AP893A - Undercut excavation with protection against seismic events or excessive ground movement. - Google Patents

Undercut excavation with protection against seismic events or excessive ground movement. Download PDF

Info

Publication number
AP893A
AP893A APAP/P/1998/001301A AP9801301A AP893A AP 893 A AP893 A AP 893A AP 9801301 A AP9801301 A AP 9801301A AP 893 A AP893 A AP 893A
Authority
AP
ARIPO
Prior art keywords
posts
concrete
excavation
resilient elements
tire
Prior art date
Application number
APAP/P/1998/001301A
Other versions
AP9801301A0 (en
Inventor
Charles M Gryba
Original Assignee
998492 Ontario Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 998492 Ontario Inc filed Critical 998492 Ontario Inc
Publication of AP9801301A0 publication Critical patent/AP9801301A0/en
Application granted granted Critical
Publication of AP893A publication Critical patent/AP893A/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)
  • Piles And Underground Anchors (AREA)
  • Earth Drilling (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

An undercut excavation method is provided, which is particularly suitable as an undercut-and-fill mining method, wherein concrete posts are inserted into holes drilled in the ground and are used to support a concrete floor poured on their top ends, which serves as a roof for the lower excavation level. The bottom ends of these posts rest on resilient elements to provide protection against seismic events or excessive ground movements. Excavation beneath such roof is thereby safely carried out in areas prone to seismic events such as rock bursts or earth quakes or to excessive ground movements. The concrete posts may be attached to the resilient elements at their bottom ends, thereby producing yielding posts suitable for such excavation. For still greater safety, a double post system may be used, which involves placing a second post beside the first after excavation on a given level and tying them all together with the concrete used to make the floor/roof for the next lower level of excavation. In mining this is called double-post mining or DPM.

Description

UNDERCUT EXCAVATION WITH PROTECTION AGAINST
SEISMIC EVENTS OR EXCESSIVE GROUND MOVEMENT
BACKGROUND OF THE INVENTION
1. Field of the Invention
This invention relates to a method for excavation from the top down, usually known as undercut excavation which also comprises protection against seismic events such as rock bursts or earth quakes as well as from excessive but relatively slow ground movement. More particularly the invention relates to an io undercut excavation method using concrete posts which are adapted to support concrete floors that become a roof for the next lower level of excavation and wherein the posts are combined with resilient elements to provide protection against seismic events or against ground movement that exceeds failure load of the concrete posts.
2. Discussion of the Prior Art
Applicant's U.S. Patent No. 5,522,676 of June 4,1996 discloses an undercut excavation method wherein, as the first step, posts are inserted into the ground, which may be done by drilling holes in tire ground and inserting concrete posts in such holes, and further these posts have top ends capable of supporting a
0 concrete roof and are inserted into tire ground so that their top ends are essentially flush with the ground; then a concrete floor is poured on the ground and on tire top ends of the posts; and finally safe excavation proceeds beneath the concrete floor which now serves as a concrete roof for the excavation.
The above method also provides for a multi-level undercut excavation,
-iAP Ο ϋ Ο 8 9 3 such as an undercut-and-fill mining method, whereby tire same procedure is repeated at each level as tire excavation progresses downwardly from level to level until a desired number of levels has thus been excavated. In the undercutand-fill mining method, the excavated rooms are back-filled with a suitable fill after excavating the same. Moreover, holes may be drilled around the posts inserted into the ground, and blasted with explosives to break the ground around tire posts without, however, damaging tire posts themselves. This facilitates excavation under tire concrete floor/roof thereafter and minimizes damage to tire posts during excavation.
io It has also been disclosed hr said U.S. Patent No. 5,522,676 drat additional posts may be stood-up in plumb on top of tire posts previously inserted into the holes to provide further support to tire concrete roof and thus an enhanced safety. This is called double post excavation, or when applied to mining double post mining or DPM.
When a set of concrete posts is installed in holes iir air rurdercut excavation as mentioned above or as part of tire double post excavation or DPM, the posts have zero load. Once the concrete floor/roof has been cast and tire excavation has been performed, there will be a load applied to tire posts. If tire excavation is only a one level excavation, it is likely that there may be a structure placed over it, o such as a building or tire like, which will exert air additional load onto tire posts over and above tire load exerted by tire floor/roof poured thereover. The sanre applies to a nrulti-level excavation. Also iir a mining undercut-and-fill method, loads are transmitted to tire posts run the backfill as tire rock or ore formations
AP/P/ 9 8 / 0 1 30 1
APOoo093 move or relax. The concrete posts are, of course, rigid and they could overload and fail particularly during seismic events, such as a rock burst or earth quake, which may produce massive energy releases.
SUMMARY OF THE INVENTION
It is, therefore, an object of the present invention to provide a method of undercut excavation or mining, which will include protection against seismic events, such as rock bursts or earth quakes or against excessive ground o movement < %
A further object of the invention is to achieve such protection in a simple and efficient manner.
A still further object of the present invention is to provide safe excavation and mining in zones or areas prone to strong earth quakes or rock bursts or 15 excessive ground movement.
Other objects and advantages of die invention will be apparent from the ( , tu following description thereof.
In essence the method of excavation of die present invention comprises:
(a) drilling holes of predetermined size and length in the ground;
0 (b) placing at the bottom of said holes resilient elements capable of absorbing shock energy or excessive loads due to ground movement;
(c) inserting concrete posts into said holes, these posts having their bottom ends resting on the resilient elements and having their top ends essentially flush with die ground, die posts being capable of supporting a concrete roof on their
5 top ends;
98/01301
-3ΑΡ$θΟ893 (d) pouring a concrete floor on tire ground and on tire top ends of tire posts, and (e) excavating beneath the concrete floor which now serves as the concrete roof for tire excavation, with tire resilient elements providing protection against seismic events in tire area of the excavation or against gound movement exceeding failure load of tire concrete posts.
When reference is made herein to concrete posts, these include reinforced concrete posts and when reference is made to pouring a concrete floor on the ground and on tire top ends of the posts, it also includes the pouring or casting of a reinforced concrete floor, i.e. a floor designed with rebar and screen elements within the concrete, so that tire posts cannot puncture tire same.
The novel method is particularly suitable for multi-level excavation irr areas prone to strong earth movements, such as earth quakes and the like, hr cases, for example, where a multi-level underground garage is built in this manner, once tire excavation on tire first level is completed, new holes are drilled in tire ground of such first excavated level and resilient elements capable of absorbing shock energy are placed in these irew holes, and new concrete posts are inserted into tire new holes to rest on tire resilient elements and a concrete floor is poured on tire ground of tire first excavation level to be supported by tire new posts, and then excavation is pursued on tire new lower level under this concrete floor which now serves as a roof for tlris new lower excavation level, while tire resilient elenreirts on which tire new posts rest now provide protection against seismic events as well as against excessive ground movement generally.
I 0 £ I 0 / β 6 /d/dV
-4APO00893
The invention is also particularly suitable for carrying out undercut-andfill mining in areas prone to strong rock bursts and excessive rock movements. Such mining method essentially comprises:
(a) cutting initial drifts in an underground mine to form rooms in a 5 conventional manner with a sill at the upper end of our ore body, and recovering the mined material from such rooms;
(b) drilling holes of a predetermined size and length in the sill of each room;
(c) placing resilient elements at the bottom of the holes capable of absorbing z-i shock energy or excessive loads due to rock movement;
ί o (d) inserting concrete posts in these holes to rest on the resilient elements with their bottom ends and having their top ends essentially flush with the sill of the rooms;
(e) pouring a concrete floor in the rooms to be supported by the top ends of the posts;
(f) back filling the rooms with a suitable fill after they have been mined out;
(g) once a complete lift has been so mined, repeating this mining procedure on a lower level where the concrete floors now serve as a roof supported by the concrete posts and the resilient elements serve as protection against seismic events, such as rock bursts or against rock movement exceeding failure load of o the concrete posts; and (h) continuing mining in this manner from level to level until the desired ore body is mined, with the resilient elements under tire posts of the lowermost level serving as protection against seismic events and excessive rock movements to
APT/ 98/01301
-5ΑΡ ϋ j ύ 8 9 3 which tlie mine may be exposed.
It should be emphasized that in the case of multi-level excavation or mining, it is tlie resilient elements of tire lowermost level that provide protection against the seismic events and excessive ground movement, and the elements used at higher levels may be recovered and reused at lower levels.
Furthermore, additional posts may be stood-up on top of the concrete posts inserted into holes drilled in tire ground or in the mine sill at each level of excavation, so as to exert pressure on these concrete posts and provide suitable load on said posts and on the resilient elements on which they rest, thereby transmitting protection against seismic events and excessive ground movement to the upper levels of the excavated body or mine. These additioiral posts may be concrete posts but they may also be posts other than concrete posts, such as posts made of timber or steel. The additional posts are preferably positioned adjacent to the original posts supporting tire concrete roof so as to facilitate tying them all together when tire concrete floor is poured at tire new level, hr tire case of mining, tlris is called a double-post mining or DPM, where tire posts at the lowermost level resting on tire resilient elements provide protection against seismic events or excessive gound movement in tire mined area.
It should also be mentioned tlrat tire holes drilled iir tire ground or in tire sill of a mine are preferably deeper than tire sill of tire next lower level and extend below tire floor of such next level by a sufficient distance to accommodate tire resilient elements under tire sill or floor level of tire next excavation, hr tlris manner such elements may be easily recovered during tire excavation of tire next p/n/ 98/01301
ΑΡΟ00893 lower level and reused in further lower levels of excavation or mining. Moreover, so that the resilient elements are not lost during the excavation of the lower level, they may be attached to a suitable chain or rope in order to facilitate their subsequent recovery.
Furthermore, in rock or mine excavations, and particularly where the excavation is done by a drill-and-blast method, it is preferable to drill small blast holes around the holes with inserted concrete posts and to blast the same to break the ground around the posts without damaging said posts, so as to facilitate subsequent excavation under the concrete roof supported by these posts.
It should be noted that rigid concrete posts, including reinforced concrete posts are vulnerable to shock loads and rapid earth movements that exceed 1 or 2 centimetres. Such seismic events will cause immediate failure of the concrete posts. Also, even slow steady movement that exceeds tire compressive ability of rigid reinforced concrete will cause post failure. For a concrete post 5 m in length, a load that produces a movement exceeding about 2 cm will cause failure.
According to the present invention, by placing a resilient element under the concrete post, one creates a yielding post out of what is normally a very rigid member. This resilient element may be, for example, an engineered solid spring, o e.g. a plastic spring, which may either be placed at tire bottom of the hole into which tire concrete post is subsequently inserted or it may be attached to the bottom end of the post.
hr lieu of the spring one may use a plastic block or a plastic element, for
ΛΡ/Γ/98/0 1301
-7APu ο ο 8 9 3 example, in the form of a doughnut, made of an engineered plastic such as Tecspah1·''1 manufactured by DuPont and which has excellent ability to absorb shock loads and may be designed to compress like a spring.
For example, one can thus design a spring or spring like resilient element for withstanding ten times the movement of a rigid concrete post (20 cm), yet maintaining the support design load of the post. Thus, a range of movements that would cause tire post to fail in compression would simply compress the spring or spring like resilient element while maintaining post loads below failure loading.
hr fact, by electing proper materials and processing conditions, a very io specific spring rate may be obtained. For instance, if rock mechanics modelling suggests that one has to design for 10 cm movement at 400 tonnes of load pressure, tire plastic spring or block or other suitable such resilient element may be designed specifically for such set of parameters. This is particularly important for deep mining applicatioxrs which may result hr serious rock bursts. The ability7 is to engineer and install the posts so as to absorb such shock loads in a controlled manner limits tire damage area and considerably improves mining safety.
BRIEF DESCRIPTION OF THE DRAWINGS
0 The invention will now be described, by7 way7 of example, with reference to tire accompanying drawings hr which tire same parts are designated by tire same numerals, and in which:
Fig. 1 is a perspective view of air excavation according to tire method of the present invention;
s Fig. 2 is a section view of such excavation;
AP/P/ 98/01301
APO00893
Fig. 3 is a detailed view of double post arrangement; and
Fig. 4 is a partial section view of a double-post mining excavation with back filling of the previously excavated rooms.
DESCRIPTION OF THE PREFERRED EMBODIMENTS
Referring to the drawings, in Fig. 1 ground 10 represents any surface from which the excavation according to the present invention proceeds in the downward direction. In this ground 10, which can be on the surface of the earth io or in an underground mine, holes such as hole 12 are drilled using, for example, Ingersol Rand's DTH drills, cluster drills or rotary drills. For example, 0.5 m diameter and about 5.2 m deep holes 12 would be drilled at a distance of 8 meters from one another in the longitudinal direction L and in width W. Resilient elements 13, such as plastic blocks or springs capable of absorbing shock energy, are placed in these holes 12 and concrete posts 14 of about 0.45 m in diameter and approximately 5 m in length are inserted into these holes 12 to rest on the resilient elements 13. These concrete posts are preferably made of reinforced concrete using rebars or the like as reinforcing elements and once they are placed in holes 12, their top ends are essentially flush with tire ground. Once this is
0 accomplished, a concrete floor 16, having a thickness 0.2-0.3 nr, is poured on tire ground which is preferably provided with a layer of broken rock or ore prior to pouring the concrete. The concrete is also preferably reinforced with screens and rebars as is known in the art to give it greater strength.
Once the concrete floor has been poured, i.e. cast, excavation proceeds
5 thereunder, for example, in the direction of arrow E. This excavation can be done
10«! 0/8 6/d/dV
-9by any suitable means Mid it will be obvious that during such excavation the floor 16 will serve as a solid roof for the excavated space thereunder. In such manner, excavation at level A cmi proceed safely and efficiently. Also the 8 m x 8 m spacings allow for heavy excavation machinery to be used, such as LHDs for mucking, 15 ton trucks to truck ore or dump fill, a single or double boom hydraulic jumbo for drilling, a boom truck for mecliMiized post handling Mid so on.
As the excavation at level A proceeds, further holes are drilled of the same size Mid height as holes 12. hi plan these holes are drilled off-plumb Mid o immediately adjacent to the existing concrete posts 14. Again resilient elements are placed at the bottom of these holes. Then concrete posts 24 are inserted into said holes to rest on said resilient elements 13. These posts 24 are essentially identical to posts 14, previously inserted into die ground at level A. On top of posts 24, additional posts 18, shown in broken lines, are stood-up Mid blocked between the ground 20 of level A and the floor/roof 16. These filler posts 18 are similar to posts 14 and 24 but slightly shorter in length so that they can tightly fit between the top of post 24 and the floor/roof 16 and provide exha support for the floor/roof 16. Once all these posts 14,18 and 24 are properly positioned and secured, concrete floor 26 is poured to tie-in die posts at die bottom 20, thus
0 solidifying die entire structure. Rebar Mid screen is preferably installed between die various posts to provide reinforcement when die concrete is poured. Once level A is flius excavated or mined, it may be back-filled widi appropriate filling material.
AP/P/9 8 /0 1 301
-ioΑΡϋ00893
The same procedure is then repeated at level B where, as the excavation proceeds, holes 12 are drilled in plumb below posts 14 and resilient elements 13 are placed at the bottom of said holes. Posts 28 are then inserted therein to rest on said resilient elements 13. Thereafter posts 25, shown in broken lines, are stood up at level B on top of posts 28 and secured between said posts 28 and the roof 26 or rather the bottom ends of posts 14 which would normally extend under roof 26. These additional posts 25 are tightly fitted between the top ends of posts 28 and the bottom ends of posts 14. The posts 25 are undamaged by any prior excavating operation and will, therefore, provide additional safe support for the io floor above even when it is back-filled and will also help transmit protection against seismic events or excessive loads to die upper levels. Again, once posts 24, 25 and 28 are properly positioned and secured, concrete floor 27 is poured to tie their ends with concrete and solidify the entire structure. The same procedure may then be repeated for level C and any additional levels in the downward is direction. As mentioned previously, a layer 22 of broken rock or ore is preferably provided prior to pouring the concrete floor 27. hi any such excavation the resilient elements 13 at the lowermost level provide protection against seismic events, such as rock bursts or earth quakes or excessive ground movement.
Fig. 2 is a section view of the same excavation system as shown in Fig. '1.
o The excavation proceeds from ground 10 downwards. Posts 14 extend somewhat below floor/roof 26. Initially, there are provided resilient elements 13 under posts 14, but they are subsequently removed during excavation of level B. These resilient elements 13 are shown under posts 24 and posts 28. Only resilient
AP/P/9 8/0 1 301
-nelements under posts 28, which are inserted into holes 12, provide protection against seismic events or excessive loads for the entire excavation; those under posts 24 will be removed when the excavation of level C is carried out. Posts 14, 24 and 28 extend deeper than the respective floors/roofs at each level to provide suitable space for the resilient elements under the said posts. When excavation of level C is carried out, resilient elements 13 under posts 24 may be recovered and reused at a lower level.
Posts 18 and 25 are stood-up in plumb on posts 24 and 28 respectively to provide further protection during excavation. However protection against ι o seismic events or excessive ground movement is provided only by the resilient elements 13 placed under posts 28 when the upper levels have been excavated.
As better illustrated in Fig. 3, top ends of the concrete posts, such as post 28, are essentially flush with the ground at their respective level of excavation, however they preferably extend slightly above the ground or the broken rock or ore 22 and penetrate into the concrete floor/roof 27, but without piercing or puncturing said concrete floor/roof. For example, the top end of the concrete posts may so extent 5-8 cm into the concrete floor/roof which is normally 20-30 cm thick. This stabilizes the concrete posts, such as post 28, so that they cannot fall over during rock bursts or excessive ground movements. The bottom ends of
0 the stood-up posts, such as post 25, will also preferably slightly penetrate (e.g. 2-5 cm) into the concrete floor 25 for stability purposes, but without touching the top ends of the concrete posts, such as post 28.
In Fig. 4 there is shown a section of a double-post mining operation or
AP/F' 9 fl ' 0 1 3 01
AP 0 ο ϋ 8 9 3
DPM. In this case it is shown that the drifts at the excavated level have been filled with a suitable filler material 30, such as, for example, a 5% cement-rock fill. Since according to the present invention several rooms can be opened at the same time, the pouring of concrete floors, drilling of holes, placing of posts and back filling of rooms will not slow down the drill-blast-muck-fill cycles of the mining operation. Slinger trucks may be used for tight back-filling with cemented rock fill, but paste fill or cemented sand could also be employed for back-filling. Posts 24 and 28 are re-inforced concrete posts placed in holes prior to excavation at their respective levels and resting on resilient elements 13. Usually these resilient io elements 13 will be recovered when the excavation proceeds. For example, resilient elements 13 which are under posts 24 may be recovered when fire excavation is carried out under tire floor/roof 27 and may then be reused at another lower level. In order not to lose these resilient elements 13, they may be attached by means of chains 32.
Posts 24 project below floor/roof 26 to provide space for installing resilient elements 13 and to have their upper ends essentially flush with the ground on which floor/roof 26 is poured or cast. The same is true of posts 28. Prior to pouring the concrete floor 27, a layer of broken rock or ore 22 may be provided to improve concrete adherence. On top of posts 28, additional posts 25
0 are stood-up (as more clearly shown in Fig. 3) and may be connected to posts 28 by rebars 34 or similar connecting members. These posts 25 apply pressure on posts 28 to keep them under suitable load. Also, prior to excavation under floor/roof 27 one may drill small holes around posts 28 and blast them to break to £1 0 / 8 6 /d/dV
-13APU Ο υ 8 9 3 tire ground around these posts without damaging the same. This helps to perform subsequent excavation at the level below floor/roof 27 without damaging posts 28, particularly if such excavation is carried out by drill-andblast techniques. Also, when floor/roof 27 is cast, it ties-up all the ends of the posts 24, 25 and 28 together, thereby forming a strong and secure supporting structure for tire excavation below.
It should be understood that the invention is not limited to the above described preferred embodiments, but that various modification obvious to those skilled in the ail can be made without departing from tire spirit of the invention l o and the scope of tire following claims.

Claims (10)

1. An undercut-and-fill mining method, which comprises:
(a) cutting initial drifts in an underground mine to form rooms in a conventional manner with a sill 5 at the upper end of an ore body, and recovering the mined material from said rooms;
(b) drilling holes of a predetermined size and length in the sill of each room;
(c) placing resilient elements at the bottom of said holes capable of absorbing shock energy or excessive loads due to ground movement;
(d) inserting concrete posts in said holes to rest on said resilient elements with their bottom ends io and having their top ends essentially flush with the sill of the rooms;
(e) pouring a concrete floor in said rooms to be supported by the top ends of said posts;
(f) back filling the rooms with a suitable fill;
(g) once a complete lift has been so mined, repeating this mining procedure on a lower level where the concrete floors now serve as a roof supported by said posts and said resilient elements is serve as protection against seismic events, such as rock bursts or against ground movement exceeding failure loads of the concrete posts; and (h) continuing mining jn this manner from level to level until the desired ore body is mined, with s
the resilient elements under the posts of the lowermost level serving as protection against seismic events to which the mine may be exposed.
2 0 2. A method as claimed in claim 1, in which additional posts are stood-up on top of the concrete posts inserted into holes drilled into the sill of each room under the concrete roof, so as to exert pressure and provide suitable load on said concrete posts and on the resilient elements on which they rest and thereby transmit protection against seismic events or excessive ground movement to the upper levels of the mine.
25
3. A method according to claim 2, in which said additional posts are positioned adjacent to the posts supporting the concrete roof so as to facilitate tying them all together when pouring the concrete floor in the sill of the mined level and thereby providing a double-post mining system in
ΑΡ/Γ.' 98/01301
ΑΡ ο ο ο 8 8 3 which the posts at the lowermost level resting on the resilient elements provide protection against seismic events or excessive ground movement in the mine.
4. A method according to claims 2 or 3, in which the bottom ends of the stood-up additional posts slightly penetrate into the concrete floor, but without touching the top ends of the concrete
5. Method according to claims 1,2 or 3, in which the resilient elements are attached to a suitable chain or rope to facilitate their recovery.
5 posts.
6. Method according to any one of claims 1 to 5, in which small blast holes are drilled around the holes with inserted posts and are blasted to break the ground around said posts without damaging ι o the posts.
7. Method according to any one of claims 1 to 6, in which the resilient elements consist of a plastic spring designed to compress more and faster than the reinforced concrete posts resting thereon, so that seismic events that would cause the posts to fail would merely compress the spring while maintaining post loads below failure loading.
is
8. Method according to any one of claims 1 to 6, in which the resilient elements consist of a suitably engineered plastic squeeze block made of plastic material which absorbs shock loads and is designed to compress like a spring.
9. Method according to claims 7 or 8, in which the resilient elements are connected to the bottom ends of the posts.
so
10. A yield post for an undercut excavation method, which is a post made of concrete and which has a resilient element capable of absorbing shock energy or excessive loads connected to the bottom end thereof.
APAP/P/1998/001301A 1997-04-16 1998-04-14 Undercut excavation with protection against seismic events or excessive ground movement. AP893A (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CA002202851A CA2202851C (en) 1997-04-16 1997-04-16 Undercut excavation with protection against seismic events or excessive ground movement

Publications (2)

Publication Number Publication Date
AP9801301A0 AP9801301A0 (en) 1998-09-30
AP893A true AP893A (en) 2000-11-16

Family

ID=4160443

Family Applications (1)

Application Number Title Priority Date Filing Date
APAP/P/1998/001301A AP893A (en) 1997-04-16 1998-04-14 Undercut excavation with protection against seismic events or excessive ground movement.

Country Status (6)

Country Link
US (1) US5944453A (en)
AP (1) AP893A (en)
AU (1) AU726015B2 (en)
CA (1) CA2202851C (en)
EA (1) EA000555B1 (en)
PE (1) PE34299A1 (en)

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6220789B1 (en) * 1998-12-29 2001-04-24 Richard W. White Integrated excavation shoring building foundation method
JP3556559B2 (en) * 2000-02-28 2004-08-18 エヌ・アイ・シー・エンジニアリング株式会社 Underground structure construction method
AU2002351613A1 (en) 2002-12-18 2004-07-09 Charles M. Gryba Multi-level undercut excavation method using superimposed posts
US7500807B2 (en) * 2006-04-25 2009-03-10 Arcelormittal Commercial S.A.R.L. Method of construction using sheet piling sections
EP2503061B1 (en) * 2008-01-28 2013-11-13 Darin Kruse Apparatus and Methods for Underground Structures and Construction Thereof
KR100926323B1 (en) 2009-03-13 2009-11-12 황기수 Constructing method for extension of underground
CA3081191A1 (en) 2011-06-03 2012-12-06 Darin R. Kruse Lubricated soil mixing systems and methods
CA2756266A1 (en) 2011-10-26 2013-04-26 Charles Michael Gryba Undercut excavation method with continuous concrete floors
CN102678119A (en) * 2012-05-09 2012-09-19 河北钢铁集团矿业有限公司 High-efficiency filling mining method for controlling rock mass movement
CN104018512B (en) * 2014-06-13 2015-12-30 上海市基础工程集团有限公司 The caisson sinking construction method dynamic to environment micro-turbulence
CN104806265B (en) * 2015-03-31 2017-01-25 辽宁工程技术大学 Impact ground pressure preventing method of full seam gateway
US9970193B1 (en) * 2016-04-28 2018-05-15 Boxer Anaya, LLC System and method for the construction of dwellings
US10138616B2 (en) * 2016-08-12 2018-11-27 Wuhan Zhihe Geotechnical Engineering Co., Ltd. Inverse construction method for deep, large and long pit assembling structure of suspension-type envelope enclosure
CN106351494B (en) * 2016-10-20 2019-09-27 北京工业大学 A kind of Self-resetting assembled subway station flexible anti-shock structure
CN106988345A (en) * 2017-04-01 2017-07-28 武汉科技大学 A kind of excavation method of reverse construction foundation ditch
CN110004988B (en) * 2019-02-11 2023-12-19 中国水电基础局有限公司 Protection device and method for joint hole of underground diaphragm wall constructed by tube drawing method
CN109898525B (en) * 2019-03-22 2020-11-24 昆明理工大学 High-stability tailing dam and construction method thereof
CN110241835B (en) * 2019-05-13 2024-04-26 中建八局第二建设有限公司 Drainage construction structure of foundation pit blind ditch and construction method thereof
CN110412240A (en) * 2019-05-14 2019-11-05 华北理工大学 Obturation and the three-dimensional analog simulation experimental rig of country rock interaction rule and method
EP4127342A4 (en) * 2020-03-27 2024-04-10 Nexii Building Solutions Inc. Systems and methods for constructing a single-storey building
CN112049033B (en) * 2020-07-27 2022-08-12 成龙建设集团有限公司 Method for reinforcing municipal building highway door opening

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB940500A (en) * 1959-12-02 1963-10-30 Noel Ebenezer Morris Brydon Improvements relating to the construction of underground buildings
US3184893A (en) * 1960-04-11 1965-05-25 Contact Foundation Inc Contact foundation method

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1746566A (en) * 1927-08-31 1930-02-11 Robert B Tufts Sewer construction
US2194279A (en) * 1935-06-01 1940-03-19 John B Goldsborough Skeleton framework structure and method of constructing the same
IT1025608B (en) * 1974-11-12 1978-08-30 Alpina Spa PREFABRICATED ELEMENTS FOR THE CONSTRUCTION OF TRENCH STRUCTURES AND RELATED PROCEDURE
JPS532242B2 (en) * 1974-12-24 1978-01-26
US4266379A (en) * 1979-03-06 1981-05-12 Hector Valencia Aguilar Aseismic system for structure foundation
US4574540A (en) * 1983-10-17 1986-03-11 Shiau Jgi Jiang Structural support system for minimizing the effects of earthquakes on buildings and the like
NL8603259A (en) * 1986-12-22 1988-07-18 Lenten Hendrik LIQUID BUFFER TO PROTECT BUILDINGS FROM EARTHQUAKES.
GB2222196B (en) * 1988-02-08 1991-07-17 Kunz Alfred & Co A process for lowering a building structure into the ground
CA2079694C (en) * 1992-10-02 1997-09-09 Charles M. Gryba Undercut excavation method
WO1996029477A1 (en) * 1995-03-17 1996-09-26 Kuninori Mori Foundation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB940500A (en) * 1959-12-02 1963-10-30 Noel Ebenezer Morris Brydon Improvements relating to the construction of underground buildings
US3184893A (en) * 1960-04-11 1965-05-25 Contact Foundation Inc Contact foundation method

Also Published As

Publication number Publication date
CA2202851A1 (en) 1998-10-16
AU726015B2 (en) 2000-10-26
CA2202851C (en) 2004-01-20
AU6077098A (en) 1998-10-22
EA199800298A1 (en) 1998-10-29
AP9801301A0 (en) 1998-09-30
PE34299A1 (en) 1999-04-09
EA000555B1 (en) 1999-10-28
US5944453A (en) 1999-08-31

Similar Documents

Publication Publication Date Title
AP893A (en) Undercut excavation with protection against seismic events or excessive ground movement.
US9151047B2 (en) Undercut excavation method with continuous concrete floors
US5522676A (en) Undercut excavation method
CN105863650B (en) It is a kind of elder generation wall after hole tunnel construction method
CN108678772A (en) A kind of multilevel hierarchy suspension device and its construction method for rich water sandy gravel stratum tunnel
CN205013013U (en) Secretly dig station supporting construction suitable for last soft hard formation down
CN111608726A (en) Method for reducing damage of spaced overlying rock crushed-expansion filling steel reinforcement cage bag by grouting
CA1139322A (en) Method of mining
CN110284885A (en) Shield inspection-pit construction method
CN113586086B (en) Method for reinforcing weak broken bottom plate of semi-closed large-section roadway
CN110259448B (en) Method for preventing hard roof entry rock burst by pressure relief roof breaking and wide lane flexible wall
KR200381572Y1 (en) Paker can pressure with milk grouting
KR100710866B1 (en) Pressure Grouting Method using Milk Grouting and Paker
Sigl et al. NATM tunnelling in Singapore old alluvium–design assumptions and construction experience
CN210343358U (en) Plug-in type floor of coal mining tunnel
CN111472389B (en) Open excavation construction method for rebuilding existing tunnel into double-layer tunnel
CN218880866U (en) Lifting foot supporting system under condition of broken bedrock of soil-rock binary foundation pit
CN212336050U (en) Anchoring structure of deformation side slope
EP0028124A1 (en) Method of mining
SU1705582A1 (en) Method of making large-volume cavity in rocks
RU1820000C (en) Method for lowering of large bodies into underground space
JP2000145354A (en) Deep foundation excavation method in bedrock
JPS6140992A (en) Production of tubelar underground hollow part
Bell Geology and construction
Madan Limitation of shotcrete and rock bolting as supporting system in structurally weak rock formation in underground works