BRPI0905842A2 - Método e instalação de fabricação de elementos de concreto reforçado modulares prismáticos ocos e elemento obtido com eles. - Google Patents

Método e instalação de fabricação de elementos de concreto reforçado modulares prismáticos ocos e elemento obtido com eles.

Info

Publication number
BRPI0905842A2
BRPI0905842A2 BRPI0905842-7A BRPI0905842A BRPI0905842A2 BR PI0905842 A2 BRPI0905842 A2 BR PI0905842A2 BR PI0905842 A BRPI0905842 A BR PI0905842A BR PI0905842 A2 BRPI0905842 A2 BR PI0905842A2
Authority
BR
Brazil
Prior art keywords
formwork
concrete elements
element obtained
fabrication
installation
Prior art date
Application number
BRPI0905842-7A
Other languages
English (en)
Inventor
Jose Tragante Ruano
Miguel Morte Morales
Original Assignee
Compact Habit S L
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=40913358&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=BRPI0905842(A2) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Compact Habit S L filed Critical Compact Habit S L
Publication of BRPI0905842A2 publication Critical patent/BRPI0905842A2/pt

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/22Moulds for making units for prefabricated buildings, i.e. units each comprising an important section of at least two limiting planes of a room or space, e.g. cells; Moulds for making prefabricated stair units
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/002Producing shaped prefabricated articles from the material assembled from preformed elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0091Transformable moulds allowing the change of shape of an initial moulded preform by preform deformation or the change of its size by moulding on the preform
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/02Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for rooms as a whole by which walls and floors are cast simultaneously, whole storeys, or whole buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/06Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
    • E04G11/20Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
    • E04G11/32Tiltable forms or tilting tables for making walls as a whole or in parts in situ
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0088Moulds in which at least one surface of the moulded article serves as mould surface, e.g. moulding articles on or against a previously shaped article, between previously shaped articles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10TTECHNICAL SUBJECTS COVERED BY FORMER US CLASSIFICATION
    • Y10T29/00Metal working
    • Y10T29/49Method of mechanical manufacture
    • Y10T29/49616Structural member making
    • Y10T29/49623Static structure, e.g., a building component

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Moulds, Cores, Or Mandrels (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Panels For Use In Building Construction (AREA)
  • Catalysts (AREA)
  • Rod-Shaped Construction Members (AREA)
BRPI0905842-7A 2008-02-01 2009-01-30 Método e instalação de fabricação de elementos de concreto reforçado modulares prismáticos ocos e elemento obtido com eles. BRPI0905842A2 (pt)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
ES200800263A ES2330911B1 (es) 2008-02-01 2008-02-01 Procedimiento e instalacion para la fabricacion de elementos modulares prismaticos huecos de hormigon armado y elemento obtenido mediante estos.
PCT/IB2009/050376 WO2009095884A2 (es) 2008-02-01 2009-01-30 Procedimiento e instalación para la fabricación de elementos modulares prismáticos huecos de hormigón armado y elemento obtenido mediante estos

Publications (1)

Publication Number Publication Date
BRPI0905842A2 true BRPI0905842A2 (pt) 2015-06-30

Family

ID=40913358

Family Applications (1)

Application Number Title Priority Date Filing Date
BRPI0905842-7A BRPI0905842A2 (pt) 2008-02-01 2009-01-30 Método e instalação de fabricação de elementos de concreto reforçado modulares prismáticos ocos e elemento obtido com eles.

Country Status (12)

Country Link
US (1) US8652379B2 (pt)
EP (1) EP2248644B1 (pt)
CN (1) CN101965254B (pt)
AT (1) ATE523305T1 (pt)
BR (1) BRPI0905842A2 (pt)
CA (1) CA2713826C (pt)
ES (2) ES2330911B1 (pt)
MA (1) MA32103B1 (pt)
MX (1) MX2010008424A (pt)
PL (1) PL2248644T3 (pt)
RU (1) RU2471620C2 (pt)
WO (1) WO2009095884A2 (pt)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2013175027A1 (es) 2012-05-23 2013-11-28 Anton Arquitectos, S.L.U. Módulo habitable y sistema de construcción modular de espacios para habitar
CN103029199B (zh) * 2013-01-09 2014-12-31 上海高诚艺术包装有限公司 一种方形陶瓷制品的生产方法
RU2549977C2 (ru) * 2013-06-19 2015-05-10 Открытое акционерное общество "Первоуральский завод горного оборудования" (ОАО "ПЗГО") Металлокаменное полое изделие
CN103434010B (zh) * 2013-08-10 2015-10-28 杨福聚 一种烟道模具及使用该烟道模具制作烟道的方法
CN105178196B (zh) * 2015-09-28 2017-03-29 中铁上海工程局集团有限公司 一种多节点连动式环湿接段整体模板及方法
CN107627443B (zh) * 2017-10-31 2023-07-25 中冶建工集团有限公司 一种便于收叠的混凝土试块模具
CN111231076B (zh) * 2020-01-20 2024-05-17 中交一公局集团有限公司 垫石模板装置
CN114750262B (zh) * 2022-05-30 2023-08-18 中国天楹股份有限公司 一种利用固废制作大型配重块的全自动生产工艺方法
CN115107147B (zh) * 2022-05-31 2023-11-21 青岛青建理工建筑工业化研究院有限公司 一种ppvc空间模块构建方法
CN115262968A (zh) * 2022-09-01 2022-11-01 天津瑞孚特科技有限公司 一种高精度模板卡具

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1276624A (en) * 1918-05-20 1918-08-20 Robert A Cummings Method of constructing reinforced-concrete hulls for boats, &c.
US1581797A (en) * 1925-10-06 1926-04-20 Fey George Concrete block making
US3676536A (en) * 1969-01-10 1972-07-11 Shelley Systems Inc System for producing modular building blocks
AT301428B (de) * 1969-07-03 1972-09-11 Hugo Mischek Dipl Ing Form zur Herstellung einer Raumzelle
US3932082A (en) * 1974-01-21 1976-01-13 Beaman Samuel W Means for forming a reinforced concrete module
US4207042A (en) * 1979-01-29 1980-06-10 Mikhail Linetsky Casting and erecting machine
DE3203107A1 (de) 1982-01-30 1983-08-11 Riplinger, Michael, 6638 Dillingen Vorrichtung und verfahren zum herstellen von winkelelementen aus beton
NL8502696A (nl) * 1985-10-03 1987-05-04 Jacob Penseel Werkwijze voor het ter plaatse produceren van monteerbare scheidingswanden alsmede daarvoor toegepaste produktie-eenheid.
US4799982A (en) * 1986-03-20 1989-01-24 Charmasson & Holz Method of molding monolithic building structure
SU1722843A1 (ru) * 1989-05-03 1992-03-30 Проектный Институт N2 Госстроя Ссср Установка дл изготовлени объемных железобетонных блоков
SU1717368A1 (ru) * 1990-06-27 1992-03-07 В.В.Пушкарев, В.Я.Фофанов, ААДульзон и Ю.В.Максимов Установка дл изготовлени сборно-монолитных объемных изделий
SU1735011A1 (ru) * 1990-08-08 1992-05-23 Научно-Исследовательский Институт Строительных Конструкций Установка дл изготовлени сборно-монолитных объемных элементов
AU658179B2 (en) * 1992-05-08 1995-04-06 Quickcell Technology Pty Ltd Method of manufacturing precast concrete units
CN1106725A (zh) * 1993-11-10 1995-08-16 奎克塞尔技术有限公司 预制混凝土构件的生产方法
ES2285877B1 (es) 2004-08-12 2008-10-16 Compact-Habit, S.L. Sistema estructural para edificaciones.

Also Published As

Publication number Publication date
US8652379B2 (en) 2014-02-18
CN101965254A (zh) 2011-02-02
ES2330911B1 (es) 2010-09-22
CA2713826C (en) 2016-08-30
RU2471620C2 (ru) 2013-01-10
ES2330911A1 (es) 2009-12-16
ATE523305T1 (de) 2011-09-15
WO2009095884A3 (es) 2009-12-03
CA2713826A1 (en) 2009-08-06
WO2009095884A2 (es) 2009-08-06
CN101965254B (zh) 2012-09-05
MX2010008424A (es) 2010-11-10
US20110000088A1 (en) 2011-01-06
RU2010134565A (ru) 2012-03-10
ES2372667T3 (es) 2012-01-25
PL2248644T3 (pl) 2012-01-31
MA32103B1 (fr) 2011-02-01
EP2248644B1 (en) 2011-09-07
EP2248644A2 (en) 2010-11-10

Similar Documents

Publication Publication Date Title
BRPI0905842A2 (pt) Método e instalação de fabricação de elementos de concreto reforçado modulares prismáticos ocos e elemento obtido com eles.
AU2015100669A4 (en) Hollow Wall
EA201491930A1 (ru) Способ отливки на месте армированной стальными сетками бетонной панели со сборным каркасом и подвесной опалубкой
BR112018017006A2 (pt) painel de piso para uso em edifícios de múltiplos andares usando treliças de parede de aço estrutural empilhadas
EP2567033A4 (en) BUILDING STRUCTURE
JP2012533696A (ja) 床構築用トップスラブ
KR101445286B1 (ko) 기준층의 공기단축이 가능한 pc-sf공법
WO2016020932A3 (en) Deployable pre-fabricated reinforcement cage system
WO2013032349A3 (en) Monolithic- precast housing construction system
EA201401006A1 (ru) Пустотелая плита с межпустотными усилителями
TWI659143B (zh) 異型格子板施工方法
ITTO20080430A1 (it) Metodo di costruzione modulare prefabbricato per la realizzazione di muri e contropareti, in particolare in conglomerato cementizio semplice o armato
DE50010181D1 (de) Stahlbetonteil zur herstellung von fundamenten für bauwerke
UA92378C2 (ru) Система сооружения полусборного дома
EA201690155A1 (ru) Конструктивная система здания повышенной этажности
EA201591257A1 (ru) Система сборных элементов, содержащая рамную конструкцию, для гражданского строительства
TN2012000605A1 (en) Method for producing compact modules for construction
RU94998U1 (ru) Безбалочный каркас многоэтажного здания
RU2379435C1 (ru) Способ возведения монолитной конструкции зданий и сооружений
PL418366A1 (pl) Sposób wytwarzania prefabrykowanej ściany podwójnej i prefabrykowana ściana podwójna
PL424089A1 (pl) Sposób wznoszenia budynków o konstrukcji szkieletowej na bazie prefabrykowanego dwu-różnowęzłowego słupa konstrukcyjnego oraz prefabrykowany dwu-różnowęzłowy słup konstrukcyjny
UA118723C2 (uk) Спосіб зведення зовнішніх стін багатоповерхових каркасно-монолітних будинків
PH12013000048B1 (en) Method of concrete building construction using re-usable easy-to-install formworks including partition wall forms
PL408363A1 (pl) Wielkopłytowy prefabrykowany ustrój budowlany oraz elementy składające się na ten ustrój
ITPA20120013A1 (it) Pannello p.c.e. tecnologia di costruzione prefabbricata, trasporto e montaggio del pannello prefabbricato in conglomerato cementizio armato.

Legal Events

Date Code Title Description
B07A Application suspended after technical examination (opinion) [chapter 7.1 patent gazette]
B08F Application dismissed because of non-payment of annual fees [chapter 8.6 patent gazette]

Free format text: REFERENTE A 10A ANUIDADE.

B08K Patent lapsed as no evidence of payment of the annual fee has been furnished to inpi [chapter 8.11 patent gazette]

Free format text: EM VIRTUDE DO ARQUIVAMENTO PUBLICADO NA RPI 2499 DE 27-11-2018 E CONSIDERANDO AUSENCIA DE MANIFESTACAO DENTRO DOS PRAZOS LEGAIS, INFORMO QUE CABE SER MANTIDO O ARQUIVAMENTO DO PEDIDO DE PATENTE, CONFORME O DISPOSTO NO ARTIGO 12, DA RESOLUCAO 113/2013.