CN100387796C - 自动液压爬升模板 - Google Patents

自动液压爬升模板 Download PDF

Info

Publication number
CN100387796C
CN100387796C CNB2006102008234A CN200610200823A CN100387796C CN 100387796 C CN100387796 C CN 100387796C CN B2006102008234 A CNB2006102008234 A CN B2006102008234A CN 200610200823 A CN200610200823 A CN 200610200823A CN 100387796 C CN100387796 C CN 100387796C
Authority
CN
China
Prior art keywords
guide rail
force
bearing
template
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2006102008234A
Other languages
English (en)
Other versions
CN1912314A (zh
Inventor
杨秋利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB2006102008234A priority Critical patent/CN100387796C/zh
Publication of CN1912314A publication Critical patent/CN1912314A/zh
Application granted granted Critical
Publication of CN100387796C publication Critical patent/CN100387796C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

一种自动液压爬升模板,包括附墙连接的导轨、与导轨连接的移动横梁、移动横梁上方连接的模板系统、移动横梁下面连接的液压提升系统和操作平台,其导轨每隔一段由附墙装置与墙体连接,导轨上均匀分布有踏步块;液压油缸上下端分别与上、下爬升箱连接,上、下爬升箱的箱体内侧面有一与导轨滑动连接的凹形滑槽,爬升箱内的承力块与旋转手柄连接,承力块的导向面为中间平、两边斜的梯形折面,两斜面分别与上承力面和下承力面相交为直角,旋转手柄与其箱体外侧之间连接一压簧。本发明不仅可以爬升模板,也可以爬升导轨,施工周期短,安全性明显提高,节省了模板用量。应用于桥梁、电视塔、烟筒、高层和超高层建筑物的爬升。

Description

自动液压爬升模板
(一)技术领域
本发明涉及一种高层或超高层建筑施工模板爬升装置。
(二)背景技术
模板爬升装置是一种将模板依附在建筑结构上,随着结构施工而逐层提升的装置,适用于高层建筑或高耸构造物现浇钢筋混凝土竖向结构施工。传统的模板爬升装置有液压滑模装置、电动爬架装置、普通爬模装置和翻模装置,普通爬模装置需要吊装设备才能爬升到下一个工作面,爬架又只能爬升导轨,不能爬升模板,结构复杂,施工周期长,混凝土外观质量不好,安全性、操作性不理想,模板用量较多,效率较低,且造价较高。传统的滑模装置不能间断施工,混凝土表面粗糙,操作人员要具备较高的专业知识。
(三)发明内容
本发明的目的是提供一种自动液压爬升模板,要解决高层或超高层建筑模板爬升需要吊装设备才能爬升到下一个工作面的问题,并解决传统爬架只能爬升导轨、不能爬升模板的问题,还同时解决传统的模板爬升装置结构复杂,施工周期长,安全性、操作性不理想、模板用量较多、效率较低、且造价较高的问题。
本发明采用的技术方案:这种自动液压爬升模板,包括附墙连接的导轨、与导轨连接的移动横梁、移动横梁上方连接的模板系统、移动横梁下面连接的液压提升系统和操作平台,其特征在于:导轨每隔一段由附墙装置与墙体连接,导轨上均匀分布有踏步块;
液压油缸上下端分别与上、下爬升箱连接,上、下爬升箱的箱体内侧面有一与导轨滑动连接的凹形滑槽;爬升箱的箱体两侧箱壁之间有一销轴,销轴穿过承力块中心的销孔和旋转手柄,承力块的导向面为中间平、两边斜的梯形折面,两斜面分别与上承力面和下承力面相交为直角,承力块与旋转手柄通过小销轴固定连接,旋转手柄与其箱体外侧之间连接一压簧。
上述模板系统包括模板支架、与模板支架连接的模板、与移动磺梁连接的调节支撑。
上述操作平台包括主立撑、调节斜撑、爬梯,该操作平台下面还连接下工作平台。
上述压簧外面套有压簧套。
本发明与传统工艺相比所具有的有益效果:本发明通过液压系统沿附墙导轨、从一个以浇注好的混凝土工作面,自动的把模板系统、操作平台、绑扎钢筋用的工作平台、开合模板支架、一次或多次提升到下一个工作面。当结构工程混凝土达到拆模强度而脱模后,模板不落地,依靠机械设备和支撑物将模板和爬模装置向上爬升一层,定位紧固,反复循环施工。本发明把模板系统、模板支架和工作平台、液压系统、电控系统、附墙装置,爬升装置合理组成一体。自动的完成每一循环的模板系统、模板支架、工作平台的升降,与传统工艺相比提高效率50%,省去专门转运的塔吊,总体成本降低,节省了材料和时间。
本发明在液压油缸两端连接上下两个爬升箱,爬升箱内的承力块具有上承力面和下承力面,不仅可以爬升模板,也可以爬升导轨,具有操作简单、运行安全的特点。比传统施工工艺节约大量的工时及转运的吊装设备,爬模系统与模板系统同步爬升,与滑模、翻模工艺相比,模板用量少近40%,施工周期短,混凝土外观质量好,其安全性、操作性明显提高。
本发明克服了普通爬模需要吊装设备才能爬升到下一个工作面的麻烦,省去了专门转运的塔吊,总体成本降低,解决了爬架只能爬升导轨,不能爬升模板的不足。主要应用于桥梁的墩柱、了望塔、电视塔、烟筒、高层和超高层楼房等建筑物的内外模板的爬升、工作平台的独立爬升。
(四)附图说明
图1是本发明的结构示意图;
图2是本发明的侧面结构示意图;
图3是本发明爬升模板时液压提升系统的结构示意图;
图4是本发明爬升导轨时液压提升系统的结构示意图;
图5是本发明爬升模板时的承力块结构图;
图6是本发明爬升导轨时的承力块结构图;
图7是本发明的下爬升箱的主视图;
图8是本发明的下爬升箱的仰视图。
图中:1-模板,2-墙体,3-附墙装置,4-导轨,5-液压油缸,6-下爬升箱,7-踏步块,8-上爬升箱,9下工作平台,10-爬梯,11-调节斜撑,12-主立撑,13-移动横梁,14-调节支撑,15-模板支架。
61-承力块,611-导向面,612-上承力面,613-下承力面,614-大销孔,615-小销孔,
62-销轴,63-箱体,64压簧套,65-压簧,66挂耳,67-旋转手柄,68-滑槽,69-连接孔。
(五)具体实施方式
实施例参见图1、图2,这种自动液压爬升模板,包括附墙连接的导轨4、与导轨连接的移动横梁13、移动横梁上方连接的模板系统、移动横梁下面连接的液压提升系统和操作平台,导轨4每隔一段由附墙装置3与墙体2连接,导轨上均匀分布有踏步块7。上述模板系统包括模板支架15、与模板支架15连接的模板1、与移动横梁13连接的调节支撑14。上述操作平台包括主立撑12、调节斜撑11、爬梯10,该操作平台下面还连接下工作平台9。
参见图3-8,液压油缸5的上下端分别与上爬升箱8、下爬升箱6连接,上、下爬升箱的箱体63内侧面有一与导轨4滑动连接的凹形滑槽68,爬升箱的箱体两侧箱壁之间有一销轴62,销轴穿过承力块中心的大销孔614和旋转手柄67。承力块与旋转手柄用小销轴穿过小销孔615固定连接,旋转手柄67与箱体外侧的挂耳66之间连接一压簧65,压簧外面还可套有压簧套64。
参见图5,图6,承力块61的导向面611为中间平、两边斜的梯形折面,两斜面即梯形两腰分别与上承力面612和下承力面613相交为直角,承力块中心开有用于连接爬升箱箱体的大销孔614和用于连接旋转手柄的小销孔615。
参见图7,图8,下爬升箱的箱体63两侧箱壁之间有一用于连接承力块和旋转手柄的销轴62,箱体63内侧面有一用于与导轨滑动连接的凹形滑槽68,箱体外侧有一用于连接压簧的挂耳66,箱体上部开有一用于连接液压油缸的连接孔69。箱体内当然可以还可有一些加强肋,箱体的横截面可以是矩形或梯形。
本发明的工作步骤:第一步,支模,浇注混凝土,第二步,安装附墙装置、附墙导轨和模板支架;第三步,合模,浇注混凝土;第四步,退模,吊装导轨;第五步,固定导轨,用液压系统爬升模板;第六步,合模,浇注混凝土;第七步,安装附墙装置,提升导轨,爬升模板;第八步,清理模板,合模,振捣混凝土,一个循环结束。
参见图3、5,爬升模板的工作过程:旋转手柄67绕销轴向下转动,下爬升箱6中的承力块61下承力面613压在导轨的踏步块7上面,由压簧提供压紧力;液压油缸5向上伸出,顶升移动横梁,从而带动模板爬升;到位后上爬升箱8中承力块压在导轨的踏步块上面,模板上升一个高度;液压油缸5收缩,提升下爬升箱6,使它到上一个踏步块上面,完成一个工作循环,如此循环直到模板爬升到位。
参见图4、6,爬升导轨的工作过程:旋转手柄67绕销轴向上转动,使下爬升箱中的承力块61的上承力面612支撑在导轨的踏步块7下面,由压簧提供压紧力;上爬升箱8不动,液压油缸5上下伸展、收缩运动,带动导轨4提升;到位后,上爬升箱中的承力块支撑导轨;完成一个工作循环,如此循环直到导轨爬升到位。

Claims (4)

1.一种自动液压爬升模板,包括附墙连接的导轨、与导轨连接的移动横梁、移动横梁上方连接的模板系统、移动横梁下面连接的液压提升系统和操作平台,其特征在于:导轨每隔一段由附墙装置与墙体连接,导轨上均匀分布有踏步块;
液压油缸上下端分别与上、下爬升箱连接,上、下爬升箱的箱体内侧面有一与导轨滑动连接的凹形滑槽;爬升箱的箱体两侧箱壁之间有一销轴,销轴穿过承力块中心的销孔和旋转手柄,承力块的导向面为中间平、两边斜的梯形折面,两斜面分别与上承力面和下承力面相交为直角,承力块与旋转手柄通过小销轴固定连接,旋转手柄与其箱体外侧之间连接一压簧。
2.根据权利要求1所述的自动液压爬升模板,其特征在于:上述模板系统包括模板支架、与模板支架连接的模板、与移动横梁连接的调节支撑。
3.根据权利要求1或2所述的自动液压爬升模板,其特征在于:上述操作平台包括主立撑、调节斜撑、爬梯,该操作平台下面还连接下工作平台。
4.根据权利要求1或2所述的自动液压爬升模板,其特征在于:上述压簧外面套有压簧套。
CNB2006102008234A 2006-08-28 2006-08-28 自动液压爬升模板 Expired - Fee Related CN100387796C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006102008234A CN100387796C (zh) 2006-08-28 2006-08-28 自动液压爬升模板

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006102008234A CN100387796C (zh) 2006-08-28 2006-08-28 自动液压爬升模板

Publications (2)

Publication Number Publication Date
CN1912314A CN1912314A (zh) 2007-02-14
CN100387796C true CN100387796C (zh) 2008-05-14

Family

ID=37721353

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006102008234A Expired - Fee Related CN100387796C (zh) 2006-08-28 2006-08-28 自动液压爬升模板

Country Status (1)

Country Link
CN (1) CN100387796C (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101582573B (zh) * 2009-07-03 2011-01-26 江苏省电力公司常州供电公司 自动升降式带电作业用绝缘平台

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102007018851A1 (de) * 2007-04-20 2008-10-30 Doka Industrie Gmbh Führungsschuh und Kombination eines Führungsschuhs mit einem Kletterprofil
DE102008015682A1 (de) * 2008-03-25 2009-10-08 Peri Gmbh Schienengeführtes Selbstkletterschalungssystem mit Kletterschienen-Verlängerungsstücken
WO2011032322A1 (zh) * 2009-09-21 2011-03-24 珠海市晶艺玻璃工程有限公司 用于建筑物的提升系统
CN102071798B (zh) * 2011-01-30 2012-01-04 中建三局建设工程股份有限公司 附壁支撑架液压爬升系统
CN102345381B (zh) * 2011-10-12 2013-08-14 四川路桥建设股份有限公司 液压爬模系统及爬模施工方法
CN102444276B (zh) * 2011-12-20 2014-03-05 中国葛洲坝集团股份有限公司 液压爬升模板辅助调整方法
CN103046472A (zh) * 2013-01-15 2013-04-17 中国土木工程集团有限公司 一体式轨道模板结构及其使用方法
CN103840398B (zh) * 2014-03-05 2016-06-29 国家电网公司 配电水泥杆带电操作平台
CN105507152B (zh) * 2015-11-26 2017-08-25 柳州欧维姆机械股份有限公司 一种建筑高墩自提升步履式模板施工方法
CN105908966B (zh) * 2016-06-02 2017-12-22 中国建筑第八工程局有限公司 用于斜墙施工的爬模系统及其施工方法
CN109989350A (zh) * 2019-03-26 2019-07-09 中铁七局集团有限公司 一种大桥索塔施工方法
CN110644376B (zh) * 2019-10-14 2021-04-27 中交武汉港湾工程设计研究院有限公司 斜塔柱内模支架自动爬升装置
CN113233287B (zh) * 2021-04-25 2023-03-07 陈汇辉 一种具有高稳定性的可自动爬升的模板吊装系统
CN113550557A (zh) * 2021-07-27 2021-10-26 中国建筑一局(集团)有限公司 一种用于高层建筑施工的爬模及液压爬模施工工艺
CN113550556A (zh) * 2021-07-27 2021-10-26 中国建筑一局(集团)有限公司 一种用于高层建筑施工的爬模
CN116931504B (zh) * 2023-08-25 2024-04-09 江苏墨者科技有限公司 Plc闭环智能控制系统及设备

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1054136A (ja) * 1996-08-09 1998-02-24 Kajima Corp スリップフォーム工法における架構システム
US6260311B1 (en) * 1999-02-11 2001-07-17 Peter Vladikovic Concrete form suspension system and method
GB2366828A (en) * 2000-09-11 2002-03-20 Gerard Doheny Automatic formwork climbing system
CN2660028Y (zh) * 2003-09-18 2004-12-01 山东省路桥集团有限公司 液压自升爬模
CN1769623A (zh) * 2005-11-07 2006-05-10 中建一局建设发展公司 可升降液压爬升模板及其施工方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1054136A (ja) * 1996-08-09 1998-02-24 Kajima Corp スリップフォーム工法における架構システム
US6260311B1 (en) * 1999-02-11 2001-07-17 Peter Vladikovic Concrete form suspension system and method
GB2366828A (en) * 2000-09-11 2002-03-20 Gerard Doheny Automatic formwork climbing system
CN2660028Y (zh) * 2003-09-18 2004-12-01 山东省路桥集团有限公司 液压自升爬模
CN1769623A (zh) * 2005-11-07 2006-05-10 中建一局建设发展公司 可升降液压爬升模板及其施工方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101582573B (zh) * 2009-07-03 2011-01-26 江苏省电力公司常州供电公司 自动升降式带电作业用绝缘平台

Also Published As

Publication number Publication date
CN1912314A (zh) 2007-02-14

Similar Documents

Publication Publication Date Title
CN100387796C (zh) 自动液压爬升模板
CN103806644B (zh) 用于电梯井筒模液压伸缩装置及其运行方法
CN102704674B (zh) 竖井液压自升模板及施工方法
CN202090591U (zh) 一种建筑施工升降式爬升模板
KR20100001123U (ko) 자립 오토 클라이밍장치 및 이를 이용한 자립 오토클라이밍 시스템
CN206110656U (zh) 电梯井可伸缩折叠式整体提升筒模
CN206680962U (zh) 液压自升桁架式悬臂重型拱坝模板系统
CN201962944U (zh) 一种建筑施工液压爬升模板
CN112458918A (zh) 一种高墩液压顶升整体式钢架平台翻模施工系统及施工方法
CN108252504A (zh) 剪力墙筒体混凝土结构大模板提升式施工方法及施工装置
KR100647977B1 (ko) 탈부착되는 실린더와 이동되는 펌프가 구비된 거푸집작업발판의 인양방법
CN201703943U (zh) 液压爬升楼梯
CN110552507A (zh) 一种井道自爬升的混凝土自动布料系统
KR20090020246A (ko) 자립 오토 클라이밍 시스템 및 이를 이용한 방법
CN202347842U (zh) 一种高层建筑液压爬升模板装置
CN108118620A (zh) 用于桥塔施工的整体自爬式集成平台及其施工方法
CN109252656B (zh) 高层建筑爬升模板及组装、灌注和提升方法
CN203200664U (zh) 变截面空心高墩滑模施工装置
CN113216587A (zh) 一种高层建筑外墙施工操作平台固定结构及其施工方法
CN207727440U (zh) 用于桥塔施工的整体自爬式集成平台
CN208949720U (zh) 一种用于桥塔施工的自爬式支承顶升系统
CN208152583U (zh) 一种高层建筑施工辅助设备
CN1020645C (zh) 超高建筑模具外脚手整体升降系统
CN211714541U (zh) 电梯井内剪力墙模板安装专用操作架
WO2017054724A1 (zh) 凹字型楼层成型装置的吊装设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hebei Zhuozhou three bridge template Manufacturing Co., Ltd.

Assignor: Yang Qiuli

Contract fulfillment period: 2009.8.20 to 2015.8.20 contract change

Contract record no.: 2009130000227

Denomination of invention: Automatic hydraulic climbing shuttering

Granted publication date: 20080514

License type: Exclusive license

Record date: 20091027

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2009.8.20 TO 2015.8.20; CHANGE OF CONTRACT

Name of requester: HEBEI PROVINCE ZHUOZHOU CITY SANBO BRIDGE FORMWORK

Effective date: 20091027

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080514

Termination date: 20150828

EXPY Termination of patent right or utility model