WO2024047827A1 - 管理システム、管理方法及びプログラム - Google Patents

管理システム、管理方法及びプログラム Download PDF

Info

Publication number
WO2024047827A1
WO2024047827A1 PCT/JP2022/032894 JP2022032894W WO2024047827A1 WO 2024047827 A1 WO2024047827 A1 WO 2024047827A1 JP 2022032894 W JP2022032894 W JP 2022032894W WO 2024047827 A1 WO2024047827 A1 WO 2024047827A1
Authority
WO
WIPO (PCT)
Prior art keywords
risk prediction
prediction activity
activity sheet
agreement
worker
Prior art date
Application number
PCT/JP2022/032894
Other languages
English (en)
French (fr)
Inventor
雷太 工藤
Original Assignee
スパイダープラス株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by スパイダープラス株式会社 filed Critical スパイダープラス株式会社
Priority to JP2023532781A priority Critical patent/JPWO2024047827A1/ja
Priority to PCT/JP2022/032894 priority patent/WO2024047827A1/ja
Publication of WO2024047827A1 publication Critical patent/WO2024047827A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling

Definitions

  • the present invention relates to a technique effective for managing a risk prediction activity sheet for confirming dangerous matters at a construction site.
  • Non-Patent Document 1 a display board depicting letters, illustrations, and photographs, which was not available in the past, is formed using a transparent material resin on both the front and back sides of a thin material such as paper or resin film.
  • a danger prediction activity display board placed in a case is disclosed.
  • a near miss index which is the actual number of near misses at a work place within a predetermined period, is stored, and the actual number of near misses is stored.
  • a system is disclosed that outputs points of high danger and their countermeasures to a model danger prediction table.
  • a hazard prediction activity sheet is created to make workers aware of the dangers at the site, and workers on the site who are aware of the dangers sign this hazard prediction activity sheet.
  • This risk prediction activity sheet is generally kept for three years or more, but since the risk prediction activity sheet is signed on paper, there is a risk of it being lost and it is difficult to secure storage space.
  • Non-Patent Document 1 and Patent Document 1 it is not possible to electronically present information regarding risk prediction activities to workers, obtain electronic signatures, and manage the trail at a later date. There wasn't. Therefore, the present inventor focused on a mechanism for confirming whether the terms agreed upon with the workers are being followed.
  • An object of the present invention is to provide a management system, a management method, and a program that make it possible to confirm whether agreements with workers are being followed by utilizing a risk prediction activity sheet.
  • the present invention is a management system for managing a risk prediction activity sheet for confirming dangerous matters at a construction site, a sheet acquisition unit that acquires the risk prediction activity sheet; a sheet output unit that outputs the acquired risk prediction activity sheet to a terminal used by a worker at the construction site where the dangerous matter is targeted; an agreement acquisition unit that acquires consent from the worker to the outputted risk prediction activity sheet; an agreement recording unit that records that the worker has agreed to the risk prediction activity sheet based on the obtained agreement; an agreement output unit that outputs the recorded agreement to a terminal used by a site supervisor at the construction site; a pointed-out acquisition unit that acquires, from the on-site supervisor, work contents in which the contents of the agreement are not complied with as pointed out matters; a pointed matter recording unit that records the acquired pointed matters; a pointed-out matter notification unit that notifies a foreman among the workers at the construction site of the recorded pointed-out matters; Provides a management system with.
  • a management system that manages a risk prediction activity sheet for confirming dangerous matters at a construction site acquires the risk prediction activity sheet and applies the acquired risk prediction activity sheet to the object of the dangerous matter. output to a terminal used by a worker at a construction site, obtain consent from the worker for the outputted risk prediction activity sheet, and based on the obtained agreement, the worker uses the risk prediction activity sheet. Record what has been agreed upon, output the recorded agreement to a terminal used by the site supervisor at the construction site, and obtain from the site supervisor the details of the work in which the contents of the agreement are not complied with as points to be pointed out. The points pointed out are recorded and the foreman among the workers at the construction site is notified of the recorded points pointed out.
  • the danger prediction activity sheet it is possible to use the danger prediction activity sheet to confirm whether the agreements with the workers are being followed.
  • FIG. 1 is a diagram illustrating an overview of a management system 1.
  • FIG. 1 is a diagram showing a functional configuration of a management system 1.
  • FIG. 3 is a diagram showing a flowchart of sheet acquisition processing executed by the management system 1.
  • FIG. 2 is a diagram schematically showing an example of a risk prediction activity sheet.
  • FIG. 2 is a diagram schematically showing an example of a work-related input form. It is a diagram showing only the work content column in the danger prediction activity sheet 40.
  • FIG. 2 is a diagram schematically showing an example of a KY record input form.
  • FIG. 2 is a diagram schematically showing an example of a form for confirming safety instructions.
  • FIG. 4 is a diagram showing only the main contractor safety instructions column in the risk prediction activity sheet 40.
  • FIG. 4 is a diagram showing only the main contractor safety instructions column in the risk prediction activity sheet 40.
  • FIG. 2 is a diagram schematically showing an example of a KY activity input form.
  • FIG. 2 is a diagram schematically showing an example of a KY activity input form. It is a diagram showing only the hazardous factors column in the risk prediction activity sheet 40. It is a diagram showing only the preventive measures column in the risk prediction activity sheet 40.
  • 3 is a diagram showing a flowchart of approval processing executed by the management system 1.
  • FIG. 2 is a diagram schematically showing an example of an approval input form.
  • 3 is a diagram showing only the approval column in the risk prediction activity sheet 40.
  • FIG. 3 is a diagram showing a flowchart of preliminary output processing executed by the management system 1.
  • FIG. 2 is a diagram showing a flowchart of an agreement acquisition process executed by the management system 1.
  • FIG. 2 is a diagram schematically showing an example of an agreement input form.
  • 4 is a diagram showing only the agreement column in the risk prediction activity sheet 40.
  • FIG. 2 is a diagram showing a flowchart of an agreement notification process executed by the management system 1.
  • FIG. 2 is a diagram showing a flowchart of communication processing executed by the management system 1.
  • FIG. FIG. 2 is a diagram showing a flowchart of a pointed-out matter notification process executed by the management system 1.
  • FIG. FIG. 2 is a diagram schematically showing an example of a form for inputting points to be pointed out.
  • FIG. 2 is a diagram schematically showing an example of a form for confirming pointed matters.
  • 4 is a diagram showing only the correction instruction record column in the risk prediction activity sheet 40.
  • FIG. 3 is a diagram showing a flowchart of overall notification processing executed by the management system 1.
  • FIG. 2 is a diagram showing a flowchart of daily report generation processing executed by the management system 1.
  • the worker terminal 20 in this specification does not necessarily have to be a terminal owned and managed by the worker himself, but may be a terminal that the worker can use (for example, a terminal installed at a construction site or a terminal installed by a craftsman). A terminal borrowed from the foreman) is fine.
  • the site supervisor terminal 30 in this specification does not need to be a terminal owned and managed by the site supervisor himself, and may be any terminal that can be used by the site supervisor (for example, a terminal installed at a construction site).
  • FIG. 1 is a schematic diagram for explaining an overview of the management system 1.
  • a computer 10 having a server function realizes processing for managing a risk prediction activity sheet for confirming dangerous matters at a construction site.
  • the management system 1 may be any system as long as it includes a computer 10 having at least a server function.
  • This computer 10 may be realized by, for example, one computer, or may be realized by a plurality of computers such as a cloud computer.
  • a cloud computer refers to one that uses any computer in a scalable manner to perform a certain function, or one that includes multiple functional modules to realize a certain system, and whose functions can be freely combined. It can be anything.
  • the management system 1 includes, in addition to the computer 10, a worker terminal 20 used by workers such as foremen and craftsmen at a construction site, and a site supervisor terminal 30 used by a site supervisor at the construction site.
  • a computer 10 In the management system 1, a computer 10, a worker terminal 20, and a site supervisor terminal 30 cooperate to realize various processes.
  • the terminal devices constituting the management system 1 are merely examples, and the number, types, and functions of each terminal device other than the computer 10 can be changed as appropriate.
  • the computer 10 obtains a risk prediction activity sheet (step S1).
  • the computer 10 acquires a risk prediction activity sheet created by a worker (foreman).
  • the worker terminal 20 transmits the risk prediction activity sheet created by the worker to the computer 10.
  • the computer 10 obtains the risk prediction activity sheet by receiving this risk prediction activity sheet.
  • the computer 10 outputs the acquired risk prediction activity sheet to a terminal (worker terminal 20) used by a worker at the construction site where the hazardous matter is targeted (step S2).
  • the computer 10 transmits the acquired danger prediction activity sheet to the worker terminal 20 of the worker (craftsman) at the construction site where the dangerous matter is targeted.
  • the worker terminal 20 receives this danger prediction activity sheet and displays it on its own display section.
  • the computer 10 displays the hazard prediction activity sheet on the worker terminal 20 of the worker at the construction site where the hazardous matter is targeted, so that the acquired hazard prediction activity sheet is used by the worker at the construction site where the hazardous matter is targeted. output to the terminal.
  • the computer 10 obtains consent from the worker to the output risk prediction activity sheet (step S3). After viewing the danger prediction activity sheet by the worker (craftsman), the worker terminal 20 accepts an input of agreement regarding the danger prediction activity sheet. The worker terminal 20 transmits the received agreement to the computer 10. By receiving this agreement, the computer 10 obtains agreement from the worker to the output risk prediction activity sheet.
  • the computer 10 records that the worker has agreed to the risk prediction activity sheet (step S4).
  • the computer 10 records that the worker has agreed to the risk prediction activity sheet, and also records that the worker has agreed to the risk prediction activity sheet.
  • the computer 10 records the worker's name on the risk prediction activity sheet.
  • the computer 10 outputs the recorded agreement to a terminal (site supervisor terminal 30) used by the construction site supervisor (step S5).
  • the computer 10 transmits the risk prediction activity sheet on which the agreement is recorded to the site supervisor terminal 30.
  • the site supervisor terminal 30 receives this risk prediction activity sheet and displays it on its own display unit.
  • the computer 10 outputs the recorded agreement to a terminal used by the construction site supervisor by displaying the risk prediction activity sheet on the site supervisor terminal 30.
  • the computer 10 acquires from the site supervisor the contents of the work in which the contents of the agreement are not complied with as points to be pointed out (step S6).
  • the site supervisor terminal 30 receives the input of the points pointed out, and transmits the received points pointed out to the computer 10. By receiving this pointed matter, the computer 10 acquires from the site supervisor the contents of the work in which the contents of the agreement are not complied with as pointed out matters.
  • the computer 10 records the obtained findings (step S7).
  • the computer 10 records the acquired points themselves and also records the acquired points on the risk prediction activity sheet.
  • the computer 10 records the date, location, and content based on the acquired points on the risk prediction activity sheet.
  • the computer 10 notifies the foreman among the workers at the construction site of the recorded points (step S8).
  • the computer 10 transmits the danger prediction activity sheet in which the points noted are recorded to the worker terminal 20 used by the foreman among the workers at the construction site.
  • the worker terminal 20 receives this danger prediction activity sheet and displays it on its own display section.
  • the computer 10 notifies the foreman among the workers at the construction site of the recorded points by displaying this danger prediction activity sheet on the worker terminal 20.
  • FIG. 2 is a block diagram showing the configuration of the management system 1.
  • the management system 1 is a system that manages a risk prediction activity sheet for confirming dangerous matters at a construction site, and is composed of at least a computer 10.
  • the management system 1 includes a foreman terminal 20a used by a foreman, a craftsman terminal 20b used by a craftsman, and a site supervisor terminal 30 used by a site supervisor.
  • the foreman and the craftsman are collectively referred to as a worker
  • the foreman terminal 20a and the craftsman terminal 20b are collectively referred to as the worker terminal 20.
  • the management system 1 is a system in which a computer 10 and each terminal device are connected to enable data communication via a network 8 such as a public line network.
  • a network 8 such as a public line network.
  • the terminal devices constituting the management system 1 are merely examples, and the number, types, and functions of each terminal device other than the computer 10 can be changed as appropriate.
  • the computer 10 has a server function, and may be implemented by, for example, one computer or multiple computers such as a cloud computer.
  • the computer 10 includes a CPU (Central Processing Unit), a GPU (Graphics Processing Unit), a RAM (Random Access Memory), a ROM (Read Only Memory), etc. as a control unit, and as a communication unit, with other terminals, devices, etc.
  • a device for enabling communication a sheet acquisition unit 11 that acquires a hazard prediction activity sheet, a sheet output unit 12 that outputs the acquired hazard prediction activity sheet to a terminal used by a worker at the construction site where the hazardous matter is targeted, and work.
  • the computer 10 includes, as a recording unit, a data storage unit such as a hard disk, a semiconductor memory, a recording medium, a memory card, or the like.
  • the computer 10 includes, as a processing unit, various devices that execute various processes, an agreement recording unit 17 that records that the worker has agreed to the hazard prediction activity sheet based on the acquired agreement, and an indication unit that records the acquired points. It includes a matter recording section 18 and the like.
  • the control section works with the communication section to generate a sheet acquisition module, a site supervisor output module, an approval acquisition module, a preliminary output module, a sheet output module, an agreement acquisition module, and an agreement output module.
  • Module, agreement notification module, content reception module, content notification module, site supervisor response reception module, worker response notification module, pointed matter acquisition module, pointed matter notification module, worker response reception module, site supervisor response notification module, improvement results Realize the acquisition module and general notification module.
  • the control section cooperates with the recording section to realize a sheet recording module and a daily report recording module.
  • control unit by reading a predetermined program, the control unit cooperates with the processing unit to create a site supervisor identification module, an approval record module, a worker identification module, an agreement record module, a tabulation module, an appearance record module, Realizes a department identification module, a pointed-out reflection module, a pointed-out recording module, an improvement result recording module, and a generation module.
  • the foreman terminal 20a used by the foreman, the craftsman terminal 20b used by the craftsman, and the site supervisor terminal 30 used by the site supervisor are, for example, a mobile terminal such as a mobile phone, a smartphone, a tablet terminal, or a terminal such as a personal computer. be.
  • Each of these terminal devices is equipped with a CPU, GPU, RAM, ROM, etc. as a terminal control section, a device etc. to enable communication with other terminals or devices as a communication section, and an input/output section.
  • the system is equipped with devices for inputting and outputting various information.
  • each module may execute its processing content as its own function, or may execute it via a predetermined application.
  • the sheet acquisition module acquires a risk prediction activity sheet (step S10).
  • the risk prediction activity sheet is, for example, a sheet for recording risk countermeasures for work at a construction site and disseminating them to workers (see FIG. 4).
  • the hazard prediction activity sheet includes at least items on work content, hazardous factors, and preventive measures.
  • the sheet acquisition module acquires the risk prediction activity sheet from the foreman terminal 20a.
  • the danger prediction activity sheet will be explained based on FIG. 4.
  • This figure is a diagram schematically showing an example of a risk prediction activity sheet.
  • a danger prediction activity sheet 40 is shown.
  • the hazard prediction activity sheet consists of a work content column 41 for recording the work details, a prime contractor safety instructions column 42 for recording safety instructions from the site supervisor, a hazard factor column 43 for recording hazardous factors in the work, and a hazardous factor column 43 for recording hazardous factors in the work.
  • a preventive measures column 44 records preventive measures against the cause
  • an approval column 45 records that the site supervisor has approved the contents written on the hazard prediction activity sheet 40
  • It consists of an agreement column 46 for recording what has been agreed upon, and a correction instruction record column 47 for recording the contents of correction instructions given by the site supervisor.
  • the risk prediction activity sheet 40 includes columns other than these, a detailed explanation of the columns other than these will be omitted. Details of each column will be described later.
  • the risk prediction activity sheet 40 input contents are recorded in columns corresponding to the input contents based on inputs from the worker terminal 20 and the site supervisor terminal 30.
  • the risk prediction activity sheet 40 may include at least a work content column 41, a hazardous factor column 43, and a preventive measures column 44. Further, the position, size, notation, etc. of each column in the risk prediction activity sheet 40 are not limited to the example described above, and can be changed as appropriate.
  • the process when the foreman terminal 20a creates a risk prediction activity sheet will be explained.
  • the foreman terminal 20a receives input from the foreman into a predetermined input form, and creates a risk prediction activity sheet based on the received input contents.
  • the work content column 41 will be explained.
  • the foreman terminal 20a accepts input of the content to be recorded in the work content column 41 (see FIG. 6) in the risk prediction activity sheet 40 in the work-related input form (see FIG. 5) displayed to the foreman based on predetermined input. .
  • the work-related input form will be explained based on FIG. 5.
  • This figure is a diagram schematically showing an example of a work-related input form.
  • a work-related input form 50 is shown.
  • the work-related input form 50 includes a work content input field 51 that accepts input of work content, an essential qualification input field 52 that accepts input of names and numbers of required qualifications, and qualifications that accepts input of names and numbers of qualification holders. It consists of a holder input field 53.
  • the foreman terminal 20a accepts character input using a virtual keyboard or the like in a work content input field 51, an essential qualification input field 52, and a qualification holder input field 53. Although not shown, in addition to these contents, the foreman terminal 20a also accepts input of the name of the organization to which the foreman belongs and his own name in the corresponding columns.
  • the work content column 41 in the danger prediction activity sheet 40 will be explained. This figure shows only the work content column 41 in the risk prediction activity sheet 40 described above.
  • the work content field 41 includes a work content record field 411, a qualification record field 412, and an affiliation record field 413.
  • the work content recording field 411 is a field in which the contents input into the work content input field 51 are recorded.
  • the qualification record field 412 is a field in which the contents of inputs received in the essential qualification input field 52 and the qualification holder input field 53 are recorded.
  • the affiliation record column 413 is a column in which the name of the foreman's affiliation and the name of the foreman whose input has been accepted are recorded.
  • the foreman terminal 20a records the input contents received on the work-related input form 50 in each column of the work content column 41, and creates a risk prediction activity sheet.
  • the site supervisor terminal 30 registers safety instructions in the KY (hazard prediction) record input form (see FIG. 7) displayed on itself based on predetermined input.
  • the foreman terminal 20a inputs the contents shown in the safety instruction confirmation form (see FIG. 8) displayed to the foreman based on the safety instructions registered by the foreman into the prime contractor safety instructions field on the danger prediction activity sheet 40. 42 (see FIG. 9).
  • the KY record input form will be explained based on FIG. 7.
  • FIG. 7 is a diagram schematically showing an example of a KY record input form.
  • a KY record input form 60 is shown.
  • the KY record input form 60 includes a confirmation form 61 for confirming registered safety instructions and a registration form 62 for registering safety instructions.
  • the confirmation form 61 consists of a list 610 for each item.
  • the site supervisor terminal 30 receives input from the site supervisor regarding the items displayed in the list 610, and displays the registration form 62 superimposed on the list 610.
  • the registration form 62 includes an instruction message input field 620, a dangerous place input field 621, and a registration icon 622.
  • the on-site supervisor terminal 30 accepts character input using a virtual keyboard or the like in the instruction message input field 620 and the dangerous area input field 621.
  • the site supervisor terminal 30 accepts the safety instructions in the registration form 62 using different input methods depending on whether the safety instructions are common to all companies or the safety instructions are specific to each company.
  • the site supervisor terminal 30 accepts the input from all vendors at once. On the other hand, the site supervisor terminal 30 accepts the input on a per trader basis if the input is on a per trader basis.
  • the site supervisor terminal 30 accepts the input to the registration icon 622, reflects the contents input in the instruction message input field 620 and the dangerous place input field 621 in the list 610, and registers the safety instructions.
  • the foreman terminal 20a receives a predetermined input and displays the safety instructions registered by the foreman terminal 30 on its own display section. Display the safety instruction confirmation form (see Figure 8).
  • the safety instruction confirmation form will be explained based on FIG. 8. This figure is a diagram schematically showing an example of a form for confirming safety instructions.
  • the safety instructions confirmation form 70 includes a safety instructions column 71.
  • the safety instructions column 71 is a column in which the contents of the safety instructions registered by the site supervisor terminal 30 are reflected.
  • the main contractor safety instructions column 42 in the risk prediction activity sheet 40 will be explained. This figure shows only the prime contractor safety instruction field 42 in the risk prediction activity sheet 40 described above.
  • the main contractor safety instructions column 42 is a column in which the contents reflected in the safety instructions column 71 are recorded.
  • the foreman terminal 20a receives a predetermined input, records the contents reflected in the safety instructions field 71 in the main contractor safety instructions field 42, and creates a danger prediction activity sheet.
  • the foreman terminal 20a displays the KY activity input form (see FIGS. 10 and 11) based on predetermined input, and the foreman terminal 20a enters the hazard factor column 43 (see FIG. 12) and the preventive measures column in the risk prediction activity sheet 40. 44 (see FIG. 13).
  • the KY activity input form will be explained based on FIGS. 10 and 11.
  • This figure is a diagram schematically showing an example of a KY activity input form.
  • a KY activity input form 80 is shown.
  • the bottom of the KY activity input form 80 shown in FIG. 10 and the top of the KY activity input form shown in FIG. 11 are connected, but are shown as different drawings due to space limitations.
  • the KY activity input form 80 includes a risk input field 81, a first possibility input field 82, a first severity input field 83, a first risk evaluation input field 84, a priority input field 85, and a countermeasure input field 86. , a second possibility input field 87, a second severity input field 88, a second risk evaluation input field 89, a residual risk input field 90, a temporary storage icon 91, and a registration icon 92.
  • the foreman terminal 20a accepts character input using a virtual keyboard or the like in the danger input field 81 and countermeasure input field 86.
  • the risk input field 81 and countermeasure input field 86 are fields that accept input regarding at least the timing, cause, and phenomenon.
  • the content that is accepted as input is, for example, that a phenomenon occurs depending on the timing and cause.
  • the foreman terminal 20a has a first possibility input field 82, a first severity input field 83, a first risk evaluation input field 84, a priority input field 85, a second possibility input field 87, and a second severity input field.
  • the input field 88, the second risk evaluation input field 89, and the residual risk input field 90 accept selection inputs by tapping or the like on each number.
  • the foreman terminal 20a also accepts similar inputs such as the name of the company to which the foreman belongs and his/her own name in the corresponding columns.
  • the foreman terminal 20a When the foreman terminal 20a receives the input of the temporary storage icon 91, the foreman terminal 20a temporarily stores the input contents in the KY activity input form 80. When the foreman terminal 20a receives the input of the registration icon 92, the foreman terminal 20a records the contents input into the KY activity input form 80 on the risk prediction activity sheet.
  • the first risk assessment input field 84 does not accept selection input for each number, but automatically inputs the results of selection input for the first possibility input field 82 and first severity input field 83. It may be something that you do.
  • the second risk evaluation input field 89 similarly to the first risk evaluation input field 84, the results of the selection input for the second possibility input field 87 and the second severity input field 88 are automatically input.
  • the hazardous factor column 43 includes a period record column 431, a cause record column 432, a phenomenon record column 433, and a numerical value record column 434.
  • the period record column 431, the cause record column 432, and the phenomenon record column 433 are columns in which the contents of the input received in the danger input column 81 are recorded.
  • the period record column 431 is a column in which contents related to the period among the contents input in the danger input column 81 are recorded.
  • the cause record column 432 is a column in which contents related to causes among the contents input in the danger input column 81 are recorded.
  • the phenomenon record column 433 is a column in which contents related to the phenomenon among the contents input in the danger input column 81 are recorded.
  • the period record column 431 records words and phrases indicating the timing (for example, contents written as "When")
  • the cause record column 432 records words and phrases indicating the cause (for example, contents written as "Because") ) is recorded
  • the phenomenon record field 433 records a phrase indicating the phenomenon (for example, content written as "").
  • the numerical value record field 434 records the numerical values input into each of the first possibility input field 82, the first severity input field 83, the first risk assessment input field 84, and the priority input field 85. This is the column where The foreman terminal 20a records the input contents received in the KY activity input form 80 in each column of the hazardous factor column 43, thereby creating a risk prediction activity sheet. Based on FIG. 13, the preventive measures column 44 in the risk prediction activity sheet 40 will be explained.
  • the preventive measures column 44 includes a period record column 441 and a countermeasure record column 442.
  • the period record column 441 and the countermeasure record column 442 are columns in which the contents of inputs received in the countermeasure input column 86 are recorded.
  • the period record column 441 is a column in which contents related to the period among the contents input into the countermeasure input column 86 are recorded.
  • the countermeasure record column 442 is a column in which contents related to countermeasures among the contents input into the countermeasure input column 86 are recorded. In the period record column 441 and the countermeasure record column 442, when the format of the input content to be accepted is specified in advance, the content in accordance with this format is recorded in each column.
  • the period record column 441 records words and phrases indicating the period (for example, "when to do"), and the countermeasure record column 442 records words and phrases indicating the countermeasure (for example, "to do"). record the contents). For example, if the format of the input content is "When doing D, do E and F,” record “When doing D” in the period record column 441 and "Do E, then F” in the countermeasure record column 442. do.
  • the foreman terminal 20a records the input contents received in the KY activity input form 80 in each column of the preventive measures column 44, and creates a risk prediction activity sheet.
  • the preventive measures column 44 includes a second possibility input column 87, a second severity input column 88, a second risk evaluation input column 89, and a residual risk input column 90, similar to the above-mentioned hazardous factor column 43.
  • Each column may include a numerical value recording column for recording the numerical value input.
  • the sheet acquisition module is described as acquiring the risk prediction activity sheet created by the foreman terminal 20a, but the computer 10 may also be configured to create the risk prediction activity sheet.
  • the foreman terminal 20a transmits to the computer 10 the contents entered into each column of each form.
  • the computer 10 receives this content, records the content entered in each column in each form on the risk prediction activity sheet in a preset format, and creates the risk prediction activity sheet.
  • the foreman terminal 20a receives input from the foreman and transmits the risk prediction activity sheet created as a result of the above-described processing to the computer 10.
  • the sheet acquisition module acquires the danger prediction activity sheet by receiving this danger prediction activity sheet.
  • the sheet recording module records the acquired risk prediction activity sheet (step S11).
  • the sheet recording module records the acquired risk prediction activity sheet in association with a construction site identifier (for example, name, management number, address), etc.
  • the construction site identifier may also include the identifier of the worker who will work at this construction site (e.g., name, management number, ID) and the identifier of the site supervisor of this construction site (e.g., name, management number). , ID), etc. may be associated with each other.
  • the above is the sheet acquisition process.
  • the management system 1 uses the risk prediction activity sheet acquired through the sheet acquisition process described above to execute the process described below.
  • the approval process executed by the computer 10 will be explained based on FIG. 14.
  • This figure is a flowchart of the approval process executed by the computer 10.
  • This approval process is a process executed after the sheet acquisition process described above.
  • this approval process is a process executed before the process (step S40) of outputting the risk prediction activity sheet to a terminal used by a worker at a construction site, at least in the pre-output process described later and the agreement acquisition process described later. It is.
  • the site supervisor identification module identifies the site supervisor of the construction site targeted by the risk prediction activity sheet (step S20).
  • the site supervisor identification module identifies the identifier of the construction site supervisor associated with the recorded risk prediction activity sheet.
  • the site supervisor output module outputs the acquired risk prediction activity sheet to the terminal used by the specified site supervisor (step S21).
  • the site supervisor output module transmits the acquired and recorded risk prediction activity sheet to the site supervisor terminal 30 used by the specified site supervisor.
  • the on-site supervisor output module may transmit the danger prediction activity sheet itself to the on-site supervisor terminal 30, or may send a danger prediction activity sheet such as a URL (Uniform Resource Locator) for accessing the recorded danger prediction activity sheet. It is also possible to send something other than the prediction activity sheet itself.
  • the site supervisor terminal 30 receives this risk prediction activity sheet and displays it on its own display unit.
  • the foreman views the danger prediction activity sheet displayed by the foreman terminal 30 and confirms the danger prediction activity sheet prepared by the foreman.
  • the site supervisor output module outputs the acquired risk prediction activity sheet to the terminal used by the specified site supervisor by displaying this risk prediction activity sheet on the site supervisor terminal 30.
  • the approval acquisition module obtains approval for the output risk prediction activity sheet from the site supervisor (step S22).
  • the site supervisor terminal 30 accepts a predetermined input and displays an approval input form (see FIG. 15) on its own display unit.
  • the site supervisor terminal 30 accepts the approval input in this approval input form, and transmits the approval to the risk prediction activity sheet to the computer 10.
  • the approval input form will be explained based on FIG. 15.
  • This figure is a diagram schematically showing an example of an approval input form.
  • an approval input form 100 is shown.
  • the approval input form 100 includes a confirmation icon 101 and an approval icon 102.
  • the site supervisor terminal 30 receives an input of the confirmation icon 101 from the site supervisor when the site supervisor confirms the risk prediction activity sheet.
  • the site supervisor terminal 30 further receives an input of the approval icon 102 from the site supervisor. Upon receiving the input of the approval icon 102, the site supervisor terminal 30 transmits to the computer 10 approval information indicating that the site supervisor has confirmed and approved the risk prediction activity sheet. This approval information includes information regarding the output risk prediction activity sheet, the name of the site supervisor, etc. By receiving this approval information, the approval acquisition module obtains approval for the output risk prediction activity sheet from the site supervisor.
  • the approval recording module records that the site supervisor has approved the risk prediction activity sheet based on the obtained approval (step S23).
  • the approval recording module records the approval on the risk prediction activity sheet based on the obtained approval.
  • the approval record module records in the approval column 45 of the risk prediction activity sheet 40 that the site supervisor has approved the risk prediction activity sheet 40 (see FIG. 16).
  • the approval column 45 in the risk prediction activity sheet 40 will be explained. This figure shows only the approval column 45 in the risk prediction activity sheet 40 described above.
  • the approval column 45 is a column for recording that the site supervisor has approved the contents written on the risk prediction activity sheet 40.
  • the approval recording module records the name of the site supervisor in this approval column 45. Note that the approval column 45 is not limited to the name of the on-site supervisor, and the recording method is not particularly limited as long as the content indicates that the on-site supervisor has approved.
  • the above is the approval process.
  • the management system 1 uses the risk prediction activity sheet approved by the above-described approval process to execute the process described below. Note that the management system 1 does not necessarily need to execute the approval process, and a configuration in which it does not execute the approval process is also possible.
  • FIG. 17 is a diagram showing a flowchart of preliminary output processing executed by the computer 10.
  • This pre-output process is a process executed after the above-described approval process.
  • this pre-output process is a process that is executed at least before the work day of the construction site. Note that if the approval process is not executed, the pre-output process may be executed at least before the work day of the construction site.
  • the worker identification module identifies the worker at the construction site who is the target of the risk prediction activity sheet (step S30).
  • the worker identification module identifies the worker at the construction site who is the target of the risk prediction activity sheet, based on the identifier of the worker associated with the recorded risk prediction activity sheet.
  • the worker identification module identifies foremen and craftsmen as workers. At this time, the worker identification module may identify foremen and craftsmen who belong to a specific company, or may identify all foremen and craftsmen who work at the construction site.
  • the advance output module outputs the acquired risk prediction activity sheet to a terminal used by a worker at the specified construction site (step S31).
  • the preliminary output module transmits the acquired risk prediction activity sheet to a terminal (worker terminal 20 (specifically, craftsman terminal 20b)) used by the specified worker.
  • the preliminary output module may be one that sends the acquired risk prediction activity sheet itself to the craftsman terminal 20b, or it may send information other than the risk prediction activity sheet itself, such as a URL for accessing the recorded risk prediction activity sheet. It may also be something that sends something.
  • the craftsman terminal 20b receives this risk prediction activity sheet and displays it on its own display section.
  • the advance output module outputs the obtained risk prediction activity sheet to the terminal used by the worker at the specified construction site by displaying this risk prediction activity sheet on the craftsman terminal 20b.
  • the preliminary output module may output this risk prediction activity sheet not only to the craftsman terminal 20b but also to the foreman terminal 20a.
  • the craftsman can grasp in advance the dangers at the construction site where he is scheduled to work.
  • the management system 1 does not necessarily need to execute the pre-output process, and a configuration in which it does not execute the pre-output process is also possible.
  • This agreement acquisition process executed by the computer 10 includes a sheet output process (step S2) in which the acquired hazard prediction activity sheet is output to a terminal used by a worker at the construction site where the hazard is to be addressed; Consensus acquisition processing (step S3) to obtain agreement; agreement recording processing (step S4) to record that the worker has agreed to the hazard prediction activity sheet based on the obtained agreement; and the recorded agreement to be recorded at the construction site.
  • step S5 details of the agreement output process (step S5) that is output to the terminal used by the director.
  • This agreement acquisition process is a process executed after the sheet acquisition process described above, and is a process executed after the approval process and pre-output process described above.
  • the worker identification module identifies the worker at the construction site who is subject to the hazardous matter (step S40).
  • the worker identification module identifies the worker at the construction site who is subject to the hazardous matter that is the subject of the risk prediction activity sheet, based on the identifier of the worker associated with the recorded risk prediction activity sheet.
  • the worker identification module identifies foremen and craftsmen as workers. At this time, the worker identification module may identify foremen and craftsmen who belong to a specific company, or may identify all foremen and craftsmen who work at the construction site.
  • the sheet output module outputs the acquired risk prediction activity sheet to a terminal used by a worker at the construction site where the hazard is to be dealt with (step S41).
  • the sheet output module transmits the acquired risk prediction activity sheet to a terminal (worker terminal 20 (specifically, craftsman terminal 20b)) used by a worker at the construction site that is the target of the identified danger.
  • the sheet output module may be one that sends the danger prediction activity sheet itself to the craftsman terminal 20b, or it may send something other than the danger prediction activity sheet itself, such as a URL for accessing the recorded danger prediction activity sheet. It may also be something that sends.
  • the craftsman terminal 20b receives this risk prediction activity sheet and displays it on its own display section.
  • the sheet output module causes the craftsman terminal 20b to display this danger prediction activity sheet, thereby outputting the acquired danger prediction activity sheet to a terminal used by a worker at the construction site where the hazardous matter is targeted.
  • the craftsman can grasp dangers at the construction site where he is scheduled to work.
  • the agreement acquisition module acquires agreement on the output risk prediction activity sheet from the worker (step S42). After viewing the danger prediction activity sheet by the craftsman, the craftsman terminal 20b accepts a predetermined input and displays the agreement input form on its display (see FIG. 19). The craftsman terminal 20b receives an input of agreement from the craftsman in this agreement input form, and transmits the received agreement to the risk prediction activity sheet to the computer 10.
  • the agreement input form will be explained based on FIG. 19.
  • This figure is a diagram schematically showing an example of an agreement input form.
  • an agreement input form 110 is shown.
  • the agreement input form 110 includes a sheet field 111 for displaying the risk prediction activity sheet 40 and an agreement icon 112.
  • the craftsman terminal 20b receives an input of the agreement icon 112 from the craftsman when the craftsman views the danger prediction activity sheet 40 displayed in the sheet field 111 and agrees to the danger prediction activity sheet 40.
  • the craftsman terminal 20b receives the input of the agreement icon 112
  • the craftsman views the risk prediction activity sheet 40 and sends agreement information indicating that the craftsman has agreed to the activity sheet 40 to the computer 10.
  • This agreement information includes the name of the craftsman who has agreed to the risk prediction activity sheet 40.
  • the agreement acquisition module acquires agreement from the worker to the output risk prediction activity sheet. Note that the content that the craftsman terminal 20b accepts as input is not limited to input using the agreement icon 112, but may also include handwritten input of one's own name, electronic seal, or the like.
  • the agreement recording module records that the worker has agreed to the risk prediction activity sheet based on the obtained agreement (step S43).
  • the agreement record module records that the workers have agreed to the contents written on the hazard prediction activity sheet.
  • the agreement recording module records what the workers have agreed to, and also records what the workers have agreed to on the risk prediction activity sheet.
  • the agreement recording module Based on the acquired agreement of the craftsman, the agreement recording module records in the agreement column 46 of the hazard prediction activity sheet 40 that the craftsman has agreed to the hazard prediction activity sheet 40 (see FIG. 20).
  • the agreement column 46 in the risk prediction activity sheet 40 will be explained. This figure shows only the agreement column 46 in the risk prediction activity sheet 40 described above.
  • the agreement column 46 consists of an agreement record column 461 for recording that the craftsman has agreed to the contents written in the hazard prediction activity sheet 40, and an appearance record column 462 for recording the tally of workers' appearances at the construction site.
  • the agreement record column 461 is a column for recording the workers who have agreed.
  • the agreement record column 461 records the name of the craftsman and the name of the foreman.
  • the appearance recording column 462 is a column for recording the appearance totaled by the process of step S47, which will be described later. The details of the appearance recorded in the appearance recording column 462 will be described later.
  • the agreement recording module records the name of the craftsman who obtained the agreement in the agreement recording field 461 in the form of an electronic signature.
  • agreement record column 461 not only records the name of the craftsman with whom the agreement was obtained, but also records the agreement from the foreman by executing the process that the computer 10 executed on the craftsman terminal 20b on the foreman terminal 20a. It is also possible to record the name of the foreman who obtained the agreement. Furthermore, the agreement record column 461 is not limited to the names of the craftsman and foreman, but as long as the content indicates that the craftsman and foreman have agreed, the recording method is not particularly limited, such as using an electronic seal.
  • the aggregation module aggregates the appearances of workers at the construction site based on the number of acquired agreements (step S44).
  • the appearance is the actual number of workers at the construction site.
  • the aggregation module aggregates worker appearances at the construction site based on the number of obtained agreements between craftsmen and foremen.
  • the appearance recording module records the collected appearances of workers at the construction site (step S45).
  • the appearance recording module records the appearance of workers at the construction site on the risk prediction activity sheet based on the number of aggregated agreements.
  • the appearance recording module records the appearances of workers at the construction site in the appearance recording column 462 in the agreement column 46 of the risk prediction activity sheet 40 based on the total number of agreements (see FIG. 20).
  • the appearance record column 462 will be explained based on FIG. 20 mentioned above.
  • the appearance recording module records the total appearance in the appearance recording field 462 in numerical form. Note that the appearance recording column 462 is not limited to numerical values, and the recording method thereof is not particularly limited as long as the content indicates the tallied appearance of the worker.
  • the agreement output module outputs the recorded agreement to a terminal used by the construction site supervisor (step S46).
  • the agreement output module transmits, as the recorded agreement, the risk prediction activity sheet in which the agreement and appearance are recorded to the terminal used by the site supervisor (site supervisor terminal 30).
  • the consensus output module transmits the risk prediction activity sheet at a predetermined timing (for example, at the start time of construction work, when consensus is obtained from a preset number of workers at the construction site).
  • the consensus output module may be one that transmits this risk prediction activity sheet itself to the site supervisor terminal 30, or it may send information other than the risk prediction activity sheet itself, such as a URL for accessing this risk prediction activity sheet. It may also be something that sends something.
  • the site supervisor terminal 30 receives this risk prediction activity sheet and displays it on its own display unit.
  • the agreement output module outputs the recorded agreement to a terminal used by the construction site supervisor by displaying this risk prediction activity sheet on the site supervisor terminal 30.
  • the site supervisor can easily grasp the workers who have agreed.
  • the site supervisor can easily understand the craftsmen and foremen at the construction site. It is also possible to conduct a roll call for the foremen.
  • the agreement output module may transmit the recorded agreement to a terminal used by the worker (worker terminal 20 (specifically, foreman terminal 20b)).
  • agreement notification process executed by computer 10 The agreement notification process executed by the computer 10 will be described based on FIG. 21. This figure is a flowchart of the agreement notification process executed by the computer 10. This agreement notification process is a process executed after the above-mentioned agreement acquisition process.
  • the affiliation identification module identifies the affiliation of each worker who performs work at the construction site targeted by the risk prediction activity sheet (step S50).
  • the affiliation is, for example, a company or an organization.
  • the affiliation identification module identifies the affiliation of each worker working at this construction site by referring to an affiliation database etc. in which the names and affiliations of each worker working at this construction site are registered in advance. .
  • the affiliation identification module identifies the affiliation of the worker who has agreed to the risk prediction activity sheet (step S51).
  • the affiliation specifying module refers to the aforementioned affiliation database, etc., and identifies the affiliation associated with the name of the worker who has agreed to the risk prediction activity sheet.
  • the agreement notification module notifies other workers at the construction site of the workers who have agreed to the risk prediction activity sheet (step S52).
  • Other workers in this process refer to workers who belong to a different organization from that of the worker who agreed to the risk prediction activity sheet. Since a variety of contractors work at construction sites, there are some workers who have no direct relationship with the hazardous factors recorded on the hazard prediction activity sheet. A worker who has no direct relationship with the hazardous factors recorded in such a risk prediction activity sheet is another worker who belongs to a different organization than the agreed worker.
  • the agreement notification module transmits the risk prediction activity sheet in which the agreement is recorded to a terminal used by another worker (foreman or craftsman belonging to another organization).
  • the agreement notification module may send to this terminal the risk prediction activity sheet itself in which the agreement is recorded, or it may send information such as a URL for accessing the risk prediction activity sheet in which the agreement is recorded. It is also possible to send a person other than the prediction activity sheet itself.
  • the terminals used by other workers receive this risk prediction activity sheet and display it on their own display sections.
  • the agreement notification module notifies other workers at the construction site of the workers who have agreed to the risk prediction activity sheet by displaying the risk prediction activity sheet on terminals used by other workers. By allowing other workers to view the hazard prediction activity sheet displayed by this terminal, they can share hazardous factors and raise safety awareness throughout the construction site.
  • FIG. 22 This figure is a diagram showing a flowchart of communication processing executed by the computer 10. This communication process is a process executed after the above-mentioned agreement acquisition process.
  • the content reception module receives input of predetermined content from the operator (step S60).
  • the predetermined contents are, for example, work contents, risk assessment, etc., and are contents that require a report or confirmation from the worker (foreman) to the site supervisor.
  • the foreman terminal 20a displays a predetermined content input form for inputting predetermined content based on a predetermined input from the foreman.
  • the foreman terminal 20a accepts input of predetermined contents on this predetermined contents input form.
  • the foreman terminal 20a transmits the received predetermined content to the computer 10.
  • the content reception module accepts input of the predetermined content from the worker.
  • the method by which the foreman terminal 20a receives input of predetermined content is not limited to the predetermined content input form, and may be any other method (e.g., email).
  • the content notification module notifies the site supervisor of the received predetermined content (step S61).
  • the content notification module transmits the received predetermined content to the site supervisor terminal 30.
  • the site supervisor terminal 30 receives this predetermined content and displays it on its own display unit.
  • the content notification module notifies the site supervisor of the received predetermined content by displaying the received predetermined content on the site supervisor terminal 30.
  • the site supervisor views the predetermined content displayed on the site supervisor terminal 30 and understands the predetermined content.
  • the site supervisor response reception module receives input of a response to the notified predetermined content from the site supervisor (step S62).
  • the response to the predetermined content is, for example, a safety instruction for the work content, approval for the risk assessment, etc., and is an instruction or approval from the site supervisor to the worker (foreman).
  • the site supervisor terminal 30 displays a response form for inputting a response to predetermined content based on a predetermined input from the site supervisor.
  • the site supervisor terminal 30 accepts input of a response to this response form.
  • the site supervisor terminal 30 transmits the received response to the computer 10. By receiving this response, the site supervisor response reception module accepts input of a response to the notified predetermined content from the site supervisor.
  • the method by which the site supervisor terminal 30 receives a response is not limited to the predetermined response form, and may be any other method (e.g., email).
  • the worker response notification module notifies the worker of the received response (step S63).
  • the worker response notification module transmits the received response to the foreman terminal 20a.
  • the foreman terminal 20a receives this response and displays it on its own display.
  • the worker response notification module notifies the worker (foreman) of the received response by displaying the received response on the foreman terminal 20a.
  • the foreman views the response displayed on the foreman terminal 20a and understands this response. Based on this response, the foreman can begin work.
  • the computer 10 can also be configured to record predetermined input contents and responses on a risk prediction activity sheet. In this case, the computer 10 notifies the site supervisor of the danger prediction activity sheet recording the predetermined contents, and notifies the worker of the danger prediction activity sheet recording the responses.
  • the above is the communication processing.
  • This pointed-out notification process consists of a pointed-out acquisition process (step S6) that acquires the contents of the work in which the agreed contents have not been complied with from the on-site supervisor (step S6), and a pointed-out recording process (step S6) that records the acquired points.
  • step S6 a pointed-out acquisition process
  • step S6 a pointed-out recording process
  • step S6 a pointed-out recording process
  • step S8 the noted matter notification process for notifying the foreman among the workers at the construction site of the recorded matter.
  • This pointed-out notification process is a process executed after the above-mentioned agreement acquisition process.
  • the pointed-out acquisition module acquires, from the site supervisor, the content of the work in which the content of the agreement has not been complied with as pointed-out points (step S70).
  • the points pointed out are, for example, the fact that the work is not being carried out according to the KY implementation items.
  • the site supervisor inspects the construction site by making rounds to see if the work is being done in accordance with the KY implementation items, and inputs any matters that are not being done as points to be pointed out.
  • the site supervisor terminal 30 displays a pointed matter input form (see FIG. 24) for inputting pointed matters based on a predetermined input from the site supervisor. Based on FIG. 24, the form for inputting points to be pointed out will be explained.
  • FIG. 120 is a diagram schematically showing an example of a form for inputting points to be pointed out.
  • a form 120 for inputting points to be pointed out is shown.
  • the form 120 for inputting matters to be pointed out includes a classification input field 121 that accepts the input of the classification, an inspection record input field 122 that accepts the input of inspection results, a correction instruction input field 123 that accepts the input of the contents of the correction instruction, and an input of the presence or absence of correction confirmation. It consists of a correction confirmation input field 124 that accepts a correction confirmation input field, and an image input field 125 that accepts an input of an image of an inspection location.
  • the site supervisor terminal 30 receives an input for selecting a category desired by the site supervisor from among a plurality of preset categories (eg, A to E) in the category input field 121.
  • the site supervisor terminal 30 accepts character input using a virtual keyboard or the like in the inspection record input field 122 and the correction instruction input field 123.
  • the on-site supervisor terminal 30 accepts an input selection of the necessity desired by the on-site supervisor from among the preset necessity of confirmation (for example, OK, NG) in the correction confirmation input field 124 (for example, , the site supervisor terminal 30 accepts input to the OK icon.).
  • the site supervisor terminal 30 receives an input of a photographed image of the inspection area in the image input field 125.
  • the site supervisor terminal 30 when the site supervisor terminal 30 receives an input to the image input field 125, it starts a photographing application, etc., photographs the image desired by the site supervisor, and inputs the photographed image into the image input field 125. It's okay to have one.
  • the site supervisor terminal 30 transmits to the computer 10 the input contents received on the pointed-out matter input form 120.
  • the pointed-out matter acquisition module acquires from the site supervisor the contents of the work in which the contents of the agreement have not been complied with as pointed-out matters.
  • the pointed-out matter reflection module reflects the acquired pointed-out matters on the pointed-out confirmation form (step S71).
  • the indicated matter confirmation form is a form in which the obtained indicated matters are reflected.
  • the specified matter reflection module reflects the input contents received in each column of the pointed matter input form 120 on the pointed matter confirmation form (see FIG. 25).
  • the pointed-out confirmation form will be explained based on FIG. 25.
  • This figure is a diagram schematically showing an example of a form for confirming pointed matters. In the same figure, a form 130 for confirming pointed matters is shown.
  • the pointed-out confirmation form 130 includes a category reflection column 131 that reflects the category input in the category input column 121, an inspection record reflection column 132 that reflects the inspection record input in the inspection record input column 122, and a correction instruction input column 123.
  • the correction instruction reflection column 133 reflects the contents of the correction instruction input in the correction confirmation input column 124
  • the correction confirmation reflection column 134 reflects the correction confirmation input in the correction confirmation input column 124
  • the image of the inspection area input in the image input column 125 It consists of an image reflection field 135 to be reflected.
  • the pointed-out matter reflection module reflects the contents input in each column in the pointed-out matter input firmware 130 to the corresponding columns in the pointed-out matter confirmation firmware.
  • the pointed out matter recording module records the acquired pointed out matter (step S72).
  • the findings recording module records the obtained findings on the risk prediction activity sheet as corrective instructions.
  • the pointed-out matter recording module records the pointed-out matter in the correction instruction record column of the risk prediction activity sheet based on the acquired pointed matter (see FIG. 26). Based on FIG. 26, the correction instruction record column 47 in the risk prediction activity sheet 40 will be explained. This figure shows only the correction instruction record column 47 in the risk prediction activity sheet 40 described above.
  • the correction instruction record field 47 consists of an inspection date record field 471 for recording the date on which the pointed matter occurred, a location record field 472 for recording the place where the pointed matter occurred, and a content record field 473 for recording the contents of the pointed matter.
  • the indicated matter recording module records the date on which the indicated matter was obtained in the inspection date record column 471.
  • the indicated matter recording module records the location included in the indicated matter in the location record column 472.
  • the pointed out matter recording module records the contents of the pointed out matter in the contents recording column 473. Note that each column of the correction instruction record column 47 is not limited to the example described above, and can be changed as appropriate.
  • the pointed out matter notification module notifies the foreman among the workers at the construction site of the recorded pointed out matter (step S73).
  • the pointed-out matter notification module notifies the foreman terminal 20a that there is a pointed-out matter.
  • the pointed-out matter notification module notifies the foreman using a push notification or the like of this application.
  • the pointed-out matter notification module transmits an e-mail to the foreman terminal 20a, which includes the fact that there is a pointed matter and the URL of the pointed-out confirmation form. Based on these notifications, the foreman terminal 20a displays the pointed-out confirmation form on its own display unit.
  • the foreman views this farm for confirming pointed matters and understands the pointed matters.
  • the foreman takes corrective measures for the identified matters. For example, in the example described above, implementing the contents of the correction instruction reflection column 133 is listed as the corrective action.
  • the pointed-out matter notification module notifies the foreman among the workers at the construction site of the recorded pointed-out matter by displaying a pointed-out confirmation form on the foreman terminal 20a.
  • the pointed-out matter notification module may notify the foreman terminal 20a of a danger prediction activity sheet in which the pointed matters are recorded as corrective instructions.
  • the pointed-out matter notification module and the foreman terminal 20a may perform the above-described process using this risk prediction activity sheet instead of the pointed-out confirmation form.
  • the worker response reception module receives input of a response to the notified matter from the foreman (step S74).
  • the response to the pointed matter is, for example, that corrective measures have been completed, and the foreman reports and communicates to the foreman.
  • the foreman terminal 20a displays a response form for inputting a response to predetermined content from the foreman.
  • the response form may be the above-mentioned point-out confirmation form provided with a column for inputting a response.
  • the foreman terminal 20a accepts input of a response to this response form.
  • the foreman terminal 20a transmits the received response to the computer 10.
  • the worker response reception module receives input of a response to the notified matter from the foreman.
  • the method by which the foreman terminal 20a receives a response is not limited to the predetermined response form. Other methods (e.g., e-mail) may also be used.
  • the site supervisor response notification module notifies the site supervisor of the received response (step S75).
  • the site supervisor response notification module transmits the received response to the site supervisor terminal 30.
  • the site supervisor terminal 30 receives this response and displays it on its own display unit.
  • the foreman response notification module notifies the foreman of the received response by displaying the received response on the foreman terminal 30.
  • the site supervisor views the response displayed by the site supervisor terminal 30 and understands this response. Based on this response, the site supervisor can immediately confirm that corrective measures have been taken.
  • the improvement result acquisition module acquires the improvement results of the indicated items from the site supervisor (step S76).
  • the improvement result of the pointed out items is, for example, the result of corrective measures taken by the foreman or craftsman in response to the pointed out items notified to the foreman.
  • the site supervisor terminal 30 displays an improvement result form for inputting improvement results for matters pointed out by the site supervisor based on predetermined input from the site supervisor.
  • the site supervisor terminal 30 receives input of the improvement results of the pointed out items in this improvement result form.
  • the site supervisor terminal 30 transmits the improvement results of the received points to the computer 10.
  • the improvement result acquisition module acquires the improvement result of the pointed matter from the site supervisor by receiving the improvement result of the pointed matter.
  • the improvement result recording module records the improvement results of the acquired points (step S77).
  • the improvement result recording module records the improvement result of the pointed matter in the improvement result record column of the risk prediction activity sheet based on the obtained improvement result of the pointed matter.
  • the improvement result record column may include an improvement date record column for recording the date on which the indicated matter was improved, a content record column for recording the contents of the improvement results, and the like.
  • the improvement result recording module records the date on which the improvement result of the pointed out item was obtained in the improvement date record column.
  • the improvement result recording module records the contents of the improvement results in the contents recording column. Note that the improvement result recording column is not limited to the example described above, and can be changed as appropriate. Furthermore, the improvement result recording module does not necessarily need to record the improvement results on the risk prediction activity sheet, and may simply record the improvement results in its own recording section.
  • FIG. 27 This figure is a diagram showing a flowchart of the overall notification process executed by the computer 10.
  • This overall notification process is a process executed after the above-mentioned noted matter notification process. Note that detailed explanations of processes similar to those described above will be omitted.
  • the affiliation identification module identifies the affiliation of each worker who performs work at the construction site targeted by the risk prediction activity sheet (step S80).
  • the process in step S80 is similar to the process in step S50 described above.
  • the affiliation identification module identifies the affiliation of each worker who performs the work in which the pointed matter has occurred (step S81).
  • the affiliation identification module refers to the aforementioned affiliation database, etc., and identifies the affiliation associated with the name of the worker who has agreed to the risk prediction activity sheet in which the points noted are recorded.
  • the points noted on the hazard prediction activity sheet are those that occurred as a result of the work performed by each worker who agreed to the hazard prediction activity sheet. Therefore, the affiliation identification module identifies the affiliation of each worker who performs the work in which the pointed matter has occurred by identifying the affiliation of the agreed workers.
  • the general notification module notifies other workers at the construction site of the recorded points (step S82).
  • Other workers in this process like the other workers mentioned above, refer to workers who belong to a different organization from the organization of the worker who agreed to the risk prediction activity sheet.
  • the general notification module transmits the risk prediction activity sheet in which the points noted are recorded to terminals used by other workers (foremen or craftsmen belonging to other organizations).
  • the general notification module may send to this terminal the risk prediction activity sheet itself in which the points noted are recorded, or it may send a URL etc. for accessing the risk prediction activity sheet in which the points noted are recorded. It is also possible to send a person other than the risk prediction activity sheet itself.
  • the terminals used by other workers receive this risk prediction activity sheet and display it on their own display sections.
  • the general notification module notifies other workers at the construction site of the recorded points by displaying this risk prediction activity sheet on terminals used by other workers. By allowing other workers to view the hazard prediction activity sheet displayed by this terminal, they can share hazardous factors and raise safety awareness throughout the construction site.
  • the daily report generation process executed by the computer 10 will be explained based on FIG. 28.
  • This figure is a flowchart of daily report generation processing executed by the computer 10.
  • the daily report generation process is a process executed after the above-mentioned problem notification process.
  • the generation module generates a daily report based on the risk prediction activity sheet and the findings (step S90).
  • the daily report may be, for example, a daily work report at a general construction site.
  • the generation module generates a daily report based on the risk prediction activity sheet in which agreements and findings are recorded.
  • the generation module generates a daily report by reflecting the contents recorded in the risk prediction activity sheet and the normal work contents on the daily report in a predetermined format set in advance.
  • the daily report recording module records the generated daily report (step S91).
  • the daily report recording module records the generated daily report in association with a construction site identifier and the like.
  • the construction site identifier may be further associated with an identifier of a worker who performs work at this construction site, an identifier of a site supervisor at this construction site, and the like.
  • the computer 10 may output the generated daily report to the site supervisor terminal 30. Further, the computer 10 may output the generated daily report to the worker terminal 20 (foreman terminal 20a or craftsman terminal 20b). Further, the computer 10 may output the generated daily report to another terminal (for example, a printing device such as a printer). Further, the computer 10 may output the generated daily report in a predetermined data format (eg, document format, spreadsheet format, PDF (Portable Document Format)), or the like.
  • a predetermined data format eg, document format, spreadsheet format, PDF (Portable Document Format)
  • the computer 10 can also be configured to execute a part or all of the above-mentioned processes in combination. Further, the computer 10 can also be configured to execute each process at a timing other than the timing described above.
  • the means and functions described above are realized by a computer (including a CPU, an information processing device, and various terminals) reading and executing a predetermined program.
  • the program may be provided from a computer via a network (SaaS: Software as a Service) or in a cloud service.
  • the program may be provided in a form recorded on a computer-readable recording medium.
  • the computer reads the program from the recording medium, transfers it to an internal recording device or an external recording device, records it, and executes it.
  • the program may be recorded in advance on a recording device (recording medium) and provided to the computer from the recording device via a communication line.
  • a management system that manages a hazard prediction activity sheet for confirming dangerous matters at a construction site, a sheet acquisition unit (for example, sheet acquisition unit 11, sheet acquisition module) that acquires the risk prediction activity sheet; a sheet output unit (e.g., sheet output unit 12, sheet output module) that outputs the acquired risk prediction activity sheet to a terminal used by a worker (e.g., foreman, craftsman) at a construction site where the dangerous matter is a target; , an agreement acquisition unit (e.g., agreement acquisition unit 13, agreement acquisition module) that acquires agreement from the worker regarding the outputted risk prediction activity sheet; an agreement recording unit (for example, an agreement recording unit 17, an agreement recording module) that records that the worker has agreed to the risk prediction activity sheet based on the acquired agreement; an agreement output unit (e.g., agreement output unit 14, agreement output module) that outputs the recorded agreement to a terminal (e.g., site supervisor terminal 30) used by a site supervisor at the construction site; a pointed-out acquisition unit (e.g., pointed-
  • a preliminary output unit for example, a preliminary output module that outputs the danger prediction activity sheet to a terminal used by the worker before the work day at the construction site;
  • the worker views the danger prediction activity sheet in advance, making it easy to make the worker understand the dangers at the construction site in advance.
  • a site supervisor output unit (for example, a site supervisor output module) that outputs the acquired risk prediction activity sheet to a terminal used by the site supervisor before the sheet output unit outputs the risk prediction activity sheet.
  • an approval acquisition unit (for example, an approval acquisition module) that acquires approval from the site supervisor for the outputted risk prediction activity sheet; further comprising;
  • the sheet output unit starts outputting the risk prediction activity sheet in response to the obtained approval.
  • an improvement result acquisition unit for example, an improvement result acquisition module
  • an improvement result recording unit for example, an improvement result recording module
  • a generation unit e.g. generation module that generates a daily report based on the risk prediction activity sheet and the pointed out items;
  • the risk prediction activity sheet includes at least items on work content, hazardous factors, and preventive measures; The management system described in (1).
  • a totalizing unit for example, a totaling module that totalizes the appearance of workers at the construction site based on the number of acquired agreements;
  • an agreement notification unit (for example, an agreement notification module) that notifies other workers at the construction site of the worker who has agreed to the risk prediction activity sheet;
  • a general notification unit for example, a general notification module that notifies other workers at the construction site of the recorded points;
  • a content reception unit for example, a content reception module
  • a content notification unit for example, a content notification module
  • a site supervisor response reception unit for example, a site supervisor response reception module
  • a worker response notification unit for example, a worker response notification module
  • a worker response reception unit for example, a worker response reception module
  • a site supervisor response notification unit for example, a site supervisor response notification module
  • a step of acquiring the risk prediction activity sheet for example, step S11
  • a step of outputting the acquired risk prediction activity sheet to a terminal used by a worker at the construction site targeted by the dangerous matter (for example, step S41); a step of obtaining consent from the worker for the outputted risk prediction activity sheet (for example, step S42); a step of recording that the worker has agreed to the risk prediction activity sheet based on the obtained agreement (for example, step S43); outputting the recorded agreement to a terminal used by the construction site supervisor (for example, step S46); a step of acquiring from the site supervisor the contents of the work in which the contents of the agreement are not complied with as points to be pointed out (for example, step S70); a step of recording the obtained noted matter (for example, step S72); a step of notifying a foreman among the workers at the construction site of the recorded points (for example, step S73);
  • a computer readable program for example, step S11 a step of outputting the acquired risk prediction activity sheet to a terminal

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • User Interface Of Digital Computer (AREA)

Abstract

【課題】危険予知活動シートを活用し、作業者との合意事項が守られているかを確認する。 【解決手段】建設現場の危険事項を確認させるための危険予知活動シートを管理する管理システムは、危険予知活動シートを取得し、取得した前記危険予知活動シートを、前記危険事項の対象の建設現場の作業者が利用する端末に出力し、前記作業者から、出力した前記危険予知活動シートに対する合意を取得し、取得した前記合意に基づいて、前記作業者が前記危険予知活動シートに合意したことを記録し、記録した合意を、前記建設現場の現場監督が利用する端末に出力し、前記現場監督から、前記合意の内容が守られていない作業内容を指摘事項として取得し、取得した前記指摘事項を記録し、記録した前記指摘事項を、前記建設現場の作業者の内、職長に通知する。

Description

管理システム、管理方法及びプログラム
 本発明は、建設現場の危険事項を確認させるための危険予知活動シートの管理に有効な技術に関する。
 従来、建設現場では、作業に潜む危険有害要因の特定及び対策に関する危険予知が行われている。
 建設現場の危険予知については、例えば、非特許文献1では、紙、樹脂フィルム等の薄肉質素材の表裏の両面に従来にない、文字、挿絵、写真を描写した表示板を透明材質樹脂で形成されたケースに入れた危険予知活動表示板が開示されている。
 また、他には、特許文献1では、労働災害の発生を防止するための適切な情報を提供するために、所定期間内の作業場所のヒヤリハットの実績回数であるヒヤリハット指数を記憶し、実績危険度の高い危険のポイント及びその対策を、模範危険予知表に出力するシステムが開示されている。
実用新案登録第3123016号公報
特開2013-080304号公報
 建設現場では、安全のために、危険予知活動シートを作成し、現場の危険を作業者に認識してもらい、危険を認識した現場の作業者が、この危険予知活動シートに署名している。
 この危険予知活動シートは、3年以上保管することが一般的であるが、危険予知活動シートへの署名は、紙面で行っているため、紛失のおそれや、保管スペースの確保が困難であることに加えて、合意事項が守られているかを後日管理することが出来ないといった問題があった。
 そのため、危険予知活動シートを活用し、作業者との合意事項が守られているかを確認する技術が求められている。
 しかしながら、非特許文献1及び特許文献1に記載の技術では、危険予知活動に関する情報を電子的に作業者に提示したり、電子署名を取得したり、その証跡を後日管理したりすることが出来なかった。
 そこで、本発明者は、作業者との合意事項が守られているかを確認する仕組みに着目した。
 本発明は、危険予知活動シートを活用し、作業者との合意事項が守られているかを確認することを可能とする管理システム、管理方法及びプログラムを提供することを目的とする。
 本発明は、建設現場の危険事項を確認させるための危険予知活動シートを管理する管理システムであって、
 前記危険予知活動シートを取得するシート取得部と、
 取得した前記危険予知活動シートを、前記危険事項の対象の建設現場の作業者が利用する端末に出力するシート出力部と、
 前記作業者から、出力した前記危険予知活動シートに対する合意を取得する合意取得部と、
 取得した前記合意に基づいて、前記作業者が前記危険予知活動シートに合意したことを記録する合意記録部と、
 記録した合意を、前記建設現場の現場監督が利用する端末に出力する合意出力部と、
 前記現場監督から、前記合意の内容が守られていない作業内容を指摘事項として取得する指摘事項取得部と、
 取得した前記指摘事項を記録する指摘事項記録部と、
 記録した前記指摘事項を、前記建設現場の作業者の内、職長に通知する指摘事項通知部と、
 を備える管理システムを提供する。
 本発明によれば、建設現場の危険事項を確認させるための危険予知活動シートを管理する管理システムは、前記危険予知活動シートを取得し、取得した前記危険予知活動シートを、前記危険事項の対象の建設現場の作業者が利用する端末に出力し、前記作業者から、出力した前記危険予知活動シートに対する合意を取得し、取得した前記合意に基づいて、前記作業者が前記危険予知活動シートに合意したことを記録し、記録した合意を、前記建設現場の現場監督が利用する端末に出力し、前記現場監督から、前記合意の内容が守られていない作業内容を指摘事項として取得し、取得した前記指摘事項を記録し、記録した前記指摘事項を、前記建設現場の作業者の内、職長に通知する。
 本発明は、システムのカテゴリであるが、方法及びプログラムであっても同様の作用、効果を奏する。
 本発明によれば、危険予知活動シートを活用し、作業者との合意事項が守られているかを確認することが可能となる。
管理システム1の概要を説明する図である。 管理システム1の機能構成を示す図である。 管理システム1が実行するシート取得処理のフローチャートを示す図である。 危険予知活動シートの一例を模式的に示した図である。 作業関係入力用フォームの一例を模試的に示した図である。 危険予知活動シート40における作業内容欄のみを示した図である。 KY記録入力用フォームの一例を模式的に示した図である。 安全指示事項確認用フォームの一例を模式的に示した図である。 危険予知活動シート40における元請安全指示事項欄のみを示した図である。 KY活動入力用フォームの一例を模式的に示した図である。 KY活動入力用フォームの一例を模式的に示した図である。 危険予知活動シート40における危険有害要因欄のみを示した図である。 危険予知活動シート40における予防対策欄のみを示した図である。 管理システム1が実行する承認処理のフローチャートを示す図である。 承認入力用フォームの一例を模式的に示した図である。 危険予知活動シート40における承認欄のみを示した図である。 管理システム1が実行する事前出力処理のフローチャートを示す図である。 管理システム1が実行する合意取得処理のフローチャートを示す図である。 合意入力用フォームの一例を模式的に示した図である。 危険予知活動シート40における合意欄のみを示した図である。 管理システム1が実行する合意通知処理のフローチャートを示す図である。 管理システム1が実行するコミュニケーション処理のフローチャートを示す図である。 管理システム1が実行する指摘事項通知処理のフローチャートを示す図である。 指摘事項入力用フォームの一例を模式的に示した図である。 指摘事項確認用フォームの一例を模式的に示した図である。 危険予知活動シート40における是正指示記録欄のみを示した図である。 管理システム1が実行する全体通知処理のフローチャートを示す図である。 管理システム1が実行する日報生成処理のフローチャートを示す図である。
 以下、添付図面を参照して、本発明を実施するための形態(以下、実施形態)について詳細に説明する。以降の図においては、実施形態の説明の全体を通して同じ要素には同じ番号又は符号を付している。
 なお、本明細書における作業者端末20は、必ずしも、作業者自身が保有及び管理する端末である必要はなく、作業者が利用可能な端末(例えば、建設現場に設置された端末や、職人が職長から借用した端末)であれば良い。また、本明細書における現場監督端末30は、現場監督自身が保有及び管理する端末である必要はなく、現場監督が利用可能な端末(例えば、建設現場に設置された端末)であれば良い。
 [管理システム1の概要]
 図1は、管理システム1の概要を説明するための模式図である。
 管理システム1は、サーバ機能を有するコンピュータ10が、建設現場の危険事項を確認させるための危険予知活動シートを管理する処理を実現する。
 管理システム1を構成する端末及び装置について説明する。
 管理システム1は、少なくともサーバ機能を有するコンピュータ10を備えるシステムであれば良い。このコンピュータ10は、例えば、1台のコンピュータで実現されても良いし、クラウドコンピュータのように、複数のコンピュータで実現されても良い。
 本明細書におけるクラウドコンピュータとは、ある特定の機能を果たす際に、任意のコンピュータをスケーラブルに用いるものや、あるシステムを実現するために複数の機能モジュールを含み、その機能を自由に組み合わせて用いるものの何れであっても良い。
 本明細書において、管理システム1は、コンピュータ10に加え、建設現場における職長や職人等の作業者が利用する作業者端末20、建設現場における現場監督が利用する現場監督端末30により構成される。管理システム1において、コンピュータ10、作業者端末20及び現場監督端末30が協働し、様々な処理を実現する。
 管理システム1を構成する端末装置は、あくまでも一例であり、コンピュータ10を除く各端末装置については、その数、種類及び機能については、適宜変更可能である。
 管理システム1が、建設現場の危険事項を確認させるための危険予知活動シートを管理する際の処理ステップの概要について説明する。
 コンピュータ10は、危険予知活動シートを取得する(ステップS1)。
 コンピュータ10は、作業者(職長)が作成した危険予知活動シートを取得する。
 作業者端末20は、作業者が作成した危険予知活動シートを、コンピュータ10に送信する。
 コンピュータ10は、この危険予知活動シートを受信することにより、危険予知活動シートを取得する。
 コンピュータ10は、取得した危険予知活動シートを、危険事項の対象の建設現場の作業者が利用する端末(作業者端末20)に出力する(ステップS2)。
 コンピュータ10は、取得した危険予知活動シートを、危険事項の対象の建設現場の作業者(職人)の作業者端末20に送信する。
 作業者端末20は、この危険予知活動シートを受信し、自身の表示部に表示する。
 コンピュータ10は、危険事項の対象の建設現場の作業者の作業者端末20に危険予知活動シートを表示させることにより、取得した危険予知活動シートを、危険事項の対象の建設現場の作業者が利用する端末に出力する。
 コンピュータ10は、作業者から、出力した危険予知活動シートに対する合意を取得する(ステップS3)。
 作業者端末20は、作業者(職人)による危険予知活動シートの閲覧後、この危険予知活動シートに対する合意の入力を受け付ける。作業者端末20は、受け付けた合意を、コンピュータ10に送信する。
 コンピュータ10は、この合意を受信することにより、作業者から、出力した危険予知活動シートに対する合意を取得する。
 コンピュータ10は、取得した合意に基づいて、作業者が危険予知活動シートに合意したことを記録する(ステップS4)。
 コンピュータ10は、作業者が危険予知活動シートに合意したことそのものを記録するとともに、危険予知活動シートに、作業者が合意したことを記録する。コンピュータ10は、作業者の氏名を、危険予知活動シートに記録する。
 コンピュータ10は、記録した合意を、建設現場の現場監督が利用する端末(現場監督端末30)に出力する(ステップS5)。
 コンピュータ10は、合意が記録された危険予知活動シートを、現場監督端末30に送信する。
 現場監督端末30は、この危険予知活動シートを受信し、自身の表示部に表示する。
 コンピュータ10は、現場監督端末30に危険予知活動シートを表示させることにより、記録した合意を、建設現場の現場監督が利用する端末に出力する。
 コンピュータ10は、現場監督から、合意の内容が守られていない作業内容を指摘事項として取得する(ステップS6)。
 現場監督端末30は、指摘事項の入力を受け付け、受け付けた指摘事項を、コンピュータ10に送信する。
 コンピュータ10は、この指摘事項を受信することにより、現場監督から、合意の内容が守られていない作業内容を指摘事項として取得する。
 コンピュータ10は、取得した指摘事項を記録する(ステップS7)。
 コンピュータ10は、取得した指摘事項そのものを記録するとともに、危険予知活動シートに、取得した指摘事項を記録する。コンピュータ10は、取得した指摘事項に基づいた日付、場所及び内容を、危険予知活動シートに記録する。
 コンピュータ10は、記録した指摘事項を、建設現場の作業者の内、職長に通知する(ステップS8)。
 コンピュータ10は、指摘事項が記録された危険予知活動シートを、建設現場の作業者の内、職長が利用する作業者端末20に送信する。
 作業者端末20は、この危険予知活動シートを受信し、自身の表示部に表示する。
 コンピュータ10は、この危険予知活動シートを、作業者端末20に表示させることにより、記録した指摘事項を、建設現場の作業者の内、職長に通知する。
 以上が、管理システム1の概要である。
 本管理システム1によれば、危険予知活動シートを活用し、作業者との合意事項が守られているかを確認することが可能となる。
 [装置構成]
 図2は、管理システム1の構成を示すブロック図である。管理システム1は、建設現場の危険事項を確認させるための危険予知活動シートを管理するシステムであり、少なくともコンピュータ10により構成される。本実施形態では、管理システム1は、職長が利用する職長端末20a、職人が利用する職人端末20b、現場監督が利用する現場監督端末30を備える。なお、本実施形態において、職長及び職人をまとめて、作業者とも称し、職長端末20a及び職人端末20bをまとめて、作業者端末20とも称す。
 管理システム1は、コンピュータ10と、各々の端末装置とが、公衆回線網等のネットワーク8を介して、データ通信可能に接続されたシステムである。
 なお、管理システム1を構成する端末装置は、あくまでも一例であり、コンピュータ10を除く各端末装置については、その数、種類及び機能については、適宜変更可能である。
 コンピュータ10は、サーバ機能を有し、例えば、1台のコンピュータで実現されても良いし、クラウドコンピュータのように、複数のコンピュータで実現されても良い。
 コンピュータ10は、制御部として、CPU(Central Processing Unit)、GPU(Graphics Processing Unit)、RAM(Random Access Memory)、ROM(Read Only Memory)等を備え、通信部として、他の端末や装置等と通信可能にするためのデバイス、危険予知活動シートを取得するシート取得部11、取得した危険予知活動シートを危険事項の対象の建設現場の作業者が利用する端末に出力するシート出力部12、作業者から、出力した危険予知活動シートに対する合意を取得する合意取得部13、記録した合意を、建設現場の現場監督が利用する端末に出力する合意出力部14、現場監督から、合意の内容が守られていない作業内容を指摘事項として取得する指摘事項取得部15、記録した指摘事項を、建設現場の作業者の内、職長に通知する指摘事項通知部16等を備える。
 コンピュータ10は、記録部として、ハードディスクや半導体メモリ、記録媒体、メモリカード等によるデータのストレージ部等を備える。
 コンピュータ10は、処理部として、各種処理を実行する各種デバイス、取得した合意に基づいて、作業者が危険予知活動シートに合意したことを記録する合意記録部17、取得した指摘事項を記録する指摘事項記録部18等を備える。
 コンピュータ10において、制御部が所定のプログラムを読み込むことにより、通信部と協働して、シート取得モジュール、現場監督出力モジュール、承認取得モジュール、事前出力モジュール、シート出力モジュール、合意取得モジュール、合意出力モジュール、合意通知モジュール、内容受付モジュール、内容通知モジュール、現場監督応答受付モジュール、作業者応答通知モジュール、指摘事項取得モジュール、指摘事項通知モジュール、作業者応答受付モジュール、現場監督応答通知モジュール、改善結果取得モジュール、全体通知モジュールを実現する。
 また、コンピュータ10において、制御部が所定のプログラムを読み込むことにより、記録部と協働して、シート記録モジュール、日報記録モジュールを実現する。
 また、コンピュータ10において、制御部が所定のプログラムを読み込むことにより、処理部と協働して、現場監督特定モジュール、承認記録モジュール、作業者特定モジュール、合意記録モジュール、集計モジュール、出面記録モジュール、所属先特定モジュール、指摘事項反映モジュール、指摘事項記録モジュール、改善結果記録モジュール、生成モジュールを実現する。
 職長が利用する職長端末20a、職人が利用する職人端末20b及び現場監督が利用する現場監督端末30は、其々、例えば、携帯電話、スマートフォン、タブレット端末等の携帯端末やパーソナルコンピュータ等の端末である。
 これらの端末装置は、其々、端末制御部として、CPU、GPU、RAM、ROM等を備え、通信部として、他の端末や装置等と通信可能にするためのデバイス等を備え、入出力部として、各種情報の入出力を実行するためのデバイス等を備える。
 以下、管理システム1が実行する各処理について、上述した各モジュールが実行する処理と併せて説明する。
 本明細書において、各モジュールは、その処理内容を、自身が有する機能として実行するものであっても良いし、所定のアプリケーションを介して実行するものであっても良い。
 [コンピュータ10が実行するシート取得処理]
 図3に基づいて、コンピュータ10が実行するシート取得処理について説明する。同図は、コンピュータ10が実行するシート取得処理のフローチャートを示す図である。本シート取得処理は、上述した危険予知活動シートを取得するシート取得処理(ステップS1)の詳細である。
 シート取得モジュールは、危険予知活動シートを取得する(ステップS10)。
 危険予知活動シートは、例えば、建設現場における作業のリスク対策を記録し、作業者に周知するためのシートである(図4参照)。危険予知活動シートは、少なくとも、作業内容、危険有害要因及び予防対策の項目を含むものである。
 シート取得モジュールは、危険予知活動シートを、職長端末20aから取得する。
 図4に基づいて、危険予知活動シートについて説明する。同図は、危険予知活動シートの一例を模式的に示した図である。同図において、危険予知活動シート40が示されている。
 危険予知活動シートは、作業内容を記録する作業内容欄41、現場監督からの安全指示事項を記録する元請安全指示事項欄42、作業における危険有害要因を記録する危険有害要因欄43、危険有害要因に対する予防対策を記録する予防対策欄44、現場監督が危険予知活動シート40に記載された内容を承認したことを記録する承認欄45、作業者が危険予知活動シート40に記載された内容に合意したことを記録する合意欄46、現場監督が行った是正指示の内容を記録する是正指示記録欄47からなる。危険予知活動シート40には、これら以外の欄が含まれているが、これら以外の欄についてのその詳細な説明は省略する。各欄についての詳細は、後述する。
 危険予知活動シート40は、作業者端末20や現場監督端末30からの入力に基づいて、その入力内容に該当する欄にその入力内容が記録される。
 なお、危険予知活動シート40は、少なくとも、作業内容欄41、危険有害要因欄43及び予防対策欄44が含まれるものであれば良い。また、危険予知活動シート40における各欄の位置、サイズ、表記法等については、上述した例に限定されるものではなく、適宜変更可能である。
 職長端末20aが、危険予知活動シートを作成する際の処理について説明する。
 職長端末20aは、職長から、所定の入力用フォームに対する入力を受け付け、受け付けた入力内容に基づいて、危険予知活動シートを作成する。
 はじめに、作業内容欄41について説明する。
 職長端末20aは、所定の入力に基づいて自身に表示した作業関係入力用フォーム(図5参照)において、危険予知活動シート40における作業内容欄41(図6参照)に記録する内容の入力を受け付ける。
 図5に基づいて、作業関係入力用フォームについて説明する。同図は、作業関係入力用フォームの一例を模試的に示した図である。同図において、作業関係入力用フォーム50が示されている。
 作業関係入力用フォーム50は、作業内容の入力を受け付ける作業内容入力欄51、必須資格の名称や数字等の入力を受け付ける必須資格入力欄52、資格保有者の氏名や数字等の入力を受け付ける資格保有者入力欄53からなる。
 職長端末20aは、作業内容入力欄51、必須資格入力欄52及び資格保有者入力欄53に対して、仮想キーボード等による文字入力を受け付ける。図示していないものの、職長端末20aは、これらの内容に加えて、自身が所属する所属先の名称や自身の氏名も、対応する欄に対して、同様の入力を受け付ける。
 図6に基づいて、危険予知活動シート40における作業内容欄41について説明する。同図は、上述した危険予知活動シート40における作業内容欄41のみを示した図である。
 作業内容欄41は、作業内容記録欄411、資格記録欄412、所属先記録欄413からなる。
 作業内容記録欄411は、作業内容入力欄51に対して入力を受け付けた内容が記録される欄である。資格記録欄412は、必須資格入力欄52及び資格保有者入力欄53に対して入力を受け付けた内容が記録される欄である。所属先記録欄413は、入力を受け付けた職長の所属先の名称や職長の氏名が記録される欄である。
 職長端末20aは、作業関係入力用フォーム50に対して入力を受け付けた入力内容を、作業内容欄41の各欄に対して記録させ、危険予知活動シートを作成する。
 次に、元請安全指示事項欄42について説明する。
 現場監督端末30は、所定の入力に基づいて自身に表示したKY(危険予知)記録入力用フォーム(図7参照)において、安全指示事項を登録する。
 職長端末20aは、現場監督が登録した安全指示事項に基づいて自身に表示した安全指示事項確認用フォーム(図8参照)に示された内容を、危険予知活動シート40における元請安全指示事項欄42(図9参照)に記録する。
 図7に基づいて、KY記録入力用フォームについて説明する。同図は、KY記録入力用フォームの一例を模式的に示した図である。同図において、KY記録入力用フォーム60が示されている。
 KY記録入力用フォーム60は、登録された安全指示事項を確認する確認用フォーム61、安全指示事項を登録する登録用フォーム62からなる。
 確認用フォーム61は、項目毎の一覧610からなる。現場監督端末30は、現場監督から、一覧610に表示された項目に対する入力を受け付け、登録用フォーム62を、一覧610に重畳させて表示する。
 登録用フォーム62は、指示連絡事項入力欄620、危険箇所入力欄621、登録アイコン622からなる。
 現場監督端末30は、指示連絡事項入力欄620及び危険箇所入力欄621に対して、仮想キーボード等による文字入力を受け付ける。このとき、現場監督端末30は、登録用フォーム62において、全業者共通の安全指示事項である場合と、業者毎の安全指示事項である場合とで、異なる入力方法により、これらを受け付ける。具体的には、現場監督端末30は、全業者共通である場合、全業者に対して、一括で、その入力を受け付ける。一方、現場監督端末30は、業者毎である場合、業者単位で、その入力を受け付ける。
 現場監督端末30は、登録アイコン622に対する入力を受け付け、指示連絡事項入力欄620及び危険箇所入力欄621に入力された内容を、一覧610に反映し、安全指示事項を登録する。
 職長端末20aは、所定の入力を受け付け、現場監督端末30が登録した安全指示事項を、自身の表示部に表示する。安全指示事項確認用フォーム(図8参照)を表示する。
 図8に基づいて、安全指示事項確認用フォームについて説明する。同図は、安全指示事項確認用フォームの一例を模式的に示した図である。同図において、安全指示事項確認用フォーム70が示されている。
 安全指示事項確認用フォーム70は、安全指示事項欄71からなる。
 安全指示事項欄71は、現場監督端末30が登録した安全指示事項の内容が反映される欄である。
 図9に基づいて、危険予知活動シート40における元請安全指示事項欄42について説明する。同図は、上述した危険予知活動シート40における元請安全指示事項欄42のみを示した図である。
 元請安全指示事項欄42は、安全指示事項欄71に反映された内容が記録される欄である。
 職長端末20aは、所定の入力を受け付け、安全指示事項欄71に反映された内容を、元請安全指示事項欄42に対して記録させ、危険予知活動シートを作成する。
 次に、危険有害要因欄43及び予防対策欄44について説明する。
 職長端末20aは、所定の入力に基づいて自身に表示したKY活動入力用フォーム(図10及び図11参照)において、危険予知活動シート40における危険有害要因欄43(図12参照)及び予防対策欄44(図13参照)に記録する内容の入力を受け付ける。
 図10及び図11に基づいて、KY活動入力用フォームについて説明する。同図は、KY活動入力用フォームの一例を模式的に示した図である。同図において、KY活動入力用フォーム80が示されている。図10で示すKY活動入力用フォーム80の最下部と、図11で示すKY活動入力用フォームの最上部とは、繋がっているが、紙面の関係上異なる図面として表したものである。
 KY活動入力用フォーム80は、危険性入力欄81、第1可能性入力欄82、第1重篤度入力欄83、第1危険性評価入力欄84、優先度入力欄85、対策入力欄86、第2可能性入力欄87、第2重篤度入力欄88、第2危険性評価入力欄89、残留リスク入力欄90、一時保存アイコン91、登録アイコン92からなる。
 職長端末20aは、危険性入力欄81及び対策入力欄86に対して、仮想キーボード等による文字入力を受け付ける。危険性入力欄81及び対策入力欄86は、少なくとも、時期、原因、現象に関する入力を受け付ける欄である。入力を受け付ける内容は、例えば、時期と、原因とによって、現象が発生するといったものである。職長端末20aは、第1可能性入力欄82、第1重篤度入力欄83、第1危険性評価入力欄84、優先度入力欄85、第2可能性入力欄87、第2重篤度入力欄88、第2危険性評価入力欄89及び残留リスク入力欄90に対して、各数字に対するタップ操作等による選択入力を受け付ける。図示していないものの、職長端末20aは、これらの内容に加えて、自身の所属先の名称や自身の氏名も、対応する欄に対して、同様の入力を受け付ける。
 職長端末20aは、一時保存アイコン91の入力を受け付けた場合、KY活動入力用フォーム80に入力を受け付けた内容を一時的に保存する。職長端末20aは、登録アイコン92の入力を受け付けた場合、KY活動入力用フォーム80に入力を受け付けた内容を、危険予知活動シートに記録する。
 なお、第1危険性評価入力欄84については、各数字に対する選択入力を受け付けるのではなく、第1可能性入力欄82、第1重篤度入力欄83に対する選択入力の結果を自動的に入力するものであっても良い。また、第2危険性評価入力欄89についても、第1危険性評価入力欄84と同様に、第2可能性入力欄87、第2重篤度入力欄88に対する選択入力の結果を自動的に入力するものであっても良い。
 図12に基づいて、危険予知活動シート40における危険有害要因欄43について説明する。同図は、上述した危険予知活動シート40における危険有害要因欄43のみを示した図である。
 危険有害要因欄43は、時期記録欄431、原因記録欄432、現象記録欄433、数値記録欄434からなる。
 時期記録欄431、原因記録欄432及び現象記録欄433は、危険性入力欄81に対して入力を受け付けた内容が記録される欄である。時期記録欄431は、危険性入力欄81に対して入力を受け付けた内容の内、時期に関する内容が記録される欄である。原因記録欄432は、危険性入力欄81に対して入力を受け付けた内容の内、原因に関する内容が記録される欄である。現象記録欄433は、危険性入力欄81に対して入力を受け付けた内容の内、現象に関する内容が記録される欄である。時期記録欄431、原因記録欄432、現象記録欄433は、予め、受け付ける入力内容の形式が指定されている場合、この形式に沿った内容を、各欄に記録する。時期記録欄431は、時期を示す語句(例えば、「~するとき」と記載された内容)を記録し、原因記録欄432は、原因を示す語句(たとえば、「~なので」と記載された内容)を記録し、現象記録欄433は、現象を示す語句(例えば、「~なる」と記載された内容)を記録する。例えば、入力内容の形式が、「Aするとき、Bなので、Cになる」である場合、時期記録欄431に、「Aするとき」、原因記録欄432に、「Bなので」、現象記録欄433に、「Cになる」と記録する。
 数値記録欄434は、第1可能性入力欄82、第1重篤度入力欄83、第1危険性評価入力欄84、優先度入力欄85の其々に対して入力を受け付けた数値が記録される欄である。
 職長端末20aは、KY活動入力用フォーム80に対して入力を受け付けた入力内容を、危険有害要因欄43の各欄に対して記録させ、危険予知活動シートを作成する。
 図13に基づいて、危険予知活動シート40における予防対策欄44について説明する。同図は、上述した危険予知活動シート40における予防対策欄44のみを示した図である。
 予防対策欄44は、時期記録欄441、対策記録欄442からなる。
 時期記録欄441及び対策記録欄442は、対策入力欄86に対して入力を受け付けた内容が記録される欄である。時期記録欄441は、対策入力欄86に対して入力を受け付けた内容の内、時期に関する内容が記録される欄である。対策記録欄442は、対策入力欄86に対して入力を受け付けた内容の内、対策に関する内容が記録される欄である。時期記録欄441及び対策記録欄442は、予め、受け付ける入力内容の形式が指定されている場合、この形式に沿った内容を、各欄に記録する。時期記録欄441は、時期を示す語句(例えば、「~するとき」と記載された内容)を記録し、対策記録欄442は、対策を示す語句(例えば、「~を、~する」と記載された内容)を記録する。例えば、入力内容の形式が、「Dするとき、Eを、Fする」である場合、時期記録欄441に、「Dするとき」、対策記録欄442に、「Eを、Fする」と記録する。
 職長端末20aは、KY活動入力用フォーム80に対して入力を受け付けた入力内容を、予防対策欄44の各欄に対して記録させ、危険予知活動シートを作成する。
 なお、予防対策欄44は、上述した危険有害要因欄43と同様に、第2可能性入力欄87、第2重篤度入力欄88、第2危険性評価入力欄89、残留リスク入力欄90の各欄に入力を受け付けた数値を記録する数値記録欄が含まれるものであっても良い。
 上述した処理において、シート取得モジュールは、職長端末20aが作成した危険予知活動シートを取得するものとして説明しているが、コンピュータ10が危険予知活動シートを作成する構成であっても良い。
 この場合、職長端末20aは、各フォームにおける各欄に対して入力を受け付けた内容を、コンピュータ10に送信する。コンピュータ10は、この内容を受信し、各フォームにおける各欄に入力された内容を、予め設定された形式で、危険予知活動シートに記録させ、危険予知活動シートを作成すれば良い。
 職長端末20aは、職長からの入力を受け付け、上述した処理の結果作成した危険予知活動シートを、コンピュータ10に送信する。
 シート取得モジュールは、この危険予知活動シートを受信することにより、危険予知活動シートを取得する。
 図3に戻り、シート取得処理の続きを説明する。
 シート記録モジュールは、取得した危険予知活動シートを記録する(ステップS11)。
 シート記録モジュールは、取得した危険予知活動シートを、建設現場の識別子(例えば、名称、管理番号、住所)等と対応付けて記録する。このとき、建設現場の識別子には、更に、この建設現場で作業を行う作業者の識別子(例えば、氏名、管理番号、ID)や、この建設現場の現場監督の識別子(例えば、氏名、管理番号、ID)等が対応付けられていても良い。
 以上が、シート取得処理である。
 管理システム1は、上述したシート取得処理により取得した危険予知活動シートを用いて、後述する処理を実行する。
 [コンピュータ10が実行する承認処理]
 図14に基づいて、コンピュータ10が実行する承認処理について説明する。同図は、コンピュータ10が実行する承認処理のフローチャートを示す図である。本承認処理は、上述したシート取得処理の後に実行する処理である。加えて、本承認処理は、少なくとも後述する事前出力処理及び後述する合意取得処理における、危険予知活動シートを、建設現場の作業者が利用する端末に出力する処理(ステップS40)以前に実行する処理である。
 現場監督特定モジュールは、危険予知活動シートの対象となる建設現場の現場監督を特定する(ステップS20)。
 現場監督特定モジュールは、記録した危険予知活動シートに対応付けられた建設現場の現場監督の識別子を特定する。
 現場監督出力モジュールは、取得した危険予知活動シートを、特定した現場監督が利用する端末に出力する(ステップS21)。
 現場監督出力モジュールは、取得し、記録した危険予知活動シートを、特定した現場監督が利用する現場監督端末30に送信する。なお、現場監督出力モジュールは、危険予知活動シートそのものを、現場監督端末30に送信するものであっても良いし、記録した危険予知活動シートへアクセスするためのURL(Uniform Resource Locator)等の危険予知活動シートそのもの以外のものを送信するものであっても良い。
 現場監督端末30は、この危険予知活動シートを受信し、自身の表示部に表示する。
 現場監督は、この現場監督端末30が表示した危険予知活動シートを閲覧し、職長が作成した危険予知活動シートを確認する。
 現場監督出力モジュールは、現場監督端末30に、この危険予知活動シートを表示させることにより、取得した危険予知活動シートを、特定した現場監督が利用する端末に出力する。
 承認取得モジュールは、現場監督から、出力した危険予知活動シートに対する承認を取得する(ステップS22)。
 現場監督端末30は、現場監督による危険予知活動シートの確認後、所定の入力を受け付け、承認入力用フォーム(図15参照)を自身の表示部に表示する。現場監督端末30は、この承認入力用フォームにおける承認の入力を受け付け、危険予知活動シートに対する承認をコンピュータ10に送信する。
 図15に基づいて、承認入力用フォームについて説明する。同図は、承認入力用フォームの一例を模式的に示した図である。同図において、承認入力用フォーム100が示されている。
 承認入力用フォーム100は、確認アイコン101、承認アイコン102からなる。
 現場監督端末30は、現場監督が、危険予知活動シートを確認した際、現場監督から、確認アイコン101の入力を受け付ける。現場監督端末30は、更に、現場監督から、承認アイコン102の入力を受け付ける。現場監督端末30は、この承認アイコン102の入力を受け付けたことを契機として、現場監督が危険予知活動シートを確認し、承認したことを示す承認情報を、コンピュータ10に送信する。この承認情報は、出力された危険予知活動シートに関する情報や現場監督の氏名等が含まれる。
 承認取得モジュールは、この承認情報を受信することにより、現場監督から、出力した危険予知活動シートに対する承認を取得する。
 図14に戻り、承認処理の続きを説明する。
 承認記録モジュールは、取得した承認に基づいて、現場監督が危険予知活動シートを承認したことを記録する(ステップS23)。
 承認記録モジュールは、取得した承認に基づいて、危険予知活動シートに、承認したことを記録する。
 承認記録モジュールは、取得した建設現場監督の承認に基づいて、危険予知活動シート40における承認欄45に、現場監督がこの危険予知活動シート40を承認したことを記録する(図16参照)。
 図16に基づいて、危険予知活動シート40における承認欄45について説明する。同図は、上述した危険予知活動シート40における承認欄45のみを示した図である。
 承認欄45は、現場監督が危険予知活動シート40に記載された内容を承認したことを記録する欄である。
 承認記録モジュールは、現場監督の氏名を、この承認欄45に記録する。
 なお、承認欄45は、現場監督の氏名に限らず、現場監督が承認したことを示す内容であれば、その記録方法は、特に限定されるものではない。
 以上が、承認処理である。
 管理システム1は、上述した承認処理により承認が得られた危険予知活動シートを用いて、後述する処理を実行する。
 なお、管理システム1は、承認処理を、必ずしも実行する必要はなく、実行しない構成も可能である。
 [コンピュータ10が実行する事前出力処理]
 図17に基づいて、コンピュータ10が実行する事前出力処理について説明する。同図は、コンピュータ10が実行する事前出力処理のフローチャートを示す図である。本事前出力処理は、上述した承認処理の後に実行する処理である。加えて、本事前出力処理は少なくとも建設現場の作業日以前に実行する処理である。
 なお、承認処理が実行されない場合、本事前出力処理は、少なくとも、建設現場の作業日以前に実行する処理であれば良い。
 作業者特定モジュールは、危険予知活動シートの対象となる建設現場の作業者を特定する(ステップS30)。
 作業者特定モジュールは、記録した危険予知活動シートに対応付けられた作業者の識別子等に基づいて、危険予知活動シートの対象となる建設現場の作業者を特定する。作業者特定モジュールは、作業者として、職長及び職人を特定する。このとき、作業者特定モジュールは、特定の企業に所属する職長及び職人を特定するものであっても良いし、建設現場で作業を行う全ての職長及び職人を特定するものであっても良い。
 事前出力モジュールは、取得した危険予知活動シートを、特定した建設現場の作業者の利用する端末に出力する(ステップS31)。
 事前出力モジュールは、取得した危険予知活動シートを、特定した作業者が利用する端末(作業者端末20(具体的には、職人端末20b))に送信する。なお、事前出力モジュールは、取得した危険予知活動シートそのものを、職人端末20bに送信するものであっても良いし、記録した危険予知活動シートへアクセスするためのURL等の危険予知活動シートそのもの以外のものを送信するものであっても良い。
 職人端末20bは、この危険予知活動シートを受信し、自身の表示部に表示する。
 事前出力モジュールは、この危険予知活動シートを、職人端末20bに表示させることにより、取得した危険予知活動シートを、特定した建設現場の作業者の利用する端末に出力する。なお、事前出力モジュールは、職人端末20bだけでなく、職長端末20aにも、この危険予知活動シートを出力しても良い。
 職人は、この職人端末20bが表示した危険予知活動シートを閲覧することにより、予め、これから作業を行う予定の建設現場における危険事項を把握することが可能となる。
 以上が、事前出力処理である。
 なお、管理システム1は、事前出力処理を、必ずしも実行する必要はなく、実行しない構成も可能である。
 [コンピュータ10が実行する合意取得処理]
 図18に基づいて、コンピュータ10が実行する合意取得処理について説明する。同図は、コンピュータ10が実行する合意取得処理のフローチャートを示す図である。本合意取得処理は、取得した危険予知活動シートを、危険事項の対象の建設現場の作業者が利用する端末に出力するシート出力処理(ステップS2)、作業者から、出力した危険予知活動シートに対する合意を取得する合意取得処理(ステップS3)、取得した合意に基づいて、作業者が危険予知活動シートに合意したことを記録する合意記録処理(ステップS4)、記録した合意を、建設現場の現場監督が利用する端末に出力する合意出力処理(ステップS5)の詳細である。本合意取得処理は、上述したシート取得処理の後に実行する処理であり、上述した承認処理及び事前出力処理の後に実行する処理である。
 作業者特定モジュールは、危険事項の対象となる建設現場の作業者を特定する(ステップS40)。
 作業者特定モジュールは、記録した危険予知活動シートに対応付けられた作業者の識別子等に基づいて、危険予知活動シートの対象である危険事項の対象となる建設現場の作業者を特定する。作業者特定モジュールは、作業者として、職長及び職人を特定する。このとき、作業者特定モジュールは、特定の企業に所属する職長及び職人を特定するものであっても良いし、建設現場で作業を行う全ての職長及び職人を特定するものであっても良い。
 シート出力モジュールは、取得した危険予知活動シートを、危険事項の対象となる建設現場の作業者が利用する端末に出力する(ステップS41)。
 シート出力モジュールが、取得した危険予知活動シートを、特定した危険事項の対象となる建設現場の作業者が利用する端末(作業者端末20(具体的には、職人端末20b))に送信する。なお、シート出力モジュールは、危険予知活動シートそのものを、職人端末20bに送信するものであっても良いし、記録した危険予知活動シートへアクセスするためのURL等の危険予知活動シートそのもの以外のものを送信するものであっても良い。
 職人端末20bは、この危険予知活動シートを受信し、自身の表示部に表示する。
 シート出力モジュールは、職人端末20bに、この危険予知活動シートを表示させることにより、取得した危険予知活動シートを、危険事項の対象となる建設現場にいる作業者が利用する端末に出力する。
 職人は、この職人端末20bが表示した危険予知活動シートを閲覧することにより、これから作業を行う予定の建設現場における危険事項を把握することが可能となる。
 合意取得モジュールは、作業者から、出力した危険予知活動シートに対する合意を取得する(ステップS42)。
 職人端末20bは、職人による危険予知活動シートの閲覧後、所定の入力を受け付け、合意入力用フォームを自身の表示部に表示する(図19参照)。職人端末20bは、この合意入力用フォームにおいて、職人から合意の入力を受け付け、受け付けた危険予知活動シートに対する合意をコンピュータ10に送信する。
 図19に基づいて、合意入力用フォームについて説明する。同図は、合意入力用フォームの一例を模式的に示した図である。同図において、合意入力用フォーム110が示されている。
 合意入力用フォーム110は、危険予知活動シート40を表示するシート欄111、合意アイコン112からなる。
 職人端末20bは、職人が、シート欄111に表示された危険予知活動シート40を閲覧後、この危険予知活動シート40に合意した際、職人から、合意アイコン112の入力を受け付ける。職人端末20bは、この合意アイコン112の入力を受け付けたことを契機として、職人が危険予知活動シート40を閲覧し、合意したことを示す合意情報を、コンピュータ10に送信する。この合意情報は、危険予知活動シート40に合意した職人の氏名等が含まれる。
 合意取得モジュールは、この合意情報を受信することにより、作業者から、出力した危険予知活動シートに対する合意を取得する。
 なお、職人端末20bが入力を受け付ける内容は、合意アイコン112による入力に限らず、自身の氏名の手書入力や、電子印等による構成も可能である。
 図18に戻り、合意取得処理の続きを説明する。
 合意記録モジュールは、取得した合意に基づいて、作業者が危険予知活動シートに合意したことを記録する(ステップS43)。
 合意記録モジュールは、作業者が、危険予知活動シートに記載された内容に合意したことを記録する。ここで、合意記録モジュールは、作業者が合意したことそのものを記録するとともに、危険予知活動シートに、作業者が合意したことを記録する。
 合意記録モジュールは、取得した職人の合意に基づいて、危険予知活動シート40における合意欄46に、職人がこの危険予知活動シート40に合意したことを記録する(図20参照)。
 図20に基づいて、危険予知活動シート40における合意欄46について説明する。同図は、上述した危険予知活動シート40における合意欄46のみを示した図である。
 合意欄46は、職人が危険予知活動シート40に記載された内容に合意したことを記録する合意記録欄461、建設現場における作業者の出面の集計結果を記録する出面記録欄462からなる。
 合意記録欄461は、合意した作業者を記録する欄である。本実施形態では、合意記録欄461には、職人の氏名及び職長の氏名が記録される。出面記録欄462は、後述するステップS47の処理により集計した出面を記録する欄である。出面記録欄462に記録する出面については、その詳細は後述する。
 合意記録モジュールは、合意を取得した職人の氏名を、この合意記録欄461に電子署名の形式で記録する。
 なお、合意記録欄461は、合意を取得した職人の氏名だけでなく、コンピュータ10が、職人端末20bに対して実行した処理を、職長端末20aに対しても実行することにより、職長からの合意を取得し、合意を取得した職長の氏名を記録する構成も可能である。
 また、合意記録欄461は、職人及び職長の氏名に限らず、職人及び職長が合意したことを示す内容であれば、その記録方法は、電子印を用いる等、特に限定されるものではない。
 図18に戻り、合意取得処理の続きを説明する。
 集計モジュールは、取得した合意の数に基づいて、建設現場における作業者の出面を集計する(ステップS44)。
 出面は、建設現場における実際の作業者の人数である。
 集計モジュールは、取得した職人及び職長の合意の数に基づいて、建設現場における作業者の出面を集計する。
 出面記録モジュールは、集計した建設現場における作業者の出面を記録する(ステップS45)。
 出面記録モジュールは、集計した合意の数に基づいて、建設現場における作業者の出面を、危険予知活動シートに記録する。
 出面記録モジュールは、集計した合意の数に基づいて、危険予知活動シート40の合意欄46における出面記録欄462に、建設現場における作業者の出面を記録する(図20参照)。
 上述した図20に基づいて、出面記録欄462について説明する。
 出面記録モジュールは、集計した出面を、この出面記録欄462に数字の形式で記録する。
 なお、出面記録欄462は、数値に限らず、集計した作業者の出面を示す内容であれば、その記録方法は、特に限定されるものではない。
 図18に戻り、合意取得処理の続きを説明する。
 合意出力モジュールは、記録した合意を、建設現場の現場監督が利用する端末に出力する(ステップS46)。
 合意出力モジュールは、記録した合意として、合意及び出面が記録された危険予知活動シートを、現場監督が利用する端末(現場監督端末30)に送信する。合意出力モジュールは、所定のタイミング(例えば、建設作業の開始時刻、予め設定された建設現場の作業者の数分の合意を取得した時)において、危険予知活動シートを送信する。なお、合意出力モジュールは、この危険予知活動シートそのものを、現場監督端末30に送信するものであっても良いし、この危険予知活動シートへアクセスするためのURL等の危険予知活動シートそのもの以外のものを送信するものであっても良い。
 現場監督端末30は、この危険予知活動シートを受信し、自身の表示部に表示する。
 合意出力モジュールは、現場監督端末30に、この危険予知活動シートを表示させることにより、記録した合意を、建設現場の現場監督が利用する端末に出力する。
 現場監督は、現場監督端末30が表示した合意が記録された危険予知活動シートを閲覧することにより、合意した作業者を把握することが容易となる。また、現場監督は、合意及び出面が記録された危険予知活動シートを閲覧することにより、建設現場にいる職人や職長を把握することが容易となるため、この危険予知活動シートの存在で、職人や職長の点呼とすることも可能となる。
 なお、合意出力モジュールは、記録した合意を、作業者が利用する端末(作業者端末20(具体的には、職長端末20b))に送信しても良い。
 以上が、合意取得処理である。
 [コンピュータ10が実行する合意通知処理]
 図21に基づいて、コンピュータ10が実行する合意通知処理について説明する。同図は、コンピュータ10が実行する合意通知処理のフローチャートを示す図である。本合意通知処理は、上述した合意取得処理の後に実行する処理である。
 所属先特定モジュールは、危険予知活動シートの対象となる建設現場において作業を行う各作業者の所属先を特定する(ステップS50)。
 所属先は、例えば、企業、団体である。
 所属先特定モジュールは、予め、この建設現場において作業を行う各作業者の氏名及び所属先を登録した所属先データベース等を参照し、この建設現場において作業を行う各作業者の所属先を特定する。
 所属先特定モジュールは、危険予知活動シートに対して合意した作業者の所属先を特定する(ステップS51)。
 所属先特定モジュールは、上述した所属先データベース等を参照し、危険予知活動シートに対して合意した作業者の氏名に対応付けられた所属先を特定する。
 合意通知モジュールは、危険予知活動シートに対して合意した作業者を、建設現場の他の作業者に通知する(ステップS52)。
 本処理における他の作業者は、危険予知活動シートに対して合意した作業者の所属先とは異なる所属先に属する作業者を意味するものである。建設現場は、様々な業者が作業を行うものであるため、危険予知活動シートに記録された危険有害要因とは直接的な関係が無い作業者も存在する。このような危険予知活動シートに記録された危険有害要因とは直接的な関係が無い作業者が、合意した作業者とは異なる所属先に属する他の作業者となる。
 合意通知モジュールは、他の作業者(他の所属先に属する職長又は職人)が利用する端末に、合意が記録された危険予知活動シートを送信する。なお、合意通知モジュールは、この端末に、合意が記録された危険予知活動シートそのものを送信するものであっても良いし、合意が記録された危険予知活動シートへアクセスするためのURL等の危険予知活動シートそのもの以外の者を送信するものであっても良い。
 他の作業者が利用する端末は、この危険予知活動シートを受信し、自身の表示部に表示する。
 合意通知モジュールは、この危険予知活動シートを、他の作業者が利用する端末に表示させることにより、危険予知活動シートに対して合意した作業者を、建設現場の他の作業者に通知する。
 他の作業者が、この端末が表示した危険予知活動シートを閲覧することにより、建設現場全体で、危険有害要因を共有し、安全意識を高めることに繋がる。
 以上が、合意通知処理である。
 [コンピュータ10が実行するコミュニケーション処理]
 図22に基づいて、コンピュータ10が実行するコミュニケーション処理について説明する。同図は、コンピュータ10が実行するコミュニケーション処理のフローチャートを示す図である。本コミュニケーション処理は、上述した合意取得処理の後に実行する処理である。
 内容受付モジュールは、作業者から、所定の内容の入力を受け付ける(ステップS60)。
 所定の内容は、例えば、作業内容、リスクアセスメント等であり、作業者(職長)から、現場監督へ報告又は確認が必要となる内容である。
 職長端末20aは、職長からの所定の入力に基づいて、所定の内容を入力する所定内容入力用フォームを表示する。職長端末20aは、この所定内容入力用フォームに対して、所定の内容の入力を受け付ける。職長端末20aは、受け付けた所定の内容を、コンピュータ10に送信する。
 内容受付モジュールは、この所定の内容を受信することにより、作業者から、所定の内容の入力を受け付ける。
 なお、職長端末20aが所定の内容の入力を受け付ける方法は、所定内容入力用フォームに限らず、それ以外の方法(例えば、メール)であっても良い。
 内容通知モジュールは、受け付けた所定の内容を、現場監督に通知する(ステップS61)。
 内容通知モジュールは、受け付けた所定の内容を、現場監督端末30に送信する。
 現場監督端末30は、この所定の内容を受信し、自身の表示部に表示する。
 内容通知モジュールは、受け付けた所定の内容を、現場監督端末30に表示させることにより、受け付けた所定の内容を、現場監督に通知する。
 現場監督は、現場監督端末30が表示する所定の内容を閲覧し、この所定の内容を把握する。
 現場監督応答受付モジュールは、現場監督から、通知した所定の内容に対する応答の入力を受け付ける(ステップS62)。
 所定の内容に対する応答は、例えば、作業内容に対する安全指示、リスクアセスメントに対する承認等であり、現場監督から、作業者(職長)への指示や承認である。
 現場監督端末30は、現場監督からの所定の入力に基づいて、所定の内容に対する応答を入力する応答用フォームを表示する。
 現場監督端末30は、この応答用フォームに対して、応答の入力を受け付ける。現場監督端末30は、受け付けた応答を、コンピュータ10に送信する。
 現場監督応答受付モジュールは、この応答を受信することにより、現場監督から、通知した所定の内容に対する応答の入力を受け付ける。
 なお、現場監督端末30が応答を受け付ける方法は、所定の応答用フォームに限らず、それ以外の方法(例えば、メール)であっても良い。
 作業者応答通知モジュールは、受け付けた応答を、作業者に通知する(ステップS63)。
 作業者応答通知モジュールは、受け付けた応答を、職長端末20aに送信する。
 職長端末20aは、この応答を受信し、自身の表示部に表示する。
 作業者応答通知モジュールは、受け付けた応答を、職長端末20aに表示させることにより、受け付けた応答を、作業者(職長)に通知する。
 職長は、職長端末20aが表示する応答を閲覧し、この応答を把握する。職長は、この応答に基づいて、作業に取り掛かることが可能となる。
 なお、コンピュータ10は、入力を受け付けた所定の内容及び応答を、危険予知活動シートに記録する構成も可能である。この場合、コンピュータ10は、所定の内容を記録した危険予知活動シートを、現場監督に通知し、応答を記録した危険予知活動シートを、作業者に通知する。
 以上が、コミュニケーション処理である。
 [コンピュータ10が実行する指摘事項通知処理]
 図23に基づいて、コンピュータ10が実行する指摘事項通知処理について説明する。同図は、コンピュータ10が実行する指摘事項通知処理のフローチャートを示す図である。本指摘事項通知処理は、上述した現場監督から、合意の内容が守られていない作業内容を指摘事項として取得する指摘事項取得処理(ステップS6)、取得した指摘事項を記録する指摘事項記録処理(ステップS7)、記録した指摘事項を、建設現場の作業者の内、職長に通知する指摘事項通知処理(ステップS8)の詳細である。本指摘事項通知処理は、上述した合意取得処理の後に実行する処理である。
 指摘事項取得モジュールは、現場監督から、合意の内容が守られていない作業内容を指摘事項として取得する(ステップS70)。
 指摘事項は、例えば、KY実施事項の通り作業が出来ていない事柄である。現場監督は、KY実施事項の通り作業ができているか巡回等することにより建設現場を点検し、できていない事柄を、指摘事項として入力する。
 現場監督端末30は、現場監督からの所定の入力に基づいて、指摘事項を入力する指摘事項入力用フォーム(図24参照)を表示する。
 図24に基づいて、指摘事項入力用フォームについて説明する。同図は、指摘事項入力用フォームの一例を模式的に示した図である。同図において、指摘事項入力用フォーム120が示されている。
 指摘事項入力用フォーム120は、区分の入力を受け付ける区分入力欄121、点検結果の入力を受け付ける点検記録入力欄122、是正指示の内容の入力を受け付ける是正指示入力欄123、是正確認の有無の入力を受け付ける是正確認入力欄124、点検箇所の画像の入力を受け付ける画像入力欄125からなる。
 現場監督端末30は、区分入力欄121に対して、予め設定された複数の区分(例えば、A~E)の中から、現場監督が所望する区分の選択入力を受け付ける。現場監督端末30は、点検記録入力欄122及び是正指示入力欄123に対して、仮想キーボード等による文字入力を受け付ける。現場監督端末30は、是正確認入力欄124に対して、予め設定された確認の有無の必要性(例えば、OK、NG)の中から、現場監督が所望する必要性の選択入力を受け付ける(例えば、現場監督端末30は、OKアイコンに対する入力を受け付ける。)。現場監督端末30は、画像入力欄125に対して、撮影した点検箇所の画像の入力を受け付ける。なお、現場監督端末30は、画像入力欄125に対する入力を受け付けた際、撮影用アプリケーション等を起動し、現場監督が所望する画像を撮影し、撮影した画像を画像入力欄125に入力するものであっても良い。
 現場監督端末30は、指摘事項入力用フォーム120に対して入力を受け付けた入力内容を、コンピュータ10に送信する。
 指摘事項取得モジュールは、この入力内容を受信することにより、現場監督から、合意の内容が守られていない作業内容を指摘事項として取得する。
 図23に戻り、指摘事項通知処理の続きを説明する。
 指摘事項反映モジュールは、取得した指摘事項を、指摘事項確認用フォームに反映する(ステップS71)。
 指摘事項確認用フォームは、取得した指摘事項が反映されるフォームである。
 指定事項反映モジュールは、指摘事項入力用フォーム120における各欄に受け付けた入力内容を、指摘事項確認用フォームに反映する(図25参照)。
 図25に基づいて、指摘事項確認用フォームについて説明する。同図は、指摘事項確認用フォームの一例を模式的に示した図である。同図において、指摘事項確認用フォーム130が示されている。
 指摘事項確認用フォーム130は、区分入力欄121に入力された区分を反映する区分反映欄131、点検記録入力欄122に入力された点検記録を反映する点検記録反映欄132、是正指示入力欄123に入力された是正指示の内容を反映する是正指示反映欄133、是正確認入力欄124に入力された是正確認を反映する是正確認反映欄134、画像入力欄125に入力された点検箇所の画像を反映する画像反映欄135からなる。
 指摘事項反映モジュールは、指摘事項入力用ファーム130における各欄に入力された内容を、指摘事項確認用ファームにおける対応する各欄に反映する。
 図23に戻り、指摘事項通知処理の続きを説明する。
 指摘事項記録モジュールは、取得した指摘事項を記録する(ステップS72)。
 指摘事項記録モジュールは、取得した指摘事項を、是正指示として、危険予知活動シートに記録する。
 指摘事項記録モジュールは、取得した指摘事項に基づいて、危険予知活動シートにおける是正指示記録欄に、指摘事項を記録する(図26参照)。
 図26に基づいて、危険予知活動シート40における是正指示記録欄47について説明する。同図は、上述した危険予知活動シート40における是正指示記録欄47のみを示した図である。
 是正指示記録欄47は、指摘事項が発生した日付を記録する点検日記録欄471、指摘事項が発生した場所を記録する場所記録欄472、指摘事項の内容を記録する内容記録欄473からなる。
 指摘事項記録モジュールは、指摘事項を取得した日付を、点検日記録欄471に記録する。指摘事項記録モジュールは、指摘事項に含まれる場所を、場所記録欄472に記録する。指摘事項記録モジュールは、指摘事項の内容を、内容記録欄473に記録する。
 なお、是正指示記録欄47の各欄は、上述した例に限定されるものではなく、適宜変更可能である。
 図23に戻り、指摘事項通知処理の続きを説明する。
 指摘事項通知モジュールは、記録した指摘事項を、建設現場の作業者の内、職長に通知する(ステップS73)。
 指摘事項通知モジュールは、職長端末20aに指摘事項がある旨を通知する。ここで、指摘事項通知モジュールは、職長端末20aに所定のアプリケーションがインストールされている場合、このアプリケーションのプッシュ通知等によりこの旨を通知する。また、指摘事項通知モジュールは、指摘事項が有る旨及び指摘事項確認用フォームのURL等が記載されたメールを、職長端末20aに送信する。
 職長端末20aは、これらの通知に基づいて、自身の表示部に指摘事項確認用フォームを表示する。職長は、この指摘事項確認用ファームを閲覧し、指摘事項を把握する。職長は、把握した指摘事項に対して是正措置を行う。例えば、上述した例では、是正指示反映欄133の内容を実行することが是正措置として挙げられる。
 指摘事項通知モジュールは、職長端末20aに、指摘事項確認用フォームを表示させることにより、記録した指摘事項を、建設現場の作業者の内、職長に通知する。
 なお、指摘事項通知モジュールは、指摘事項を是正指示として記録した危険予知活動シートを、職長端末20aに通知しても良い。この場合、指摘事項通知モジュール及び職長端末20aは、指摘事項確認用フォームの代わりに、この危険予知活動シートを用いて上述した処理を行えば良い。
 作業者応答受付モジュールは、職長から、通知した指摘事項に対する応答の入力を受け付ける(ステップS74)。
 指摘事項に対する応答は、例えば、是正措置が完了したこと等であり、職長から、現場監督への報告及び連絡である。
 職長端末20aは、職長からの所定の入力に基づいて、職長からの所定の内容に対する応答を入力する応答用フォームを表示する。なお、応答用フォームは、上述した指摘事項確認用フォームに、応答を入力する欄が設けられたものであっても良い。
 職長端末20aは、この応答用フォームに対して、応答の入力を受け付ける。職長端末20aは、受け付けた応答を、コンピュータ10に送信する。
 作業者応答受付モジュールは、この応答を受信することにより、職長から、通知した指摘事項に対する応答の入力を受け付ける
 なお、職長端末20aが応答を受け付ける方法は、所定の応答用フォームに限らず、それ以外の方法(例えば、メール)であっても良い。
 現場監督応答通知モジュールは、受け付けた応答を、現場監督に通知する(ステップS75)。
 現場監督応答通知モジュールは、受け付けた応答を、現場監督端末30に送信する。
 現場監督端末30は、この応答を受信し、自身の表示部に表示する。
 現場監督応答通知モジュールは、受け付けた応答を、現場監督端末30に表示させることにより、受け付けた応答を、現場監督に通知する。
 現場監督は、現場監督端末30が表示する応答を閲覧し、この応答を把握する。現場監督は、この応答に基づいて、是正措置がされたことをすぐに確認することが可能となる。
 改善結果取得モジュールは、現場監督から、指摘事項の改善結果を取得する(ステップS76)。
 指摘事項の改善結果は、例えば、職長に通知した指摘事項に対して、職長や職人が行った是正措置の結果である。現場監督は、指摘事項の通知後に、再度、巡回等することにより、KY実施事項の通りの作業が遵守されたのか確認し、遵守されていたら遵守されていることを入力する。
 現場監督端末30は、現場監督からの所定の入力に基づいて、現場監督からの指摘事項の改善結果を入力する改善結果用フォームを表示する。
 現場監督端末30は、この改善結果用フォームに対して、指摘事項の改善結果の入力を受け付ける。現場監督端末30は、受け付けた指摘事項の改善結果を、コンピュータ10に送信する。
 改善結果取得モジュールは、この指摘事項の改善結果を受信することにより、現場監督から、指摘事項の改善結果を取得する。
 改善結果記録モジュールは、取得した指摘事項の改善結果を記録する(ステップS77)。
 改善結果記録モジュールは、取得した指摘事項の改善結果に基づいて、危険予知活動シートにおける改善結果記録欄に、指摘事項の改善結果を記録する。
 改善結果記録欄は、指摘事項が改善された日付を記録する改善日記録欄、改善結果の内容を記録する内容記録欄等からなれば良い。
 改善結果記録モジュールは、指摘事項の改善結果を取得した日付を、改善日記録欄に記録する。改善結果記録モジュールは、改善結果の内容を、内容記録欄に記録する。
 なお、改善結果記録欄は、上述した例に限定されるものではなく、適宜変更可能である。
 また、改善結果記録モジュールは、危険予知活動シートに、改善結果を記録する必要は必ずしもなく、単純に、改善結果を自身の記録部に記録するものであっても良い。
 以上が、指摘事項通知処理である。
 [コンピュータ10が実行する全体通知処理]
 図27に基づいて、コンピュータ10が実行する全体通知処理について説明する。同図は、コンピュータ10が実行する全体通知処理のフローチャートを示す図である。本全体通知処理は、上述した指摘事項通知処理の後に実行する処理である。なお、上述した処理と同様の処理については、その詳細な説明は省略する。
 所属先特定モジュールは、危険予知活動シートの対象となる建設現場において作業を行う各作業者の所属先を特定する(ステップS80)。
 ステップS80の処理は、上述したステップS50の処理と同様である。
 所属先特定モジュールは、指摘事項が発生した作業を行う各作業者の所属先を特定する(ステップS81)。
 所属先特定モジュールは、上述した所属先データベース等を参照し、指摘事項が記録された危険予知活動シートに対して合意した作業者の氏名に対応付けられた所属先を特定する。危険予知活動シートに記録された指摘事項は、この危険予知活動シートに合意した各作業者が行う作業により発生したものである。そのため、所属先特定モジュールは、この合意した作業者の所属先を特定することにより、指摘事項が発生した作業を行う各作業者の所属先を特定する。
 全体通知モジュールは、記録した指摘事項を、建設現場の他の作業者に通知する(ステップS82)。
 本処理における他の作業者は、上述した他の作業者と同様に、危険予知活動シートに対して合意した作業者の所属先とは異なる所属先に属する作業者を意味するものである。
 全体通知モジュールは、他の作業者(他の所属先に属する職長又は職人)が利用する端末に、指摘事項が記録された危険予知活動シートを送信する。なお、全体通知モジュールは、この端末に、指摘事項が記録された危険予知活動シートそのものを送信するものであっても良いし、指摘事項が記録された危険予知活動シートへアクセスするためのURL等の危険予知活動シートそのもの以外の者を送信するものであっても良い。
 他の作業者が利用する端末は、この危険予知活動シートを受信し、自身の表示部に表示する。
 全体通知モジュールは、この危険予知活動シートを、他の作業者が利用する端末に表示させることにより、記録した指摘事項を、建設現場の他の作業者に通知する。
 他の作業者が、この端末が表示した危険予知活動シートを閲覧することにより、建設現場全体で、危険有害要因を共有し、安全意識を高めることに繋がる。
 以上が、全体通知処理である。
 [コンピュータ10が実行する日報生成処理]
 図28に基づいて、コンピュータ10が実行する日報生成処理について説明する。同図は、コンピュータ10が実行する日報生成処理のフローチャートを示す図である。本日報生成処理は、上述した指摘事項通知処理の後に実行する処理である。
 生成モジュールは、危険予知活動シート及び指摘事項に基づいて、日報を生成する(ステップS90)。
 日報は、例えば、一般的な建設現場における作業日報であれば良い。
 生成モジュールは、合意及び指摘事項を記録した危険予知活動シートに基づいて、日報を生成する。生成モジュールは、予め設定された所定の形式の日報に対して、危険予知活動シートに記録された内容と、通常の作業内容とを反映させて、日報を生成する。
 日報記録モジュールは、生成した日報を記録する(ステップS91)。
 日報記録モジュールは、生成した日報を、建設現場の識別子等と対応付けて記録する。この時、建設現場の識別子には、更に、この建設現場で作業を行う作業者の識別子や、この建設現場の現場監督の識別子等が対応付けられていても良い。
 なお、コンピュータ10は、生成した日報を、現場監督端末30に出力しても良い。また、コンピュータ10は、生成した日報を、作業者端末20(職長端末20a又は職人端末20b)に出力しても良い。また、コンピュータ10は、生成した日報を、それ以外の端末(例えば、プリンタ等の印刷装置)等に出力しても良い。また、コンピュータ10は、生成した日報を、所定のデータ形式(例えば、ドキュメント形式、表計算形式、PDF(Portable Document Format))等に出力しても良い。
 以上が、日報生成処理である。
 上述した各処理は、別個の処理として記載しているが、コンピュータ10は、上述した各処理の一部又は全部を組み合わせて実行する構成も可能である。また、コンピュータ10は、各処理において、説明したタイミング以外のタイミングであっても、その処理を実行する構成も可能である。
 上述した手段、機能は、コンピュータ(CPU、情報処理装置、各種端末を含む)が、所定のプログラムを読み込んで、実行することによって実現される。プログラムは、例えば、コンピュータからネットワーク経由で提供される(SaaS:ソフトウェア・アズ・ア・サービス)形態やクラウドサービスで提供されて良い。また、プログラムは、コンピュータ読取可能な記録媒体に記録された形態で提供されて良い。この場合、コンピュータはその記録媒体からプログラムを読み取って内部記録装置又は外部記録装置に転送し記録して実行する。また、そのプログラムを、記録装置(記録媒体)に予め記録しておき、その記録装置から通信回線を介してコンピュータに提供するようにしても良い。
 以上、本発明の実施形態について説明したが、本発明は上述したこれらの実施形態に限るものではない。また、本発明の実施形態に記載された効果は、本発明から生じる最も好適な効果を列挙したに過ぎず、本発明による効果は、本発明の実施形態に記載されたものに限定されるものではない。
 (1)建設現場の危険事項を確認させるための危険予知活動シートを管理する管理システムであって、
 前記危険予知活動シートを取得するシート取得部(例えば、シート取得部11、シート取得モジュール)と、
 取得した前記危険予知活動シートを、前記危険事項の対象の建設現場の作業者(例えば、職長、職人)が利用する端末に出力するシート出力部(例えば、シート出力部12、シート出力モジュール)と、
 前記作業者から、出力した前記危険予知活動シートに対する合意を取得する合意取得部(例えば、合意取得部13、合意取得モジュール)と、
 取得した前記合意に基づいて、前記作業者が前記危険予知活動シートに合意したことを記録する合意記録部(例えば、合意記録部17、合意記録モジュール)と、
 記録した合意を、前記建設現場の現場監督が利用する端末(例えば、現場監督端末30)に出力する合意出力部(例えば、合意出力部14、合意出力モジュール)と、
 前記現場監督から、前記合意の内容が守られていない作業内容を指摘事項として取得する指摘事項取得部(例えば、指摘事項取得部15、指摘事項取得モジュール)と、
 取得した前記指摘事項を記録する指摘事項記録部(例えば、指摘事項記録部18、指摘事項記録モジュール)と、
 記録した前記指摘事項を、前記建設現場の作業者の内、職長に通知する指摘事項通知部(例えば、指摘事項通知部16、指摘事項通知モジュール)と、
 を備える管理システム。
 (1)の発明によれば、危険予知活動シートを活用し、作業者との合意事項が守られているかを確認することが可能となる。
 (2)前記建設現場の作業日以前に、前記危険予知活動シートを前記作業者が利用する端末に出力する事前出力部(例えば、事前出力モジュール)と、
 を更に備える(1)に記載の管理システム。
 (2)の発明によれば、事前に、作業者が危険予知活動シートを閲覧することになり、予め、作業者に建設現場における危険事項を把握させることが容易となる。
 (3)取得した前記危険予知活動シートを、前記シート出力部が前記危険予知活動シートを出力する以前に、前記現場監督が利用する端末に出力する現場監督出力部(例えば、現場監督出力モジュール)と、
 前記現場監督から、出力した前記危険予知活動シートに対する承認を取得する承認取得部(例えば、承認取得モジュール)と、
 を更に備え、
 前記シート出力部は、取得した前記承認に応じて、前記危険予知活動シートの出力を始動する、
 (1)に記載の管理システム。
 (3)の発明によれば、取得した危険予知活動シートの内、現場監督が承認したものを用いることが可能となる。
 (4)前記指摘事項の通知後に、前記現場監督から、前記指摘事項の改善結果を取得する改善結果取得部(例えば、改善結果取得モジュール)と、
 取得した前記改善結果を記録する改善結果記録部(例えば、改善結果記録モジュール)と、
 を更に備える(1)に記載の管理システム。
 (4)の発明によれば、危険予知活動シートを活用し、作業者との合意事項が守られているかを確認することが可能となる。
 (5)前記危険予知活動シート及び前記指摘事項に基づいて、日報を生成する生成部(例えば、生成モジュール)と、
 を更に備える(1)に記載の管理システム。
 (5)の発明によれば、必要な日報を簡単に作成することが可能となる。
 (6)前記危険予知活動シートは、少なくとも、作業内容、危険有害要因及び予防対策の項目を含む、
 (1)に記載の管理システム。
 (6)の発明によれば、危険予知活動に必要な内容を有する危険予知活動シートを用いることが容易となる。
 (7)取得した前記合意の数に基づいて、前記建設現場における作業者の出面を集計する集計部(例えば、集計モジュール)と、
 をさらに備える(1)に記載の管理システム。
 (7)の発明によれば、集計結果に基づいて、建設現場における作業者の点呼が可能となる。
 (8)前記危険予知活動シートに対して合意した前記作業者を、前記建設現場の他の作業者に通知する合意通知部(例えば、合意通知モジュール)と、
 を更に備える(1)に記載の管理システム。
 (8)の発明によれば、建設現場全体で、危険有害要因を共有し、安全意識を高めることが容易となる。
 (9)記録した前記指摘事項を、前記建設現場の他の作業者に通知する全体通知部(例えば、全体通知モジュール)と、
 を更に備える(1)に記載の管理システム。
 (9)の発明によれば、建設現場全体で、危険有害要因を共有し、安全意識を高めることが容易となる。
 (10)前記作業者から、所定の内容の入力を受け付ける内容受付部(例えば、内容受付モジュール)と、
 受け付けた前記所定の内容を、前記現場監督に通知する内容通知部(例えば、内容通知モジュール)と、
 前記現場監督から、通知した前記所定の内容に対する応答の入力を受け付ける現場監督応答受付部(例えば、現場監督応答受付モジュール)と、
 受け付けた前記応答を、前記作業者に通知する作業者応答通知部(例えば、作業者応答通知モジュール)と、
 を更に備える(1)に記載の管理システム。
 (10)の発明によれば、作業者からの連絡事項を、現場監督が即座に確認することが容易となる。
 (11)前記職長から、通知した前記指摘事項に対する応答の入力を受け付ける作業者応答受付部(例えば、作業者応答受付モジュール)と、
 受け付けた前記応答を、前記現場監督に通知する現場監督応答通知部(例えば、現場監督応答通知モジュール)と、
 を更に備える(1)に記載の管理システム。
 (11)の発明によれば、現場監督からの指摘事項を、作業者が即座に対応することが容易となる。
 (12)建設現場の危険事項を確認させるための危険予知活動シートを管理するコンピュータが実行する管理方法であって、
 前記危険予知活動シートを取得するステップ(例えば、ステップS11)と、
 取得した前記危険予知活動シートを、前記危険事項の対象の建設現場の作業者が利用する端末に出力するステップ(例えば、ステップS41)と、
 前記作業者から、出力した前記危険予知活動シートに対する合意を取得するステップ(例えば、ステップS42)と、
 取得した前記合意に基づいて、前記作業者が前記危険予知活動シートに合意したことを記録するステップ(例えば、ステップS43)と、
 記録した合意を、前記建設現場の現場監督が利用する端末に出力するステップ(例えば、ステップS46)と、
 前記現場監督から、前記合意の内容が守られていない作業内容を指摘事項として取得するステップ(例えば、ステップS70)と、
 取得した前記指摘事項を記録するステップ(例えば、ステップS72)と、
 記録した前記指摘事項を、前記建設現場の作業者の内、職長に通知するステップ(例えば、ステップS73)と、
 を備える管理方法。
 (13)建設現場の危険事項を確認させるための危険予知活動シートを管理するコンピュータに、
 前記危険予知活動シートを取得するステップ(例えば、ステップS11)、
 取得した前記危険予知活動シートを、前記危険事項の対象の建設現場の作業者が利用する端末に出力するステップ(例えば、ステップS41)、
 前記作業者から、出力した前記危険予知活動シートに対する合意を取得するステップ(例えば、ステップS42)、
 取得した前記合意に基づいて、前記作業者が前記危険予知活動シートに合意したことを記録するステップ(例えば、ステップS43)、
 記録した合意を、前記建設現場の現場監督が利用する端末に出力するステップ(例えば、ステップS46)、
 前記現場監督から、前記合意の内容が守られていない作業内容を指摘事項として取得するステップ(例えば、ステップS70)、
 取得した前記指摘事項を記録するステップ(例えば、ステップS72)、
 記録した前記指摘事項を、前記建設現場の作業者の内、職長に通知するステップ(例えば、ステップS73)、
 を実行させるためのコンピュータ読み取り可能なプログラム。
 1 管理システム
 8 ネットワーク
 10 コンピュータ
 11 シート取得部
 12 シート出力部
 13 合意取得部
 14 合意出力部
 15 指摘事項取得部
 16 指摘事項通知部
 17 合意記録部
 18 指摘事項記録部
 20 作業者端末
 20a 職長端末
 20b 職人端末
 30 現場監督端末
 40 危険予知活動シート
 41 作業内容欄
 411 作業内容記録欄
 412 資格記録欄
 413 所属先記録欄
 42 元請安全指示事項欄
 43 危険有害要因欄
 431 時期記録欄
 432 原因記録欄
 433 現象記録欄
 434 数値記録欄
 44 予防対策欄
 441 時期記録欄
 442 対策記録欄
 45 承認欄
 46 合意欄
 461 合意記録欄
 462 出面記録欄
 47 是正指示記録欄
 471 点検日記録欄
 472 場所記録欄
 473 内容記録欄
 50 作業関係入力用フォーム
 51 作業内容入力欄
 52 必須資格入力欄
 53 資格保有者入力欄
 60 KY記録入力用フォーム
 61 確認用フォーム
 610 一覧
 62 登録用フォーム
 620 指示連絡事項入力欄
 621 危険箇所入力欄
 622 登録アイコン
 70 安全指示事項確認用フォーム
 71 安全指示事項欄
 80 KY活動入力用フォーム
 81 危険性入力欄
 82 第1可能性入力欄
 83 第1重篤度入力欄
 84 第1危険性評価入力欄
 85 優先度入力欄
 86 対策入力欄
 87 第2可能性入力欄
 88 第2重篤度入力欄
 89 第2危険性評価入力欄
 90 残留リスク入力欄
 91 一時保存アイコン
 92 登録アイコン
 100 承認入力用フォーム
 101 確認アイコン
 102 承認アイコン
 110 合意入力用フォーム
 111 シート欄
 112 合意アイコン
 120 指摘事項入力用フォーム
 121 区分入力欄
 122 点検記録入力欄
 123 是正指示入力欄
 124 是正確認入力欄
 125 画像入力欄
 130 指摘事項確認用フォーム
 131 区分反映欄
 132 点検記録反映欄
 133 是正指示反映欄
 134 是正確認反映欄
 135 画像反映欄

 

Claims (13)

  1.  建設現場の危険事項を確認させるための危険予知活動シートを管理する管理システムであって、
     前記危険予知活動シートを取得するシート取得部と、
     取得した前記危険予知活動シートを、前記危険事項の対象の建設現場の作業者が利用する端末に出力するシート出力部と、
     前記作業者から、出力した前記危険予知活動シートに対する合意を取得する合意取得部と、
     取得した前記合意に基づいて、前記作業者が前記危険予知活動シートに合意したことを記録する合意記録部と、
     記録した合意を、前記建設現場の現場監督が利用する端末に出力する合意出力部と、
     前記現場監督から、前記合意の内容が守られていない作業内容を指摘事項として取得する指摘事項取得部と、
     取得した前記指摘事項を記録する指摘事項記録部と、
     記録した前記指摘事項を、前記建設現場の作業者の内、職長に通知する指摘事項通知部と、
     を備える管理システム。
  2.  前記建設現場の作業日以前に、前記危険予知活動シートを前記作業者が利用する端末に出力する事前出力部と、
     を更に備える請求項1に記載の管理システム。
  3.  取得した前記危険予知活動シートを、前記シート出力部が前記危険予知活動シートを出力する以前に、前記現場監督が利用する端末に出力する現場監督出力部と、
     前記現場監督から、出力した前記危険予知活動シートに対する承認を取得する承認取得部と、
     を更に備え、
     前記シート出力部は、取得した前記承認に応じて、前記危険予知活動シートの出力を始動する、
     請求項1に記載の管理システム。
  4.  前記指摘事項の通知後に、前記現場監督から、前記指摘事項の改善結果を取得する改善結果取得部と、
     取得した前記改善結果を記録する改善結果記録部と、
     を更に備える請求項1に記載の管理システム。
  5.  前記危険予知活動シート及び前記指摘事項に基づいて、日報を生成する生成部と、
     を更に備える請求項1に記載の管理システム。
  6.  前記危険予知活動シートは、少なくとも、作業内容、危険有害要因及び予防対策の項目を含む、
     請求項1に記載の管理システム。
  7.  取得した前記合意の数に基づいて、前記建設現場における作業者の出面を集計する集計部と、
     をさらに備える請求項1に記載の管理システム。
  8.  前記危険予知活動シートに対して合意した前記作業者を、前記建設現場の他の作業者に通知する合意通知部と、
     を更に備える請求項1に記載の管理システム。
  9.  記録した前記指摘事項を、前記建設現場の他の作業者に通知する全体通知部と、
     を更に備える請求項1に記載の管理システム。
  10.  前記作業者から、所定の内容の入力を受け付ける内容受付部と、
     受け付けた前記所定の内容を、前記現場監督に通知する内容通知部と、
     前記現場監督から、通知した前記所定の内容に対する応答の入力を受け付ける現場監督応答受付部と、
     受け付けた前記応答を、前記作業者に通知する作業者応答通知部と、
     を更に備える請求項1に記載の管理システム。
  11.  前記職長から、通知した前記指摘事項に対する応答の入力を受け付ける作業者応答受付部と、
     受け付けた前記応答を、前記現場監督に通知する現場監督応答通知部と、
     を更に備える請求項1に記載の管理システム。
  12.  建設現場の危険事項を確認させるための危険予知活動シートを管理するコンピュータが実行する管理方法であって、
     前記危険予知活動シートを取得するステップと、
     取得した前記危険予知活動シートを、前記危険事項の対象の建設現場の作業者が利用する端末に出力するステップと、
     前記作業者から、出力した前記危険予知活動シートに対する合意を取得するステップと、
     取得した前記合意に基づいて、前記作業者が前記危険予知活動シートに合意したことを記録するステップと、
     記録した合意を、前記建設現場の現場監督が利用する端末に出力するステップと、
     前記現場監督から、前記合意の内容が守られていない作業内容を指摘事項として取得するステップと、
     取得した前記指摘事項を記録するステップと、
     記録した前記指摘事項を、前記建設現場の作業者の内、職長に通知するステップと、
     を備える管理方法。
  13.  建設現場の危険事項を確認させるための危険予知活動シートを管理するコンピュータに、
     前記危険予知活動シートを取得するステップ、
     取得した前記危険予知活動シートを、前記危険事項の対象の建設現場の作業者が利用する端末に出力するステップ、
     前記作業者から、出力した前記危険予知活動シートに対する合意を取得するステップ、
     取得した前記合意に基づいて、前記作業者が前記危険予知活動シートに合意したことを記録するステップ、
     記録した合意を、前記建設現場の現場監督が利用する端末に出力するステップ、
     前記現場監督から、前記合意の内容が守られていない作業内容を指摘事項として取得するステップ、
     取得した前記指摘事項を記録するステップ、
     記録した前記指摘事項を、前記建設現場の作業者の内、職長に通知するステップ、
     を実行させるためのコンピュータ読み取り可能なプログラム。

     
PCT/JP2022/032894 2022-08-31 2022-08-31 管理システム、管理方法及びプログラム WO2024047827A1 (ja)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2023532781A JPWO2024047827A1 (ja) 2022-08-31 2022-08-31
PCT/JP2022/032894 WO2024047827A1 (ja) 2022-08-31 2022-08-31 管理システム、管理方法及びプログラム

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/032894 WO2024047827A1 (ja) 2022-08-31 2022-08-31 管理システム、管理方法及びプログラム

Publications (1)

Publication Number Publication Date
WO2024047827A1 true WO2024047827A1 (ja) 2024-03-07

Family

ID=90099003

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/032894 WO2024047827A1 (ja) 2022-08-31 2022-08-31 管理システム、管理方法及びプログラム

Country Status (2)

Country Link
JP (1) JPWO2024047827A1 (ja)
WO (1) WO2024047827A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013109740A (ja) * 2011-11-21 2013-06-06 Anabuki College Service:Kk 遠隔品質管理システム
JP2019109718A (ja) * 2017-12-19 2019-07-04 五洋建設株式会社 安全管理システム
JP2021018751A (ja) * 2019-07-23 2021-02-15 東京電力ホールディングス株式会社 プログラム、情報処理方法及び情報処理装置
JP2022051601A (ja) * 2020-09-21 2022-04-01 株式会社インフィニティ 施工管理システム、施工管理方法、及び施工管理用のコンピュータプログラム
JP2022076617A (ja) * 2020-11-10 2022-05-20 大林道路株式会社 朝礼支援装置、及びプログラム

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013109740A (ja) * 2011-11-21 2013-06-06 Anabuki College Service:Kk 遠隔品質管理システム
JP2019109718A (ja) * 2017-12-19 2019-07-04 五洋建設株式会社 安全管理システム
JP2021018751A (ja) * 2019-07-23 2021-02-15 東京電力ホールディングス株式会社 プログラム、情報処理方法及び情報処理装置
JP2022051601A (ja) * 2020-09-21 2022-04-01 株式会社インフィニティ 施工管理システム、施工管理方法、及び施工管理用のコンピュータプログラム
JP2022076617A (ja) * 2020-11-10 2022-05-20 大林道路株式会社 朝礼支援装置、及びプログラム

Also Published As

Publication number Publication date
JPWO2024047827A1 (ja) 2024-03-07

Similar Documents

Publication Publication Date Title
US20150356477A1 (en) Method and system for technology risk and control
KR20130033915A (ko) 클라우드 컴퓨팅에 기초하여 보험 계약들을 처리하기 위한 시스템 및 방법과 관련 비지니스 관리 도구
US20140244451A1 (en) E-commerce transaction verification system and method
CN102622677A (zh) 一种企业安全生产管理方法
CN107730198A (zh) 基于物联网的运营维护管理方法、终端、存储介质及装置
WO2019144400A1 (en) A system and a method for use in data exchange
Murray Procurement fraud vulnerability: a case study
JP2017062606A (ja) 消防用設備の点検システム
Ohki et al. Information security governance framework
WO2024047827A1 (ja) 管理システム、管理方法及びプログラム
US20170069032A1 (en) Method and apparatus for managing compliance for financial transactions
WO2024047826A1 (ja) 管理システム、管理方法及びプログラム
JP2016115027A (ja) 作業現場集中監視システム
JPWO2019225142A1 (ja) 情報処理装置及び情報処理方法
JP2024082314A (ja) 児童相談業務を支援する情報処理方法、プログラム、情報処理システム
US20210319374A1 (en) Utilizing a combinatorial accountability framework database system for risk management and compliance
US11450165B2 (en) Blockchain-based system and method for securing transactions and controlling access to worksites
JP2009251935A (ja) 建物管理情報共有システム
US20170024684A1 (en) Systems and Methods for Worksite Safety Management and Tracking
Lee et al. The application of mistake-proofing to organisational security management
Ong et al. Hong Kong's data breach notification scheme: From the stakeholders’ perspectives
US20190228418A1 (en) Electronic employment document control system with mobile application
TWM555027U (zh) 電子保險單據之產生系統
KR102595680B1 (ko) 범용성을 갖는 스마트 통합 안전 관리 시스템
KR20150116544A (ko) 4대보험 신고 알람 시스템 및 그 제공방법

Legal Events

Date Code Title Description
ENP Entry into the national phase

Ref document number: 2023532781

Country of ref document: JP

Kind code of ref document: A

121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22956694

Country of ref document: EP

Kind code of ref document: A1