WO2024053290A1 - 連続鋳造用のタンディッシュ、鋼の連続鋳造方法及び、堰 - Google Patents

連続鋳造用のタンディッシュ、鋼の連続鋳造方法及び、堰 Download PDF

Info

Publication number
WO2024053290A1
WO2024053290A1 PCT/JP2023/028182 JP2023028182W WO2024053290A1 WO 2024053290 A1 WO2024053290 A1 WO 2024053290A1 JP 2023028182 W JP2023028182 W JP 2023028182W WO 2024053290 A1 WO2024053290 A1 WO 2024053290A1
Authority
WO
WIPO (PCT)
Prior art keywords
weir
inert gas
continuous casting
tundish
molten steel
Prior art date
Application number
PCT/JP2023/028182
Other languages
English (en)
French (fr)
Inventor
孝平 古米
則親 荒牧
Original Assignee
Jfeスチール株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jfeスチール株式会社 filed Critical Jfeスチール株式会社
Priority to JP2023572688A priority Critical patent/JPWO2024053290A1/ja
Publication of WO2024053290A1 publication Critical patent/WO2024053290A1/ja

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/10Supplying or treating molten metal
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D11/00Continuous casting of metals, i.e. casting in indefinite lengths
    • B22D11/10Supplying or treating molten metal
    • B22D11/11Treating the molten metal

Definitions

  • the present invention relates to a tundish for continuous casting, a method for continuous casting of steel, and a weir.
  • Manufacturing of steel materials is carried out as follows. That is, the molten steel supplied from the ladle to the tundish is supplied to the mold and cast into a slab. The slab is formed into a predetermined shape by processing such as rolling to become a steel material.
  • inclusions such as Al 2 O 3 in the molten steel cause defects in the steel material, it is preferable to separate them from the molten steel before casting and remove them. Specifically, in the tundish, inclusions contained in molten steel are floated and separated.
  • a weir that separates a steel receiving area where molten steel is supplied to the tundish from a semi-stationary steel area where molten steel is discharged from a discharge port provided at the bottom.
  • Patent Document 2 in addition to the weir described in Patent Document 1 being provided on the tundish, a rib is provided on the steel semi-stationary region side that protrudes upward from the bottom of the tundish. ing. Therefore, even if the inclusion moves from the hole of the weir toward the steel quasi-stationary region, the direction of movement is changed upward by the rib. Thereby, inclusions can also be floated on the steel receiving area side.
  • Patent Document 3 in addition to the weir described in Patent Document 1 being provided in the tundish, inert gas is supplied upward from the bottom of the tundish to the steel quasi-stationary region side. things are being done. As a result, even if the inclusions move from the hole of the weir toward the steel quasi-stationary region, the inclusions are floated by the inert gas.
  • Japanese Unexamined Patent Publication No. 53-6231 Japanese Patent Application Publication No. 10-216909 Japanese Patent Application Publication No. 2011-143449
  • the present invention has been made in view of the above problems, and aims to provide a tundish for continuous casting, a method for continuous casting of steel, and a weir that can improve the cleanliness of molten steel.
  • the present invention has the following features.
  • a tundish for continuous casting having a storage part for storing supplied molten steel,
  • the storage section includes one or more molten steel outlets through which the molten steel flows out, and a weir formed in a hollow cylindrical shape and arranged upstream of the molten steel than the one or more molten steel outlets.
  • the weir has a bottom portion; a wall portion erected from the bottom portion; an eaves portion provided at one end of the wall portion so as to cover a peripheral edge thereof and facing the bottom portion of the weir; a gas supply unit that supplies an inert gas to an internal space surrounded by the wall part and the bottom part,
  • the gas supply section includes a porous section in which a plurality of pores are formed throughout; a support part that supports the porous part and is provided on the wall of the weir;
  • a tundish for continuous casting comprising: a pipe provided on the wall of the weir between the support part and the bottom of the weir, and discharging the inert gas.
  • the weir has a storage chamber surrounded by the porous part, the support part, the wall part of the weir, and the bottom part of the weir,
  • R Flow rate of inert gas per unit area of porous part [NL/(s ⁇ m 2 )] [6]
  • a weir provided in a tundish for continuous casting and formed in a hollow cylindrical shape, the bottom and a wall portion erected from the bottom portion; an eaves portion provided at one end of the wall portion so as to cover a peripheral edge thereof and facing the bottom portion of the weir; a gas supply unit that supplies an inert gas to an internal space surrounded by the wall part and the bottom part,
  • the gas supply section includes a porous section in which a plurality of pores are formed throughout; a support part that supports the porous part and is provided on the wall part;
  • a weir including a pipe provided on the wall between the support part and the bottom part and discharging the inert gas.
  • the present invention by supplying inert gas through the porous portion, fine inert gas bubbles can be supplied to the molten steel injection region.
  • the volume ratio of inert gas in the molten steel can be increased, and inclusions contained in the molten steel poured into the tundish from the ladle can be efficiently floated. Thereby, the cleanliness of molten steel can be improved.
  • FIG. 2 is an explanatory diagram showing the configuration of the weir in FIG. 1.
  • FIG. FIG. 4 is a top view of the weir in FIG. 3; It is an explanatory view showing a mode where piping is installed. It is an explanatory view showing other aspects where piping is installed. It is a graph showing the relationship between the gas flow rate per unit area and the number density of inclusions. It is a graph showing the number density of inclusions in a conventional example and the present invention.
  • FIG. 1 is an explanatory diagram showing the configuration of a tundish for continuous casting.
  • FIG. 2 is an explanatory view showing a side surface of a tundish for continuous casting.
  • a tundish 100 for continuous casting is arranged between a ladle (not shown) in which molten steel MS is stored and a mold 30 in which the molten steel MS is cooled.
  • a tundish for continuous casting (hereinafter simply referred to as a tundish) 100 has a housing section 10 that is open at the top and shaped like a box with a bottom.
  • the accommodating portion 10 of the tundish 100 for continuous casting is formed into an inverted truncated cone shape in which the upper base is longer than the lower base.
  • the accommodating portion 10 has a molten steel injection region AR1 into which molten steel MS is injected from the nozzle N1 of the ladle.
  • Molten steel injection region AR1 is formed along axis AX of nozzle N1.
  • the molten steel injection region AR1 is formed extending from the tip of the nozzle N1 to the axis AX of the nozzle N1.
  • the molten steel injection region AR1 is a region extending in the circumferential direction of the axis AX of the nozzle N1.
  • the accommodating portion 10 has one or more molten steel outlet ports 11 through which molten steel MS flows out into the mold. As shown in FIG. 1, in this embodiment, the molten steel outlet 11 is formed at one end and the other end in the left-right direction in the bottom 12 of the tundish 100.
  • the storage section 10 has a weir 20 arranged between the molten steel injection region AR1 and the molten steel outlet 11.
  • the weir 20 is arranged on the upstream side of the molten steel MS rather than the molten steel outlet 11.
  • the weir 20 is hollow and has a bottomed cylindrical shape.
  • the weir 20 has a wall portion 21 formed to surround the molten steel injection region AR1, and a bottom portion 22 provided at one end, that is, the lower end side of the wall portion 21.
  • the wall portion 21 is erected from the bottom portion 22.
  • the bottom portion 22 is provided opposite to and in contact with the bottom portion 12 of the tundish 100 .
  • the weir 20 has a substantially U-shaped side cross section.
  • the weir 20 has an internal space 20a surrounded by a wall 21 and a bottom 22. A part of the molten steel injection region AR1 is accommodated in the internal space 20a of the weir 20.
  • Each of the molten steel outlets 11 is provided with a nozzle N2 that connects the tundish 100 and the mold 30.
  • the molten steel MS is supplied from the molten steel outlet 11 to the mold 30 via the nozzle N2.
  • the molten steel MS is cooled in the mold 30 and becomes a slab 40.
  • FIG. 3 is an explanatory diagram showing the configuration of the weir 20.
  • FIG. 4 shows the top surface of the weir 20.
  • the weir 20 has an eaves portion 23 provided at the other end, that is, the upper end, of the wall portion 21 so as to cover the periphery thereof and facing the bottom portion 22.
  • the shape of the eaves portion 23 is not particularly limited, it is preferably formed to protrude toward the molten steel injection region AR1 side. In the present embodiment, the eaves portion 23 is formed to extend along a direction parallel to the bottom portion 22 (eg, horizontal direction) toward the molten steel injection portion AR1 side.
  • the weir 20 has a gas supply section 24 that supplies inert gas from above the bottom 22 toward the molten steel injection region AR1.
  • the gas supply section 24 is provided below the eaves section 23. In other words, the gas supply section 24 supplies inert gas to the internal space from above the bottom section 22 . A part of the inert gas supplied from the gas supply section 24 comes into contact with the eaves section 23 and rises.
  • the gas supply section 24 includes a porous section 25 in which a plurality of pores 25a are formed throughout, and a support section 26 that supports the porous section 25. Further, the gas supply section 24 includes a pipe 27 that is provided on the wall section 21 between the porous section 25 and the bottom section 22 and discharges the inert gas GS.
  • the porous portion 25 is made of a ceramic refractory.
  • refractories include those obtained by sintering one or more kinds of refractory inorganic particles such as alumina and silica mixed together. Note that, as the refractory, one mainly composed of alumina is particularly preferable.
  • the porous portion 25 can be produced by using spherical particles mainly made of alumina as aggregate and firing them at 1600° C. or higher.
  • the porous portion 25 can be manufactured, for example, by casting into a dense castable refractory.
  • the pores 25a of the porous portion 25 can be formed.
  • the pores 25a of the porous portion 25 are not particularly limited, but may be formed to have an average pore diameter of 10 to 40 ⁇ m, for example, as measured by mercury porosimetry.
  • the bubbles of the inert gas supplied from the porous portion 25 can be made finer.
  • the diameter of the bubbles is about 100 ⁇ m, but by supplying inert gas in this way, the diameter of the bubbles is reduced to 1/10 to 1/1 of the conventional method. It can be set to about 20. Further, by setting the pores 25a of the porous portion 25 to 10 to 40 ⁇ m, it becomes possible to appropriately control the flow rate of the inert gas.
  • the shape of the porous portion 25 is not particularly limited, but in this embodiment, it is formed into a plate shape. Specifically, as shown in FIG. 4, it is formed into a rectangular shape when viewed from above.
  • the support portion 26 is made of a ceramic refractory.
  • refractories include those obtained by sintering one or more kinds of refractory inorganic particles such as alumina and silica mixed together. Note that, as the refractory, one mainly composed of alumina is particularly preferable.
  • the support part 26 is formed into a frame shape so as to be able to support the bottom edge of the porous part 25.
  • the shape of the support portion 26 is not particularly limited, in this embodiment, it is formed into a frame shape that is rectangular when viewed from above.
  • the support portion 26 is provided on the wall portion 21 .
  • the support portion 26 is fixed by fitting into a fitting recess (not shown) formed in the wall portion 21, for example.
  • the weir 20 has a housing chamber 28 surrounded by a porous part 25, a support part 26, a wall part 21, and a bottom part 22. Piping 27 is provided in the wall portion 21 surrounding the storage chamber 28 .
  • the piping 27 is preferably fire resistant.
  • FIG. 5 shows how the piping 27 is installed.
  • the piping 27 is arranged along the wall 13 of the housing section 10.
  • the pipe 27 is covered with a covering material 50 having fire resistance.
  • the covering material 50 include precast refractories.
  • the covering material 50 may be a combination of a precast refractory and a patching material.
  • a precast refractory 51 is disposed as a covering material 50 disposed on the edge side of the housing portion 10.
  • a patching material 52 is disposed as a covering material 50 disposed on the bottom 12 side of the tundish 100.
  • FIG. 6 shows another embodiment in which the piping 27 is installed.
  • a pipe cover 53 is used instead of the precast refractory described in the example shown in FIG.
  • a plurality of pipe covers 53 may be used, and in the example shown in FIG. 6, four pipe covers 53 are connected along the axial direction of the pipe 27.
  • the piping 27 By configuring the piping 27 in this way, refractory construction can be easily performed. Moreover, the maintainability of the piping 27 can be improved more than when the piping 27 is inserted through the bottom 12 of the tundish 100. Further, since no processing is required for inserting the pipe 27 into the bottom 12 of the tundish 100, leakage of molten steel from the bottom 12 can be suppressed.
  • the piping 27 is provided with an adjusting means 29 for adjusting the flow rate of the inert gas.
  • a valve can be used.
  • the adjusting means 29 may be operated manually, or the opening degree may be adjusted by a control section (not shown).
  • the inert gas supplied from the pipe 27 is introduced into the storage chamber 28.
  • the pressure of the inert gas is uniformly applied to the surface of the porous portion 25 facing the bottom 22.
  • the inert gas is supplied from the storage chamber 28 to the molten steel injection region AR1 through the pores 25a of the porous portion 25.
  • the inert gas is not particularly limited, but includes Ar, N2 , CO2, and the like.
  • inert gas is supplied to the porous portion 25 from the storage chamber 28.
  • the inert gas may be supplied to the porous portion 25 without passing through the storage chamber 28.
  • an attachment (not shown) capable of covering the surface of the porous portion 25 on the bottom 22 side may be attached to the pipe 27.
  • the continuous steel casting method includes a process in which molten steel MS is supplied to a tundish 100 from a nozzle N1 connected to a ladle (not shown), and inclusions contained in the molten steel MS are removed in the tundish 100. A step of flowing out the molten steel MS from the molten steel outlet 11 of the tundish 100 to the mold 30, and a step of cooling the molten steel MS in the mold 30 to produce a slab.
  • the step of removing inclusions contained in the molten steel MS in the tundish 100 includes the step of blowing inert gas at a flow rate that satisfies the following equation (1). 0.02 ⁇ R ⁇ 1.0 (1)
  • R Flow rate of inert gas per unit area of porous part [NL/(s ⁇ m 2 )]
  • the gas flow rate (R) per unit area of the porous part 25 is preferably 0.02 to 1.00 NL/(s ⁇ m 2 ) supplied from the gas supply unit 24, and 0.20 to 1.00 NL/( More preferably, it is supplied in a size of s ⁇ m 2 ). Note that the gas flow rate (R) per unit area of the porous portion 25 can be adjusted by the adjusting means 29.
  • the gas flow rate (R) per unit area of the porous portion 25 By setting the gas flow rate (R) per unit area of the porous portion 25 to 1.00 NL/(s ⁇ m 2 ) or less, it is possible to prevent the tundish slag from being drawn in. Furthermore, by blowing the inert gas under such high flow velocity conditions, the bubble diameter of the inert gas can be made finer. Thereby, it is possible to promote the floating of the inclusions and to suppress the inclusion of the inclusions in the molten steel.
  • the tundish 100 of the present invention by supplying inert gas through the porous portion 25, fine inert gas bubbles can be supplied to the molten steel injection region AR1.
  • the volume ratio of inert gas in the molten steel MS can be increased, and inclusions contained in the molten steel poured into the tundish 100 from the ladle can be efficiently floated.
  • the flow rate of the molten steel MS in the molten steel injection region AR1 of the weir 20 is faster than in other regions. Therefore, by supplying the inert gas toward the molten steel injection region AR1, it is possible to increase the frequency with which the inert gas bubbles come into contact with each other. As a result, the inert gas bubbles can be made smaller. Thereby, the volume fraction of inert gas in the molten steel MS can be further increased.
  • the tundish 100 of the present invention it is possible to increase the floating effect of inclusions. Further, since inclusions can be floated with a smaller flow rate of inert gas, it is possible to suppress slag entrainment in the tundish 100.
  • the inert gas bubbles can be made finer than conventional bubbles. Fine bubbles can further enhance the floating effect of inclusions. As described above, according to the tundish 100 of the present invention, inclusions can be efficiently floated, and inclusion of inclusions in molten steel can be suppressed, making it possible to manufacture highly clean steel. .
  • Test Example 1 Inclusion measurement test
  • 300 tons of molten steel was used, which had been subjected to oxygen blowing in a converter and RH vacuum degassing treatment. This molten steel was supplied from the ladle to the tundish.
  • the number of inclusions was measured by ultrasonic flaw detection on the slabs produced by continuous casting. Regarding inclusions, those with a size of 10 ⁇ m or more were measured. The number of inclusions per 1 m 2 of the measured slab was calculated as the density.
  • FIG. 7 shows the relationship between the flow rate (R) of inert gas per unit area of the porous part and the density of inclusions in the slab. As shown in FIG. 7, when the flow rate (R) of the inert gas is lower than 0.02, the density of inclusions is higher than under other conditions.
  • the density of inclusions is lower than under other conditions.
  • the density of inclusions is lower than under the condition where no inert gas is supplied. Furthermore, under this condition, the density of inclusions is higher than under the condition where the flow rate (R) of the inert gas is 1.00 or less.
  • Test Example 2 Inclusion measurement test
  • Sample The same molten steel as in Test Example 1 was used.
  • invention example a weir was provided, and inert gas was supplied from the weir toward the molten steel injection region.
  • invention examples (Inventions 1 to 8) were carried out by changing the flow rate of the inert gas supplied from the gas supply section of the weir. The flow rates of each inert gas are shown in Table 1.
  • FIG. 8 shows the density of inclusions in the conventional example and invention examples 1 to 8. As shown in FIG. 8, it was found that the present inventions 1 to 8 had a significantly lower density of inclusions in the slab than the conventional example. In particular, in Inventions 1 to 5, the flow rate (R) of the inert gas was 0.02 to 1.00, so better results were obtained than Inventions 6 to 8.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)

Abstract

溶鋼の清浄度を高めることが可能な連続鋳造用のタンディッシュを提供する。連続鋳造用のタンディッシュは、供給された溶鋼を貯留する収容部を有する。前記収容部は、前記溶鋼を流出させる1又は複数の溶鋼流出口及び、前記1又は複数の溶鋼流出口よりも前記溶鋼の上流側に配置されかつ、中空の筒状に形成された堰を有する。前記堰は、底部と、前記底部から立設された壁部と、前記壁部の一端において周縁を覆うようにかつ、前記堰の底部と対向して設けられている庇部と、前記壁部及び前記底部によって囲まれた内部空間に不活性ガスを供給するガス供給部と、を含む。前記ガス供給部は、複数の細孔が全体に形成されているポーラス部と、前記ポーラス部を支持し、かつ前記堰の壁部に設けられている支持部と、前記支持部と前記堰の前記底部との間の前記堰の前記壁部に設けられかつ、前記不活性ガスを吐出する配管と、を含む。

Description

連続鋳造用のタンディッシュ、鋼の連続鋳造方法及び、堰
 本発明は、連続鋳造用のタンディッシュ、鋼の連続鋳造方法及び、堰に関する。
 鉄鋼材料の製造は次のようにして行われている。すなわち、取鍋からタンディッシュに供給された溶鋼は、鋳型に供給されて鋳造され鋳片となる。鋳片は、圧延等の処理によって所定の形状に成形され鉄鋼材料となる。
 溶鋼中のAl等の介在物は、鉄鋼材料の欠陥原因となるため、鋳造される前の溶鋼から分離して除去されることが好ましい。具体的には、タンディッシュにおいては、溶鋼中に含まれる介在物を浮上させて分離させることが行われている。
 このような溶鋼から介在物を除去する清浄技術は、高品質な鉄鋼材料の製造に不可欠であるため、その向上が求められている。従来においては、タンディッシュに溶鋼が供給される受鋼領域と、底部に設けられた排出口から溶鋼が排出される鋼準静止領域とを隔てる堰を設けることが行われている。
 例えば、特許文献1に記載の堰には、受鋼領域側の面から鋼準静止領域側の面まで貫通した孔が、タンディッシュの底部側において複数形成されている。したがって、溶鋼よりも比重が軽い介在物は、堰によって移動が制限される。また、溶鋼は、堰の孔を通ることにより受鋼領域側から鋼準静止領域側に移動する。
 また、特許文献2においては、特許文献1に記載された堰がタンディッシュに設けられていることに加えて、鋼準静止領域側にタンディッシュの底部から上方に向かって突出したリブが設けられている。したがって、堰の孔から介在物が鋼準静止領域側に移動したとしても、リブによってその移動方向が上方に変えられる。これにより、受鋼領域側においても介在物を浮上させることができる。
 また、特許文献3においては、特許文献1に記載された堰がタンディッシュに設けられていることに加えて、鋼準静止領域側にタンディッシュの底部から上方に向かって不活性ガスを供給することが行われている。これにより、堰の孔から介在物が鋼準静止領域側に移動したとしても、不活性ガスによって介在物を浮上させている。
特開昭53-6231号公報 特開平10-216909号公報 特開2011-143449号公報
 特許文献1のように堰をタンディッシュに設けた場合であっても、介在物が堰の孔を通過することがある。介在物が溶鋼の排出口から排出されると、鉄鋼材料の欠陥を招く恐れがある。
 また、特許文献2のようにリブによって介在物を浮上させることについては、より効果的に介在物を浮上させることが望まれており改善の余地がある。さらに、鋳造が終了した際には、リブと堰との間に溶綱が残るため、残鋼を処理するコストが高くなる問題がある。
 特許文献3のように不活性ガスを用いて介在物を浮上させる場合、十分な浮上効果を得るために、溶鋼における不活性ガスの体積率を高くしなければならない問題がある。溶鋼における不活性ガスの体積率を高くするために不活性ガスの流量を多くすると、溶鋼の表面に存在する介在物であるタンディッシュスラグが不活性ガスによって溶鋼に巻き込まれる恐れがある。溶鋼にタンディッシュスラグが巻き込まれると、溶鋼が汚染され、鉄鋼材料の欠陥を招く恐れがある。
 本発明は、上記問題に鑑みてなされたものであり、溶鋼の清浄度を高めることが可能な連続鋳造用のタンディッシュ、鋼の連続鋳造方法及び、堰を提供することを目的とする。
 上記課題を解決するため、本発明は以下の特徴を有する。
 [1]
 供給された溶鋼を貯留する収容部を有する連続鋳造用のタンディッシュであって、
 前記収容部は、前記溶鋼を流出させる1又は複数の溶鋼流出口及び、前記1又は複数の溶鋼流出口よりも前記溶鋼の上流側に配置されかつ、中空の筒状に形成された堰を有し、
 前記堰は、底部と、
 前記底部から立設された壁部と、
 前記壁部の一端において周縁を覆うようにかつ、前記堰の底部と対向して設けられている庇部と、
 前記壁部及び前記底部によって囲まれた内部空間に不活性ガスを供給するガス供給部と、を含み、
 前記ガス供給部は、複数の細孔が全体に形成されているポーラス部と、
 前記ポーラス部を支持し、かつ前記堰の壁部に設けられている支持部と、
 前記支持部と前記堰の前記底部との間の前記堰の前記壁部に設けられかつ、前記不活性ガスを吐出する配管と、を含む、連続鋳造用のタンディッシュ。
 [2]
 前記堰は、前記ポーラス部、前記支持部、前記堰の前記壁部及び、前記堰の前記底部によって囲まれた収容室を有し、
 前記配管は、前記収容室を囲む前記堰の前記壁部に設けられている、[1]に記載の連続鋳造用のタンディッシュ。
 [3]
 前記ガス供給部は、前記配管から供給される前記不活性ガスの流量を調整する調整手段を有する、[1]又は[2]に記載の連続鋳造用のタンディッシュ。
 [4]
 前記配管は、前記収容部の壁部に沿って配されかつ、耐火性を有する被覆材によって覆われている、[1]~[3]のいずれかに記載の連続鋳造用のタンディッシュ。
 [5]
 [1]~[4]のいずれかに記載の連続鋳造用のタンディッシュを用いた鋼の連続鋳造方法であって、
 下記(1)式を満たす流量で不活性ガスを吹き込む工程を含む、鋼の連続鋳造方法。
 0.02≦R≦1.00 (1)
 R:ポーラス部の単位面積当たりの不活性ガスの流量[NL/(s×m)]
 [6]
 連続鋳造用のタンディッシュに設けられかつ、中空の筒状に形成されている堰であって、
 底部と、
 前記底部から立設された壁部と、
 前記壁部の一端において周縁を覆うようにかつ、前記堰の底部と対向して設けられている庇部と、
 前記壁部及び前記底部によって囲まれた内部空間に不活性ガスを供給するガス供給部と、を含み、
 前記ガス供給部は、複数の細孔が全体に形成されているポーラス部と、
 前記ポーラス部を支持し、かつ前記壁部に設けられている支持部と、
 前記支持部と前記底部との間の前記壁部に設けられかつ、前記不活性ガスを吐出する配管と、を含む、堰。
 [7]
 前記ポーラス部、前記支持部、前記堰の前記壁部及び、前記堰の前記底部によって囲まれた収容室を有し、
 前記配管は、前記収容室を囲む前記堰の前記壁部に設けられている、[6]に記載の堰。
 [8]
 前記ガス供給部は、前記配管から供給される前記不活性ガスの流量を調整する調整手段を有する、[6]又は[7]に記載の堰。
 本発明によれば、ポーラス部を介して不活性ガスを供給することにより、細かい不活性ガスの気泡を溶鋼注入領域に供給することができる。その結果、溶鋼における不活性ガスの体積率を高くすることができ、取鍋からタンディッシュに注入された溶鋼に含まれる介在物を効率的に浮上させることができる。これにより、溶鋼の清浄度を高めることができる。
連続鋳造用のタンディッシュの構成を示す説明図である。 連続鋳造用のタンディッシュの側面を示す説明図である。 図1の堰の構成を示す説明図である。 図3の堰の上面図である。 配管が設置されている態様を示す説明図である。 配管が設置されている他の態様を示す説明図である。 単位面積当たりのガス流量と、介在物の個数密度と、の関係を示すグラフである。 従来例及び本発明の介在物の個数密度を示すグラフである。
 図1は、連続鋳造用のタンディッシュの構成を示す説明図である。図2は、連続鋳造用のタンディッシュの側面を示す説明図である。図1に示すように、連続鋳造用のタンディッシュ100は、溶鋼MSが貯留されている取鍋(図示せず)と、溶鋼MSが冷却される鋳型30と、の間に配されている。
 図1及び2に示すように、連続鋳造用のタンディッシュ(以下、単にタンディッシュと称する)100は、上部が開口しかつ、有底の箱状に形成された収容部10を有する。連続鋳造用のタンディッシュ100の収容部10は、本実施形態においては、上底が下底よりも長く形成されている逆錐台状に形成されている。
 収容部10は、取鍋のノズルN1から溶鋼MSが注入される溶鋼注入領域AR1を有する。溶鋼注入領域AR1は、ノズルN1の軸AXに沿って形成されている。言い換えれば、溶鋼注入領域AR1は、ノズルN1の先端からノズルN1の軸AXに延びて形成されている。溶鋼注入領域AR1は、ノズルN1の軸AXの周方向に拡がりをもつ領域である。
 収容部10は、鋳型に溶鋼MSを流出させる1又は複数の溶鋼流出口11を有する。図1に示されているように、本実施形態において溶鋼流出口11は、タンディッシュ100の底部12において左右方向の一端側及び、他端側に形成されている。
 収容部10は、溶鋼注入領域AR1と溶鋼流出口11との間に配置された堰20を有する。堰20は、溶鋼流出口11よりも溶鋼MSの上流側に配置される。堰20は、中空でありかつ、有底の筒状に形成されている。
 堰20は、溶鋼注入領域AR1を囲むように形成されている壁部21及び、壁部21の一端、すなわち下端側に設けられている底部22を有する。言い換えれば、壁部21は、底部22から立設されている。また、底部22は、タンディッシュ100の底部12に対向しかつ、当該底部12に接して設けられている。
 堰20は、側断面が略U字状に形成されている。堰20は、壁部21及び底部22によって囲まれた内部空間20aを有する。溶鋼注入領域AR1の一部は、堰20の内部空間20aに収容されている。
 溶鋼流出口11の各々には、タンディッシュ100と鋳型30とを接続するノズルN2が設けられている。溶鋼MSは、溶鋼流出口11からノズルN2を介して鋳型30に供給される。溶鋼MSは、鋳型30で冷却されて鋳片40となる。
 図3は、堰20の構成を示す説明図である。図4は、堰20の上面を示している。図3及び4に示すように、堰20は、壁部21の他端、すなわち上端においてその周縁を覆うようにかつ、底部22と対向して設けられている庇部23を有する。
 庇部23の形状は、特には限定されないが、溶鋼注入領域AR1側に向かって突出して形成されていることが好ましい。庇部23は、本実施形態においては、溶鋼注入部AR1側に向かって底部22と平行な方向(例えば、水平方向)に沿って延びて形成されている。
 堰20は、底部22よりも上方から溶鋼注入領域AR1に向けて不活性ガスを供給するガス供給部24を有する。ガス供給部24は、庇部23よりも下方に設けられている。言い換えれば、ガス供給部24は、底部22よりも上方から内部空間に不活性ガスを供給する。ガス供給部24から供給された不活性ガスの一部は、庇部23と接触して上昇する。
 ガス供給部24は、複数の細孔25aが全体に形成されているポーラス部25と、ポーラス部25を支持する支持部26と、を含む。また、ガス供給部24は、ポーラス部25と底部22との間の壁部21に設けられかつ、不活性ガスGSを吐出する配管27を含む。
 ポーラス部25は、セラミックスである耐火物で形成されている。このような耐火物としては、例えば、アルミナ、シリカ等の耐火性を有する無機粒子から選択される1種又は2種以上を混合して焼結されたものが挙げられる。尚、耐火物としては、アルミナを主として構成されるものが特に好ましい。
 ポーラス部25は、アルミナを主とする球状粒子を骨材とし、それらを1600℃以上で焼成することで作製することができる。ポーラス部25は、例えば、緻密質キャスタブル耐火物へ鋳込み成形して製造することができる。
 球状粒子を骨材とすることにより、ポーラス部25の細孔25aを形成することができる。ポーラス部25の細孔25aは、特には限定されないが、例えば、水銀圧入法で測定されたその平均孔径を10~40μmに形成することができる。このように細孔25aを形成することで、ポーラス部25から供給される不活性ガスの気泡を細かくすることができる。すなわち、従来の方法で不活性ガスを供給した場合、その気泡の径は100μm程度であるが、このようにして不活性ガスを供給することにより、気泡の径を従来の1/10~1/20程度にすることができる。また、ポーラス部25の細孔25aを10~40μmとすることで、不活性ガスの流量を適切に制御することが可能となる。
 ポーラス部25の形状は、特には限定されないが、本実施形態においては板状に形成されている。具体的には、図4にも示すように、上面視が矩形に形成されている。
 支持部26は、セラミックスである耐火物で形成されている。このような耐火物としては、例えば、アルミナ、シリカ等の耐火性を有する無機粒子から選択される1種又は2種以上を混合して焼結されたものが挙げられる。尚、耐火物としては、アルミナを主として構成されるものが特に好ましい。
 支持部26は、ポーラス部25の底部の縁を支持可能に枠状に形成されている。支持部26の形状は、特には限定されないが、本実施形態においては、上面視が矩形の枠状に形成されている。支持部26は、壁部21に設けられている。支持部26は、例えば、壁部21に形成された嵌合凹部(図示せず)と嵌合することにより固定されている。
 堰20は、ポーラス部25、支持部26、壁部21及び、底部22によって囲まれた収容室28を有する。収容室28を囲む壁部21には、配管27が設けられている。
 配管27は、耐火性を有するようにするとよい。図5は、配管27が設置されている態様を示している。図5にも示すように、配管27は、収容部10の壁部13に沿って配されている。また、配管27は、耐火性を有する被覆材50によって覆われている。被覆材50としては、例えば、プレキャスト耐火物を挙げることができる。また、被覆材50は、プレキャスト耐火物及び、パッチング材を組み合わせて用いてもよい。図5に示す例においては、収容部10の縁側に配される被覆材50として、プレキャスト耐火物51が配されている。また、タンディッシュ100の底部12側に配される被覆材50として、パッチング材52が配されている。
 また、被覆材50としては、パイプカバーを用いてもよい。図6は、配管27が設置されている他の態様を示している。図6に示す例では、図5に示した例で説明したプレキャスト耐火物に代えて、パイプカバー53が用いられている。また、パイプカバー53は、複数用いられてもよく、図6に示す例では、4つのパイプカバー53が配管27の軸方向に沿って接続されている。
 このように配管27を構成することにより、容易に耐火物の施工を行うことができる。また、配管27をタンディッシュ100の底部12から挿通させた場合よりも、配管27のメンテナンス性を向上させることができる。また、タンディッシュ100の底部12に対して配管27を挿通するための加工を要しないため、当該底部12から溶鋼が漏れることを抑制することが可能となる。
 配管27には、不活性ガスの流量を調整する調整手段29が設けられていることが好ましい。調整手段29としては、バルブを用いることができる。また調整手段29は、手動で操作してもよいし、図示しない制御部によって開度が調整されるようにしてもよい。
 配管27から供給された不活性ガスは、収容室28に導入される。収容室28に不活性ガスが導入されると、ポーラス部25の底部22に対向する面に不活性ガスによる圧力が一様に加わる。その結果、不活性ガスは、収容室28からポーラス部25の細孔25aを介して溶鋼注入領域AR1に供給される。このように不活性ガスを供給することにより、不活性ガスの供給態様のばらつきを抑制することができる。尚、不活性ガスとしては、特には限定されないが、Ar、N、CO等が挙げられる。
 尚、本実施形態においては、収容室28から不活性ガスをポーラス部25に供給するようにした。しかし、不活性ガスは、収容室28を介さずにポーラス部25に供給するようにしてもよい。例えば、ポーラス部25の底部22側の面を覆うことが可能なアタッチメント(図示せず)を配管27に取り付けて実施してもよい。
 鋼の連続鋳造方法は、取鍋(図示せず)に接続されたノズルN1からタンディッシュ100に溶鋼MSが供給される工程と、タンディッシュ100において溶鋼MSに含まれている介在物を除去する工程と、タンディッシュ100の溶鋼流出口11から鋳型30に溶鋼MSを流出させる工程と、鋳型30において溶鋼MSを冷却して鋳片を製造する工程と、を含む。
 タンディッシュ100において溶鋼MSに含まれている介在物を除去する工程は、下記(1)式を満たす流量で不活性ガスを吹き込む工程を含む。
 0.02≦R≦1.0    (1)
 R:ポーラス部の単位面積当たりの不活性ガスの流量[NL/(s×m)]
 ポーラス部25の単位面積当たりのガス流量(R)は、0.02~1.00NL/(s×m)でガス供給部24から供給されるとよく、0.20~1.00NL/(s×m)で供給されることがより好ましい。尚、ポーラス部25の単位面積当たりのガス流量(R)は、調整手段29によって調整することができる。
 ポーラス部25の単位面積当たりのガス流量(R)が0.02NL/(s×m)以上であることにより、溶鋼MS中の介在物の浮上を促進させることができる。
 ポーラス部25の単位面積当たりのガス流量(R)が1.00NL/(s×m)以下であることにより、タンディッシュスラグの巻き込みを防止することができる。また、このような高速流速条件で不活性ガスを吹き込むことにより、不活性ガスの気泡径をより微細にすることができる。これにより、介在物の浮上を促進させかつ、介在物の溶鋼への巻き込みを抑制することができる。
 以上のように、本発明のタンディッシュ100によれば、ポーラス部25を介して不活性ガスを供給することにより、細かい不活性ガスの気泡を溶鋼注入領域AR1に供給することができる。その結果、溶鋼MSにおける不活性ガスの体積率を高くすることができ、取鍋からタンディッシュ100に注入された溶鋼に含まれる介在物を効率的に浮上させることができる。
 また、堰20の溶鋼注入領域AR1における溶鋼MSの流速は、他の領域よりも速い。このため、溶鋼注入領域AR1に向けて不活性ガスを供給することにより、不活性ガスの気泡同士が接触する頻度を高めることができる。その結果、不活性ガスの気泡をより小さくすることができる。これにより、溶鋼MSにおける不活性ガスの体積率をさらに高めることができる。
 このため、本発明のタンディッシュ100によれば、介在物の浮上効果の増大を図ることができる。また、より少ない不活性ガスの流量で介在物を浮上させることができるため、タンディッシュ100におけるスラグ巻き込みの抑制を図ることができる。
 ノズルN1から供給された溶鋼MSは、堰20の底部22に到達するとノズルN1の軸AXの周方向に拡がるように移動する。溶鋼MSは、堰20の壁部21に達すると、続いて供給される溶鋼MSによって上方に押し上げられる。溶鋼MSは、庇部23まで達すると、ノズルN1の軸AXの中心、すなわち、溶鋼注入領域AR1に向かって移動する。
 ノズルN1の軸AXの中心、すなわち、溶鋼注入領域AR1の中央においては、様々な方向の溶鋼MSのベクトルが打ち消しあうことになる。その結果、溶鋼MSの移動速度は減速する。
 これにより、溶鋼MSが溶鋼注入領域AR1から溶鋼流出口11に直接的に流れる、いわゆる短絡流の発生を抑制することができる。したがって、多くの溶鋼MSを堰20の上方に移動させることができる。その結果、介在物を浮上させて溶鋼MSから分離させることを促すことができる。これにより、溶鋼流出口11から鋳型30に流出する介在物の量を減少させることができる。特に、本発明のタンディッシュ100によれば、不活性ガスの気泡を従来の気泡よりも微細にすることができる。微細な気泡は、介在物の浮上効果をより高めることが可能となる。このように本発明のタンディッシュ100によれば、介在物を効率よく浮上させることができ、介在物の溶鋼への巻き込みを抑制することができるため高清浄度鋼を製造することが可能になる。
 (試験例1:介在物の計測試験)
(試料)
 転炉での酸素吹錬及び、RH真空脱ガス処理が施された300トンの溶鋼を用いた。この溶鋼は、取鍋からタンディッシュに供給した。
 (連続鋳造)
 堰から吹き込む不活性ガスとしてArを用い連続鋳造を行った。具体的には、ポーラス部の単位面積当たりの不活性ガスの流量(R)を変えて、複数の試験を行った。(R:ポーラス部の単位面積当たりの不活性ガスの流量[NL/(s×m)])
 (介在物の個数測定)
 連続鋳造により作成したスラブについて、介在物の個数を超音波探傷により測定した。介在物については、10μm以上のものについて計測した。計測したスラブの1mあたりの介在物の個数を密度として算出した。
 図7に、ポーラス部の単位面積当たりの不活性ガスの流量(R)と、スラブ中の介在物の密度と、の関係を示す。図7に示されているように、不活性ガスの流量(R)が0.02よりも低い場合、介在物の密度が他の条件よりも高くなっている。
 不活性ガスの流量(R)が0.02~1.00である場合、介在物の密度が他の条件よりも低くなっている。不活性ガスの流量(R)が1.00を超える場合、不活性ガスの供給が行われない条件よりも介在物の密度が低くなっている。また、また当該条件では、不活性ガスの流量(R)が1.00以下の条件よりも介在物の密度が高くなっている。
 不活性ガスの流量(R)が0.02よりも低い場合では、当該条件においては、タンディッシュにおける介在物を浮上させる効果が十分に得られないと考えられる。このため当該条件では、介在物の密度が高くなっていると考えられる。
 また、不活性ガスの流量(R)が1.00を超える条件では、不活性ガスによってタンディッシュスラグ(介在物)が溶鋼に巻き込まれると考えられる。このため、当該条件では不活性ガスの流量(R)が0.02~1.00である場合よりも、介在物の密度が高くなっていると考えられる。
 (試験例2:介在物の計測試験)
 (試料)
 試験例1と同一の溶鋼を用いた。
 (連続鋳造)
 従来例及び発明例(本発明1~8)のタンディッシュを用いて連続鋳造を行った。また、各々のタンディッシュに吹き込む不活性ガスとしてArを用いた。具体的には従来例については、タンディッシュに堰を設けずに不活性ガスを溶鋼注入領域に向けて供給した。
 また発明例については、堰を設けて当該堰から不活性ガスを溶鋼注入領域に向けて供給した。発明例(本発明1~8)については、当該堰のガス供給部から供給される不活性ガスの流量を変えて実施した。各々の不活性ガスの流量については、表1に示す。
Figure JPOXMLDOC01-appb-T000001
 R:ポーラス部の単位面積当たりの不活性ガスの流量[NL/(s×m)]
 (介在物の個数測定)
 試験例1と同一の方法で行った。
 図8に、従来例及び発明例1~8の介在物の密度を示す。図8に示すように、本発明1~8は、従来例よりもスラブの介在物の密度が大幅に低いことがわかった。特に、本発明1~5は、不活性ガスの流量(R)が0.02~1.00であるため、本発明6~8よりも良好な結果が得られた。
 100 タンディッシュ
 10 収容部
 11 溶鋼流出口
 20 堰
 20a 内部空間
 21 壁部
 22 底部
 23 庇部
 24 ガス供給部
 25 ポーラス部
 26 支持部
 27 配管
 28 収容室
 29 調整手段
 AR1 溶鋼注入領域
 MS 溶鋼

Claims (12)

  1.  供給された溶鋼を貯留する収容部を有する連続鋳造用のタンディッシュであって、
     前記収容部は、前記溶鋼を流出させる1又は複数の溶鋼流出口及び、前記1又は複数の溶鋼流出口よりも前記溶鋼の上流側に配置されかつ、中空の筒状に形成された堰を有し、
     前記堰は、
     底部と、
     前記底部から立設された壁部と、
     前記壁部の一端において周縁を覆うようにかつ、前記堰の底部と対向して設けられている庇部と、
     前記壁部及び前記底部によって囲まれた内部空間に不活性ガスを供給するガス供給部と、を含み、
     前記ガス供給部は、複数の細孔が全体に形成されているポーラス部と、
     前記ポーラス部を支持し、かつ前記堰の壁部に設けられている支持部と、
     前記支持部と前記堰の前記底部との間の前記堰の前記壁部に設けられかつ、前記不活性ガスを吐出する配管と、を含む、連続鋳造用のタンディッシュ。
  2.  前記堰は、前記ポーラス部、前記支持部、前記堰の前記壁部及び、前記堰の前記底部によって囲まれた収容室を有し、
     前記配管は、前記収容室を囲む前記堰の前記壁部に設けられている、請求項1に記載の連続鋳造用のタンディッシュ。
  3.  前記ガス供給部は、前記配管から供給される前記不活性ガスの流量を調整する調整手段を有する、請求項1又は2に記載の連続鋳造用のタンディッシュ。
  4.  前記配管は、前記収容部の壁部に沿って配されかつ、耐火性を有する被覆材によって覆われている、請求項1又は2に記載の連続鋳造用のタンディッシュ。
  5.  前記配管は、前記収容部の壁部に沿って配されかつ、耐火性を有する被覆材によって覆われている、請求項3に記載の連続鋳造用のタンディッシュ。
  6.  請求項1又は2に記載の連続鋳造用のタンディッシュを用いた鋼の連続鋳造方法であって、
     下記(1)式を満たす流量で前記不活性ガスを吹き込む工程を含む、鋼の連続鋳造方法。
     0.02≦R≦1.00    (1)
    R:ポーラス部の単位面積当たりの不活性ガスの流量[NL/(s×m)]
  7.  請求項3に記載の連続鋳造用のタンディッシュを用いた鋼の連続鋳造方法であって、下記(1)式を満たす流量で前記不活性ガスを吹き込む工程を含む、鋼の連続鋳造方法。
     0.02≦R≦1.00    (1)
     R:ポーラス部の単位面積当たりの不活性ガスの流量[NL/(s×m)]
  8.  請求項4に記載の連続鋳造用のタンディッシュを用いた鋼の連続鋳造方法であって、下記(1)式を満たす流量で前記不活性ガスを吹き込む工程を含む、鋼の連続鋳造方法。
     0.02≦R≦1.00    (1)
     R:ポーラス部の単位面積当たりの不活性ガスの流量[NL/(s×m)]
  9.  請求項5に記載の連続鋳造用のタンディッシュを用いた鋼の連続鋳造方法であって、下記(1)式を満たす流量で前記不活性ガスを吹き込む工程を含む、鋼の連続鋳造方法。
     0.02≦R≦1.00    (1)
     R:ポーラス部の単位面積当たりの不活性ガスの流量[NL/(s×m)]
  10.  連続鋳造用のタンディッシュに設けられかつ、中空の筒状に形成されている堰であって、
     底部と、
     前記底部から立設された壁部と、
     前記壁部の一端において周縁を覆うようにかつ、前記堰の底部と対向して設けられている庇部と、
     前記壁部及び前記底部によって囲まれた内部空間に不活性ガスを供給するガス供給部と、を含み、
     前記ガス供給部は、複数の細孔が全体に形成されているポーラス部と、
     前記ポーラス部を支持し、かつ前記壁部に設けられている支持部と、
     前記支持部と前記底部との間の前記壁部に設けられかつ、前記不活性ガスを吐出する配管と、を含む、堰。
  11.  前記ポーラス部、前記支持部、前記堰の前記壁部及び、前記堰の前記底部によって囲まれた収容室を有し、
     前記配管は、前記収容室を囲む前記堰の前記壁部に設けられている、請求項10に記載の堰。
  12.  前記ガス供給部は、前記配管から供給される前記不活性ガスの流量を調整する調整手段を有する、請求項10又は11に記載の堰。
PCT/JP2023/028182 2022-09-09 2023-08-01 連続鋳造用のタンディッシュ、鋼の連続鋳造方法及び、堰 WO2024053290A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2023572688A JPWO2024053290A1 (ja) 2022-09-09 2023-08-01

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2022143846 2022-09-09
JP2022-143846 2022-09-09

Publications (1)

Publication Number Publication Date
WO2024053290A1 true WO2024053290A1 (ja) 2024-03-14

Family

ID=90190908

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2023/028182 WO2024053290A1 (ja) 2022-09-09 2023-08-01 連続鋳造用のタンディッシュ、鋼の連続鋳造方法及び、堰

Country Status (2)

Country Link
JP (1) JPWO2024053290A1 (ja)
WO (1) WO2024053290A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09164455A (ja) * 1995-12-15 1997-06-24 Kawasaki Steel Corp 溶融金属中の非金属介在物除去方法
CN203109191U (zh) * 2013-03-15 2013-08-07 濮阳濮耐高温材料(集团)股份有限公司 一种带有吹气功能的中间包稳流器
WO2013190799A1 (ja) * 2012-06-18 2013-12-27 Jfeスチール株式会社 高清浄度鋼鋳片の製造方法及びタンディッシュ
US20210053111A1 (en) * 2019-08-19 2021-02-25 Harbisonwalker International, Inc. Diffusion article
CN113564309A (zh) * 2020-04-28 2021-10-29 宝山钢铁股份有限公司 一种具有吹氩去除钢水夹杂物功能的中间包

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09164455A (ja) * 1995-12-15 1997-06-24 Kawasaki Steel Corp 溶融金属中の非金属介在物除去方法
WO2013190799A1 (ja) * 2012-06-18 2013-12-27 Jfeスチール株式会社 高清浄度鋼鋳片の製造方法及びタンディッシュ
CN203109191U (zh) * 2013-03-15 2013-08-07 濮阳濮耐高温材料(集团)股份有限公司 一种带有吹气功能的中间包稳流器
US20210053111A1 (en) * 2019-08-19 2021-02-25 Harbisonwalker International, Inc. Diffusion article
CN113564309A (zh) * 2020-04-28 2021-10-29 宝山钢铁股份有限公司 一种具有吹氩去除钢水夹杂物功能的中间包

Also Published As

Publication number Publication date
JPWO2024053290A1 (ja) 2024-03-14

Similar Documents

Publication Publication Date Title
US10562094B2 (en) Annular weir
JP4556804B2 (ja) 溶融金属の注入管および注入方法
JP6515388B2 (ja) 連続鋳造用の上ノズル
WO2024053290A1 (ja) 連続鋳造用のタンディッシュ、鋼の連続鋳造方法及び、堰
JP2005131661A (ja) タンディッシュによる高清浄度鋼の連続鋳造方法と装置
WO2024053291A1 (ja) 連続鋳造用のタンディッシュ、鋼の連続鋳造方法及び、ガス供給装置
JP5082700B2 (ja) 鋼の連続鋳造方法
KR20140129895A (ko) 연속주조용 턴디쉬
JP4815821B2 (ja) アルミキルド鋼の連続鋳造方法
JP4240916B2 (ja) タンディッシュ上ノズル及び連続鋳造方法
JP5510047B2 (ja) 連続鋳造方法および連続鋳造装置
JP7157387B2 (ja) タンディッシュ上ノズル
GB2149699A (en) Method and apparatus for avoiding vortexing in a bottom pour vessel
WO2023210201A1 (ja) タンディッシュおよびそれを用いた連続鋳造方法
JP2017177109A (ja) 連続鋳造開始時における溶鋼の注入開始方法
KR101722951B1 (ko) 침지 노즐
JP3241523B2 (ja) 溶融金属の不純物除去方法
TWI770616B (zh) 鋼液分配器上噴嘴結構體及連續鑄造方法
KR102361362B1 (ko) 웰 블록, 주조 장치 및 방법
JP4319072B2 (ja) 介在物浮上性に優れるタンディシュ
KR200267443Y1 (ko) 제강공정에서의용강중슬래그혼입저감구조
JP2024085132A (ja) 連続鋳造方法及び取鍋用の注入ノズル
JP2010069515A (ja) 鋼の連続鋳造方法
JP2022067579A (ja) ガス吹きノズル
JPS63157745A (ja) 溶鋼の介在物除去促進方法

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2023572688

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 23862833

Country of ref document: EP

Kind code of ref document: A1