) Domestic sewage treatment system for ecological residential quarter
CN110550829B (en) Tower ecological purification integrated device of little town domestic sewage
CN110386736A (en) A kind of sewage treatment nitrogen phosphorus advanced treatment system and its processing method
CN204039221U (en) A kind of biomembrance process four pond purification system of rural domestic sewage treatment
CN202988927U (en) Biological wetland treatment device for domestic sewage
CN101973679B (en) Distributed sewage treatment and regeneration technology
CN101781060A (en) Composite artificial marsh sewage treatment system
CN101921044B (en) Two-stage anaerobic-tower type filter chamber livestock/poultry wastewater treatment system and treatment process
CN102976548A (en) Zero emission district sewage resource treatment apparatus
Mažeikienė Improving small-scale wastewater treatment plant performance by using a filtering tertiary treatment unit
CN106115904A (en) A kind of device and method utilizing microorganism in situ to excite quickly process black and odorous water
CN110092543B (en) Environment-friendly treatment method for tail water of urban sewage treatment plant by using algae pond, artificial wetland and ecological pond
Gao et al. Comparison of nitrogen and phosphorus removal efficiency between two types of baffled vertical flow constructed wetlands planted with Oenanthe Javanica
CN104016484B (en) A kind of for removing nitrogen phosphorus and antibiotic upwelling artificial swamp in breeding wastewater
CN204981512U (en) Pig farm effluent treatment plant
CN104150715A (en) Sewage treatment device by combining tidal current artificial marsh and soil percolation system and method thereof
CN206447733U (en) A kind of oil-containing sewage treatment system
CN105152467A (en) Intensive deep decontamination and denitrification treatment system and method for domestic sewage
CN105036450A (en) Method and device of treating village domestic sewage through three-stage circular-flow-type constructed wetland
CN111253001A (en) Domestic sewage treatment device and treatment method thereof
CN105174619A (en) Method for treating rural domestic sewage

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080910

Termination date: 20151124