- WO2025192536A1 WO2025192536A1 PCT/JP2025/008856 JP2025008856W WO2025192536A1 WO 2025192536 A1 WO2025192536 A1 WO 2025192536A1 JP 2025008856 W JP2025008856 W JP 2025008856W WO 2025192536 A1 WO2025192536 A1 WO 2025192536A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- power
- storage unit
- amount
- unit
- integrated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R22/00—Arrangements for measuring time integral of electric power or current, e.g. electricity meters
- G01R22/06—Arrangements for measuring time integral of electric power or current, e.g. electricity meters by electronic methods
Definitions
- the present invention relates to a measurement device, a measurement method, and a program.
- Patent Document 1 discloses a power monitoring device that displays the accumulated amount of power.
- the accumulated amount of power being measured is stored in volatile memory. If the power supply to the volatile memory is stopped, the stored accumulated amount of power is lost. For this reason, measuring devices are equipped with batteries so that power measurement can continue even if the power supply from the power source is stopped due to a power outage or other reason. However, some measuring devices do not include batteries in order to reduce the cost of the measuring device. With such measuring devices that do not include batteries, if the power supply from the power source is stopped, the accumulated amount of power being measured is lost, making it difficult to continue measuring the accumulated amount of power. The electricity usage fee for the lost accumulated amount of power is borne by the equipment installer.
- the present invention was made in consideration of the above-mentioned problems, and its purpose is to provide technology that makes it possible to continue measuring the accumulated amount of power even when the power supply is stopped.
- a measuring device comprises a measuring unit that measures the amount of power supplied from a specified power source, a volatile first storage unit, a non-volatile second storage unit, and a control unit that sequentially stores an integrated amount of power obtained by integrating the amount of power measured by the measuring unit in the first storage unit and stores the integrated amount of power stored in the first storage unit in the second storage unit at specified intervals.
- a control unit that sequentially stores an integrated amount of power obtained by integrating the amount of power measured by the measuring unit in the first storage unit and stores the integrated amount of power stored in the first storage unit in the second storage unit at specified intervals.
- the control unit stores the accumulated amount of power stored in the second storage unit in the first storage unit.
- the control unit By writing the accumulated amount of power stored in the second storage unit to the first storage unit, it is possible to restore the accumulated amount of power stored in the first storage unit.
- the second storage unit stores a plurality of the accumulated amounts of power, and when the supply of power from the specified power source is stopped, the control unit calculates an estimated accumulated amount of power at the time the supply of power from the specified power source was stopped based on the plurality of accumulated amounts of power stored in the second storage unit and the time the supply of power from the specified power source was stopped, and when the supply of power from the specified power source is resumed, the control unit stores the estimated accumulated amount of power in the first storage unit. By writing the estimated accumulated amount of power to the first storage unit, it is possible to restore the accumulated amount of power in the first storage unit.
- the specified interval is set based on parameters related to rewriting of the second storage unit. This makes it possible to set the specified interval appropriately.
- the parameters include the guaranteed number of rewrites and the guaranteed number of years.
- the guaranteed number of rewrites is, for example, the number of times data can be rewritten normally.
- the guaranteed number of years is, for example, the number of years for which the performance of the second storage unit is guaranteed.
- the above-mentioned measuring device does not have a battery. It is possible to continue measuring the accumulated amount of power in a measuring device that does not have a battery.
- the present invention can also be understood as a measurement method that includes at least part of the above-mentioned processing, a program that causes a computer to execute at least part of the above-mentioned processing, or a computer-readable recording medium on which such a program is non-temporarily recorded. It can also be understood as a measurement system that includes at least part of the above-mentioned processing.
- the above configurations and processing can be combined to form the present invention as long as no technical contradictions arise.
- FIG. 1 is a diagram showing the configuration of a measurement system.
- FIG. 2 is a diagram illustrating the operation of the measuring device under normal conditions.
- FIG. 3 is a diagram illustrating the operation of the measuring device when an abnormality occurs.
- FIG. 1 shows the configuration of a measurement system.
- the measurement system includes a measurement device (power measurement device) 1 and a management server 2.
- the measurement device 1 has a connection unit 11, a control unit 12, a measurement unit 13, a first memory unit 14, a second memory unit 15, and a communication unit 16.
- the connection unit 11 has at least a plug 21 that is inserted into an outlet provided in a structure such as a wall or building, an outlet 22 into which the plug of a load 3 such as an electrical device can be inserted, and a relay 23.
- the measurement device 1 can be electrically connected to a commercial power source (electric power system) 4 via the structure's outlet.
- the commercial power source 4 is an example of a specified power source.
- the management server 2 may be, for example, an information processing device with communication capabilities.
- the measuring device 1 does not have a battery (storage battery), and power for driving the measuring device 1 is supplied from the commercial power source 4. Therefore, the measuring device 1 is driven by power supplied from the commercial power source 4.
- the measuring device 1 also operates to start (allow) or stop (block) the supply of power from the commercial power source 4 to the load 3.
- the relay 23 is a switch component that can switch between a conductive state and a non-conductive state. The operation of the relay 23 is controlled by the control unit 12. When the relay 23 switches from a non-conductive state to a conductive state, i.e., when the relay 23 is in the ON state (conductive state), power supplied from the commercial power source 4 is supplied to the load 3 via the relay 23.
- the relay 23 switches from a conductive state to a non-conductive state, i.e., when the relay 23 is in the OFF state (non-conductive state), the power supply from the commercial power source 4 is blocked, and the power supply to the load 3 ends.
- the control unit 12 is a controller that controls each part of the measuring device 1, processes signals, performs arithmetic processing, etc.
- the control unit 12 may be configured, for example, by a computer having a processor, storage devices such as memory, I/O, etc.
- the processor is, for example, a CPU (Central Processing Unit).
- the storage device is, for example, RAM (Random Access Memory), ROM (Read Only Memory), flash memory, etc.
- the control unit 12 performs each process by expanding a program stored in the storage device and executing the program.
- the measurement unit 13 measures the amount of power supplied from the commercial power source 4. Specifically, the measurement unit 13 measures the instantaneous amount of power supplied from the commercial power source 4.
- the measurement unit 13 measures the instantaneous amount of power at a first predetermined interval.
- the first predetermined interval is, for example, one minute, but is not limited to this.
- the control unit 12 integrates the instantaneous power consumption measured by the measurement unit 13 to calculate the integrated power consumption, and stores the integrated power consumption (power consumption data) in the first storage unit 14. Because the measurement unit 13 measures the instantaneous power consumption at a first predetermined interval, the control unit 12 updates the integrated power consumption in the first storage unit 14 by adding the instantaneous power consumption to the integrated power consumption stored in the first storage unit 14 each time the measurement unit 13 measures the instantaneous power consumption.
- the first memory unit 14 is a volatile memory (volatile storage device), such as RAM.
- the control unit 12 stores the accumulated power amount stored in the first memory unit 14 in the second memory unit 15 at a predetermined timing.
- the control unit 12 may store the accumulated power amount stored in the first memory unit 14 in the second memory unit 15 at a second predetermined interval.
- the second predetermined interval is longer than the first predetermined interval.
- the second predetermined interval is an example of a predetermined interval.
- the second predetermined interval is, for example, 5 minutes, but is not limited to this.
- the second memory unit 15 is a non-volatile memory (non-volatile storage device), such as flash memory. Even when the supply of power from the commercial power source 4 to the measurement device 1 is stopped, the accumulated power amount (retained accumulated power amount) stored in the second memory unit 15 is not lost.
- the communication unit 16 is an interface for communicating with external devices such as the management server 2.
- the communication unit 16 communicates with the management server 2 wirelessly or via a wired connection.
- the control unit 12 receives a relay ON instruction or a relay OFF instruction from the management server 2 via the communication unit 16.
- the relay ON instruction is an instruction (operation signal) to switch the relay 23 to a conductive state.
- the relay OFF instruction is an instruction (stop signal) to switch the relay 23 to a non-conductive state.
- the control unit 12 switches the relay 23 from an OFF state to an ON state based on the relay ON instruction.
- the control unit 12 switches the relay 23 from an ON state to an OFF state based on the relay OFF instruction.
- the control unit 12 may send the accumulated amount of power stored in the first memory unit 14 to the management server 2 at a predetermined timing via the communication unit 16.
- the control unit 12 may send the accumulated amount of power stored in the second memory unit 15 to the management server 2 at a predetermined timing via the communication unit 16.
- the management server 2 may calculate the electricity usage fee based on the received accumulated power consumption.
- the measuring device 1 may be equipped with a display device such as a display that displays the measured cumulative amount of power, or an input device such as a touch panel that accepts input operations.
- a display device such as a display that displays the measured cumulative amount of power
- an input device such as a touch panel that accepts input operations.
- the display device and input device may be configured as a single unit, or may be configured as separate units.
- FIG. 2 is an explanatory diagram of the operation of the measuring device 1 under normal conditions.
- the power [W] shown in FIG. 2 is the instantaneous power measured by the measuring unit 13.
- the integrated power amount [kWh] shown in FIG. 2 is the integrated power amount accumulated by the control unit 12 and is the integrated power amount stored in the first memory unit 14.
- the retained integrated power amount [kWh] shown in FIG. 2 is the integrated power amount stored in the second memory unit 15.
- the control unit 12 receives a relay ON instruction.
- the control unit 12 switches the relay 23 to the ON state.
- the relay ON count shown in Figure 2 is the number of times the relay 23 has transitioned to the ON state.
- the power [W] increases to a constant value, and the accumulated energy [kWh] increases continuously.
- the control unit 12 stores the accumulated energy [kWh] in the second memory unit 15 at second predetermined intervals, so the stored accumulated energy [kWh] increases in stages.
- interval D1 corresponds to the second predetermined interval.
- the control unit 12 receives a relay OFF command and switches the relay 23 to the OFF state. Because the relay 23 is in the OFF state, the power [W] becomes 0 [W] and the accumulated power energy [kWh] stops increasing. Because the accumulated power energy [kWh] has not increased, there is no change in the retained accumulated power energy [kWh] stored in the second memory unit 15.
- the control unit 12 receives a relay ON command.
- the control unit 12 switches the relay 23 to the ON state. As shown in FIG. 2, the power [W] increases to a constant value and the accumulated power energy [kWh] increases continuously. Because the control unit 12 stores the accumulated power energy [kWh] in the second memory unit 15 at second predetermined intervals, the retained accumulated power energy [kWh] increases in stages.
- the control unit 12 receives a relay OFF command and switches the relay 23 to the OFF state. Because the relay 23 is in the OFF state, the power [W] becomes 0 [W] and the accumulated power consumption [kWh] stops increasing. Because the accumulated power consumption [kWh] has not increased, there is no change in the accumulated power consumption [kWh] stored in the second memory unit 15.
- A1 to A11 in Figure 2 indicate the timing (storage timing) at which the control unit 12 writes the integrated power consumption [kWh] to the second memory unit 15.
- the control unit 12 When the relay 23 is in the ON state, the control unit 12 writes the integrated power consumption [kWh] to the second memory unit 15 at a second predetermined interval.
- the control unit 12 receives a relay OFF instruction or switches the relay 23 to the OFF state, it writes the integrated power consumption [kWh] to the second memory unit 15. For example, since there is a limit (upper limit) on the number of times non-volatile memory can be rewritten, it is preferable to reduce the number of times data is written to the non-volatile memory. Because the control unit 12 stores the integrated power consumption [kWh] in the second memory unit 15 at predetermined timing, it is possible to reduce the number of times data is written to the second memory unit 15, which is non-volatile memory.
- FIG 3 is a diagram explaining the operation of the measuring device 1 in the event of an abnormality.
- the integrated power amount [kWh] shown in Figure 3 is the integrated power amount accumulated by the control unit 12 and is the integrated power amount stored in the first memory unit 14.
- the retained integrated power amount [kWh] shown in Figure 3 is the integrated power amount stored in the second memory unit 15.
- the control unit 12 receives a relay ON instruction.
- the control unit 12 switches the relay 23 to the ON state.
- the relay ON count shown in Figure 3 is the number of times the relay 23 has transitioned to the ON state.
- the power [W] increases to a constant value, and the accumulated energy [kWh] increases continuously.
- the control unit 12 stores the accumulated energy [kWh] in the second memory unit 15 at second predetermined intervals, so the stored accumulated energy [kWh] increases in stages.
- interval D1 corresponds to the second predetermined interval.
- the power outage is resolved and power begins to be supplied from the commercial power source 4 to the measuring device 1.
- the relay 23 is in the OFF state and the power [W] is 0 [W].
- the control unit 12 stores the accumulated power amount stored in the second memory unit 15 in the first memory unit 14. Because the accumulated power amount stored in the first memory unit 14 was lost due to the power outage, the control unit 12 writes the accumulated power amount stored in the second memory unit 15 to the first memory unit 14, thereby restoring the accumulated power amount in the first memory unit 14.
- the control unit 12 receives a relay OFF command.
- the relay 23 is in the OFF state, and the control unit 12 maintains the relay 23 in the OFF state.
- the control unit 12 receives a relay ON command.
- the control unit 12 switches the relay 23 to the ON state.
- the power [W] increases to a constant value, and the accumulated energy [kWh] increases continuously.
- the control unit 12 stores the accumulated energy [kWh] in the second memory unit 15 at second predetermined intervals, so the stored accumulated energy [kWh] increases in stages.
- the control unit 12 receives a relay OFF command and switches the relay 23 to the OFF state. Because the relay 23 is in the OFF state, the power [W] becomes 0 [W] and the accumulated power consumption [kWh] stops increasing. Because the accumulated power consumption [kWh] has not increased, there is no change in the accumulated power consumption [kWh] stored in the second memory unit 15.
- B1 to B7 in Figure 3 indicate the timing (storage timing) at which the control unit 12 writes the accumulated power consumption [kWh] to the second memory unit 15.
- the control unit 12 When the relay 23 is in the ON state, the control unit 12 writes the accumulated power consumption [kWh] to the second memory unit 15 at a second predetermined interval.
- the control unit 12 receives a relay OFF instruction or when the relay 23 is switched to the OFF state, it writes the accumulated power consumption [kWh] to the second memory unit 15. Because the control unit 12 stores the accumulated power consumption [kWh] in the second memory unit 15 at predetermined timing, it is possible to reduce the number of times writing to the second memory unit 15, which is a non-volatile memory.
- the accumulated amount of power stored in the first memory unit 14 is stored in the second memory unit 15 at a second predetermined interval. Even if a power outage occurs and the supply of power from the commercial power source 4 to the measurement device 1 is stopped, the accumulated amount of power before the power outage, which is the accumulated amount of power for a predetermined period of time from the time the power outage occurred, is stored in the second memory unit 15.
- the control unit 12 restores the accumulated amount of power in the first memory unit 14 by writing the accumulated amount of power stored in the second memory unit 15 to the first memory unit 14.
- the control unit 12 updates the accumulated amount of power in the first memory unit 14 by adding the instantaneous amount of power to the restored accumulated amount of power in the first memory unit 14. In this way, it is possible to continue measuring the accumulated amount of power even if the supply of power from the commercial power source 4 is stopped. Furthermore, even if a power outage occurs and the power is turned off, it is possible to prevent the integrated power amount held by the measuring device 1 from being completely lost, thereby minimizing the loss of the integrated power amount.
- the measuring device 1 does not have a battery. It is possible to continue measuring the integrated power amount in a measuring device 1 that does not have a battery. Furthermore, even if a power outage occurs and the power is turned off, it is possible to prevent the integrated power amount held by the measuring device 1 that does not have a battery from being completely lost, thereby minimizing the loss of the integrated power amount.
- the second memory unit 15 may store multiple accumulated amounts of power.
- the second memory unit 15 may store the latest accumulated amount of power and past accumulated amounts of power. For example, if the latest accumulated amount of power is the accumulated amount of power written to the second memory unit 15 at timing B4 in FIG. 3, the accumulated amounts of power for the past two times are the accumulated amount of power written to the second memory unit 15 at timing B3 in FIG. 3 and the accumulated amount of power written to the second memory unit 15 at timing B2 in FIG. 3.
- control unit 12 may estimate the accumulated amount of power at the time the supply of power from the commercial power source 4 was stopped (the time the power outage occurred) based on the latest accumulated amount of power, the past accumulated amount of power, and the time when the power outage occurred, and calculate the estimated accumulated amount of power.
- the control unit 12 calculates the difference (amount of power) between the accumulated power amount written to the second memory unit 15 at timing B4 in FIG. 3 and the accumulated power amount written to the second memory unit 15 at timing B3 in FIG. 3.
- the control unit 12 calculates the ratio of the time from timing B4 in FIG. 3 to the time when the power outage occurs to the predetermined interval (D1) (hereinafter referred to as ratio A).
- the control unit 12 calculates the amount of power A by multiplying the difference (amount of power) by ratio A.
- the control unit 12 may also calculate the estimated accumulated power amount by adding the amount of power A to the held accumulated power amount.
- the control unit 12 calculates a first difference (power amount) between the integrated power amount written to the second memory unit 15 at timing B4 in FIG. 3 and the integrated power amount written to the second memory unit 15 at timing B3 in FIG. 3.
- the control unit 12 calculates a second difference (power amount) between the integrated power amount written to the second memory unit 15 at timing B3 in FIG. 3 and the integrated power amount written to the second memory unit 15 at timing B2 in FIG. 3.
- the control unit 12 calculates an average power amount of the first difference (power amount) and the second difference (power amount).
- the control unit 12 calculates a ratio A and calculates a power amount B by multiplying the average power amount by ratio A.
- the control unit 12 may calculate an estimated integrated power amount by adding a power amount B to the retained integrated power amount.
- control unit 12 may store the estimated accumulated amount of power in the first memory unit 14. In other words, the control unit 12 may restore the accumulated amount of power in the first memory unit 14 by writing the estimated accumulated amount of power to the first memory unit 14. The control unit 12 may also obtain the time of the power outage from the management server 2.
- the second specified interval is set too short, the time it takes for the number of rewrites of the second memory unit 15 to reach the guaranteed number of rewrites (number of possible rewrites) will be shorter.
- the guaranteed number of rewrites is, for example, the number of times data can be rewritten successfully.
- the second specified interval is set too long, the cumulative amount of power lost when the power is turned off will increase, and the cumulative error specifications will no longer be met. Therefore, it is preferable to set the second specified interval appropriately, taking into account the guaranteed number of rewrites and the cumulative amount of power lost.
- the second predetermined interval may be set based on parameters related to rewriting of the second storage unit 15.
- the parameters related to rewriting of the second storage unit 15 may be stored in a storage device of the control unit 12.
- the parameters related to rewriting of the second storage unit 15 include, but are not limited to, for example, the guaranteed number of rewrites (number of times rewriting is possible), the guaranteed number of years, and the relay ON rate.
- the guaranteed number of years is, for example, the number of years for which the performance of the second storage unit 15 is guaranteed.
- the second predetermined interval can be set to five minutes (60 minutes/12 rewrites). If the second predetermined interval is five minutes, the accumulated power consumption will not be saved in the second memory unit 15 for a maximum of five minutes in the event of a power outage, but this accumulated power consumption is within the allowable range in the event of a power outage.
- the relay ON rate is set to 50%, but it is not limited to 50% and may be another value.
- the relay ON rate may also be omitted.
- the relay ON rate may be set to 100% in the above (Equation 1).
- the present invention can also be understood as a measurement method that includes at least part of the above processing, a program that causes the computer of the measurement device 1 to execute at least part of the above processing, or a computer-readable recording medium on which such a program is non-temporarily recorded.
- the above configurations and processing can be combined with each other to constitute the present invention as long as no technical contradictions arise.
- the second storage unit (15) stores a plurality of the integrated amounts of power
- the control unit (12) calculates an estimated integrated amount of power at the stop time based on the multiple integrated amounts of power stored in the second storage unit (15) and the stop time when the supply of power from the predetermined power source (4) was stopped;
- the control unit (12) stores the estimated integrated power amount in the first storage unit (14).
- ⁇ Appendix 5> The parameters include the number of guaranteed rewrites and the number of years guaranteed. 5.
- ⁇ Appendix 7> A measurement method for a measurement device (1) having a volatile first storage unit (14) and a non-volatile second storage unit (15), comprising: a measuring step of measuring the amount of power supplied from a predetermined power source (4); a first storage step of sequentially storing an integrated amount of electric power obtained by integrating the amount of electric power measured in the measurement step in the first storage unit (14); a second storage step of storing the integrated amount of power stored in the first storage unit (14) in the second storage unit (15) at predetermined intervals; A measurement method having the following characteristics.
- Measuring device 2 Management server 3: Load 4: Commercial power supply 11: Connection unit 12: Control unit 13: Measuring unit 14: First storage unit 15: Second storage unit 16: Communication unit
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Power Sources (AREA)
Abstract
電力の供給が停止した場合であっても、積算電力量の計測を継続する。計測装置は、所定電源から供給される電力量を計測する計測部と、揮発性の第1記憶部と、不揮発性の第2記憶部と、前記計測部によって計測された電力量を積算した積算電力量を前記第1記憶部に逐次記憶し、かつ、前記第1記憶部に記憶されている前記積算電力量を前記第2記憶部に所定間隔で記憶する制御部と、を備える。
Description
本発明は、計測装置、計測方法及びプログラムに関する。
従来、電源から負荷に供給される電力量を計測装置によって計測し、一定時間間隔で電力供給開始時からの積算電力量をサーバに送信することが行われている。サーバは、受信した積算電力量から電力の利用料金を算出している。特許文献1には、積算電力量を表示する電力監視装置が開示されている。
計測中の積算電力量を揮発性のメモリに記憶することが行われている。揮発性のメモリに対する電力の供給が停止すると、記憶されている積算電力量が消失する。そのため、停電などにより電源から供給される電力が停止した場合であっても、電力量の計測が継続されるように、計測装置にバッテリを搭載することが行われている。しかし、バッテリを搭載しないことで、計測装置のコストを抑えることも行われている。このようなバッテリを搭載しない計測装置では、電源から供給される電力が停止した場合、計測中の積算電力量が消失し、積算電力量の計測を継続することが困難になる。消失した分の積算電力量に関する電力の利用料金は、設備設置者の負担になっている。
本発明は上記課題に鑑みてなされたものであって、その目的とするところは、電力の供給が停止した場合であっても、積算電力量の計測を継続することが可能な技術を提供することである。
本発明の一観点に係る計測装置は、所定電源から供給される電力量を計測する計測部と、揮発性の第1記憶部と、不揮発性の第2記憶部と、前記計測部によって計測された電力量を積算した積算電力量を前記第1記憶部に逐次記憶し、かつ、前記第1記憶部に記憶されている前記積算電力量を前記第2記憶部に所定間隔で記憶する制御部と、を備える。所定電源からの電力の供給が停止した場合、揮発性の第1記憶部における積算電力量は消失するが、不揮発性の第2記憶部における積算電力量は消失しない。第1記憶部に記憶されている積算電力量を第2記憶部に所定間隔で記憶することにより、所定電源からの電力の供給が停止した場合であっても、積算電力量の計測を継続することが可能である。
前記制御部は、前記所定電源からの電力の供給が停止した後、前記所定電源からの電力の供給が開始された場合、前記第2記憶部に記憶されている前記積算電力量を前記第1記憶部に記憶する。第2記憶部に記憶されている積算電力量を第1記憶部に書き込むことで、第1記憶部における積算電力量を復元することが可能となる。
前記第2記憶部は、複数の前記積算電力量を記憶し、前記制御部は、前記所定電源からの電力の供給が停止した場合、前記第2記憶部に記憶されている複数の前記積算電力量と、前記所定電源からの電力の供給が停止した停止時刻と、に基づいて、前記停止時刻における推定積算電力量を算出し、前記制御部は、前記所定電源からの電力の供給が開始された場合、前記推定積算電力量を前記第1記憶部に記憶する。推定積算電力量を第1記憶部に書き込むことで、第1記憶部における積算電力量を復元することが可能となる。
前記所定間隔は、前記第2記憶部の書き換えに関するパラメータに基づいて設定される。これにより、所定間隔を適切に設定することが可能となる。前記パラメータは、保証書き換え回数及び保証年数を含む。保証書き換え回数は、例えば、データを正常に書き替えることが可能な回数である。保証年数は、例えば、第2記憶部の性能が保証される年数である。上記計測装置は、バッテリを備えない。バッテリを備えていない計測装置における積算電力量の計測を継続することが可能である。
本発明は、上記処理の少なくとも一部を含む計測方法や、上記処理の少なくとも一部をコンピュータに実行させるためのプログラム、または、そのようなプログラムを非一時的に記録したコンピュータ読取可能な記録媒体として捉えることもできる。また、上記処理の少なくとも一部を含む計測システムとして捉えることもできる。上記構成および処理の各々は技術的な矛盾が生じない限り互いに組み合わせて本発明を構成することができる。
本発明によれば、電力の供給が停止した場合であっても、積算電力量の計測を継続することができる。
以下、実施形態について図を参照しながら説明する。以下に示す実施形態は、本願の一態様であり、本願の権利範囲を限定するものではない。
図1は、計測システムの構成を示す図である。計測システムは、計測装置(電力計測装置)1と、管理サーバ2とを含んで構成される。計測装置1は、接続部11と、制御部12と、計測部13と、第1記憶部14と、第2記憶部15と、通信部16と、を備える。接続部11は、少なくとも、壁、建物等の構造物に設けられたコンセントに挿入されるプラグ21と、電気機器等の負荷3のプラグを挿入可能なコンセント22と、リレー23と、を有する。計測装置1は、構造物のコンセントを介して、商用電源(電力系統)4に電気的に接続することが可能である。商用電源4は、所定電源の一例である。管理サーバ2は、例えば、通信機能を有する情報処理装置であってもよい。
計測装置1は、バッテリ(蓄電池)を備えておらず、計測装置1の駆動電力は、商用電源4から供給される。したがって、商用電源4から計測装置1に電力が供給されることにより、計測装置1が駆動する。また、計測装置1は、商用電源4から負荷3への電力の供給を開始(許可)又は終了(遮断)するように動作する。リレー23は、導通状態と非導通状態との間で切り替わるように動作可能なスイッチ部品である。リレー23の動作は、制御部12によって制御される。リレー23が非導通状態から導通状態に切り替わる場合、すなわち、リレー23がON状態(導通状態)である場合、商用電源4から供給される電力が、リレー23を経由して、負荷3に供給される。リレー23が導通状態から非導通状態に切り替わる場合、すなわち、リレー23がOFF状態(非導通状態)である場合、商用電源4からの電力供給が遮断され、負荷3への電力の供給が終了する。
制御部12は、計測装置1の各部の制御、信号処理、演算処理等を行うコントローラである。制御部12は、例えば、プロセッサ、メモリ等の記憶装置、I/O等を有するコンピュータにより構成してもよい。プロセッサは、例えば、CPU(Central Processing Unit)である。記憶装置は、例えば、RAM(Random Access Memory)、ROM(Read Only Memory)、フラッシュメモリ等である。例えば、制御部12は、記憶装置に格納されたプログラムを展開し、当該プログラムを実行することによって、各処理を実行する。計測部13は、商用電源4から供給される電力量を計測する。具体的には、計測部13は、商用電源4から供給される瞬時電力量を計測する。計測部13は、第1所定間隔で瞬時電力量を計測する。第1所定間隔は、例えば、1分間隔であるが、これに限定されない。制御部12は、計測部13によって計測された瞬時電力量を積算して、積算電力量を算出し、積算電力量(電力量データ)を第1記憶部14に記憶する。計測部13により第1所定間隔で瞬時電力量が計測されるため、制御部12は、計測部13によって瞬時電力量が計測されるごとに、第1記憶部14に記憶されている積算電力量に瞬時電力量を加算することで、第1記憶部14における積算電力量を更新する。
第1記憶部14は、揮発性メモリ(揮発性記憶装置)であり、例えば、RAMである。商用電源4から計測装置1への電力の供給が停止すると、第1記憶部14に記憶されている積算電力量が消失する。制御部12は、第1記憶部14に記憶されている積算電力量を所定タイミングで第2記憶部15に記憶する。制御部12は、第1記憶部14に記憶されている積算電力量を第2所定間隔で第2記憶部15に記憶してもよい。第2所定間隔は、第1所定間隔よりも長い。第2所定間隔は、所定間隔の一例である。第2所定間隔は、例えば、5分間隔であるが、これに限定されない。第2記憶部15は、不揮発性メモリ(不揮発性記憶装置)であり、例えば、フラッシュメモリである。商用電源4から計測装置1への電力の供給が停止しても、第2記憶部15に記憶されている積算電力量(保持積算電力量)は消失しない。
通信部16は、管理サーバ2等の外部装置と通信を行うためのインターフェースである。通信部16は、無線又は有線により、管理サーバ2と通信を行う。制御部12は、通信部16を介して、管理サーバ2からリレーON指示又はリレーOFF指示を受信する。リレーON指示は、リレー23を導通状態に切り替えるための指示(動作信号)である。リレーOFF指示は、リレー23を非導通状態に切り替えるための指示(停止信号)である。制御部12は、リレーON指示に基づいて、リレー23をOFF状態からON状態に切り替える。制御部12は、リレーOFF指示に基づいて、リレー23をON状態からOFF状態に切り替える。制御部12は、通信部16を介して、第1記憶部14に記憶されている積算電力量を所定タイミングで管理サーバ2に送ってもよい。制御部12は、通信部16を介して、第2記憶部15に記憶されている積算電力量を所定タイミングで管理サーバ2に送ってもよい。管理サーバ2は、受信した積算電力量に基づいて、電力の利用料金を算出してもよい。
図1に示す計測装置1の構成要素の全てが必須というわけではなく、適宜、計測装置1の構成要素の追加又は削除がなされてもよい。例えば、計測装置1は、計測した積算電力量を表示するディスプレイなどの表示装置を備えてもよいし、入力操作を受け付けるタッチパネルなどの入力装置を備えてもよい。表示装置及び入力装置が、一体で構成されていてもよいし、それぞれ別体で構成されていてもよい。
図2は、正常時における計測装置1の動作説明図である。図2に示す電力[W]は、計測部13によって計測された瞬時電力である。図2に示す積算電力量[kWh]は、制御部12によって積算された積算電力量であり、第1記憶部14が保持している積算電力量である。図2に示す保持積算電力量[kWh]は、第2記憶部15が保持している積算電力量である。
時刻T1において、制御部12はリレーON指示を受信する。時刻T2において、制御部12は、リレー23をON状態に切り替える。図2に示すリレーON回数は、リレー23がON状態に移行した回数である。図2に示すように、電力[W]が一定の値に上昇し、積算電力量[kWh]が連続的に上昇している。制御部12は、積算電力量[kWh]を第2所定間隔で第2記憶部15に記憶するため、保持積算電力量[kWh]が段階的に上昇している。図2では、間隔D1が第2所定間隔に対応する。
時刻T3において、制御部12はリレーOFF指示を受信し、リレー23をOFF状態に切り替える。リレー23がOFF状態になるため、電力[W]が0[W]になり、積算電力量[kWh]が上昇しなくなる。積算電力量[kWh]が上昇していないため、第2記憶部15に記憶される保持積算電力量[kWh]に変化がない。時刻T4において、制御部12はリレーON指示を受信する。時刻T5において、制御部12は、リレー23をON状態に切り替える。図2に示すように、電力[W]が一定の値に上昇し、積算電力量[kWh]が連続的に上昇している。制御部12は、積算電力量[kWh]を第2所定間隔で第2記憶部15に記憶するため、保持積算電力量[kWh]が段階的に上昇している。
時刻T6において、制御部12はリレーOFF指示を受信し、リレー23をOFF状態に切り替える。リレー23がOFF状態になるため、電力[W]が0[W]になり、積算電力量[kWh]が上昇しなくなる。積算電力量[kWh]が上昇していないため、第2記憶部15が保持している保持積算電力量[kWh]に変化がない。
図2に示すA1~A11は、制御部12が、積算電力量[kWh]を第2記憶部15に書き込むタイミング(記憶タイミング)である。リレー23がON状態である場合、制御部12は、第2所定間隔で積算電力量[kWh]を第2記憶部15に書き込む。制御部12は、リレーOFF指示を受信した場合、又は、リレー23をOFF状態に切り替えた場合、積算電力量[kWh]を第2記憶部15に書き込む。例えば、不揮発性メモリの書き替え回数には制限値(上限値)があるため、不揮発性メモリへの書き込み回数を減らすことが好ましい。制御部12は、所定タイミングで積算電力量[kWh]を第2記憶部15に記憶するため、不揮発性メモリである第2記憶部15に対する書き込み回数を減らすことができる。
図3は、異常時における計測装置1の動作説明図である。ここでは、リレー23がON状態において、商用電源4からの電力の供給が停止した場合の計測装置1の動作について説明する。図3に示す積算電力量[kWh]は、制御部12によって積算された積算電力量であり、第1記憶部14が保持している積算電力量である。図3に示す保持積算電力量[kWh]は、第2記憶部15が保持している積算電力量である。
時刻T11において、制御部12はリレーON指示を受信する。時刻T12において、制御部12は、リレー23をON状態に切り替える。図3に示すリレーON回数は、リレー23がON状態に移行した回数である。図3に示すように、電力[W]が一定の値に上昇し、積算電力量[kWh]が連続的に上昇している。制御部12は、積算電力量[kWh]を第2所定間隔で第2記憶部15に記憶するため、保持積算電力量[kWh]が段階的に上昇している。図3では、間隔D1が第2所定間隔に対応する。
時刻T13において、停電が発生し、商用電源4から計測装置1への電力の供給が停止し、リレー23がOFF状態に切り替えられる。そのため、電力[W]が0[W]になり、積算電力量[kWh]が上昇しなくなる。第1記憶部14は揮発性であるため、商用電源4から計測装置1への電力の供給が停止することで、第1記憶部14に記憶されている積算電力量が消失する。一方、第2記憶部15は不揮発性であるため、商用電源4から計測装置1への電力の供給が停止しても、第2記憶部15に記憶されている積算電力量は消失しない。
時刻T14において、停電が解消し、商用電源4から計測装置1への電力の供給が開始される。リレー23はOFF状態であり、電力[W]は0[W]である。制御部12は、第2記憶部15に記憶されている積算電力量を、第1記憶部14に記憶する。停電の発生により第1記憶部14に記憶されている積算電力量が消失したため、制御部12は、第2記憶部15に記憶されている積算電力量を第1記憶部14に書き込むことで、第1記憶部14における積算電力量を復元する。
時刻T15において、制御部12はリレーOFF指示を受信する。リレー23はOFF状態であり、制御部12はリレー23をOFF状態に維持する。時刻T16において、制御部12はリレーON指示を受信する。時刻T17において、制御部12は、リレー23をON状態に切り替える。図3に示すように、電力[W]が一定の値に上昇し、積算電力量[kWh]が連続的に上昇している。制御部12は、積算電力量[kWh]を第2所定間隔で第2記憶部15に記憶するため、保持積算電力量[kWh]が段階的に上昇している。
時刻T18において、制御部12はリレーOFF指示を受信し、リレー23をOFF状態に切り替える。リレー23がOFF状態になるため、電力[W]が0[W]になり、積算電力量[kWh]が上昇しなくなる。積算電力量[kWh]が上昇していないため、第2記憶部15が保持している保持積算電力量[kWh]に変化がない。
図3に示すB1~B7は、制御部12が、積算電力量[kWh]を第2記憶部15に書き込むタイミング(記憶タイミング)である。リレー23がON状態である場合、制御部12は、第2所定間隔で積算電力量[kWh]を第2記憶部15に書き込む。制御部12は、リレーOFF指示を受信した場合、又は、リレー23をOFF状態に切り替えた場合、積算電力量[kWh]を第2記憶部15に書き込む。制御部12は、所定タイミングで積算電力量[kWh]を第2記憶部15に記憶するため、不揮発性メモリである第2記憶部15に対する書き込み回数を減らすことができる。
第1記憶部14に保持されている積算電力量が、第2所定間隔で第2記憶部15に記憶される。停電が発生し、商用電源4から計測装置1への電力の供給が停止しても、停電発生前における積算電力量であって、停電発生時から所定時間内における積算電力量が、第2記憶部15に保持されている。停電が解消し、商用電源4から計測装置1への電力の供給が開始された場合、制御部12は、第2記憶部15に記憶されている積算電力量を第1記憶部14に書き込むことで、第1記憶部14における積算電力量を復元する。リレー23がON状態になった場合、制御部12は、第1記憶部14における復元後の積算電力量に瞬時電力量を加算することで、第1記憶部14における積算電力量を更新する。このように、商用電源4からの電力の供給が停止した場合であっても、積算電力量の計測を継続することが可能である。また、停電が発生し、電源がOFFになった場合であっても、計測装置1によって保持される積算電力量が完全に消失することを回避することができ、積算電力量の消失を抑制することが可能である。計測装置1は、バッテリを備えていない。バッテリを備えていない計測装置1における積算電力量の計測を継続することが可能である。また、停電が発生し、電源がOFFになった場合であっても、バッテリを備えていない計測装置1によって保持される積算電力量が完全に消失することを回避することができ、積算電力量の消失を抑制することが可能である。
第2記憶部15は、複数の積算電力量を記憶してもよい。第2記憶部15には、最新の積算電力量と、過去の積算電力量と、が記憶されてもよい。例えば、最新の積算電力量が、図3のタイミングB4で第2記憶部15に書き込まれた積算電力量である場合、過去2回分の積算電力量は、図3のタイミングB3で第2記憶部15に書き込まれた積算電力量及び図3のタイミングB2で第2記憶部15に書き込まれた積算電力量である。制御部12は、商用電源4からの電力の供給が停止した場合、最新の積算電力量と、過去の積算電力量と、停電発生時の時刻と、に基づいて、商用電源4からの電力の供給が停止した時刻(停電発生時刻)における積算電力量を推定し、推定積算電力量を算出してもよい。
制御部12は、図3のタイミングB4で第2記憶部15に書き込まれた積算電力量と図3のタイミングB3で第2記憶部15に書き込まれた積算電力量との差分(電力量)を算出する。制御部12は、所定間隔(D1)に対する図3のタイミングB4から停電発生時の時刻までの時間の割合(以下、割合Aと表記する。)を算出する。制御部12は、差分(電力量)に割合Aを掛けることにより電力量Aを算出する。制御部12は、保持積算電力量に電力量Aを加算することにより、推定積算電力量を算出してもよい。
制御部12は、図3のタイミングB4で第2記憶部15に書き込まれた積算電力量と図3のタイミングB3で第2記憶部15に書き込まれた積算電力量との第1差分(電力量)を算出する。制御部12は、図3のタイミングB3で第2記憶部15に書き込まれた積算電力量と図3のタイミングB2で第2記憶部15に書き込まれた積算電力量との第2差分(電力量)を算出する。制御部12は、第1差分(電力量)及び第2差分(電力量)の平均電力量を算出する。制御部12は、割合Aを算出し、平均電力量に割合Aを掛けることにより電力量Bを算出する。制御部12は、保持積算電力量に電力量Bを加算することにより、推定積算電力量を算出してもよい。
制御部12は、商用電源4からの電力の供給が開始された場合、推定積算電力量を第1記憶部14に記憶してもよい。すなわち、制御部12は、推定積算電力量を第1記憶部14に書き込むことで、第1記憶部14における積算電力量を復元してもよい。制御部12は、停電発生時刻を管理サーバ2から取得してもよい。
第2所定間隔を過度に短く設定すると、第2記憶部15の書き換え回数が、保証書き換え回数(書き換え可能回数)に達するまでの時間が短くなる。保証書き換え回数は、例えば、データを正常に書き替えることが可能な回数である。一方、第2所定間隔を過度に長く設定すると、電源がOFFになった場合に損失する積算電力量が大きくなり、積算誤差の仕様を満足できなくなる。そのため、保証書き換え回数や損失する積算電力量を考慮して、第2所定間隔を適切に設定することが好ましい。
第2所定間隔は、第2記憶部15の書き換えに関するパラメータに基づいて設定してもよい。第2記憶部15の書き換えに関するパラメータは、制御部12の記憶装置に記憶してもよい。第2記憶部15の書き換えに関するパラメータは、例えば、保証書き換え回数(書き換え可能回数)、保証年数及びリレーON率を含むが、これに限定されない。保証年数は、例えば、第2記憶部15の性能が保証される年数である。リレーON率は、リレー23がON状態である時間の割合(%)である。例えば、第2記憶部15の保証年数が10年である場合、下記式(1)により、積算電力量は43800時間(h)に渡って計測される。下記式(1)の50%は、リレーON率である。
24時間×365(日)×10(年)×50%=43800時間 (式1)
24時間×365(日)×10(年)×50%=43800時間 (式1)
例えば、保証書き換え回数が60万回である場合、60万回を43800時間で割ると、約13.7回/時間であり、1時間で約13.7回の書き換えが可能である。1時間で12回の書き換えを行う場合には、第2所定間隔を5分間隔(60分/12回)に設定することが可能である。第2所定間隔が5分間隔である場合、停電発生時において、最大5分の間、積算電力量が第2記憶部15に保存されないことになるが、この積算電力量は、停電発生時における許容範囲内である。
上記では、リレーON率を50%に設定しているが、リレーON率は50%に限定されず、他の値であってもよい。また、リレーON率を省略してもよい。この場合、上記の(式1)において、リレーON率を100%に設定してもよい。
本発明は、上記処理の少なくとも一部を含む計測方法や、上記処理の少なくとも一部を計測装置1のコンピュータに実行させるためのプログラム、または、そのようなプログラムを非一時的に記録したコンピュータ読取可能な記録媒体として捉えることもできる。上記構成及び処理の各々は技術的な矛盾が生じない限り互いに組み合わせて本発明を構成することができる。
<付記1>
所定電源(4)から供給される電力量を計測する計測部(13)と、
揮発性の第1記憶部(14)と、
不揮発性の第2記憶部(15)と、
前記計測部(14)によって計測された電力量を積算した積算電力量を前記第1記憶部(14)に逐次記憶し、かつ、前記第1記憶部(14)に記憶されている前記積算電力量を前記第2記憶部(15)に所定間隔で記憶する制御部(12)と、
を備える、
計測装置(1)。
<付記2>
前記制御部(12)は、前記所定電源(4)からの電力の供給が停止した後、前記所定電源(4)からの電力の供給が開始された場合、前記第2記憶部(15)に記憶されている前記積算電力量を前記第1記憶部(14)に記憶する、
付記1に記載の計測装置(1)。
<付記3>
前記第2記憶部(15)は、複数の前記積算電力量を記憶し、
前記制御部(12)は、前記所定電源(4)からの電力の供給が停止した場合、前記第2記憶部(15)に記憶されている複数の前記積算電力量と、前記所定電源(4)からの電力の供給が停止した停止時刻と、に基づいて、前記停止時刻における推定積算電力量を算出し、
前記制御部(12)は、前記所定電源(4)からの電力の供給が開始された場合、前記推定積算電力量を前記第1記憶部(14)に記憶する、
付記1に記載の計測装置(1)。
<付記4>
前記所定間隔は、前記第2記憶部(15)の書き換えに関するパラメータに基づいて設定される、
付記1から3の何れか一つに記載の計測装置(1)。
<付記5>
前記パラメータは、保証書き換え回数及び保証年数を含む、
付記4に記載の計測装置(1)。
<付記6>
バッテリを備えない、
付記1から5の何れか一つに記載の計測装置(1)。
<付記7>
揮発性の第1記憶部(14)及び不揮発性の第2記憶部(15)を備える計測装置(1)の計測方法であって、
所定電源(4)から供給される電力量を計測する計測ステップと、
前記計測ステップによって計測された電力量を積算した積算電力量を前記第1記憶部(14)に逐次記憶する第1記憶ステップと、
前記第1記憶部(14)に記憶されている前記積算電力量を前記第2記憶部(15)に所定間隔で記憶する第2記憶ステップと、
を有する計測方法。
<付記8>
揮発性の第1記憶部(14)及び不揮発性の第2記憶部(15)を備える計測装置(1)のコンピュータに、
所定電源(4)から供給される電力量を計測する計測ステップと、
前記計測ステップによって計測された電力量を積算した積算電力量を前記第1記憶部(14)に逐次記憶する第1記憶ステップと、
前記第1記憶部(14)に記憶されている前記積算電力量を前記第2記憶部(15)に所定間隔で記憶する第2記憶ステップと、
を実行させるためのプログラム。
所定電源(4)から供給される電力量を計測する計測部(13)と、
揮発性の第1記憶部(14)と、
不揮発性の第2記憶部(15)と、
前記計測部(14)によって計測された電力量を積算した積算電力量を前記第1記憶部(14)に逐次記憶し、かつ、前記第1記憶部(14)に記憶されている前記積算電力量を前記第2記憶部(15)に所定間隔で記憶する制御部(12)と、
を備える、
計測装置(1)。
<付記2>
前記制御部(12)は、前記所定電源(4)からの電力の供給が停止した後、前記所定電源(4)からの電力の供給が開始された場合、前記第2記憶部(15)に記憶されている前記積算電力量を前記第1記憶部(14)に記憶する、
付記1に記載の計測装置(1)。
<付記3>
前記第2記憶部(15)は、複数の前記積算電力量を記憶し、
前記制御部(12)は、前記所定電源(4)からの電力の供給が停止した場合、前記第2記憶部(15)に記憶されている複数の前記積算電力量と、前記所定電源(4)からの電力の供給が停止した停止時刻と、に基づいて、前記停止時刻における推定積算電力量を算出し、
前記制御部(12)は、前記所定電源(4)からの電力の供給が開始された場合、前記推定積算電力量を前記第1記憶部(14)に記憶する、
付記1に記載の計測装置(1)。
<付記4>
前記所定間隔は、前記第2記憶部(15)の書き換えに関するパラメータに基づいて設定される、
付記1から3の何れか一つに記載の計測装置(1)。
<付記5>
前記パラメータは、保証書き換え回数及び保証年数を含む、
付記4に記載の計測装置(1)。
<付記6>
バッテリを備えない、
付記1から5の何れか一つに記載の計測装置(1)。
<付記7>
揮発性の第1記憶部(14)及び不揮発性の第2記憶部(15)を備える計測装置(1)の計測方法であって、
所定電源(4)から供給される電力量を計測する計測ステップと、
前記計測ステップによって計測された電力量を積算した積算電力量を前記第1記憶部(14)に逐次記憶する第1記憶ステップと、
前記第1記憶部(14)に記憶されている前記積算電力量を前記第2記憶部(15)に所定間隔で記憶する第2記憶ステップと、
を有する計測方法。
<付記8>
揮発性の第1記憶部(14)及び不揮発性の第2記憶部(15)を備える計測装置(1)のコンピュータに、
所定電源(4)から供給される電力量を計測する計測ステップと、
前記計測ステップによって計測された電力量を積算した積算電力量を前記第1記憶部(14)に逐次記憶する第1記憶ステップと、
前記第1記憶部(14)に記憶されている前記積算電力量を前記第2記憶部(15)に所定間隔で記憶する第2記憶ステップと、
を実行させるためのプログラム。
1:計測装置
2:管理サーバ
3:負荷
4:商用電源
11:接続部
12:制御部
13:計測部
14:第1記憶部
15:第2記憶部
16:通信部
2:管理サーバ
3:負荷
4:商用電源
11:接続部
12:制御部
13:計測部
14:第1記憶部
15:第2記憶部
16:通信部
Claims (8)
- 所定電源から供給される電力量を計測する計測部と、
揮発性の第1記憶部と、
不揮発性の第2記憶部と、
前記計測部によって計測された電力量を積算した積算電力量を前記第1記憶部に逐次記憶し、かつ、前記第1記憶部に記憶されている前記積算電力量を前記第2記憶部に所定間隔で記憶する制御部と、
を備える計測装置。 - 前記制御部は、前記所定電源からの電力の供給が停止した後、前記所定電源からの電力の供給が開始された場合、前記第2記憶部に記憶されている前記積算電力量を前記第1記憶部に記憶する、
請求項1に記載の計測装置。 - 前記第2記憶部は、複数の前記積算電力量を記憶し、
前記制御部は、前記所定電源からの電力の供給が停止した場合、前記第2記憶部に記憶されている複数の前記積算電力量と、前記所定電源からの電力の供給が停止した停止時刻と、に基づいて、前記停止時刻における推定積算電力量を算出し、
前記制御部は、前記所定電源からの電力の供給が開始された場合、前記推定積算電力量を前記第1記憶部に記憶する、
請求項1に記載の計測装置。 - 前記所定間隔は、前記第2記憶部の書き換えに関するパラメータに基づいて設定される、
請求項1に記載の計測装置。 - 前記パラメータは、保証書き換え回数及び保証年数を含む、
請求項4に記載の計測装置。 - バッテリを備えない、
請求項1から5の何れか一項に記載の計測装置。 - 揮発性の第1記憶部及び不揮発性の第2記憶部を備える計測装置の計測方法であって、
所定電源から供給される電力量を計測する計測ステップと、
前記計測ステップによって計測された電力量を積算した積算電力量を前記第1記憶部に逐次記憶する第1記憶ステップと、
前記第1記憶部に記憶されている前記積算電力量を前記第2記憶部に所定間隔で記憶する第2記憶ステップと、
を有する計測方法。 - 揮発性の第1記憶部及び不揮発性の第2記憶部を備える計測装置のコンピュータに、
所定電源から供給される電力量を計測する計測ステップと、
前記計測ステップによって計測された電力量を積算した積算電力量を前記第1記憶部に逐次記憶する第1記憶ステップと、
前記第1記憶部に記憶されている前記積算電力量を前記第2記憶部に所定間隔で記憶する第2記憶ステップと、
を実行させるためのプログラム。
Applications Claiming Priority (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2024040300A JP2025140738A (ja) | 2024-03-14 | 2024-03-14 | 計測装置、計測方法及びプログラム |
| JP2024-040300 | 2024-03-14 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| WO2025192536A1 true WO2025192536A1 (ja) | 2025-09-18 |
Family
ID=97063743
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| PCT/JP2025/008856 Pending WO2025192536A1 (ja) | 2024-03-14 | 2025-03-10 | 計測装置、計測方法及びプログラム |
Country Status (2)
| Country | Link |
|---|---|
| JP (1) | JP2025140738A (ja) |
| WO (1) | WO2025192536A1 (ja) |
Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH10201106A (ja) * | 1997-01-07 | 1998-07-31 | Yokogawa M & C Kk | 太陽光発電モニターシステム |
| JP2010237119A (ja) * | 2009-03-31 | 2010-10-21 | Panasonic Electric Works Denro Co Ltd | 電力量計 |
| JP2011002362A (ja) * | 2009-06-19 | 2011-01-06 | Panasonic Electric Works Denro Co Ltd | 電力量計 |
| JP2012032386A (ja) * | 2010-06-29 | 2012-02-16 | Sumitomo Wiring Syst Ltd | 電力データ収集送信装置及びそれを用いた電力モニタリングシステム |
| JP2013247848A (ja) * | 2012-05-29 | 2013-12-09 | Kyocera Corp | デマンド値予測装置及びデマンド値予測方法 |
| WO2016013247A1 (ja) * | 2014-07-24 | 2016-01-28 | 日本電気株式会社 | 計量装置および計量データ記録方法 |
| JP2018005764A (ja) * | 2016-07-07 | 2018-01-11 | 株式会社デンソー | 記憶装置及び記憶領域管理方法 |
| JP2019061326A (ja) * | 2017-09-25 | 2019-04-18 | 京セラドキュメントソリューションズ株式会社 | 電子機器及びメモリー制御プログラム |
-
2024
- 2024-03-14 JP JP2024040300A patent/JP2025140738A/ja active Pending
-
2025
- 2025-03-10 WO PCT/JP2025/008856 patent/WO2025192536A1/ja active Pending
Patent Citations (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH10201106A (ja) * | 1997-01-07 | 1998-07-31 | Yokogawa M & C Kk | 太陽光発電モニターシステム |
| JP2010237119A (ja) * | 2009-03-31 | 2010-10-21 | Panasonic Electric Works Denro Co Ltd | 電力量計 |
| JP2011002362A (ja) * | 2009-06-19 | 2011-01-06 | Panasonic Electric Works Denro Co Ltd | 電力量計 |
| JP2012032386A (ja) * | 2010-06-29 | 2012-02-16 | Sumitomo Wiring Syst Ltd | 電力データ収集送信装置及びそれを用いた電力モニタリングシステム |
| JP2013247848A (ja) * | 2012-05-29 | 2013-12-09 | Kyocera Corp | デマンド値予測装置及びデマンド値予測方法 |
| WO2016013247A1 (ja) * | 2014-07-24 | 2016-01-28 | 日本電気株式会社 | 計量装置および計量データ記録方法 |
| JP2018005764A (ja) * | 2016-07-07 | 2018-01-11 | 株式会社デンソー | 記憶装置及び記憶領域管理方法 |
| JP2019061326A (ja) * | 2017-09-25 | 2019-04-18 | 京セラドキュメントソリューションズ株式会社 | 電子機器及びメモリー制御プログラム |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2025140738A (ja) | 2025-09-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8001419B2 (en) | Energy storage module | |
| WO2024156233A1 (zh) | 电池包的均衡方法、装置、车辆及存储介质 | |
| JP2003092838A (ja) | 電気機器、コンピュータ装置、インテリジェント電池、電池診断方法、電池状態表示方法、およびプログラム | |
| US7710075B1 (en) | Apparatus and implementation of a battery in a non volatile memory subsystem | |
| CN106648016B (zh) | 供电电路、供电设备及供电方法 | |
| JP5964506B2 (ja) | 電力制御装置、電力制御方法、及び電力制御システム | |
| JP6158319B2 (ja) | 電力制御装置、電力制御方法、及び電力制御システム | |
| CN116648370B (zh) | 用于管理电池的装置和用于控制电池的方法 | |
| JP2025140738A (ja) | 計測装置、計測方法及びプログラム | |
| CN119283798A (zh) | 低压电池智能补电方法、装置、电子设备和存储介质 | |
| CN115993940B (zh) | 一种电量防丢失方法、装置、电能表设备以及存储介质 | |
| KR20210102689A (ko) | 피엘씨 백업 메모리 모니터링 방법 | |
| KR20200087557A (ko) | 에러 복구 방법, 이를 이용한 마이크로 컨트롤러 유닛, 및 상기 마이크로 컨트롤러를 포함하는 배터리 장치 | |
| CN116760307A (zh) | 一种防止电池异常导致反复重启的方法 | |
| CN115963913A (zh) | 一种实时时钟供电方法、供电电路及存储介质 | |
| US7793115B2 (en) | Method and apparatus for operating a power feed in a computer system | |
| CN116995756A (zh) | 低电压保护方法 | |
| JP7675255B1 (ja) | 電子機器および電子機器の制御方法 | |
| JP2017021498A (ja) | 制御システム、その制御装置 | |
| JP7622697B2 (ja) | 蓄電システム | |
| CN121050665B (zh) | 一种数据存储方法、装置、设备、介质及产品 | |
| CN113682154A (zh) | 机动车及其电池的充电控制方法和系统、服务器 | |
| JP2906737B2 (ja) | データ退避方法 | |
| KR20240039258A (ko) | 배터리 관리 장치 및 배터리 관리 장치의 동작시간 카운트 산출 방법 | |
| JP2019068540A (ja) | 電池交換情報検出装置および方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| 121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 25769505 Country of ref document: EP Kind code of ref document: A1 |