BE1000805A3 - Shield digging in particular for digging with a front slaughter screened by the pressure of land, with endless screw conveyor for waste land. - Google Patents

Shield digging in particular for digging with a front slaughter screened by the pressure of land, with endless screw conveyor for waste land. Download PDF

Info

Publication number
BE1000805A3
BE1000805A3 BE8700887A BE8700887A BE1000805A3 BE 1000805 A3 BE1000805 A3 BE 1000805A3 BE 8700887 A BE8700887 A BE 8700887A BE 8700887 A BE8700887 A BE 8700887A BE 1000805 A3 BE1000805 A3 BE 1000805A3
Authority
BE
Belgium
Prior art keywords
conveyor
digging
shield
replacement
partition wall
Prior art date
Application number
BE8700887A
Other languages
French (fr)
Inventor
Christoph Goebel
Jurgen Hein
Hans Gunter Follert
Original Assignee
Gewerk Eisenhuette Westfalia
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gewerk Eisenhuette Westfalia filed Critical Gewerk Eisenhuette Westfalia
Application granted granted Critical
Publication of BE1000805A3 publication Critical patent/BE1000805A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms
    • E21D9/124Helical conveying means therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

Système d'évacuation des terres constitué par une vis sans fin (18) qui évacue les terres sous forme d'une boue à partir de la chambre d'abattage (11) du bouclier de creusement (1). Il comprend en outre un convoyeur de remplacement (33) constitué de préférence sous forme d'une convoyeur à chaine à raclettes, d'une bande transporteuse ou analogue, utilisé quand l'évacuation des terres n'est pas nécessaire à l'aide de la vis sans fin (18) et en particulier quand il s'agit de terres se présentant en mottes. Le convoyeur de remplacement (33) peut etre déplacé à l'intérieur du bouclier. En cas de besoin, on peut l'introduire dans la chambre d'abattage (11) par son extrémité de chargement avant en passant par une ouverture de la paroi de séparation (10).Land evacuation system constituted by an endless screw (18) which evacuates the earth in the form of a mud from the slaughter chamber (11) of the digging shield (1). It further comprises a replacement conveyor (33) preferably constituted in the form of a raclette chain conveyor, a conveyor belt or the like, used when the evacuation of the earth is not necessary using the worm (18) and in particular when it comes to earth which is in clods. The replacement conveyor (33) can be moved inside the shield. If necessary, it can be introduced into the slaughter chamber (11) through its front loading end passing through an opening in the partition wall (10).

Description

       

   <Desc/Clms Page number 1> 
 



   DESCRIPTION Bouclier de creusement, notamment pour le creusement avec un front d'abattage   blinde   par la pression du terrain, comprenant une vis transporteuse sans fin pour l'évacuation des terres. 



   L'invention concerne un bouclier de creusement, notamment pour le creusement avec un front d'abattage blindé par la pression du terrain, comprenant une paroi de séparation disposée dans le bouclier, une roue de coupe ou analogue montée dans la chambre d'abattage et à l'avant de la paroi de séparation, et une vis sans fin traversant la paroi de séparation et destinée au transport des terres. 



   Les boucliers de ce type sont connus par exemple par le périodique "Strassen-und Tiefbau", 1980, page 18 (notamment figure 19). Lorsqu'il s'agit de travaux de creusement dans des terrains meubles, par exemple formés par du gravier, du sable ou analogues, on travaille le plus souvent avec un front d'abattage   blinde   par un liquide, un liquide de support frais étant envoyé continuellement dans la masse pendant les travaux de creusement effectués par la chambre d'abattage fermée par une cloison vis-à-vis de l'enceinte arrière du bouclier, le mélange de liquide et de terres étant évacué de la chambre d'abattage à l'aide du convoyeur d'évacuation des terres. 



   Le blindage du front d'abattage est réalisé soit au moyen d'un mélange d'eau et de terres, soit au moyen d'une suspension telle qu'une suspension de bentonite, de manière que se constitue dans'la chambre d'abattage un mélange entre la suspension et les éléments constituant 

 <Desc/Clms Page number 2> 

 le terrain, qui soit largement plastique et seulement peu perméable à l'eau. L'évacuation des terres a lieu au moyen d'une vis sans fin. 



   Lorsqu'il s'agit du creusement d'un tunnel, il n'est pas rare qu'il soit nécessaire de traverser des formations différentes de terrains. Quand le creusement s'effectue dans des sols qui ne sont pas stables ou qui sont susceptibles de couler, ainsi que cela est le cas surtout de sols formés par des graviers ou du sable où l'on travaille surtout avec un front d'abattage blindé par la pression du terrain, l'evacuation du mélange de terre de la chambre d'abattage à   l'aide   d'une vis sans fin ne pose pas de difficultés.

   Mais si les conditions de travail sont telles que pendant la traversée de sols plus ou moins stables ou ébouleux en dehors de la région de la nappe phréatique on peut ne pas travailler avec un front d'abattage soutenu, l'évacuation des terres à   l'aide   d'une vis sans fin n'est de toute   facon   pas possible quand cette vis sans fin ne pénètre pas dans la chambre d'abattage par son extrémité de chargement mais se termine au niveau de l'ouverture dans la paroi de séparation. 



   Le but de l'invention est de proposer un système convoyeur destiné au transport des terres dans un bouclier de creusement permettant l'adaptation à des conditions de travail variables et   a   des données de travail qui peuvent   apparaltre   surtout quand on traverse des sols différents, sans qu'il soit besoin d'avoir recours   a   des mesures de transformation longues et compliquées. 



   Selon l'invention, le but susmentionné est atteint du fait que la paroi de séparation est munie d'une ouverture fermable destinée au passage d'un convoyeur de remplacement mobile constitué sous forme d'une bande transporteuse, d'un convoyeur   AL     chalne   à raclettes ou analogue. 



   Le bouclier de creusement selon l'invention comprend donc en plus de la vis sans fin fixe une capacité de montage d'un convoyeur de remplacement transportable ou   deplacable   qui n'est en principe utilisé que lorsque l'evacuation des terres au moyen de la vis sans fin   n'est   pas possible ou est inopportune. On réalise cette possibilité de montage du convoyeur de remplacement en disposant dans la paroi de séparation qui ferme la chambre d'abattage une ouverture particulière 

 <Desc/Clms Page number 3> 

 par laquelle le convoyeur de remplacement transportable ou   dép1acable   peut être introduit en cas de besoin dans la chambre d'abattage par son extrémité de chargement.

   On comprendra que l'ouverture de 
 EMI3.1 
 la paroi de séparation soit adaptée par sa forme et ses dimensions à la forme extérieure et aux dimensions extérieures de l'extrémité de chargement du convoyeur de remplacement. Lorsqu'on utilise ce dernier,   l'entree   vers le tube transporteur de la vis sans fin qui est constituée dans la paroi de séparation peut être fermée au moyen d'un tiroir de fermeture ou analogue. 



   Si l'on n'a pas besoin du convoyeur de remplacement, on peut l'écarter de sa position de travail et l'amener dans une position de repos située en arrière, pouvant se trouver dans le bouclier de creusement qui est alors muni d'une fixation appropriée ou d'un logement pour ce convoyeur de remplacement. L'ouverture pratiquée dans la paroi doit pouvoir être fermée par une plaque ou une porte de fermeture, ou analogue. Le convoyeur de remplacement peut donc être ainsi déplacé dans son ensemble en direction longitudinale du bouclier de creusement entre sa position de repos et sa position de travail, et inversement. 



   L'ouverture fermable constituée dans la paroi et destinée au convoyeur de remplacement est avantageusement disposée au-dessus de   l'entree   de la vis sans fin formée dans la paroi de séparation, de préférence à mi-hauteur environ du bouclier. Dans cette position, 1'extrémité de chargement du convoyeur de remplacement qui fait saillie dans la chambre d'abattage ne gêne pas la rotation de la roue de coupe même quand des bras mélangeurs faisant saillie dans la chambre d'abattage sont montés sur la roue, comme connu. L'entralnement de la roue de coupe peut être   realise   au moyen d'une couronne à denture interne située sur la périphérie extérieure de la roue dentée, ainsi que cela est connu. 



   Le convoyeur de remplacement peut être supporté dans ou directement contre l'ouverture de la paroi de séparation. 11 est alors recommandé de prévoir dans le bouclier de creusement et à une certaine distance à l'arrière de la paroi de séparation un autre support destiné à l'appui du convoyeur de remplacement quand il est dans sa position de 

 <Desc/Clms Page number 4> 

 travail. 



   Avantageusement, la vis sans fin est montée à la suite d'un convoyeur d'évacuation des terres évacuant les terres du bouclier de creusement et se présentant de préférence sous la forme d'une bande transporteuse, ainsi que cela est connu. L'agencement est alors prevu pour que le convoyeur de remplacement se décharge également dans le convoyeur d'évacuation des terres. Avantageusement l'extrémité de déchargement du convoyeur de remplacement est disposée latéralement contre l'extrémité de décharge de la vis sans fin.

   Ainsi, la vis sans fin et le convoyeur de remplacement peuvent se décharger dans le convoyeur fixe d'evacuation des terres par   l'intermediaire   d'une goulotte commune ou analogue
L'invention va maintenant être expliquée plus en détail en référence à un mode de réalisation donné à titre d'exemple et représenté sur le dessin annexé dans lequel : la figure   1   représente en coupe verticale un bouclier de creusement selon l'invention, avec un système de convoyeurs destiné à l'evacuation des terres, la figure 2 est une vue en coupe transversale selon la ligne 11-11 de la figure 1, la figure 3 est une vue en coupe transversale selon la ligne   111-111   de la figure 1. 



   Dans le mode de réalisation représenté, le bouclier de creusement cylindrique   1   est constitué de trois sections 2,3 et 4 montées les unes à la suite des autres et se chevauchant par leurs parties d'extrémité, la section avant 2 du bouclier étant munie d'une trousse coupante 5. La section avant 2 du bouclier est avancée et pressée par des presses hydrauliques 6 dans la direction du creusement, ces presses s'appuyant   a   l'arrière par   l'intermediaire   d'un anneau de poussée 7 contre une butée 8. La butée 8 est constituée soit par le cuvelage déjà mis en place du tunnel ou, comme montré, par un coffrage interne formé par des anneaux de cuvelage quand le   revetement   du tunnel est   realise   au moyen de béton coulé sur place.

   Entre'la section avant 2 du bouclier et sa section centrale 3 sont montés de façon articulée des vérins hydrauliques de commande 9 à l'aide desquels on peut agir sur la 

 <Desc/Clms Page number 5> 

 direction du creusement. La section arrière 4 du bouclier est suspendue à la section centrale 3 par l'intermédiaire de vérins hydrauliques d'entrainement 9', ce qui fait que cette section 4 peut être avancée après que les deux autres sections de bouclier 2 et 3 aient été préalablement avancées par poussée hydraulique. 



   Dans la section avant 2 du bouclier se trouve une paroi de cloisonnement ou de séparation 10 qui ferme la chambre d'abattage 11 vis-à-vis de l'enceinte arrière du bouclier. Dans la chambre d'abattage 11 fonctionne un outil d'abattage se présentant sous la forme d'une roue de coupe 12 ou analogue équipée sur son côté tourné vers le front d'abattage d'outils d'abattage de terrain 13.

   Le mécanisme d'entraînement en rotation de la roue de coupe 12 est situé à l'arrière de la paroi de séparation 10 ; il comprend plusieurs mécanismes 14 répartis en direction périphérique, au nombre de dix   a   la figure 2, qui sont raccordés à   l'arriere   à la paroi de séparation 10, ou a une console de forme annulaire supportant la paroi de   Separation,   et dont les pignons entraînés 15 sont en prise avec la denture interne d'une couronne dentée 16 qui est fermement reliée par l'arrière à la périphérie extérieure de la roue de coupe 12 au moyen d'entretoises 17 traversant la paroi de séparation. On comprendra que les ouvertures de la paroi de séparation qui sont traversées par les entretoises 17 ou analogues sont rendues étanches. 



   Des boucliers de creusement du type décrit dans ce qui précède ou d'un type analogue sont connus, ainsi que les outils d'abattage utilisés avec ces boucliers et qui se présentent sous forme de roues de coupe, de disques de scrapage et analogues, de meme que leurs mécanismes   d'entrainement.   



   Dans le disque de creusement 1 est également monté de façon fixe un transporteur à vis sans fin 18 incline vers le haut et vers   l'arrière,   à la suite duquel est également monté un convoyeur d'evacuation des terres 19 qui est fixe. Ce dernier est constitué par exemple par une bande transporteuse, un convoyeur à   chalne   à raclettes ou un convoyeur continu quelconque. A 1'aide de la vis sans fin 18 un mélange boueux constitué par les terres et un liquide est évacué de la chambre d'abattage 11, le liquide étant formé soit par l'eau provenant 

 <Desc/Clms Page number 6> 

 du terrain et/ou par l'eau introduite dans la chambre d'abattage à partir de l'enceinte du bouclier.

   Lorsqu'il s'agit   d'un   front d'abattage blindé par la pression du terrain, on introduit en général en tant que liquide une suspension et de préférence une suspension d'eau et de bentonite dans la chambre d'abattage 11, l'eau étant ensuite évacuée pendant les travaux de creusement par la vis sans fin 18 en étant mélangée aux terres. Pour améliorer le   melange,   des bras mélangeurs 20 orientés en direction de la paroi de séparation 10 peuvent être fixés sur le   cote   arrière de la roue de coupe 12, ces bras tournant avec la roue de coupe. D'autres bras mélangeurs 21 peuvent être montés de façon fixe sur la paroi de séparation 10. 



   Le tube transporteur 22 de la vis sans fin 18 se termine dans la paroi de séparation 10, et ne fait done pas saillie dans la chambre d'abattage 11. L'entrée 23 du tube transporteur 22 est done située dans la paroi de séparation 10, et dans la région inférieure du bouclier selon les figures   1   et 2. L'entrée 23 peut être fermée par un tiroir de fermeture 24. Selon la figure 2, le tiroir de fermeture est constitué de deux parties. 11 est formé par deux plaques tiroir en forme de segments 25 et 26 qui sont guidées dans des dispositifs de guidage appropriés 27 et qui sont actionnéespar des vérins hydrauliques de réglage 28. Les vérins de réglage 28 s'appuient sur des articulations 29 de la section 2 du bouclier et coopèrent par leurs tiges de piston 30 avec les plaques tiroir associées 25 ou 26.

   Lors du déploiement des vérins de réglage 28, les plaques tiroir 25 et 26 sont poussées dans leur position de fermeture alors que lors de la rentrée des vérins de réglage 28, les plaques tiroir sont rétractées. A la figure 2, la plaque tiroir 26 est représentée dans sa position de fermeture et la plaque tiroir 25 dans sa position rétractée d'ouverture de la vis sans fin 18. Grâce au tiroir de fermeture 24, la vis sans fin 18 peut done être fermée par rapport à son entrée 23 quand elle doit être mise hors fonctionnement. 



   Selon la figure 2, la paroi de séparation 10 comprend au-dessus de la vis sans fin 18 un trou d'homme fermable 31 ainsi que latéralement un passage 32 dans la paroi, qui peut être également fermé au moyen d'une plaque de fermeture, d'une porte de fermeture ou analogue. Quand 

 <Desc/Clms Page number 7> 

 la plaque de fermeture ou analogue est écartée, il est possible de faire pénétrer dans la chambre d'abattage 11, à partir de l'espace arrière du bouclier, un court convoyeur de remplacement 33 par son extrémité de chargement 34.

   Le convoyeur de remplacement 33 est constitue avantageusement par une bande 
 EMI7.1 
 transporteuse, un convoyeur à chaine a raclettes ou analogue. 11 peut être déplacé en direction longitudinale dans le bouclier de creusement   1     a   partir d'une position de repos (non représentée) vers sa position de travail représentée dans laquelle il traverse l'ouverture 32 de la paroi et se trouve situé par son extrémité de chargement 34 à l'intérieur de la chambre d'abattage 11.

   Comme le montre la figure 2, l'ouverture rectangulaire 32 constituée dans la paroi est adaptée par   -sa   forme et ses   dimensions à 1a   forme externe et aux dimensions externes du convoyeur de remplacement 33, la largeur de l'ouverture 32 étant sensiblement égale à la largeur externe du convoyeur de remplacement 33 à son extrémité de chargement. Le convoyeur de remplacement 33 s'appuie done dans l'ouverture 32 constituée dans la paroi, et il se trouve simultanément guidé latéralement par cette ouverture. 



   Dans la position de travail représentée, le convoyeur de remplacement 33 se   decharge   également dans le convoyeur d'evacuation des terres 19. Dans le bouclier de creusement et au-dessus de l'extrémité de chargement du convoyeur d'evacuation des terres 19 est prévue une fixation ou un appui 35 sur ou dans lequel le convoyeur de remplacement s'appuie dans le bouclier par son extrémité de déchargement arrière 36.

   Selon la figure 3, l'extrémité de déchargement 36 est située latéralement contre l'extrémité de déchargement de la vis sans fin 18 qui comprend dans ce cas une ouverture inférieure 37 munie d'une fermeture   a   tiroir 38 (figure   1).   La vis sans fin 18 et le convoyeur de remplacement 36 transportent done les terres ou le mélange de terres et de liquide par l'intermédiaire d'une goulotte de transfert commune 39 (figure 3) ou un entonnoir de transfert, vers le convoyeur d'évacuation des terres 19. 



   Si l'on traverse pendant les travaux de creusement des formations dans lesquelles ont peut effectuer des travaux dans la chambre 

 <Desc/Clms Page number 8> 

 d'abattage 11 sans appui, et dans lesquelles les terres n'arrivent pas sous forme d'une boue pouvant être évacuée par la vis sans fin 18, la vis sans fin fixe 18 est alors fermée au niveau de   l'entree   par fermeture du tiroir 24. Le convoyeur de remplacement 33 qui est transportable ou   déplacable   est avancé à partir de sa position de repos arrière et poussé par son extrémité de chargement dans 1'ouverture 32 de la paroi tout en étant supporté à l'arrière par le support d'appui. 



  Dans cette position de travail, les terres qui forment éventuellement des mottes sont évacuées hors de la chambre d'abattage 11 à l'aide du convoyeur de remplacement 33. Dans le mode de réalisation représenté, le convoyeur de remplacement est constitué par un convoyeur   a   channe à raclettes qui transporte les terres sur son brin supérieur. A l'intérieur de la chambre d'abattage, les terres qui tombent peuvent être reprises dans la région de la sole par des bras de chargement ou des pelles de chargement pouvant être montées à l'arrière sur la roue de coupe 12, puis remontées et ensuite déchargées par le haut sur 1'extrémité de chargement 34 du convoyeur de remplacement 33.

   Ces bras de chargement ou pelles de chargement sont indiqués en 40 à la figure   1,   sur la périphérie extérieure de la roue de coupe 12 et à l'arrière. 



   Lorsqu'il n'est pas utilise, le convoyeur de remplacement 33 est dégagé. retire vers l'carrière de l'ouverture 32 de la paroi de séparation 10 et ramené   A   sa position de repos arrière. Eventuellement, il existe également la possibilité de maintenir le convoyeur de remplacement 33 dans la position de montage représentée quand le transport des terres est   realise   provisoirement à l'aide de la vis sans fin 18. Dans ce cas, il est avantageux que le convoyeur de remplacement 33 soit ramené suffisamment en arrière par son extrémité de chargement 34 pour que l'on puisse fermer l'ouverture 32 constituée dans la paroi. 



  Dans cette position de repos ramenée en arrière, et surtout quand il 
 EMI8.1 
 s'agit de boucliers de grand diametre, la section de passage dans le I bouclier n'est pas exagérément diminuée par le convoyeur de remplacement.



   <Desc / Clms Page number 1>
 



   DESCRIPTION Digging shield, especially for digging with a felling front shielded by the pressure of the ground, including an endless conveyor screw for the evacuation of earth.



   The invention relates to a digging shield, in particular for digging with a felling front shielded by the pressure of the ground, comprising a partition wall disposed in the shield, a cutting wheel or the like mounted in the felling chamber and at the front of the partition wall, and an endless screw passing through the partition wall and intended for the transport of earth.



   Shields of this type are known, for example, from the periodical "Strassen-und Tiefbau", 1980, page 18 (in particular figure 19). When it comes to digging work in loose ground, for example formed by gravel, sand or the like, we most often work with a slaughtered front shielded by a liquid, a fresh support liquid being sent continuously in the mass during the digging work carried out by the slaughter chamber closed by a partition vis-à-vis the rear enclosure of the shield, the mixture of liquid and earth being evacuated from the slaughter chamber at l using the land evacuation conveyor.



   The shielding of the slaughter front is carried out either by means of a mixture of water and earth, or by means of a suspension such as a bentonite suspension, so that it is formed in the slaughter chamber. a mixture between the suspension and the constituent elements

 <Desc / Clms Page number 2>

 the ground, which is largely plastic and only slightly permeable to water. The evacuation of the land takes place by means of a worm.



   When it comes to digging a tunnel, it is not uncommon for it to be necessary to cross different formations of terrain. When digging is carried out in soils which are not stable or which are liable to sink, as is especially the case with soils formed by gravel or sand where we work mainly with an armored felling front by the pressure of the ground, the evacuation of the soil mixture from the felling chamber using a worm screw does not pose any difficulties.

   But if the working conditions are such that during the crossing of more or less stable or scree soils outside the region of the water table it is possible not to work with a sustained felling front, the evacuation of the land at the using a worm is not possible anyway when this worm does not enter the slaughter chamber by its loading end but ends at the opening in the partition wall.



   The object of the invention is to propose a conveyor system intended for transporting the earth in a digging shield allowing adaptation to variable working conditions and to working data which can appear especially when crossing different soils, without that there is a need for long and complicated transformation measures.



   According to the invention, the abovementioned object is achieved by the fact that the partition wall is provided with a closable opening intended for the passage of a mobile replacement conveyor constituted in the form of a conveyor belt, of a conveyor AL chalne to squeegees or the like.



   The digging shield according to the invention therefore comprises in addition to the fixed worm a mounting capacity of a transportable or displaceable replacement conveyor which is in principle only used when the evacuation of the earth by means of the screw endless is not possible or is inappropriate. This possibility of mounting the replacement conveyor is realized by placing in the separation wall which closes the slaughter chamber a particular opening.

 <Desc / Clms Page number 3>

 by which the transportable or detachable replacement conveyor can be introduced into the slaughter chamber by its loading end if necessary.

   It will be understood that the opening of
 EMI3.1
 the partition wall is adapted by its shape and dimensions to the external shape and to the external dimensions of the loading end of the replacement conveyor. When the latter is used, the inlet to the conveyor tube of the worm which is formed in the partition wall can be closed by means of a closing drawer or the like.



   If you do not need the replacement conveyor, you can move it out of its working position and bring it to a rest position located behind, which can be in the digging shield which is then fitted with '' a suitable fixing or housing for this replacement conveyor. The opening made in the wall must be capable of being closed by a closing plate or door, or the like. The replacement conveyor can thus be moved as a whole in the longitudinal direction of the digging shield between its rest position and its working position, and vice versa.



   The closable opening formed in the wall and intended for the replacement conveyor is advantageously arranged above the entry of the worm formed in the partition wall, preferably at about half the height of the shield. In this position, the loading end of the replacement conveyor which projects into the felling chamber does not hinder the rotation of the cutting wheel even when mixing arms protruding into the felling chamber are mounted on the wheel , as known. The center of the cutting wheel can be achieved by means of a ring with internal toothing located on the outer periphery of the toothed wheel, as is known.



   The replacement conveyor can be supported in or directly against the opening of the partition wall. It is then recommended to provide in the digging shield and at a certain distance behind the partition wall another support intended to support the replacement conveyor when it is in its position of

 <Desc / Clms Page number 4>

 job.



   Advantageously, the worm is mounted following a soil evacuation conveyor evacuating the earth from the digging shield and preferably taking the form of a conveyor belt, as is known. The arrangement is then provided so that the replacement conveyor also discharges into the earth evacuation conveyor. Advantageously, the discharge end of the replacement conveyor is disposed laterally against the discharge end of the worm.

   Thus, the worm screw and the replacement conveyor can be discharged into the fixed conveyor for evacuating the land via a common chute or the like.
The invention will now be explained in more detail with reference to an embodiment given by way of example and represented in the appended drawing in which: FIG. 1 shows in vertical section a digging shield according to the invention, with a conveyor system for the evacuation of land, Figure 2 is a cross-sectional view along line 11-11 of Figure 1, Figure 3 is a cross-sectional view along line 111-111 of Figure 1 .



   In the embodiment shown, the cylindrical digging shield 1 consists of three sections 2, 3 and 4 mounted one after the other and overlapping by their end portions, the front section 2 of the shield being provided with 'a cutting kit 5. The front section 2 of the shield is advanced and pressed by hydraulic presses 6 in the direction of the digging, these presses pressing at the rear by means of a thrust ring 7 against a stop 8. The stop 8 is constituted either by the casing already in place of the tunnel or, as shown, by an internal formwork formed by casing rings when the lining of the tunnel is carried out by means of concrete poured on site.

   Between the front section 2 of the shield and its central section 3 are hingedly mounted hydraulic control cylinders 9 with the aid of which one can act on the

 <Desc / Clms Page number 5>

 direction of digging. The rear section 4 of the shield is suspended from the central section 3 by means of hydraulic drive cylinders 9 ′, which means that this section 4 can be advanced after the two other shield sections 2 and 3 have been previously advanced by hydraulic thrust.



   In the front section 2 of the shield is a partition wall or partition 10 which closes the slaughter chamber 11 vis-à-vis the rear enclosure of the shield. In the felling chamber 11, a felling tool operates in the form of a cutting wheel 12 or the like equipped on its side facing the felling front with felling tools 13.

   The mechanism for driving the cutting wheel 12 in rotation is located at the rear of the partition wall 10; it comprises several mechanisms 14 distributed in the peripheral direction, ten in number in FIG. 2, which are connected at the rear to the partition wall 10, or to an annular console supporting the partition wall, and whose pinions driven 15 are engaged with the internal toothing of a ring gear 16 which is firmly connected from the rear to the outer periphery of the cutting wheel 12 by means of spacers 17 passing through the partition wall. It will be understood that the openings in the partition wall which are traversed by the spacers 17 or the like are made watertight.



   Digging shields of the type described in the foregoing or of a similar type are known, as well as the felling tools used with these shields and which are in the form of cutting wheels, scraping discs and the like. same as their training mechanisms.



   In the digging disc 1 is also fixedly mounted a worm conveyor 18 inclines upwards and backwards, after which is also mounted a land discharge conveyor 19 which is fixed. The latter is constituted for example by a conveyor belt, a conveyor belt raclette or any continuous conveyor. Using the worm 18 a muddy mixture consisting of earth and a liquid is evacuated from the slaughter chamber 11, the liquid being formed either by water from

 <Desc / Clms Page number 6>

 of the ground and / or by the water introduced into the slaughter chamber from the shield enclosure.

   In the case of a slaughter front shielded by the pressure of the ground, a suspension and preferably a suspension of water and bentonite are generally introduced as liquid into the slaughter chamber 11, l the water then being discharged during the digging work by the worm 18 by being mixed with the earth. To improve mixing, mixing arms 20 oriented in the direction of the partition wall 10 can be fixed to the rear side of the cutting wheel 12, these arms rotating with the cutting wheel. Other mixing arms 21 can be fixedly mounted on the partition wall 10.



   The conveyor tube 22 of the worm 18 ends in the partition wall 10, and therefore does not protrude into the slaughter chamber 11. The inlet 23 of the conveyor tube 22 is therefore located in the partition wall 10 , and in the lower region of the shield according to FIGS. 1 and 2. The inlet 23 can be closed by a closing drawer 24. According to FIG. 2, the closing drawer is made up of two parts. 11 is formed by two drawer plates in the form of segments 25 and 26 which are guided in suitable guiding devices 27 and which are actuated by hydraulic adjustment cylinders 28. The adjustment cylinders 28 are supported on articulations 29 of the section 2 of the shield and cooperate by their piston rods 30 with the associated drawer plates 25 or 26.

   During the deployment of the adjustment cylinders 28, the drawer plates 25 and 26 are pushed into their closed position while during the retraction of the adjustment cylinders 28, the drawer plates are retracted. In FIG. 2, the drawer plate 26 is shown in its closed position and the drawer plate 25 in its retracted position for opening the worm screw 18. Thanks to the closure drawer 24, the worm screw 18 can therefore be closed relative to its input 23 when it must be put out of operation.



   According to Figure 2, the partition wall 10 comprises above the worm 18 a closable manhole 31 and laterally a passage 32 in the wall, which can also be closed by means of a closure plate , a closing door or the like. When

 <Desc / Clms Page number 7>

 the closing plate or the like is separated, it is possible to bring a short replacement conveyor 33 through its loading end 34 into the slaughter chamber 11, from the rear space of the shield.

   The replacement conveyor 33 is advantageously constituted by a band
 EMI7.1
 conveyor, a scraper chain conveyor or the like. 11 can be moved in the longitudinal direction in the digging shield 1 from a rest position (not shown) to its working position shown in which it passes through the opening 32 of the wall and is located by its end of load 34 inside the slaughter chamber 11.

   As shown in FIG. 2, the rectangular opening 32 formed in the wall is adapted by its shape and its dimensions to the external shape and to the external dimensions of the replacement conveyor 33, the width of the opening 32 being substantially equal to the external width of the replacement conveyor 33 at its loading end. The replacement conveyor 33 is therefore supported in the opening 32 formed in the wall, and it is simultaneously guided laterally by this opening.



   In the working position shown, the replacement conveyor 33 also unloads in the earth evacuation conveyor 19. In the digging shield and above the loading end of the earth evacuation conveyor 19 is provided a fixing or a support 35 on or in which the replacement conveyor is supported in the shield by its rear unloading end 36.

   According to Figure 3, the discharge end 36 is located laterally against the discharge end of the worm 18 which in this case comprises a lower opening 37 provided with a drawer closure 38 (Figure 1). The worm 18 and the replacement conveyor 36 therefore transport the earth or the mixture of earth and liquid via a common transfer chute 39 (FIG. 3) or a transfer funnel, towards the conveyor land evacuation 19.



   If one crosses during the digging work formations in which one can carry out work in the room

 <Desc / Clms Page number 8>

 slaughter 11 without support, and in which the earth does not arrive in the form of a sludge which can be evacuated by the worm 18, the fixed worm 18 is then closed at the entrance by closing the drawer 24. The replacement conveyor 33 which is transportable or displaceable is advanced from its rear rest position and pushed by its loading end into the opening 32 of the wall while being supported at the rear by the support d 'support.



  In this working position, the earth which eventually forms lumps is removed from the slaughter chamber 11 using the replacement conveyor 33. In the embodiment shown, the replacement conveyor is constituted by a conveyor a squeegee that carries the earth on its upper strand. Inside the felling chamber, the falling earth can be taken up in the sole region by loading arms or loading shovels which can be mounted at the rear on the cutting wheel 12, then reassembled and then unloaded from above onto the loading end 34 of the replacement conveyor 33.

   These loading arms or loading shovels are indicated at 40 in FIG. 1, on the outer periphery of the cutting wheel 12 and at the rear.



   When not in use, the replacement conveyor 33 is released. withdraws towards the quarry of the opening 32 of the partition wall 10 and returned to its rear rest position. Optionally, there is also the possibility of maintaining the replacement conveyor 33 in the mounting position shown when the transport of the soil is temporarily carried out using the worm screw 18. In this case, it is advantageous for the conveyor replacement 33 is brought back enough by its loading end 34 so that one can close the opening 32 formed in the wall.



  In this resting position brought back, and especially when it
 EMI8.1
 these are large diameter shields, the passage section in the shield is not excessively reduced by the replacement conveyor.


    

Claims (12)

REVENDICATIONS 1. Bouclier de creusement, notamment pour le creusement avec un front d'abattage blindé par la pression du terrain, comprenant une paroi de séparation disposée dans le bouclier, une roue de coupe ou analogue montée dans la chambre d'abattage et a l'avant de la paroi de séparation, et une vis transporteuse sans fin pour l'evacuation des terres, caractérisé en ce que la paroi de Separation (10) est munie d'une ouverture (32) fermable et destinée au passage d'un convoyeur de remplacement (33) mobile et constitue sous forme d'une bande transporteuse, d'un convoyeur à chaine ä raclettes ou analogue.  CLAIMS 1. Digging shield, in particular for digging with a felling front shielded by the pressure of the ground, comprising a partition wall disposed in the shield, a cutting wheel or the like mounted in the felling chamber and at the front of the partition wall, and an endless conveyor screw for evacuating the earth, characterized in that the partition wall (10) is provided with a closable opening (32) intended for the passage of a conveyor mobile replacement (33) and constitutes in the form of a conveyor belt, a raclette chain conveyor or the like. 2. Bouclier de creusement selon la revendication l, caractérisé en ce que l'entrée (23) du tube de transfert (22) de la vis sans fin (18) qui est disposée dans la région de la paroi de séparation (10) peut être fermée au moyen d'un tiroir de fermeture (24).  2. digging shield according to claim l, characterized in that the inlet (23) of the transfer tube (22) of the worm (18) which is arranged in the region of the partition wall (10) can be closed by means of a closing drawer (24). 3. Bouclier de creusement selon la revendication 1 ou 2, caractérisé en ce que le convoyeur-de remplacement (33) est monté de façon mobile dans sa direction longitudinale dans le bouclier de creusement.  3. digging shield according to claim 1 or 2, characterized in that the replacement conveyor (33) is movably mounted in its longitudinal direction in the digging shield. 4. Bouclier de creusement selon l'une quelconque des revendications 1 ä 3, caractérisé en ce que l'ouverture (32) constituée dans la paroi se trouve sensiblement a mi-hauteur du bouclier.  4. digging shield according to any one of claims 1 to 3, characterized in that the opening (32) formed in the wall is located substantially halfway up the shield. 5. Bouclier de creusement selon l'une quelconque des revendications 1 ä 4, caractérisé en ce que l'ouverture fermable (32) est située au-dessus de l'entrée (23) de la vis sans fin (18) dans la paroi de séparation (10).  5. digging shield according to any one of claims 1 to 4, characterized in that the closable opening (32) is located above the inlet (23) of the worm (18) in the wall separation (10). 6. Bouclier de creusement selon l'une quelconque des revendications 1 à 5, caractérisé en ce que le convoyeur de remplacement (33) est supporté et guidé dans l'ouverture (32) de 1a paroi.  6. Digging shield according to any one of claims 1 to 5, characterized in that the replacement conveyor (33) is supported and guided in the opening (32) of the wall. 7. Bouclier de creusement selon l'une quelconque des revendications l'a 6, caractérisé en ce que l'ouverture (32) de la paroi qui est de préférence rectangulaire présente une largeur interne qui correspond sensiblement ä la largeur du convoyeur de remplacement (33).  7. digging shield according to any one of claims a 6, characterized in that the opening (32) of the wall which is preferably rectangular has an internal width which corresponds substantially to the width of the replacement conveyor ( 33). 8. Bouclier de creusement selon l'une quelconque des <Desc/Clms Page number 10> revendications 1 ä 7, caractérisé en ce qu'un logement destine au convoyeur de remplacement (33) dans sa position de repos est prévu dans le bouclier (1) à 1'arrière de la paroi de séparation (10).  8. Digging shield according to any one of  <Desc / Clms Page number 10>  Claims 1 to 7, characterized in that a housing for the replacement conveyor (33) in its rest position is provided in the shield (1) at the rear of the partition wall (10). 9. Bouclier de creusement selon l'une quelconque des revendications 1 à 8, dans lequel un convoyeur d'évacuation des terres ayant de préférence la forme d'une bande transporteuse ou d'un convoyeur à chaine à raclettes évacue les terres du bouclier de creusement et est monté à la suite de la vis sans fin, caractérisé en ce que le convoyeur de remplacement (33) se décharge également dans le convoyeur d'évacuation des terres (19).  9. Digging shield according to any one of claims 1 to 8, in which a soil evacuation conveyor preferably having the form of a conveyor belt or a scraper chain conveyor evacuates the earth from the shield. digging and is mounted as a result of the worm, characterized in that the replacement conveyor (33) also unloads in the soil evacuation conveyor (19). 10. Bouclier de creusement selon la revendication 9, caractérisé en ce que 1'extrémité de déchargement (36) du convoyeur de remplacement (33) est disposée latéralement contre l'extrémité de déchargement de la vis sans fin (18).  10. Digging shield according to claim 9, characterized in that the unloading end (36) of the replacement conveyor (33) is arranged laterally against the unloading end of the worm (18). 11. Bouclier de creusement selon la revendication 9 ou 10, caractérisé en ce que la vis sans fin (18) et le convoyeur de remplacement (33) se déchargent dans le convoyeur d'evacuation des terres (19)'par l'intermédiaire d'une goulotte de transfert commune, d'une trémie de transfert (39) ou analogue.  11. digging shield according to claim 9 or 10, characterized in that the worm (18) and the replacement conveyor (33) are unloaded in the earth evacuation conveyor (19) 'via d '' a common transfer chute, a transfer hopper (39) or the like. 12. Bouclier de creusement selon l'une quelconque des revendications 1 à 11, caractérisé en ce qu'un appui (35) servant à supporter le convoyeur de remplacement (33) dans sa position da travail est monté dans le bouclier ä l'arrière de la paroi de séparation (10).  12. digging shield according to any one of claims 1 to 11, characterized in that a support (35) serving to support the replacement conveyor (33) in its working position is mounted in the shield at the rear of the partition wall (10).
BE8700887A 1986-08-12 1987-08-10 Shield digging in particular for digging with a front slaughter screened by the pressure of land, with endless screw conveyor for waste land. BE1000805A3 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19863627270 DE3627270A1 (en) 1986-08-12 1986-08-12 Driving shield, in particular for driving with a heading face supported by earth pressure, with a screw conveyor for the earth moving

Publications (1)

Publication Number Publication Date
BE1000805A3 true BE1000805A3 (en) 1989-04-11

Family

ID=6307197

Family Applications (1)

Application Number Title Priority Date Filing Date
BE8700887A BE1000805A3 (en) 1986-08-12 1987-08-10 Shield digging in particular for digging with a front slaughter screened by the pressure of land, with endless screw conveyor for waste land.

Country Status (3)

Country Link
BE (1) BE1000805A3 (en)
DE (1) DE3627270A1 (en)
FR (1) FR2602822B1 (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4213987C2 (en) * 1992-04-29 2002-06-27 Herrenknecht Gmbh Conveying device for a shield tunneling machine for drilling tunnel sections
DE19752718C1 (en) 1997-11-28 1999-04-29 Wayss & Freytag Ag Method of conveying bulk material from pressure chamber
FR2795129B1 (en) * 1999-06-15 2001-09-21 Nfm Tech TUNNEL EXCAVATION MACHINE
WO2014004405A1 (en) * 2012-06-25 2014-01-03 The Robbins Company Tunnel boring machine with cutterhead support assembly supporting a variable number of drive systems
CN109113754B (en) * 2018-10-15 2023-11-24 中国铁建重工集团股份有限公司 Slurry balance shield machine and cutter disc mud cake preventing device thereof
CN109838242A (en) * 2019-03-22 2019-06-04 中国铁建重工集团有限公司 Development machine
CN113446016B (en) * 2021-07-27 2022-04-19 中铁工程装备集团有限公司 Online dual-mode shield tunneling machine and dual-mode conversion method of shield tunneling machine

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH532694A (en) * 1970-12-23 1973-01-15 Grund & Tiefbau Ag Protective shield for driving tunnels
DE3326219A1 (en) * 1983-07-21 1985-01-31 Gewerkschaft Eisenhütte Westfalia, 4670 Lünen Driving shield with bulkhead wall
DE3330635A1 (en) * 1983-08-25 1985-03-21 Wayss & Freytag Ag, 6000 Frankfurt Driving shield

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH532694A (en) * 1970-12-23 1973-01-15 Grund & Tiefbau Ag Protective shield for driving tunnels
DE3326219A1 (en) * 1983-07-21 1985-01-31 Gewerkschaft Eisenhütte Westfalia, 4670 Lünen Driving shield with bulkhead wall
DE3330635A1 (en) * 1983-08-25 1985-03-21 Wayss & Freytag Ag, 6000 Frankfurt Driving shield

Also Published As

Publication number Publication date
FR2602822B1 (en) 1989-05-26
DE3627270A1 (en) 1988-02-18
FR2602822A1 (en) 1988-02-19

Similar Documents

Publication Publication Date Title
EP0251876B1 (en) Mechanized assembly for digging a trench and laying elongate objects
CA1309810C (en) Sweeping process and means
BE1000805A3 (en) Shield digging in particular for digging with a front slaughter screened by the pressure of land, with endless screw conveyor for waste land.
EP1194031B1 (en) Device and method for treating the soil by aeration
FR2517643A1 (en) AUTOMATIC DEVICE FOR STORING GARBAGE IN A CONVEYABLE CONTAINER AND UNLOADING IT
FR2720596A1 (en) Baling press.
EP0258165B1 (en) Apparatus for filling and emptying an agricultural liquid manure tank
FR2498948A1 (en) SEMI-TRAILER SHREDDING PLANT, FOR EXAMPLE FOR ROAD COVERING MATERIALS
FR2622910A1 (en) EXCAVATOR BENCH WITH GODETS
FR2542973A1 (en) Device for gathering shellfish, such as oysters
FR2512792A1 (en) COMPACTOR-COLLECTOR DEVICE FOR COLLECTING AND COMPACTING WASTE OR GARBAGE
FR2464628A1 (en) MANURE SPREADER AND SIMILAR MATERIALS
BE896006A (en) PROCESS FOR THE PERMANENT IMPROVEMENT OF THE SURFACE DRAINAGE OF LANDS, PREFERABLY, GROUNDS COVERED WITH GRASS, AND APPARATUS FOR CARRYING OUT SAID METHOD
FR2687533A1 (en) Device for preparing the land for removing objects therefrom
EP0014153A1 (en) Device for picking up, transporting and distributing materials
EP0015197A1 (en) Industrial household refuse crusher
FR2712769A1 (en) Hopper device for the central collection of grapes
FR2540905A1 (en) Improvements to screen buckets for front loaders
FR2630415A1 (en) GARBAGE CONTAINER
FR2485084A1 (en) Thick deposit mine-working lemniscate gear shield block - has gear linked guide rod hinged to bottom part of articulated shield
FR2767634A1 (en) Silage separator
EP3323300B1 (en) Unit for treating agricultural products
FR2637874A1 (en) DEVICE FOR THE CONTINUOUS COLLECTION AND COMPACTION OF GARBAGE
FR2478486A1 (en) IMPACT CRUSHER HAVING A CRUSHING TRACK FORMED BY THE END OF STACKED IMPACT OR IMPACT BARS
FR2712572A1 (en) Container for the selective storage of waste.

Legal Events

Date Code Title Description
RE Patent lapsed

Owner name: GEWERKSCHAFT EISENHUTTE WESTFALIA G.M.B.H.

Effective date: 19940831