US20040172175A1
(en)
*
|
2003-02-27 |
2004-09-02 |
Julich Paul M. |
System and method for dispatching by exception
|
US20060212187A1
(en)
*
|
2003-02-27 |
2006-09-21 |
Wills Mitchell S |
Scheduler and method for managing unpredictable local trains
|
US20060212188A1
(en)
*
|
2003-02-27 |
2006-09-21 |
Joel Kickbusch |
Method and apparatus for automatic selection of alternative routing through congested areas using congestion prediction metrics
|
US7725249B2
(en)
*
|
2003-02-27 |
2010-05-25 |
General Electric Company |
Method and apparatus for congestion management
|
US7797087B2
(en)
*
|
2003-02-27 |
2010-09-14 |
General Electric Company |
Method and apparatus for selectively disabling train location reports
|
US20060212186A1
(en)
*
|
2003-02-27 |
2006-09-21 |
Philp Joseph W |
Method and apparatus for scheduling maintenance of way
|
US7937193B2
(en)
*
|
2003-02-27 |
2011-05-03 |
General Electric Company |
Method and apparatus for coordinating railway line of road and yard planners
|
KR100402348B1
(en)
*
|
2003-07-02 |
2003-10-22 |
Bong Taek Kim |
Automatic train protection stop device for controlling railroad using data communication
|
US8292172B2
(en)
*
|
2003-07-29 |
2012-10-23 |
General Electric Company |
Enhanced recordation device for rail car inspections
|
US7908047B2
(en)
|
2004-06-29 |
2011-03-15 |
General Electric Company |
Method and apparatus for run-time incorporation of domain data configuration changes
|
US20060015224A1
(en)
*
|
2004-07-15 |
2006-01-19 |
Hilleary Thomas N |
Systems and methods for delivery of railroad crossing and wayside equipment operational data
|
WO2006079326A2
(de)
*
|
2005-01-26 |
2006-08-03 |
Josef Wiegand Gmbh & Co. Kg |
Beförderungssystem in form einer hängebahn für personen, insbesondere zu vergnügungszwecken, oder für güter
|
JP4375253B2
(ja)
*
|
2005-02-25 |
2009-12-02 |
株式会社日立製作所 |
信号保安システム
|
RU2430845C2
(ru)
|
2005-03-14 |
2011-10-10 |
Дженерал Электрик Компани |
Способ планирования передвижения множества железнодорожных вагонов через железнодорожный станционный парк (варианты)
|
DE102005042218B4
(de)
*
|
2005-09-05 |
2012-07-26 |
Deutsches Zentrum für Luft- und Raumfahrt e.V. |
Eisenbahnkollisions-Warneinrichtung
|
US8311689B2
(en)
*
|
2005-12-21 |
2012-11-13 |
General Electric Company |
Protection against exceeding the braking capability of remote controlled locomotives
|
FR2897701B1
(fr)
*
|
2006-02-17 |
2008-07-11 |
Alstom Transport Sa |
Systeme securitaire d'acquisition d'informations numeriques.
|
DE102006015318B4
(de)
*
|
2006-03-30 |
2008-03-06 |
Siemens Ag |
Verfahren zum Betreiben einer Zugbeeinflussungseinrichtung
|
US7734383B2
(en)
*
|
2006-05-02 |
2010-06-08 |
General Electric Company |
Method and apparatus for planning the movement of trains using dynamic analysis
|
US20070260497A1
(en)
*
|
2006-05-02 |
2007-11-08 |
Wolfgang Daum |
Method of planning train movement using a front end cost function
|
US8498762B2
(en)
*
|
2006-05-02 |
2013-07-30 |
General Electric Company |
Method of planning the movement of trains using route protection
|
US7797088B2
(en)
|
2006-05-02 |
2010-09-14 |
General Electric Company |
Method and apparatus for planning linked train movements
|
US7680750B2
(en)
|
2006-06-29 |
2010-03-16 |
General Electric Company |
Method of planning train movement using a three step optimization engine
|
US8082071B2
(en)
*
|
2006-09-11 |
2011-12-20 |
General Electric Company |
System and method of multi-generation positive train control system
|
DE102006044329B3
(de)
*
|
2006-09-19 |
2008-04-17 |
Siemens Ag |
System und Verfahren zur Fahrwegs- und/oder Geschwindigkeitsbestimmung von Fahrzeugen, insbesondere zur Zugbeeinflussung
|
US8433461B2
(en)
|
2006-11-02 |
2013-04-30 |
General Electric Company |
Method of planning the movement of trains using pre-allocation of resources
|
GB2445374A
(en)
*
|
2007-01-04 |
2008-07-09 |
Westinghouse Brake & Signal |
A method for regulating the movement of a train through an area of railway fitted with trackside radio signaling equipment.
|
DE102007031138A1
(de)
*
|
2007-06-29 |
2009-01-02 |
Siemens Ag |
Verfahren und Anordnung zum Betreiben einer Eisenbahnstrecke
|
US8565945B2
(en)
*
|
2008-01-17 |
2013-10-22 |
Lockheed Martin Corporation |
Method for managing vital train movements
|
ES2325850A1
(es)
*
|
2008-03-18 |
2009-09-21 |
Sociedad Publica Eusko Trenbideak-Ferrocarriles Vascos, S.A. |
Sistema de ayuda a la operacion de gestion de bloqueos ferroviarios via radio.
|
DE102008020700A1
(de)
|
2008-04-24 |
2009-11-05 |
Deutsches Zentrum für Luft- und Raumfahrt e.V. |
Eisenbahnkollisions-Warnvorrichtung
|
DE102008023347B4
(de)
*
|
2008-05-13 |
2014-04-03 |
Siemens Ag Bereich Verkehrstechnik |
Verfahren zum Erkennen und Zuordnen von Haltfällen und Haltfallerkennungseinrichtung für ein Zugsicherungssystem
|
US8478463B2
(en)
*
|
2008-09-09 |
2013-07-02 |
Wabtec Holding Corp. |
Train control method and system
|
DE102008042890A1
(de)
*
|
2008-10-16 |
2010-04-22 |
Maurer Söhne Gmbh & Co. Kg |
Beförderungssystem, insbesondere zu Vergnügungszwecken, und Verfahren zur Steuerung eines Beförderungssystems
|
DE102008060188A1
(de)
*
|
2008-11-28 |
2010-06-10 |
Siemens Aktiengesellschaft |
Verfahren und Vorrichtung zur Abstandsmessung
|
DE102009015540A1
(de)
*
|
2009-04-01 |
2010-10-14 |
Siemens Aktiengesellschaft |
Verfahren und Vorrichtung zur Geschwindigkeitsüberwachung
|
CN101927768B
(zh)
*
|
2009-06-18 |
2012-08-15 |
株洲南车时代电气股份有限公司 |
一种搜索列车牵引计算制动点、加速点及惰行点的方法
|
FR2958248B1
(fr)
|
2010-04-01 |
2012-06-15 |
Alstom Transport Sa |
Procede de gestion de la circulation de vehicules sur un reseau ferroviaire et systeme associe
|
CN101934808B
(zh)
*
|
2010-09-10 |
2013-03-20 |
华为技术有限公司 |
列控系统的控车方法及装置
|
KR101253684B1
(ko)
*
|
2011-04-22 |
2013-04-11 |
주식회사 혁신전공사 |
열차의 운전시격 산출방법
|
EP2524852B1
(de)
|
2011-05-17 |
2019-09-25 |
Schweizerische Bundesbahnen SBB |
Verfahren und Vorrichtung zur Überwachung eines Gleisabschnittes
|
JP5898904B2
(ja)
*
|
2011-09-30 |
2016-04-06 |
日本信号株式会社 |
列車制御システム
|
FR2982230B1
(fr)
|
2011-11-07 |
2015-09-04 |
Alstom Transport Sa |
Installation et procede de gestion de la circulation de vehicules sur un reseau ferroviaire
|
CN102510823B
(zh)
*
|
2011-11-17 |
2014-07-16 |
华为技术有限公司 |
列车控制方法、设备和系统
|
KR101339348B1
(ko)
*
|
2012-03-23 |
2013-12-09 |
한국철도기술연구원 |
궤도회로를 이용한 이동폐색과 고정폐색의 혼합 운행 시스템 및 방법
|
WO2014011887A1
(en)
*
|
2012-07-11 |
2014-01-16 |
Carnegie Mellon University |
A railroad interlocking system with distributed control
|
DE102012217777A1
(de)
*
|
2012-09-28 |
2014-04-03 |
Siemens Aktiengesellschaft |
Steuerung eines Schienenfahrzeugs
|
DE102012217817A1
(de)
*
|
2012-09-28 |
2014-04-03 |
Siemens Aktiengesellschaft |
Steuerung eines Schienenfahrzeugs
|
DE102013201224A1
(de)
*
|
2013-01-25 |
2014-07-31 |
Siemens Aktiengesellschaft |
Verfahren und Vorrichtung zur ETCS -L1 - und/oder -L2 - Zugbeeinflussung
|
DE102013203152A1
(de)
*
|
2013-02-26 |
2014-08-28 |
Siemens Aktiengesellschaft |
Schienenfahrzeug mit mindestens einem Zugsicherungsgerät nach einem nationalen Standard und mit einer ETCS-Fahrzeugeinrichtung sowie Verfahren zum Betreiben des Schienenfahrzeugs
|
DE102013203124A1
(de)
*
|
2013-02-26 |
2014-08-28 |
Siemens Aktiengesellschaft |
Schienenfahrzeug mit einer Tachometer-Geschwindigkeitsanzeigeeinrichtung und Verfahren zum Betreiben eines solchen Schienenfahrzeugs
|
US9283945B1
(en)
*
|
2013-03-14 |
2016-03-15 |
Wabtec Holding Corp. |
Braking systems and methods of determining a safety factor for a braking model for a train
|
KR101351508B1
(ko)
|
2013-03-25 |
2014-01-16 |
현대로템 주식회사 |
Ertms 발리스의 고장 표시시스템 및 방법
|
KR101344418B1
(ko)
|
2013-05-14 |
2013-12-23 |
대아티아이 (주) |
ETCS Level 1 신호시스템과 상호간섭을 받는 신호시스템의 ATP/ATO 신호송수신시스템의 운행방법
|
US8924066B2
(en)
*
|
2013-05-22 |
2014-12-30 |
General Electric Company |
Systems and methods for determining route location
|
US9340220B2
(en)
|
2013-05-23 |
2016-05-17 |
Alstom Transport Technologies |
Systems and methods for management of crossings near stations
|
US9150229B2
(en)
|
2013-06-05 |
2015-10-06 |
General Electric Company |
Systems and method for controlling warnings at vehicle crossings
|
US9026360B2
(en)
*
|
2013-06-05 |
2015-05-05 |
General Electric Company |
Systems and methods for providing constant warning time at crossings
|
US9842502B2
(en)
|
2013-06-10 |
2017-12-12 |
Alstom Transport Technologies |
Systems and methods for maintaining interlockings of transportation networks
|
US9751545B2
(en)
|
2013-06-10 |
2017-09-05 |
Alstom Transport Technologies |
Systems and methods for testing wayside units
|
WO2015019432A1
(ja)
*
|
2013-08-07 |
2015-02-12 |
株式会社日立製作所 |
運行管理システム
|
DE102013226718A1
(de)
*
|
2013-12-19 |
2015-06-25 |
Siemens Aktiengesellschaft |
ETCS-Streckenausrüstung
|
CN103754242B
(zh)
*
|
2013-12-31 |
2017-01-18 |
中铁第四勘察设计院集团有限公司 |
市域铁路信号系统及其控制方法
|
US9481385B2
(en)
|
2014-01-09 |
2016-11-01 |
General Electric Company |
Systems and methods for predictive maintenance of crossings
|
JP6153882B2
(ja)
*
|
2014-03-27 |
2017-06-28 |
日立建機株式会社 |
車両走行システム及び運行管理サーバ
|
FR3026710B1
(fr)
*
|
2014-10-03 |
2017-10-06 |
Metrolab |
Vehicule ferroviaire, vehicules ferroviaires amont et aval, procede de regulation de distance entre un vehicule ferroviaire aval et un vehicule ferroviaire amont
|
US9499183B2
(en)
*
|
2015-02-23 |
2016-11-22 |
Mitsubishi Electric Research Laboratories, Inc. |
System and method for stopping trains using simultaneous parameter estimation
|
FR3041311B1
(fr)
*
|
2015-09-22 |
2019-03-22 |
Sncf Mobilites |
Procede et systeme de controle de vehicules ferroviaires circulant sur une voie ferree.
|
DE102015218971A1
(de)
|
2015-09-30 |
2017-03-30 |
Siemens Aktiengesellschaft |
Sicherungsverfahren für ein Gleisstreckennetz
|
US11021178B2
(en)
*
|
2015-10-24 |
2021-06-01 |
Nabil N. Ghaly |
Method and apparatus for autonomous train control system
|
US10279823B2
(en)
*
|
2016-08-08 |
2019-05-07 |
General Electric Company |
System for controlling or monitoring a vehicle system along a route
|
WO2019052689A1
(de)
|
2017-09-18 |
2019-03-21 |
Sew-Eurodrive Gmbh & Co. Kg |
Schienenanlage und verfahren zum betreiben einer schienenanlage mit schienengeführtem mobilteil und zentraler steuerung
|
CN108260085A
(zh)
*
|
2017-12-19 |
2018-07-06 |
北京交通大学 |
基于位置的呼叫限制方法
|
CN112172841B
(zh)
*
|
2020-10-15 |
2022-08-09 |
天津津航计算技术研究所 |
一种用于真空金属管道高速列车的防撞系统
|
DE112022000607A5
(de)
|
2021-01-13 |
2023-11-09 |
Pintsch Gmbh |
Verfahren und anordnung zum überwachen von gleisabschnitten
|
CN116513279B
(zh)
*
|
2023-06-30 |
2023-10-03 |
卡斯柯信号(北京)有限公司 |
一种测试列车后备模式正常运行的方法及装置
|