CN100387796C - 自动液压爬升模板 - Google Patents
自动液压爬升模板 Download PDFInfo
- Publication number
- CN100387796C CN100387796C CNB2006102008234A CN200610200823A CN100387796C CN 100387796 C CN100387796 C CN 100387796C CN B2006102008234 A CNB2006102008234 A CN B2006102008234A CN 200610200823 A CN200610200823 A CN 200610200823A CN 100387796 C CN100387796 C CN 100387796C
- Authority
- CN
- China
- Prior art keywords
- guide rail
- force
- bearing
- template
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006102008234A CN100387796C (zh) | 2006-08-28 | 2006-08-28 | 自动液压爬升模板 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006102008234A CN100387796C (zh) | 2006-08-28 | 2006-08-28 | 自动液压爬升模板 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1912314A CN1912314A (zh) | 2007-02-14 |
CN100387796C true CN100387796C (zh) | 2008-05-14 |
Family
ID=37721353
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006102008234A Expired - Fee Related CN100387796C (zh) | 2006-08-28 | 2006-08-28 | 自动液压爬升模板 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100387796C (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101582573B (zh) * | 2009-07-03 | 2011-01-26 | 江苏省电力公司常州供电公司 | 自动升降式带电作业用绝缘平台 |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102007018851A1 (de) * | 2007-04-20 | 2008-10-30 | Doka Industrie Gmbh | Führungsschuh und Kombination eines Führungsschuhs mit einem Kletterprofil |
DE102008015682A1 (de) * | 2008-03-25 | 2009-10-08 | Peri Gmbh | Schienengeführtes Selbstkletterschalungssystem mit Kletterschienen-Verlängerungsstücken |
WO2011032322A1 (zh) * | 2009-09-21 | 2011-03-24 | 珠海市晶艺玻璃工程有限公司 | 用于建筑物的提升系统 |
CN102071798B (zh) * | 2011-01-30 | 2012-01-04 | 中建三局建设工程股份有限公司 | 附壁支撑架液压爬升系统 |
CN102345381B (zh) * | 2011-10-12 | 2013-08-14 | 四川路桥建设股份有限公司 | 液压爬模系统及爬模施工方法 |
CN102444276B (zh) * | 2011-12-20 | 2014-03-05 | 中国葛洲坝集团股份有限公司 | 液压爬升模板辅助调整方法 |
CN103046472A (zh) * | 2013-01-15 | 2013-04-17 | 中国土木工程集团有限公司 | 一体式轨道模板结构及其使用方法 |
CN103840398B (zh) * | 2014-03-05 | 2016-06-29 | 国家电网公司 | 配电水泥杆带电操作平台 |
CN105507152B (zh) * | 2015-11-26 | 2017-08-25 | 柳州欧维姆机械股份有限公司 | 一种建筑高墩自提升步履式模板施工方法 |
CN105908966B (zh) * | 2016-06-02 | 2017-12-22 | 中国建筑第八工程局有限公司 | 用于斜墙施工的爬模系统及其施工方法 |
CN109989350A (zh) * | 2019-03-26 | 2019-07-09 | 中铁七局集团有限公司 | 一种大桥索塔施工方法 |
CN110644376B (zh) * | 2019-10-14 | 2021-04-27 | 中交武汉港湾工程设计研究院有限公司 | 斜塔柱内模支架自动爬升装置 |
CN113233287B (zh) * | 2021-04-25 | 2023-03-07 | 陈汇辉 | 一种具有高稳定性的可自动爬升的模板吊装系统 |
CN113550557A (zh) * | 2021-07-27 | 2021-10-26 | 中国建筑一局(集团)有限公司 | 一种用于高层建筑施工的爬模及液压爬模施工工艺 |
CN113550556A (zh) * | 2021-07-27 | 2021-10-26 | 中国建筑一局(集团)有限公司 | 一种用于高层建筑施工的爬模 |
CN116931504B (zh) * | 2023-08-25 | 2024-04-09 | 江苏墨者科技有限公司 | Plc闭环智能控制系统及设备 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1054136A (ja) * | 1996-08-09 | 1998-02-24 | Kajima Corp | スリップフォーム工法における架構システム |
US6260311B1 (en) * | 1999-02-11 | 2001-07-17 | Peter Vladikovic | Concrete form suspension system and method |
GB2366828A (en) * | 2000-09-11 | 2002-03-20 | Gerard Doheny | Automatic formwork climbing system |
CN2660028Y (zh) * | 2003-09-18 | 2004-12-01 | 山东省路桥集团有限公司 | 液压自升爬模 |
CN1769623A (zh) * | 2005-11-07 | 2006-05-10 | 中建一局建设发展公司 | 可升降液压爬升模板及其施工方法 |
-
2006
- 2006-08-28 CN CNB2006102008234A patent/CN100387796C/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1054136A (ja) * | 1996-08-09 | 1998-02-24 | Kajima Corp | スリップフォーム工法における架構システム |
US6260311B1 (en) * | 1999-02-11 | 2001-07-17 | Peter Vladikovic | Concrete form suspension system and method |
GB2366828A (en) * | 2000-09-11 | 2002-03-20 | Gerard Doheny | Automatic formwork climbing system |
CN2660028Y (zh) * | 2003-09-18 | 2004-12-01 | 山东省路桥集团有限公司 | 液压自升爬模 |
CN1769623A (zh) * | 2005-11-07 | 2006-05-10 | 中建一局建设发展公司 | 可升降液压爬升模板及其施工方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101582573B (zh) * | 2009-07-03 | 2011-01-26 | 江苏省电力公司常州供电公司 | 自动升降式带电作业用绝缘平台 |
Also Published As
Publication number | Publication date |
---|---|
CN1912314A (zh) | 2007-02-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100387796C (zh) | 自动液压爬升模板 | |
CN103806644B (zh) | 用于电梯井筒模液压伸缩装置及其运行方法 | |
CN102704674B (zh) | 竖井液压自升模板及施工方法 | |
CN202090591U (zh) | 一种建筑施工升降式爬升模板 | |
KR20100001123U (ko) | 자립 오토 클라이밍장치 및 이를 이용한 자립 오토클라이밍 시스템 | |
CN206110656U (zh) | 电梯井可伸缩折叠式整体提升筒模 | |
CN206680962U (zh) | 液压自升桁架式悬臂重型拱坝模板系统 | |
CN201962944U (zh) | 一种建筑施工液压爬升模板 | |
CN112458918A (zh) | 一种高墩液压顶升整体式钢架平台翻模施工系统及施工方法 | |
CN108252504A (zh) | 剪力墙筒体混凝土结构大模板提升式施工方法及施工装置 | |
KR100647977B1 (ko) | 탈부착되는 실린더와 이동되는 펌프가 구비된 거푸집작업발판의 인양방법 | |
CN201703943U (zh) | 液压爬升楼梯 | |
CN110552507A (zh) | 一种井道自爬升的混凝土自动布料系统 | |
KR20090020246A (ko) | 자립 오토 클라이밍 시스템 및 이를 이용한 방법 | |
CN202347842U (zh) | 一种高层建筑液压爬升模板装置 | |
CN108118620A (zh) | 用于桥塔施工的整体自爬式集成平台及其施工方法 | |
CN109252656B (zh) | 高层建筑爬升模板及组装、灌注和提升方法 | |
CN203200664U (zh) | 变截面空心高墩滑模施工装置 | |
CN113216587A (zh) | 一种高层建筑外墙施工操作平台固定结构及其施工方法 | |
CN207727440U (zh) | 用于桥塔施工的整体自爬式集成平台 | |
CN208949720U (zh) | 一种用于桥塔施工的自爬式支承顶升系统 | |
CN208152583U (zh) | 一种高层建筑施工辅助设备 | |
CN1020645C (zh) | 超高建筑模具外脚手整体升降系统 | |
CN211714541U (zh) | 电梯井内剪力墙模板安装专用操作架 | |
WO2017054724A1 (zh) | 凹字型楼层成型装置的吊装设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Hebei Zhuozhou three bridge template Manufacturing Co., Ltd. Assignor: Yang Qiuli Contract fulfillment period: 2009.8.20 to 2015.8.20 contract change Contract record no.: 2009130000227 Denomination of invention: Automatic hydraulic climbing shuttering Granted publication date: 20080514 License type: Exclusive license Record date: 20091027 |
|
LIC | Patent licence contract for exploitation submitted for record |
Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.8.20 TO 2015.8.20; CHANGE OF CONTRACT Name of requester: HEBEI PROVINCE ZHUOZHOU CITY SANBO BRIDGE FORMWORK Effective date: 20091027 |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080514 Termination date: 20150828 |
|
EXPY | Termination of patent right or utility model |