WO2023145095A1 - 水採取装置、水採取方法及び水電解装置 - Google Patents

水採取装置、水採取方法及び水電解装置 Download PDF

Info

Publication number
WO2023145095A1
WO2023145095A1 PCT/JP2022/003702 JP2022003702W WO2023145095A1 WO 2023145095 A1 WO2023145095 A1 WO 2023145095A1 JP 2022003702 W JP2022003702 W JP 2022003702W WO 2023145095 A1 WO2023145095 A1 WO 2023145095A1
Authority
WO
WIPO (PCT)
Prior art keywords
water
ice
gas
regolith
rgl
Prior art date
Application number
PCT/JP2022/003702
Other languages
English (en)
French (fr)
Inventor
浩基 内田
理亮 川上
健 森田
成美 松風
敦史 加藤
大輔 馬場
柊吾 津村
尭志 岡
Original Assignee
高砂熱学工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 高砂熱学工業株式会社 filed Critical 高砂熱学工業株式会社
Priority to PCT/JP2022/003702 priority Critical patent/WO2023145095A1/ja
Publication of WO2023145095A1 publication Critical patent/WO2023145095A1/ja

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C51/00Apparatus for, or methods of, winning materials from extraterrestrial sources

Definitions

  • the present disclosure relates to a water sampling device, a water sampling method, and a water electrolysis device.
  • Patent Literature 1 discloses a resource mining method for mining resources buried in the sand while gas is being blown into the sand to fluidize the sand. Patent Literature 1 discloses generating water vapor by melting ice blocks buried in sand and blowing hot gas into the ice blocks to further vaporize the generated water.
  • the present disclosure provides a technology for efficiently collecting water from underground, especially from underground on the surface of the moon.
  • the present disclosure also provides techniques for treating water collected from underground.
  • the present disclosure includes an ice wall forming portion that heats the ground to form an ice wall formed of ice containing moisture contained in the ground, and recovers a first gas inside the area surrounded by the ice wall, and a water sampling unit for sampling water from the collected first gas.
  • water sampling device and water sampling method of the present disclosure water can be efficiently collected from the ground, especially from the ground on the surface of the moon.
  • water electrolysis device of the present disclosure it is possible to treat water collected from underground using the water collection device and the water collection method.
  • FIG. 1 is a diagram showing a schematic configuration of a water sampling device according to the first embodiment.
  • FIG. 2 is a diagram illustrating the steam generator of the water sampling device according to the first embodiment.
  • FIG. 3 is a diagram illustrating the water vapor recovery unit of the water sampling device according to the first embodiment.
  • FIG. 4 is a diagram illustrating a water sampling method using the water sampling device according to the first embodiment.
  • FIG. 5 is a diagram illustrating a water sampling method using the water sampling device according to the first embodiment.
  • FIG. 6 is a diagram illustrating a water sampling method using the water sampling device according to the first embodiment.
  • FIG. 7 is a diagram illustrating a water sampling method using the water sampling device according to the first embodiment.
  • FIG. 1 is a diagram showing a schematic configuration of a water sampling device according to the first embodiment.
  • FIG. 2 is a diagram illustrating the steam generator of the water sampling device according to the first embodiment.
  • FIG. 3 is a diagram illustrating the water vapor recovery unit of
  • FIG. 8 is a diagram illustrating a water sampling method using the water sampling device according to the first embodiment.
  • FIG. 9 is a diagram explaining a water sampling method using the water sampling device according to the first embodiment.
  • FIG. 10 is a diagram explaining a water sampling method using the water sampling device according to the first embodiment.
  • FIG. 11 is a diagram illustrating a water sampling method using the water sampling device according to the first embodiment.
  • FIG. 12 is a diagram illustrating a water sampling method using the water sampling device according to the first embodiment.
  • FIG. 13 is a diagram illustrating formation of an ice wall in the water sampling method using the water sampling device according to the first embodiment.
  • 14A and 14B are diagrams illustrating the formation of ice walls in the water sampling method using the water sampling device according to the first embodiment.
  • FIG. 15A and 15B are diagrams illustrating the formation of ice walls in the water sampling method using the water sampling device according to the first embodiment.
  • FIG. FIG. 16 is a diagram showing a schematic configuration of a water sampling device according to the second embodiment.
  • FIG. 17 is a diagram explaining the operation of the water sampling device according to the second embodiment.
  • FIG. 18 is a diagram explaining the operation of the water sampling device according to the second embodiment.
  • FIG. 19 is a diagram explaining the operation of the water sampling device according to the second embodiment.
  • FIG. 20 is a diagram showing a schematic configuration of a water sampling device according to the third embodiment.
  • FIG. 21 is a diagram explaining the operation of the water sampling device according to the fourth embodiment.
  • FIG. 22 is a diagram explaining the operation of the water sampling device according to the fourth embodiment.
  • FIG. 16 is a diagram showing a schematic configuration of a water sampling device according to the second embodiment.
  • FIG. 17 is a diagram explaining the operation of the water sampling device according to the second embodiment.
  • FIG. 23 is a diagram explaining the operation of the water sampling device according to the fourth embodiment.
  • FIG. 24 is a diagram explaining the operation of the water sampling device according to the fourth embodiment.
  • FIG. 25 is a diagram illustrating formation of an ice wall in the water sampling device according to the fifth embodiment.
  • FIG. 26 is a diagram illustrating an outline of a water sampling device according to the sixth embodiment.
  • FIG. 27 is a diagram illustrating an outline of a modification of the water sampling device according to the sixth embodiment.
  • FIG. 28 is a diagram explaining an outline of a modification of the water sampling device according to the sixth embodiment.
  • FIG. 29 is a diagram explaining an outline of a modification of the water sampling device according to the sixth embodiment.
  • FIG. 30 is a diagram explaining an outline of a modification of the water sampling device according to the sixth embodiment.
  • FIG. 30 is a diagram explaining an outline of a modification of the water sampling device according to the sixth embodiment.
  • FIG. 31 is a diagram explaining an overview of a modification of the water sampling device according to the sixth embodiment.
  • FIG. 32 is a diagram illustrating an outline of a modification of the water sampling device according to the sixth embodiment.
  • FIG. 33 is a diagram for explaining the outline of the water sampling device according to the seventh embodiment.
  • FIG. 34 is a diagram for explaining the outline of the water sampling device according to the seventh embodiment.
  • FIG. 35 is a diagram for explaining the amount of water that can be collected on the lunar surface by the water sampling device according to this embodiment.
  • FIG. 36 is a diagram for explaining the amount of water that can be collected on the lunar surface by the water sampling device according to this embodiment.
  • 37A and 37B are diagrams for explaining the behavior of the ice wall by the water sampling device according to the present embodiment.
  • FIG. 38 is a diagram explaining the behavior of the ice wall by the water sampling device according to this embodiment.
  • 39 is a perspective view of the water electrolysis device according to the first embodiment.
  • FIG. 40 is an exploded perspective view of the water electrolysis device according to the first embodiment.
  • FIG. 41 is a diagram explaining the operation of the water electrolysis device according to the first embodiment.
  • FIG. 42 is a diagram explaining the operation of the water electrolysis device according to the first embodiment.
  • FIG. 43 is an exploded perspective view of the water electrolysis device according to the second embodiment.
  • FIG. 44 is an exploded perspective view of the water electrolysis device according to the second embodiment.
  • FIG. 45 is a perspective view of the anode current collector of the water electrolysis device according to the second embodiment.
  • FIG. 46 is a side view of the anode current collector of the water electrolysis device according to the second embodiment.
  • FIG. 47 is an exploded perspective view of the water electrolysis device according to the third embodiment.
  • FIG. 48 is a front view of the anode current collector of the water electrolysis device according to the third embodiment.
  • FIG. 49 is a diagram showing a schematic configuration of a water electrolysis device according to the fourth embodiment.
  • FIG. 50 is a diagram showing a schematic configuration of a water electrolysis device according to the fifth embodiment.
  • FIG. 51 is a diagram illustrating the behavior of the water electrolysis device according to this embodiment.
  • FIG. 52 is a diagram explaining the behavior of the water electrolysis device of the comparative example.
  • An object of the present disclosure is to provide a water sampling apparatus capable of efficiently sampling water existing in the ground, particularly on the surface of the moon, in a wide range while saving energy.
  • the lunar surface is covered with gravel called regolith.
  • the ground on the moon contains ice. That is, ice is contained in the interstices of regolith deposited on the lunar surface.
  • the soil on the moon has a cryogenic temperature of less than -150°C. In order to collect ice from the lunar surface with a water sampling device, it is necessary to heat and melt the ice contained in the lunar surface.
  • the water sampling device uses gas to propagate heat over a wide range.
  • the water sampling apparatus forms an ice wall on the lunar surface by freezing the supplied water vapor or the vaporized water vapor present in the regolith, and is surrounded by the ice wall. Water can be collected efficiently by collecting water vapor in the formed sealed space.
  • FIG. 1 is a diagram showing a schematic configuration of a water sampling device 1 according to the first embodiment.
  • FIG. 2 is a diagram for explaining the water vapor generator 10 of the water sampling device 1 according to the first embodiment.
  • FIG. 3 is a diagram illustrating the water vapor recovery section 20 of the water sampling device 1 according to the first embodiment.
  • the water sampling device 1 samples the water (ice) contained in the lunar regolith.
  • the water sampling device 1 includes a steam generator 10 and a steam recovery unit 20 .
  • the steam generator 10 generates steam.
  • the steam generator 10 also supplies the generated steam through the steam supply pipe 11 into the lunar soil, in other words, into the regolith RGL of the ground GL on the moon.
  • the water vapor supply pipe 11 is inserted into the lunar soil, in other words into the regolith RGL of the ground GL on the moon.
  • the steam generator 10 supplies steam into the regolith RGL from a steam supply port 11h at the end (tip) of the steam supply pipe 11 opposite to the steam generator 10 .
  • an ice wall IW is formed surrounding the water vapor supply port 11h, as will be described later. That is, the water vapor generator 10 heats the ground (inside the regolith RGL) to form an ice wall IW made of ice containing moisture contained in the ground (inside the regolith RGL).
  • the steam generator 10 includes a water supply tank 10a.
  • the water supply tank 10a stores water W1.
  • the steam generator 10 generates steam by evaporating the water W1 stored in the water supply tank 10a.
  • the water vapor generation unit 10 generates water vapor by setting the inside of the water supply tank 10a to a saturated vapor pressure at a temperature of 0° C. or higher.
  • the steam generator 10 supplies saturated steam to the regolith RGL from the steam supply port 11h via the steam supply pipe 11 .
  • the water vapor recovery unit 20 recovers water vapor through the water vapor recovery pipe 21 into the lunar soil, in other words, from the regolith RGL of the ground GL on the moon. Further, the water vapor recovery unit 20 converts the recovered water vapor into water and recovers it.
  • the water vapor recovery pipe 21 is inserted into the lunar soil, in other words into the regolith RGL of the ground GL on the moon.
  • the water vapor recovery unit 20 recovers water vapor from the regolith RGL through a water vapor recovery port 21h at the end (tip) of the water vapor recovery pipe 21 opposite to the water vapor recovery unit 20 .
  • the steam recovery unit 20 includes a water recovery tank 20a.
  • the water recovery tank 20a condenses water vapor and stores the condensed water WCD1.
  • the steam recovery unit 20 generates water by condensing the steam recovered in the water recovery tank 20a.
  • the water vapor recovery unit 20 recovers water vapor by reducing the temperature inside the water recovery tank 20a to less than 5°C.
  • the water vapor recovery port 21h of the water vapor recovery pipe 21 is surrounded by an ice wall IW. Therefore, the water vapor recovery unit 20 recovers the water vapor in the area surrounded by the ice wall IW, and extracts water from the recovered water vapor.
  • FIGS. 4 to 12 are diagrams for explaining a water sampling method using the water sampling device 1 according to the first embodiment. The steps of the water sampling method according to the present embodiment will be described with reference to FIGS. 4 to 12.
  • FIG. 4 to 12 are diagrams for explaining a water sampling method using the water sampling device 1 according to the first embodiment. The steps of the water sampling method according to the present embodiment will be described with reference to FIGS. 4 to 12.
  • FIG. 4 to 12 are diagrams for explaining a water sampling method using the water sampling device 1 according to the first embodiment. The steps of the water sampling method according to the present embodiment will be described with reference to FIGS. 4 to 12.
  • a hole is drilled vertically from the ground GL on the lunar surface into the regolith RGL with a drill DRL.
  • a space SP0 is formed by drilling a hole in the regolith RGL with a drill DRL (FIG. 4).
  • the diameter of the drill DRL is slightly larger than the diameter of the steam supply/recovery pipe 31 so that the steam supply/recovery pipe 31, which will be described later, can be inserted into the hole (space SP0) formed by the drill DRL.
  • the diameter of the drill DRL should be such that a large amount of steam does not leak from the gap between the steam supply/recovery pipe 31 and the hole (space SP0).
  • the water vapor supply/recovery pipe 31 is inserted into the hole (space SP0) drilled by the drill DRL in the regolith RGL (Fig. 5).
  • the steam supply/recovery pipe 31 is inserted into the space SP0.
  • a space not occupied by the steam supply/recovery pipe 31 beyond the tip of the steam supply/recovery pipe 31 in the space SP0 is referred to as a space SP1.
  • the water vapor supply/recovery pipe 31 is a pipe that integrates the water vapor supply pipe 11 and the water vapor recovery pipe 21 described above.
  • the water vapor supply/recovery pipe 31 is a pipe in which the water vapor supply pipe 11 and the water vapor recovery pipe 21 are integrated.
  • the steam supply/recovery pipe 31 is, for example, divided into two halves, one of which is connected to the steam generating section 10 and the other of which is connected to the steam recovery section 20 .
  • dotted lines indicate the divided portions of the steam supply/recovery pipe 31 .
  • the left side of the dotted line is connected to the steam generating section 10 and the right side of the dotted line is connected to the steam recovery section 20 .
  • FIG. 8 An enlarged view of the area RA in FIG. 5 is shown in FIG. 8, 9, 10 and 12 are similarly enlarged views of the area RA in either one of FIGS. 7 and 11.
  • FIG. 8 An enlarged view of the area RA in FIG. 5 is shown in FIG. 8, 9, 10 and 12 are similarly enlarged views of the area RA in either one of FIGS. 7 and 11.
  • FIG. 8 An enlarged view of the area RA in FIG. 5 is shown in FIG. 8, 9, 10 and 12 are similarly enlarged views of the area RA in either one of FIGS. 7 and 11.
  • the regolith RGL part in Fig. 6 shows the state of the regolith RGL on the lunar surface.
  • the regolith RGL is a porous material having voids EMP between the fine particles RGP.
  • the air gap EMP between the granules RGP is a vacuum.
  • the porosity of the regolith RGL is, for example, 30 to 60% by volume.
  • ice ICE is included in a part of the gap EMP between the plurality of fine particles RGP.
  • the temperature in the regolith RGL is extremely low, approximately -273°C.
  • the steam generator 10 supplies steam to the space SP1 through the steam supply/recovery pipe 31 (Fig. 7).
  • the steam generator 10 supplies saturated steam at a temperature of 20° C. and a pressure of 2340 Pascals to the space SP1, for example.
  • the regolith RGL is a porous body with a porosity of about 30 to 60% by volume
  • the steam VP1 supplied from the steam supply/recovery pipe 31 flows through the space EMP between the fine particles RGP. while spreading (Fig. 8).
  • the regolith RGL has an extremely low temperature of -200°C or below. Therefore, the water vapor VP1 supplied from the water vapor supply/recovery pipe 31 solidifies and freezes at a very short distance after entering the regolith RGL to form an ice layer ICL (FIG. 9). More specifically, water vapor VP1 condenses on the surface of the regolith RGL on the space SP1 side. Since the temperature in the regolith RGL is 0° C. or less, the water vapor VP1 solidifies and freezes. The void EMP of the regolith RGL, which is a porous material, is filled with solidified and frozen ice to form an ice layer ICL that separates the space SP1 of the drilled hole from the inside of the regolith RGL.
  • the ice layer ICL is formed by water vapor supplied from the water vapor generation unit 10 and water (ice ICE) contained in the regolith RGL. That is, the ice wall IW formed by the ice layer ICL contains water contained in the regolith RGL.
  • the surface of the ice layer ICL on the space SP1 side is heated.
  • a portion of the ice layer ICL melts.
  • water WTR is generated (FIG. 10).
  • the ice layer ICL on the side opposite to the space SP1 grows toward the inside of the low-temperature, low-pressure regolith RGL.
  • the side of the ice layer ICL opposite to the space SP1 involves the ice ICE inside the regolith RGL as it grows toward the inside of the low-temperature, low-pressure regolith RGL.
  • the ice layer ICL is formed to surround the space SP1.
  • the water vapor VP1 selectively flows into the hole.
  • the water vapor VP1 freezes and blocks the holes.
  • the inside of the ice layer ICL is set to a temperature of about 5 ° C and a water vapor pressure (for example, a pressure of 900 pascals), and the soil (regolith) of the lunar ground GL in a vacuum state RGL). Whether or not the ice wall (ice layer ICL) is completed can be detected by measuring the pressure of the water vapor supply port.
  • the steam generator 10 injects steam from the steam supply/recovery pipe 31 with the upper limit of the steam temperature generated by the steam generator 10 set to 5°C and the upper limit of the saturated steam pressure set to 900 pascals.
  • the steam generator 10 stops supplying steam.
  • the water sampling device 1 closes the valve provided on the steam supply pipe 11 .
  • the valve provided in the water vapor recovery pipe 21 is opened, and the water vapor VP2 in the sealed space surrounded by the ice wall (ice layer ICL) ice wall is recovered in the water vapor recovery unit 20 through the water vapor recovery port 21h (FIG. 11).
  • the inside of the water recovery tank 20a is cooled to a temperature lower than 5°C.
  • the saturated water vapor in the sealed space formed by the ice layer ICL in the lunar soil flows into the water vapor recovery section 20 (FIG. 12).
  • water WTR deposited on the surface of the ice layer ICL on the space SP1 side is recovered as water vapor VP2.
  • Water vapor VP2 is an example of the first gas.
  • the saturated water vapor pressure at a temperature of -50°C is about 5 Pascals.
  • the inside temperature of the water recovery tank 20a is ⁇ 50° C.
  • the water vapor of the pressure of 900 pascals in the lunar soil can flow into the water vapor recovery device and be recovered.
  • FIG. 13 to 15 are diagrams for explaining the formation of the ice wall IW in the water sampling method using the water sampling device 1 according to the first embodiment.
  • the water vapor supply pipe 41 is inserted from the ground of the regolith RGL to a depth of about 1 meter.
  • High-temperature steam RHA is injected from the steam inlet of the steam supply pipe 41 (FIG. 13).
  • the ice in the vicinity of the water vapor inlet of the water vapor supply pipe 41 is sublimated, and the water vapor moves toward the low pressure (vacuum) outer side together with the high temperature water vapor RHA. That is, the high-temperature steam RHA flows toward the outside of the sphere centered on the steam inlet of the steam supply pipe 41 .
  • the water vapor that has moved outward from the water vapor supply pipe 41 is cooled, solidified, and frozen. That is, an ice wall IW is formed.
  • the formed ice wall has a spherical shell shape centering on the water vapor intake port of the water vapor supply pipe 41 . Even if the ice wall IW is not a perfect spherical shell and has a hole IWh, the high-temperature steam RHA selectively flows through the hole IWH and freezes to block the hole IWh (FIG. 14).
  • the ice wall IW is grown thick by continuing to supply the high-temperature steam RHA.
  • a dry high-temperature gas such as high-temperature nitrogen gas may be supplied.
  • the ice wall IW may be formed using the moisture of the melted ice while melting the ice in the regolith RGL by supplying a high-temperature gas.
  • water vapor may be supplied.
  • the steam generating unit 10 is an example of an ice wall forming unit
  • the steam recovery unit 20 is an example of a water collecting unit.
  • the water sampling device 1 according to the first embodiment supplies steam from the steam generator 10 to the regolith RGL, and collects the existing water in the regolith RGL together.
  • the water sampling device 2 according to the second embodiment sufficiently heats the inside of the sealed space formed in the regolith RGL to heat and collect water more efficiently.
  • the water sampling device 2 according to the second embodiment sends high-temperature gas into the closed space inside the regolith RGL and recovers the water in the closed space inside the regolith RGL.
  • FIG. 16 is a diagram showing a schematic configuration of a water sampling device 2 according to the second embodiment.
  • the water sampling device 2 includes a gas supply/recovery unit 50.
  • the gas supply/recovery part 50 supplies a high-temperature dry gas, such as nitrogen gas, through the gas supply port 51h of the gas supply pipe 51, and is formed by an ice wall IW formed in the regolith RGL under the ground GL. supply to a closed space.
  • the gas supply/recovery unit 50 supplies low-temperature wet gas such as nitrogen gas from the closed space formed by the ice wall IW formed in the regolith RGL through the gas recovery port 52h of the gas recovery pipe 52. to recover.
  • the high-temperature and dry gas supplied by the gas supply/recovery unit 50 is an example of the second gas.
  • the water sampling device 2 supplies high-temperature and dry gas from the gas supply/recovery unit 50 to heat the inside of the ice wall IW. Then, the water sampling device 2 recovers the low-temperature, high-humidity gas containing the water vapor generated by the heating of the ice wall IW in the gas supply/recovery unit 50 .
  • the gas supply/collection unit 50 collects water from the low-temperature, high-humidity gas containing the collected water vapor. As described above, the water sampling device 2 alternately repeats the supply of the high-temperature dry gas and the recovery of the low-temperature, high-humidity gas.
  • dry regolith DRGL is deposited by recovering wet gas by the gas supply recovery unit 50 .
  • the water sampling device 2 supplies high-temperature gas from the gas supply/recovery unit 50, the inner surface of the ice wall IW melts, and at the same time, the ice wall IW is heated by steam convection.
  • the ice wall IW spreads away from the gas supply pipe 51 while melting water (ice) contained in the regolith RGL outside the ice wall IW.
  • the water sampling device 2 according to the second embodiment alternately repeats the supply of high-temperature dry gas and the recovery of low-temperature and high-humidity gas, the ice wall IW grows.
  • the water (ice) contained in the regolith RGL is involved in the ice wall.
  • the water contained in the regolith RGL can be recovered.
  • the gas supply/collection unit 50 collects the gas inside the area surrounded by the ice wall IW and collects water from the collected gas.
  • the gas supply/recovery section 50 is an example of a water sampling section.
  • the ice in the regolith RGL is vaporized by supplying high-temperature dry gas from the gas supply/recovery unit 50 through the gas supply pipe 51.
  • An ice wall IW may be formed by refreezing.
  • the gas supply/recovery section 50 is an example of the ice wall forming section and the water sampling section.
  • FIG. 20 is a diagram showing a schematic configuration of a water sampling device 3 according to the third embodiment.
  • the water sampling device 3 includes a heating section 61 , a cooling section 62 , a water vapor supply section 63 , a water storage section 64 and a gas supply section 65 .
  • the heating unit 61 includes a heat exchanger 61hx.
  • the cooling unit 62 includes a heat exchanger 62hx.
  • One end of the pipe forming the heat exchanger 61hx and one end of the pipe forming the heat exchanger 62hx are connected to the compressor 66 .
  • the other end of the pipe forming the heat exchanger 61hx and the other end of the pipe forming the heat exchanger 62hx are connected to an expansion valve 68 .
  • heat exchanger 61hx acts as a condenser.
  • the heat exchanger 62hx acts as an evaporator.
  • the heating section 61 and the cooling section 62 are connected by a blower 67 .
  • the blower 67 blows the gas cooled by the heat exchanger 62hx of the cooling section 62 to the heat exchanger 61hx of the heating section 61 .
  • the gas blown to the heat exchanger 61hx is supplied to the regolith RGL through the gas supply pipe 61p. Also, the gas from the regolith RGL is recovered to the cooling unit 62 via the gas recovery pipe 62p.
  • the heat exchanger 61hx acts as a condenser. Therefore, the gas blown to the heat exchanger 61hx is heated.
  • the air heated by the heating unit 61 is supplied to the regolith RGL.
  • the gas supplied to the regolith RGL is recovered and cooled in the cooling section 62 .
  • the heat exchanger 62hx acts as an evaporator. Therefore, the gas blown to the heat exchanger 62hx is cooled.
  • the cooling unit 62 collects water vapor in the region surrounded by ice wall IW, and extracts water from the collected water vapor. Dry air is supplied to the heating part 61 by removing moisture.
  • the water vapor supply unit 63 supplies water vapor to the regolith RGL.
  • the water vapor supplied by the water vapor supply unit 63 forms an ice wall IW. That is, the water vapor supply unit 63 heats the ground (inside the regolith RGL) to form an ice wall IW made of water-containing ice contained in the ground (inside the regolith RGL).
  • the water storage unit 64 stores water deposited from the collected gas.
  • the gas supply unit 65 supplies gas blown by the blower 67 .
  • the gas is, for example, nitrogen gas.
  • the water vapor supply unit 63 is an example of the ice wall forming unit, and the cooling unit 62 is an example of the water collecting unit. Further, when the regolith RGL contains sufficient moisture, the ice in the regolith RGL is vaporized and re-frozen by supplying dry gas at a high temperature from the heating unit 61 through the gas supply pipe 61p.
  • An ice wall IW may be formed by In that case, the heating portion 61 is an example of an ice wall forming portion. Furthermore, an ice wall may be formed by combining the heating section 61 and the water vapor supply section 63 .
  • the water sampling device 4 according to the fourth embodiment forms an ice wall IW and collects water (ice) existing on the lunar surface.
  • the configuration of the water sampling device 4 will be described while describing the operation of the water sampling device 4 according to the fourth embodiment based on FIGS. 21 to 24 .
  • 21 to 24 white arrows indicate the flow of heat, and lines with arrows indicate the flow of gas.
  • the water sampling device 4 includes a heating section 71 , a cooling section 72 , a water supply section 73 , a water storage section 74 and a gas supply section 75 .
  • the heating unit 71 includes a heat exchanger 71hx.
  • the cooling unit 72 includes a heat exchanger 72hx.
  • One end of the pipe forming the heat exchanger 71hx and one end of the pipe forming the heat exchanger 72hx are connected to the compressor 76 .
  • the other end of the pipe forming the heat exchanger 71hx and the other end of the pipe forming the heat exchanger 72hx are connected to an expansion valve 78 .
  • the compressor 76 operates in two operation modes, a first mode supplying compressed refrigerant to the heat exchanger 71hx and a second mode supplying compressed refrigerant to the heat exchanger 72hx.
  • first mode heat exchanger 71hx acts as a condenser.
  • the heat exchanger 72hx acts as an evaporator.
  • the heat exchanger 71hx acts as an evaporator.
  • the heat exchanger 72hx acts as a condenser.
  • the water sampling device 4 supplies water vapor to the regolith RGL to form the ice wall IW (Fig. 21).
  • the water supply unit 73 supplies water to the heating unit 71 .
  • the heat exchanger 71hx functions as a condenser when the compressor 76 is operating in the first mode. Water is supplied from the water supply unit 73 to the heat exchanger 71hx that functions as a condenser, whereby the water is vaporized to generate steam in the heat exchanger 71hx. The steam generated in the heat exchanger 71hx is supplied to the regolith RGL.
  • the high-temperature water vapor supplied to the regolith RGL from the heating unit 71 condenses and solidifies in the regolith RGL to form an ice wall IW. That is, the heating unit 71 heats the ground (inside the regolith RGL) to form an ice wall IW made of water-containing ice contained in the ground (inside the regolith RGL).
  • RHA indicates an area where high-temperature gas is supplied.
  • the inside of the ice wall IW is heated by supplying high-temperature steam from the heating unit 71 . Since water vapor condenses and solidifies inside the ice wall IW, the ice wall IW can be efficiently heated. Also, the ice wall IW grows on both the outer and inner sides.
  • steam is used as the heat medium.
  • Heat transfer between the heat medium and the regolith RGL and ice wall IW is performed by condensation and solidification latent heat.
  • Steam, which is a heat medium, is supplied from the heating unit 71 to the regolith RGL and the ice wall IW due to the saturated vapor pressure difference between the inside of the heating unit 71 and the regolith RGL and the ice wall IW.
  • the spherical shell of the ice wall IW can be formed and the spherical shell of the ice wall IW can be enlarged. Also, by supplying water vapor from the heating unit 71 to the regolith RGL, the thickness of the ice wall IW can be increased. Furthermore, by supplying water vapor from the heating unit 71 to the regolith RGL, even if there is a hole in the spherical shell of the ice wall IW, the water vapor is selectively supplied to the hole, and the hole can be closed.
  • the ice in the regolith RGL is vaporized and re-frozen by supplying high-temperature and dry gas from the heating unit 71 through the gas supply pipe 71p.
  • An ice wall IW may be formed by
  • the water sampling device 4 supplies hot gas to the regolith RGL and the ice wall IW to expand the ice wall IW (FIG. 22).
  • the gas supply unit 75 supplies gas to the heating unit 71 .
  • the gas supplied from the gas supply unit 75 is, for example, nitrogen gas.
  • the type of gas supplied from the gas supply unit 75 is not limited as long as it is non-condensable and inert.
  • Compressor 76 operates in a first mode. That is, the heat exchanger 71hx functions as a condenser. Further, the heating unit 71 recovers gas from the regolith RGL via the blower 77a. The gas supplied from the heating unit 71 is circulated so as to be recovered, heated again, and supplied.
  • a high-temperature gas is supplied from the heating part 71 to the inside of the ice wall IW.
  • the inside of the ice wall IW is heated by supplying high-temperature gas to the inside of the ice wall IW. Since there is no condensation or solidification of water inside the ice wall IW, the ice wall IW can grow only in the outward direction of the ice wall IW. Since the heat transfer between the gas and the ice wall IW is convective heat transfer, it takes time to heat the ice wall IW.
  • a high-temperature gas such as nitrogen gas is used as the heat medium. Heat transfer between the heat medium and the regolith RGL and ice wall IW is by convective heat transfer.
  • a high-temperature gas as a heat medium is supplied from the heating unit 71 to the regolith RGL and the ice wall IW by the blower 77a.
  • the spherical shell of the ice wall IW can be enlarged. Further, by supplying high-temperature gas from the heating unit 71 to the regolith RGL, the thickness of the ice wall IW can be increased. Furthermore, by supplying high-temperature gas from the heating unit 71 to the regolith RGL, even if there is a hole in the spherical shell of the ice wall IW, the hole can be selectively supplied with water vapor to close the hole.
  • the water sampling device 4 supplies high-temperature dry gas to the inside of the ice wall IW to extract water from the ice wall IW (Fig. 23).
  • the gas supply unit 75 supplies gas to the heating unit 71 .
  • the gas supplied from the gas supply unit 75 is, for example, nitrogen gas.
  • the type of gas supplied from the gas supply unit 75 is not limited as long as it is non-condensable and inert.
  • Compressor 76 operates in a first mode. That is, the heat exchanger 71hx functions as a condenser, and the heat exchanger 72hx functions as an evaporator. Further, the blower 77 b supplies high-temperature dry gas from the heating unit 71 to the regolith RGL, and recovers the gas containing water vapor from the regolith RGL to the cooling unit 72 .
  • the gas supplied from the heating unit 71 is collected by the cooling unit 72, cooled and dehumidified, heated again by the heating unit 71, and circulated so as to be supplied to the regolith RGL.
  • the inside of the ice wall IW is heated by supplying high-temperature dry gas, such as nitrogen gas, from the heating unit 71 to the inside of the ice wall IW.
  • high-temperature dry gas such as nitrogen gas
  • the heating unit 71 By heating the inside of the ice wall IW, the ice inside the ice wall IW is sublimated.
  • the gas produced by sublimating the ice inside the ice wall IW contains moisture (water vapor).
  • the gas containing water vapor is cooled by the cooling section 72 .
  • the gas containing water vapor collected in the cooling unit 72 is cooled, and the water vapor in the gas is condensed and solidified. Ice ICE2 adheres to the heat exchanger 72hx. That is, cooling unit 72 collects water vapor in the region surrounded by ice wall IW, and collects water from the collected water vapor.
  • a high-temperature gas such as nitrogen gas is used as the heat medium. Heat transfer between the heat transfer medium and the ice wall IW is by convective heat transfer due to the circulation of hot dry gas.
  • a high-temperature gas which is a heat medium, is supplied from the heating unit 71 to the ice wall IW by the blower 77b.
  • the moisture derived from the ice inside the ice wall IW is recovered.
  • the collected moisture is frozen by the cooling unit 72 .
  • the water sampling device 4 melts the icing that freezes and adheres to the heat exchanger 72hx of the cooling unit 72 to produce water (FIG. 24).
  • the rotation of the compressor 76 is reversed when the icing on the heat exchanger 72hx of the cooling unit 72 increases and the icing efficiency decreases. That is, the compressor 76 is operated in the second mode.
  • heat exchanger 72hx acts as a condenser. Since the heat exchanger 72hx acts as a condenser, the icing (ice ICE2) adhering to the heat exchanger 72hx is heated and melted. The water produced by melting the icing is stored in the water storage section 74 .
  • the valves provided in the pipes of the heating unit 71 and the cooling unit 72 connected to the inside of the regolith RGL are closed to prevent the water vapor from returning to the inside of the regolith.
  • the water sampling device 4 can continuously sample water by switching the rotation direction of the compressor 76, that is, by alternately switching the operation mode of the compressor 76.
  • the heating unit 71 and the water supply unit 73 are examples of the ice wall forming unit, and the cooling unit 72 is an example of the water sampling unit. Further, when the ice wall IW is formed by supplying high-temperature and dry gas from the heating unit 71 through the gas supply pipe 71p, the heating unit 71 is an example of the ice wall forming unit.
  • FIG. 25 is a diagram illustrating a method of forming the ice wall IW.
  • a drill DRL is used to dig a hole in the regolith RGL (Fig. 25(a)). Then, the sleeve SLV is inserted into the dug hole so that the hole does not collapse (FIG. 25(b)). Then, the heater HTR is inserted into the deepest part of the sleeve SLV (FIG. 25(c)). By inserting the heater HTR to the deepest point of the sleeve SLV, the heater HTR contacts the regolith RGL. In addition, in FIG. 25(c), circles indicate ice grains that already exist inside the regolith RGL.
  • the method for forming the ice wall IW as described in the water sampling apparatus according to the first embodiment, the method using water vapor, the method using dry heated gas, and the method using the water sampling apparatus according to the fifth embodiment. As described, methods using heaters HTR may be combined.
  • the heater HTR may be used to heat the regolith RGL to try to form an ice wall. Whether or not the ice wall IW is formed by heating the regolith RGL by the heater HTR depends on the water content in the regolith RGL. Therefore, first, the heater HTR is used to heat the regolith RGL to try to form an ice wall, and the portion heated by the heater HTR is filled with gas and the internal pressure is measured to determine whether an ice wall has been formed. good too.
  • the portion heated by the heater HTR is filled with gas and there is no change in the internal pressure, it may be determined that the ice wall has been completed. If the portion heated by the heater HTR is filled with gas and the internal pressure gradually decreases, it may be determined that the ice wall is not sufficiently formed and that there is a hole in the ice wall.
  • the heater HTR does not form an ice wall
  • dry heated gas may be supplied to try to close the hole in the ice wall. Then, it may be determined whether or not an ice wall has been formed by filling gas again into the portion where the ice wall is formed and measuring the internal pressure.
  • the part forming the ice wall is filled with gas and there is no change in the internal pressure, it may be determined that the ice wall has been completed. If the portion forming the ice wall is filled with gas and the internal pressure gradually decreases, it may be determined that the ice wall is not sufficiently formed and that there is a hole in the ice wall.
  • water vapor may be further supplied to form an ice wall.
  • the ice wall can be formed without using water if the regolith RGL contains sufficient water.
  • the ice wall can be formed without using water, You can reduce the amount of water used for water collection.
  • the heater HTR is an example of the ice wall forming portion.
  • FIG. 26 is a diagram illustrating an outline of a water sampling device according to the sixth embodiment.
  • the water sampling device according to the present embodiment described above may be a rover-type water sampling device mounted on a probe about the size of a one-seater car.
  • a rover-type water sampling device 80 includes a water sampling device 81, a power battery BAT, and a water tank TNK. At the rear of the exploration vehicle 80, a pipe PIP for supplying and recovering steam or gas and a drill DRL for drilling a hole for installing the pipe PIP in the regolith are provided. The pipe PIP is connected to the water sampling device 81 .
  • the probe 80 for example, it is possible to collect water while moving on the lunar surface.
  • rover 180 that is a modification of the rover-type water sampling device (rover 80) that is the water sampling device according to the sixth embodiment will be described.
  • FIGS. 27, 28 and 29 are diagram explaining an outline of a survey vehicle 180 which is a modified example of the water sampling device according to the sixth embodiment.
  • 27 is a top view of the survey vehicle 180
  • FIG. 28 is a side view of the survey vehicle 180
  • FIG. 29 is a front view of the survey vehicle 180.
  • FIG. 28 and 29 show an ice wall IW formed in the regolith RGL when water is collected.
  • the probe 180 includes a first temperature control unit 181, a second temperature control unit 182, a water supply unit 183, a water storage unit 184, a gas supply unit 185, a compressor 186, a blower 187, and an expansion valve. 188;
  • FIG. 30 is a diagram illustrating the first temperature control section 181 and the second temperature control section 182. As shown in FIG.
  • the first temperature control unit 181 has a gas supply port 181a, a water supply port 181w, a water discharge port 181d, a fan connection port 181b, and an external connection port 181e.
  • the gas supply port 181 a is connected to the gas supply section 185 .
  • a non-condensable gas is supplied from the gas supply port 181a.
  • the water supply port 181w is connected to the water supply section 183 .
  • Moisture for forming the ice wall IW is supplied from the water supply portion 183 to the water supply port 181w.
  • 181 d of water outlets are connected to the water storage part 184. As shown in FIG. Water collected by a heat exchanger 181hx provided inside the first temperature control unit 181, which will be described later, is discharged to the water storage unit 184 through the water discharge port 181d.
  • the blower connection port 181b is connected to the blower 187.
  • the external connection port 181e is connected to the thermal mining bit 193 via a flexible tube TB1.
  • the first temperature control unit 181 includes a heat exchanger 181hx inside.
  • FIG. 31 is a diagram illustrating the heat exchanger 181hx included in the first temperature control section 181.
  • the heat exchanger 181hx is formed by connecting a plurality of pipes 181p by folded portions 181r.
  • a coolant flows inside the pipe 181p.
  • the coolant flows in from one of the coolant port 181c1 and the coolant port 181c2 and flows out from the other of the coolant port 181c1 and the coolant port 181c2.
  • One of the refrigerant port 181c1 and the refrigerant port 181c2 is connected to the compressor 186 .
  • the other of the refrigerant port 181c1 and the refrigerant port 181c2 is connected to the expansion valve 188 .
  • a gas flows between the plurality of pipes 181p.
  • the heat exchanger 181hx exchanges heat between the gas and the refrigerant by causing the gas to flow through the plurality of pipes 181p.
  • the heat exchanger 181hx included in the first temperature control section 181 and the heat exchanger included in the second temperature control section 182 are connected via a compressor 186 and an expansion valve 188 to form a refrigerant circuit.
  • the heat exchanger 181hx acts as a condenser. That is, the first temperature control part 181 acts as a heating part that heats the gas.
  • the heat exchanger included in the second temperature control section 182 that constitutes the refrigerant circuit acts as an evaporator. That is, the second temperature control part 182 acts as a cooling part that cools the gas.
  • the heat exchanger 181hx acts as an evaporator. That is, the first temperature control part 181 acts as a cooling part that cools the gas.
  • the heat exchanger included in the second temperature control section 182 that constitutes the refrigerant circuit acts as a condenser. That is, the second temperature control part 182 acts as a heating part that heats the gas.
  • the second temperature control section 182 has a gas supply port 182a, a water supply port 182w, a water discharge port 182d, a fan connection port 182b, and an external connection port 182e.
  • the gas supply port 182 a is connected to the gas supply section 185 .
  • a non-condensable gas is supplied from the gas supply port 182a.
  • the water supply port 182w is connected to the water supply section 183 .
  • Moisture for forming the ice wall IW is supplied from the water supply portion 183 to the water supply port 182w.
  • Water outlet 182 d connects to water reservoir 184 . Water collected by the heat exchanger provided inside the second temperature control unit 182 is discharged to the water storage unit 184 through the water discharge port 182d.
  • the blower connection port 182b is connected to the blower 187.
  • the external connection port 182e is connected to the thermal mining bit 193 via a flexible tube TB2.
  • a blower 187 is connected to each of the blower connection port 181 b of the first temperature control section 181 and the blower connection port 182 b of the second temperature control section 182 .
  • the blower 187 When the blower 187 rotates, for example, in the first rotation direction, the blower 187 blows gas to the first temperature control section 181 . In other words, the blower 187 blows gas to the blower connection port 181b.
  • the gas sent from the blower 187 to the blower connection port 181b undergoes heat exchange in the heat exchanger 181hx of the first temperature control unit 181, and the gas is discharged from the external connection port 181e.
  • the blower 187 rotates, for example, in the first rotation direction, the blower 187 sucks gas from the second temperature control section 182 .
  • the blower 187 sucks gas from the blower connection port 182b.
  • the blower 187 sucks gas from the blower connection port 182b
  • the gas is sucked from the external connection port 182e, heat is exchanged in the heat exchanger of the second temperature control unit 182, and the gas is fed from the blower connection port 182b to the blower 187. is discharged.
  • the blower 187 When the blower 187 rotates in a second rotation direction opposite to the first rotation direction, the blower 187 sucks gas from the first temperature control unit 181 . In other words, the blower 187 sucks gas from the blower connection port 181b.
  • the air blower 187 When the air blower 187 sucks gas from the air blower connection port 181b, the air is sucked from the external connection port 181e, heat is exchanged by the heat exchanger 181hx of the first temperature control unit 181, and the air flows from the air blower connection port 181b to the air blower 187. Gas is expelled.
  • the blower 187 when the blower 187 rotates in a second rotation direction opposite to the first rotation direction, the blower 187 blows gas to the second temperature control unit 182 .
  • the blower 187 blows gas to the blower connection port 182b.
  • the gas sent from the blower 187 to the blower connection port 182b undergoes heat exchange in the heat exchanger of the second temperature control section 182, and the gas is discharged from the external connection port 182e.
  • the rover 180 also includes a drill bit 191 , a heater bit 192 and a thermal mining bit 193 .
  • drill bit 191, heater bit 192 and thermal mining bit 193 is movably attached to rail RL.
  • Each of the drill bit 191 , heater bit 192 and thermal mining bit 193 is moved above the opening TH provided in the floor of the rover 180 . Then, one of the moved drill bit 191, heater bit 192 and thermal mining bit 193 is inserted into the regolith RGL.
  • the drill bit 191 is inserted into the regolith RGL to form a hole in the regolith RGL, for example, as shown in FIGS. 4 and 25(a).
  • a heater HTR is provided at the tip of the heater bit 192, for example, as shown in FIG. 25(c).
  • a heater bit 192 is inserted into the hole formed by the drill bit 191 to form an ice wall, for example, as shown in FIGS. 25(c) to 25(f).
  • FIG. 32 is a diagram for explaining the outline of the thermal mining bit 193. As shown in FIG. In addition, in FIG. 32, the pipe 193p is shown cut in the middle in order to explain the inside of the pipe 193p.
  • the thermal mining bit 193 has a pipe 193p inserted into the regolith RGL.
  • the thermal mining bit 193 has a first connection portion 193a connected to the first temperature control portion 181 via the tube TB1, and a second connection connected to the second temperature control portion 182 via the tube TB2. and a portion 193b.
  • the pipe 193p has a first channel 193pa and a second channel 193pb inside.
  • Each of the first flow path 193pa and the second flow path 193pb is formed along the longitudinal direction of the pipe 193p.
  • the first flow path 193pa is connected to the first connecting portion 193a above the pipe 193p.
  • the second flow path 193pb is connected to the second connection portion 193b at the upper portion of the pipe 193p.
  • the pipe 193p has an opening 193ha and an opening 193hb at its tip.
  • the opening 193ha is connected to the first channel 193pa.
  • the opening 193hb is connected to the second channel 193pb.
  • the gas supplied from the first temperature control section 181 is supplied from the first connection section 193a through the first flow path 193pa and into the regolith RGL from the opening 193ha. Then, the gas from inside the regolith RGL passes through the opening 193hb, passes through the second flow path 193pb, and is sucked into the second temperature control section 182 from the second connecting portion 193b.
  • the gas supplied from the second temperature control section 182 is supplied from the second connection section 193b through the second flow path 193pb and into the regolith RGL from the opening 193hb. Then, the gas from inside the regolith RGL passes through the opening 193ha, passes through the first flow path 193pa, and is sucked into the first temperature control section 181 from the first connecting portion 193a.
  • the water supply unit 183 supplies water for forming the ice wall IW to each of the first temperature control unit 181 and the second temperature control unit 182 .
  • the ice wall IW is formed by supplying high-temperature and dry gas from the first temperature control unit 181 and the second temperature control unit 182 acting as heating units. You may
  • the gas supply unit 185 supplies non-condensable gas to each of the first temperature control unit 181 and the second temperature control unit 182 .
  • Non-condensable gas is, for example, nitrogen gas, oxygen gas, hydrogen gas, etc.
  • the probe 180 includes a control unit CTL, a solar panel SOL, and a power battery BAT.
  • the control unit CTL controls the exploration vehicle 180 as a whole.
  • the control unit CTL also controls the drill bit 191, the heater bit 192 and the thermal mining bit 193, respectively. Further, the control unit CTL controls the compressor 186, the blower 187, etc. to operate the rover 180 to collect the moisture contained within the regolith RGL.
  • the solar panel SOL generates power to operate the rover 180.
  • the solar panel SOL generates power from sunlight. Electric power generated by the solar panel SOL is supplied to the control unit CTL, the compressor 186, the blower 187, and the like, and is also supplied to the power supply battery BAT.
  • the power supply battery BAT stores electricity and supplies the stored electricity to the control unit CTL, the compressor 186, the blower 187, and the like.
  • the power battery BAT is charged, for example, at a base or the like. Also, the power battery BAT is charged with power generated by the solar panel SOL and supplied to the power battery BAT.
  • the probe 180 operates one of the first temperature control unit 181 and the second temperature control unit 182 as a heating unit and the other as a cooling unit, and then operates one of the first temperature control unit 181 and the second temperature control unit 182. one as a cooling part and the other as a heating part.
  • first temperature control section 181 and the second temperature control section 182 By operating the first temperature control section 181 and the second temperature control section 182 while alternately switching between the heating section and the cooling section, moisture in the regolith RGL can be continuously collected.
  • any one of the water supply unit 183, the first temperature control unit 181 and the second temperature control unit 182 acting as a heating unit is an example of an ice wall forming unit, and the first temperature control unit 181 and the second temperature control unit acting as a cooling unit.
  • Any one of the adjustment units 182 is an example of a water sampling unit.
  • the heater bit 192 is an example of an ice wall forming portion.
  • the water sampling apparatus according to the seventh embodiment has a configuration in which the ice wall IW is not present on the ground surface side by covering the ground surface side with the tent TNT.
  • 33 and 34 are diagrams explaining the outline of the water sampling device according to the seventh embodiment.
  • Heated gas is supplied to the ice wall from the pipe PIP.
  • the ice pre-existing in the regolith RGL becomes water vapor together by sublimating the ice wall IW. Water vapor is expelled from the surface of the regolith RGL. Water vapor inside the tent TNT discharged from the surface of the regolith RGL is collected separately.
  • FIG. 35 is a diagram illustrating a model for calculating the amount of water that can be collected on the moon by the water sampling device according to this embodiment.
  • a spherical shell-shaped ice wall IW having an inner radius R1 and a thickness W1 at a depth D1.
  • the bulk density ⁇ of the dry regolith RGL is 1800 kg/m3
  • the specific gravity G of fine particles constituting the regolith RGL is 3
  • the density of water ⁇ w is 1000 kg/m3.
  • the porosity n of the regolith RGL is 0.4.
  • the ice in the regolith RGL is calculated assuming that some of the fine grains of the regolith are replaced with ice while leaving the voids between the fine grains that make up the regolith in the dry regolith. That is, the volume ratio of voids in the regolith RGL is assumed to be 40 percent.
  • the amount of water contained in the regolith RGL inside the ice wall IW is roughly estimated.
  • the calculation is performed with the radius R1 set to 0.5 meters.
  • the volume inside the ice wall IW is 0.52 cubic meters.
  • the amount of water contained inside the ice wall IW is about 35 kg when the ice content in the regolith RGL is 4% by weight. , about 170 kilograms for an ice content of 30 weight percent in the regolith RGL.
  • the water sampling device when the ice content in the regolith RGL is 4% by weight, about 35 kg, and when the ice content in the regolith RGL is 30% by weight, about 35 kg 170 kg of water can be collected.
  • FIG. 36 shows the ratio of the amount of water in the spherical ice wall IW having a thickness W1 of 5 mm to the amount of water that can be collected.
  • the amount of water that can be collected inside the ice wall IW will form the ice wall IW. exceeds the amount of water required for Further, when the ice content in the regolith RGL is 30% by weight, if the radius R1 of the ice wall IW is 50 mm (0.05 m) or more, the amount of water that can be collected inside the ice wall IW is Exceeds the amount of water needed to form.
  • the amount of water that can be inoculated from inside the ice wall IW is about 35 kg.
  • the amount of water required to form the ice wall IW is approximately 3 kg. Therefore, approximately 32 kilograms net of water can be harvested from the regolith RGL.
  • the amount of water that can be inoculated from the inside of the ice wall IW is about 170 kg, and the amount of water required to form the ice wall IW is about 3 kg. Become. Therefore, approximately 167 kilograms net of water can be harvested from the regolith RGL.
  • the amount of heat required to heat the regolith RGL inside the ice wall IW is roughly estimated, assuming that the ice wall IW is a spherical shell of radius R1. Here, the calculation is performed with the radius R1 set to 0.5 meters. The volume inside the ice wall IW is 0.52 cubic meters.
  • the specific heat of the regolith RGL fine particles is 486 joules per kilogram per kelvin (when the temperature is -100°C), and the specific heat of ice is 1377 joules per kilogram per kelvin (when the temperature is -100°C). It is also assumed that the heat of condensation of ice is 2442 kilojoules per kilogram and the heat of solidification of water is 334 kilojoules per kilogram.
  • Ice in a vacuum begins to sublimate at a temperature of -100°C to -50°C. Therefore, if there is ice in the regolith RGL, it is considered to exist at least at a temperature of -100°C or lower. Also, in order to sublimate and take out the ice present at extremely low temperatures in the regolith RGL, it is necessary to heat at least from -100° C. to -50° C. or higher.
  • the calculation assumes an ice-containing regolith RGL below the lunar ground GL at a temperature of ⁇ 150° C. and an ice content of 4 weight percent in the regolith RGL. Suppose it exists. Then, the energy required to heat the inside of the spherical ice wall IW with a radius R1 of 0.5 m to a temperature of ⁇ 50° C. and extract the ice by sublimating it into water vapor is calculated.
  • the sensible heat energy to heat the regolith RGL from -150°C to -50°C is 45 megajoules
  • the latent heat energy to turn ice into steam is 96 megajoules, for a total of 141 megajoules of heat.
  • a heating capacity of about 39 kilowatts is required.
  • the sensible heat energy to heat the regolith RGL from -150°C to -50°C is 42 megajoules
  • the latent heat energy to turn ice into steam is 470 megajoules, for a total of 512 megajoules of heat.
  • a heating capacity of about 143 kW is required.
  • the regolith RGL is heated by the dry gas VP3 from inside the space SP1.
  • the ice in the outermost surface area RB inside the regolith RGL is sublimated and water vapor is taken into the dry gas VP3.
  • the dry gas VP3 that has taken in water vapor is collected in the water sampling device.
  • the ice in the region RC deep inside the regolith RGL is also heated and sublimated.
  • the water vapor originating from the ice in the sublimated region RC moves outward because the outside of the regolith RGL has a lower temperature and pressure than the inside.
  • the water vapor moving outward travels outward through the voids inside the regolith RGL. Since the regolith RGL has a low temperature, the temperature of the water vapor drops on the solid surface of the regolith RGL granules, and the water vapor condenses and solidifies again. When the water vapor condenses and solidifies again, the voids are filled with ice.
  • an ice-rich region RI is formed within the regolith RGL. Also, a dry area RS is formed inside the ice-rich area RI.
  • the ice-rich region RI ie, the ice wall
  • the high-pressure gas inside the ice wall does not leak into the vacuum region outside the ice wall. Also, the ice that forms the ice wall moves so as to expand outward.
  • Water electrolysis system a water electrolysis device that electrolyzes water to produce hydrogen and oxygen in a low-gravity environment such as the lunar surface will be described.
  • the water decomposition device according to the present embodiment electrolyzes water sampled by the water sampling device according to the present disclosure.
  • Water electrolysis systems mainly include alkaline water electrolysis, solid polymer water electrolysis, and solid oxide water electrolysis.
  • the solid polymer water electrolysis method is considered to be the most suitable because it can use easy-to-handle room-temperature water and can cope with frequent starting and stopping.
  • the solid polymer type water electrolysis system releases oxygen gas into water on the anode side. Therefore, in the solid polymer type water electrolysis method, a separate mechanism for extracting oxygen gas from water is required.
  • the water electrolysis apparatus can perform good gas-liquid separation even in environments with low gravity, such as outer space and the surface of the moon.
  • FIG. 39 is a perspective view of the water electrolysis device 100 according to the first embodiment.
  • FIG. 40 is an exploded perspective view of the water electrolysis device 100 according to the first embodiment.
  • 41 and 42 are diagrams explaining the operation of the water electrolysis device 100 according to the first embodiment. Specifically, FIGS. 41 and 42 are diagrams illustrating the details of the vicinity of the interface with the solid electrolyte membrane 130.
  • FIG. 39 is a perspective view of the water electrolysis device 100 according to the first embodiment.
  • FIG. 40 is an exploded perspective view of the water electrolysis device 100 according to the first embodiment.
  • 41 and 42 are diagrams explaining the operation of the water electrolysis device 100 according to the first embodiment. Specifically, FIGS. 41 and 42 are diagrams illustrating the details of the vicinity of the interface with the solid electrolyte membrane 130.
  • FIG. 41 and 42 are diagrams illustrating the details of the vicinity of the interface with the solid electrolyte membrane 130.
  • the water electrolysis device 100 generates gas from at least one of the anode and the cathode from supplied water (pure water). For example, oxygen is generated from the anode side of the water electrolysis device 100 . Hydrogen is generated from the cathode side of the water electrolysis device 100 .
  • An anode 110, a cathode 120, and a solid electrolyte membrane 130 are provided inside the housing 100a. In water electrolysis device 100 , anode 110 and cathode 120 are separated by solid electrolyte membrane 130 .
  • the solid electrolyte membrane 130 includes an anode side catalyst membrane 131 , a cathode side catalyst membrane 132 and a separation membrane 133 .
  • the anode 110 contacts the solid electrolyte membrane 130 .
  • Anode 110 is formed of a porous body through which gas or liquid can flow.
  • the anode 110 is formed, for example, by plating a sintered body of titanium with gold.
  • a plurality of grooves 111 are formed on the surface (front surface) of anode 110 that contacts solid electrolyte membrane 130 .
  • a water chamber 101 to which water is supplied is provided on the side opposite to the solid electrolyte membrane 130 of the anode 110 .
  • Pure water is supplied to the water chamber 101 from a water supply pipe 101a.
  • water is discharged to the water chamber 101 from a water discharge pipe 101b. That is, part or all of the back surface of the anode 110 opposite to the solid electrolyte membrane 130 contacts the water supplied to the water chamber 101 .
  • the pure water supplied to the water chamber 101 seeps inside from the back surface of the anode 110, which is a porous body.
  • anode 110 is a hydrophilic porous body
  • water that contacts the back surface of the anode 110 moves in the direction of the arrow A1 due to capillary force and permeates into the inside of the anode 110.
  • the water that has soaked into the interior of anode 110 passes through the interior of anode 110 and permeates up to the surface facing solid electrolyte membrane 130 .
  • Water that permeates to the contact interface between the anode 110 and the solid electrolyte membrane 130 is electrolyzed to generate oxygen.
  • oxygen generated at the contact interface is released from the contact interface into the plurality of grooves 111.
  • water is supplied in the direction of arrow A2 without backflow of gas (oxygen) in the pores due to surface tension.
  • Oxygen generated from the contact interface between the solid electrolyte membrane 130 and the anode 110 is discharged to one of the grooves 111 .
  • Oxygen generated from the contact interface between the solid electrolyte membrane 130 and the anode 110 is collected in the plurality of grooves 111 . Further, from each groove 111 through the plurality of grooves 111, oxygen is exhausted into the oxygen gas chamber 103 and collected. Oxygen collected in the oxygen gas chamber 103 is discharged from an oxygen discharge pipe 103 a communicating with the oxygen gas chamber 103 .
  • the cathode 120 contacts the solid electrolyte membrane 130 .
  • the cathode 120 is formed of a porous body through which gas or liquid can flow.
  • the cathode 120 is made of carbon, for example.
  • a plurality of grooves 121 are formed on the surface of the cathode 120 that contacts the solid electrolyte membrane 130 .
  • Hydrogen is generated at the interface between the cathode 120 and the solid electrolyte membrane 130 .
  • the generated hydrogen is collected in the hydrogen chamber 102 and discharged from the hydrogen discharge pipe 102a.
  • FIG. 43 is an exploded perspective view of the anode-side stack 210 of the water electrolysis device according to the second embodiment.
  • FIG. 44 is an exploded perspective view of the cathode-side stack 220 of the water electrolysis device according to the second embodiment.
  • the anode-side stack 210 of the water electrolysis device according to the second embodiment includes a first case 211, a first gasket 212, an extraction electrode 213, a current collector 214, a second gasket 215, and a second case 216. , a third gasket 217 and a separator 218 .
  • the first case 211 supplies water to the inside from the outside and discharges oxygen generated inside to the outside.
  • the first case 211 has a water discharge hole 211w1, a water supply hole 211w2, and an oxygen discharge hole 211a penetrating from the outside to the inside of the first case 211. As shown in FIG.
  • the water supplied from the water supply hole 211w2 passes through the extraction electrode 213 and is supplied to the current collector 214. Also, part of the water supplied from the water supply hole 211w2 is discharged from the water discharge hole 211w1. Oxygen generated inside the anode-side stack 210 is discharged from the oxygen discharge holes 211a.
  • the first case 211 is made of acrylic, for example.
  • the first case 211 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view. Further, the first case 211 has through holes 211h at four corners through which rod-shaped members for assembling the anode-side stack 210 are passed when assembling the water electrolysis device.
  • viewing the first case 211 from the upper side of FIG. 44 may be referred to as planar view. The same applies to FIG. 45 as well.
  • the first gasket 212 prevents leakage of water and oxygen at the boundary between the first case 211 and the extraction electrode 213 .
  • the first gasket 212 has an opening 212w through which water from the first case 211 flows and an opening 212a through which oxygen flows.
  • the water supplied from the first case 211 is supplied to the current collector 214 through the opening 212w and the extraction electrode 213 .
  • Oxygen generated inside the anode-side stack 210 passes through the opening 212 a and is discharged from the oxygen discharge hole 211 a of the first case 211 .
  • the first gasket 212 is made of transparent rubber, for example.
  • the first gasket 212 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view.
  • the first gasket 212 also has through holes 212h at its four corners through which rod-like members for assembling the anode-side stack 210 are passed when assembling the water electrolysis device.
  • the extraction electrode 213 supplies electric power from an external power source to the current collector 214 . Further, the extraction electrode 213 supplies water supplied from the first case 211 to the current collector 214 .
  • the lead-out electrode 213 is formed of a net-like conductor.
  • the extraction electrode 213 has an opening 213a through which oxygen passes.
  • the water supplied from the first case 211 is supplied to the current collector 214 through the extraction electrode 213 formed of a net-like conductor. Oxygen generated inside the anode-side stack 210 passes through the opening 213a and is discharged to the first case 211 side.
  • the extraction electrode 213 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view.
  • the extraction electrode 213 has an extraction terminal 213t on one side of the rectangular shape.
  • An external power supply is connected to the extraction terminal 213t.
  • the lead-out electrode 213 has through holes 213h at its four corners through which rod-shaped members for assembling the anode-side stack 210 are passed when assembling the water electrolysis device.
  • Current collector 214 supplies power from an external power source to separator 218 having a solid electrolyte membrane. Also, the current collector 214 supplies water supplied from the first case 211 to the separator 218 .
  • the current collector 214 is made of a porous material.
  • the water supplied from the first case 211 permeates the current collector 214 which is a porous body and is supplied to the separator 218 .
  • Oxygen generated at the interface between the current collector 214 and the separator 218 is discharged to grooves formed in the current collector 214 .
  • Oxygen discharged to the water formed on the current collector 214 is discharged to the lateral sides of the current collector 214 .
  • Oxygen discharged to the lateral side of the current collector 214 passes through the opening 213a and is discharged to the first case 211 side.
  • the current collector 214 has, for example, a rectangular shape of 40 mm ⁇ 50 mm in plan view.
  • the current collector 214 is inserted into the first portion 215c1 of the opening 215c of the second gasket 215, the first portion 216c1 of the opening 216c of the second case 216, and the first portion 217c1 of the opening 217c of the third gasket 217. be provided.
  • FIG. 45 is a perspective view of the current collector 214 on the anode side of the water electrolysis device according to the second embodiment.
  • FIG. 46 is a side view of the current collector 214 on the anode side of the water electrolysis device according to the second embodiment.
  • the current collector 214 has a plate-like shape of height H ⁇ width W ⁇ thickness D.
  • the height H is 40 millimeters
  • the width W is 50 millimeters
  • the thickness D is 2 millimeters.
  • Grooves are provided at a pitch P on one surface of the current collector 214 .
  • the pitch P is 2 millimeters.
  • the second gasket 215 prevents leakage of water and oxygen at the boundary between the extraction electrode 213 and the second case 216 . Also, the second gasket 215 has an opening 215c.
  • the opening 215c has a first portion 215c1 having an outline substantially equal to that of the current collector 214 in plan view, and a second portion 215c2 provided adjacent to the first portion 215c1.
  • the current collector 214 is inserted into the first portion 215c1. Oxygen generated at the interface between the current collector 214 and the separator 218 flows through the second portion 215c2.
  • the second gasket 215 is made of transparent rubber, for example.
  • the second gasket 215 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view. Further, the second gasket 215 has through holes 215h at its four corners through which rod-shaped members for assembling the anode-side stack 210 are passed when assembling the water electrolysis device.
  • the second case 216 holds the current collector 214 inside and discharges oxygen generated inside to the outside.
  • the second case 216 has an opening 216c.
  • the opening 216c has a first portion 216c1 having an outline substantially equal to that of the current collector 214 in plan view, and a second portion 216c2 provided adjacent to the first portion 216c1.
  • the current collector 214 is inserted into the first portion 216c1. Oxygen generated at the interface between the current collector 214 and the separator 218 flows through the second portion 216c2.
  • the second case 216 is made of acrylic, for example.
  • the second case 216 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view.
  • the second case 216 has through holes 216h at its four corners through which rod-shaped members for assembling the anode-side stack 210 are passed when assembling the water electrolysis device.
  • the third gasket 217 prevents leakage of water and oxygen at the boundary between the second case 216 and the separator 218 . Also, the third gasket 217 has an opening 217c.
  • the opening 217c has a first portion 217c1 having an outline substantially equal to that of the current collector 214 in plan view, and a second portion 217c2 provided adjacent to the first portion 217c1.
  • a current collector 214 is inserted into the first portion 217c1. Oxygen generated at the interface between the current collector 214 and the separator 218 flows through the second portion 217c2.
  • the third gasket 217 is made of transparent rubber, for example.
  • the third gasket 217 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view. Further, the third gasket 217 has through holes 217h at its four corners through which rod-shaped members for assembling the anode-side stack 210 are passed when assembling the water electrolysis device.
  • a separator 218 separates the anode and cathode.
  • the separator 218 includes a substrate 218b and an electrolyte membrane 218c formed on the substrate 218b.
  • the current collector 214 is in contact with the electrolyte membrane 218c. Oxygen is generated at the interface between electrolyte membrane 218 c and current collector 214 . Oxygen generated at the interface passes through the grooves formed in the current collector 214 and is discharged to the second portion 216c2 side of the opening 216c of the second case 216 .
  • the substrate 218b of the separator 218 is made of resin, for example.
  • the substrate 218b of the separator 218 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view. Further, the substrate 218b of the separator 218 has through holes 218h at its four corners through which rod-shaped members for assembling the anode-side stack 210 are passed when assembling the water electrolysis device.
  • a cathode-side stack 220 of the water electrolysis device according to the second embodiment includes a first case 221, a first gasket 222, an extraction electrode 223, a current collector 224, a second gasket 225, and a second case 226. , a third gasket 227 and a separator 228 .
  • the first case 221 discharges water discharged from the inside and discharges hydrogen generated inside to the outside.
  • the first case 221 has a water discharge hole 221w and a hydrogen discharge hole 221a penetrating from the outside to the inside of the first case 221 .
  • Water discharged from the inside of the cathode-side stack 220 passes through the extraction electrode 223 and is discharged from the water discharge hole 221w. Hydrogen generated inside the cathode-side stack 220 is discharged from the hydrogen discharge holes 221a.
  • the first case 221 is made of acrylic, for example.
  • the first case 221 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view.
  • the first case 221 also has through holes 221h at its four corners through which rod-shaped members for assembling the cathode-side stack 220 are passed when assembling the water electrolysis device.
  • the first gasket 222 prevents leakage of water or hydrogen at the boundary between the first case 221 and the extraction electrode 223 .
  • the first gasket 222 has an opening 222a through which water and hydrogen flow.
  • Water generated inside the cathode-side stack 220 is carried to the first case 221 through the opening 222a. Also, the hydrogen generated inside the cathode-side stack 220 passes through the opening 222 a and is discharged from the hydrogen discharge hole 221 a of the first case 221 .
  • the first gasket 222 is made of transparent rubber, for example.
  • the first gasket 222 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view.
  • the first gasket 222 also has through holes 222h at its four corners through which rod-shaped members for assembling the cathode-side stack 220 are passed when assembling the water electrolysis device.
  • the extraction electrode 223 supplies electric power from an external power source to the current collector 224 . Also, the extraction electrode 223 discharges water discharged from the inside of the cathode-side stack 220 .
  • the lead-out electrode 223 is formed of a net-like conductor.
  • the water discharged from the inside of the cathode-side stack 220 is carried to the first case 221 through the lead-out electrode 223 formed of a net conductor. Hydrogen generated inside the cathode-side stack 220 is discharged to the first case 221 side through the lead-out electrode 223 formed of a net conductor.
  • the extraction electrode 223 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view.
  • the lead-out electrode 223 has a lead-out terminal 223t on one side of the rectangular shape.
  • An external power supply is connected to the extraction terminal 223t.
  • the extraction electrode 223 has through holes 223h at four corners through which rod-shaped members for assembling the cathode-side stack 220 are passed when assembling the water electrolysis device.
  • Current collector 224 supplies power from an external power source to separator 228 having a solid electrolyte membrane. Also, the current collector 224 carries water discharged from the separator 228 to the first case 221 .
  • the current collector 224 is made of a porous material.
  • the water discharged from the separator 228 permeates the current collector 224, which is a porous body, and is carried to the first case 221 side. Hydrogen generated at the interface between the current collector 224 and the separator 228 permeates the current collector 224 and is sent to the extraction electrode 223 side.
  • the current collector 224 has, for example, a rectangular shape of 40 mm ⁇ 50 mm in plan view.
  • the current collector 224 is provided by being inserted into an opening 225c of the second gasket 225, an opening 226c of the second case 226, and an opening 227c of the third gasket 227.
  • the second gasket 225 prevents leakage of water and hydrogen at the boundary between the extraction electrode 223 and the second case 226 . Also, the second gasket 225 has an opening 225c. A current collector 224 is inserted into the opening 225c.
  • the second gasket 225 is made of transparent rubber, for example.
  • the second gasket 225 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view.
  • the second gasket 225 also has through holes 225h at its four corners through which rod-shaped members for assembling the cathode-side stack 220 are passed when assembling the water electrolysis device.
  • the second case 226 holds the current collector 224 inside.
  • the second case 226 has an opening 226c.
  • the opening 226c has an outline substantially equal to that of the current collector 224 in plan view.
  • the current collector 224 is inserted into the opening 226c.
  • the second case 226 is made of acrylic, for example.
  • the second case 226 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view. Further, the second case 226 has through holes 226h at its four corners through which rod-shaped members for assembling the cathode-side stack 220 are passed when assembling the water electrolysis device.
  • the third gasket 227 prevents leakage of water or hydrogen at the boundary between the second case 226 and the separator 228 . Also, the third gasket 227 has an opening 227c. The current collector 224 is inserted into the opening 227c.
  • the third gasket 227 is made of transparent rubber, for example.
  • the third gasket 227 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view. Further, the third gasket 227 has through holes 227h at four corners through which rod-shaped members for assembling the cathode-side stack 220 are passed when assembling the water electrolysis device.
  • a separator 228 separates the anode and cathode.
  • the separator 228 includes a substrate 228b and an electrolyte membrane 228c formed on the substrate 228b.
  • the current collector 224 is in contact with the electrolyte membrane 228c. Hydrogen is generated at the interface between the electrolyte membrane 228 c and the current collector 224 . Hydrogen generated at the interface passes through the current collector 224 and is discharged to the first case 221 side.
  • the substrate 228b of the separator 228 is made of resin, for example.
  • the substrate 228b of the separator 228 has, for example, a rectangular shape of 80 mm ⁇ 80 mm in plan view. Further, the substrate 228b of the separator 228 has through holes 228h at four corners through which rod-shaped members for assembling the cathode-side stack 220 are passed when assembling the water electrolysis device.
  • FIG. 47 is an exploded perspective view of a water electrolysis cell 300 used in the water electrolysis device according to the third embodiment.
  • the water electrolysis cell 300 of the water electrolysis device according to the third embodiment includes an electrolyte membrane 330 .
  • the water electrolysis cell 300 includes an insulating plate 311 , an electrode plate 312 , a plate spring 313 , a first gasket 314 , a water flow path case 315 , and a current collector 316 in order from the outside on the anode side of the electrolyte membrane 330 . , and a second gasket 317 .
  • the water electrolysis cell 300 of the water electrolysis apparatus according to the third embodiment includes an insulating plate 321, an electrode plate 322, a leaf spring 323, and a first gasket 324 in this order from the outside on the cathode side of the electrolyte membrane 330. , a hydrogen channel case 325 , a current collector 326 , and a second gasket 327 .
  • the anode side of the electrolyte membrane 330 of the water electrolysis cell 300 will be explained in order from the outside.
  • the insulating plate 311 forms the outermost surface of the water electrolysis cell 300 .
  • the electrode plate 312 supplies power from the outside.
  • the plate spring 313 presses the current collector 316 against the electrolyte membrane 330 from the insulating plate 311 side. Also, the plate spring 313 supplies power from the electrode plate 312 to the current collector 316 .
  • the first gasket 314 prevents leakage of water and oxygen at the boundary between the electrode plate 312 and the water channel case 315 .
  • the water channel case 315 supplies water to the current collector 316 from the outside.
  • the current collector 316 includes a first member 316a and a second member 316b.
  • FIG. 48 is a front view of a first member 316a and a second member 316b obtained by disassembling the current collector 316 on the anode side of the water electrolysis device according to the third embodiment.
  • the first member 316a and the second member 316b are provided in close contact with each other.
  • a laterally extending groove 361ag is provided on the upper side of the first member 316a.
  • the second member 316b is provided with a plurality of grooves 316bg in the vertical direction.
  • Each of the first member 316a and the second member 316b that constitute the current collector 316 is made of a conductive porous material.
  • Each of the first member 316a and the second member 316b is made of, for example, titanium nonwoven fabric. Since the first member 316a and the second member 316b are each made of a conductive porous material, the water supplied from the water channel case 315 permeates the first member 316a and the second member 316b. Water that has passed through each of the first member 316 a and the second member 316 b is supplied to the electrolyte membrane 330 .
  • the water supplied to the electrolyte membrane 330 is electrolyzed by the electricity supplied to the current collector 316 .
  • Oxygen generated at the interface between the current collector 316 and the electrolyte membrane 330 due to water electrolysis passes through the grooves 316bg of the second member 316b of the current collector 316 and is collected in the grooves 316ag of the first member 316a. be done.
  • Oxygen collected in the grooves 316ag of the first member 316a is discharged outside the water electrolysis cell 300 .
  • the cathode side of the electrolyte membrane 330 of the water electrolysis cell 300 will be explained in order from the outside.
  • the insulating plate 321 forms the outermost surface of the water electrolysis cell 300 .
  • the electrode plate 322 supplies power from the outside.
  • the leaf spring 323 presses the current collector 326 against the electrolyte membrane 330 from the insulating plate 321 side. Also, the plate spring 323 supplies power from the electrode plate 322 to the current collector 326 .
  • the first gasket 324 prevents leakage of water and oxygen at the boundary between the electrode plate 322 and the hydrogen channel case 325 . Hydrogen channel case 325 recovers hydrogen generated in water electrolysis cell 300 .
  • the current collector 326 includes a first member 326a and a second member 326b.
  • the first member 326 a has the same shape as the first member 316 a of the current collector 316 .
  • the second member 326 b has the same shape as the second member 315 b of the current collector 316 .
  • Each of the first member 326a and the second member 326b that constitute the current collector 326 is made of a conductive porous material.
  • Each of the first member 326a and the second member 326b is formed of, for example, carbon non-woven fabric. Since each of the first member 326a and the second member 326b is made of a conductive porous material, the hydrogen generated at the interface between the current collector 326 and the electrolyte membrane 330 flows into the first member 326a and the second member 326b. 326b. Hydrogen that permeates the first member 326 a and the second member 326 b is recovered by the hydrogen channel case 325 .
  • FIG. 49 is a schematic configuration diagram of a water electrolysis device 400 according to the fourth embodiment.
  • the water electrolysis device 400 includes an anode 410 , a cathode 420 and an electrolyte membrane 430 . Furthermore, the water electrolysis device 400 includes a water tank 440 , a pump 450 , an oxygen tank 460 and a hydrogen tank 470 .
  • Water is supplied to the anode 410 from a water tank 440 by a pump 450 . A portion of the water supplied to anode 410 is returned to water tank 440 again.
  • Oxygen generated from the anode 410 is stored in the oxygen tank 460 .
  • Anode 410 is provided with grooves in the current collector as described above. Oxygen can be efficiently separated by the grooves provided in the current collector.
  • Hydrogen generated at cathode 420 is stored in hydrogen tank 470 .
  • FIG. 50 is a schematic configuration diagram of a water electrolysis device 500 according to the fifth embodiment.
  • Water electrolysis device 500 has a configuration in which pump 450 in water electrolysis device 400 is not used.
  • the water electrolysis device 500 includes an anode 510, a cathode 520, and an electrolyte membrane 530. Furthermore, the water electrolysis device 500 includes a water tank 540 , an oxygen tank 560 and a hydrogen tank 570 .
  • Anode 510 is composed of a current collector that is a porous body. Water is supplied to the anode 510 by natural circulation due to the capillary force of the current collector, which is a porous body. Oxygen generated from the anode 510 is stored in the oxygen tank 560 . Anode 510 is provided with grooves in the current collector as described above. Oxygen can be efficiently separated by the grooves provided in the current collector. Hydrogen generated at cathode 520 is stored in hydrogen tank 570 .
  • FIG. 51 is a diagram illustrating the behavior of the water electrolysis device according to this embodiment.
  • a surface tension film is formed at the interface between the water inside the current collector AN and the oxygen in the groove GRV.
  • the pore diameter D of the current collector AN is, for example, 20 micrometers
  • oxygen does not enter the current collector AN if the pressure PW inside the grooves GRV is 14 kilopascals or less.
  • Groove GRV connects from the oxygen chamber to the exhaust pipe to the oxygen tank. Since the oxygen tank is at atmospheric pressure, the pressure in groove GRV is kept low. Therefore, oxygen does not enter the inside of the current collector AN.
  • FIG. 52 is a diagram explaining the behavior of the water electrolysis device of the comparative example.
  • the pressure of the oxygen bubbles must exceed the surface tension and the flow resistance that pushes out the water in the pores. For example, if the channel length of the pores is 0.3 mm, the flow resistance calculated from the amount of oxygen generated per unit time is 0.024 kilopascals.
  • Water sampling device 10 Steam generating unit 20 Steam recovery unit 50 Gas supply recovery unit 61, 71 Heating unit 62, 72 Cooling unit 63 Steam supply unit 64, 74 Water storage unit 65, 75 Gas supply Parts 66, 76 Compressors 67, 77a, 77b Blowers 68, 78 Expansion valves 80, 180 Survey vehicle 100 Water electrolysis device 110 Anode 111 Groove 210 Anode-side stack 214 Current collector 300 Water electrolysis cell 316 Current collector 316b Second member 316bg Groove 400, 500 Water electrolysis device

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

地中を加熱して、前記地中に含まれる水分を含む氷で形成される氷壁を形成する氷壁形成部と、前記氷壁に囲まれる領域の内部における第1気体を回収し、回収した前記第1気体から水を採取する水採取部と、を備える水採取装置。

Description

水採取装置、水採取方法及び水電解装置
 本開示は、水採取装置、水採取方法及び水電解装置に関する。
 特許文献1には、砂地に気体を吹込みながら、砂地を流動化した状態で、砂地に埋もれている資源を採掘する資源採掘方法が開示されている。特許文献1には、砂地に埋もれている氷塊を溶解し、生成した水をさらに気化する程度に熱い気体を氷塊に吹き込むことによって、水蒸気を発生させることが開示されている。
特開2019-148155号公報
 月面において資源を回収する場合に、できるだけエネルギーを使わずに、効率よく回収することが求められている。また、月面において資源を回収する場合に、月面への輸送コストを削減するために、設備の小型化が求められている。
 本開示は、地中、特に月面における地中、から効率よく水を採取する技術を提供する。また、本開示は、地中から採取した水を処理する技術を提供する。
 本開示は、地中を加熱して、前記地中に含まれる水分を含む氷で形成される氷壁を形成する氷壁形成部と、前記氷壁に囲まれる領域の内部における第1気体を回収し、回収した前記第1気体から水を採取する水採取部と、を備える水採取装置を提供する。
 本開示の水採取装置及び水採取方法によれば、地中、特に月面における地中、から効率よく水を採取できる。また、本開示の水電解装置によれば、水採取装置及び水採取方法により地中から採取した水を処理できる。
図1は、第1実施形態に係る水採取装置の概略構成を示す図である。 図2は、第1実施形態に係る水採取装置の水蒸気生成部について説明する図である。 図3は、第1実施形態に係る水採取装置の水蒸気回収部について説明する図である。 図4は、第1実施形態に係る水採取装置を用いる水採取方法について説明する図である。 図5は、第1実施形態に係る水採取装置を用いる水採取方法について説明する図である。 図6は、第1実施形態に係る水採取装置を用いる水採取方法について説明する図である。 図7は、第1実施形態に係る水採取装置を用いる水採取方法について説明する図である。 図8は、第1実施形態に係る水採取装置を用いる水採取方法について説明する図である。 図9は、第1実施形態に係る水採取装置を用いる水採取方法について説明する図である。 図10は、第1実施形態に係る水採取装置を用いる水採取方法について説明する図である。 図11は、第1実施形態に係る水採取装置を用いる水採取方法について説明する図である。 図12は、第1実施形態に係る水採取装置を用いる水採取方法について説明する図である。 図13は、第1実施形態に係る水採取装置を用いる水採取方法における氷壁の形成について説明する図である。 図14は、第1実施形態に係る水採取装置を用いる水採取方法における氷壁の形成について説明する図である。 図15は、第1実施形態に係る水採取装置を用いる水採取方法における氷壁の形成について説明する図である。 図16は、第2実施形態に係る水採取装置の概略構成を示す図である。 図17は、第2実施形態に係る水採取装置の動作について説明する図である。 図18は、第2実施形態に係る水採取装置の動作について説明する図である。 図19は、第2実施形態に係る水採取装置の動作について説明する図である。 図20は、第3実施形態に係る水採取装置の概略構成を示す図である。 図21は、第4実施形態に係る水採取装置の動作について説明する図である。 図22は、第4実施形態に係る水採取装置の動作について説明する図である。 図23は、第4実施形態に係る水採取装置の動作について説明する図である。 図24は、第4実施形態に係る水採取装置の動作について説明する図である。 図25は、第5実施形態に係る水採取装置における氷壁の形成について説明する図である。 図26は、第6実施形態に係る水採取装置の概要について説明する図である。 図27は、第6実施形態に係る水採取装置の変形例の概要について説明する図である。 図28は、第6実施形態に係る水採取装置の変形例の概要について説明する図である。 図29は、第6実施形態に係る水採取装置の変形例の概要について説明する図である。 図30は、第6実施形態に係る水採取装置の変形例の概要について説明する図である。 図31は、第6実施形態に係る水採取装置の変形例の概要について説明する図である。 図32は、第6実施形態に係る水採取装置の変形例の概要について説明する図である。 図33は、第7実施形態に係る水採取装置の概要について説明する図である。 図34は、第7実施形態に係る水採取装置の概要について説明する図である。 図35は、本実施形態に係る水採取装置が月面において採取可能な水の量について説明する図である。 図36は、本実施形態に係る水採取装置が月面において採取可能な水の量について説明する図である。 図37は、本実施形態に係る水採取装置による氷壁の挙動について説明する図である。 図38は、本実施形態に係る水採取装置による氷壁の挙動について説明する図である。 図39は、第1実施形態に係る水電解装置の斜視図である。 図40は、第1実施形態に係る水電解装置の分解斜視図である。 図41は、第1実施形態に係る水電解装置の動作について説明する図である。 図42は、第1実施形態に係る水電解装置の動作について説明する図である。 図43は、第2実施形態に係る水電解装置の分解斜視図である。 図44は、第2実施形態に係る水電解装置の分解斜視図である。 図45は、第2実施形態に係る水電解装置の陽極集電体の斜視図である。 図46は、第2実施形態に係る水電解装置の陽極集電体の側面図である。 図47は、第3実施形態に係る水電解装置の分解斜視図である。 図48は、第3実施形態に係る水電解装置の陽極集電体の正面図である。 図49は、第4実施形態に係る水電解装置の概略構成を示す図である。 図50は、第5実施形態に係る水電解装置の概略構成を示す図である。 図51は、本実施形態に係る水電解装置の挙動について説明する図である。 図52は、比較例の水電解装置の挙動について説明する図である。
 以下、実施形態について、添付の図面を参照しながら説明する。なお、各実施形態に係る明細書及び図面の記載に関して、実質的に同一の又は対応する機能構成を有する構成要素については、同一の符号を付することにより重複した説明を省略する場合がある。また、理解を容易にするために、図面における各部の縮尺は、実際とは異なる場合がある。
 ≪水採取装置≫
 本開示は、地中、特に月面における土中に存在する水を省エネルギーでかつ広範囲に効率よく採取できる水採取装置を提供することを目的とする。月面は、レゴリスと呼ばれる砂礫に覆われている。月面おける地中には、氷が含まれる。すなわち、月面に堆積するレゴリスの隙間には、氷が含まれる。月面における土中は-150℃未満の極低温である。水採取装置により、月面における地中の氷を採取するためには、月面における土中に含まれる氷を加熱して溶かす必要がある。
 月面において、氷を加熱して溶かす場合に、少ない加熱エネルギーで効率よく加熱することが求められる。しかしながら、月面は真空であり、レゴリス中の隙間も真空であるため、ヒータ等を使用して加熱しても固体内の熱伝導のみでは広範なレゴリスを加熱できない。また、月面の真空中で氷を加熱していくと-70℃付近で氷から水蒸気へ昇華する。氷が水蒸気に昇華すると、水蒸気は真空中に拡散して、消失する。氷を加熱して、昇華した水蒸気を回収するためには、水蒸気が拡散しないよう密閉空間にて氷を昇華させ水蒸気を回収する必要がある。
 本実施形態に係る水採取装置は、気体を用いて広範囲に熱を伝搬させる。また、本実施形態に係る水採取装置は、供給した水蒸気又はレゴリス中に存在する氷を気化させた水蒸気が凍結することにより月面において氷の壁を形成し、氷の壁に囲まれることにより形成した密閉空間で水蒸気を回収することにより、効率よく水を採取できる。
 <第1実施形態>
 [構成]
 第1実施形態に係る水採取装置1について説明する。図1は、第1実施形態に係る水採取装置1の概略構成を示す図である。図2は、第1実施形態に係る水採取装置1の水蒸気生成部10について説明する図である。図3は、第1実施形態に係る水採取装置1の水蒸気回収部20について説明する図である。
 水採取装置1は、例えば、月面のレゴリスに含まれる水分(氷)を採取する。水採取装置1は、水蒸気生成部10と、水蒸気回収部20と、を備える。
 (水蒸気生成部10)
 水蒸気生成部10は、水蒸気を発生させる。また、水蒸気生成部10は、発生した水蒸気を、水蒸気供給管11を介して、月面土中に、いいかえると、月面における地面GLのレゴリスRGL中に、供給する。水蒸気供給管11は、月面土中に、いいかえると、月面における地面GLのレゴリスRGL中に、差し込まれる。水蒸気生成部10は、水蒸気供給管11の水蒸気生成部10と反対側の端部(先端)における水蒸気供給口11hから、水蒸気をレゴリスRGL中に供給する。
 レゴリスRGL中に水蒸気が供給されることにより、後述するように、氷壁IWが水蒸気供給口11hを囲んで形成される。すなわち、水蒸気生成部10は、地中(レゴリスRGL中)を加熱して、地中(レゴリスRGL中)に含まれる水分を含む氷で形成される氷壁IWを形成する。
 水蒸気生成部10は、水供給タンク10aを備える。水供給タンク10aは、水W1を貯蔵する。水蒸気生成部10は、水供給タンク10aに貯蔵された水W1を蒸発させることにより、水蒸気を発生させる。例えば、水蒸気生成部10は、水供給タンク10aの内部を温度0℃以上の飽和蒸気圧にして水蒸気を発生させる。水蒸気生成部10は、水蒸気供給管11を経由して水蒸気供給口11hからレゴリスRGL中に飽和水蒸気を供給する。
 (水蒸気回収部20)
 水蒸気回収部20は、水蒸気回収管21を介して、月面土中に、いいかえると、月面における地面GLのレゴリスRGL中から、水蒸気を回収する。また、水蒸気回収部20は、回収した水蒸気を水にして回収する。水蒸気回収管21は、月面土中に、いいかえると、月面における地面GLのレゴリスRGL中に、差し込まれる。水蒸気回収部20は、水蒸気回収管21の水蒸気回収部20と反対側の端部(先端)における水蒸気回収口21hから、レゴリスRGL中から水蒸気を回収する。
 水蒸気回収部20は、水回収タンク20aを備える。水回収タンク20aは、水蒸気を凝縮させて、凝縮させた水WCD1を貯蔵する。水蒸気回収部20は、水回収タンク20aに回収された水蒸気を凝縮させることにより、水を発生させる。例えば、水蒸気回収部20は、水回収タンク20aの内部を温度5℃未満にして水蒸気を回収する。
 水蒸気回収管21の水蒸気回収口21hは、氷壁IWにより囲まれている。したがって、水蒸気回収部20は、氷壁IWに囲まれる領域における水蒸気を回収し、回収した水蒸気から水を採取する。
 なお、氷壁IWの密閉空間の内部には、水蒸気回収部20により湿った気体が回収されることにより、乾燥したレゴリスDRGLが堆積する。
 [水採取方法]
 本実施形態に係る水採取装置1を用いた水採取方法について説明する。図4から図12のそれぞれは、第1実施形態に係る水採取装置1を用いる水採取方法について説明する図である。図4から図12を用いて、本実施形態に係る水採取方法の工程について説明する。
 最初に、月面における地面GLからレゴリスRGL中に垂直にドリルDRLで穴を開ける。レゴリスRGLにドリルDRLで穴を開けることにより、空間SP0が形成される(図4)。ドリルDRLの径は、後述する水蒸気供給回収管31がドリルDRLで形成した穴(空間SP0)に挿入できるように、水蒸気供給回収管31の径より若干大きくなっている。ただし、ドリルDRLの径は、水蒸気供給回収管31と穴(空間SP0)との隙間から水蒸気が多量に漏れない程度の隙間になるようにする。
 次に、レゴリスRGL中にドリルDRLで開けた穴(空間SP0)に、水蒸気供給回収管31を挿入する(図5)。いいかえると、空間SP0に水蒸気供給回収管31を差し込む。空間SP0における水蒸気供給回収管31の先端から先の水蒸気供給回収管31に占められていない空間を空間SP1という。
 なお、水蒸気供給回収管31は、前述の水蒸気供給管11及び水蒸気回収管21を一体化した管である。いいかえると、水蒸気供給回収管31は、水蒸気供給管11及び水蒸気回収管21を一体構造とした管である。水蒸気供給回収管31は、例えば、水蒸気供給回収管31を半分に分け、一方が水蒸気生成部10に接続し、他方が水蒸気回収部20に接続する。図5等においては、点線で水蒸気供給回収管31の分かれている部分を示す。図5等においては、点線の左側は水蒸気生成部10に接続し、点線の右側は水蒸気回収部20に接続する。
 図5における領域RAを拡大した図を図6に示す。なお、図8、図9、図10及び図12も同様に、図7及び図11のいずれかにおける領域RAを拡大した図である。
 図6のレゴリスRGLの部分は、月面におけるレゴリスRGLの状態を示す。レゴリスRGLは、複数の細粒物RGPが堆積している。そして、レゴリスRGLは、細粒物RGPの間に空隙EMPを有する多孔質体である。複数の細粒物RGPの間の空隙EMPは、真空である。レゴリスRGLの空隙率は、例えば、30から60体積%である。また、複数の細粒物RGPの間の空隙EMPの一部には、氷ICEが含まれる。なお、レゴリスRGLにおける温度は極低温であって、略-273℃である。
 次に、水蒸気生成部10は、水蒸気供給回収管31を介して空間SP1に水蒸気を供給する(図7)。水蒸気生成部10は、例えば、温度20℃、圧力2340パスカルの飽和水蒸気を空間SP1に供給する。上述のように、レゴリスRGLは、空隙率が30から60体積%程度の多孔質体であることから、水蒸気供給回収管31から供給された水蒸気VP1は、細粒物RGP間の空隙EMPを流動しつつ、拡散する(図8)。
 一方、レゴリスRGLは、温度が-200℃以下と極めて低温になっている。したがって、水蒸気供給回収管31から供給された水蒸気VP1は、レゴリスRGLに入ってから極めて近い距離で凝固、氷結して、氷層ICLを形成する(図9)。より詳しく説明すると、レゴリスRGLの空間SP1側における表面で水蒸気VP1が凝縮する。そして、レゴリスRGLにおける温度は0℃以下のため、水蒸気VP1は凝固、氷結する。多孔質体であるレゴリスRGLの空隙EMPは、凝固、氷結した氷により埋められて、ドリルで形成した穴の空間SP1とレゴリスRGLの内部とを隔てる氷層ICLが形成される。
 なお、氷層ICLは、水蒸気生成部10から供給された水蒸気と、レゴリスRGL中に含まれる水分(氷ICE)と、により形成される。すなわち、氷層ICLにより形成される氷壁IWには、レゴリスRGL中に含まれる水分が含まれることになる。
 さらに、氷層ICLの空間SP1側の表面に水蒸気VP1が供給されると、氷層ICLの空間SP1側の表面が加熱される。氷層ICLの空間SP1側の表面が加熱されると、氷層ICLの一部が溶融する。氷層ICLの空間SP1側の一部が溶融すると水分WTRが生成する(図10)。また、氷層ICLの空間SP1と反対側は、低温、低圧のレゴリスRGLの内側に向かって成長する。氷層ICLの空間SP1と反対側が、低温、低圧のレゴリスRGLの内側に向かって成長する際に、レゴリスRGLの内部の氷ICEを巻き込む。
 氷層ICLは、空間SP1を囲むように形成される。なお、氷層ICLにおいて、氷層ICLが空間SP1を完全に囲っておらず一部に穴があったとしても、水蒸気VP1が選択的に穴の部分に流動する。水蒸気VP1が選択的に穴の部分に流動すると、水蒸気VP1が氷結して穴をふさぐ。氷層ICLが空間SP1を囲むように形成されることにより、氷層ICLの内側の空間SP1が、レゴリスRGLから隔離され、密閉空間となる。
 氷層ICLの厚さが、5ミリメートル以上であれば、氷層ICLの内部を温度5℃程度の水蒸気圧(例えば、圧力900パスカル)として、真空状態である月の地面GLの土中(レゴリスRGL)から隔離できる。氷壁(氷層ICL)が完成されたか否かは水蒸気供給口の圧力を測定することで検知できる。
 水蒸気生成部10で発生させる水蒸気温度の上限温度を5℃、飽和蒸気圧の上限を900パスカルとして、水蒸気生成部10は、水蒸気供給回収管31から水蒸気を注入する。水蒸気供給口における圧力が900パスカルに到達した時点で、水蒸気生成部10は、水蒸気の供給を停止する。そして、水採取装置1は、水蒸気供給管11に設けられる弁を閉じる。
 次に、水蒸気回収管21に設けられる弁を開けて、水蒸気回収口21hから、氷壁(氷層ICL)氷壁に囲まれた密閉空間にある水蒸気VP2を水蒸気回収部20に回収する(図11)。例えば、水回収タンク20aの内部を温度5℃より低い温度に冷却する。水回収タンク20aを冷却することにより、月面土中の氷層ICLにより形成された密閉空間の飽和水蒸気が水蒸気回収部20に流れ込む(図12)。例えば、氷層ICLの空間SP1側の表面に析出した水分WTRが、水蒸気VP2として回収される。回収できる水蒸気量は、月面に供給した水蒸気量に加えて、月面土中に含まれる水の量の回収が可能である。水蒸気VP2が第1気体の一例である。
 例えば、温度-50℃の飽和水蒸気圧は5パスカル程度である。水回収タンク20aの内部を温度-50℃とすることで、月面土中の圧力900パスカルの水蒸気は水蒸気回収装置に流れこみ回収できる。
 [氷壁の形成]
 氷壁IWの形成について説明する。図13から図15のそれぞれは、第1実施形態に係る水採取装置1を用いる水採取方法における氷壁IWの形成について説明する図である。
 レゴリスRGLの地上から深さ1メートルぐらいまで、水蒸気供給管41を挿入する。水蒸気供給管41の水蒸気吸気口から、高温水蒸気RHAを注入する(図13)。水蒸気供給管41の水蒸気吸気口近傍の氷は昇華して、高温水蒸気RHAとともに低圧(真空)である外側に向かって水蒸気は移動する。すなわち、高温水蒸気RHAは、水蒸気供給管41の水蒸気吸気口を中心とする球の外側に向かって流動する。
 水蒸気供給管41から外側に向かって移動した水蒸気は、冷却されて凝固、氷結する。すなわち、氷壁IWが形成される。形成される氷壁は水蒸気供給管41の水蒸気吸気口を中心とした球殻状になる。なお、氷壁IWが完全な球殻状ではなく、穴IWhがある場合でも、高温水蒸気RHAが選択的に穴IWHの部分を流動し、氷結して穴IWhを塞ぐ(図14)。高温水蒸気RHAを供給し続けることによって氷壁IWを厚く成長させる。なお、例えば、氷壁IWを形成する初期に氷壁IWを形成する水分が足りない場合、加熱管からより多くの水蒸気を供給するようにする。そして、レゴリスRGL中に、球殻状の氷壁IWが形成される(図15)。
 なお、氷壁IWを形成する際に、水蒸気ではなく、乾燥した高温気体、例えば、高温の窒素ガス、を供給して形成してもよい。すなわち、高温気体を供給することにより、レゴリスRGL内の氷を溶かしながら、溶かした氷の水分を用いて、氷壁IWを形成してもよい。なお、特に、氷壁IWを形成する初期に氷壁IWを形成する水分が足りない場合、水蒸気を供給してもよい。
 なお、水蒸気生成部10が氷壁形成部の一例、水蒸気回収部20が水採取部の一例、である。
 <第2実施形態>
 第1実施形態に係る水採取装置1は、水蒸気生成部10からレゴリスRGLに水蒸気を供給し、レゴリスRGL内の既存の水を一緒に回収する。第2実施形態に係る水採取装置2は、レゴリスRGLに形成された密閉空間の内部を十分加熱して、水をより効率的に加熱し回収する。第2実施形態に係る水採取装置2は、レゴリスRGL内の密閉空間に高温気体を送り込みレゴリスRGL内の密閉空間の水を回収する。
 水採取装置2は、例えば、月面のレゴリスに含まれる水分(氷)を採取する。図16は、第2実施形態に係る水採取装置2の概略構成を示す図である。
 水採取装置2は、気体供給回収部50を備える。気体供給回収部50は、高温で乾燥した気体、例えば、窒素ガス、を、気体供給管51の気体供給口51hを介して、地面GL下のレゴリスRGL内に形成された、氷壁IWにより形成された密閉空間に供給する。また、気体供給回収部50は、レゴリスRGL内に形成された、氷壁IWにより形成された密閉空間から低温で湿った気体、例えば、窒素ガスを、気体回収管52の気体回収口52hを介して回収する。なお、気体供給回収部50が供給する高温で乾燥したガスが第2気体の一例である。
 水採取装置2は、レゴリスRGL内に氷壁IWができたら、気体供給回収部50から高温で乾燥した気体を供給して、氷壁IWの内側を加熱する。そして、水採取装置2は、氷壁IWが加熱されることにより発生した水蒸気を含む低温で湿度の高い気体を気体供給回収部50で回収する。気体供給回収部50は、回収した水蒸気を含む低温で湿度の高い気体から水を採取する。上述のように、水採取装置2は、高温乾燥気体の供給と、低温高湿気体の回収と、を交互に繰り返す。
 密閉空間の内部には、気体供給回収部50により湿った気体が回収されることにより、乾燥したレゴリスDRGLが堆積する。
 水採取装置2が、気体供給回収部50から高温の気体を供給すると、氷壁IWの内側の表面が溶解すると同時に蒸気対流で氷壁IWが加熱される。氷壁IWが加熱されると、氷壁IWの外側のレゴリスRGLに含まれる水分(氷)を溶かしながら、氷壁IWは気体供給管51に対して離れる方向に広がる。図17から図19に示すように、第2実施形態に係る水採取装置2が高温乾燥気体の供給と、低温高湿気体の回収と、を交互に繰り返すと、氷壁IWは大きくなっていく。
 水採取装置2において、氷壁IWを大きくしていくことにより、レゴリスRGLに含まれる水(氷)を氷壁に巻き込んでいく。そして、氷壁IWの内側を融かしながら水分を回収することにより、レゴリスRGLに含まれていた水分を回収できる。
 気体供給回収部50は、氷壁IWに囲まれる領域の内部における気体を回収して、回収した気体から水を採取する。気体供給回収部50は水採取部の一例である。
 なお、レゴリスRGL内に十分水分が含まれている場合は、気体供給回収部50から気体供給管51を介して高温で乾燥した気体を供給することによって、レゴリスRGL内の氷を気化させて、再氷結することにより氷壁IWを形成してもよい。その場合は、気体供給回収部50が氷壁形成部及び水採取部の一例である。
 <第3実施形態>
 第3実施形態に係る水採取装置3は、氷壁IWの形成と、月面に存在する水(氷)の回収と、を行う。図20は、第3実施形態に係る水採取装置3の概略構成を示す図である。
 水採取装置3は、加熱部61と、冷却部62と、水蒸気供給部63と、水貯蔵部64と、ガス供給部65と、を備える。
 加熱部61は熱交換器61hxを備える。また、冷却部62は熱交換器62hxを備える。熱交換器61hxを構成する配管の一方の端部と、熱交換器62hxを構成する配管の一方の端部は、圧縮機66に接続される。熱交換器61hxを構成する配管の他方の端部と、熱交換器62hxを構成する配管の他方の端部は、膨張弁68に接続される。圧縮機66が動作すると、熱交換器61hxは、凝縮器として作用する。また、圧縮機66が動作すると、熱交換器62hxは、蒸発器として作用する。
 加熱部61と、冷却部62とは、送風機67により接続されている。送風機67は、冷却部62が有する熱交換器62hxで冷却された気体を加熱部61が有する熱交換器61hxに送風する。熱交換器61hxに送風された気体は、気体供給管61pを介してレゴリスRGLに供給される。また、レゴリスRGLからの気体が、気体回収管62pを介して冷却部62に回収される。
 熱交換器61hxは、凝縮器として作用する。したがって、熱交換器61hxに送風された気体は加熱される。加熱部61で加熱された空気は、レゴリスRGLに供給される。レゴリスRGLに供給された気体は、回収され冷却部62で冷却される。また、熱交換器62hxは、蒸発器として作用する。したがって、熱交換器62hxに送風された気体は冷却される。冷却部62で気体が冷却されると、気体の内部に含まれる水分が凝縮して、水分が取り除かれる。すなわち、冷却部62は、氷壁IWに囲まれる領域における水蒸気を回収し、回収した水蒸気から水を採取する。水分が取り除かれることにより、乾いた空気が加熱部61に供給される。
 水蒸気供給部63は、レゴリスRGLに水蒸気を供給する。水蒸気供給部63により供給された水蒸気により、氷壁IWが形成される。すなわち、水蒸気供給部63は、地中(レゴリスRGL中)を加熱して、地中(レゴリスRGL中)に含まれる水分を含む氷で形成される氷壁IWを形成する。
 水貯蔵部64は、回収された気体から析出した水を貯蔵する。
 ガス供給部65は、送風機67により送風する気体を供給する。気体は、例えば、窒素ガスである。
 なお、水蒸気供給部63が氷壁形成部の一例、冷却部62が水採取部の一例、である。また、レゴリスRGL内に十分水分が含まれている場合は、加熱部61から気体供給管61pを介して高温で乾燥した気体を供給することによって、レゴリスRGL内の氷を気化させて、再氷結することにより氷壁IWを形成してもよい。その場合は、加熱部61は、氷壁形成部の一例である。さらに、加熱部61と水蒸気供給部63とを組み合わせて、氷壁を形成してもよい。
 <第4実施形態>
 第4実施形態に係る水採取装置4は、氷壁IWの形成と、月面に存在する水(氷)の回収と、を行う。図21から図24に基づいて、第4実施形態に係る水採取装置4の動作を説明しながら、水採取装置4の構成について説明する。なお、図21から図24において、白抜きの矢印は熱の流れを、矢印付き線は気体の流れを、示す。
 水採取装置4は、加熱部71と、冷却部72と、水供給部73と、水貯蔵部74と、ガス供給部75と、を備える。
 加熱部71は熱交換器71hxを備える。また、冷却部72は熱交換器72hxを備える。熱交換器71hxを構成する配管の一方の端部と、熱交換器72hxを構成する配管の一方の端部は、圧縮機76に接続される。熱交換器71hxを構成する配管の他方の端部と、熱交換器72hxを構成する配管の他方の端部は、膨張弁78に接続される。
 圧縮機76は、熱交換器71hxに圧縮した冷媒を供給する第1モードと、熱交換器72hxに圧縮した冷媒を供給する第2モードと、二つの動作モードで動作する。圧縮機76が第1モードで動作すると、熱交換器71hxは、凝縮器として作用する。また、圧縮機76が第1モードで動作すると、熱交換器72hxは、蒸発器として作用する。そして、圧縮機76が第2モードで動作すると、熱交換器71hxは、蒸発器として作用する。また、圧縮機76が第2モードで動作すると、熱交換器72hxは、凝縮器として作用する。
 (レゴリスRGLへの水蒸気の供給)
 最初に、水採取装置4は、レゴリスRGLに水蒸気を供給して氷壁IWを形成する(図21)。
 水供給部73は、加熱部71に水を供給する。圧縮機76が第1モードで動作しているときに、熱交換器71hxは凝縮器として機能する。凝縮器として機能する熱交換器71hxに水供給部73から水が供給されることにより、熱交換器71hxにおいて、水が気化して水蒸気が発生する。熱交換器71hxにおいて発生した水蒸気は、レゴリスRGLに供給される。
 加熱部71からレゴリスRGLに供給された高温の水蒸気は、レゴリスRGLにおいて凝縮、凝固して氷壁IWを形成する。すなわち、加熱部71は、地中(レゴリスRGL中)を加熱して、地中(レゴリスRGL中)に含まれる水分を含む氷で形成される氷壁IWを形成する。なお、RHAは、高温の気体が供給されている領域を示す。また、氷壁IWが形成された状態で、加熱部71から高温の水蒸気が供給されることにより、氷壁IWの内側が加熱される。氷壁IWの内側で水蒸気が凝縮、凝固するため、効率よく氷壁IWを加熱できる。また、氷壁IWは、外側及び内側の両側に成長する。
 図21において、熱媒体は水蒸気を用いる。熱媒体とレゴリスRGL及び氷壁IWとの間の伝熱は、凝縮、凝固潜熱により行われる。熱媒体である水蒸気は、加熱部71内部とレゴリスRGL及び氷壁IWとの間の飽和蒸気圧力差により、加熱部71からレゴリスRGL及び氷壁IWに供給される。
 加熱部71からレゴリスRGLへ水蒸気を供給することにより、氷壁IWの球殻を形成するとともに、氷壁IWの球殻を大きくできる。また、加熱部71からレゴリスRGLへ水蒸気を供給することにより、氷壁IWの厚さを厚くすることができる。さらに、加熱部71からレゴリスRGLへ水蒸気を供給することにより、氷壁IWの球殻に穴があったとしても、選択的に穴に水蒸気が供給され、穴を塞ぐことができる。
 なお、レゴリスRGL内に十分水分が含まれている場合は、加熱部71から気体供給管71pを介して高温で乾燥した気体を供給することによって、レゴリスRGL内の氷を気化させて、再氷結することにより氷壁IWを形成してもよい。
 (レゴリスRGLへの高温気体の供給)
 次に、水採取装置4は、レゴリスRGL及び氷壁IWに高温気体を供給して、氷壁IWを拡大させる(図22)。
 ガス供給部75は、加熱部71に気体を供給する。ガス供給部75から供給される気体は、例えば、窒素ガスである。ガス供給部75から供給される気体は、非凝縮性であって不活性な気体であれば種類は限定されない。圧縮機76は、第1モードで動作する。すなわち、熱交換器71hxは凝縮器として機能する。また、加熱部71は、レゴリスRGLから送風機77aを介して、気体を回収する。加熱部71から供給された気体は、回収されて再度加熱されて供給するように循環する。
 加熱部71から高温の気体を氷壁IWの内部に供給する。氷壁IWの内部に高温の気体を供給することにより、氷壁IWの内側を加熱する。氷壁IWの内側に水の凝縮、凝固がないため、氷壁IWを氷壁IWの外側方向にのみ成長させることができる。なお、気体と氷壁IWとの間の伝熱は対流熱伝達であるため、氷壁IWを加熱するためには時間を要する。
 図22において、熱媒体は高温の気体、例えば、窒素ガスを用いる。熱媒体とレゴリスRGL及び氷壁IWとの間の伝熱は、対流熱伝達により行われる。熱媒体である高温気体は、送風機77aにより、加熱部71からレゴリスRGL及び氷壁IWに供給される。
 加熱部71からレゴリスRGLへ高温気体を供給することにより、氷壁IWの球殻を大きくできる。また、加熱部71からレゴリスRGLへ高温気体を供給することにより、氷壁IWの厚さを厚くすることができる。さらに、加熱部71からレゴリスRGLへ高温気体を供給することにより、氷壁IWの球殻に穴があったとしても、選択的に穴に水蒸気が供給され、穴を塞ぐことができる。
 (氷壁IWからの水を採取)
 次に、水採取装置4は、氷壁IWの内部に高温の乾燥した気体を供給して、氷壁IWから水分を採取する(図23)。
 ガス供給部75は、加熱部71に気体を供給する。ガス供給部75から供給される気体は、例えば、窒素ガスである。ガス供給部75から供給される気体は、非凝縮性であって不活性な気体であれば種類は限定されない。圧縮機76は、第1モードで動作する。すなわち、熱交換器71hxは凝縮器とし、熱交換器72hxは蒸発器として機能する。また、送風機77bは、加熱部71からレゴリスRGLへ高温の乾燥気体を供給し、レゴリスRGLから水蒸気を含む気体を冷却部72に回収する。加熱部71から供給された気体は、冷却部72で回収されて冷却と除湿されて、再度、加熱部71で加熱されてレゴリスRGLに供給するように循環する。
 加熱部71から高温で乾いた気体、例えば、窒素ガス、を氷壁IWの内部に供給することにより、氷壁IWの内側を加熱する。氷壁IWの内側を加熱することにより、氷壁IWの内側の氷を昇華させる。氷壁IWの内側の氷を昇華させた気体には、水分(水蒸気)が含まれる。水蒸気を含んだ気体は、冷却部72で冷却される。冷却部72に回収された水蒸気を含んだ気体は、冷却され、気体中の水蒸気が凝縮、凝固される。熱交換器72hxには、氷ICE2が付着する。すなわち、冷却部72は、氷壁IWに囲まれる領域における水蒸気を回収し、回収した水蒸気から水を採取する。
 図23において、熱媒体は高温の気体、例えば、窒素ガスを用いる。熱媒体と氷壁IWとの間の伝熱は、高温の乾燥した気体が循環することにより対流熱伝達により行われる。熱媒体である高温気体は、送風機77bにより、加熱部71から氷壁IWに供給される。
 加熱部71からレゴリスRGLへ高温気体を供給することにより、氷壁IWの内側の氷に由来する水分を回収する。回収した水分は、冷却部72により氷結される。
 (氷結した水分を水に溶解)
 次に、水採取装置4は、冷却部72が有する熱交換器72hxに氷結して付着した着氷を融かして水にする(図24)。
 冷却部72が有する熱交換器72hxに着氷が増加し、着氷の効率が低下した時点で、圧縮機76の回転を逆転させる。すなわち、圧縮機76を第2モードで動作させる。圧縮機76を第2モードで動作させると、熱交換器72hxは、凝縮器として作用する。熱交換器72hxが凝縮器として作用することにより、熱交換器72hxに付着した着氷(氷ICE2)が加熱されて溶解する。着氷が溶解してできた水は、水貯蔵部74に貯蔵する。なお、レゴリスRGL内に繋がる加熱部71及び冷却部72のそれぞれの配管に設けられる弁は閉じて、水蒸気がレゴリス内に戻らないようにする。
 水採取装置4は、圧縮機76の回転方向を入れ替えること、すなわち、圧縮機76の運転モードを交互に切り替えることにより、連続して水採取ができる。
 なお、加熱部71及び水供給部73が氷壁形成部の一例、冷却部72が水採取部の一例、である。また、加熱部71から気体供給管71pを介して高温で乾燥した気体を供給して氷壁IWを形成する場合は、加熱部71が氷壁形成部の一例である。
 <第5実施形態>
 第5実施形態に係る水採取装置として、レゴリスRGLの内部に最初に氷壁IWを形成する氷壁IWの形成方法について説明する。図25は、氷壁IWの形成方法について説明する図である。
 最初に、ドリルDRLを用いて、レゴリスRGLに穴を掘る(図25(a))。そして、穴が崩れないように、掘った穴にスリーブSLVを挿入する(図25(b))。そして、スリーブSLVの一番深いところにヒータHTRを挿入する(図25(c))。スリーブSLVの一番深いところまでヒータHTRを挿入することにより、ヒータHTRがレゴリスRGLに接触する。なお、図25(c)において、丸印は、レゴリスRGLの内部に予め存在する氷粒を示す。
 次に、ヒータHTRに電力を供給してヒータHTRを加熱する(図25(d))。ヒータHTRを加熱すると、ヒータHTRに接触するレゴリスRGL内の氷が溶融、昇華する。そして、ヒータHTR近傍から昇華した水蒸気はわずかに離れた位置、例えば、10ミリメートル程度離れた位置、で再凝縮する(図25(e))。水蒸気が再凝縮すると、ヒータHTRを囲んで氷壁IWが形成される。そして、ヒータHTRへの電力の供給を停止して、ヒータHTRをスリーブSLVから引き抜くと、内部に水分を含まない氷壁IWが形成される。
 なお、氷壁IWの形成方法としては、第1実施形態に係る水採取装置において説明したように、水蒸気を用いる方法と、乾燥した加熱気体を用いる方法と、第5実施形態に係る水採取装置において説明したように、ヒータHTRを用いる方法を組み合わせてもよい。
 例えば、最初に、ヒータHTRを用いてレゴリスRGLを加熱して氷壁の形成を試みてもよい。ヒータHTRによるレゴリスRGLの加熱により、氷壁IWができるか否かは、レゴリスRGL内の水の含有率に依存する。したがって、最初に、ヒータHTRを用いてレゴリスRGLを加熱して氷壁の形成を試みて、ヒータHTRで加熱した部分に気体を充填して内圧測定して、氷壁ができたか否かを判定してもよい。
 例えば、ヒータHTRで加熱した部分に気体を充填して、内圧に変化がなければ、氷壁が完成したと判断してもよい。ヒータHTRで加熱した部分に気体を充填して、内圧が徐々に下がるようであれば、十分な氷壁ができておらず、氷壁に穴があると判断してもよい。
 ヒータHTRにより氷壁ができていない場合は、例えば、乾燥した加熱気体を供給して、氷壁の穴を塞ぐことを試みてもよい。そして、氷壁を形成している部分に、再度気体を充填して内圧測定して、氷壁ができたか否かを判定してもよい。
 例えば、氷壁を形成している部分に気体を充填して、内圧に変化がなければ、氷壁が完成したと判断してもよい。氷壁を形成している部分に気体を充填して、内圧が徐々に下がるようであれば、十分な氷壁ができておらず、氷壁に穴があると判断してもよい。
 乾燥した加熱気体を供給しても、氷壁ができてない場合は、更に、水蒸気を供給して氷壁を形成してもよい。
 上記のように氷壁を形成することにより、レゴリスRGL内に水分が十分ある場合は、水を使わずに氷壁を形成することができる。水を使わずに氷壁を形成することによって、
水採取に使う水を削減できる。
 なお、ヒータHTRが氷壁形成部の一例である。
 <第6実施形態>
 第6実施形態に係る水採取装置として、月面探査車に、水採取装置を搭載した例を説明する。図26は、第6実施形態に係る水採取装置の概要について説明する図である。
 上述の本実施形態に係る水採取装置を、一人乗り自動車くらいのサイズの探査車に搭載させたローバー型の水採取装置としてもよい。
 ローバー型の水採取装置である探査車80は、水採取装置81と、電源バッテリBATと、水タンクTNKと、を備える。探査車80の後部には、水蒸気又は気体を供給し回収する配管PIPと、配管PIPをレゴリスに設置するための穴を掘削するドリルDRLと、を備える。配管PIPは、水採取装置81に接続される。
 探査車80により、例えば、月面を移動しながら水の採取ができる。
 また、第6実施形態に係る水採取装置であるローバー型の水採取装置(探査車80)の変形例であるローバー型の水採取装置(探査車180)について説明する。
 図27、図28及び図29のそれぞれは、第6実施形態に係る水採取装置の変形例である探査車180の概要について説明する図である。図27は探査車180の上面図、図28は探査車180の側面図、図29は探査車180の正面図である。なお、図28及び図29には、レゴリスRGLに、水を採集する際に形成される氷壁IWを示す。
 探査車180は、第1温度調節部181と、第2温度調節部182と、水供給部183と、水貯蔵部184と、ガス供給部185と、圧縮機186と、送風機187と、膨張弁188と、を備える。
 第1温度調節部181及び第2温度調節部182のそれぞれは、気体を加熱又は冷却する。図30は、第1温度調節部181及び第2温度調節部182を説明する図である。
 第1温度調節部181は、ガス供給口181aと、水供給口181wと、水排出口181dと、送風機接続口181bと、外部接続口181eと、を有する。
 ガス供給口181aは、ガス供給部185に接続される。ガス供給口181aから非凝縮性ガスが供給される。水供給口181wは、水供給部183に接続される。水供給口181wに水供給部183から氷壁IWを形成するための水分が供給される。水排出口181dは、水貯蔵部184に接続する。水排出口181dから、後述する第1温度調節部181の内部に備える熱交換器181hxで採集された水が水貯蔵部184に排出される。
 送風機接続口181bは、送風機187に接続される。外部接続口181eは、サーマルマイニングビット193に、柔軟性を有するチューブTB1を介して接続される。
 第1温度調節部181は、内部に、熱交換器181hxを備える。図31は、第1温度調節部181が備える熱交換器181hxについて説明する図である。熱交換器181hxは、複数の配管181pが、折り返し部181rにより接続されて形成される。配管181pの内部には、冷媒が流通する。冷媒は、冷媒口181c1及び冷媒口181c2の一方から流入し、冷媒口181c1及び冷媒口181c2の他方から流出する。冷媒口181c1及び冷媒口181c2の一方は、圧縮機186に接続する。冷媒口181c1及び冷媒口181c2の他方は、膨張弁188に接続する。
 複数の配管181pの間には、気体が流通する。気体が複数の配管181pの間を流通することにより、熱交換器181hxは、気体と冷媒との間で熱交換を行う。
 なお、上記の説明では、第1温度調節部181について説明したが、第2温度調節部182でも同様である。第1温度調節部181が備える熱交換器181hxと、第2温度調節部182が備える熱交換器とは、圧縮機186及び膨張弁188を介して接続し、冷媒回路を構成する。
 圧縮機186から熱交換器181hxに高圧の冷媒が供給されると、熱交換器181hxは凝縮器として作用する。すなわち、第1温度調節部181は、気体を加熱する加熱部として作用する。一方、冷媒回路を構成する第2温度調節部182が備える熱交換器は蒸発器として作用する。すなわち、第2温度調節部182は、気体を冷却する冷却部として作用する。
 また、圧縮機186から膨張弁188を介して熱交換器181hxに低圧の冷媒が供給されると、熱交換器181hxは蒸発器として作用する。すなわち、第1温度調節部181は、気体を冷却する冷却部として作用する。一方、冷媒回路を構成する第2温度調節部182が備える熱交換器は凝縮器として作用する。すなわち、第2温度調節部182は、気体を加熱する加熱部として作用する。
 第2温度調節部182は、ガス供給口182aと、水供給口182wと、水排出口182dと、送風機接続口182bと、外部接続口182eと、を有する。
 ガス供給口182aは、ガス供給部185に接続される。ガス供給口182aから非凝縮性ガスが供給される。水供給口182wは、水供給部183に接続される。水供給口182wに水供給部183から氷壁IWを形成するための水分が供給される。水排出口182dは、水貯蔵部184に接続する。水排出口182dから、第2温度調節部182の内部に備える熱交換器で採集された水が水貯蔵部184に排出される。
 送風機接続口182bは、送風機187に接続される。外部接続口182eは、サーマルマイニングビット193に、柔軟性を有するチューブTB2を介して接続される。
 第1温度調節部181の送風機接続口181b及び第2温度調節部182の送風機接続口182bのそれぞれには、送風機187が接続される。
 送風機187が、例えば、第1回転方向にファンが回転すると、送風機187は第1温度調節部181に気体を送風する。いいかえると、送風機187は、送風機接続口181bに気体を送風する。送風機187から送風機接続口181bに送られた気体は、第1温度調節部181の熱交換器181hxで熱交換を行い、外部接続口181eから気体が排出される。
 一方、送風機187が、例えば、第1回転方向にファンが回転すると、送風機187は、第2温度調節部182から気体を吸気する。いいかえると、送風機187は、送風機接続口182bから気体を吸気する。送風機187が送風機接続口182bから気体を吸気することにより、外部接続口182eから気体が吸気され、第2温度調節部182の熱交換器で熱交換を行い、送風機接続口182bから送風機187へ気体が排出される。
 送風機187が、例えば、第1回転方向を逆方向である第2回転方向にファンが回転すると、送風機187は第1温度調節部181から気体を吸気する。いいかえると、送風機187は、送風機接続口181bから気体を吸気する。送風機187が送風機接続口181bから気体を吸気することにより、外部接続口181eから気体が吸気され、第1温度調節部181の熱交換器181hxで熱交換を行い、送風機接続口181bから送風機187へ気体が排出される。
 一方、送風機187が、例えば、第1回転方向を逆方向である第2回転方向にファンが回転すると、送風機187は第2温度調節部182に気体を送風する。いいかえると、送風機187は、送風機接続口182bに気体を送風する。送風機187から送風機接続口182bに送られた気体は、第2温度調節部182の熱交換器で熱交換を行い、外部接続口182eから気体が排出される。
 また、探査車180は、ドリルビット191と、ヒータビット192と、サーマルマイニングビット193と、を備える。ドリルビット191、ヒータビット192及びサーマルマイニングビット193のそれぞれは、レールRLに移動可能に取り付けられる。
 ドリルビット191、ヒータビット192及びサーマルマイニングビット193のそれぞれは、探査車180の床に設けられた開口THの上方に移動される。そして、移動されたドリルビット191、ヒータビット192及びサーマルマイニングビット193のいずれかは、レゴリスRGLに差し込まれる。
 ドリルビット191は、レゴリスRGLに差し込まれることにより、例えば、図4、図25(a)に示すように、レゴリスRGLに穴を形成する。
 ヒータビット192の先端には、例えば、図25(c)に示すように、ヒータHTRが設けられる。ヒータビット192が、ドリルビット191により形成された穴に挿入されることにより、例えば、図25(c)から図25(f)に示すように、氷壁を形成する。
 サーマルマイニングビット193は、レゴリスRGL内に気体を供給するとともに、レゴリスRGL内から気体を回収する。図32は、サーマルマイニングビット193の概略を説明する図である。なお、図32において、配管193pの内部を説明するために、配管193pを途中で切断して示す。
 サーマルマイニングビット193は、レゴリスRGL内に挿入される配管193pを有する。サーマルマイニングビット193は、配管193pの上部に、第1温度調節部181とチューブTB1を介して接続する第1接続部193aと、第2温度調節部182とチューブTB2を介して接続する第2接続部193bと、を有する。
 配管193pは、内部に、第1流路193paと、第2流路193pbと、を有する。第1流路193pa及び第2流路193pbのそれぞれは、配管193pの長手方向にわたって形成されている。第1流路193paは、配管193pの上部で第1接続部193aと繋がる。また、第2流路193pbは、配管193pの上部で第2接続部193bと繋がる。
 配管193pは、先端に開口193haと、開口193hbと、を有する。開口193haは、第1流路193paと繋がる。また、開口193hbは、第2流路193pbと繋がる。
 例えば、第1温度調節部181から供給された気体は、第1接続部193aから第1流路193paを通って、開口193haからレゴリスRGL内に供給される。そして、レゴリスRGL内からの気体は、開口193hbから、第2流路193pbを通って、第2接続部193bから第2温度調節部182に吸気される。
 また、例えば、第2温度調節部182から供給された気体は、第2接続部193bから第2流路193pbを通って、開口193hbからレゴリスRGL内に供給される。そして、レゴリスRGL内からの気体は、開口193haから、第1流路193paを通って、第1接続部193aから第1温度調節部181に吸気される。
 水供給部183は、第1温度調節部181及び第2温度調節部182のそれぞれに、氷壁IWを形成するための水分を供給する。なお、レゴリスRGL内に十分水分が含まれている場合は、加熱部として作用する第1温度調節部181及び第2温度調節部182から高温で乾燥した気体を供給することによって、氷壁IWを形成してもよい。
 ガス供給部185は、第1温度調節部181及び第2温度調節部182のそれぞれに、非凝縮性ガスを供給する。非凝縮性ガスは、例えば、窒素ガス、酸素ガス、水素ガス等である
 さらに、探査車180は、制御ユニットCTLと、太陽光パネルSOLと、電源バッテリBATと、を備える。
 制御ユニットCTLは、探査車180全体を制御する。また、制御ユニットCTLは、ドリルビット191、ヒータビット192及びサーマルマイニングビット193のそれぞれを制御する。さらに、制御ユニットCTLは、圧縮機186及び送風機187等を制御して、レゴリスRGL内に含まれる水分を採取するように探査車180を動作させる。
 太陽光パネルSOLは、探査車180を動作させるための動力を生成する。太陽光パネルSOLは、太陽光から発電する。太陽光パネルSOLで発電した電力は、制御ユニットCTL、圧縮機186及び送風機187等に供給されるとともに、電源バッテリBATに供給される。
 電源バッテリBATは、電気を貯蔵するとともに、貯蔵した電気を制御ユニットCTL、圧縮機186及び送風機187等に供給する。電源バッテリBATは、例えば、基地等において充電される。また、電源バッテリBATは、太陽光パネルSOLが発電して電源バッテリBATに供給された電力により充電される。
 探査車180は、第1温度調節部181及び第2温度調節部182の一方を加熱部、他方を冷却部として動作させ、次に、第1温度調節部181及び第2温度調節部182の一方を冷却部、他方を加熱部として動作させるように切り替えて動作する。第1温度調節部181及び第2温度調節部182のそれぞれを交互に加熱部及び冷却部のいずれかに切替ながら動作させることにより、連続してレゴリスRGL内の水分を採取できる。
 なお、水供給部183、加熱部として作用する第1温度調節部181及び第2温度調節部182のいずれかが氷壁形成部の一例、冷却部として作用する第1温度調節部181及び第2温度調節部182のいずれかが水採取部の一例、である。また、ヒータビット192は、氷壁形成部の一例である。
 <第7実施形態>
 第7実施形態に係る水採取装置は、地表側をテントTNTによって覆うことにより、地表側に氷壁IWがない構成を示している。図33及び図34は、第7実施形態に係る水採取装置の概要について説明する図である。
 配管PIPから加熱気体が氷壁に供給される。配管PIPから供給された加熱空気により、レゴリスRGL内に予め存在した氷は、氷壁IWを昇華することにより一緒に水蒸気となる。水蒸気はレゴリスRGLの表面から排出される。レゴリスRGL表面から排出されたテントTNT内の水蒸気は別途回収される。
 配管PIPから加熱気体が供給されると、氷壁IWは外側に移動する(図34)。氷壁IWが移動することにより、氷壁IWが移動した位置に予め存在した水分WTRを回収できる。
 <本実施形態に係る水採取装置による採取可能な水の量について>
 本実施形態に係る水採取装置によって採取可能な水の量について検討する。図35は、本実施形態に係る水採取装置が月面において採取可能な水の量について計算するためのモデルについて説明する図である。深さD1に、内面における半径が半径R1、厚さが厚さW1の球殻状の氷壁IWがあるとする。
 ここでは、例として、乾いたレゴリスRGLのかさ密度ρは1800キログラム毎立方メートル、レゴリスRGLを構成する細粒物の比重Gは3、水の密度ρwは1000キログラム毎立方メートルとして、レゴリスRGLの空隙率n(単位:無次元)を計算すると下記のようになる。
  ρ   =G×ρw  ×(1-n)
  1800=3×1000×(1-n)
  n   =0.4
 すなわち、レゴリスRGLの空隙率nは0.4となる。
 (レゴリスRGLに含まれる氷の体積割合)
 レゴリスRGL中の氷の含有量が4重量パーセント及び30重量パーセントの場合について、半径R1のレゴリスRGLの球の内部、すなわち、内面の半径R1である氷壁IWの内部、にあるレゴリスRGLに含まれる水分の体積割合について計算する。
 ここでは、レゴリスRGL内の氷について、乾いたレゴリスにおけるレゴリスを構成する細粒物間の空隙はそのままで、レゴリスの細粒物の一部が氷に置き換わったとして計算する。すなわち、レゴリスRGL中の空隙の体積割合は、40パーセントであるとする。
 氷の密度を930キログラム毎立方メートル(温度-100℃における氷の密度)として計算すると、レゴリスRGL中の氷の含有量が4重量パーセントの場合は、レゴリスRGL中の氷の体積割合は、約7パーセント、レゴリスの細粒物の体積割合は、約53パーセントとなる。また、レゴリスRGL中の氷の含有量が30重量パーセントの場合は、レゴリスRGL中の氷の体積割合は、約35パーセント、レゴリスの細粒物の体積割合は、約25パーセントとなる。
 (氷壁IWの内側のレゴリスRGLに含まれる水分量)
 氷壁IWを半径R1の球殻として、氷壁IWの内側のレゴリスRGLに含まれる水分量を概算する。ここでは、半径R1を0.5メートルとして計算を行う。氷壁IWの内側の体積は、0.52立方メートルとなる。上記のレゴリスRGLに含まれる氷の体積割合から氷の密度を用いて計算すると、氷壁IWの内側に含まれる水分量は、レゴリスRGL中の氷の含有量が4重量パーセントの場合は約35キログラム、レゴリスRGL中の氷の含有量が30重量パーセントの場合は、約170キログラム、となる。
 すなわち、本実施形態に係る水採取装置によれば、レゴリスRGL中の氷の含有量が4重量パーセントの場合は約35キログラム、レゴリスRGL中の氷の含有量が30重量パーセントの場合は、約170キログラム、の水を採取可能である。
 また、氷壁IWを形成するのに必要な水量について、採取可能な水量に対する割合について検討する。ここでは、氷壁IWに必要な厚さW1を5ミリメートルとして計算する。厚さW1が5ミリメートルである球殻状の氷壁IWの水量について、採取可能な水量に対する割合を図36に示す。
 レゴリスRGL中の氷の含有量が4重量パーセントの場合は氷壁IWの半径R1が100ミリメートル(0.1メートル)以上であれば、氷壁IWの内側の採取可能な水量は氷壁IWを形成するのに必要な水量を上回る。また、レゴリスRGL中の氷の含有量が30重量パーセントの場合は、氷壁IWの半径R1が50ミリメートル(0.05メートル)以上であれば、氷壁IWの内側の採取可能な水量は氷壁IWを形成するのに必要な水量を上回る。
 例えば、氷壁IWの半径R1を1メートルとした場合について検討すると、レゴリスRGL中の氷の含有量が4重量パーセントの場合、氷壁IWの内部から接種可能な水分量は、約35キログラムとなる。一方、氷壁IWを形成するのに必要な水量は約3キログラムとなる。したがって、正味約32キログラムの水をレゴリスRGLから採取可能である。同様に、レゴリスRGL中の氷の含有量が30重量パーセントの場合、氷壁IWの内部から接種可能な水分量は、約170キログラムとなり、氷壁IWを形成するのに必要な水量は約3キログラムとなる。したがって、正味約167キログラムの水をレゴリスRGLから採取可能である。
 (氷壁IWの内側のレゴリスRGLを加熱するのに必要な熱量)
 氷壁IWを半径R1の球殻として、氷壁IWの内側のレゴリスRGLを加熱するのに必要な熱量を概算する。ここでは、半径R1を0.5メートルとして計算を行う。氷壁IWの内側の体積は、0.52立方メートルとなる。
 ここでは、レゴリスRGLの細粒物の比熱は486ジュール毎キログラム毎ケルビン(温度-100℃の場合)、氷の比熱は1377ジュール毎キログラム毎ケルビン(温度-100℃の場合)であるとする。また、氷の凝縮熱は2442キロジュール毎キログラム、水の凝固熱は334キロジュール毎キログラムであるとする。
 真空中の氷は、温度-100℃から-50℃で昇華を開始する。したがって、レゴリスRGL内に氷がある場合、少なくとも温度が-100℃以下の状態で存在していると考えられる。またレゴリスRGL内に極低温で存在している氷を昇華して取り出すためには、少なくとも温度を-100℃から-50℃以上に加熱する必要がある。
 加熱するのに必要な熱量を概算するにあたって、計算の仮定として、月面の地面GLの下に温度-150℃で、レゴリスRGL中の氷の含有量が4重量パーセントに氷含有のレゴリスRGLが存在するとする。そして、半径R1が0.5メートルの球殻状である氷壁IWの内部を温度-50℃まで加熱して氷を水蒸気に昇華して取り出す場合に必要なエネルギーを算出する。
 レゴリスRGL中の氷の含有量が4重量パーセントの場合、下記のようになる。
  氷壁IWの内部のレゴリスRGLの重量:865キログラム
  氷壁IWの内部の含水量       :35キログラム
  氷壁IWの内部の氷含有レゴリスの比熱:522ジュール毎キログラム毎ケルビン
 したがって、レゴリスRGLを温度-150℃から-50℃に加熱する顕熱エネルギーは45メガジュール、氷を水蒸気にする潜熱エネルギーは96メガジュール、合計141メガジュールの熱量が必要となる。例えば、1時間程度で水を取り出す場合には、39キロワット程度の加熱能力が必要となる。
 同様の計算を、レゴリスRGL中の氷の含有量が30重量パーセントの場合について行うと、下記のようになる。
  氷壁IWの内部のレゴリスRGLの重量:565キログラム
  氷壁IWの内部の含水量       :170キログラム
  氷壁IWの内部の氷含有レゴリスの比熱:753ジュール毎キログラム毎ケルビン
 したがって、レゴリスRGLを温度-150℃から-50℃に加熱する顕熱エネルギーは42メガジュール、氷を水蒸気にする潜熱エネルギーは470メガジュール、合計512メガジュールの熱量が必要となる。例えば、1時間程度で水を取り出す場合には、143キロワット程度の加熱能力が必要となる。
 <本実施形態に係る水採取装置による氷壁の挙動について>
 本実施形態に係る水採取装置によって、氷壁がどのような挙動を示すかについて説明する。図37及び図38は、本実施形態に係る水採取装置による氷壁の挙動について説明する図である。
 レゴリスRGLは、空間SP1の内側から乾燥気体VP3により加熱される。レゴリスRGLの内側における最表面の領域RBの氷は、昇華し水蒸気は乾燥気体VP3中に取り込まれる。水蒸気を取り込んだ乾燥気体VP3は、水採取装置に回収される。
 レゴリスRGLの内側表面から奥まった領域RCの氷も、加熱され昇華する。昇華した領域RCの氷に由来する水蒸気は、レゴリスRGLの外側は内側に比べて低温、低圧であることから、外側に向かって進む。
 外側に向かって進む水蒸気は、外側に向かってレゴリスRGL内の空隙を進む。レゴリスRGLは温度が低いことから、レゴリスRGLの細粒物における固体表面で、水蒸気の温度が降下し、水蒸気は再度凝縮、凝固する。水蒸気が再度凝縮、凝固する際に、空隙内を氷で塞ぐ。
 上述のようにして、レゴリスRGL内に、氷リッチな領域RIが形成される。また、氷リッチな領域RIの内側には、乾燥領域RSが形成される。氷リッチな領域RI、すなわち、氷壁が形成されることにより、氷壁の外側の真空領域に、氷壁の内側の高圧気体は漏れない。また、氷壁を形成した氷は、外側に拡張するように移動する。
 ≪水電解装置≫
 次に、月面のような低重力の環境において、水を電気分解して、水素と酸素を生成する水電解装置について説明する。例えば、本実施形態に係る水分解装置は、本開示に係る水採取装置により採取した水を電気分解する。
 水電解装置の方式としては、主にアルカリ形水電解方式、固体高分子形水電解方式及び固体酸化物形水電解方式等が挙げられる。月面及び宇宙空間での水電解は、取り扱いが容易な常温の水を使用可能であり、頻繁な起動停止に対応可能な固体高分子形水電解方式が最適と考えられる。固体高分子形水電解方式はアノード側において水中に酸素ガスを放出する。したがって、固体高分子形水電解方式では、別途水中から酸素ガスを取り出す仕組みが必要である。
 地球上においては、水と酸素ガスとの比重差から生ずる酸素ガスの気泡の浮力によって、水溜めタンクなどにおいて水から酸素を分離する。しかしながら、宇宙空間や重力が地球上の六分の一と小さくなる月面においては、酸素ガスの浮力によって水と酸素を分離することは困難である。
 本実施形態に係る水電解装置は、宇宙空間及び月面などの重力が小さい環境においても、良好な気液分離ができる。
 <第1実施形態>
 第1実施形態に係る水電解装置100について説明する。図39は、第1実施形態に係る水電解装置100の斜視図である。図40は、第1実施形態に係る水電解装置100の分解斜視図である。図41及び図42は、第1実施形態に係る水電解装置100の動作について説明する図である。具体的には、図41及び図42は、固体電解質膜130との境界面付近の詳細について説明する図である。
 水電解装置100は、供給された水(純水)から陽極及び陰極の少なくとも一方から気体を発生させる。例えば、水電解装置100の陽極側からは酸素が発生する。水電解装置100の陰極側からは水素が発生する。筐体100aの内部に、陽極110と、陰極120と、固体電解質膜130と、を備える。水電解装置100は、固体電解質膜130によって、陽極110と陰極120とは隔離される。固体電解質膜130は、陽極側触媒膜131と、陰極側触媒膜132と、分離膜133と、を備える。
 陽極110は、固体電解質膜130に接触する。陽極110は、内部を気体や液体が流通可能な多孔質体により形成される。陽極110は、例えば、チタンの焼結体に金めっきされて形成される。陽極110の固体電解質膜130と接触する面(前面)には、複数の溝111が形成される。
 陽極110の固体電解質膜130と反対側には、水が供給される水チャンバ101が設けられる。水チャンバ101には、水供給管101aから純水が供給される。また、水チャンバ101には、水排出管101bから水が排出される。すなわち、陽極110の固体電解質膜130と向き合う反対側の背面において、背面の一部又は全部が水チャンバ101に供給される水と接触する。水チャンバ101に供給された純水は、多孔質体である陽極110の背面から、内部に染み込む。
 図42に示すように、陽極110は、親水性の多孔質体であることから、陽極110の背面に接触する水は、毛管力によって矢印A1の向きに移動し陽極110の内部に染み込む。陽極110の内部に染み込んだ水は、陽極110の内部を通過して固体電解質膜130と向き合う面まで浸透する。
 陽極110と固体電解質膜130との接触界面まで浸透した水は、電解され酸素が発生する。図42に示すように、接触界面で発生した酸素は、接触界面から複数の溝111に放出される。図42の下の図に示すように、表面張力により気体(酸素)は、細孔内を逆流せずに、矢印A2の向きに水が供給される。
 固体電解質膜130と陽極110との接触界面から発生した酸素は、複数の溝111のいずれかに排出される。そして、固体電解質膜130と陽極110との接触界面から発生した酸素は、複数の溝111に集められる。さらに、複数の溝111を通ってそれぞれの溝111から、酸素は、酸素ガスチャンバ103に排出され、集められる。酸素ガスチャンバ103に集められた酸素は、酸素ガスチャンバ103に連通する酸素排出管103aから排出される。
 陰極120は、固体電解質膜130に接触する。陰極120は、内部を気体や液体が流通可能な多孔質体により形成される。陰極120は、例えば、カーボンにより形成される。陰極120の固体電解質膜130と接触する面には、複数の溝121が形成される。
 陰極120と固体電解質膜130との境界面では、水素が発生する。発生した水素は、水素チャンバ102に集められ、水素排出管102aから排出される。
 <第2実施形態>
 第1実施形態に係る水電解装置100では、単一電極セットの基本構造の水電解セルを用いた形態について説明した。第2実施形態に係る水電解装置として、複数の電極セットを積み上げ可能なスタック構造の水電解セルを用いた形態について説明する。図43は、第2実施形態に係る水電解装置の陽極側スタック210の分解斜視図である。図44は、第2実施形態に係る水電解装置の陰極側スタック220の分解斜視図である。
 [陽極側スタック210]
 第2実施形態に係る水電解装置の陽極側スタック210は、第1ケース211と、第1ガスケット212と、引き出し電極213と、集電体214と、第2ガスケット215と、第2ケース216と、第3ガスケット217と、セパレータ218と、を備える。
 (第1ケース211)
 第1ケース211は、外部から水を内部に供給するとともに、内部で発生した酸素を外部に排出する。第1ケース211は、第1ケース211の外側から内側まで貫通する水排出孔211w1、水供給孔211w2及び酸素排出孔211aを有する。
 水供給孔211w2から供給された水は、引き出し電極213を透過して集電体214に供給される。また、水供給孔211w2から供給された水の一部は、水排出孔211w1から排出される。陽極側スタック210の内部で発生した酸素は、酸素排出孔211aから排出される。
 第1ケース211は、例えば、アクリルにより形成される。第1ケース211は、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、第1ケース211は、水電解装置を組み立てる際に陽極側スタック210を組み付けるための棒状部材が貫通する貫通穴211hを四隅に備える。なお、以下、図44の上側から第1ケース211を見ることを平面視という場合がある。なお、図45についても同様である。
 (第1ガスケット212)
 第1ガスケット212は、第1ケース211と取り出し電極213との境界において、水や酸素の漏れを防止する。第1ガスケット212は、第1ケース211からの水が流通する開口212wと、酸素が流通する開口212aと、を有する。
 第1ケース211から供給された水は、開口212wを通って、引き出し電極213を透過して集電体214に供給される。また、陽極側スタック210の内部で発生した酸素は、開口212aを通過して、第1ケース211の酸素排出孔211aから排出される。
 第1ガスケット212は、例えば、透明ゴムにより形成される。第1ガスケット212は、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、第1ガスケット212は、水電解装置を組み立てる際に陽極側スタック210を組み付けるための棒状部材が貫通する貫通穴212hを四隅に備える。
 (引き出し電極213)
 引き出し電極213は、外部の電源からの電力を集電体214に供給する。また、引き出し電極213は、第1ケース211から供給される水を集電体214に供給する。引き出し電極213は、網状の導電体により形成される。引き出し電極213は、酸素が通過する開口213aを有する。
 第1ケース211から供給された水は、網状の導電体により形成された引き出し電極213を透過して集電体214に供給される。また、陽極側スタック210の内部で発生した酸素は、開口213aを通過して、第1ケース211側に排出される。
 引き出し電極213は、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、引き出し電極213は、矩形状の一つの辺に、取り出し端子213tを有する。取り出し端子213tには、外部の電源が接続される。さらに、引き出し電極213は、水電解装置を組み立てる際に陽極側スタック210を組み付けるための棒状部材が貫通する貫通穴213hを四隅に備える。
 (集電体214)
 集電体214は、外部の電源からの電力を、固体電解質膜を有するセパレータ218に供給する。また、集電体214は、第1ケース211から供給される水をセパレータ218に供給する。集電体214は、多孔質体により形成される。
 第1ケース211から供給された水は、多孔質体である集電体214を浸透してセパレータ218に供給される。また、集電体214とセパレータ218の境界面で発生した酸素は、集電体214に形成される溝に排出される。集電体214に形成される水に排出された酸素は、集電体214の横側に排出される。集電体214の横側に排出された酸素は、開口213aを通過して、第1ケース211側に排出される。
 集電体214は、例えば、平面視で40ミリメートル×50ミリメートルの矩形状の形状を有する。
 集電体214は、第2ガスケット215が有する開口215cにおける第1部分215c1、第2ケース216が有する開口216cにおける第1部分216c1及び第3ガスケット217が有する開口217cにおける第1部分217c1に挿入され設けられる。
 図45は、第2実施形態に係る水電解装置の陽極側の集電体214の斜視図である。図46は、第2実施形態に係る水電解装置の陽極側の集電体214の側面図である。集電体214は、高さH×幅W×厚さDの板状の形状を有する。例えば、高さHは40ミリメートル、幅Wは50ミリメートル、厚さDは2ミリメートル、である。集電体214の一方の面には、ピッチP間隔で溝が設けられる。例えば、ピッチPは2ミリメートルである。
 (第2ガスケット215)
 第2ガスケット215は、取り出し電極213と第2ケース216との境界において、水や酸素の漏れを防止する。また、第2ガスケット215は、開口215cを有する。開口215cは、集電体214と平面視で略等しい外形を有する第1部分215c1と、第1部分215c1に隣接して設けられる第2部分215c2と、を有する。
 第1部分215c1には、集電体214が挿入される。第2部分215c2は、集電体214とセパレータ218の境界面で発生した酸素が流通する。
 第2ガスケット215は、例えば、透明ゴムにより形成される。第2ガスケット215は、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、第2ガスケット215は、水電解装置を組み立てる際に陽極側スタック210を組み付けるための棒状部材が貫通する貫通穴215hを四隅に備える。
 (第2ケース216)
 第2ケース216は、内部に集電体214を保持するとともに、内部で発生した酸素を外部に排出する。第2ケース216は、開口216cを有する。開口216cは、集電体214と平面視で略等しい外形を有する第1部分216c1と、第1部分216c1に隣接して設けられる第2部分216c2と、を有する。
 第1部分216c1には、集電体214が挿入される。第2部分216c2は、集電体214とセパレータ218の境界面で発生した酸素が流通する。
 第2ケース216は、例えば、アクリルにより形成される。第2ケース216は、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、第2ケース216は、水電解装置を組み立てる際に陽極側スタック210を組み付けるための棒状部材が貫通する貫通穴216hを四隅に備える。
 (第3ガスケット217)
 第3ガスケット217は、第2ケース216とセパレータ218との境界において、水や酸素の漏れを防止する。また、第3ガスケット217は、開口217cを有する。開口217cは、集電体214と平面視で略等しい外形を有する第1部分217c1と、第1部分217c1に隣接して設けられる第2部分217c2と、を有する。
 第1部分217c1には、集電体214が挿入される。第2部分217c2は、集電体214とセパレータ218の境界面で発生した酸素が流通する。
 第3ガスケット217は、例えば、透明ゴムにより形成される。第3ガスケット217は、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、第3ガスケット217は、水電解装置を組み立てる際に陽極側スタック210を組み付けるための棒状部材が貫通する貫通穴217hを四隅に備える。
 (セパレータ218)
 セパレータ218は、陽極と陰極を分離する。セパレータ218は、基板218bと、基板218bに形成される電解質膜218cと、を備える。
 電解質膜218cには、集電体214が接触する。電解質膜218cと集電体214との境界面において、酸素が発生する。境界面で発生した酸素は、集電体214に形成された溝を通って、第2ケース216の開口216cの第2部分216c2側に排出される。
 セパレータ218の基板218bは、例えば、樹脂により形成される。セパレータ218の基板218bは、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、セパレータ218の基板218bは、水電解装置を組み立てる際に陽極側スタック210を組み付けるための棒状部材が貫通する貫通穴218hを四隅に備える。
 [陰極側スタック220]
 第2実施形態に係る水電解装置の陰極側スタック220は、第1ケース221と、第1ガスケット222と、引き出し電極223と、集電体224と、第2ガスケット225と、第2ケース226と、第3ガスケット227と、セパレータ228と、を備える。
 (第1ケース221)
 第1ケース221は、内部から排出される水を排出するとともに、内部で発生した水素を外部に排出する。第1ケース221は、第1ケース221の外側から内側まで貫通する水排出孔221w及び水素排出孔221aを有する。
 陰極側スタック220の内部から排出される水は、引き出し電極223を透過して水排出孔221wから排出される。陰極側スタック220の内部で発生した水素は、水素排出孔221aから排出される。
 第1ケース221は、例えば、アクリルにより形成される。第1ケース221は、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、第1ケース221は、水電解装置を組み立てる際に陰極側スタック220を組み付けるための棒状部材が貫通する貫通穴221hを四隅に備える。
 (第1ガスケット222)
 第1ガスケット222は、第1ケース221と取り出し電極223との境界において、水や水素の漏れを防止する。第1ガスケット222は、水及び水素が流通する開口222aを有する。
 陰極側スタック220の内部で発生した水は、開口222aを通って第1ケース221に運ばれる。また、陰極側スタック220の内部で発生した水素は、開口222aを通過して、第1ケース221の水素排出孔221aから排出される。
 第1ガスケット222は、例えば、透明ゴムにより形成される。第1ガスケット222は、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、第1ガスケット222は、水電解装置を組み立てる際に陰極側スタック220を組み付けるための棒状部材が貫通する貫通穴222hを四隅に備える。
 (引き出し電極223)
 引き出し電極223は、外部の電源からの電力を集電体224に供給する。また、引き出し電極223は、陰極側スタック220の内部から排出される水を排出する。引き出し電極223は、網状の導電体により形成される。
 陰極側スタック220の内部から排出された水は、網状の導電体により形成された引き出し電極223を透過して第1ケース221に運ばれる。また、陰極側スタック220の内部で発生した水素は、網状の導電体により形成された引き出し電極223を透過して第1ケース221側に排出される。
 引き出し電極223は、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、引き出し電極223は、矩形状の一つの辺に、取り出し端子223tを有する。取り出し端子223tには、外部の電源が接続される。さらに、引き出し電極223は、水電解装置を組み立てる際に陰極側スタック220を組み付けるための棒状部材が貫通する貫通穴223hを四隅に備える。
 (集電体224)
 集電体224は、外部の電源からの電力を、固体電解質膜を有するセパレータ228に供給する。また、集電体224は、セパレータ228から排出される水を第1ケース221に運ぶ。集電体224は、多孔質体により形成される。
 セパレータ228から排出される水は、多孔質体である集電体224を浸透して第1ケース221側に運ばれる。また、集電体224とセパレータ228の境界面で発生した水素は、集電体224を透過して引き出し電極223側に送られる。
 集電体224は、例えば、平面視で40ミリメートル×50ミリメートルの矩形状の形状を有する。
 集電体224は、第2ガスケット225が有する開口225c、第2ケース226が有する開口226c及び第3ガスケット227が有する開口227cに挿入され設けられる。
 (第2ガスケット225)
 第2ガスケット225は、取り出し電極223と第2ケース226との境界において、水や水素の漏れを防止する。また、第2ガスケット225は、開口225cを有する。開口225cには、集電体224が挿入される。
 第2ガスケット225は、例えば、透明ゴムにより形成される。第2ガスケット225は、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、第2ガスケット225は、水電解装置を組み立てる際に陰極側スタック220を組み付けるための棒状部材が貫通する貫通穴225hを四隅に備える。
 (第2ケース226)
 第2ケース226は、内部に集電体224を保持する。第2ケース226は、開口226cを有する。開口226cは、集電体224と平面視で略等しい外形を有する。開口226cには、集電体224が挿入される。
 第2ケース226は、例えば、アクリルにより形成される。第2ケース226は、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、第2ケース226は、水電解装置を組み立てる際に陰極側スタック220を組み付けるための棒状部材が貫通する貫通穴226hを四隅に備える。
 (第3ガスケット227)
 第3ガスケット227は、第2ケース226とセパレータ228との境界において、水や水素の漏れを防止する。また、第3ガスケット227は、開口227cを有する。開口227cには、集電体224が挿入される。
 第3ガスケット227は、例えば、透明ゴムにより形成される。第3ガスケット227は、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、第3ガスケット227は、水電解装置を組み立てる際に陰極側スタック220を組み付けるための棒状部材が貫通する貫通穴227hを四隅に備える。
 (セパレータ228)
 セパレータ228は、陽極と陰極を分離する。セパレータ228は、基板228bと、基板228bに形成される電解質膜228cと、を備える。
 電解質膜228cには、集電体224が接触する。電解質膜228cと集電体224との境界面において、水素が発生する。境界面で発生した水素は、集電体224を通って、第1ケース221側に排出される。
 セパレータ228の基板228bは、例えば、樹脂により形成される。セパレータ228の基板228bは、例えば、平面視で80ミリメートル×80ミリメートルの矩形状の形状を有する。また、セパレータ228の基板228bは、水電解装置を組み立てる際に陰極側スタック220を組み付けるための棒状部材が貫通する貫通穴228hを四隅に備える。
 <第3実施形態>
 第3実施形態に係る水電解装置として、複数の電極セットを積み上げ可能なスタック構造の水電解セル300を用いた形態について説明する。図47は、第3実施形態に係る水電解装置に用いられる水電解セル300の分解斜視図である。
 第3実施形態に係る水電解装置の水電解セル300は、電解質膜330を備える。水電解セル300は、電解質膜330の陽極側に、外側から順に、絶縁板311と、電極板312と、板バネ313と、第1ガスケット314と、水流路ケース315と、集電体316と、第2ガスケット317と、を備える。また、第3実施形態に係る水電解装置の水電解セル300は、電解質膜330の陰極側に、外側から順に、絶縁板321と、電極板322と、板バネ323と、第1ガスケット324と、水素流路ケース325と、集電体326と、第2ガスケット327と、を備える。
 水電解セル300の電解質膜330の陽極側について、外から順に説明する。絶縁板311は、水電解セル300の最外面を形成する。電極板312は、外部から電源を供給する。板バネ313は、集電体316を絶縁板311側から電解質膜330に押す。また、板バネ313は、電極板312からの電力を集電体316に供給する。第1ガスケット314は、電極板312と水流路ケース315との境界において、水や酸素の漏れを防止する。水流路ケース315は、外部から水を集電体316に供給する。
集電体316は、第1部材316aと、第2部材316bと、を備える。図48は、第3実施形態に係る水電解装置の陽極側の集電体316を分解した第1部材316a及び第2部材316bの正面図である。第1部材316aと第2部材316bとは、密着して設けられる。第1部材316aの上側には、横方向に延びる溝361agが設けられる。第2部材316bは、縦方向に複数の溝316bgが設けられる。
 集電体316を構成する第1部材316a及び第2部材316bのそれぞれは、導電性の多孔質体により形成される。第1部材316a及び第2部材316bのそれぞれは、例えば、チタンの不織布により形成される。第1部材316a及び第2部材316bのそれぞれが導電性の多孔質体により形成されることにより、水流路ケース315から供給された水が第1部材316a及び第2部材316bのそれぞれを透過する。第1部材316a及び第2部材316bのそれぞれを透過した水は、電解質膜330に供給される。
 電解質膜330に供給された水は、集電体316に供給された電気により水電解される。水電解されて集電体316と電解質膜330との境界面で発生した酸素は、集電体316の第2部材316bの溝316bgのそれぞれを通過して、第1部材316aの溝316agに集められる。第1部材316aの溝316agに集められた酸素は、水電解セル300の外部に排出される。
 水電解セル300の電解質膜330の陰極側について、外から順に説明する。絶縁板321は、水電解セル300の最外面を形成する。電極板322は、外部から電源を供給する。板バネ323は、集電体326を絶縁板321側から電解質膜330に押す。また、板バネ323は、電極板322からの電力を集電体326に供給する。第1ガスケット324は、電極板322と水素流路ケース325との境界において、水や酸素の漏れを防止する。水素流路ケース325は、水電解セル300で発生した水素を回収する。
 集電体326は、第1部材326aと、第2部材326bと、を備える。第1部材326aは、集電体316の第1部材316aと同様の形状を有する。第2部材326bは、集電体316の第2部材315bと同様の形状を有する。
 集電体326を構成する第1部材326a及び第2部材326bのそれぞれは、導電性の多孔質体により形成される。第1部材326a及び第2部材326bのそれぞれは、例えば、炭素の不織布により形成される。第1部材326a及び第2部材326bのそれぞれが導電性の多孔質体により形成されることにより、集電体326と電解質膜330との界面において、発生した水素が第1部材326a及び第2部材326bのそれぞれを透過する。第1部材326a及び第2部材326bのそれぞれを透過した水素は、水素流路ケース325により回収される。
 <第4実施形態>
 第4実施形態に係る水電解装置400について説明する。図49は、第4実施形態に係る水電解装置400の概略構成図である。
 水電解装置400は、陽極410と、陰極420と、電解質膜430と、を備える。さらに、水電解装置400は、水タンク440と、ポンプ450と、酸素タンク460と、水素タンク470と、を備える。
 陽極410には、水タンク440からポンプ450により水が供給される。陽極410に供給された水の一部は、再度、水タンク440に戻される。また、陽極410から発生した酸素は、酸素タンク460に貯められる。陽極410は、前述のように、集電体に溝が設けられる。集電体に設けられた溝により、効率よく酸素を分離することができる。陰極420で発生した水素は、水素タンク470に貯蔵される。
 <第5実施形態>
 第5実施形態に係る水電解装置500について説明する。図50は、第5実施形態に係る水電解装置500の概略構成図である。水電解装置500は、水電解装置400におけるポンプ450を使用しない構成である。
 水電解装置500は、陽極510と、陰極520と、電解質膜530と、を備える。さらに、水電解装置500は、水タンク540と、酸素タンク560と、水素タンク570と、を備える。
 陽極510には、水タンク540から水が供給される。陽極510は、多孔質体である集電体により構成される。多孔質体である集電体による毛管力により、陽極510に自然循環にて水が供給される。また、陽極510から発生した酸素は、酸素タンク560に貯めらる。陽極510は、前述のように、集電体に溝が設けられる。集電体に設けられた溝により、効率よく酸素を分離することができる。陰極520で発生した水素は、水素タンク570に貯蔵される。
 <本実施形態に係る水採取装置の挙動について>
 本実施形態に係る水採取装置における挙動について説明する。図51は、本実施形態に係る水電解装置の挙動について説明する図である。
 集電体ANの内部の水と、溝GRVの酸素の界面には表面張力の膜が形成される。集電体ANの細孔の径Dが、例えば、20マイクロメートルの場合、溝GRVの内部の圧力PWが14キロパスカル以下であれば、集電体ANの内部に酸素が入り込まない。溝GRVは、酸素チャンバから、排出管、酸素タンクに接続する。酸素タンクは大気圧であることから、溝GRVの圧力は低圧に保持される。したがって、集電体ANの内部に酸素は入り込まない。
 一方、電解質膜MEAと、集電体ANとの間には、水が水電解されることによりに酸素の気泡が発生する。発生する気泡の圧力は非常に大きい。界面で発生した気泡は、近傍の集電体ANの細孔に入り込む。気泡が細孔に入ると、細孔内は粘性抵抗が発生する。
 例えば、厚さ2ミリのチタン製の不織布の裏側に酸素が抜ける場合、水を押し退けるために0.16キロパスカルの流動抵抗が発生する。一方、集電体ANの溝GRVに酸素が抜ける場合は、例えば、長さが0.5ミリメートルに抜ける流動抵抗は0.04キロパスカルである。したがって、発生した気泡は、圧損が小さい溝GRV側に抜ける。
 次に、溝GRVがない場合について検討する。図52は、比較例の水電解装置の挙動について説明する図である。
 溝GRVがない場合は、電解質膜MEAと集電体ANとの間界面で発生した酸素気泡は、近傍の集電体ANの細孔に入り込む。細孔の径を例えば20マイクロメートルとすると、細孔経路内に気液界面が形成され、多孔質の孔径に応じた表面張力が発生する。孔径を20マイクロメートルとすると、表面張力は14キロパスカルとなる。
 そして、界面の酸素気泡が集電体ANの反対側の面に移動するためには、酸素気泡の圧力が、上記の表面張力と細孔中の水を押し出す流動抵抗を上回る必要がある。例えば、細孔の流路長さを0.3ミリメートルとすると、単位時間あたりの酸素発生量から計算した流動抵抗は0.024キロパスカルとなる。
 以上、実施形態を説明したが、特許請求の範囲の趣旨及び範囲から逸脱することなく、形態や詳細の多様な変更が可能なことが理解されるであろう。他の実施形態の一部又は全部との組み合わせや置換などの種々の変形及び改良が可能である。
1、2、3、4、5 水採取装置
10 水蒸気生成部
20 水蒸気回収部
50 気体供給回収部
61、71 加熱部
62、72 冷却部
63 水蒸気供給部
64、74 水貯蔵部
65、75 ガス供給部
66、76 圧縮機
67、77a、77b 送風機
68、78 膨張弁
80、180 探査車
100 水電解装置
110 陽極
111 溝
210 陽極側スタック
214 集電体
300 水電解セル
316 集電体
316b 第2部材
316bg 溝
400、500 水電解装置

Claims (7)

  1.  地中を加熱して、前記地中に含まれる水分を含む氷で形成される氷壁を形成する氷壁形成部と、
     前記氷壁に囲まれる領域の内部における第1気体を回収し、回収した前記第1気体から水を採取する水採取部と、
    を備える、
    水採取装置。
  2.  前記氷壁形成部は、前記地中に差し込まれ、前記地中を加熱するヒータを備える、
    請求項1に記載の水採取装置。
  3.  前記氷壁形成部は、前記地中に供給する第2気体を加熱する加熱部を備える、
    請求項1に記載の水採取装置。
  4.  前記氷壁形成部は、前記地中に供給する水蒸気を生成する水蒸気生成部を備える、
    請求項1に記載の水採取装置。
  5.  前記水採取部は、
      前記第1気体に含まれる水分を凝縮して前記水を生成する凝縮器と、
      前記凝縮器が凝縮した前記水を回収するタンクと、を備える、
    請求項1から請求項4のいずれか一項に記載の水採取装置。
  6.  地中を加熱して、前記地中に含まれる水分を含む氷で形成される氷壁を形成する工程と、
     前記氷壁に囲まれる領域の内部における第1気体を回収し、回収した前記第1気体から水を採取する工程と、を含む、
    水採取方法。
  7.  陽極と、
     固体電解質膜と、
     陰極と、を備え、
     前記陽極は、前記固体電解質膜と接触する集電体であり、
     前記集電体は、内部を気体や液体が流通可能な親水性の多孔質体であって、前記固体電解質膜と接触する前面に複数の溝を有し、
     前記集電体の前記固体電解質膜と接触する面の反対側の背面には、請求項1から請求項5のいずれか一項に記載の水採取装置から水が供給され、
     前記背面から前記前面まで毛管力によって前記水が浸透し、前記前面において発生した酸素は、前記溝に排出される、
    水電解装置。
PCT/JP2022/003702 2022-01-31 2022-01-31 水採取装置、水採取方法及び水電解装置 WO2023145095A1 (ja)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/003702 WO2023145095A1 (ja) 2022-01-31 2022-01-31 水採取装置、水採取方法及び水電解装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2022/003702 WO2023145095A1 (ja) 2022-01-31 2022-01-31 水採取装置、水採取方法及び水電解装置

Publications (1)

Publication Number Publication Date
WO2023145095A1 true WO2023145095A1 (ja) 2023-08-03

Family

ID=87470999

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2022/003702 WO2023145095A1 (ja) 2022-01-31 2022-01-31 水採取装置、水採取方法及び水電解装置

Country Status (1)

Country Link
WO (1) WO2023145095A1 (ja)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03177592A (ja) * 1989-12-04 1991-08-01 Mitsubishi Heavy Ind Ltd 電気化学的に酸素を輸送する装置
JP2011140022A (ja) * 2010-01-08 2011-07-21 Hamilton Sundstrand Corp レゴリス材料からガスを放出させてこれを回収するシステムおよび方法、遠隔の位置で使用される構造材料を供給する方法
JP2018032557A (ja) * 2016-08-25 2018-03-01 シャープ株式会社 金属空気電池
JP2019148155A (ja) * 2018-02-28 2019-09-05 清水建設株式会社 資源採掘方法及び資源採掘システム
US20190271228A1 (en) * 2018-03-02 2019-09-05 Colorado School Of Mines System and method of extracting and collecting water from a regolith

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH03177592A (ja) * 1989-12-04 1991-08-01 Mitsubishi Heavy Ind Ltd 電気化学的に酸素を輸送する装置
JP2011140022A (ja) * 2010-01-08 2011-07-21 Hamilton Sundstrand Corp レゴリス材料からガスを放出させてこれを回収するシステムおよび方法、遠隔の位置で使用される構造材料を供給する方法
JP2018032557A (ja) * 2016-08-25 2018-03-01 シャープ株式会社 金属空気電池
JP2019148155A (ja) * 2018-02-28 2019-09-05 清水建設株式会社 資源採掘方法及び資源採掘システム
US20190271228A1 (en) * 2018-03-02 2019-09-05 Colorado School Of Mines System and method of extracting and collecting water from a regolith

Similar Documents

Publication Publication Date Title
JP3499090B2 (ja) 燃料電池
US7645531B2 (en) Retaining water in a fuel cell stack for cooling and humidification during frozen startup
JP4339684B2 (ja) 燃料電池用の二帯式水輸送プレート
BRPI0618543A2 (pt) cuba de eletrólise com permutador térmico
CN103109142B (zh) 利用地热的热泵系统
JP2006517336A (ja) 凍結始動時の冷却剤水の燃料電池スタック溶解
WO2023145095A1 (ja) 水採取装置、水採取方法及び水電解装置
KR102518536B1 (ko) 연료전지 냉각수용 열교환 장치 및 이를 포함하는 연료전지 시스템
WO2015115688A1 (ko) 진공증발을 이용한 냉방시스템 및 냉방구현방법
JPH11325649A (ja) 土壌熱源氷蓄熱ヒートポンプ装置
KR101691189B1 (ko) 지열파이프를 이용한 냉난방 시스템
JP3207138B2 (ja) 水蒸発式冷却装置
CN209960795U (zh) 蓄热型热泵系统
JP3443221B2 (ja) 燃料電池システム及びその運転方法
KR101744293B1 (ko) 히트 파이프 일체형 태양전지
CN111794801A (zh) 一种地源热泵的隧道保温水沟加热系统
US20030121515A1 (en) Counter - thermosyphon loop heat pipe solar collector
CN116018492A (zh) 热能储存和取回系统及其方法
CN109520148A (zh) 一种用于人工冻结富水松软地层的太阳能制冷装置
CN219868570U (zh) 地热开采系统
CN113865160B (zh) 空气循环系统
JP4917048B2 (ja) 蒸発器
JP2006073340A (ja) 燃料電池システム
CN114191937B (zh) 一种制水机、一种空气制水系统和一种循环空气制水系统
CN117684542A (zh) 一种用于多年冻土区且能降温排水滤沙的抗滑桩结构

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22923958

Country of ref document: EP

Kind code of ref document: A1