WO2024096128A1 - 道路構築材、道路構築材セット及び道路の構築方法 - Google Patents

道路構築材、道路構築材セット及び道路の構築方法 Download PDF

Info

Publication number
WO2024096128A1
WO2024096128A1 PCT/JP2023/039740 JP2023039740W WO2024096128A1 WO 2024096128 A1 WO2024096128 A1 WO 2024096128A1 JP 2023039740 W JP2023039740 W JP 2023039740W WO 2024096128 A1 WO2024096128 A1 WO 2024096128A1
Authority
WO
WIPO (PCT)
Prior art keywords
road construction
construction material
road
top surface
layer
Prior art date
Application number
PCT/JP2023/039740
Other languages
English (en)
French (fr)
Inventor
高史 吉田
俊明 森
実 澤口
Original Assignee
積水テクノ成型株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 積水テクノ成型株式会社 filed Critical 積水テクノ成型株式会社
Publication of WO2024096128A1 publication Critical patent/WO2024096128A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/20Pavings made of prefabricated single units made of units of plastics, e.g. concrete with plastics, linoleum

Definitions

  • the present invention relates to road construction materials, road construction material sets, and road construction methods.
  • Expressways and ordinary roads are constructed by layering the roadbed, roadbed, and surface layer (base and surface layers) in that order on top of the road body (ground or bridge deck).
  • the road body is made up of the ground (soil or sand) or bridge deck
  • the roadbed is made up of crushed stone
  • the surface layer is made up of asphalt mixture.
  • Patent Document 1 discloses an upper roadbed material in which a granulated stone-washing waste mud product is obtained by adding a cement-based solidifying agent to the stone-washing waste mud and adding and mixing asphalt-based, resin-based, and rubber-based emulsions, either alone or in any combination, as additives, and using the resulting granulated stone-washing waste mud in place of the fine particles of size-adjusted crushed stone.
  • the present invention provides road construction materials that enable road repair work to be completed in a short period of time and that can extend the life of the road.
  • the road construction material of the present invention comprises: A road construction material laid between a road body and a surface layer constructed on the road body,
  • the road construction material is characterized in that it has a flat rectangular road construction material body that can be laid in the front, back, left and right directions, and has an upper surface that can be fitted with an upper surface material placed on the road construction material body.
  • the road construction material of the present invention comprises: A road construction material that is laid between a road body constituting a road and a surface layer constructed on the road body,
  • the road construction material has a road construction material body formed in a flat rectangular shape that can be laid on the road body in the front-to-back and left-to-right directions, the upper surface of the road construction material body is formed into a top surface material mounting surface on which a top surface material can be arranged, and one or more of a first recess and a first convex portion that can fit into the first recess are formed on the opposing surface between the top surface material mounting surface of the road construction material body and the top surface material.
  • the road construction material of the present invention comprises: A road construction material that is laid between a road body constituting a road and a surface layer constructed on the road body,
  • the road construction material has a road construction material body formed in a flat rectangular shape that can be laid on the road body in the front-rear and left-right directions, and is characterized in that a first recess is provided on the upper surface of the road construction material body to which a connecting member that connects and integrates adjacent road construction materials can be connected.
  • the road construction material set of the present invention comprises: A road construction material set to be laid between a road body and a surface layer to be constructed on the road body, comprising: a road construction material having a road construction material body formed in a planar rectangular shape that can be laid on the road body in the front-rear and left-right directions; and a top surface material to be placed on the road construction material;
  • the upper surface of the road construction material is characterized in that it can be fitted with the upper surface material.
  • the road construction method of the present invention comprises the steps of: a road construction material layer constructing step of laying a road construction material having a road construction material body formed in a planar rectangular shape in the front-rear and left-right directions on a road body to construct a road construction material layer; A top surface material layer construction process in which the top surface material is laid in the front-rear and left-right directions on the top surface of the road construction material layer to construct a top surface material layer connected to the road construction material layer; and a surface layer construction step of constructing a surface layer on the upper surface material layer.
  • the road construction method of the present invention comprises the steps of: a road construction material layer construction process for constructing a road construction material layer by laying a road construction material in the front-rear and left-right directions on a road body constituting a road, the road construction material having a road construction material body formed in a planar rectangular shape and an upper surface formed on an upper surface material placement surface on which an upper surface material can be placed; a top surface material layer construction process for constructing a top surface material layer connected to the road construction material layer by fitting the road construction material body and the top surface material together and laying the top surface material on the road construction material in the front-rear and left-right directions; and a surface layer construction step of constructing a surface layer on the upper surface material layer.
  • the road construction material of the present invention is a road construction material that is laid between the road body that constitutes the road and the surface layer that is constructed on this road body. By laying it on the road body in parallel in the front-to-back and left-to-right directions, it is possible to easily replace part of the roadbed and/or roadbed constructed between the road body and the surface layer with the road construction material, making it possible to complete road construction work such as road repair work in a short period of time and to keep vehicle traffic restrictions to a minimum.
  • the road construction material of the present invention is laid between the road body that constitutes the road and the surface layer that is constructed on this road body, and absorbs vibrations and loads from vehicles traveling on the road, reducing damage to other layers that constitute the road caused by vibrations and loads caused by vehicles traveling on the road, thereby extending the life of the road.
  • the road construction material of the present invention can be used to build a layer made of road construction material on the road surface simply by laying it on the road surface in the front-to-back and left-to-right directions, with other layers interposed as necessary, and the work of laying the road construction material can be completed in a short time, shortening the time required to repair the road.
  • a portion without protrusions can be formed on at least a part of the upper surface of the road construction material formed in a row in the front-rear and left-right directions. Therefore, it is possible to easily transport other materials by running a transport device or walking using the portion without protrusions formed on the road construction material.
  • a first recess and a first convex portion are formed on the top surface of the road construction material body of the road construction material, and when one of the two road construction materials is turned upside down and stacked as a top surface material on the top surface of the other road construction material, if the first recess and first convex portion of the one road construction material are configured to be interlocked with the first convex portion and first recess of the other road construction material that will become the top surface material, a layer composed of the road construction material and the top surface material can be easily constructed between the road body and the surface layer using one type of road construction material.
  • the above road construction material eliminates the need to prepare a separate top surface material in addition to the road construction material, which simplifies management during storage and also saves space during storage.
  • one type of road construction material can be transported to the site, and the work of laying the road construction material and the work of laying other road construction materials as top surface materials on top of the laid road construction material can be carried out in parallel as necessary, allowing the road construction work to be completed in a short period of time.
  • the top surface of the road construction material body of the road construction material is divided by virtual cross-shaped dividing lines, and two sections that face each other through the intersection of the virtual cross-shaped dividing lines are designated as a first region and a second region, and a first recess is formed in the first region while a first convex portion is formed in the second region.
  • the road construction material can be laid on the top surface of the road construction material body of the road construction material by simply inverting the road construction material upside down, and road construction work can be completed smoothly and in a short time.
  • FIG. 1 is a perspective view showing a road building material according to the present invention.
  • FIG. 2 is a schematic plan view showing road construction materials.
  • FIG. 2 is a cross-sectional view taken along line XX in FIG.
  • FIG. A cross-sectional view showing the state in which a top surface material (road construction material) is layered on top of a road construction material.
  • FIG. 1 is a schematic cross-sectional view showing a conventional road structure.
  • FIG. 1 is a schematic cross-sectional view showing a road constructed using road construction materials.
  • FIG. 11 is a perspective view showing another example of a road construction material.
  • FIG. 11 is a perspective view showing another example of a road construction material.
  • FIG. 11 is a perspective view showing another example of a road construction material.
  • FIG. 11 is a perspective view showing another example of a road construction material.
  • FIG. 11 is a perspective view showing another example of
  • FIG. 11 is a plan view showing another example of a road construction material laid in the front-back, left-right directions.
  • FIG. A perspective view showing the top surface material Cross-sectional view showing the top surface material.
  • FIG. 11 is a perspective view showing another example of a road construction material.
  • FIG. 11 is a perspective view showing another example of a road construction material.
  • FIG. 11 is a plan view showing another example of a road construction material.
  • FIG. 11 is a plan view showing another example of a road construction material laid in the front-back, left-right directions.
  • FIG. 13 is a perspective view showing another example of an upper surface material.
  • FIG. 13 is a perspective view showing another example of an upper surface material.
  • FIG. 11 is a cross-sectional view showing another example of an upper surface material.
  • FIG. 11 is a perspective view showing another example of a road construction material.
  • FIG. 11 is a perspective view showing another example of a road construction material.
  • FIG. 4 is a cross-sectional view showing another example of a road construction material.
  • FIG. 11 is a schematic plan view showing another example of a road construction material.
  • FIG. 11 is a perspective view showing another example of a road construction material laid in the front-rear and left-right directions and connected together with connecting members.
  • FIG. 13 is a perspective view showing another example of an upper surface material.
  • FIG. 13 is a perspective view showing another example of an upper surface material.
  • FIG. 11 is a cross-sectional view showing another example of an upper surface material.
  • FIG. 11 is a perspective view showing another example of a road construction material. Cross-sectional view of line YY in Figure 38.
  • a cross-sectional view showing the process of layering the top surface material on the road construction material A cross-sectional view showing the state in which the top surface material is layered on the road construction material.
  • the term "fitting" used in the present invention does not necessarily mean that the shapes of the parts that are fitted together must be the same, but it is sufficient that the road construction material (and top surface material) is positioned by fitting together to an extent that does not impair the effect of the present invention. Therefore, the road construction material (and top surface material) laid in the front-rear and left-right directions does not need to be completely fixed, and it is acceptable for it to be slightly displaced in the front-rear and left-right directions within a range that does not impair the effect of the present invention.
  • the shape of the first recess and the shape of the first convex part and the fitting part of the connecting member that fit into this first recess do not necessarily need to be the same.
  • the road construction material (and top surface material) laid in the front-rear and left-right directions is positioned by fitting the first convex part (or the fitting part of the connecting member) into the first recess, but it is acceptable for the road construction material (and top surface material) laid in the front-rear and left-right directions to be slightly displaced within a range that does not impair the effect of the present invention.
  • the "front-rear direction” refers to the "vertical direction”
  • the "left-right direction” refers to the "horizontal direction”. For example, in FIG.
  • the “vertical direction on the paper” is the “front-rear direction” and the “horizontal direction on the paper” is the “left-right direction”.
  • “laying in the front-rear-left-right direction” refers to forming columns and rows in the vertical and horizontal directions, respectively, and arranging them in a planar shape.
  • the "vertical direction on the paper” is the "front-rear direction” and the “horizontal direction on the paper” is the "left-right direction”.
  • the “road construction material” is a concept that does not include the “top surface material”.
  • the “road construction material set” is a concept that includes the "road construction material” and the "top surface material”.
  • the road construction material body 1a of the road construction material 1 is formed into a plate shape that is square in plan and has a certain thickness on the top and bottom.
  • the road construction material 1 is preferably composed mainly of synthetic resin, and may contain fiber as necessary.
  • the content of synthetic resin in the road construction material 1 is preferably 60 mass% or more.
  • the synthetic resins constituting the road construction material are not particularly limited, and examples include thermoplastic resins such as polyethylene, polypropylene, polyamide, polyacetal, polybutylene terephthalate, polyethylene terephthalate, polyester, ABS, polystyrene, acrylic, polycarbonate, aromatic polyamide, polyphenylene sulfide, liquid crystal polymer, polysulfone, polyetherimide, polyamideimide, polyether ether ketone, and polytetrafluoroethylene, and thermosetting resins.
  • thermoplastic resins such as polyethylene, polypropylene, polyamide, polyacetal, polybutylene terephthalate, polyethylene terephthalate, polyester, ABS, polystyrene, acrylic, polycarbonate, aromatic polyamide, polyphenylene sulfide, liquid crystal polymer, polysulfone, polyetherimide, polyamideimide, polyether ether ketone, and polytetrafluoroethylene, and thermosetting resins.
  • fibers
  • the road construction material may be made of materials other than synthetic resin (e.g., metal materials such as iron, concrete, etc.).
  • the inside of the road construction material main body 1a is formed with a void.
  • the inside (void) of the road construction material main body 1a is divided into a lattice pattern in the front, back, left and right directions over the entire length of its thickness, and the lattice-shaped divided parts are divided parts 1b, 1b... which are entirely void.
  • the top surface 11 of the road construction material main body 1a is formed as a top material placement surface on which the road construction material 1 can be stacked upside down as a top material, as described below.
  • the top surface 11 of the road construction material body 1a is divided into four areas a to d by cross-shaped imaginary dividing lines 12 consisting of a first imaginary dividing line 12a connecting the middle parts of the opposing front and rear edges, and a second imaginary dividing line 12b that connects at right angles to the front and rear edges and connects the middle parts of the opposing left and right edges (see Figure 2).
  • regions a to d formed on the top surface 11 of the road construction material body 1a regions a and b, which face each other via the intersection 12c between the first imaginary dividing line 12a and the second imaginary dividing line 12b, constitute a first region group A, and a plurality of first recesses 13, 13... are formed in this first region group A.
  • each of areas a and b five partitions 1b each in the front-rear and left-right directions are arranged in a grid pattern (areas surrounded by lines arranged vertically and horizontally) for a total of 25 partitions 1b.
  • the multiple first recesses 13, 13 are arranged at predetermined intervals in the front-rear and left-right directions.
  • the upper end openings of every other partition 1b are formed in the first recess 13.
  • the first recess 13 has a bottom surface 131 formed at a depth position that matches the height of the first protrusion 14 that fits into the first recess 13, and is configured to receive the top surface 141 of the first protrusion 14 that fits into the first recess 13 and improve the strength of the partition 1b in which the first recess 13 is formed.
  • the partitions 1b in which the first recesses 13 are formed have bottom surfaces 131 formed, and the partitions 1b in which the first recesses 13 are not formed have their lower end openings blocked by bottom surfaces 132, improving the strength and lightness of the road construction material 1.
  • the bottom surfaces 132 of the partitions 1b are formed so as to be flush with the bottom surface of the road construction material main body 1a.
  • the bottom surfaces 131 and bottom surfaces 132 of the partitions 1b are respectively formed with water passage holes 131a, 132a that penetrate in the vertical direction.
  • the areas other than areas a and b i.e. areas c and d which face each other via the intersection 12c between the first imaginary demarcation line 12a and the second imaginary demarcation line 12b, constitute a second area group B, and in this second area group B, first protrusions 14, 14... which can fit into the first recesses 13, 13 formed in the first area group A are protruded upward.
  • each of areas c and d five partitions 1b each in the front-rear and left-right directions are arranged in a grid pattern, totaling 25 partitions 1b.
  • Four partitions 1b located at the corners of areas c and d and five partitions 1b in the center between these four partitions 1b, 1b, have a first protrusion 14 in the shape of a rectangular prism (with a square outline in plan view) of a certain height protruding upward at the upper open end.
  • Every other one of the nine partitions 1b has an upper open end blocked by a blocking portion 1b1, and a first protrusion 14 in the shape of a rectangular prism of a certain height is formed on this blocking portion 1b1 toward the upper end.
  • the first protrusions 14, 14... are arranged at predetermined intervals in the front-rear and left-right directions.
  • the first convex portion 14 is formed in a rectangular prism shape of a certain height with an outer shape slightly smaller than the planar shape of the upper opening end of the partition portion 1b, and is formed so as to be able to fit into the first concave portion 13 formed in the region a and the region b.
  • the inside of the first convex portion 14 is formed as a gap portion, which reduces the weight of the road construction material 1 and improves water permeability in the vertical direction.
  • the top surface 141 of the first convex portion 14 is formed so as to be received by the bottom surface portion 131 of the first concave portion 13.
  • the partition portion 1b in which the first convex portion 14 is formed has a blocking portion 1b1 formed therein, which is configured to improve the strength of the partition portion 1b in which the first convex portion 14 is formed.
  • the partitions 1b in which the first convex portions 14 are formed have closed portions 1b1, and the partitions 1b in which the first convex portions 14 are not formed have their lower end openings closed by the underside portions 142, improving the strength and lightness of the road construction material 1.
  • the underside portions 142 of the partitions 1b are formed so as to be flush with the underside of the road construction material main body 1a.
  • the closed portions 1b1 and underside portions 142 of the partitions 1b have water holes 1b11, 142a formed, respectively, that penetrate in the vertical direction.
  • the first recesses 13 formed in the areas a and b are configured to have the same shape when rotated 180° horizontally around the intersection 12c between the first virtual demarcation line 12a and the second virtual demarcation line 12b.
  • the first convex portions 14 formed in the areas c and d are configured to have the same shape when rotated 180° horizontally around the intersection 12c of the first imaginary demarcation line 12a and the second imaginary demarcation line 12b.
  • the road construction material 1 has a structure in which the first recessed portion 13 formed in areas a and b, and the first protruding portion 14 formed in areas c and d are point-symmetrical with respect to the intersection point 12c between the first imaginary demarcation line 12a and the second imaginary demarcation line 12b. Therefore, the road construction material 1 is configured so that it has the same shape in one state and when rotated 180 degrees horizontally from this state.
  • two road construction materials 1, 1 are prepared, one of the road construction materials 1 is turned upside down, and one (upper) road construction material 1 is placed on the other (lower) road construction material 1 with the formation surfaces of the first recessed portion 13 and the first protruding portion 14 formed on the pair of road construction materials 1 facing each other, i.e., the upper surfaces 11.
  • the first protruding portion 14 of one road construction material 1 fits into the first recessed portion 13 of the other road construction material 1
  • the first protruding portion 14 of the other road construction material 1 fits into the first recessed portion 13 of the one road construction material 1, so that the pair of road construction materials 1 can be stacked in a state where the upper surfaces 11 are in close contact with each other (see Figure 5).
  • a plurality of road construction materials 1 are laid in the front-rear and left-right directions so that the areas a and b where the first recessed portion 13 of the road construction material 1 is formed and the areas c and d where the first protruding portion 14 is formed are alternately arranged (see FIG. 8).
  • areas a-d are simply written as "a-d”.
  • the road construction materials 1 prepared are turned upside down so that the upper surfaces 11 face each other, and then stacked on the upper surfaces 11 of the road construction materials 1 laid in the front-rear and left-right directions, shifted by half (1/2) in each direction.
  • first recessed portion 13 and the first protruding portion 14 of the upper road construction material 1 and the first recessed portion 13 and the first protruding portion 14 of the lower road construction material 1 are fitted together, and the upper and lower road construction materials 1, 1 are stacked with the upper surfaces 11, 11 in close contact with each other while straddling each other.
  • the road construction materials 1 are configured so that one road construction material 1 can be turned upside down and stacked on top of the other road construction material 1, so that one road construction material 1 can be used as the top surface material.
  • the first recess 13 is described as being rectangular in plan view and the first protrusion 14 as being square prism-shaped, but the shapes of the first recess 13 and the first protrusion 14 are not limited to this, and it is sufficient that the first recess 13 and the first protrusion 14 can fit together.
  • the first recess 13 may be circular in plan view and the first protrusion 14 may be cylindrical in shape so as to fit into the first recess 13.
  • the lower openings are open in some of the partitions 1b, but all of the lower openings of the partitions 1b may be blocked by blocking parts (lower surface parts). In this case, it is preferable to form water holes that penetrate in the vertical direction in the blocking parts (lower surface parts) of the partitions 1b.
  • the lower surface parts of the partitions 1b appear on the lower surface side of the road construction material layer S1 or the upper surface material layer S2, they can be in contact with the layer (for example, the lower subgrade R32 in the case of the road construction material layer S1, and for example, the base layer R41 in the case of the upper surface material layer S2) directly opposite and in contact with the road construction material layer S1 or the upper surface material layer S2 over a wide area, and a road with reduced sinking can be constructed by reducing the reduction in the thickness of the layer containing crushed stone or asphalt material.
  • the ratio of the lower openings blocked in the partitions 1b of the road construction material 1 is preferably 50% or more, and more preferably 60% or more.
  • first recesses 13 are formed at predetermined intervals in areas a and b, and a total of nine first protrusions 14 are formed at predetermined intervals in areas c and d.
  • shape, number and arrangement of the first recesses and first protrusions formed in areas a to d are not particularly limited as long as the first recesses 13 and first protrusions 14 of one road construction material 1 and the first protrusions 14 and first recesses 13 of the other road construction material 1 are arranged so that they can fit together.
  • road construction material 1 can also be used when constructing new roads, but the following will explain how to repair existing roads as an example.
  • roads R such as expressways and general roads are constructed by stacking the roadbed R2, roadbed R3, and surface layer (base layer and surface layer) R4 in this order on the road body (ground or bridge deck) R1.
  • the roadbed R3 is composed of a lower roadbed R32 and an upper roadbed R31 stacked on the lower roadbed R32.
  • the lower roadbed R32 and the upper roadbed R31 are composed of crushed stone, and the upper roadbed R31 is usually mixed with asphalt material.
  • the surface layer R4 is composed of a base layer R41 and a surface layer R42 stacked on the base layer R41.
  • the surface layer R4 is usually composed of an asphalt mixture (asphalt mixture).
  • the asphalt mixture is a mixed material that combines crushed stone, sand, stone powder, and asphalt in a specified ratio.
  • Roads are subject to damage from the vibrations and loads that occur when vehicles travel, rainwater, etc., and therefore repair work is carried out at regular intervals or as needed.
  • Road repair work generally involves removing the heavily damaged surface layer R4 and upper roadbed R31, and then constructing a new surface layer R4 and upper roadbed R31.
  • the above road construction material 1 can be used to construct a new upper roadbed R31.
  • the road repair work involves newly constructing the surface layer R4 and upper roadbed R31, but in addition to the surface layer R4 and upper roadbed R31, the lower roadbed R32 and roadbed R2 may be removed as necessary and then newly constructed.
  • the above road construction material 1 may be used to construct any one or more layers of the newly constructed upper roadbed R31, lower roadbed R32 and roadbed R2. The following will explain an example in which the above road construction material 1 is used to construct the upper roadbed R31 when newly constructing the surface layer R4 and upper roadbed R31 after the surface layer R4 and upper roadbed R31 are removed.
  • road construction material layer S1 road construction material layer construction process
  • the road construction material 1 has a square shape in plan, so when the road construction material 1 is laid on the lower roadbed R32, the road construction material 1 is laid in the front-to-back and left-to-right directions with adjacent road construction materials 1, 1 in close contact with each other so that the areas a or b where the first recess 13 is formed and the areas c or d where the first protrusion 14 is formed are alternately arranged in the left-to-right and front-to-back directions.
  • a top surface material is layered on the top surface 11 of the road construction material 1 that constitutes the road construction material layer S1 to construct the top surface material layer.
  • the road construction material 1 can be used as a top surface material by turning it upside down so that the top surface 11 faces downwards. Since the road construction material 1 can be used as both a road construction material and a top surface material, road repair work can be carried out by transporting only one type of road construction material 1 to the road repair site, which improves the efficiency of transporting road construction materials and repair work, and shortens the time required to repair roads.
  • the road construction material 1 can be used as the top surface material 2 by inverting it upside down.
  • the road construction material 1 is inverted upside down so that the top surface 11 of the upper road construction material 1 (top surface material 2) faces the top surface 11 of the road construction material 1 that constitutes the road construction material layer S1, and the separately prepared road construction material 1 that will become the top surface material 2 is layered on the top surface 11 of the road construction material 1 that constitutes the road construction material layer S1 with adjacent road construction materials (top surface materials 2, 2) in close contact with each other, and laid in the front-to-back, left-to-right directions to construct the top surface material layer S2 (top surface material layer construction process).
  • the road construction material 1 to be the upper surface material 2 is placed and stacked on the road construction material 1 that constitutes the road construction material layer S1 so as to straddle the adjacent road construction materials 1, 1 that constitute the road construction material layer S1.
  • the road construction material 1 to be the upper surface material 2 is placed and stacked on the road construction material 1 that constitutes the road construction material layer S1 in a state where it is shifted by half (1/2) of the dimension of one side of the planar shape of the road construction material 1 in the front-rear direction and the left-right direction in a plan view with respect to the road construction material 1 that constitutes the road construction material layer S1.
  • the first recess 13 of the upper road construction material 1 that will be the upper surface material 2 is fitted into the first convex portion 14 of the road construction material 1 that constitutes the road construction material layer S1. Furthermore, the first convex portion 14 of the upper road construction material 1 that will be the upper surface material 2 is fitted into the first recess 13 of the road construction material 1 that constitutes the road construction material layer S1. For example, in the shaded area of FIG.
  • the first recess 13 of area a (area b) of the road construction material 1 that constitutes the road construction material layer S1 is fitted with the first convex portion 14 of area c (area d) of the road construction material 1 that constitutes the upper surface material layer S2, or the first convex portion 14 of area c (area d) of the road construction material 1 that constitutes the road construction material layer S1 is fitted with the first recess 13 of area a (area b) of the road construction material 1 that constitutes the upper surface material layer S2.
  • the road construction material 1 that constitutes the road construction material layer S1 and the road construction material 1 that constitutes the upper surface material layer S2 are connected by fitting.
  • the road construction material layer S1 and the upper surface material layer S2 are continuous in the vertical and horizontal directions on the paper, but only a portion is shown for convenience.
  • the road construction material 1 and top surface material 2 (upper road construction material 1) that constitute road construction material layer S1 and top surface material layer S2 are mutually constrained, and the road construction material layer S1 and top surface material layer S2 are firmly integrated in the front-to-back, left-right and up-down directions, and there is no shifting of the road construction material 1 and top surface material 2 (upper road construction material 1) that respectively constitute road construction material layer S1 and top surface material layer S2, despite the vibrations and loads of vehicles traveling on the road.
  • the road construction material 1 that will be the upper surface material 2 and the road construction material 1 that will be the road construction material layer S1 may be stacked together in a vertically aligned state, without the road construction material 1 that will be the upper surface material 2 being placed between the road construction materials 1 that will be the road construction material layer S1.
  • both the road construction material 1 and the top surface material 2 are made of molded products, they can be easily constructed by simply laying multiple road construction materials 1 in close contact with each other in the front-to-back and left-to-right directions on the exposed lower subgrade R32 of the road, and even unskilled workers can easily and accurately construct the road construction material layer S1 and top surface material layer S2. Because no heavy machinery is required to lay the road construction material 1 and top surface material 2, the work of laying the road construction material 1 and top surface material 2 can be done by hand at the same time, which also shortens the repair time.
  • the road construction material 1 and top surface material 2 due to the presence of the partition section 1b with gaps, can smoothly disperse the heat of the heated asphalt material layered on the top surface material 2, allowing the asphalt material to be cooled in a short period of time, shortening the time required for repair work.
  • an upper roadbed mainly made of crushed stone is constructed under the surface layer R4 (base layer R41 and surface layer R42).
  • the crushed stone that makes up the upper roadbed breaks down due to the vibrations and loads of vehicles traveling on the road, making the crushed stone particles smaller.
  • the smaller crushed stone then flows into the gaps between the crushed stone, reducing the volume of the upper roadbed, which causes the road to sink and accelerates damage to the road.
  • top surface material layer S2 and road construction material layer S1 constructed under the surface layer R4 (base layer R41 and surface layer R42), so there is almost no risk of the road construction material 1 (top surface material 2) collapsing due to the vibrations and loads of vehicles traveling on the road, resulting in a reduction in the volume of the road construction material layer S1 and top surface material layer S2, and the lifespan of the road can be extended.
  • the road construction material 1 has many compartments 1b with internal voids, and even when the road construction material 1 and the top surface material 2 (the upper road construction material 1) are stacked vertically, most of the compartments 1b of the road construction material 1 remain void.
  • the road construction material 1 and the top surface material 2 (the upper road construction material 1) can smoothly absorb vibrations and loads from vehicles traveling on the road, reducing damage not only to the road construction material 1 and the top surface material 2 (the upper road construction material 1), but also to the entire road.
  • the road construction material 1 and the top surface material 2 have numerous water passage holes formed, so that rainwater that has seeped through the surface layer R4 of the road can be discharged outside the road or into the lower roadbed R32, roadbed R2, or road body R1 constructed below the road construction material layer S1, improving the safety of vehicles traveling on the road in rainy weather and reducing the weakening caused by rainwater in each layer that constructs the road, thereby extending the life of the road.
  • road construction material that can be used both as a road construction material and as a top surface material to be laid on top of this road construction material, but the road construction material is not limited to this, and may be a road construction material and top surface material having the following structure.
  • the road construction material body 3a of the road construction material 3 has a flat square base plate 31 and a rectangular frame-shaped peripheral wall portion 32 extending downward from all four outer peripheries of the base plate 31, and the top surface 310 of the base plate 31 is formed as a top surface material mounting surface on which a top surface material 4 can be placed.
  • the road construction material 3 is mainly composed of synthetic resin and may contain fiber as necessary.
  • the content of synthetic resin in the road construction material 3 is preferably 60 mass% or more.
  • a number of inverted octagonal pyramid-shaped legs 33 are formed on the base plate 31 of the road construction material main body 3a of the road construction material 3 by bulging parts downward at a predetermined interval in the front-rear and left-right directions and protruding downward from the peripheral wall part 32 of the road construction material main body 3a. These legs 33 are formed at the four corners of the base plate 31 of the road construction material main body 3a and in the parts between these four corners. In detail, a total of nine legs 33, 33... are formed in a lattice pattern, three in the front-rear direction and three in the left-right direction, parallel to the edge of the base plate 31 of the road construction material 3.
  • the leg 33 of the road construction material 3 is formed in an inverted octagonal pyramid shape that gradually narrows from top to bottom, with a hollow interior and an upper end that opens completely upward into a flat octagonal shape, and the upper end opening of the leg 33 is formed into a first recess 330 into which the first protrusion of the upper surface material 4 described below can fit.
  • the first recess 330 of the road construction material 3 is configured so that it is identical in one state and when rotated horizontally by 90°, 180°, or 270° from this state.
  • the road construction material 3 is configured so that it has the same shape when it is in one state and when it is rotated horizontally by 90°, 180°, or 270° from this state.
  • the distance (center-to-center distance, pitch) L1 between adjacent first recesses 330 in the front-to-rear or left-to-right direction along the edge of the substrate 31 of the road building material 3 is configured to be equal to the distance (center-to-center distance, pitch) L2 between adjacent first recesses 330, 330 between adjacent road building materials 3 arranged in close contact with each other in the front-to-rear or left-to-right direction.
  • the top surface material 4 described later is layered on the top surface 310 of the road construction material 3 constituting the road construction material layer S1
  • the top surface material 4 is configured so that it can be placed and layered in a state spanning between the road construction materials 3, 3 laid adjacent to each other (a state shifted horizontally relative to the road construction materials 3 constituting the road construction material layer S1).
  • a water passage hole 331 that penetrates in the vertical direction is formed on the lower end surface of the leg 33 of the road construction material 3.
  • the upper end opening of the leg 33 is not limited to a planar octagonal shape, and may be another polygonal shape or a circular shape.
  • a number of water-passing holes 31a that penetrate in the vertical direction are formed in the area between adjacent leg portions 33, and water-passing grooves 31b are formed that connect the upper end openings of adjacent leg portions 33.
  • the base plate 31 of the road construction material 3 has a number of grooves 31c formed between the upper end openings of the legs 33 formed along the outer peripheral edge of the base plate 31 and the outer surface of the peripheral wall 32.
  • the road construction material 3 is formed with multiple water holes 331, 31a and grooves 31b, 31c through which water such as rainwater can pass, and is configured so that water that flows into the road construction material 3 can be smoothly discharged outside the road construction material 3.
  • the road construction material 3 has grooves 31b, 31c formed in it, the road construction material 3 can flexibly deform in response to stress applied from above and smoothly absorb the stress. Therefore, it is possible to smoothly absorb the vibrations and loads of vehicles traveling on the road, and to reduce damage not only to the road construction material 3 and top surface material 4, but also to the entire road.
  • the upper surface material 4 is laminated on the upper surface 310 of the road construction material 3. As shown in Figures 12 to 14, the upper surface material 4 has a planar square-shaped substrate 41 that is the same shape and size as the substrate 31 of the road construction material 3, and a first protrusion 42 that protrudes from the lower surface of this substrate 41.
  • a lattice-shaped partition 41a is formed over the entire upper surface of the substrate 41 of the upper surface material 4, forming a plurality of partitions 41b.
  • the interior of each partition 41b is formed as a gap, and the upper side is completely open.
  • a water-passing section 41d that penetrates in the vertical direction is formed in the part of the substrate 41 that closes the lower opening of each partition 41b.
  • the upper surface material 4 has many partitions 41b with gaps, and by deforming the partitions 41b, the upper surface material 4 smoothly absorbs the vibrations and loads of vehicles traveling on the road, reducing damage not only to the road construction material 3 and the upper surface material 4, but also to the entire road.
  • first protrusions 42, 42... are formed at predetermined intervals in a lattice pattern, three in the front-rear direction and three in the left-right direction.
  • the first protrusions 42 formed on the lower surface of the upper surface material 4 are formed in a circular ring shape (cylindrical shape) with a certain height, and the first protrusions 42 are formed so as to be able to fit into the first recesses 330 of the road construction material 3.
  • the distance (center-to-center distance, pitch) L31 between the first protrusions 42, 42 of the upper surface material 4 is configured to match the distance (center-to-center distance, pitch) L1 between the first recesses 330 adjacent to each other in the front-rear direction or left-right direction parallel to the edge of the base plate 31 of the road construction material 3. Furthermore, the distance L32 between the outer peripheral edge of the upper surface material 4 and the center of the first convex portion 42 formed closest to this outer peripheral edge is formed to be equal to 1/2 the distance L31 between the first convex portions 42, 42 of the upper surface material 4 [the distance (center-to-center distance, pitch) L1 between the first concave portions 330].
  • the top surface material 4 is placed on the top surface 310 of the road construction material 3 that constitutes the road construction material layer S1, with its base plate 41 shifted in the front-rear and/or left-right directions by one or more rows of first recesses 330 relative to the base plate 31 of the road construction material 3. Then, each of the first convex portions 42 of the top surface material 4 is fitted into the first recesses 330 of the road construction material 3 that face these first convex portions 42. Then, the top surface material 4 is configured to be layered on the road construction material 3 with the lower surface of the base plate 41 of the top surface material 4 in full contact with the top surface 310 of the road construction material 3. Note that in FIG. 15, the road construction material layer S1 and the top surface material layer S2 are continuous in the vertical and horizontal directions on the paper, but for convenience, only a portion is shown.
  • the surface layer R4 (surface layer R42 and base layer R41) and upper roadbed R31 of the road R that needs repair are removed to expose the lower roadbed R32.
  • road construction materials 3 are laid in the front-to-back and left-to-right directions with adjacent road construction materials 3, 3 in close contact with each other to construct the road construction material layer S1.
  • the arrangement direction of the road construction material as viewed from above is not particularly limited.
  • the top surface material 4 is laminated on the top surface 310 of the road construction material 3 constituting the road construction material layer S1 to construct the top surface material layer S2.
  • the top surface material 4 is laminated on the top surface 310 of the road construction material 1 constituting the road construction material layer S1 in a state in which its base plate 41 is shifted in the front-rear and/or left-right directions by one or more rows of the first recesses 330 relative to the base plate 31 of the road construction material 3.
  • each of the first convex portions 42 of the top surface material 4 is fitted into the first recesses 330 of the road construction material 3 that face these first convex portions 42.
  • the top surface material 4 is laminated on the road construction material 3 in a state in which the bottom surface of its base plate 41 is in full contact with the top surface 310 of the road construction material 3 and the top surface material layer S2 is constructed as the top surface material 4 straddles the road construction materials 3, 3.
  • the road construction material 3 and the top surface material 4 are connected by fitting.
  • the road construction materials 3 and top surface material 4 that make up road construction material layer S1 are stacked vertically while straddling each other in the front-to-back and left-to-right directions, so that the road construction materials 3 and top surface material 4 that make up road construction material layer S1 and top surface material layer S2, respectively, are restrained from each other.
  • the road construction material layer S1 and top surface material layer S2 are firmly integrated in the front-to-back, left-to-right and up-to-down directions, and there is no shifting of the road construction materials 3 and top surface material 4 that make up road construction material layer S1 and top surface material layer S2, despite the vibrations and loads of vehicles traveling on the road.
  • the top surface material 2 may be laminated on the substrate 41 of the top surface material 2 and the substrate 31 of the road construction material 3 constituting the road construction material layer S1 in a vertically aligned state, without the top surface material 2 being placed across the road construction materials 3 constituting the road construction material layer S1.
  • the base layer R41 and surface layer R42 are constructed using asphalt material on top of the upper surface material layer S2 in a standard manner to complete the construction of the repaired road.
  • both the road construction material 3 and the top surface material 4 are made from molded parts, the work of laying the road construction material 3 and the top surface material 4 can be done by hand at the same time, which also shortens the time required for repair work.
  • the construction of the base layer R41 and surface layer R42 can be completed using asphalt material on top of the road construction material 3 and top surface material 4 without any time delay after their installation, and the construction of the repaired road can be completed, thereby shortening the time required for repair work.
  • the road construction material 3 and the top surface material 4 have many internal voids, which allows the heat of the heated asphalt material layered on the top surface material 4 to be dispersed smoothly, allowing the asphalt material to be cooled in a short period of time, shortening the repair work.
  • the top surface material layer S2 and road construction material layer S1 are constructed under the surface layer R4 (base layer R41 and surface layer R42), so the road construction material 3 and top surface material 4 are unlikely to collapse due to vibrations and loads from vehicles traveling on the road, resulting in a decrease in the volume of the road construction material layer S1 and top surface material layer S2, and the lifespan of the road can be extended.
  • the road construction material 3 and the top surface material 4 are formed with numerous water passage holes, so that rainwater and other water that has seeped through the surface layer R4 of the road can be discharged outside the road or into the lower roadbed R32, roadbed R2, or road body R1 constructed below the road construction material layer S1, improving the safety of vehicles traveling on the road in rainy weather and reducing the weakening caused by rainwater in each layer that constructs the road, thereby extending the life of the road.
  • the road construction material 5 and the top surface material 6 may be those shown in Figures 17 to 23.
  • the road construction material body 5a of the road construction material 5 has a flat square base plate 51 and a rectangular frame-shaped peripheral wall portion 52 extending downward from all four outer peripheries of the base plate 51, and the top surface 510 of the base plate 51 is formed into an upper surface 510 on which the top surface material 6 can be placed.
  • the road construction material 5 is mainly composed of synthetic resin, and may contain fiber as necessary.
  • the content of synthetic resin in the road construction material 5 is preferably 60 mass% or more.
  • the base plate 51 of the road construction material main body 5a of the road construction material 5 has a plurality of inverted octagonal pyramid-shaped legs 53 formed by bulging out parts of it downward at a predetermined interval in the front-rear and left-right directions and at the same height as the peripheral wall part 52 of the road construction material main body 5a.
  • These legs 53 are formed on the parts of the base plate 51 of the road construction material main body 5a excluding the outer periphery on all four sides, and in detail, a total of nine legs 53, 53... are formed in a lattice pattern, three each in the front-rear direction and three each in the left-right direction, parallel to the edge of the base plate 51 of the road construction material 5.
  • the leg 53 of the road construction material 5 is formed in an inverted octagonal pyramid shape that gradually narrows from top to bottom.
  • the inside of the leg 53 is a hollow space, and the upper end opens completely upward into a flat octagonal shape.
  • the upper end opening of the leg 53 is formed into a first recess 530 into which the first protrusion of the upper surface material 6 described below can fit.
  • the first recess 530 of the road construction material 5 is configured so that it is identical in one state and when rotated horizontally by 90°, 180°, or 270° from this state.
  • a dividing recess 521 is formed on each of the four outer peripheral surfaces of the peripheral wall portion 52 of the road construction material 5, and the dividing recess 521 has a shape substantially identical to the concave shape formed by dividing the leg portion 53 in half along a vertical plane.
  • the dividing recess 521 formed on each of the four outer peripheral surfaces of the peripheral wall portion 52 is formed on each of the extension lines of the arrangement of the legs 53, 53, ... arranged in parallel in the front-rear and left-right directions.
  • a divided recess 522 is formed, which has approximately the same shape as the concave shape formed by dividing the leg portion 53 into 1/4 on a vertical plane.
  • the dividing recesses 522, 522... of adjacent road construction materials 5, 5 face each other, and the four dividing recesses 522 form a first recess 55 into which the first protrusion of the upper surface material 6 can fit.
  • the first recesses 54, 55 formed between the road construction materials 5, 5 have small gaps between the opposing end faces of the divided recesses 521, 521 that make up the first recesses 54, 55, and between the opposing end faces of the divided recesses 522, 522, but the inner shape excluding these gaps is configured to be the same as the inner shape of the first recess 530 that consists of the upper end opening of the leg 53 of the road construction material 5.
  • a second recess 521a having a semicircular U-shaped cross section is formed at the lower end of the dividing recesses 521, 522 formed on the two outer peripheral surfaces that connect at right angles in the peripheral wall portion 52 of the road construction material 5 and the corners where these outer peripheral surfaces connect, while a locking piece 521b that can be locked to the second recess 521a is formed at the lower end of the dividing recesses 521, 522 formed on the remaining two outer peripheral surfaces that connect at right angles in the peripheral wall portion 52 of the road construction material 5 and the corners where these outer peripheral surfaces connect.
  • This locking piece 521b has a locking piece main body 521c that is circular in plan view and a locking claw portion 521d that is formed on the lower surface of this locking piece main body 521c and can be locked to the second recess 521a (see Figures 18 and 19).
  • a second recess may be formed on one of the opposing surfaces of adjacent road construction materials, and a locking piece that can be locked into this second recess may be formed on the other surface.
  • the distance (center-to-center distance, pitch) L4 between adjacent first recesses 530 in the front-to-back or left-to-right direction along the edge of the substrate 51 of the road building material 5 is configured to be equal to the distance (center-to-center distance, pitch) L5 between the first recess 54 formed between the road building materials 5, 5 and the first recess 530 facing this first recess 54.
  • the distance (center-to-center distance, pitch) L4 between adjacent first recesses 530 in the front-to-back or left-to-right direction along the edge of the substrate 51 of the road building material 5 is configured to be equal to the distance L6 between the center of a first recess 55 formed between the road building materials 5, 5, 5, 5 and the first recess 530 facing this first recess 55.
  • the road construction material 5 is configured so that in one state, it has the same shape as when it is rotated horizontally by 90°, 180°, or 270° from this state, except for the second recess 521a of the dividing recess 521 and the locking piece 521b.
  • the top surface material 6 when stacking the top surface material 6 described later on the top surface 510 of the road construction material 5 constituting the road construction material layer S1, the top surface material 6 is configured so that it can be placed and stacked across the road construction materials 5, 5 laid adjacent to each other (horizontally offset relative to the road construction materials 5 constituting the road construction material layer S1) (see Figure 25).
  • a water passage hole 531 that penetrates in the vertical direction is formed on the lower end surface of the leg 53 of the road construction material 5.
  • the upper end opening of the leg 53 is not limited to a planar octagonal shape, and may be other polygonal shapes or a circle.
  • a number of water-passing holes 51a that penetrate vertically are formed in the area between adjacent leg portions 53, and water-passing grooves 51b are formed that connect the upper end openings of adjacent leg portions 53.
  • the base plate 51 of the road construction material 5 has a number of grooves 51c formed between the upper end openings of the legs 53 formed along the outer peripheral edge of the base plate 31 and the outer surface of the peripheral wall 52.
  • the road construction material 3 is formed with multiple water holes 531, 51a and grooves 51b, 51c through which water such as rainwater can pass, and is configured so that water that flows into the road construction material 5 can be smoothly discharged outside the road construction material 5.
  • the road construction material 5 is formed with grooves 51b, 51c, the road construction material 5 can flexibly deform in response to stress applied from above and smoothly absorb the stress. Therefore, it is possible to smoothly absorb the vibrations and loads of vehicles traveling on the road, and to reduce damage not only to the road construction material 5 and top surface material 6, but also to the entire road.
  • the upper surface material 6 is laminated on the upper surface 510 of the road construction material 5. As shown in Figures 21 to 23, the upper surface material 6 has a planar square-shaped substrate 61 that is the same shape as the substrate 61 of the road construction material 5 but slightly smaller in size, and a first protrusion 62 that protrudes from the lower surface of this substrate 61.
  • a lattice-shaped partition 61a is formed across the entire upper surface of the substrate 61 of the upper surface material 6, forming a plurality of partitions 61b.
  • the interior of each partition 61b is formed as a gap, and the upper side is completely open.
  • a water-passing section 61d that penetrates in the vertical direction is formed in the part of the substrate 61 that closes the lower opening of each partition 61b.
  • the upper surface material 6 has many partitions 61b with gaps, and by deforming the partitions 61b, the upper surface material 6 smoothly absorbs the vibrations and loads of vehicles traveling on the road, reducing damage not only to the road construction material 5 and upper surface material 6, but also to the entire road.
  • first protrusions 62, 62... are formed at predetermined intervals in a lattice pattern, with three in the front-to-rear direction and three in the left-to-right direction.
  • the first protrusions 62 formed on the underside of the upper surface material 6 are formed in a circular ring shape (cylindrical shape) with a certain height, and the first protrusions 62 are formed so that they can fit into the first recesses 530 of the road construction material 5 and the first recesses 54, 55 formed between the road construction materials 5, 5.
  • the distance (center distance, pitch) L7 between the first convex parts 62, 62 of the upper surface material 6 is configured to be equal to the distance (center distance, pitch) L4 between the first concave parts 530 adjacent to each other in the front-rear direction or left-right direction parallel to the edge of the base plate 51 of the road building material 5.
  • the distance (center distance, pitch) L7 between the first convex parts 62, 62 of the upper surface material 6 is configured to be equal to the distance L5 between the first concave part 54 formed between the road building materials 5, 5, 5, 5 and the first concave part 530 facing the first concave part 54.
  • the distance (center distance, pitch) L7 between the first convex parts 62, 62 of the upper surface material 6 is configured to be equal to the distance L6 between the first concave part 55 formed between the road building materials 5, 5 and the first concave part 530 facing the first concave part 55.
  • the distance L8 between the outer periphery of the base plate 61 of the upper surface material 6 and the center of the first protrusion 62 closest to this outer periphery is configured to be equal to half the dimensions of the above L4 , L5 and L6 .
  • the top surface material 6 is laid in the front-rear and left-right directions on the top surface 510 of the road construction material 5 that constitutes the road construction material layer S1, with the top surface material 6 in close contact with the top surface 510. Then, each of the first convex portions 62 of the top surface material 6 fits into the first concave portion 530 of the road construction material 5 that faces the first convex portions 62, or into the first concave portions 54, 55 formed between the road construction materials 5, 5.
  • the top surface material 6 is configured to be layered on the road construction material 5, with the bottom surface of the substrate 61 of the top surface material 6 in full contact with the top surface 510 of the road construction material 5.
  • the surface layer R4 (surface layer R42 and base layer R41) and upper roadbed R31 of the road R that needs repair are removed to expose the lower roadbed R32.
  • road construction materials 5 are laid in the front-rear and left-right directions with adjacent road construction materials 5, 5 in contact with each other to construct the road construction material layer S1.
  • the road construction materials 5 are laid so that their second recesses 521a (locking pieces 521b) are in the same direction (leftward and upward in Figure 20), and between adjacent road construction materials 5, 5, the locking piece 521b of one road construction material 5 is locked to the second recess 521a of the other road construction material 5.
  • the top surface material 6 is laid on the top surface 510 of the road construction material 5 constituting the road construction material layer S1 in a state where they are in contact with each other in the front-rear and left-right directions to construct the top surface material layer S2.
  • Each of the first convex parts 62 of the top surface material 6 is fitted into the first concave part 530 of the road construction material 5 or the first concave parts 54, 55 formed between the road construction materials 5, 5, which face these first convex parts 62.
  • the top surface material 6 is layered on the top surface 510 of the road construction material 5 in a state where the bottom surface of its substrate 61 is in full contact with the entire surface.
  • the road construction material 5 and the top surface material 6 are connected by fitting.
  • the top surface material 6 is layered on the road construction material 5 to construct the top surface material layer S2. Note that in FIG. 25, the road construction material layer S1 and the top surface material layer S2 are continuous in the vertical and horizontal directions on the paper, but for convenience, only a part is shown.
  • first recesses 54, 55 are formed into which the first protrusion 62 of the top surface material 6 can fit. Therefore, when the top surface material 6 is laid in the front-to-back and left-to-right directions on the top surface 510 of the road construction material 5 in a state where the top surface material 6 is in close contact with each other, the first protrusion 62 of the top surface material 6 also fits into the first recesses 54, 55 formed between the road construction materials 5, 5.
  • the first recesses 530 of the road construction material 5 and the first protrusions 62 of the top surface material 6 are formed in equal numbers. Meanwhile, as described above, first recesses 54, 55 are also formed between the road construction materials 5, 5, and the first protrusions 62 of the top surface material 6 are fitted into these first recesses 54, 55 as well. As a result, a misalignment occurs between the road construction material 5 and the top surface material 6, and the top surface material 6 is laid on the road construction material 5 in a state in which it straddles the adjacent road construction materials 5, 5.
  • the road construction material 5 constituting road construction material layer S1 and the top surface material 6 constituting top surface material layer S2 are stacked vertically, straddling each other in both the front-to-back and left-to-right directions.
  • the road construction materials 5 and top surface materials 6 constituting road construction material layer S1 and top surface material layer S2, respectively, are mutually constrained, and road construction material layer S1 and top surface material layer S2 are firmly integrated in the front-to-back and left-to-right and up-to-down directions.
  • the base layer R41 and surface layer R42 are constructed using asphalt material on top of the upper surface material layer S2 in a standard manner to complete the construction of the repaired road.
  • connection and integration of the road construction materials 5, 5 may be performed by either the locking structure of the second recess 521a and the locking piece 521b, or the connection structure by the top surface material.
  • the connection and integration of the road construction materials 5, 5 is performed by the locking structure of the second recess 521a and the locking piece 521b, the use of the connection structure by the top surface material may be omitted.
  • connection and integration of road construction materials by the locking structure of the second recess and the locking piece may be applied to road construction materials other than the third form.
  • the second recess may be formed on one of the opposing surfaces of the road construction material body of the road construction material, and the locking piece may be formed on the other. Adjacent road construction materials laid adjacent to each other may be connected and integrated by the locking structure of the second recess and the locking piece.
  • connection and integration of road construction materials laid adjacent to each other may be performed by either the locking structure of the second recess 521a and the locking piece 521b or the connection structure of the upper surface material (upper road construction material).
  • the connection and integration of road construction materials is performed by the locking structure of the second recess and the locking piece, the use of the connection structure of the upper surface material may be omitted.
  • the road construction material body 7a of the road construction material 7 has a flat square base plate 71 and a rectangular frame-shaped peripheral wall portion 72 extending downward from all four outer peripheries of the base plate 71, and the top surface 710 of the base plate 71 is formed into an upper surface 710 on which the top surface material 8 can be placed.
  • the road construction material 7 is mainly composed of synthetic resin, and may contain fiber as necessary.
  • the content of synthetic resin in the road construction material 7 is preferably 60 mass% or more.
  • the base plate 71 of the road construction material body 7a of the road construction material 7 is formed with a plurality of rectangular column-shaped legs 73 by bulging parts of it downward at a predetermined interval in the front-rear and left-right directions and protruding downward beyond the peripheral wall portion 72 of the road construction material body 7a.
  • the legs 73 of the road building material 7 are formed in the four corners and intermediate parts of each of the four corners of each of the regions e to h obtained by dividing the base plate 71 into four cross sections by straight lines connecting the midpoints of the opposing edges of the base plate 71.
  • a total of nine legs 73, 73... are formed in a grid pattern parallel to the edges of the base plate 71 of the road building material 7, with three each in the front-to-back direction and three each in the left-to-right direction. Therefore, the road building material 7 has a total of 36 legs 73, 73... protruding downward.
  • the leg 73 of the road construction material 7 has a hollow space inside and an upper end that opens completely upward in a flat square shape, with the upper opening of the leg 73 being formed into a first recess 730 into which the first protrusion of the upper surface material 8 (upper road construction material 7) described below can fit.
  • a bottom surface 730a is formed within the upper opening of the leg 73, and this bottom surface is configured to be able to receive the top surface of the first protrusion fitted into the first recess 730.
  • a water hole 730b that penetrates in the vertical direction is formed in the bottom surface portion 730a of the first recess 730.
  • the road construction material 3 is formed with a plurality of water holes 730b through which water such as rainwater can pass, and the water that flows into the road construction material 3 is configured to be smoothly discharged outside the road construction material 3.
  • the first recess 730 of the road construction material 7 is configured so that it is identical in one state and when rotated horizontally by 90°, 180°, or 270° from this state.
  • the lower end of the leg 73 of the road construction material 7 is formed into a first convex portion 731 that can fit into the first concave portion 730 of the road construction material 7 described above.
  • an abutment piece 732 is formed between the first convex portion 731 (the lower end of the leg 73) of the road construction material 7 and the lower end of the peripheral wall portion 72 of the road construction material main body 7a.
  • a curtain piece 733 is formed between adjacent abutment pieces 732, 732.
  • the first convex portion 731 of the upper road construction material 7 fits into the first concave portion 730 of the lower road construction material opposite the first convex portion 731, and the lower end faces of the abutment piece 732 and curtain piece 733 of the leg portion 73 of the upper road construction material 7 are received on the open end face of the first concave portion 730 of the lower road construction material 7 (see Figure 29).
  • the road construction material 7 is configured so that it has the same shape in one state as it does when rotated horizontally by 90°, 180°, or 270° from this state. Furthermore, the road construction material 7 is configured so that the two halves of the material, divided by a straight line connecting the midpoints of any opposing edges of the substrate 71, have the same shape.
  • the road construction material 7 when stacking a top surface material on the top surface 710 of the road construction material 7 constituting the road construction material layer S1, the road construction material 7 can be used as the top surface material.
  • another road construction material 7 can be placed and stacked as a top surface material, straddling the road construction materials 7, 7 laid adjacent to each other.
  • "Straddling the road construction materials 7, 7" means "a state in which the road construction material 7 is shifted horizontally by half (1/2) the dimension of one side of the planar shape of the road construction material 7 with respect to the road construction material 7 constituting the road construction material layer S1.”
  • the first recess 730 is formed in a square shape in plan view, and the first protrusion 731 is formed in a rectangular prism shape.
  • the shapes of the first recess 730 and the first protrusion 731 are not limited to this, and it is sufficient that the first recess 730 and the first protrusion 731 can fit into each other.
  • the first recess 730 may be formed in a circular shape in plan view, and the first protrusion 731 may be formed in a cylindrical shape that can fit into the first recess 730.
  • first recesses 730 are formed in each of the regions e to h.
  • first recesses 730 and the first protrusions 731 are arranged so that they can fit into each other, there is no particular limit to the number and arrangement of the first recesses and first protrusions formed in the regions e to h.
  • road construction materials 7 are laid in the front-to-back and left-to-right directions on the exposed lower subgrade R32 with adjacent road construction materials 7, 7 in contact with each other, to construct a road construction material layer S1.
  • the road construction material 7 Since the road construction material 7 has a square shape in plan, there is no need to consider the direction in which it is laid when laying the road construction material 7 on the lower roadbed R32.
  • a top surface material is layered on the top surface 710 of the road construction material 7 that constitutes the road construction material layer S1 to construct the top surface material layer.
  • the above road construction materials 7 can be layered on top of each other, and therefore can be used as top surface materials.
  • the above road construction material 7 can be used as both a road construction material and a top surface material, which can improve the efficiency of transporting road construction materials and repair work, and shorten the time required to repair roads.
  • the road construction material 7 that will become the top surface material 8 is shifted by half (1/2) of the dimension of one side of the planar shape of the road construction material 7 in the front-rear and left-right directions in a plan view relative to the road construction material 7 that constructs the road construction material layer S1.
  • the road construction material 7 that will become the top surface material 8 is placed on the road construction material 7 that constructs the road construction material layer S1 and stacked.
  • the first convex portion 731 of the upper road construction material 7 that will become the top surface material 8 is fitted into the first concave portion 730 of the road construction material 7 that constructs the road construction material layer S1.
  • the road construction material 7 that constructs the road construction material layer S1 and the upper road construction material 7 that will become the top surface material 8 are stacked in the vertical direction while straddling each other in the front-rear and left-right directions. Then, the road construction materials 7, 7 constituting the road construction material layer S1 and the top surface material layer S2, respectively, are mutually constrained, and the road construction material layer S1 and the top surface material layer S2 are firmly integrated in the front-rear, left-right and up-down directions. The road construction material 7 and the top surface material 8 are connected by fitting.
  • the road construction material 1 and the top surface material 2 (the upper road construction material 1), which respectively constitute the road construction material layer S1 and the top surface material layer S2.
  • the road construction material layer S1 and the top surface material layer S2 are continuous in the vertical and horizontal directions on the paper, but for convenience only a portion is shown.
  • the road construction material 7 that will be the upper surface material 8 and the road construction material 7 that will be the road construction material layer S1 may be stacked together in a vertically aligned state, without the road construction material 7 that will be the upper surface material 8 being placed between the road construction materials 7 that will be the road construction material layer S1.
  • abutment pieces 732 are formed at the corners of the legs 73, and curtain pieces 733 are formed between these abutment pieces 732, 732, but the abutment pieces 732 and curtain pieces 733 do not necessarily have to be formed.
  • first to fourth forms of the road construction material described above a case has been described in which the road construction material and the top surface material (the road construction material that becomes the top surface material) are fitted together to connect them in the vertical direction.
  • a top surface material placed on the top surface of the road construction material is used to connect and integrate road construction materials laid in the front-rear and left-right directions, but the road construction materials may also be connected and integrated using connecting members without using a top surface material.
  • the explanation will be given using the road construction material explained as the second embodiment.
  • the first recess 330 of the road construction material 3 is used as a connection part for fitting the fitting part of the connection member.
  • connection member 9 has a connecting rod 91 that has a length equal to the distance between the first recesses 330, 330 of adjacent road construction materials 3 in the diagonal direction, front-rear direction, or left-right direction of the base plate 31, and is formed with a width that allows it to be inserted from above into the grooves 31b, 31c of the road construction material 3, between road construction materials 3, 3 that are adjacent to each other and has inverted triangular pyramid-shaped fitting parts 92, 92 formed on each end of the connecting rod 91 and that can fit into the first recesses 330 of the road construction material 3.
  • the inside of the fitting part 92 of the connection member 9 is formed as a gap and is formed in a state that allows water to pass through in the vertical direction.
  • the connecting rod 91 of the connecting member 9 is inserted from above into the grooves 31b, 31c of the road construction material 3, and the fitting parts 92 formed on both ends of the connecting rod 91 are fitted into the first recesses 330, 330 of the road construction material 3, thereby connecting and integrating the road construction materials 3, 3 together (see Figure 32).
  • FIG. 32 the case where the first recesses 330, 330 are adjacent to each other in the diagonal direction of the substrate 31 between the adjacent road construction materials 3, 3 is shown, but the first recesses 330, 330 adjacent to each other in the front-rear or left-right direction of the road construction material 3 may also be used.
  • the first recess may also be used in other types of road construction materials, and adjacent road construction materials laid next to each other may be connected and integrated using a connecting member.
  • the first type of road construction material can be used as a top surface material by turning it upside down.
  • the weight and vibration of a vehicle running on the surface layer R4 of the road is transmitted to the road construction material layer S1 and the top surface material layer S2 (see Figure 7).
  • the weight and vibration of vehicles traveling on the surface layer R4 may cause the top surface material 2 that constitutes the top surface material layer S2 to move on the road construction material layer S1.
  • Figure 34 when a vehicle (not shown) travels from right to left on the surface layer (not shown), the position at which the load is applied on the top surface material of the top surface material layer S2 below the surface layer usually moves in the order of W1, W2, W3 as the vehicle travels. That is, the position at which the load of the vehicle is applied on the top surface material moves in the order of the outer periphery, center, and outer periphery.
  • Figure 34 shows a state in which the top surface material is layered on top of a road construction material, but in the following explanation, the same applies when the top surface material is layered across adjacent road construction materials.
  • top surface material tends to sway in a direction in which its outer periphery moves up and down around its center (arrow M in Figure 34).
  • the outer periphery of the above-mentioned top surface material is formed at a 90° corner (see Figures 5, 16, 24 and 29). Therefore, every time the top surface material sways, the corners of the top surface material collide with the surface layer R4, which can cause cracks in the surface layer R4 due to the collision of the top surface material, resulting in damage to the road R.
  • the upper surface material 2' further has the structure described below (see FIGS. 35 to 37).
  • the upper surface material 2' is preferably one in which all of the ridges (sharp corners) are cut off at the outer peripheral edge of the upper surface 20 to form a chamfered edge 2a. It is preferable that the entire outer peripheral edge of the upper surface 20 of the upper surface material 2' is chamfered.
  • the outer peripheral edge of the upper surface 20 of the upper surface material 2' is formed into a chamfered edge 2a, as described above, even if the upper surface material sways, the upper surface material hits the surface layer R4 not at the corners but at the surface, so that the impact force on the surface layer R4 can be dispersed over the entire surface, and the occurrence of cracks in the surface layer R4 can be reduced.
  • the parts having the same structure as the road construction material 1 that can also be used as the upper surface material 2 are given the same reference numerals and the description is omitted. Water holes do not have to be formed in the lower surface parts 132 and 142 of the partition part 1b.
  • the surface shape of the chamfered edge 2a of the upper surface material 2' may be a cross-sectional inclined line shape (straight line shape) or a cross-sectional convex curve shape.
  • a convex curve shape is preferably a convex arc shape (R surface).
  • the width of the chamfered edge 2a is preferably 2 to 50 mm, and more preferably 5 to 40 mm.
  • the surface shape of the chamfered edge 2a of the upper surface material 2' is preferably a C-surface formed by linearly chamfering at an angle of 45° to the upper surface 20.
  • the chamfered edges 2a, 2a of adjacent top surface materials 2 face each other to form a third recess 2b.
  • the third recess 2b is formed so as to surround the top surface material 2.
  • the third recess 2b formed between adjacent top surface materials 2, 2 is filled with the surface layer R4 of the road R (see Figure 7).
  • the top surface material 2 is fixed at its outer periphery by the surface layer R4 filled in the third recess 2b, suppressing the shaking of the top surface material 2.
  • the above-mentioned shaking of the top surface material 2 can also be reduced, and the occurrence of cracks in the surface layer R4 can be more effectively reduced.
  • chamfered edge 2a is formed on the outer peripheral edge of the top surface 20 in the top surface material 2'
  • a chamfered edge may also be formed on the outer peripheral edge of other top surface materials.
  • the chamfered edges of adjacent top surface materials face each other to form a third recess.
  • the above-mentioned shaking of the upper surface material 2 (2') may be reduced by strengthening the connection by fitting between the road construction material 1 and the upper surface material 2 constituting the road construction material layer S1.
  • ribs 14a are formed on the outer peripheral surfaces of some or all of the first convex parts 14 of the road construction material 1.
  • ribs 14a are formed on the outer peripheral surfaces of some or all of the first convex parts 14 of the road construction material 1 of the upper surface material 2'.
  • the ribs 14a formed on the outer peripheral surfaces of the first convex parts 14 have a small protruding degree at the tip end, while the protruding degree at the base end is large.
  • the protruding degree of the tip end of the rib 14a is adjusted so that the tip end of the first convex part 14 can be inserted into the opening end of the first recess 13.
  • the degree of protrusion of the rib 14a, excluding the tip is adjusted so that a part or the whole of the rib 14a is crushed by the inner peripheral surface of the first recess 13 when the first protrusion 14 is fitted into the first recess 13.
  • Figures 35 to 39 show a case where a rib 14a is formed on one outer peripheral surface of the first protrusion 14, the rib 14a may be formed on multiple outer peripheral surfaces of the outer peripheral surface of the first protrusion 14.
  • the ribs 14a, 14a of the first convex portions 14, 14 of the road construction material 1 and the top surface material 2' are inserted into the first concave portions 13, 13 while being crushed.
  • the ribs 14a, 14a of the crushed first convex portions 14, 14 are present in the gap formed between the opposing surfaces of the first convex portion 14 and the first concave portion 13.
  • the crushed ribs 14a prevent the first convex portion 14 from moving within the first concave portion 13, making the fit between the first convex portion 14 and the first concave portion 13 stronger. Therefore, the shaking of the top surface material 2' on the road construction material 1 can be reduced.
  • ribs 14a are formed on the outer peripheral surface of the first convex portion 14
  • ribs may be formed on the inner peripheral surface of the first recess 13.
  • the ribs formed on the inner peripheral surface of the first recess 13 have a small degree of protrusion at the opening end of the first recess 13, but a large degree of protrusion inside the first recess 13.
  • the degree of protrusion of the ribs formed on the opening end of the first recess 13 is adjusted so that the tip of the first convex portion 14 can be inserted into the opening end of the first recess 13.
  • the degree of protrusion of a part or the entirety of the ribs formed in the part other than the opening end of the first recess 13 is adjusted so that they are crushed by the inner peripheral surface of the first recess 13 when the first convex portion 14 is fitted into the first recess 13.
  • the action and effect of the ribs when the first convex portion 14 and the first recess 13 are fitted together is the same as that described above, so a description thereof will be omitted.
  • a rib may be formed on one outer peripheral surface of the first recess 13, or ribs 14a may be formed on multiple outer peripheral surfaces of the outer peripheral surface of the first protrusion 14.
  • the road construction material 1 and the top surface material 2' are shown to have ribs formed on part of the first convex portion, but ribs may be formed on the entire first convex portion.
  • the road construction material 1 and the top surface material 2' are shown to have ribs formed on part of the first concave portion, but ribs may be formed on the entire first concave portion.
  • the number of ribs formed on the first convex portion or the first concave portion may be either one or multiple.
  • ribs are formed on either or both of the first convex portion and the first concave portion in the road construction material 1 and the top surface material 2', but ribs may also be formed on either or both of the first convex portion and the first concave portion in other top surface materials.
  • a synthetic resin sheet may be laid, preferably over the entire surface, on the above-mentioned upper surface material layer, and a surface layer R4 may be constructed on the synthetic resin sheet.
  • a coating of asphalt mixture may be formed partially or entirely on the surface of the above-mentioned road construction material layer S1 and/or top surface material layer S2 to more firmly integrate the top surface material with the surface layer R4 of the road R, the road construction material and the road construction material, the top surface material and the top surface material, or the road construction material and the top surface material, thereby reducing the above-mentioned shaking of the top surface material.
  • a method for forming a coating of asphalt mixture on the surface of the road construction material layer S1 or the upper surface material layer S2 includes, for example, spraying an emulsified water of asphalt mixture onto the road construction material layer S1 or the upper surface material layer S2, and evaporating the water in the emulsified water to form a coating of asphalt mixture.
  • the upper surface material 2' has an opening in the partition section 1b on its upper surface 20 to improve its light weight.
  • the surface layer R4 is constructed on the upper surface material layer S2.
  • the construction of the surface layer R4 includes a first step of forming an asphalt mixture layer by arranging an asphalt mixture in layers on the upper surface material layer S2, and a second step of compacting the asphalt mixture layer using a rolling machine until a predetermined density is obtained.
  • the asphalt mixture will flow into the partition 1b.
  • the asphalt mixture has a high viscosity, the asphalt mixture will not flow evenly into the partition 1b, and unevenness in the degree of filling of the asphalt mixture is likely to occur, which may result in the compaction of the asphalt mixture layer taking time.
  • the partition 1b is sometimes filled with gravel or other filler in advance.
  • the filling process of filling the partition 1b with filler is troublesome, and another problem occurs in that the filling process takes time.
  • the filler remains on the top surface material 2', a large pressure caused by the filler is applied to the top surface material 2' when the asphalt mixture is compacted, which can cause the top surface material 2' to be damaged.
  • the third recess 2b is filled with filler, which can cause the above-mentioned effect to be lost.
  • a member for closing the partition 1b (hereinafter referred to as a "closing member") J may be disposed in the partition 1b of the upper surface material 2' to close the opening formed in the upper surface 20 of the upper surface material 2'.
  • the closing member J has a leg J1 that can be inserted into the partition 1b and has a predetermined height, and a lid J2 that is integrally formed at the upper end of the leg J1.
  • the lid J2 has a shape that roughly matches the shape of the opening of the partition 1b at the height position of the leg J1 disposed in the partition 1b.
  • the lid J2 prevents the asphalt mixture from flowing further into the partition 1b. It is sufficient to eliminate unevenness in the degree of filling of the asphalt mixture into the partition 1b. Therefore, it is not necessary to close the open end of the partition 1b, and the partition 1b only needs to be closed by the closing member J at a position shallower than 1/2 of the depth of the partition 1b (preferably, at a position shallower than 2/3 of the depth of the partition). In the partition 1b formed on the outer peripheral edge of the upper surface material 2', the upper end opening of the partition 1b opens to the chamfered edge 2a.
  • the height of the leg J1 is adjusted so that the lid part J2 of the closing member J arranged in the partition 1b is located lower than the chamfered edge 2a.
  • the above-mentioned closing member may also be used in other upper surface materials other than the upper surface material 2'.
  • the road construction material constituting the road construction material layer S1 and the top surface material constituting the top surface material layer S2 may be fixed with a fixing member K.
  • the road construction materials may be fixed to each other, or the top surface materials may be fixed to each other with a fixing member.
  • the fixing member K may be, for example, a screw, a nail, a rivet, a bitumen sheet, an adhesive sheet, a sticky sheet, or an adhesive.
  • the adhesive include a polyvinyl acetate adhesive, an epoxy adhesive, an acrylic adhesive, a urethane adhesive, a rubber adhesive, an asphalt emulsion, and an asphalt adhesive.
  • the road construction material of the present invention can be easily laid on the road body in parallel in the front-to-back and left-to-right directions to replace at least a portion of the roadbed or subgrade constructed between the road body and the surface layer, and road construction work such as road repair work can be completed in a short period of time.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

本発明は、道路の補修作業を短期間のうちに完了することができ且つ道路の長寿命化を図ることができる道路構築材を提供する。本発明の道路構築材は、路体とこの路体上に構築される表面層との間に敷設される道路構築材であって、上記道路構築材は、前後左右方向に敷設可能な平面矩形状の道路構築材本体であって、上面が上記道路構築材本体上に載置される上面材と嵌合可能である道路構築材本体を有するので、路体上に前後左右方向に並列した状態に敷設することによって、路体と表面層との間に構築された路盤又は路床の一部を容易に道路構築材によって置換することができ、道路の補修作業などの道路の構築作業を短期間のうちに完了させ、車輛の通行規制を最小限にとどめることができる。

Description

道路構築材、道路構築材セット及び道路の構築方法
 本発明は、道路構築材、道路構築材セット及び道路の構築方法に関する。
 高速道路及び一般道路は、路体(地面又は橋梁の床版)上に、路床、路盤、表面層(基層及び表層)がこの順序で積層されて構成されている。一般的に、路体は、地面(土や砂)又は橋梁の床版から構成され、路盤は、砕石から構成され、表面層(基層及び表層)は、アスファルト合材から構成されている。
 高速道路及び一般道路の路面は、車輛の走行によって発生する振動及び荷重、雨水によって損傷を生じる。この損傷を可能な限り抑制するために、道路の構造を合理的に改良し、道路の長寿命化を図るために、新規な舗装構造や施工方法の技術開発が行われている。
 特許文献1には、洗石廃泥に、セメント系固化剤を加えるとともに、アスファルト系、樹脂系、ゴム系のエマルジョンを単体で又は任意に組み合わせた添加剤として加えて混合して得られた洗石廃泥造粒物を、粒度調整砕石の細粒分に代えて用いた道路用上層路盤材料が開示されている。
特開平7-207612号公報
 しかしながら、上記道路用上層路盤材料においても道路の損傷を十分に抑制することができず、道路の長寿命化を図ることができない。
 又、高速道路は、重量を有するトラックなどを含む車輛が高速で走行するため、車輛の走行によって生じる振動も大きく、高速道路の路面は一般道路に比して短期間のうちに損傷する。
 高速道路は、所定の期間毎に道路の補修作業を行っているが、道路の補修作業を行なうために、車輛の通行を規制する必要がある。車輛の通行の規制は、他の道路への迂回や交通渋滞を招き、物流の停滞などの問題を生じる。
 そのため、高速道路の補修作業は、可能な限り、短期間のうちに完了することが望まれ、更に、車輛の通行の規制も全面的なものではなく、車輛の通行を一部許容した形で行なわれることが求められている。
 本発明は、道路の補修作業を短期間のうちに完了することができ且つ道路の長寿命化を図ることができる道路構築材を提供する。
 本発明の道路構築材は、
 路体とこの路体上に構築される表面層との間に敷設される道路構築材であって、
 上記道路構築材は、前後左右方向に敷設可能な平面矩形状の道路構築材本体であって、上面が上記道路構築材本体上に載置される上面材と嵌合可能である道路構築材本体を有することを特徴とする。
 本発明の道路構築材は、
 道路を構成している路体とこの路体上に構築される表面層との間に敷設される道路構築材であって、
 上記道路構築材は、上記路体上に前後左右方向に敷設可能な平面矩形状に形成された道路構築材本体を有し、上記道路構築材本体の上面は、上面材が配設可能な上面材載置面に形成されており、上記道路構築材本体の上面材載置面と上記上面材との対向面には、第1凹部及び上記第1凹部に嵌合可能な第1凸部の何れか1個以上が形成されていることを特徴とする。
 本発明の道路構築材は、
 道路を構成している路体とこの路体上に構築される表面層との間に敷設される道路構築材であって、
 上記道路構築材は、上記路体上に前後左右方向に敷設可能な平面矩形状に形成された道路構築材本体を有し、上記道路構築材本体の上面には、互いに隣接する道路構築材同士を接続一体化させる接続部材が接続可能な第1凹部が設けられていることを特徴とする。
 本発明の道路構築材セットは、
 路体とこの路体上に構築される表面層との間に敷設される道路構築材セットであって、
 上記路体上に前後左右方向に敷設可能な平面矩形状に形成された道路構築材本体を有する道路構築材と、
 上記道路構築材の上に配置する上面材とを含み、
 上記道路構築材の上面は、上記上面材と嵌合可能であることを特徴とする。
 本発明の道路の構築方法は、
 路体上に、平面矩形状に形成された道路構築材本体を有する道路構築材を前後左右方向に敷設して道路構築材層を構築する道路構築材層構築工程と、
 上記道路構築材層の上面上に、上記上面材を前後左右方向に敷設して上記道路構築材層と接続された上面材層を構築する上面材層構築工程と、
 上記上面材層上に表面層を構築する表面層構築工程とを含むことを特徴とする。
 本発明の道路の構築方法は、
 道路を構成している路体上に、平面矩形状に形成され且つ上面が上面材が配設可能な上面材載置面に形成された道路構築材本体を有する道路構築材を前後左右方向に敷設して道路構築材層を構築する道路構築材層構築工程と、
 上記道路構築材層上に、上記道路構築材本体と上記上面材とを嵌合させて上記道路構築材上に上記上面材を前後左右方向に敷設して上記道路構築材層と接続された上面材層を構築する上面材層構築工程と、
 上記上面材層上に表面層を構築する表面層構築工程とを含むことを特徴とする。
 本発明の道路構築材は、道路を構成している路体とこの路体上に構築される表面層との間に敷設される道路構築材であり、路体上に前後左右方向に並列した状態に敷設することによって、路体と表面層との間に構築された路盤及び/又は路床の一部を容易に道路構築材によって置換することができ、道路の補修作業などの道路の構築作業を短期間のうちに完了させ、車輛の通行規制を最小限にとどめることができる。
 本発明の道路構築材は、道路を構成している路体とこの路体上に構築される表面層との間に敷設され、道路を走行している車輛からの振動及び荷重などを吸収し、道路を構成している他の層が車輛走行時の振動及び荷重などによって損傷することを低減することができ、道路の長寿命化を図ることができる。
 本発明の道路構築材は、路体上に必要に応じて他の層を介して前後左右方向に敷設するだけで路体上に道路構築材から構成された層を構築することができ、短時間のうちに道路構築材の敷設作業を完了させて、道路の補修時間の短縮化を図ることができる。
 道路構築材において、道路構築材本体の上面に第1凹部が形成されていると共に、上面材における上記道路構築材本体との対向面に第1凸部が形成されている場合には、路体上に必要に応じて他の層を介して前後左右方向に道路構築材を敷設した状態において、前後左右方向に連ねて形成された道路構築材の上面の少なくとも一部に突出部が形成されていない部分を形成することができる。従って、道路構築材上に形成された突出部が形成されていない部分を利用して運搬具を走行させ又は歩行によって他の資材などの運搬を容易に行なうことができる。
 道路構築材において、道路構築材の道路構築材本体の上面には第1凹部と第1凸部とが形成されており、2個の道路構築材のうちの一方の道路構築材を上下反転させて他方の道路構築材の上面上に上面材として積層させると、上記一方の道路構築材の第1凹部及び第1凸部と、上記上面材となる他方の道路構築材の第1凸部及び第1凹部とが嵌合可能に構成されている場合には、一種類の道路構築材を用いて路体と表面層との間に道路構築材及び上面材から構成された層を容易に構築することができる。
 上記道路構築材によれば、道路構築材の他に別途、上面材を用意する必要がなく、保管時の管理の簡略化を図ることができると共に、保管時の省スペース化も図ることができる。
 そして、上記道路構築材によれば、一種類の道路構築材を現場に搬入し、道路構築材の敷設作業と、敷設した道路構築材上への上面材としての道路構築材の敷設作業とを必要に応じて並行して行なうことができ、道路の構築作業を短時間のうちに完了させることができる。
 道路構築材の道路構築材本体の上面を十字の仮想区画線によって区画し、上記十字の仮想区画線の交点を介して対向する2個の区画をそれぞれ、第1領域及び第2領域とし、第1領域には第1凹部を形成する一方、第2領域には第1凸部を形成し、2個の道路構築材のうちの一方の道路構築材の上面上に、他方の道路構築材を上下反転させて上面材として積層させると、一方の道路構築材の第1凹部及び第1凸部に、上面材とした他方の道路構築材の第1凸部及び第1凹部が嵌合するように構成されている場合には、道路構築材の道路構築材本体の上面に、道路構築材を上下反転させるだけで上面材として道路構築材上に敷設することができ、道路の構築作業を円滑に且つ短時間のうちに完了することができる。
本発明の道路構築材を示した斜視図。 道路構築材を示した模式平面図。 図1のX-X線における断面図。 道路構築材を示した斜視図。 道路構築材上に上面材(道路構築材)を積層した状態を示した断面図。 従来の道路の構造を示した模式断面図。 道路構築材を用いて構築された道路を示した模式断面図。 道路構築材を前後左右方向に敷設した状態を示した模式図。 道路構築材の他の一例を示した斜視図。 道路構築材の他の一例を示した斜視図。 道路構築材の他の一例を前後左右方向に敷設した状態を示した平面図。 上面材を示した斜視図。 上面材を示した斜視図 上面材を示した断面図。 道路構築材及び上面材を前後左右方向に敷設した状態を示した模式図。 道路構築材上に上面材を積層した状態を示した断面図。 道路構築材の他の一例を示した斜視図。 道路構築材の他の一例を示した斜視図。 道路構築材の他の一例を示した平面図。 道路構築材の他の一例を前後左右方向に敷設した状態を示した平面図。 上面材の他の一例を示した斜視図。 上面材の他の一例を示した斜視図。 上面材の他の一例を示した断面図。 道路構築材上に上面材を積層した状態を示した断面図。 道路構築材及び上面材を前後左右方向に敷設した状態を示した模式図。 道路構築材の他の一例を示した斜視図。 道路構築材の他の一例を示した斜視図。 道路構築材の他の一例を示した断面図。 道路構築材上に上面材(道路構築材)を積層した状態を示した断面図。 道路構築材及び上面材を前後左右方向に敷設した状態を示した模式図。 道路構築材の他の一例を示した模式平面図。 道路構築材の他の一例を前後左右方向に敷設し且つ接続部材で接続一体化した状態を示した斜視図。 接続部材を示した斜視図。 道路構築材層及び上面材層を構築した状態を示した正面図。 上面材の他の一例を示した斜視図。 上面材の他の一例を示した斜視図。 上面材の他の一例を示した断面図。 道路構築材の他の一例を示した斜視図。 図38のY-Y線断面図。 道路構築材上に上面材を積層させる途上を示した断面図。 道路構築材上に上面材を積層させた状態を示した断面図。 道路構築材上に上面材を積層させた状態を示した断面図。 道路構築材上に上面材を積層させた状態を示した断面図。
 本発明の道路構築材の一例を図面を参照しながら説明する。本発明において使用する用語「嵌合」は、互いに嵌め合わせられる部分の形状が必ずしも同一であることを必要とすることを意味するものではなく、互いに嵌め合わせることによって、本発明の効果を損なわない程度に、道路構築材(及び上面材)が位置決めされればよい。従って、前後左右方向に敷設された道路構築材(及び上面材)は、完全に固定されている必要はなく、本発明の効果を損なわない範囲内において、前後左右方向に若干、変位することは許容される。具体的には、第1凹部の形状と、この第1凹部に嵌め合わせる第1凸部及び接続部材の嵌合部の形状は、必ずしも同一である必要はない。第1凹部に第1凸部(又は接続部材の嵌合部)を嵌め込むことによって、前後左右方向に敷設された道路構築材(及び上面材)は、位置決めされるが、本発明の効果を損なわない範囲内において、前後左右方向に敷設された道路構築材(及び上面材)は、若干、変位することが許容される。本発明において、「前後方向」とは「縦方向」をいい、「左右方向」とは「横方向」をいう。例えば、図2において、「紙面上の縦方向」が「前後方向」であり、「紙面上の横方向」が「左右方向」となる。本発明において、「前後左右方向に敷設する」とは、縦方向及び横方向にそれぞれ、列及び行を形成して面状に配設することをいう。例えば、図8において、「紙面上の縦方向」が「前後方向」であり、「紙面上の横方向」が「左右方向」となる。本発明において、「道路構築材」は、「上面材」を含まない概念である。本発明において、「道路構築材セット」は、「道路構築材」及び「上面材」を含む概念である。
[道路構築材の第1の形態]
 図1~5に示したように、道路構築材1の道路構築材本体1aは、平面正方形状で且つ上下に一定厚みを有するプレート状に形成されている。道路構築材1は、好ましくは合成樹脂を主成分として構成されており、必要に応じて、繊維が含まれてもよい。道路構築材1中における合成樹脂の含有量は、60質量%以上が好ましい。
 道路構築材を構成する合成樹脂としては、特に限定されず、例えば、ポリエチレン、ポリプロピレン、ポリアミド、ポリアセタール、ポリブチレンテレフタレート、ポリエチレンテレフタレート、ポリエステル、ABS、ポリスチレン、アクリル、ポリカーボネート、芳香族ポリアミド、ポリフェニレンスルフィド、液晶ポリマー、ポリスルフォン、ポリエーテルイミド、ポリアミドイミド、ポリエーテルエーテルケトン、ポリテトラフルオロエチレンなどの熱可塑性樹脂、熱硬化性樹脂などが挙げられる。繊維としては、例えば、ガラス繊維、炭素繊維、樹脂繊維などが挙げられる。
 道路構築材は、合成樹脂以外の材料(例えば、鉄などの金属材料、コンクリートなど)から形成されていてもよい。
 道路構築材本体1aの内部は空隙部に形成されている。道路構築材本体1aは、その内部(空隙部)が全面的に厚み方向の全長に亘って格子状に前後左右方向に区画されており、格子状に区画された部分は全面的に空隙とされた区画部1b、1b・・・とされている。道路構築材本体1aの上面11は、後述するように、上下反転させた道路構築材1を上面材として積層可能な上面材載置面に形成されている。
 道路構築材本体1aの上面11は、互いに対向する前後縁辺の中間部同士を結ぶ第1仮想区画線12aと、前後縁辺に直角に接続し且つ互いに対向する左右縁辺の中間部同士を結ぶ第2仮想区画線12bとからなる十字の仮想区画線12によって、4個の領域a~dに区画されている(図2参照)。
 道路構築材本体1aの上面11に形成された4個の領域a~dのうち、第1仮想区画線12aと第2仮想区画線12bとの交点12cを介して互いに対向している領域a及び領域bは第1領域群Aを構成しており、この第1領域群Aには、複数個の第1凹部13、13・・・が形成されている。
 詳細には、領域a及び領域bにはそれぞれ、前後左右方向に5個ずつ合計25個の区画部1bが格子の目(縦横に組み合わされた線で囲まれた部分)状に配列されている。領域a及び領域bの角部に位置する4個の区画部1bと、これら4個の区画部1b、1b間の中央部にある5個の区画部1bの平面矩形状の上端開口部は、平面正方形状の第1凹部13に形成されている。複数個の第1凹部13、13は、前後左右方向に所定間隔を存して配設されている。即ち、領域a及び領域bに形成された区画部1bのうち、1個おきの合計9個の区画部1bの上端開口部を第1凹部13に形成している。第1凹部13には、この第1凹部13に嵌合する第1凸部14の高さに合致する深さ位置に底面部131が形成されており、第1凹部13に嵌合する第1凸部14の頂面141を受止し且つ第1凹部13が形成された区画部1bの強度を向上させるように構成されている。
 領域a及び領域bに形成された区画部1bにおいて、第1凹部13が形成された区画部1bには底面部131が形成されていると共に、第1凹部13が形成されていない区画部1bは、その下端開口部が下面部132によって閉塞されており、道路構築材1の強度及び軽量性の向上を図っている。区画部1bの下面部132は、道路構築材本体1aの下面と面一となるように形成されている。区画部1bの底面部131及び下面部132にはそれぞれ、上下方向に貫通する通水孔131a、132aが形成されている。
 一方、領域a及びb以外の領域、即ち、第1仮想区画線12aと第2仮想区画線12bとの交点12cを介して互いに対向している領域c及領域dは第2領域群Bを構成しており、この第2領域群Bには、第1領域群Aに形成された第1凹部13、13に嵌合可能な第1凸部14、14・・・が上方に向かって突設されている。
 詳細には、領域c及び領域dにはそれぞれ、前後左右方向に5個ずつ合計25個の区画部1bが格子の目状に配列されている。領域c及び領域dの角部に位置する4個の区画部1bと、これら4個の区画部1b、1b間の中央部にある5個の区画部1bの上側開口端のそれぞれには、一定高さを有する四角柱状(外形が平面正方形状)の第1凸部14が上方に向かって突設されている。即ち、領域c及び領域dに形成された区画部1bのうち、1個おきの合計9個の区画部1bの上側開口端は、閉塞部1b1によって閉塞されており、この閉塞部1b1上に一定高さの四角柱状の第1凸部14が上方に向かって形成されている。複数個の第1凸部14、14・・・は、前後左右方向に所定間隔を存して配設されている。第1凸部14は、区画部1bの上側開口端の平面形状よりも一回り小さな外形を有する一定高さを有する四角柱状に形成されており、領域a及び領域bに形成された第1凹部13に嵌合可能に形成されている。第1凸部14の内部は空隙部に形成され、道路構築材1の軽量化及び上下方向の通水性の向上が図られている。第1凸部14を第1凹部13に嵌合した状態において、第1凸部14の頂面141が第1凹部13の底面部131に受止されるように形成されている。第1凸部14が形成された区画部1bには、上述の通り、閉塞部1b1が形成されており、第1凸部14が形成された区画部1bの強度を向上させるように構成されている。
 領域c及び領域dに形成された区画部1bにおいて、第1凸部14が形成された区画部1bには閉塞部1b1が形成されていると共に、第1凸部14が形成されていない区画部1bは、その下端開口部が下面部142によって閉塞されており、道路構築材1の強度及び軽量性の向上を図っている。区画部1bの下面部142は、道路構築材本体1aの下面と面一となるように形成されている。区画部1bの閉塞部1b1及び下面部142にはそれぞれ、上下方向に貫通する通水孔1b11、142aが形成されている。
 道路構築材1において、領域a及び領域bに形成された第1凹部13同士は、第1仮想区画線12aと第2仮想区画線12bとの交点12cを中心として、180°水平方向に回転させると、同一形状となるように構成されている。
 同様に、道路構築材1において、領域c及び領域dに形成された第1凸部14同士は、第1仮想区画線12aと第2仮想区画線12bとの交点12cを中心として、180°水平方向に回転させると、同一形状となるように構成されている。
 道路構築材1は、上述の通り、領域a及び領域bに形成された第1凹部13、並びに、領域c及び領域dに形成された第1凸部14が、第1仮想区画線12aと第2仮想区画線12bとの交点12cを中心として点対称な構造を有している。よって、道路構築材1は、一の状態と、この状態から水平方向に180°回転させた状態は、同一形状となるように構成されている。
 従って、2個の道路構築材1、1を用意し、一方の道路構築材1を上下反転させて、一対の道路構築材1同士をこれらに形成されている第1凹部13及び第1凸部14の形成面、即ち、上面11同士が対向した状態として、他方(下側)の道路構築材1上に、一方(上側)の道路構築材1を重ね合わせる。すると、一方の道路構築材1の第1凸部14が他方の道路構築材1の第1凹部13に、他方の道路構築材1の第1凸部14が一方の道路構築材1の第1凹部13に嵌合し、一対の道路構築材1の上面11同士が互いに密着した状態に積層させることができるように構成されている(図5参照)。
 更に、複数個の道路構築材1を、この道路構築材1の第1凹部13が形成されている領域a及びbと、第1凸部14が形成されている領域c及びdとが交互に配設されるように前後左右方向に敷設する(図8参照)。なお、図8において、「領域a~d」をそれぞれ、単に「a~d」と表記した。一方、別途、用意した道路構築材1を上下反転させて上面11同士を対向させた上で、前後左右方向に敷設した道路構築材1の上面11上に、前後左右方向にそれぞれ半分(1/2)ずつずらした状態で積層する。すると、上側の道路構築材1の第1凹部13及び第1凸部14と、下側の道路構築材1の第1凹部13及び第1凸部14とが嵌合し、上下の道路構築材1、1同士が互いに跨いだ状態に上面11、11同士を密着させた状態で積層されるように構成されている。
 後述するように、道路を構成している路体と、この路体上に構築される表面層との間に道路構築材1を敷設するにあたって、道路構築材1の上面11上に上面材が敷設されるが、上述の通り、道路構築材1は、一方の道路構築材1を上下反転させて他方の道路構築材1上に積層可能に構成されているので、一方の道路構築材1を上面材として用いることができる。
 なお、上記道路構築材1では、第1凹部13を平面矩形状、第1凸部14を四角柱状に形成した場合を説明したが、第1凹部13及び第1凸部14の形状はこれに限定されるものではなく、第1凹部13と第1凸部14とが互いに嵌合可能であればよく、例えば、第1凹部13を平面円形状とし且つ第1凸部14を第1凹部13に嵌合可能な円柱状としてもよい。
 又、上記道路構築材1では、区画部1bの一部において、下側開口部を開口した状態としたが、区画部1bの全ての下側開口部を閉塞部(下面部)によって閉塞してもよい。この場合、区画部1bの閉塞部(下面部)には、上下方向に貫通する通水孔を形成することが好ましい。区画部1bの下面部が、道路構築材層S1の下面側や上面材層S2の上面側に現れると、道路構築材層S1又は上面材層S2に対向して直接、接する層(道路構築材層S1である場合、例えば、下層路盤R32であり、上面材層S2の場合、例えば、基層R41である)に対して広い面積で接することができ、砕石やアスファルト材料を含む層の厚みの減少を低減化して沈み込みが低減された道路を構築することができる。道路構築材1の区画部1bのうち、下側開口部が閉塞された割合は、50%以上が好ましく、60%以上がより好ましい。
 上記道路構築材1では、領域a及びbに第1凹部13を所定間隔ごとに合計9個形成し、領域c及びdに第1凸部14を所定間隔ごとに合計9個形成した場合を説明したが、上述のように、道路構築材1を上下反転させて、他の道路構築材1上に重ね合わせた状態において、一方の道路構築材1の第1凹部13及び第1凸部14と、他方の道路構築材1の第1凸部14及び第1凹部13とが互いに嵌合可能に配列されておれば、領域a~dに形成される第1凹部及び第1凸部の形状、数及び配列形態は特に限定されない。
 次に、上記道路構築材1を用いて道路の補修作業を行う要領について説明する。なお、道路構築材1は、新規に道路を構築する場合にも用いることができるが、以下では、既設道路の補修を行なう要領を例に挙げて説明する。
 一般的に、図6に示したように、高速道路及び一般道路などの道路Rは、路体(地面又は橋梁の床版)R1上に、路床R2、路盤R3、表面層(基層及び表層)R4がこの順序で積層されて構築されている。そして、路盤R3は、下層路盤R32とこの下層路盤R32上に積層された上層路盤R31とから構成されている。下層路盤R32及び上層路盤R31は砕石から構成され、上層路盤R31は、通常、アスファルト材料が混合されている。表面層R4は、基層R41とこの基層R41上に積層された表層R42とから構成されている。表面層R4は、通常、アスファルト合材(アスファルト混合物)から構成されている。アスファルト合材は、砕石、砂、石粉及びアスファルトを所定の割合で配合した混合材料である。
 道路は、車輛の走行時に生じる振動及び荷重、雨水などによって損傷を受けるため、所定期間ごと又は必要に応じて補修作業が行われる。道路の補修作業は、一般的に、損傷の大きい表面層R4及び上層路盤R31が除去された後、表面層R4及び上層路盤R31が新しく構築される。上記道路構築材1は、新しい上層路盤R31を構築するために用いることができる。
 上記では、道路の補修作業は、表面層R4及び上層路盤R31が新しく構築されることを述べたが、表面層R4及び上層路盤R31以外に、下層路盤R32や路床R2が必要に応じて除去された後、下層路盤R32や路床R2が新しく構築されてもよく、この場合、新しく構築される上層路盤R31、下層路盤R32及び路床R2の何れか又は複数の層を構築するために上記道路構築材1が用いられてもよい。なお、以下は、表面層R4及び上層路盤R31が除去された後、表面層R4及び上層路盤R31を新しく構築するにあたって、上記道路構築材1を用いて上層路盤R31を構築する場合を例に挙げて説明する。
 先ず、補修を必要とする道路Rの表面層R4(表層R42及び基層R41)及び上層路盤R31を除去して下層路盤R32が露出した状態とする。この露出した下層路盤R32上に、道路構築材1を互いに隣接する道路構築材1、1同士が接した状態に前後左右方向に敷設して道路構築材層S1を構築する(道路構築材層構築工程)。
 道路構築材1は、平面正方形状であるので、道路構築材1を下層路盤R32上に敷設するにあたって、第1凹部13が形成された領域a又はbと、第1凸部14が形成された領域c又はdとが、左右方向及び前後方向に交互に配設されるように、道路構築材1が互いに隣接する道路構築材1、1同士が密着した状態に前後左右方向に敷設される。
 次に、道路構築材層S1を構成している道路構築材1の上面11上に上面材を積層して上面材層を構築する。上述の通り、上記道路構築材1は、上下反転させて上面11を下方に向けた状態とすることによって、上面材として用いることができる。上記道路構築材1は、道路構築材及び上面材の双方の使用が可能であるので、道路の補修現場に、一種類の道路構築材1のみを搬入することによって、道路の補修作業を行うことができ、道路構築材の搬入及び補修作業の効率化を図り、道路の補修時間の短縮化を図ることができる。
 上述の通り、道路構築材1は、上下反転させることによって上面材2として用いることができる。道路構築材1を上下反転させて、上側の道路構築材1(上面材2)の上面11と、道路構築材層S1を構築している道路構築材1の上面11とを対向させた状態とし、道路構築材層S1を構築している道路構築材1の上面11上に、上面材2となる別に用意した道路構築材1を互いに隣接する道路構築材(上面材2、2)同士が密着した状態に積層して前後左右方向に敷設して上面材層S2を構築する(上面材層構築工程)。
 この時、道路構築材層S1を構築している互いに隣接する道路構築材1、1間に跨がるように、上面材2となる道路構築材1を、道路構築材層S1を構築している道路構築材1上に載置して積層する。詳細には、図8に示したように、上面材2となる道路構築材1を、道路構築材層S1を構築している道路構築材1に対して平面視にて前後方向及び左右方向のそれぞれに、道路構築材1の平面形状の一辺の寸法の半分(1/2)の寸法だけずらした状態にして、道路構築材層S1を構築している道路構築材1上に載置して積層する。上面材2となる上側の道路構築材1の第1凹部13と道路構築材層S1を構築している道路構築材1の第1凸部14とを嵌合させる。更に、上面材2となる上側の道路構築材1の第1凸部14と、道路構築材層S1を構築している道路構築材1の第1凹部13とを嵌合させる。例えば、図8の斜線部分において、道路構築材層S1を構築している道路構築材1の領域a(領域b)の第1凹部13に、上面材層S2を構成している道路構築材1の領域c(領域d)の第1凸部14が嵌合しているか、又は、道路構築材層S1を構築している道路構築材1の領域c(領域d)の第1凸部14が、上面材層S2を構成している道路構築材1の領域a(領域b)の第1凹部13に嵌合している。道路構築材層S1を構築している道路構築材1と、上面材層S2を構成している道路構築材1とが嵌合によって接続されている。なお、図8において、道路構築材層S1及び上面材層S2は、紙面上、縦方向及び横方向に連続しているが、便宜上、一部のみを表した。
 このように、道路構築材層S1を構築している道路構築材1と、上面材2となる上側の道路構築材1とを互いに跨がった状態に上下方向に積層することによって、道路構築材層S1及び上面材層S2を構成している道路構築材1及び上面材2(上側の道路構築材1)が互いに拘束し合い、道路構築材層S1及び上面材層S2は、前後左右方向及び上下方向に強固に一体化しており、道路を走行する車輛の振動及び荷重などにもかかわらず、道路構築材層S1及び上面材層S2をそれぞれ構成している、道路構築材1及び上面材2(上側の道路構築材1)にずれが生じることはない。
 なお、図5に示したように、上面材2となる道路構築材1を道路構築材層S1を構成している道路構築材1間に跨がらせることなく、上面材2となる道路構築材1と道路構築材層S1を構成している道路構築材1とを上下方向に合致した状態に互いに積層させてもよい。
 道路構築材1及び上面材2は共に成形品から構成されているので、道路の露出した下層路盤R32上に複数個の道路構築材1を前後左右方向に互いに密着させて敷設するだけで容易に構築することができ、熟練者でなくても道路構築材層S1及び上面材層S2を容易に且つ精度良く構築することができる。道路構築材1及び上面材2の敷設にあたって重機を必要としないので、人手によって道路構築材1及び上面材2の敷設作業を同時に行うことが可能となり、補修時間の短縮化も図ることができる。
 又、従来の道路の補修工事では、上層路盤R31を構築する材料にはアスファルト材が混合されているため、アスファルト材の冷却を待つ必要があったが、上記道路構築材1及び上面材2は成形品から構成されているので、道路構築材1及び上面材2の敷設作業が完了した後に時間をおくことなく、その上にアスファルト材によって基層R41及び表層R42を構築して表面層を形成し(表面層構築工程)、補修された道路の構築を完了させることができ、補修作業の時間の短縮化を図ることができる。
 しかも、道路構築材1及び上面材2は、空隙を有する区画部1bの存在によって、上面材2上に積層される加熱されたアスファルト材の熱を円滑に分散させることができ、アスファルト材の冷却を短時間のうちに完了させ、補修作業の時間の短縮化を図ることができる。
 従来の道路では、表面層R4(基層R41及び表層R42)の下に、主に砕石から構成された上層路盤が構築されている。道路を走行する車輛の振動及び荷重などによって上層路盤を構成している砕石が砕け、砕石の粒子が小さくなり、小さくなった砕石が砕石間に流入することによって上層路盤の体積が小さくなり、これが原因となって道路の沈下が生じ、道路の損傷が促進されていた。
 一方、上述のようにして補修された道路は、表面層R4(基層R41及び表層R42)の下に上面材層S2及び道路構築材層S1が構築されているので、道路を走行する車輛の振動及び荷重などによって道路構築材1(上面材2)が崩壊して道路構築材層S1及び上面材層S2の体積が減少することは殆どなく、道路の長寿命化を図ることができる。
 道路構築材1は、上述の通り、内部が空隙部とされた多数の区画部1bを有し、道路構築材1と上面材2(上側の道路構築材1)とを上下方向に積層させた状態においても、道路構築材1の区画部1bの大部分は空隙状態を維持しており、道路構築材1及び上面材2(上側の道路構築材1)は、区画部1bを変形させることによって、道路を走行する車輛の振動及び荷重などを円滑に吸収し、道路構築材1及び上面材2(上側の道路構築材1)の損傷のみならず、道路全体の損傷も低減化することができる。
 そして、道路構築材1及び上面材2には、多数の通水孔が形成されているので、道路の表面層R4を通じて浸透した雨水などを道路外や、道路構築材層S1の下に構築された、下層路盤R32、路床R2又は路体R1などに排出することができ、雨天時に道路上を走行する車輛の安全性を向上させることができると共に、道路を構築している各層の雨水による脆弱化を低減化して道路の長寿命化を図ることができる。
 上記では、道路構築材とこの道路構築材上に敷設する上面材とを共用することができる道路構築材を説明したが、道路構築材はこれに限定されるものではなく、下記の構造を有する道路構築材及び上面材であってもよい。
[道路構築材の第2の形態]
 図9~11に示したように、道路構築材3の道路構築材本体3aは、平面正方形状の基板31と、この基板31の四方外周縁の全周から下方に向かって延設された四角枠状の周壁部32とを有しており、基板31の上面310は、上面材4を載置可能な上面材載置面に形成されている。道路構築材3は、合成樹脂を主成分から構成されており、必要に応じて、繊維が含まれてもよい。道路構築材3中における合成樹脂の含有量は、60質量%以上が好ましい。
 道路構築材3の道路構築材本体3aにおける基板31には、その一部を前後左右方向に所定間隔を存して且つ道路構築材本体3aの周壁部32よりも下方に突出させた状態に下方に膨出させることによって、逆八角錐状の脚部33が複数個、形成されている。この脚部33は、道路構築材本体3aの基板31の四隅部と、この四隅部の間の部分とに形成され、詳細には、道路構築材3の基板31の縁辺に平行に、前後方向に3個ずつ、左右方向に3個ずつの合計9個の脚部33、33・・・が格子の目状に形成されている。
 道路構築材3の脚部33は、上方から下方に向かって漸次、縮径する逆八角錐状に形成されており、内部は空隙部とされ、上端が全面的に上方に向かって平面八角形状に開口しており、脚部33の上端開口部は、後述する上面材4の第1凸部が嵌合可能な第1凹部330に形成されている。
 道路構築材3の第1凹部330は、一の状態と、この状態から90°、180°又は270°水平方向に回転させた状態とは、何れにおいても、互いに同一になるように構成されている。
 道路構築材3は、一の状態と、この状態から全体を90°、180°又は270°水平方向に回転させた状態とは、同一の形態になるように構成されている。
 そして、図11に示したように、道路構築材3の基板31の縁辺に沿って前後方向又は左右方向に互いに隣接する第1凹部330間の距離(中心間距離、ピッチ)L1は、前後方向又は左右方向に互いに密着させて配設された互いに隣接する道路構築材3間において互いに隣接する第1凹部330、330間の距離(中心間距離、ピッチ)L2に等しくなるように構成されている。
 従って、道路構築材層S1を構成している道路構築材3の上面310上に、後述する上面材4を積層するにあたって、互いに隣接して敷設された道路構築材3、3間に跨がった状態(道路構築材層S1を構成している道路構築材3に対して水平方向にずれた状態)に、上面材4を載置して積層させることができるように構成されている。
 又、道路構築材3の脚部33の下端面には、上下方向に貫通する通水孔331が形成されている。なお、脚部33の上端開口部は、平面八角形状に限定されず、その他の多角形状や円形状であってもよい。
 道路構築材3の基板31において、互いに隣接する脚部33間の部分には、上下方向に貫通する通水孔31aが多数、形成されていると共に、互いに隣接する脚部33の上端開口部間を接続する通水可能な溝部31bが形成されている。
 更に、道路構築材3の基板31には、この基板31の外周縁部に沿って形成された脚部33の上端開口部と、周壁部32の外面との間を貫通する複数の溝部31cが形成されている。
 このように、道路構築材3には、複数の雨水などの水が通水可能な通水孔331、31a及び溝部31b、31cが形成されており、道路構築材3に流入した水は、道路構築材3外に円滑に排出可能に構成されている。そして、道路構築材3には、溝部31b、31cが形成されているので、道路構築材3は、上方から加えられた応力に対して柔軟に変形し、応力を円滑に吸収することができる。よって、道路を走行する車輛の振動及び荷重などを円滑に吸収し、道路構築材3及び上面材4の損傷のみならず、道路全体の損傷も低減化することができる。
 道路構築材3の上面310上には、上面材4が積層される。図12~14に示したように、上面材4は、道路構築材3の基板31と同一形状、同一大きさの平面正方形状の基板41と、この基板41の下面に突設された第1凸部42とを有している。
 上面材4の基板41の上面には、その全面に亘って格子状の仕切部41aが形成されて複数の区画部41bが形成されている。各区画部41bは、その内部が空隙部に形成され且つ上側が全面的に開口している。各区画部41bの下側開口部を閉塞している基板41部分には、上下方向に貫通する通水部41dが形成されている。
 上面材4は、空隙部を有する区画部41bを多数有しており、上面材4は、区画部41bを変形させることによって、道路を走行する車輛の振動及び荷重などを円滑に吸収し、道路構築材3及び上面材4の損傷のみならず、道路全体の損傷も低減化することができる。
 上面材4の基板41の下面には、前後方向に3個ずつ、左右方向に3個ずつの合計9個の第1凸部42、42・・・が所定間隔を存して格子の目状に形成されている。上面材4の下面に形成された第1凸部42は、一定高さを有する円環状(円柱状)に形成されており、第1凸部42は、道路構築材3の第1凹部330に嵌合可能に形成されている。上面材4の第1凸部42、42間の距離(中心間距離、ピッチ)L31は、道路構築材3の基板31の縁辺に平行に前後方向又は左右方向に互いに隣接する第1凹部330間の距離(中心間距離、ピッチ)L1に合致するように構成されている。更に、上面材4の外周縁辺とこの外周縁辺に最も近くに形成された第1凸部42の中心との距離L32は、上面材4の第1凸部42、42間の距離L31[第1凹部330間の距離(中心間距離、ピッチ)L1]の1/2に等しくなるように形成されている。
 そして、図15に示したように、道路構築材層S1を構築している道路構築材3の上面310上に、上面材4をその基板41が道路構築材3の基板31に対して第1凹部330の一列又は複数列分だけ前後方向及び/又は左右方向にずらした状態に載置する。すると、上面材4の第1凸部42のそれぞれが、これらの第1凸部42に対向する道路構築材3の第1凹部330に嵌合される。そして、道路構築材3の上面310に、上面材4の基板41の下面が全面的に密着した状態に、上面材4が道路構築材3上に積層されるように構成されている。なお、図15において、道路構築材層S1及び上面材層S2は、紙面上、縦方向及び横方向に連続しているが、便宜上、一部のみを表した。
 次に、上記道路構築材1を用いて道路の補修作業を行う要領について説明する。図1に示した道路構築材1と同様の要領については、その説明を省略する。
 先ず、補修を必要とする道路Rの表面層R4(表層R42及び基層R41)及び上層路盤R31を除去して下層路盤R32が露出した状態とする。この露出した下層路盤R32上に、道路構築材3を互いに隣接する道路構築材3、3同士が密接した状態に前後左右方向に敷設して道路構築材層S1を構築する。
 道路構築材3は、平面正方形状であるので、道路構築材1を下層路盤R32上に敷設するにあたって、平面から見た道路構築材の配設方向は、特に限定されない。
 次に、図15に示したように、道路構築材層S1を構成している道路構築材3の上面310上に上面材4を積層して上面材層S2を構築する。具体的には、道路構築材層S1を構成している道路構築材1の上面310上に、上面材4をその基板41が道路構築材3の基板31に対して第1凹部330の一列又は複数列分だけ前後方向及び/又は左右方向にずらした状態に重ね合わせる。すると、上面材4の第1凸部42のそれぞれが、これらの第1凸部42に対向する道路構築材3の第1凹部330に嵌合される。そして、道路構築材3の上面310に上面材4がその基板41の下面を全面的に密着させ且つ道路構築材3、3を跨いだ状態に道路構築材3上に上面材4が積層されて上面材層S2が構築される。道路構築材3と上面材4とは嵌合によって接続されている。
 道路構築材層S1を構築している道路構築材3と、上面材4とは、前後方向及び左右方向のそれぞれに互いに跨がった状態に上下方向に積層することによって、道路構築材層S1及び上面材層S2をそれぞれ構成している、道路構築材3及び上面材4が互いに拘束し合う。道路構築材層S1及び上面材層S2は、前後左右方向及び上下方向に強固に一体化しており、道路を走行する車輛の振動及び荷重などにもかかわらず、道路構築材層S1及び上面材層S2を構成している道路構築材3及び上面材4にずれが生じることはない。
 なお、図16に示したように、上面材2を道路構築材層S1を構成している道路構築材3間に跨がらせることなく、上面材2の基板41と道路構築材層S1を構成している道路構築材3の基板31とを上下方向に合致した状態に互いに積層させてもよい。
 しかる後、上面材層S2上に、汎用の要領にて、アスファルト材によって基層R41及び表層R42の構築作業を行って補修された道路の構築を完了させればよい。
 道路構築材3及び上面材4が共に成形品から構成されているので、人手によって道路構築材3及び上面材4の敷設作業を同時に行うことが可能となり、補修作業の時間の短縮化も図ることができる。
 又、道路構築材3及び上面材4は成形品から構成されているので、道路構築材3及び上面材4の敷設作業が完了後に時間をおくことなく、その上にアスファルト材によって基層R41及び表層R42の構築作業を行って補修された道路の構築を完了させることができ、補修作業の時間の短縮化を図ることができる。
 しかも、道路構築材3及び上面材4は、内部に多数の空隙を有しているので、上面材4上に積層される加熱されたアスファルト材の熱を円滑に分散させることができ、アスファルト材の冷却を短時間のうちに完了させ、補修作業の短縮化を図ることができる。
 上述のようにして補修された道路は、表面層R4(基層R41及び表層R42)の下に上面材層S2及び道路構築材層S1が構築されているので、道路を走行する車輛の振動及び荷重などによって道路構築材3及び上面材4が崩壊して道路構築材層S1及び上面材層S2の体積が減少することは殆どなく、道路の長寿命化を図ることができる。
 そして、道路構築材3及び上面材4には、多数の通水孔が形成されているので、道路の表面層R4を通じて浸透した雨水などを道路の外や、道路構築材層S1の下に構築された、下層路盤R32、路床R2又は路体R1などに排出することができ、雨天時に道路上を走行する車輛の安全性を向上させることができると共に、道路を構築している各層の雨水による脆弱化を低減化して道路の長寿命化を図ることができる。
[道路構築材の第3の形態]
 図17~23に示した道路構築材5及び上面材6であってもよい。道路構築材5の道路構築材本体5aは、平面正方形状の基板51と、この基板51の四方外周縁の全周から下方に向かって延設された四角枠状の周壁部52とを有しており、基板51の上面510は、上面材6を載置可能な上面510に形成されている。道路構築材5は、合成樹脂を主成分から構成されており、必要に応じて、繊維が含まれてもよい。道路構築材5中における合成樹脂の含有量は、60質量%以上が好ましい。
 道路構築材5の道路構築材本体5aにおける基板51には、その一部を前後左右方向に所定間隔を存して且つ道路構築材本体5aの周壁部52と同一高さにて下方に膨出させることによって、逆八角錐状の脚部53が複数個、形成されている。この脚部53は、道路構築材本体5aの基板51における四方外周部を除いた部分に形成され、詳細には、道路構築材5の基板51の縁辺に平行に、前後方向に3個ずつ、左右方向に3個ずつの合計9個の脚部53、53・・・が格子の目状に形成されている。
 道路構築材5の脚部53は、上方から下方に向かって漸次、縮径する逆八角錐状に形成されている。脚部53は、その内部が空隙部とされ、上端が全面的に上方に向かって平面八角形状に開口している。脚部53の上端開口部は、後述する上面材6の第1凸部が嵌合可能な第1凹部530に形成されている。
 道路構築材5の第1凹部530は、一の状態と、この状態から90°、180°又は270°水平方向に回転させた状態とは、何れにおいても、互いに同一になるように構成されている。
 図17及び図18に示したように、道路構築材5の周壁部52の四方外周面のそれぞれには、脚部53を垂直面にて半分に分割して形成された凹状形状と略同一形状である分割凹部521が形成されている。周壁部52の四方外周面に形成された分割凹部521は、前後左右方向に並列された脚部53、53・・・の配列の延長線上のそれぞれに形成されている。
 更に、道路構築材5の周壁部52における四方角部の外周面のそれぞれには、脚部53を垂直面にて1/4に分割して形成された凹状形状と略同一形状である分割凹部522が形成されている。
 図20に示したように、複数個の道路構築材5、5・・・を前後左右方向に隙間なく敷設すると、互いに隣接する道路構築材5、5の分割凹部521、521・・・同士が対向した状態となり、2個の分割凹部521によって、上面材6の第1凸部が嵌合可能な第1凹部54が形成されるように構成されている。
 又、複数個の道路構築材5、5・・・を前後左右方向に隙間なく敷設すると、互いに隣接する道路構築材5、5の分割凹部522、522・・・同士が対向した状態となり、4個の分割凹部522によって、上面材6の第1凸部が嵌合可能な第1凹部55が形成されるように構成されている。
 道路構築材5、5間に形成された第1凹部54、55は、この第1凹部54、55を構成している分割凹部521、521の対向端面間、及び、分割凹部522、522の対向端面間に僅かな隙間を有するものの、この隙間を除いた内面形状は、道路構築材5の脚部53の上端開口部からなる第1凹部530の内面形状と同一になるように構成されている。
 道路構築材5における周壁部52における直角に接続する2個の外周面及びこれらの外周面が接続する角部に形成された分割凹部521、522の下端には、断面U字状の半円状の第2凹部521aが形成されている一方、道路構築材5における周壁部52における残余の直角に接続する2個の外周面及びこれらの外周面が接続する角部に形成された分割凹部521、522の下端には第2凹部521aに係止可能な係止片521bが形成されている。この係止片521bは、平面円形状の係止片本体521cと、この係止片本体521cの下面に形成され且つ上記第2凹部521aに係止可能な係止爪部521dとを有している(図18及び図19参照)。
 複数個の道路構築材5をこれら道路構築材5の第2凹部521a(係止片521b)が同一方向(図20では、左方向及び上方向)となるように前後左右方向に互いに隙間なく敷設すると、互いに隣接する道路構築材5、5において、一方の道路構築材5の第2凹部521aに、他方の道路構築材5の係止片521bが上方から係止し、互いに隣接する道路構築材5、5同士が接続一体化される。よって、道路を走行する車輛の振動及び荷重などにもかかわらず、複数個の道路構築材5を前後左右方向に安定的に敷設した状態を維持することができる。
 なお、本明細書に開示されている道路構築材を前後左右方向に互いに密着させて敷設した状態において、互いに隣接する道路構築材の対向面の何れか一方に第2凹部を、他方にこの第2凹部に係止可能な係止片が形成されてもよい。
 そして、道路構築材5の基板51の縁辺に沿って前後方向又は左右方向に互いに隣接する第1凹部530間の距離(中心間距離、ピッチ)L4は、道路構築材5、5間に形成された第1凹部54とこの第1凹部54に対向する第1凹部530間の距離(中心間距離、ピッチ)L5に等しくなるように構成されている。
 同様に、道路構築材5の基板51の縁辺に沿って前後方向又は左右方向に互いに隣接する第1凹部530間の距離(中心間距離、ピッチ)L4は、道路構築材5、5、5、5間に形成された第1凹部55の中心とこの第1凹部55に対向する第1凹部530間の距離L6に等しくなるように構成されている。
 道路構築材5は、一の状態と、この状態から全体を90°、180°又は270°水平方向に回転させた状態とは、分割凹部521の第2凹部521a及び係止片521bを除いて同一の形態になるように構成されている。
 従って、道路構築材層S1を構成している道路構築材5の上面510上に、後述する上面材6を積層するにあたって、互いに隣接して敷設された道路構築材5、5間に跨がった状態(道路構築材層S1を構成している道路構築材5に対して水平方向にずれた状態)に、上面材6を載置して積層させることができるように構成されている(図25参照)。
 又、道路構築材5の脚部53の下端面には、上下方向に貫通する通水孔531が形成されている。なお、脚部53の上端開口部は、平面八角形状に限定されず、その他の多角形状や円形状であってもよい。
 道路構築材5の基板51において、互いに隣接する脚部53間の部分には、上下方向に貫通する通水孔51aが多数、形成されていると共に、互いに隣接する脚部53の上端開口部間を接続する通水可能な溝部51bが形成されている。
 更に、道路構築材5の基板51には、この基板31の外周縁部に沿って形成された脚部53の上端開口部と、周壁部52の外面との間を貫通する複数の溝部51cが形成されている。
 このように、道路構築材3には、複数の雨水などの水が通水可能な通水孔531、51a及び溝部51b、51cが形成されており、道路構築材5に流入した水は、道路構築材5外に円滑に排出可能に構成されている。そして、道路構築材5には、溝部51b、51cが形成されているので、道路構築材5は、上方から加えられた応力に対して柔軟に変形し、応力を円滑に吸収することができる。よって、道路を走行する車輛の振動及び荷重などを円滑に吸収し、道路構築材5及び上面材6の損傷のみならず、道路全体の損傷も低減化することができる。
 道路構築材5の上面510上には、上面材6が積層される。図21~23に示したように、上面材6は、道路構築材5の基板61と同一形状で且つ一回り小さい大きさの平面正方形状の基板61と、この基板61の下面に突設された第1凸部62とを有している。
 上面材6の基板61の上面には、その全面に亘って格子状の仕切部61aが形成されて複数の区画部61bが形成されている。各区画部61bは、その内部が空隙部に形成され且つ上側が全面的に開口している。各区画部61bの下側開口部を閉塞している基板61部分には、上下方向に貫通する通水部61dが形成されている。
 上面材6は、空隙部を有する区画部61bを多数有しており、上面材6は、区画部61bを変形させることによって、道路を走行する車輛の振動及び荷重などを円滑に吸収し、道路構築材5及び上面材6の損傷のみならず、道路全体の損傷も低減化することができる。
 上面材6の基板61の下面には、前後方向に3個ずつ、左右方向に3個ずつの合計9個の第1凸部62、62・・・が所定間隔を存して格子の目状に形成されている。上面材6の下面に形成された第1凸部62は、一定高さを有する円環状(円柱状)に形成されており、第1凸部62は、道路構築材5の第1凹部530と、道路構築材5、5間に形成された第1凹部54、55とに嵌合可能に形成されている。
 図20及び図23において、上面材6の第1凸部62、62間の距離(中心間距離、ピッチ)L7は、道路構築材5の基板51の縁辺に平行に前後方向又は左右方向に互いに隣接する第1凹部530間の距離(中心間距離、ピッチ)L4に等しくなるように構成されている。上面材6の第1凸部62、62間の距離(中心間距離、ピッチ)L7は、道路構築材5、5、5、5間に形成された第1凹部54とこの第1凹部54に対向する第1凹部530間の距離L5に等しくなるように構成されている。上面材6の第1凸部62、62間の距離(中心間距離、ピッチ)L7は、道路構築材5、5間に形成された第1凹部55とこの第1凹部55に対向する第1凹部530間の距離L6に等しくなるように構成されている。
 更に、上面材6の基板61の外周縁辺とこの外周縁辺に最も近い第1凸部62の中心との距離L8は、上記L4、L5及びL6の1/2の寸法に等しくなるように構成されている。
 そして、道路構築材層S1を構築している道路構築材5の上面510上に、上面材6を互いに密着させた状態で前後左右方向に敷設する。すると、上面材6の第1凸部62のそれぞれが、これらの第1凸部62に対向する道路構築材5の第1凹部530又は道路構築材5、5間に形成された第1凹部54、55に嵌合される。道路構築材5の上面510に上面材6の基板61の下面が全面的に密着した状態に、上面材6が道路構築材5上に積層されるように構成されている。
 次に、上記道路構築材5を用いて道路の補修作業を行う要領について説明する。図1に示した道路構築材1と同様の要領についてはその説明を省略する。
 先ず、補修を必要とする道路Rの表面層R4(表層R42及び基層R41)及び上層路盤R31を除去して下層路盤R32が露出した状態とする。この露出した下層路盤R32上に、道路構築材5を互いに隣接する道路構築材5、5同士が接した状態に前後左右方向に敷設して道路構築材層S1を構築する。なお、道路構築材5の第2凹部521a(係止片521b)が同一方向(図20では、左方向及び上方向)となるように敷設し、互いに隣接する道路構築材5、5間において、一方の道路構築材5の第2凹部521aに、他方の道路構築材5の係止片521bを係止させる。
 次に、図25に示したように、道路構築材層S1を構成している道路構築材5の上面510上に、上面材6を前後左右方向に互いに接した状態に敷設して上面材層S2を構築する。上面材6の第1凸部62のそれぞれが、これらの第1凸部62に対向する、道路構築材5の第1凹部530又は道路構築材5、5間に形成された第1凹部54、55に嵌合される。道路構築材5の上面510に、上面材6がその基板61の下面を全面的に密着させた状態に積層される。道路構築材5と上面材6とは嵌合によって接続されている。道路構築材5上に上面材6が積層されて上面材層S2が構築される。なお、図25において、道路構築材層S1及び上面材層S2は、紙面上、縦方向及び横方向に連続しているが、便宜上、一部のみを表した。
 道路構築材層S1を構成している道路構築材5、5間には、上面材6の第1凸部62が嵌合可能な第1凹部54、55が形成されている。従って、道路構築材5の上面510上に上面材6を互いに密着させた状態に前後左右方向に敷設すると、道路構築材5、5間に形成された第1凹部54、55にも上面材6の第1凸部62が嵌合される。
 道路構築材5の第1凹部530及び上面材6の第1凸部62は同数に形成されている。一方、上述の通り、道路構築材5、5間にも第1凹部54、55が形成され、この第1凹部54、55にも上面材6の第1凸部62が嵌合される。その結果、道路構築材5と上面材6との間にずれが生じ、上面材6は、互いに隣接する道路構築材5、5間に跨がった状態にて道路構築材5上に敷設される。
 従って、道路構築材層S1を構築している道路構築材5と、上面材層S2を構築している上面材6とは、前後方向及び左右方向のそれぞれに互いに跨がった状態に上下方向に積層されている。道路構築材層S1及び上面材層S2をそれぞれ構成している、道路構築材5及び上面材6が互いに拘束し合い、道路構築材層S1及び上面材層S2は、前後左右方向及び上下方向に強固に一体化している。道路を走行する車輛の振動及び荷重などにもかかわらず、道路構築材層S1及び上面材層S2を構成している道路構築材5及び上面材6にずれが生じることはない。
 しかる後、上面材層S2上に、汎用の要領にて、アスファルト材によって基層R41及び表層R42の構築作業を行って補修された道路の構築を完了させればよい。
 そして、道路構築材5及び上面材6を用いた道路の補修作業及び補修された道路において奏する効果は、道路構築材3及び上面材4を用いた場合と同様であるのでその説明を省略する。
 上記では、道路構築材5における第2凹部521aと係止片521bとの係止構造、及び、互いに隣接して敷設された道路構築材5、5の上面材6による接続構造によって、互いに隣接して敷設された道路構築材5、5同士を接続一体化させる場合を説明した。道路構築材5、5同士の接続一体化は、上記第2凹部521a及び係止片521bの係止構造、又は、上記上面材による接続構造の何れかの構造によって行なわれればよい。道路構築材5、5同士の接続一体化は、上記第2凹部521a及び係止片521bの係止構造によって行なわれる場合、上記上面材による接続構造の使用は省略されてもよい。
 道路構築材同士の第2凹部及び係止片の係止構造による接続一体化は、道路構築材の第3の形態以外の形態に適用されてもよい。詳細には、前後左右方向に敷設され且つ互いに隣接する道路構築材間において、道路構築材の道路構築材本体の対向面の何れか一方に第2凹部を、他方に係止片を形成してもよい。互いに隣接して敷設された道路構築材同士の第2凹部と係止片との係止構造によって、隣接する道路構築材同士を接続一体化してもよい。道路構築材の第3の形態以外の形態においても、互いに隣接して敷設された道路構築材同士の接続一体化は、上記第2凹部521a及び係止片521bの係止構造、又は、上記上面材(上側の道路構築材)による接続構造の何れかの構造によって行なわれればよい。道路構築材同士の接続一体化は、上記第2凹部及び係止片の係止構造によって行なわれる場合、上記上面材による接続構造の使用は省略されてもよい。
[道路構築材の第4の形態]
 図26~29に示したように、道路構築材7の道路構築材本体7aは、平面正方形状の基板71と、この基板71の四方外周縁の全周から下方に向かって延設された四角枠状の周壁部72とを有しており、基板71の上面710は、上面材8を載置可能な上面710に形成されている。道路構築材7は、合成樹脂を主成分から構成されており、必要に応じて、繊維が含まれてもよい。道路構築材7中における合成樹脂の含有量は、60質量%以上が好ましい。
 道路構築材7の道路構築材本体7aにおける基板71には、その一部を前後左右方向に所定間隔を存して且つ道路構築材本体7aの周壁部72よりも下方に突出させた状態に下方に膨出させることによって、四角柱状の脚部73が複数個、形成されている。
 図26、図27及び図31に示したように、道路構築材7の脚部73は、基板71をこの基板71の対向する縁辺の中間点同士を結んだ直線で十字に四分割した領域e~hのそれぞれにおいて、各領域の四隅部と、この四隅部の中間部分とに形成されている。詳細には、各領域e~hにおいて、道路構築材7の基板71の縁辺に平行に、前後方向に3個ずつ、左右方向に3個ずつの合計9個の脚部73、73・・・が格子の目状に形成されている。従って、道路構築材7には、合計36個の脚部73、73・・・が下方に向かって突設されている。
 道路構築材7の脚部73は、その内部が空隙部とされ、上端部が全面的に上方に向かって平面正方形状に開口しており、脚部73の上端開口部は、後述する上面材8(上側の道路構築材7)の第1凸部が嵌合可能な第1凹部730に形成されている。脚部73の上端開口部内には底面部730aが形成されており、この底面部は、第1凹部730内に嵌合された第1凸部の頂面を受止可能に構成している。
 なお、第1凹部730の底面部730aには、上下方向に貫通する通水孔730bが形成されている。このように、道路構築材3には、複数の雨水などの水が通水可能な通水孔730bが形成されており、道路構築材3に流入した水は、道路構築材3外に円滑に排出可能に構成されている。
 道路構築材7の第1凹部730は、一の状態と、この状態から90°、180°又は270°水平方向に回転させた状態とは、何れにおいても、互いに同一になるように構成されている。
 道路構築材7の脚部73の下端部を上述した道路構築材7の第1凹部730に嵌合可能な第1凸部731に形成している。脚部73の角部において、道路構築材7の第1凸部731(脚部73の下端部)と、道路構築材本体7aの周壁部72の下端との間には、当接片732が形成されている。更に、互いに隣接する当接片732、732間には、幕片733が形成されている。
 2個の道路構築材7を上下方向に重ね合わせると、上側の道路構築材7の第1凸部731が、これらの第1凸部731に対向する下側の道路構築材の第1凹部730に嵌合し、上側の道路構築材7における脚部73の当接片732及び幕片733の下端面が下側の道路構築材7の第1凹部730の開口端面に受止されるように構成されている(図29参照)。
 上記の通り、道路構築材7は、一の状態と、この状態から全体を90°、180°又は270°水平方向に回転させた状態とは、同一の形態になるように構成されている。更に、道路構築材7は、その基板71の任意の対向する縁辺の中間点同士を結んだ直線で2分割した分割体同士は、互いに同一の形状となるように構成されている。
 従って、道路構築材層S1を構成している道路構築材7の上面710上に、上面材を積層するにあたって、上面材として道路構築材7を用いることができる。そして、道路構築材層S1を構成している道路構築材7の上面710上に上面材として道路構築材7を積層する時、互いに隣接して敷設された道路構築材7、7間に跨がった状態に、別の道路構築材7を上面材として載置して積層することができるように構成されている。「道路構築材7、7間に跨がった状態」とは、「道路構築材層S1を構成している道路構築材7に対して、道路構築材7の平面形状の一辺の寸法の半分(1/2)の寸法だけ水平方向にずれた状態」をいう。
 なお、上記道路構築材7では、第1凹部730を平面正方形状、第1凸部731を四角柱状に形成した場合を説明したが、第1凹部730及び第1凸部731の形状はこれに限定されるものではなく、第1凹部730と第1凸部731とが互いに嵌合可能であればよく、例えば、第1凹部730を平面円形状とし且つ第1凸部731を第1凹部730に嵌合可能な円柱状としてもよい。
 上記道路構築材7では、各領域e~hに第1凹部730を合計9個形成した場合を説明したが、第1凹部730と第1凸部731とが互いに嵌合可能に配列されておれば、領域e~hに形成される第1凹部及び第1凸部の数及び配列形態は特に限定されない。
 次に、上記道路構築材7を用いて道路の補修作業を行う要領について説明する。上記道路構築材1を用いた道路の補修作業と同様の要領についてはその説明を省略する。
 先ず、補修を必要とする道路Rにおいて、露出した下層路盤R32上に、道路構築材7を互いに隣接する道路構築材7、7同士が接した状態に前後左右方向に敷設して道路構築材層S1を構築する。
 道路構築材7は、平面正方形状であるので、道路構築材7を下層路盤R32上に敷設するにあたって、その配設方向を考慮する必要はない。
 次に、道路構築材層S1を構成している道路構築材7の上面710上に上面材を積層して上面材層を構築する。上述の通り、上記道路構築材7は、互いに道路構築材7上に積層可能であるので、上面材として用いることができる。上記道路構築材7は、道路構築材及び上面材の双方の使用が可能であるので、道路構築材の搬入及び補修作業の効率化を図り、道路の補修時間の短縮化を図ることができる。
 道路構築材層S1を構成している道路構築材7の上面710上に上面材8として道路構築材7を積層するにあたって、道路構築材層S1を構築している互いに隣接する道路構築材7、7間に跨がるように、上面材8となる道路構築材7を、道路構築材層S1を構築している道路構築材1上に載置して積層する。
 詳細には、図30に示したように、上面材8となる道路構築材7を、道路構築材層S1を構築している道路構築材7に対して平面視にて前後方向及び左右方向のそれぞれに道路構築材7の平面形状の一辺の寸法の半分(1/2)の寸法ずつずらした状態とする。この状態で、上面材8となる道路構築材7を、道路構築材層S1を構築している道路構築材7上に載置して積層する。上面材8となる上側の道路構築材7の第1凸部731と、道路構築材層S1を構築している道路構築材7の第1凹部730とを嵌合させる。このように、道路構築材層S1を構築している道路構築材7と、上面材8となる上側の道路構築材7とを前後方向及び左右方向のそれぞれに互いに跨がった状態に上下方向に積層する。すると、道路構築材層S1及び上面材層S2をそれぞれ構成している、道路構築材7、7同士が互いに拘束し合い、道路構築材層S1及び上面材層S2は、前後左右方向及び上下方向に強固に一体化される。道路構築材7と上面材8とは嵌合によって接続されている。道路を走行する車輛の振動及び荷重などにもかかわらず、道路構築材層S1及び上面材層S2をそれぞれ構成している、道路構築材1及び上面材2(上側の道路構築材1)にずれが生じることはない。なお、図30において、道路構築材層S1及び上面材層S2は、紙面上、縦方向及び横方向に連続しているが、便宜上、一部のみを表した。
 なお、図29に示したように、上面材8となる道路構築材7を道路構築材層S1を構成している道路構築材7間に跨がらせることなく、上面材8となる道路構築材7と道路構築材層S1を構成している道路構築材7とを上下方向に合致した状態に互いに積層させてもよい。
 そして、道路構築材7及び上面材8を用いた道路の補修作業及び補修された道路において奏する効果は、道路構築材1を用いた場合と同様であるのでその説明を省略する。
 なお、上記道路構築材7では、脚部73の角部に当接片732と、この当接片732、732間に幕片733を形成したが、当接片732及び幕片733は必ずしも形成する必要はない。
 上述した道路構築材の第1~4の形態において、道路構築材と上面材(上面材となる道路構築材)とを嵌合させて上下方向に接続させる場合を説明した。第1凹部とこの第1凹部に嵌合可能な第1凸部の何れか一方又は双方を道路構築材及び上面材のそれぞれに形成した場合を説明した。道路構築材と上面材とが嵌合可能であれば、道路構築材に第1凹部及び第1凸部の何れか一方又は双方が設けられてもよいし、上面材に第1凹部及び第1凸部の何れか一方又は双方が設けられてもよい。
[接続部材]
 上記道路構築材では、この道路構築材の上面上に載置した上面材によって、前後左右方向に敷設した道路構築材同士を接続一体化した場合を説明したが、上面材を用いることなく、接続部材を用いて道路構築材同士を接続一体化してもよい。
 第2の形態として説明した道路構築材を用いて説明する。道路構築材3の第1凹部330を接続部材の嵌合部を嵌合させるための接続部として用いる。
 図33に示したように、接続部材9は、互いに隣接して敷設された道路構築材3、3間において、基板31の対角線方向、前後方向又は左右方向に隣接する道路構築材3の第1凹部330、330間の距離に等しい長さを有し且つ道路構築材3の溝部31b、31cに上方から挿入可能な幅に形成された連結杆91と、この連結杆91の両端のそれぞれに形成され且つ道路構築材3の第1凹部330に嵌合可能な逆三角錐状の嵌合部92、92とを有している。なお、接続部材9の嵌合部92の内部は空隙部に形成され且つ上下方向に通水可能に貫通した状態に形成されている。
 上記接続部材9を用いて道路構築材3、3同士を接続するには、接続部材9をその連結杆91を道路構築材3の溝部31b、31c内に上方から挿入すると共に、連結杆91の両端に形成された嵌合部92を道路構築材3の第1凹部330、330内に嵌合させることによって、道路構築材3、3同士を接続一体化することができる(図32参照)。
 図32では、互いに隣接する道路構築材3、3間において、基板31の対角線方向に隣接する第1凹部330、330を用いた場合を示したが、道路構築材3の前後方向又は左右方向に隣接する第1凹部330、330を用いてもよい。
 上記では、第2の形態の道路構築材を用いた場合を説明したが、その他の形態の道路構築材においても同様に第1凹部を利用し、接続部材を用いて互いに隣接して敷設された道路構築材同士を接続一体化してもよい。
 上述した第1の形態の道路構築材は、上下反転させることによって上面材として用いることができることを説明した。道路の表面層R4上を走行する車輛の重量及び振動が、道路構築材層S1及び上面材層S2に伝達される(図7参照)。
 道路Rの構成要素である路体R1、路床R2、路盤R3及び表面層R4のコンディションによっては、表面層R4上を走行する車輛の重量及び振動によって、上面材層S2を構成している上面材2が道路構築材層S1上で動くことがある。
 詳細には、図34に示したように、図面上において、車輛(図示せず)が表面層(図示せず)上を右側から左側に走行すると、表面層の下にある上面材層S2の上面材には、通常、車輛の走行に伴ってW1、W2、W3の順に荷重の加わる位置が移動する。即ち、上面材には、外周部、中央部及び外周部の順に、車輛の荷重が加わる位置が移動する。なお、図34では、道路構築材上に上面材を積層している状態を示したが、以下の説明において、隣接する道路構築材上に跨がった状態に上面材を積層した場合も同様である。
 そうすると、上面材は、その中央部を中心にして外周部が上下方向に移動する方向に揺れるような動きをしやすい(図34の矢印M)。上述した上面材の外周縁部は、90°の角部に形成されている(図5、図16、図24及び図29参照)。そのため、上面材が揺れるたびに、上面材の角部が表面層R4に衝突し、表面層R4が上面材の衝突によって亀裂を生じ、道路Rに損傷が生じることがある。
 そこで、図1に示した道路構築材1を上下反転させた構造において、下記に示した構造を更に備えている上面材2'が好ましい(図35~37参照)。上面20の外周縁部において、稜角(とがった角)の全てが切除されて面取り縁部2aに形成されている上面材2’が好ましい。上面材2’は、上面20の外周縁部の全てが面取りされていることが好ましい。上面材2’は、その上面20の外周縁部が面取り縁部2aに形成されていることによって、上述のように、上面材が揺れる動きをした場合にあっても、上面材は、角部ではなく、面で表面層R4に当たるため、表面層R4への衝撃力を面全体に分散させることができ、表面層R4に亀裂が生じるのを低減することができる。なお、上面材2’において、上面材2としても用いることができる道路構築材1と同様の構造を有する部分には同一符号を付して説明を省略する。区画部1bの下面部132、142には、通水孔は形成されていなくてもよい。
 上面材2'の面取り縁部2aの表面形状は、断面傾斜線状(断面直線状)であってもよいし、断面凸曲線状であってもよい。断面凸曲線状としては、凸円弧状(R面)が好ましい。面取り縁部2aの幅は、2~50mmが好ましく、5~40mmがより好ましい。
 上面材2’の面取り縁部2aの表面形状は、上面20に対して45°の角度で直線状に面取りして形成されたC面が好ましい。
 図34に示したように、上面材2が前後左右方向に敷設されると、隣接する上面材2の面取り縁部2a、2a同士が対向した状態となって第3凹部2bを形成する。第3凹部2bは、上面材2を取り囲むように形成される。
 隣接する上面材2、2間に形成された第3凹部2bには、道路Rの表面層R4が充填される(図7参照)。第3凹部2b内に充填された表面層R4によって上面材2がその外周縁部において固定されており、上面材2の揺れが抑制されている。その結果、上面材2の上述した揺れも低減化することができ、表面層R4に亀裂が生じるのをより効果的に低減することができる。
 上記では、上面材2’において、上面20の外周縁部に面取り縁部2aを形成した場合を説明したが、その他の上面材においても、外周縁部に面取り縁部を形成してもよい。その他の上面材においても、上面材が前後左右方向に敷設されると、隣接する上面材の面取り縁部同士が対向した状態となって第3凹部を形成することが好ましい。
 又、道路構築材層S1を構成している道路構築材1と上面材2との嵌合による接続を強くすることによって、上述した上面材2(2’)の揺れを低減化してもよい。具体的には、図38及び図39に示したように、道路構築材1の第1凸部14のうち、一部又は全ての第1凸部14の外周面にリブ14aを形成する。同様に、図35~37に示したように、上面材2’の道路構築材1の第1凸部14のうち、一部又は全ての第1凸部14の外周面にリブ14aを形成する。図40に示したように、第1凸部14の外周面に形成されたリブ14aは、その先端部の突出度合いが小さい一方、基端部の突出度合いが大きくなっている。第1凸部14の先端部が第1凹部13の開口端内に挿入可能なように、リブ14aの先端部の突出度合いが調整されている。一方、リブ14aの先端部を除いた部分の一部又は全体は、第1凹部13内に第1凸部14を嵌合させた時に、第1凹部13の内周面によって押し潰されるように突出度合いが調整されている。なお、図35~39では、第1凸部14の1個の外周面にリブ14aを形成した場合を示したが、第1凸部14の外周面の複数個の外周面にリブ14aを形成してもよい。
 図40及び図41に示したように、道路構築材層S1上に上面材層S2を敷設する時、道路構築材1の第1凹部13に、上面材2’の第1凸部14を嵌合させる。同様に、上面材2’の第1凹部13に、道路構築材1の第1凸部14を嵌合させる。
 すると、道路構築材1及び上面材2'の第1凸部14、14のリブ14a、14aが押し潰されながら第1凹部13、13内に挿入される。押し潰された第1凸部14、14のリブ14a、14aは、第1凸部14と第1凹部13の対向面間に形成された隙間に存在している。押し潰されたリブ14aは、第1凸部14が第1凹部13内において動くことを阻止しており、第1凸部14と第1凹部13の嵌合をより強固にしている。従って、道路構築材1上において、上面材2’の揺れを低減化することができる。
 上記では、第1凸部14の外周面にリブ14aを形成した場合を説明したが、第1凸部14にリブ14aを形成する代わりに、第1凹部13の内周面にリブを形成してもよい。第1凹部13の内周面に形成されたリブは、第1凹部13の開口端部において、その突出度合いが小さい一方、第1凹部13の内部において突出度合いが大きくなっている。第1凸部14の先端部が第1凹部13の開口端内に挿入可能なように、第1凹部13の開口端部に形成されたリブの突出度合いが調整されている。一方、第1凹部13の開口端部以外の部分に形成されたリブの一部又は全体は、第1凹部13内に第1凸部14を嵌合させた時に、第1凹部13の内周面によって押し潰されるように突出度合いが調整されている。第1凸部14と第1凹部13とを嵌合させた時のリブの作用効果は、上述と同様であるので説明を省略する。なお、第1凹部13の1個の外周面にリブを形成してもよく、第1凸部14の外周面の複数個の外周面にリブ14aを形成してもよい。
 上記では、道路構築材1及び上面材2'において、第1凸部の一部にリブを形成した場合を示したが、第1凸部の全てにリブを形成してもよい。道路構築材1及び上面材2'において、第1凹部の一部にリブを形成した場合を示したが、第1凹部の全てにリブを形成してもよい。第1凸部又は第1凹部に形成するリブの個数は、1個又は複数個の何れであってもよい。
 上記では、道路構築材1及び上面材2’において、第1凸部又は第1凹部の何れか一方又は双方にリブを形成した場合を説明したが、その他の上面材においても、第1凸部又は第1凹部の何れか一方又は双方にリブを形成してもよい。
 上述した上面材層上に合成樹脂シートを好ましくは全面的に敷設し、合成樹脂シート上に表面層R4を構築してもよい。上面材層S2と表面層R4との間に合成樹脂シートを介在させることによって、上面材層S2を構成している上面材が表面層R4に直接、衝突することを防止し、表面層R4に亀裂が生じることを低減化することができる。
 上述した道路構築材層S1及び/又は上面材層S2の表面に、アスファルト合材の塗膜を部分的に又は全面的に形成し、上面材と道路Rの表面層R4、道路構築材と道路構築材、上面材と上面材、又は、道路構築材と上面材とをより強固に一体化させて、上面材の上述の揺れを低減化してもよい。
 道路構築材層S1又は上面材層S2の表面に、アスファルト合材の塗膜を形成する方法としては、例えば、アスファルト合材の乳化水を道路構築材層S1又は上面材層S2に吹き付け、乳化水中の水を蒸発させることによってアスファルト合材の塗膜を形成する方法などが挙げられる。
 又、上面材2’は、軽量性を向上するために、その上面20に区画部1bの開口部を有している。道路構築材層S1上に上面材層S2を形成した後、上面材層S2上に表面層R4が構築される。表面層R4の構築は、上面材層S2上にアスファルト合材を層状に配設してアスファルト合材層を形成する第1工程と、転圧機械を用いてアスファルト合材層を所定の密度が得られるまで締め固める第2工程とを有する。
 上面材2’の上面20に区画部1bの開口部があると、区画部1bにアスファルト合材が流入するが、アスファルト合材は粘度が高いため、アスファルト合材が区画部1b内に均一に流入せず、アスファルト合材の充填度合いにムラが生じやすく、アスファルト合材層の転圧作業に時間を要することがある。
 区画部1b内へのアスファルト合材の流入を防止するために、区画部1b内に砂利などの充填物を予め充填することも行なわれている。しかしながら、充填物を区画部1b内に充填する充填作業は面倒であり、充填作業に時間を要するという別の問題点を生じている。更に、充填物が上面材2’上に残存すると、アスファルト合材を締め固める時に、充填物に起因して大きな圧力が上面材2’に加わり、上面材2’が破損するという問題も生じる。上述したように、隣接する上面材の面取り縁部同士が対向した状態となって第3凹部2bが形成される場合、第3凹部2bに充填物が充填され、上記効果を奏しないという問題も生じる。
 そこで、図42に示したように、上面材2’の区画部1b内に、区画部1bを閉塞する部材(以下、「閉塞部材」という)Jを配設し、上面材2’の上面20に形成された開口部を閉塞していてもよい。閉塞部材Jを用いることによって、上記充填物を使用する必要がなくなり、上記問題点を解消することができる。閉塞部材Jは、区画部1b内に挿入可能で且つ所定の高さを有する脚部J1と、この脚部J1の上端に一体的に形成された蓋部J2とを有している。蓋部J2は、区画部1b内に配設された脚部J1の高さ位置での区画部1bの開口部形状に概ね合致した形状を有している。蓋部J2によって、それ以上、区画部1b内にアスファルト合材が流入しないようにしている。区画部1b内へのアスファルト合材の充填度合いのムラが解消できればよい。従って、区画部1bの開口端において閉塞する必要はなく、区画部1bの深さの1/2よりも浅い位置(好ましくは、区画部の深さの2/3よりも浅い位置)にて区画部1bが閉塞部材Jによって閉塞されていればよい。上面材2’の外周縁部に形成された区画部1bにおいて、区画部1bの上端開口部は、上記面取り縁部2aに開口している。面取り縁部2aに開口している部分において、区画部1bを閉塞部材Jによって閉塞すると、閉塞部材Jの蓋部J2が表面層R4に衝突する虞れがある。よって、面取り縁部2aに開口している区画部1bにおいては、区画部1b内に配設した閉塞部材Jの蓋部J2が、面取り縁部2aよりも下方に位置するように脚部J1の高さが調整されている。なお、上記閉塞部材は、上面材2’以外の他の上面材においても用いられてもよい。
 又、図43に示したように、上面材2'の上記揺れを防止するために、道路構築材層S1を構成している道路構築材と、上面材層S2を構成している上面材とを固定部材Kによって固定してもよい。道路構築材同士、又は上面材同士を固定部材によって固定してもよい。
 なお、固定部材Kとしては、例えば、ネジ、クギ、リベット、瀝青シート、接着シート、粘着シート、接着剤などが挙げられる。接着剤としては、例えば、ポリ酢酸ビニル系接着剤、エポキシ系接着剤、アクリル系接着剤、ウレタン系接着剤、ゴム系接着剤、アスファルト乳剤、アスファルト系接着剤などが挙げられる。
 本発明の道路構築材は、路体上に前後左右方向に並列した状態に敷設することによって、路体と表面層との間に構築された路盤又は路床の少なくとも一部を容易に置換することができ、道路の補修作業などの道路の構築作業を短期間のうちに完了させることができる。
(関連出願の相互参照)
 本出願は、2022年11月4日に出願された日本国特許出願第2022-177097号に基づく優先権を主張し、この出願の開示はこれらの全体を参照することにより本明細書に組み込まれる。
1,3,5,7 道路構築材
1a,3a,5a、7a 道路構築材本体
11,310,510,710 上面
12   仮想区画線
12a  第1仮想区画線
12b  第2仮想区画線
12c  交点
13,330,530,54,55、730 第1凹部
14,42,62,731 第1凸部
2,4,6,8 上面材
521  分割凹部
522  分割凹部
9   接続部材
91   連結杆
92   嵌合部
a-h 領域
R   道路
R1   路体
R4   表面層
S1   道路構築材層
S2   上面材層

Claims (18)

  1.  路体とこの路体上に構築される表面層との間に敷設される道路構築材であって、
     上記道路構築材は、前後左右方向に敷設可能な平面矩形状の道路構築材本体であって、上面が上記道路構築材本体上に載置される上面材と嵌合可能である道路構築材本体を有することを特徴とする道路構築材。
  2.  上記道路構築材本体の上面は、上記上面材と嵌合可能な第1凸部及び第1凹部の何れか1個以上を有していることを特徴とする請求項1に記載の道路構築材。
  3.  上記第1凸部は、円柱状又は角柱状に形成されていることを特徴とする請求項2に記載の道路構築材。
  4.  上下反転させることによって上記上面材として使用可能であることを特徴とする請求項1~3の何れか1項に記載の道路構築材。
  5.  上記道路構築材の上面は、上下反転させて上面材として用いられる上記道路構築材と嵌合可能であることを特徴とする請求項4に記載の道路構築材。
  6.  上記道路構築材の上面を十字の仮想区画線によって区画し、上記十字の仮想区画線の交点を介して対向する2個の領域をそれぞれ、第1領域群及び第2領域群とし、
     上記第1領域群は第1凹部を有する一方、第2領域群は第1凸部を有し、
     上記路体上に敷設された道路構築材の上面に、上記道路構築材を跨ぐように、上記上面材を積層させると、上記道路構築材と上記上面材とが、上記第1凸部と上記第1凹部の嵌合によって接続されることを特徴とする請求項1~5の何れか1項に記載の道路構築材。
  7.  上記道路構築材の道路構築材本体の周壁部には、第2凹部と係止片とを有しており、複数の上記道路構築材を互いに隣接して敷設した場合に、一方の上記道路構築材の第2凹部に、他方の上記道路構築材の上記係止片が接続可能に構成されていることを特徴とする請求項1~6の何れか1項に記載の道路構築材。
  8.  上記道路構築材は、上面に、互いに隣接する道路構築材同士を接続一体化させる接続部材が接続可能な嵌合部が設けられていることを特徴とする請求項1~7の何れか1項に記載の道路構築材。
  9.  路体とこの路体上に構築される表面層との間に敷設される道路構築材セットであって、
     上記路体上に前後左右方向に敷設可能な平面矩形状に形成された道路構築材本体を有する道路構築材と、
     上記道路構築材の上に配置する上面材とを含み、
     上記道路構築材の上面は、上記上面材と嵌合可能であることを特徴とする道路構築材セット。
  10.  上記上面材は、外周縁部に面取り縁部が形成されていることを特徴とする請求項9に記載の道路構築材セット。
  11.  上記道路構築材本体の上面と上記上面材とは、互いに嵌合可能な第1凸部及び第1凹部の何れか1個以上を有していることを特徴とする請求項9又は請求項10に記載の道路構築材セット。
  12.  上記上面材が、上記道路構築材上において、前後左右方向に敷設された状態において、上記上面材の互いに隣接する面取り縁部は、表面層の一部を充填するための第3凹部を形成していることを特徴とする請求項10に記載の道路構築材セット。
  13.  上記上面材の面取り縁部の表面形状は、断面傾斜線状、又は断面凸曲線状に形成されていることを特徴とする請求項10又は請求項12に記載の道路構築材セット。
  14.  上記第1凸部又は上記第1凹部の少なくとも何れか一方にはリブが突設されていることを特徴とする請求項11に記載の道路構築材セット。
  15.  上記上面材の上面には開口部が形成されていると共に、上記開口部には、その開口部を閉塞する部材が配設されていることを特徴とする請求項10に記載の道路構築材セット。
  16.  路体上に、平面矩形状に形成された道路構築材本体を有する道路構築材を前後左右方向に敷設して道路構築材層を構築する道路構築材層構築工程と、
     上記道路構築材層の上面上に、上記上面材を前後左右方向に敷設して上記道路構築材層と接続された上面材層を構築する上面材層構築工程と、
     上記上面材層上に表面層を構築する表面層構築工程とを含むことを特徴とする道路の構築方法。
  17.  上記道路構築材本体と上記上面材とを嵌合させて、上記道路構築材層と上記上面材層とを接続させることを特徴とする請求項16に記載の道路の構築方法。
  18.  上記道路構築材層を構成している上記道路構築材間を跨いだ状態に上記上面材を上記道路構築材層上に配設することを特徴とする請求項16又は請求項17に記載の道路の構築方法。
PCT/JP2023/039740 2022-11-04 2023-11-02 道路構築材、道路構築材セット及び道路の構築方法 WO2024096128A1 (ja)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022-177097 2022-11-04
JP2022177097 2022-11-04

Publications (1)

Publication Number Publication Date
WO2024096128A1 true WO2024096128A1 (ja) 2024-05-10

Family

ID=90930815

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2023/039740 WO2024096128A1 (ja) 2022-11-04 2023-11-02 道路構築材、道路構築材セット及び道路の構築方法

Country Status (1)

Country Link
WO (1) WO2024096128A1 (ja)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002309658A (ja) * 2001-04-11 2002-10-23 Shinichiro Hayashi 構造体
JP2009024447A (ja) * 2007-07-23 2009-02-05 Sekisui Plastics Co Ltd 積層構造体に用いる構造部材及びそれを用いた積層構造体
JP2022012077A (ja) * 2020-06-30 2022-01-17 天昇電気工業株式会社 雨水貯留浸透施設の単位ブロック部材および雨水貯留浸透施設の枠状ブロックユニット、並びに雨水貯留浸透施設

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002309658A (ja) * 2001-04-11 2002-10-23 Shinichiro Hayashi 構造体
JP2009024447A (ja) * 2007-07-23 2009-02-05 Sekisui Plastics Co Ltd 積層構造体に用いる構造部材及びそれを用いた積層構造体
JP2022012077A (ja) * 2020-06-30 2022-01-17 天昇電気工業株式会社 雨水貯留浸透施設の単位ブロック部材および雨水貯留浸透施設の枠状ブロックユニット、並びに雨水貯留浸透施設

Similar Documents

Publication Publication Date Title
EP0868576B1 (en) Integrated flexible multi-layer geogrid
KR100274850B1 (ko) 셀구조체를 이용한 도로 포장방법
JP3469203B2 (ja) 舗設用ブロック構造体及びその施工方法
US8602318B2 (en) Method of covering a rail for a railway vehicle
JP2007138467A (ja) 高架道路の荷重支持型伸縮装置とその施工法
KR20170082318A (ko) 탄성복원형 신축이음장치 및 그 시공방법
WO2024096128A1 (ja) 道路構築材、道路構築材セット及び道路の構築方法
JP7396978B2 (ja) 複層プレキャスト舗装道路
KR20100102811A (ko) 프리캐스트 패널 및 이를 이용한 도로포장 구조물
ES2352026A1 (es) Procedimiento para el cerramiento de orificios y/o proteccion de estructuras mediante la reutilizacion de neumaticos fuera de uso.
JP2011106208A (ja) 平板ブロック及び平板ブロック用枠体
JP7272307B2 (ja) 道路の構造
KR20120013623A (ko) 차도용 투수형 골재 셀 블록
KR101842997B1 (ko) 블록을 이용한 차도 포장구조 및 차도 포장 시공방법
JP2009041226A (ja) プレキャストブロック、プレキャストブロックを用いたアプローチ部の施工方法及びプレキャストブロックの製造方法
KR102209832B1 (ko) 도로 포장 구조
AU2022221468B2 (en) Support Product
US20230151557A1 (en) Support product
KR102653254B1 (ko) 데크로드 및 그 시공방법
KR101264601B1 (ko) 보차도 구조 및 보차도 시공방법
JP7405410B2 (ja) 縁石マット
CN220246763U (zh) 公路装配式固底临时护栏
KR19990046237A (ko) 방음 블록 및 그것을 사용한 방음벽_
JP2007009495A (ja) 土木構造体および土木構造体用外装構築部材
CN117266235A (zh) 一种临边山体挡土墙及其施工方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23885882

Country of ref document: EP

Kind code of ref document: A1