CH309853A - Method of tamping metal railway sleepers and equipment for implementing this method. - Google Patents

Method of tamping metal railway sleepers and equipment for implementing this method.

Info

Publication number
CH309853A
CH309853A CH309853DA CH309853A CH 309853 A CH309853 A CH 309853A CH 309853D A CH309853D A CH 309853DA CH 309853 A CH309853 A CH 309853A
Authority
CH
Switzerland
Prior art keywords
gravel
cross member
ballast
projection
tank
Prior art date
Application number
Other languages
French (fr)
Inventor
Scheuchzer Auguste
Original Assignee
Scheuchzer Auguste
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Scheuchzer Auguste filed Critical Scheuchzer Auguste
Publication of CH309853A publication Critical patent/CH309853A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/12Packing sleepers, with or without concurrent work on the track; Compacting track-carrying ballast
    • E01B27/13Packing sleepers, with or without concurrent work on the track
    • E01B27/16Sleeper-tamping machines
    • E01B27/18Sleeper-tamping machines by introducing additional fresh material under the sleepers, e.g. by the measured-shovel method, by the blowing method
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2203/00Devices for working the railway-superstructure
    • E01B2203/06Placing ballast
    • E01B2203/067Special methods for posing or quantifying ballast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Description

  

  Procédé de bourrage des traverses métalliques de chemin de fer et appareillage  pour la     mise    en     aeuvre    de ce procédé.    La     présente    invention a pour objet un  procédé de bourrage de traverses métalliques       creues    (le chemin de fer, dont les extrémités       sont.    repliées vers le bas, applicable en     parti-          culier    à des traverses logées dans du     ballast          très    grossier.  



  Ce procédé est caractérisé en ce que l'on  perce les     extrémités        des    traverses au voisinage  (le leur paroi supérieure, soulève chaque     tra-          %-erse        au-dessu,@    du ballast à son niveau correct,  l'orme, dans le ballast, deux barrages situés  (le part et d'autre du milieu de la traverse,       dans    le     volume    engendré par le soulèvement       (le    la     traverse,

      entre la paroi intérieure de       celle-ci    et son     empreinte    dans le ballast     sous-          jaeent,    injecte au moyen d'un fluide     com-          lwimé,    par chaque extrémité     perforée,    du     gra-          ilion    de bourrage en dirigeant ce gravillon  dans le sens longitudinal de la     traverse    de  manière à former un bourrage dans les deux       c,@cité    partielles subsistant. entre chacun     des-          dit,;

          harrage,s    et l'extrémité     correspondante     de la traverse.  



       L'invention    englobe également, un appa  reillage pour la mise en     ceuvre    du procédé  ci-dessus défini. Cet appareillage est.     ea.racté-          risé    en ce qu'il comprend, en outre, des  moyens pour perforer l'extrémité des     traver-          scs    métalliques, un     réservoir    à gravillon dont  le fond creux communique par un raccord       condé    avec une tuyère de projection dans la  quelle débouchent des conduites de fluide    comprimé,

   des moyens pour maintenir la  tuyère de projection engagée     dans    la perfo  ration de la traverse     clans    une position telle  que la projection de gravillon s'effectue avec  une légère composante ascendante, cette posi  tion étant celle. de l'angle optimum et une  pioche comprenant au moins un pic incurvé  dont le côté concave est tourné vers le  manche, afin que l'on puisse introduire ce pic  sous une aile de la traverse et le faire bas  culer vers la paroi supérieure interne de cette  traverse pour former 'le barrage.  



  Le     dessin    annexé représente, à titre  d'exemple, deux     formes    d'exécution et des va  riantes de détail d'un appareillage pour la  mise en ce-Livre du procédé.  



  La.     fig.    1     est    une coupe verticale longitu  dinale partielle d'une traverse métallique et  une vue en élévation de la partie inférieure  d'un réservoir à gravillon avec tuyère de pro  jection en position de     service.     



  La     fig.    2 est une vue en plan d'une sec  tion .de voie avec traverse métallique.  



  La     fig.    3 est une coupe longitudinale ver  ticale partielle d'une traverse plus longue que  dans les     fig.    1 et 2 et une     vue    en élévation  d'un réservoir à.     gravillon    avec tuyère de pro  jection suivant une première     forme    d'exécu  tion.  



  La     fig.    4 est une coupe     transversale        d'une     traverse métallique soulevée     au-dessus    de son  empreinte     dans    le     ballast.         Les     fig.    5 et 6 sont une vue en élévation  et une vue en plan d'une tuyère de projection  amovible.  



  Les     fig.    7 et 8 représentent, en élévation,  de profil et de face, la. partie inférieure d'une       tubulure    de raccord     coudée.     



  Les     fig.    9 et 7.0 représentent, en élévation,  deux positions     particulières    d'une pioche pour  le     tassement    du ballast.  



  La     fig.    11 est- une coupe longitudinale par  tielle d'une     traverse    métallique     avoisinant    un  muret. de quai et une vue en élévation d'un       réservoir    à, gravillon avec tubulure coudée  suivant une deuxième forme d'exécution.  



       La.        fig.    12 est une vue en plan du dessus  du réservoir à gravillon représenté à la.       fig.    11.  



  La     fig.    13 montre en élévation une va  riante de détail.  



  L'appareillage représenté aux     fig.    1 et 3  comprend un réservoir à gravillon cylindri  que 1     présentant.        suivant    une de. se généra  trices une fente d'observation le long de la  quelle est tracée une graduation 2 en unités  de volume. Le fond tronconique creux du ré  servoir 1 communique avec une tubulure de  raccord 3 coudée à angle droit, à l'extrémité  inférieure de laquelle est montée une tuyère  de projection 4.

   Le réservoir 1 porte une  bride latérale 5 dans laquelle est fixé un  tuyau à air comprimé 6 muni d'un robinet  d'admission avec manette 7, branché sur un       troncon    de tube 8     destiné    à. être raccordé à  un     réservoir    d'air     comprimé    non représenté.  Le tube 8     est    équipé d'un manomètre 9. A  son extrémité inférieure, .le tuyau 6 se subdi  vise en deux conduits dont.     les,    orifices 7 et 8.  adjacents, débouchent     dans    la tubulure de  raccord coudée 3, à sa.     partie    inférieure (voir  fi-. 8).  



       Au-dezsus    de la graduation 2, le réservoir  1 porte une poignée de     manaeuvre    9. L'orifice  inférieur de la. tubulure de raccord 3 est. sur  monté d'une oreille 10 portant. une tige file  tée 11 sur laquelle se visse un écrou 12. La  paroi intérieure de cet orifice présente sensi  blement à l'aplomb de l'oreille 10 un goujon  d'arrêt radial 13     (fig.    7 et 8). La. tuyère de    projection 4 visible en détail aux     fig.    5 et 6  comprend une partie cylindrique courte     1.4    à  base circulaire,     raceordée    à une partie termi  nale oblongue 15.

   La partie cylindrique     14     porte     extérieurement    un     erochet    76 destiné à  venir en prise avec la tige filetée 11 de la       tubulure    de raccord 3. Le bord inférieur de  cette partie     cylindrique    74 présente une en  coche 17 destinée à     entrer    en prise     avec.    le  goujon radial 13 (le la     tubulure    de raccord 3,  quand on engage le tronçon     cylindrique    14  dans la partie inférieure 18 de la tubulure  de raccord,

       d'une        quailtité        suffisante    pour  que le crochet 1.6 vienne buter contre l'oreille  10. La tuyère de projection amovible 4 se  monte doue dans la tubulure 3 par un rac  cord à baïonnette.  



  La partie montante de la tubulure de     rae-          cord    3 porte un collier 20 présentant une sail  lie latérale fendue 20', dans laquelle est. fixé  un bouton de support 21 traversant une pla  quette perforée 22 faisant partie d'une chape  23 dans     laquelle    est articulée une extrémité  d'une tringle de maintien 24.     L'autre    extré  mité filetée de cette tringle. 24     est    munie d'un  tendeur 25 terminé par une boucle 26.  



  Cet appareillage comprend encore un cha  lumeau oxhydrique non représenté, néces  saire pour perforer les extrémités des traver  ses     métallique,->        ereuses.     



  Cet appareillage est complété par une pio  che destinée à tasser le ballast à deux en  droits de la cavité engendrée par le soulève  ment de la traverse, pour délimiter la lon  gueur du bourrage. Le manche 28 de cette  pioche porte, à son extrémité inférieure, une  virole 29 venant d'une pièce avec un pie  courbe 30 dont la     forme    est déterminée en  fonction de la forme de la partie intérieure  de la traverse. A l'opposé du pie 30, la. virole  29 présente une     surface    d'appui courbe 31  dont le rôle sera expliqué     plus    loin.  



  On a représenté à la     fi--g.    2, en plan, une  traverse     métallique    que l'on suppose affais  sée et qu'il s'agit de ramener à son     niv        eati     correct.  



  Avant. de procéder au     bourrage    des tra  verses, on peint en général sur     celles-ci    deux      lignes suivant     Tl-T@    pour la moitié droite  et<I>T</I>     3-T4    pour la, moitié gauche. La ligne       Ti-T#,    est située à. une distance a du plan  vertical de symétrie du rail de droite<I>Rd,</I> sen  siblement égale à la distance de ce plan à  l'extrémité droite 36d de la traverse 36.

   De  même,     T3-T4    est à une distance<I>cc.</I> du plan  de symétrie du rail gauche     Rg    et à une dis       lance        :arc    de l'extrémité gauche     36g    de la     tra-          ve?'se.    On rend ainsi visibles les longueurs 2a  suivant     lesquelles    il faut bourrer la. traverse  36. La cote     b    indique la longueur de la ré  gion centrale de la. traverse qui ne doit pas  recevoir de gravillon, les barrages seront. pra  tiqués suivant les lignes     Ti-T..,    et     T3-T4,     comme cela va être expliqué.  



  La première opération du procédé de bour  rage des traverses     consiste    à soulever, au  moyen de vérins non     représentés,    en prise       sous    les rails, une section de voie comprenant  la traverse 36, par exemple. Pendant. cette  opération, la partie 32, en forme de trapèze,  (le la traverse 36, partie délimitée par le pro  fil et une droite reliant ses bords, passe de la  position visible en trait     mixte    à la     fig.    4 jus  qu'à celle représentée en trait. plein,     c'est-          à-dire    que la hauteur du soulèvement peut       être        comprise    généralement entre 15 et 30 mm.

    Cette hauteur du soulèvement     Tz        est    notable  ment inférieure à la hauteur H de l'intérieur  du trapèze 32, à     angles    arrondis, de sorte que  l'écartement entre l'empreinte convexe 33 de  la traverse dans le ballast et la paroi inté  rieure 34 de ladite traverse diminue progres  sivement en passant de la petite base du tra  pèze vers les côtés obliques 35 de     celui-ci,    ce       (lui    favorise le coincement du gravillon sur       les    côtés de cette empreinte.  



  On perfore la     traverse    métallique 36 à ses  deux extrémités repliées vers le bas 36d et       36rj    au ras de sa. paroi supérieure (34) de  manière à obtenir deux perforations     oblon-          ,O'nes    37 et 38.

   Lorsque la traverse 36 a été  soulevée jusqu'à. son niveau correct, on en  fonce le pie 30 de la pioche 28-30     oblique-          ment    dans le ballast B en     suivant    la.     ligne          TI-T.    de la     fig.    2,     1-me    première     fois    dans  le sens de la flèche     Pi    de telle manière que    le pic 30 s'engage     sous    l'aile 40 de la traverse  36.

   La pioche occupe alors la position de la       fig.    9.     Ensuite,    on fait basculer le manche 28       dans    le     sens    de la flèche     FJ,    de sorte que la       portée    d'appui 31 de la virole 29 vient, re  poser sur le ballast B, comme on le voit à la       fig.    10. Cette portée 31 forme un bossage de  basculement pour la pioche dont le pic courbe  30 tasse les morceaux de ballast contre la  paroi interne de la, traverse métallique en y  amorçant un     barrage    D     (fig.    10).

   On retire       ensuite    la pioche et l'enfonce de l'autre côté  de la     traverse    suivant la direction<U>F.;</U> en pro  cédant de façon analogue, on complète le  barrage. On réalise ensuite de la. même fa  çon un deuxième barrage suivant la ligne       T3-T4-          Quand    les barrages sont ainsi terminés,  on raccorde le tuyau 8     (fig.    3) à un réser  voir d'air comprimé et l'on place la tuyère  de projection 45 dans la perforation 37, sui  vant. la position représentée à la     fig.    1.  



  Pour que le réservoir 1 et. la tuyère 45       restent    dans la position correcte de soufflage  sans nécessiter un effort manuel trop grand,  on accroche la boucle 26 à un écrou 46 de  fixation du patin de rail 47. On agit éven  tuellement sur le régulateur de     longueur    25  de manière à engager la tuyère 45 suivant  un angle optimum     dans    l'orifice 37 de la tra  verse, ainsi que pour régler exactement. la po  sition de l'appareillage. La direction de la  tuyère présente une légère composante ascen  dante par     rapport    à la, partie médiane 50 de  la traverse, partie qui est horizontale en l'ab  sence de dévers.

   On ouvre alors le robinet  d'admission d'air comprimé 7, ce qui provoque  instantanément la projection du gravillon du  réservoir 1     dans    le volume engendré par le  soulèvement de la traverse, entre son em  preinte 33 sur le ballast et la paroi intérieure  34 de ladite traverse. Le gravillon projeté  longitudinalement remplit ce volume en quel  ques secondes, sur la longueur comprise entre  la ligne     Tl-T#>    et l'extrémité     36d    de la tra  verse.  



  On procède d'une façon analogue pour  former un     bourrage    de gravillon sous la par-      tue gauche de la traverse, entre la     ligne     <I>Ta</I>     T.4    et l'extrémité gauche     36g.    On a ainsi  obtenu de part et. d'autre et à distance du  plan de     syrnétrie        vertical    transversal     S-8     deux bourrages de gravillon qui soutiennent  la traverse à son niveau correct. Lorsque les  vérins qui ont servi à soulever la voie sont  enlevés, les traverses restent pratiquement an  niveau atteint à la fin de l'opération de bour  rage.  



  Un des principaux avantages du procédé  qui     vient    d'être décrit réside dans le fait qu'il  est inutile .de dégarnir les     traverses    métalli  ques du ballast dans lequel elles reposent.  



  Grâce à la position des perforations 37 et.  38 au ras de la paroi supérieure de la tra  verse, on peut faire passer par chacune de ces       perforations    une tringle de contrôle sur toute  la     longueur    où doit. s'effectuer le soufflage,  ce qui permet de détecter la présence éven  tuelle de pierres du ballast ou de     corps    étran  gers     dans    l'espace réservé au     soufflage.     



       Dans        certains    cas, lorsqu'il s'agit. de bour  rer des traverses     plus    longues que celle re  présentée en     fig.    2, on remplace la tuyère  amovible courte 45 par une tuyère ]on  gue     4-42,    comme on le voit à la     fig.    3. Cette  tuyère     4--42    est. introduite dans la. perfora  tion 37 de la     traverse        suivant    le     troneon    in  cliné 60 de     celle-ci,    ce qui donne une légère  composante ascendante à. la projection de gra  villon.

   En déplaçant. le     réservoir    1 et, par  suite, l'orifice 42 de la tuyère dans le sens       longitudinal    de la traverse, on peut. régler la.  longueur du bourrage.  



  Comme on le voit à. la fi-. 3, les     deux          portées    de contact.     C-F    de la tuyère longue       4.--12    avec la traverse métallique sont. situées  l'une sur la. paroi     intérieure    de la traverse,  l'autre sur le bord inférieur de la perforation  37, à une distance suffisante l'une de     l'autre     pour que     l'ensemble    du réservoir à gravillon,  de la tubulure 3 et de la tuyère     4--12    soit  maintenu en équilibre et en position     correct(-          a-ci-dessus    du ballast, la partie     rectiligne    de  la.

   tuyère de     projection        4-42    étant inclinée  parallèlement au tronçon 60 de la traverse.    Lorsqu'on ne se sert pas de la     tringle        \?4,     on la fait basculer de bas en haut autour de  son articulation dans la chape 23 et l'on atta  che la boucle 26 à. la partie     supérieure    du ré  servoir à     gravillon    1 (voir     fil-,.    3).  



  Les     fi,,,.    11 et 12     représentent        urne     deuxième     forure        d'exécution    d'appareillage,  utilisable en particulier dans les ;ares, lors  qu'un     muret    de quai     JI    limite l'espace     dislro-          nible    en     prolongenient    des traverses, telles  que 63.

   Le réservoir à     !2#ravillon        6-1        présente          toujours,    le long     d'unie    génératrice de sa par  tie     ci-lindrique,        unie        feiiêtve        d'observation     flanquée d'une     graduation    2 en     unités    de     vo-          hinie.    .lais ce     réservoir    possède un     faux-foird     en forme de cône 65 dévié par rapport à l'axe  de la partie     cçlindrique    64.

   Ce     faux-fond    est  raccordé à. une     tubulure    de projection 66-67,  en une pièce, qui     i-eniplace    la tubulure de rac  cordement<I>3 et</I> la     tuyère    de projection 45 de  la     première    forme     d'exécution.    Cette     tubulure     présente une     partie        cylindrique    verticale 66  suivie d'un     coude        avec        aplatissement    de la  section     transversale    pour     former    un orifice (le  projection     

  obloir    g 67. Le coude raccordant  les parties 66 et 67 fait un angle     aigu,    de  sorte que. le gravillon     sortant    de l'orifice 67  a une direction     longitudinale        lui    peu ascen  dante par     rapport    à. la paroi     supérieure,    sup  posée horizontale, de la     traverse    rectiligne 63.

    La     tubulure    66-67     e.st        fixée    de manière amo  vible, à la base du     faux-fond    65 au moyen  d'un collier     cle        fixation    69 avec écrou et vis  de     serrage.    Du côté opposé au rail     R,    le ré  servoir 64, le     faux-fond    65 et la tubulure 66  présentent une étroite bande verticale     eoin-          niune    70 le lon<B>g</B> de laquelle     e-;

  t        dislrosé    le  tube 6     el'adnü.,sion    d'air     coinprirné.    Cette dis  position permet     d'introduire    l'orifice de     pro-          jeetion    67 dans la     perforation        71(1e    la tra  verse     malgré    le peu de     plac(,        disponible        entre     cette traverse et. le     muret        :11.    Elle est     appli-          eable        aussi    en tunnel.  



  Le rail     R    est fixé     ii    la     traverse    de sommet       rectiligne    63 par     l'intermédiaire    d'une se  melle 72 en forme de coin, (le     type    connu.  



  On a représenté aux     fig.    11. et 12 un       organe    en forme de cône     creux.    73     disposé              coneentriquement    à     l'intérieur    du réservoir  à gravillon 64,     près    .du     faux-fond    65. Ce cône  73 est suspendu à une tige verticale 74 sou  dée à une bande diamétrale 75 de     support,     fixée près de l'extrémité supérieure du réser  voir     6-l.    L'expérience a montré que ce cône 73  empêche un bourrage indésirable du gravil  lon à la base du réservoir 64.  



  Lorsque les organes de fixation du rail     R          sui-    la traverse 63 ne présentent. pas de saillie  du côté extérieur à. la voie, on utilise une     trin-          g]e    de maintien 78 reliée par un. tendeur 76  à     un    crochet 77 de forme correspondant au  champignon du rail R auquel on     l'aeeroche    en  faisant basculer la tringle 78 autour de la  chape     d'articulation    23 qui     est    fixée, comme  dans les     exemples    décrits, à un.

   collier     \?0    serré       sur    la     tubulure    de     raccordement    3 (voir       fio-    13).



  A method of tamping metal railway sleepers and apparatus for implementing this method. The present invention relates to a method of tamping hollow metal sleepers (the railroad, the ends of which are bent downwards, particularly applicable to sleepers housed in very coarse ballast.



  This process is characterized in that the ends of the sleepers are drilled in the vicinity (their upper wall, raises each tra-% -erse above, @ the ballast to its correct level, the elm, in the ballast, two dams located (on either side of the middle of the crossing, in the volume generated by the lifting (the crossing,

      between the inner wall of the latter and its imprint in the underlying ballast, injects by means of a combined fluid, through each perforated end, the jam gravel by directing this gravel in the longitudinal direction of the crosses so as to form a jam in the two remaining partial c, @ city. between each of the said ,;

          harrage, s and the corresponding end of the cross member.



       The invention also encompasses an apparatus for carrying out the method defined above. This apparatus is. a.ractéised in that it further comprises means for perforating the end of the metal cross-pieces, a gravel tank whose hollow bottom communicates by a ducted connection with a projection nozzle into which open compressed fluid lines,

   means for maintaining the projection nozzle engaged in the perforation of the cross member in a position such that the projection of gravel takes place with a slight upward component, this position being that. optimum angle and a pick comprising at least one curved peak whose concave side is turned towards the handle, so that we can introduce this peak under a wing of the crosspiece and make it back down towards the internal upper wall of this crosses to form the dam.



  The accompanying drawing shows, by way of example, two embodiments and variants of detail of an apparatus for the implementation of the process.



  Fig. 1 is a partial longitudinal vertical section of a metal cross member and an elevation view of the lower part of a gravel tank with a projection nozzle in the service position.



  Fig. 2 is a plan view of a section .de track with metal crossmember.



  Fig. 3 is a partial vertical longitudinal section of a longer cross member than in FIGS. 1 and 2 and an elevational view of a tank. gravel with projection nozzle according to a first embodiment.



  Fig. 4 is a cross section of a metal cross member raised above its footprint in the ballast. Figs. 5 and 6 are an elevational view and a plan view of a removable spray nozzle.



  Figs. 7 and 8 show, in elevation, in profile and from the front, the. lower part of an elbow connector.



  Figs. 9 and 7.0 show, in elevation, two particular positions of a pickaxe for settling the ballast.



  Fig. 11 is a partial longitudinal section of a metal crosspiece bordering a wall. dock and a view in elevation of a gravel tank with bent pipe according to a second embodiment.



       Fig. 12 is a top plan view of the gravel tank shown in. fig. 11.



  Fig. 13 shows in elevation a variant of detail.



  The apparatus shown in FIGS. 1 and 3 includes a cylindrical gravel tank that 1 having. following one of. an observation slit is generated along which a graduation 2 in units of volume is drawn. The hollow frustoconical bottom of the tank 1 communicates with a connection pipe 3 bent at right angles, at the lower end of which a projection nozzle 4 is mounted.

   The tank 1 carries a side flange 5 in which is fixed a compressed air pipe 6 provided with an inlet valve with handle 7, connected to a section of tube 8 intended for. be connected to a compressed air tank not shown. The tube 8 is equipped with a manometer 9. At its lower end, .le pipe 6 is subdi aims in two conduits of which. the, orifices 7 and 8. adjacent, open into the elbow connection pipe 3, at its. lower part (see fig. 8).



       Above the graduation 2, the reservoir 1 carries an operating handle 9. The lower orifice of the. connection pipe 3 is. on mounted with a 10 ear bearing. a threaded rod 11 onto which a nut 12 is screwed. The inner wall of this orifice has substantially vertically in line with the lug 10 a radial stop pin 13 (fig. 7 and 8). The projection nozzle 4 visible in detail in FIGS. 5 and 6 comprises a short cylindrical part 1.4 with a circular base, raceordered to an oblong end part 15.

   The cylindrical part 14 carries on the outside an erochet 76 intended to come into engagement with the threaded rod 11 of the connection pipe 3. The lower edge of this cylindrical part 74 has a notch 17 intended to engage with. the radial stud 13 (the the connection pipe 3, when the cylindrical section 14 is engaged in the lower part 18 of the connection pipe,

       of sufficient quality so that the hook 1.6 abuts against the lug 10. The removable projection nozzle 4 is mounted end in the pipe 3 by a bayonet connector.



  The rising part of the connecting tube 3 carries a collar 20 having a split lateral projection 20 ', in which is. fixed a support button 21 passing through a perforated plate 22 forming part of a yoke 23 in which is articulated one end of a retaining rod 24. The other threaded end of this rod. 24 is provided with a tensioner 25 terminated by a loop 26.



  This apparatus also comprises an oxyhydrogen heat exchanger, not shown, necessary to perforate the ends of the metallic traverses, -> ereuses.



  This equipment is completed by a pick intended to pack the ballast two in line with the cavity generated by the lifting of the cross member, to delimit the length of the stuffing. The handle 28 of this pick carries, at its lower end, a ferrule 29 coming in one piece with a curved pie 30 whose shape is determined according to the shape of the inner part of the crosspiece. Opposite to pie 30, la. ferrule 29 has a curved bearing surface 31, the role of which will be explained below.



  We have shown in fi - g. 2, in plan, a metal crosspiece which is assumed to be sagging and which must be brought back to its correct level.



  Before. to proceed with the jamming of the sleepers, we generally paint on them two lines following Tl-T @ for the right half and <I> T </I> 3-T4 for the left half. The Ti-T # line is located at. a distance a from the vertical plane of symmetry of the right rail <I> Rd, </I> approximately equal to the distance from this plane to the right end 36d of the cross member 36.

   Likewise, T3-T4 is at a distance <I> cc. </I> from the plane of symmetry of the left rail Rg and at a distance: arc from the left end 36g of the beam. The lengths 2a along which it is necessary to stuff the are thus made visible. traverse 36. Dimension b indicates the length of the central region of the. cross which must not receive gravel, the dams will be. performed along the lines Ti-T .., and T3-T4, as will be explained.



  The first operation of the sleeper stuffing method consists in lifting, by means of jacks not shown, engaged under the rails, a section of track comprising the sleeper 36, for example. During. This operation, the part 32, in the shape of a trapezoid, (the cross member 36, part delimited by the profile and a straight line connecting its edges, passes from the position visible in phantom in fig. 4 to that shown in full line, that is to say that the height of the lift may generally be between 15 and 30 mm.

    This height of the lift Tz is notably less than the height H of the interior of the trapezoid 32, at rounded angles, so that the distance between the convex footprint 33 of the cross member in the ballast and the interior wall 34 of said cross member gradually decreases while passing from the small base of the trapezoid towards the oblique sides 35 of the latter, this (it favors the jamming of the gravel on the sides of this impression.



  The metal cross member 36 is perforated at its two ends folded down 36d and 36rj flush with its. upper wall (34) so as to obtain two oblong perforations, O'nes 37 and 38.

   When the cross member 36 has been lifted up. its correct level, we drive the pie 30 of the pick 28-30 obliquely into the ballast B following the. TI-T line. of fig. 2, 1-me first time in the direction of the arrow Pi so that the peak 30 engages under the wing 40 of the cross member 36.

   The pickaxe then occupies the position of FIG. 9. Then, the handle 28 is tilted in the direction of the arrow FJ, so that the bearing surface 31 of the shell 29 comes to rest on the ballast B, as seen in FIG. 10. This bearing 31 forms a tilting boss for the pickaxe, the curved peak 30 of which presses the pieces of ballast against the internal wall of the metal cross member by starting a dam D (FIG. 10).

   The pickaxe is then withdrawn and driven on the other side of the crossing in the direction <U> F .; </U> proceeding in a similar fashion, the dam is completed. Then we do. same way a second dam along the line T3-T4- When the dams are thus completed, we connect the pipe 8 (fig. 3) to a compressed air tank and we place the projection nozzle 45 in the perforation 37, following. the position shown in FIG. 1.



  So that the tank 1 and. the nozzle 45 remain in the correct blowing position without requiring too great a manual effort, the loop 26 is hooked to a nut 46 for fixing the rail shoe 47. The length regulator 25 may be acted upon so as to engage the nozzle 45 at an optimum angle in the orifice 37 of the cross, as well as to adjust exactly. the position of the switchgear. The direction of the nozzle has a slight upward component with respect to the middle part 50 of the cross member, which part is horizontal in the absence of cant.

   The compressed air inlet valve 7 is then opened, which instantly causes the projection of the gravel from the reservoir 1 into the volume generated by the lifting of the cross member, between its imprint 33 on the ballast and the inner wall 34 of said cross. The gravel projected longitudinally fills this volume in a few seconds, along the length between the line Tl-T #> and the end 36d of the sleeper.



  The procedure is analogous to form a chunk of gravel under the left side of the cross member, between the line <I> Ta </I> T.4 and the left end 36g. We thus obtained from part and. on the other and at a distance from the transverse vertical symmetry plane S-8, two chippings of chippings which support the cross member at its correct level. When the jacks which were used to lift the track are removed, the sleepers remain practically at the level reached at the end of the tamping operation.



  One of the main advantages of the method which has just been described lies in the fact that it is unnecessary .de stripping the metal cross members of the ballast in which they rest.



  Thanks to the position of the perforations 37 and. 38 flush with the upper wall of the cross, one can pass through each of these perforations a control rod over the entire length where must. blowing, which makes it possible to detect the possible presence of ballast stones or foreign bodies in the space reserved for blowing.



       In some cases when it comes to. to stuff sleepers longer than that shown in fig. 2, the short removable nozzle 45 is replaced by a nozzle] on gue 4-42, as seen in FIG. 3. This nozzle 4--42 is. introduced in the. perforation 37 of the crosspiece following the inclined troneon 60 of the latter, which gives a slight upward component to. the projection of gra villon.

   By moving. the reservoir 1 and, consequently, the orifice 42 of the nozzle in the longitudinal direction of the cross member, it is possible. adjust it. stuffing length.



  As seen at. the fi-. 3, the two contact scopes. C-F of the long nozzle 4 .-- 12 with the metal cross member are. located one on the. inner wall of the cross member, the other on the lower edge of the perforation 37, at a sufficient distance from each other so that the whole of the gravel tank, the pipe 3 and the nozzle 4-- 12 is kept in balance and in the correct position (- a-above the ballast, the rectilinear part of the.

   4-42 projection nozzle being inclined parallel to the section 60 of the cross member. When the rod \? 4 is not in use, it is tilted up and down around its articulation in the yoke 23 and the loop 26 is attached to. the upper part of the gravel tank 1 (see wire- ,. 3).



  The fi ,,,. 11 and 12 represent a second drill hole for carrying out equipment, usable in particular in ares, when a quay wall JI limits the available space by extending cross members, such as 63.

   The ravillon tank 6-1 always presents, along the generating unit of its adjacent part, a plain observation vessel flanked by a graduation 2 in units of vo- hinie. .lais this reservoir has a false-foird in the form of a cone 65 deviated from the axis of the cçlindrique part 64.

   This false bottom is connected to. a projection pipe 66-67, in one piece, which i-eniplace the connecting pipe <I> 3 and </I> the projection nozzle 45 of the first embodiment. This tubing has a vertical cylindrical portion 66 followed by an elbow with flattening of the cross section to form an orifice (the projection

  obloir g 67. The elbow connecting the parts 66 and 67 makes an acute angle, so that. the gravel coming out of the orifice 67 has a longitudinal direction which is slightly ascending with respect to. the upper wall, sup posed horizontal, of the straight cross member 63.

    The tubing 66-67 e.st removably attached to the base of the false bottom 65 by means of a fixing key collar 69 with nut and tightening screw. On the side opposite to the rail R, the tank 64, the false bottom 65 and the tubing 66 have a narrow vertical band eoin- niune 70 the lon <B> g </B> of which e-;

  t dislrose the tube 6 el'adnü., sion of coinprirné air. This position allows the projection orifice 67 to be introduced into the perforation 71 (the crossing despite the little space available between this crosspiece and. The wall: 11. It is also applicable in tunnel .



  The rail R is attached to the rectilinear top crossmember 63 via a wedge-shaped tread 72 (the known type.



  There is shown in FIGS. 11. and 12 a member in the form of a hollow cone. 73 disposed coneentrically inside the gravel tank 64, near the false bottom 65. This cone 73 is suspended from a vertical rod 74 welded to a diametral support band 75, fixed near the upper end of the tank see 6-l. Experience has shown that this cone 73 prevents unwanted jamming of the gravel at the base of the tank 64.



  When the fasteners of the rail R following the crossmember 63 do not present. no projection from the outside to. the track, we use a holding trin- g] e 78 connected by a. tensioner 76 to a hook 77 of shape corresponding to the head of the rail R which is the aeeroche by tilting the rod 78 around the articulation yoke 23 which is fixed, as in the examples described, to a.

   clamp \? 0 tightened on the connection pipe 3 (see fio- 13).

 

Claims (1)

REVENDICATIONS I. Procédé de bourrage de traverses métal- liques erewses de chemin de fer, dont les extrémités sont repliées vers le bas, caracté risé en ce que l'on perce les extrémités des traverses au voisinage de leur paroi supé rieure, soulève chaque traverse au-dessus du ballast à son niveau correct, forme, dans le ballast, deux barrages situés de part, et d'au tre du milieu de la traverse, dans le volume engendré par le soulèvement de la. traverse, entre la paroi intérieure de celle-ci et son empreinte dans le ballast. CLAIMS I. Method of tamping metal sleepers erewses railway, the ends of which are folded down, characterized in that the ends of the sleepers are drilled in the vicinity of their upper wall, lifts each sleeper above the ballast at its correct level, forms, in the ballast, two dams located on either side of the middle of the cross member, in the volume generated by the lifting of the. cross, between the inner wall thereof and its footprint in the ballast. sous-jacent, injecte au moyen d'un fluide comprimé, par chaque extrémité perforée, du gravillon de bourrage en dirigeant ce gravillon dans le sens longitu- (linal de la traverse, de manière à former un bourrage clans les deux cavités partielles sub sistant entre chacun desdits barrages et l'ex trémité correspondante de la. traverse. II. subjacent, injects by means of a compressed fluid, by each perforated end, the blocking gravel by directing this gravel in the longitudinal direction of the cross member, so as to form a jam in the two partial cavities subsisting between each of said dams and the corresponding end of the crossing II. Appareillage pour la mise en oeuvre du procédé selon la revendication I, compre nant des moyens pour perforer l'extrémité des traverses métalliques, un réservoir à gra villon dont le fond creux communique par iul raccord coudé avec une tuyère de projection dans laquelle débouchent des conduites de fluide comprimé, appareillage caractérisé en ce qu'il comprend, en outre, des moyens pour maintenir la tuyère de projection engagée dans la perforation de la traverse dans une position telle que la projection de gravillon s'effectue avec une légère composante ascen dante, Apparatus for carrying out the method according to claim I, comprising means for perforating the end of the metal sleepers, a gravel tank, the hollow bottom of which communicates by means of an elbow connection with a projection nozzle into which pipes open. of compressed fluid, apparatus characterized in that it further comprises means for maintaining the projection nozzle engaged in the perforation of the cross member in a position such that the projection of gravel takes place with a slight ascending component, cette position étant celle de l'angle optimum et une pioche comprenant. au moins un pic incurvé dont le côté concave est tourné vers le manche, afin que l'on puisse intro duire ce pic sous une aile de la traverse et le faire basculer vers la paroi supérieure interne de cette traverse pour former le barrage. SOUS-REVENDIC ATIONS 1. Procédé selon la revendication I, ca ractérisé en ce qu'on forme lesdits barrages en travaillant le ballast à la pioche à partir de chaque côté de la traverse métallique et en tassant ledit ballast contre les parois inté rieures de la traverse. 2. this position being that of the optimum angle and a pickaxe comprising. at least one curved peak, the concave side of which is turned towards the handle, so that this peak can be introduced under a wing of the cross member and make it tilt towards the inner upper wall of this cross member to form the barrier. SUB-CLAIM ATIONS 1. A method according to claim I, characterized in that said dams are formed by picking the ballast from either side of the metal cross member and pressing said ballast against the inner walls of the vessel. crosses. 2. Procédé selon la revendication I, appli cable aux traverses creuses, ouvertes en bas, dont. la partie délimitée -par le profil et. une droite reliant ses bords a la forme d'un tra pèze à angles arrondis, caractérisé en ce que l'on soulève la traverse d'une quantité nota blement inférieure à la hauteur de ce trapèze, de sorte que l'écartement disponible après sou lèvement, entre l'empreinte convexe,de la tra verse dans le ballast et la paroi intérieure de ladite traverse, diminue progressivement en passant de la petite base du trapèze aux côtés obliques de celui-ci, Method according to Claim I, applicable to hollow sleepers, open at the bottom, of which. the part delimited by the profile and. a straight line connecting its edges has the shape of a trapezoid with rounded angles, characterized in that the crosspiece is raised by a quantity notably less than the height of this trapezoid, so that the spacing available after lifting, between the convex footprint, of the cross in the ballast and the inner wall of said cross member, gradually decreases while passing from the small base of the trapezoid to the oblique sides thereof, ce qui favorise le coince ment du gravillon sur les côtés. 3. Appareillage selon la revendication II, caractérisé par le fait que les moyens pour maintenir la tuyère de projection engagée suivant l'angle optimum dans la perforation de la traverse consistent en une tringle reliée par articulation à un organe solidaire du ré servoir à gravillon, l'autre extrémité de la tringle portant une boucle d'accrochage des tinée à être engagée sur une saillie d'un organe de fixation du patin de rail à la. tra verse, la tringle comprenant, en outre, un dis positif de réglage de sa longueur. 4. which favors the jamming of the gravel on the sides. 3. Apparatus according to claim II, characterized in that the means for keeping the projection nozzle engaged at the optimum angle in the perforation of the cross member consist of a rod connected by articulation to a member integral with the gravel tank, the other end of the rod carrying a hooking loop of the tine to be engaged on a projection of a member for fixing the rail shoe to the. Tra verse, the rod further comprising a positive device for adjusting its length. 4. Appareillage selon la revendication<B>il,</B> caractérisé en ce que les moyens pour main tenir la tuyère clé projection engagée suivant l'angle optimum dans la perforation de la tra verse consistent en une tringle de longueur réglable reliée par articulation à un organe solidaire du réservoir à gravillon, l'autre extrémité de la tringle formant un crochet de forme correspondant au champignon du rail auquel il est destiné à s'accrocher. 5. Apparatus according to claim <B> it, </B> characterized in that the means for holding the key projection nozzle engaged at the optimum angle in the perforation of the cross consist of a rod of adjustable length connected by articulation to a member secured to the gravel container, the other end of the rod forming a hook of shape corresponding to the head of the rail to which it is intended to hang. 5. Appareillage selon la revendication II, caractérisé en ce qu'il est applicable à des voies présentant. un dégagement limité, dans le prolongement des traverses, par le fait que le réservoir à gravillon, de forme générale cy lindrique, possède un faux-fond dévié latéra- lement par rapport à la paroi cylindrique du réservoir, et que ce faux-fond est relié à une tubulure de projection de gravillon en une pièce, présentant une partie cylindrique sui vie d'un coude avec applatissement de la sec tion transversale, Apparatus according to claim II, characterized in that it is applicable to channels presenting. a limited clearance, in the extension of the cross members, by the fact that the gravel tank, of generally cylindrical shape, has a false bottom deviated laterally with respect to the cylindrical wall of the tank, and that this false bottom is connected to a one-piece gravel projection pipe, having a cylindrical part followed by an elbow with flattening of the transverse section, pour former un orifice de projection permettant de projeter le gravil- Ion avec. une légère eomposante ascendante quand le réservoir à gravillon et ladite tubu lure sont disposés verticalement, ce réservoir, le faux-fond et la tubulure présentant une étroite bande verticale commune du eôté opposé au rail. to form a projection orifice allowing the gravel to be projected with it. a slight ascending component when the gravel tank and said pipe are arranged vertically, this tank, the false bottom and the pipe having a narrow common vertical strip on the side opposite the rail.
CH309853D 1953-05-20 1953-05-20 Method of tamping metal railway sleepers and equipment for implementing this method. CH309853A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CH309853T 1953-05-20

Publications (1)

Publication Number Publication Date
CH309853A true CH309853A (en) 1955-09-30

Family

ID=4493966

Family Applications (1)

Application Number Title Priority Date Filing Date
CH309853D CH309853A (en) 1953-05-20 1953-05-20 Method of tamping metal railway sleepers and equipment for implementing this method.

Country Status (1)

Country Link
CH (1) CH309853A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0277802A2 (en) * 1987-02-03 1988-08-10 Kango Limited Tool for stone-blowing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0277802A2 (en) * 1987-02-03 1988-08-10 Kango Limited Tool for stone-blowing
EP0277802A3 (en) * 1987-02-03 1989-06-07 Kango Limited Tool for stone-blowing

Similar Documents

Publication Publication Date Title
EP0771458A1 (en) Information display device using a rolled-up sheet of material
EP0250344B1 (en) Installation for repairing and checking car bodies
FR2639971A1 (en) FLANGE FOR QUICK FIXING OF A RAILWAY RAIL AND CROSS-SECTION PROVIDED WITH SUCH A FLANGE
CH309853A (en) Method of tamping metal railway sleepers and equipment for implementing this method.
FR2764780A1 (en) DEVICE FOR INJECTING FLUIDS INTO FOODSTUFFS
EP0275800B1 (en) Swift action elastic fastening device for a railway rail
FR2461449A2 (en) Tank for hydroponic cultivation - has depth of liquid controlled and adjusted by replaceable overflow outlets of various lengths
FR2572060A1 (en) DEVICE FOR PREVENTING AND TRANSFERING ARTICLES COMPRISING A COLL, SUCH AS BOTTLES OR BOTTLES
EP0574873A1 (en) Single-facer
EP0052596A2 (en) Package with hanging device, packaging method and apparatus for performing this method
CH316098A (en) Apparatus for throwing gravel under railway sleepers
EP0667802B1 (en) Bag filters for dust-laden gas filtration
FR2688117A1 (en) BLOCK MOLD FOR THE MANUFACTURE OF CHEESES.
BE538966A (en)
FR2554783A1 (en) PROCESS FOR FORMING THE U-BOTTOM
EP1335875B1 (en) Method for mounting a cable drum flange, means therefor and resulting flange
BE1023578B1 (en) DIVIDER OF DOUGH WITH A DEFORMABLE GRID
FR2914063A1 (en) Exhaust gas recycling device, has plate pierced at two holes, where each hole is equipped with valve that is movable between closed position in which holes are closed, and opened position in which holes are opened
FR2520751A1 (en) Vertical cylindrical wine making vessel with low level marc outlet - has interior sloping discharge channel diverging towards outlet
FR2606035A1 (en) SUPPORT AND INTRODUCTION BENCH FOR A RECLINED ELONGATED PROBE AND ADAPTED PROBE
EP1010840A1 (en) Device forming foot-support for stake or post, in particular for arbour or panel support and method for its closing
CH284307A (en) Method for correcting the unevenness of railway tracks and apparatus for its implementation.
CH84100A (en) Reciprocating saw, with vertical frame, for cutting logs
CH159609A (en) Method of constructing inclined concrete piles molded into the ground by means of a jacking tube, and device for carrying out this method.
CH278499A (en) Device for blowing tracks on metal sleepers.