WO2023103473A1 - 双层联动闭环绳系安装方法 - Google Patents

双层联动闭环绳系安装方法 Download PDF

Info

Publication number
WO2023103473A1
WO2023103473A1 PCT/CN2022/115617 CN2022115617W WO2023103473A1 WO 2023103473 A1 WO2023103473 A1 WO 2023103473A1 CN 2022115617 W CN2022115617 W CN 2022115617W WO 2023103473 A1 WO2023103473 A1 WO 2023103473A1
Authority
WO
WIPO (PCT)
Prior art keywords
rope
winding
wheel assembly
wheel
layer
Prior art date
Application number
PCT/CN2022/115617
Other languages
English (en)
French (fr)
Inventor
白忠奕
张斌
谢岩
吕东
崔晓航
范天明
刘鑫
Original Assignee
北京卫星制造厂有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 北京卫星制造厂有限公司 filed Critical 北京卫星制造厂有限公司
Publication of WO2023103473A1 publication Critical patent/WO2023103473A1/zh

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05FDEVICES FOR MOVING WINGS INTO OPEN OR CLOSED POSITION; CHECKS FOR WINGS; WING FITTINGS NOT OTHERWISE PROVIDED FOR, CONCERNED WITH THE FUNCTIONING OF THE WING
    • E05F15/00Power-operated mechanisms for wings
    • E05F15/60Power-operated mechanisms for wings using electrical actuators
    • E05F15/603Power-operated mechanisms for wings using electrical actuators using rotary electromotors
    • E05F15/632Power-operated mechanisms for wings using electrical actuators using rotary electromotors for horizontally-sliding wings
    • E05F15/643Power-operated mechanisms for wings using electrical actuators using rotary electromotors for horizontally-sliding wings operated by flexible elongated pulling elements, e.g. belts, chains or cables
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME ASSOCIATED WITH SUBCLASSES E05D AND E05F, RELATING TO CONSTRUCTION ELEMENTS, ELECTRIC CONTROL, POWER SUPPLY, POWER SIGNAL OR TRANSMISSION, USER INTERFACES, MOUNTING OR COUPLING, DETAILS, ACCESSORIES, AUXILIARY OPERATIONS NOT OTHERWISE PROVIDED FOR, APPLICATION THEREOF
    • E05Y2201/00Constructional elements; Accessories therefor
    • E05Y2201/60Suspension or transmission members; Accessories therefor
    • E05Y2201/622Suspension or transmission members elements
    • E05Y2201/644Flexible elongated pulling elements
    • E05Y2201/654Cables
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME ASSOCIATED WITH SUBCLASSES E05D AND E05F, RELATING TO CONSTRUCTION ELEMENTS, ELECTRIC CONTROL, POWER SUPPLY, POWER SIGNAL OR TRANSMISSION, USER INTERFACES, MOUNTING OR COUPLING, DETAILS, ACCESSORIES, AUXILIARY OPERATIONS NOT OTHERWISE PROVIDED FOR, APPLICATION THEREOF
    • E05Y2201/00Constructional elements; Accessories therefor
    • E05Y2201/60Suspension or transmission members; Accessories therefor
    • E05Y2201/622Suspension or transmission members elements
    • E05Y2201/658Members cooperating with flexible elongated pulling elements
    • E05Y2201/668Pulleys; Wheels
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME ASSOCIATED WITH SUBCLASSES E05D AND E05F, RELATING TO CONSTRUCTION ELEMENTS, ELECTRIC CONTROL, POWER SUPPLY, POWER SIGNAL OR TRANSMISSION, USER INTERFACES, MOUNTING OR COUPLING, DETAILS, ACCESSORIES, AUXILIARY OPERATIONS NOT OTHERWISE PROVIDED FOR, APPLICATION THEREOF
    • E05Y2201/00Constructional elements; Accessories therefor
    • E05Y2201/60Suspension or transmission members; Accessories therefor
    • E05Y2201/622Suspension or transmission members elements
    • E05Y2201/658Members cooperating with flexible elongated pulling elements
    • E05Y2201/672Tensioners, tension sensors
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME ASSOCIATED WITH SUBCLASSES E05D AND E05F, RELATING TO CONSTRUCTION ELEMENTS, ELECTRIC CONTROL, POWER SUPPLY, POWER SIGNAL OR TRANSMISSION, USER INTERFACES, MOUNTING OR COUPLING, DETAILS, ACCESSORIES, AUXILIARY OPERATIONS NOT OTHERWISE PROVIDED FOR, APPLICATION THEREOF
    • E05Y2999/00Subject-matter not otherwise provided for in this subclass

Definitions

  • the invention relates to a method for installing a double-layer linkage closed-loop rope system.
  • the electric hatch is a key stand-alone machine used to realize the function of automatic cargo exit, and its sealing performance and opening and closing performance are directly related to the realization of the model function.
  • the tether mechanism is driven by a motor to move the door along a predetermined trajectory between open and closed positions.
  • the double-layer linkage closed-loop rope system of the rope mechanism includes upper and lower layers of aramid rope winding ropes. Wind different turns in the rope groove through the rope hole at the bottom of the rope groove.
  • the upper wheel of the driving wheel assembly and the lower wheel of the winding wheel assembly are wound with rope for 5 turns
  • the lower wheel of the driving wheel assembly and the upper wheel of the winding wheel assembly are wound with rope for 3 turns.
  • the lower rope is tied as a rope.
  • the upper rope is two ropes, and the other ends are respectively fixed on the cover plate of the traction point assembly, and the rope is wound 3 times in the rope groove through the rope hole at the bottom of the rope groove of the two small winding seats. It is required that the rope loops in all the rope grooves are superimposed in a single layer, not side by side or overlapped. Therefore, the installation and adjustment of the rope system is a big problem.
  • the number of rotations of each wheel is the same.
  • the driving wheel assembly rotates counterclockwise, and the number of rope windings of the lower wheel changes from 3 to 5, which drives the lower wheel of the winding wheel assembly to rotate counterclockwise, and the number of rope windings changes from 5 to 3.
  • the upper wheel of the winding wheel assembly also rotates counterclockwise, and the number of rope turns changes from 3 to 5, which drives the traction point assembly to move from the right side to the left side.
  • the driving wheel assembly rotates clockwise, and the number of rope windings of the upper wheel changes from 3 to 5, which drives the traction point assembly to move from left to right, and also drives the upper wheel of the winding wheel assembly to rotate clockwise.
  • the number of rope turns changes from 5 to 3, so that the number of turns of the lower wheel of the winding wheel assembly changes from 3 to 5, and the number of turns of the lower wheel of the driving wheel assembly changes from 5 to 3.
  • the radii of all the wheel grooves on the drive wheel assembly and the winding wheel assembly are the same, but because the number of ropes wound on them is different, the radius of gyration of each layer of rope driving wheel and winding wheel is inconsistent, which will cause the length of the rope to be drawn in one round to be different from that of the other.
  • the different rope lengths of the wheels cause changes in the length of the aramid rope in the middle of the rope system, and the tension of the rope system also changes.
  • the upper layer rope is adjusted by torsion spring, and the lower layer rope is adjusted by compression spring. It is required that during the operation of the tether mechanism, the tension force of the tether always exists while ensuring that the tether does not loosen and fail. Therefore, it is a big problem to precisely control the tension of the tether during the opening and closing movement of the hatch.
  • the present invention provides a double-layer linkage closed-loop rope installation method, which realizes the installation of the double-layer linkage rope mechanism and effectively ensures the tension of the double-layer linkage rope system.
  • the quality of setup and adjustment of the organization is the quality of setup and adjustment of the organization.
  • the invention provides a double-layer linkage closed-loop rope installation method, including:
  • the rope difference between the retracting and releasing rope is the amount of the lower wheel of the driving wheel assembly and the winding wheel assembly
  • the difference of the amount of the lower wheel of the rope is:
  • R1 represents the radius of gyration of the lower wheel of the driving wheel assembly
  • R2 represents the radius of gyration of the lower wheel of the winding wheel assembly
  • the spring is a compression spring provided on the lower wheel of the guide wheel assembly, and the maximum deformation of the compression spring is:
  • the rope winding force calculated according to the maximum force F of the compression spring is:
  • said step d includes:
  • the upper layer rope includes a first upper layer rope and a second upper layer rope, one end of the first upper layer rope is fixed on the upper wheel of the winding wheel assembly, and the other end is along the upper wheel of the winding wheel assembly.
  • the direction of the rope going out goes around the tension swing bar provided on the winding wheel assembly, and passes through the fixed pulley horizontally to pull a weight with the same weight as the winding force of the rope, and then moves along the upper wheel of the winding wheel assembly. Rotate the upper wheel of the winding wheel assembly in the opposite direction of the rope output, and fix the first upper layer rope system after winding the rope;
  • the number of rotations of the upper wheel of the winding wheel assembly is less than the number of rotations of the upper wheel of the driving wheel assembly.
  • said step e includes:
  • the number of cycles that the lower wheel of the winding wheel assembly rotates is greater than the number of cycles that the lower wheel of the driving wheel assembly rotates, the number of cycles that the lower wheel of the winding wheel assembly The number of cycles is the same, and the number of cycles that the upper wheel of the winding wheel assembly rotates is the same as the number of cycles that the lower wheel of the drive wheel assembly rotates.
  • the upper wheel of the winding wheel assembly and the lower wheel of the driving wheel assembly both rotate 3 cycles, and the lower wheel of the winding wheel assembly and the upper wheel of the driving wheel assembly rotate 5 cycles
  • the reserved first rope length is:
  • R represents the radius of the upper and lower wheels of the winding wheel assembly and the upper and lower wheels of the driving wheel assembly
  • h represents the first upper rope system, the second upper layer rope system and the lower layer rope system. The diameter of the tied rope.
  • said step f includes:
  • first upper-layer rope and the second upper-layer rope are reserved for the second rope length and fixed on the first winding seat and the second winding seat of the traction point assembly respectively, and then respectively along the first Rotate the first winding seat and the second winding seat in the opposite direction of the rope output of the winding seat and the second winding seat for the same number of cycles, and fix the traction point assembly.
  • the first winding seat and the second winding seat rotate 3 times, and the reserved second rope length is:
  • R' represents the radius of the first winding seat and the second winding seat
  • h represents the diameter of the ropes of the first upper layer tether and the second upper layer tether.
  • the process of fixing the upper-layer rope or the lower-layer rope on the wheel is as follows: the fixed end of the upper-layer rope or the lower-layer rope is passed through the rope groove on the wheel The rope groove threading hole at the bottom of the rope groove and at the tangent point of the rope outlet direction of the wheel is tied with a pressing plate to fix the fixed end of the upper layer rope system or the lower layer rope system.
  • the problem of installation and adjustment of the electric hatch door tether mechanism is solved, and the double-layer tether is guaranteed not to loosen and fail.
  • the tension of the rope during the operation of the mechanism is precisely controlled through the value of the winding force in the rope winding process, which solves the problem that the tension of the rope cannot be adjusted after winding the rope.
  • Fig. 1 schematically shows a flow chart of a double-layer linkage closed-loop tether installation method according to an embodiment of the present invention
  • Fig. 2 schematically shows a schematic structural view of a double-layer linkage closed-loop tether mechanism in a double-layer linkage closed-loop tether installation method according to an embodiment of the present invention
  • Fig. 3 schematically shows a fixed schematic view of the fixed end of the rope of the driving wheel assembly and the winding wheel assembly in the double-layer linkage closed-loop rope installation method of an embodiment of the present invention
  • Fig. 4 schematically shows a partial structural schematic view of the guide wheel assembly 2 in a double-layer linkage closed-loop rope installation method according to an embodiment of the present invention
  • Fig. 5 schematically shows a schematic diagram of the wheel shaft of the driving wheel assembly in the double-layer linkage closed-loop rope installation method according to an embodiment of the present invention
  • Fig. 6 schematically shows a schematic structural view of the traction point assembly in a double-layer linkage closed-loop tether installation method according to an embodiment of the present invention
  • Fig. 7 schematically shows a fixed schematic view of the tether fixed end of the traction point assembly in a double-layer linkage closed-loop tether installation method according to an embodiment of the present invention
  • Fig. 8 schematically shows a schematic diagram of the rope after the wedge is fixed and the rope is wound in the double-layer linkage closed-loop rope installation method according to an embodiment of the present invention
  • Fig. 9 schematically shows the structure diagram of the traction tool in the double-layer linkage closed-loop rope installation method according to an embodiment of the present invention.
  • the installation method of the present invention reserves the design for the order of winding rope, the direction of rope winding traction and the length of rope, and at the same time, during the installation During the process, the tension force of the double-layer linkage closed-loop rope mechanism is considered due to the difference in the retraction and release of the rope, so as to realize the precise control of the tension of the double-layer rope, and at the same time ensure that the double-layer rope does not loosen and fail. .
  • the steps of the double-layer linkage closed-loop tether installation method in this embodiment include:
  • the structure of the double-layer linkage closed-loop tether mechanism is shown in Figure 2.
  • the number of cycles of the upper wheel of the winding wheel assembly of the double-layer linkage closed-loop rope mechanism is the same as the number of cycles of the lower wheel of the driving wheel assembly, and the number of cycles of the lower wheel of the winding wheel assembly is the same as that of the upper wheel of the driving wheel assembly.
  • the number of cycles around the rope is also the same, and the number of cycles of the upper wheel of the winding wheel assembly is less than the number of cycles of the upper wheel of the driving wheel assembly, that is, the number of cycles of the lower wheel of the driving wheel assembly is less than that of the winding wheel
  • the number of turns the lower wheel of the component is wrapped around. Take the following layer of rope as an example.
  • the radius of gyration R1 of the lower wheel of the driving wheel assembly is equal to the radius R of the rope groove of the lower wheel of the driving wheel assembly and the number of windings on the lower wheel of the driving wheel assembly.
  • the radius of gyration R2 of the lower wheel of the winding wheel assembly is the sum of the radius R of the rope groove of the lower wheel of the winding wheel assembly and the diameter h of the rope that is wound multiple times on the lower wheel of the winding wheel assembly.
  • the retractable rope difference is:
  • the number of cycles of winding the upper wheel of the winding wheel assembly and the driving wheel assembly is different, and the number of cycles of winding the lower wheel is also different, resulting in changes in the tension of the upper rope and the lower rope.
  • the tension of the upper rope is regulated by the torsion spring that the upper wheel of the winding wheel assembly is provided with, and the tension of the lower rope is regulated by the stage clip that the lower wheel of the guide wheel assembly is provided with.
  • the above-mentioned guide wheel assembly can be provided in multiples. In this embodiment, there are two guide wheel assemblies, and only one compression spring is provided on the lower wheel of the guide wheel assembly 2 in FIG. 2 .
  • the structure and arrangement of the compression spring are shown in Figure 4. Since the tension of the upper rope is the same as that of the lower rope, and the deformation of the compression spring is easy to measure, the deformation of the compression spring is used to reflect the change of the tension of the upper and lower ropes.
  • the deformation of the compression spring of the guide wheel assembly in the double-layer linkage closed-loop tether mechanism is calculated according to the above-mentioned retractable and unwinding rope difference.
  • the maximum retraction and release rope difference generated during the operation of the double-layer linkage closed-loop rope system to calculate the deformation of the compression spring when the maximum tension of the rope is reduced to the minimum tension for:
  • the rope winding force of the double-layer linkage closed-loop tether mechanism is calculated according to the deformation of the compression spring.
  • the compression spring stiffness curve and the maximum deformation of the compression spring select the minimum compression spring force and the maximum compression spring force in the compression spring working range, so as to determine the corresponding compression spring deformation.
  • the maximum compression spring force F and maximum compression spring deformation As the basis for the rope winding control, the calculated rope winding force is:
  • the upper wheels of the driving wheel assembly and the winding wheel assembly are wound separately, each wheel uses a rope, and the rope winding method is the same.
  • the upper tethers include a first upper tether and a second upper tether.
  • one end (or called the fixed end) of the first upper layer rope is arranged along the rope groove of the upper wheel of the winding wheel assembly and passes through the bottom of the rope groove and is located at the tangent point of the rope outlet direction of the upper wheel
  • the rope groove at the place is threaded through the rope hole, and the end is fixed on the upper wheel of the winding wheel assembly with a pressure plate after knotting.
  • one end (or called the fixed end) of the second upper layer rope is also arranged along the rope groove of the upper wheel of the driving wheel assembly and passes through the bottom of the rope groove and is located in the direction of the rope output of the upper wheel.
  • the rope groove at the point is threaded through the rope hole, and the end is fixed on the upper wheel of the drive wheel assembly with a pressure plate after knotting.
  • the other end goes around the tension swing rod set on the drive wheel assembly along the rope exit direction of the upper wheel of the drive wheel assembly, and passes through the fixed pulley horizontally, the traction and rope winding force Weights of the same weight.
  • R represents the radius of the upper and lower wheels of the winding wheel assembly and the upper and lower wheels of the driving wheel assembly
  • h represents the diameters of the ropes of the first upper rope, the second upper rope and the lower rope.
  • a hexagon wrench to insert a weight of the same weight into the hexagonal hole of the lower wheel axle of the driving wheel assembly, and rotate the lower wheel of the driving wheel assembly in the opposite direction of the rope exiting from the lower wheel of the driving wheel assembly until the maximum deformation of the compression spring is L.
  • the lower wheel of the driving wheel assembly in this embodiment rotates 3 times around the rope.
  • first upper-layer rope and the second upper-layer rope respectively along the rope-threading holes at the bottom of the two winding seat rope grooves of the tow point assembly, and reserve the second rope length K2 (the starting point of the reserved rope length starts from the threading hole from the edge of the hole) and cut off the knot.
  • the other ends of the knotted first upper layer rope and the second upper layer rope are respectively fixed on the first winding seat (the rope winding seat 1 shown in Figure 6) and the tow point assembly.
  • the second winding seat (the rope winding seat 2 shown in Figure 6), and then rotate the first winding seat and the second winding seat in the opposite direction of the rope output of the first winding seat and the second winding seat for the same number of cycles and merge together, use the cover and web to secure the tow point assembly. It is realized that the ropes are not installed side by side and do not overlap.
  • first winding seat and the second winding seat of this embodiment both rotate 3 times around the rope, and the reserved second rope length K2 is:
  • R' represents the radius of the first winding seat and the second winding seat
  • h represents the diameter of the ropes of the first upper layer tether and the second upper layer tether.
  • the problem of installation and adjustment of the electric cabin door tether mechanism is solved, and the tethers are installed without being side by side or overlapping.
  • the tension of the rope during the operation of the mechanism is precisely controlled through the value of the winding force in the rope winding process, which solves the problem that the tension of the rope cannot be adjusted after winding the rope.

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Electric Cable Installation (AREA)

Abstract

本发明涉及一种双层联动闭环绳系安装方法,包括:a、计算双层联动闭环绳系机构中驱动轮组件和缠绕轮组件的收放绳差;b、根据收放绳差计算双层联动闭环绳系机构中导向轮组件的弹簧的变形量;c、设定弹簧最小受力F',根据上述弹簧变形量及弹簧刚度计算弹簧最大受力为F;d、根据弹簧最大受力F计算双层联动闭环绳系机构的绕绳缠绕力;e、在驱动轮组件的上层绳系上施加绕绳缠绕力,对驱动轮组件和缠绕轮组件的上层绳系进行绕绳;f、在驱动轮组件和缠绕轮组件的下层绳系上施加绕绳缠绕力,对下层绳系进行绕绳;g、对驱动轮组件和缠绕轮组件的上层绳系进行闭绳。本发明实现双层联动绳系机构的安装,有效保证双层联动绳系机构的装调质量。

Description

双层联动闭环绳系安装方法
本申请要求于2021年12月6日提交中国专利局、申请号为202111478183.4、申请名称为“双层联动闭环绳系安装方法”的中国专利申请的优先权,其全部内容通过引用结合在本申请中。
技术领域
本发明涉及一种双层联动闭环绳系安装方法。
背景技术
电动舱门是用于实现货物自动出舱功能的关键单机,其密封性能和开关性能直接关系到型号功能的实现。绳系机构作为舱门滑移传动机构组成部分,由电机驱动牵引舱门沿预定轨迹在打开和关闭位置之间运动。
绳系机构的双层联动闭环绳系包括上、下两层芳纶绳缠绕绳系,每层绳系两端分别固定在驱动轮组件和缠绕轮组件的上、下轮外表面压板上,并通过绳槽底部穿绳孔在绳槽内缠绕不同圈数。在初始安装状态,驱动轮组件上轮和缠绕轮组件下轮绕绳5圈,驱动轮组件下轮和缠绕轮组件上轮绕绳3圈。下层绳系为一根绳。上层绳系为两根绳,另一端分别固定在牵引点组件盖板上,并通过两个小缠绕座绳槽底部穿绳孔在绳槽内绕绳3圈。要求所有绳槽内的绳圈均为单层叠加,不并排、不交叠,因此,绳系机构的绕绳装调是一大难题。
由于驱动轮组件和缠绕轮组件的上下两层轮均为刚性连接,故各轮的旋转圈数相同。舱门打开时,驱动轮组件逆时针旋转,下轮绕绳圈数由3圈变化成5圈,带动缠绕轮组件下轮逆时针旋转,绕绳圈数由5圈变化成3圈,进而使缠绕轮组件上轮亦逆时针旋转,绕绳圈数由3圈变化成5圈,带动牵引点组件由右侧移动到左侧。舱门关闭时,驱动轮组件顺时针旋转,上轮绕绳圈数由3圈变化成5圈,带动牵引点组件由左侧移动到右侧,亦带动缠绕轮组件上轮顺时针旋转,绕绳圈数由5圈变化成3圈,从而使缠绕轮组件下轮绕绳圈数由3圈变化成5圈,驱动轮组件下轮绕绳圈数由5圈变化成3圈。
驱动轮组件和缠绕轮组件上所有轮槽半径相同,但由于其上绕绳圈数不同,故每层绳系驱动轮和缠绕轮的回转半径不一致,将导致一轮的收绳长度与另一轮的放绳长度不同,引起绳系中间芳纶绳长度的变化,绳系张紧力亦发生变化。上层绳系通过扭簧进行调节,下层绳系通过压簧调节。要求绳系机构运行中,绳系张紧力始终存在的同时保证绳系不松脱失效。因此,精确控制舱门开合运动中的绳系张紧力是一大难题。
技术问题
为解决双层联动绳系机构的绳系张紧力精确控制的问题,本发明提供一种双层联动闭环绳系安装方法,实现双层联动绳系机构的安装,有效保证双层联动绳系机构的装调质量。
技术解决方案
为实现上述发明目的,本发明的技术方案是:
本发明提供一种双层联动闭环绳系安装方法,包括:
a、计算双层联动闭环绳系机构中驱动轮组件和缠绕轮组件的收放绳差;
b、根据所述收放绳差计算所述双层联动闭环绳系机构中导向轮组件的弹簧的变形量;
c、设定所述弹簧的最小受力F′,根据所述弹簧的变形量及所述弹簧的刚度计算所述弹簧的最大受力为F;
d、根据所述弹簧的最大受力为F计算所述双层联动闭环绳系机构的绕绳缠绕力;
e、对所述驱动轮组件的上层绳系施加所述绕绳缠绕力,对所述驱动轮组件和所述缠绕轮组件的上层绳系进行绕绳;
f、对所述驱动轮组件和所述缠绕轮组件的下层绳系施加所述绕绳缠绕力,对所述下层绳系进行绕绳;
g、对所述驱动轮组件和所述缠绕轮组件的上层绳系进行闭绳。
根据本发明的一个方面,当所述驱动轮组件和所述缠绕轮组件的下轮同时转动时,所述收放绳差为所述驱动轮组件的下轮收绳量与所述缠绕轮组件的下轮放绳量的差,为:
Figure dest_path_image001
其中,R1表示驱动轮组件下轮的回转半径,R2表示缠绕轮组件下轮的回转半径,
Figure 20438dest_path_image002
表示所述驱动轮组件和所述缠绕轮组件的下轮的转动角度。
根据本发明的一个方面,所述弹簧为所述导向轮组件下轮上设置的压簧,所述压簧的最大变形量为:
Figure dest_path_image003
其中,
Figure 96978dest_path_image004
表示最大收放绳差,
Figure dest_path_image005
表示导向轮组件下轮(有压簧)两端绳之间的夹角;所述压簧的最大受力为
Figure 539461dest_path_image006
,其中,K表示压簧的弹性系数。
根据本发明的一个方面,根据所述压簧的最大受力F计算的所述绕绳缠绕力为:
Figure 214942dest_path_image007
根据本发明的一个方面,所述步骤d包括:
所述上层绳系包括第一上层绳系和第二上层绳系,将所述第一上层绳系的一端固定在所述缠绕轮组件的上轮,另一端沿所述缠绕轮组件的上轮的出绳方向绕过在所述缠绕轮组件上设置的张紧摆杆,并水平通过定滑轮,牵引与所述绕绳缠绕力相同重量的砝码,再沿所述缠绕轮组件的上轮出绳的反方向旋转所述缠绕轮组件的上轮,固定绕绳后的所述第一上层绳系;
将所述第二上层绳系的一端固定在所述驱动轮组件的上轮,另一端沿所述驱动轮组件的上轮的出绳方向绕过在所述驱动轮组件上设置的张紧摆杆,并水平通过定滑轮,牵引与所述绕绳缠绕力相同重量的砝码,再沿所述驱动轮组件的上轮出绳的反方向旋转所述驱动轮组件的上轮,标记所述张紧摆杆旋转角度的初始位置,固定绕绳后的所述第二上层绳系;
其中,所述缠绕轮组件的上轮旋转的周数小于所述驱动轮组件的上轮旋转的周数。
根据本发明的一个方面,所述步骤e包括:
将所述下层绳系的一端缠绕在所述缠绕轮组件的下轮,另一端沿所述缠绕轮组件的下轮的出绳方向水平通过定滑轮,牵引与所述绕绳缠绕力相同重量的砝码,再沿所述缠绕轮组件的上轮出绳的反方向旋转所述缠绕轮组件的上轮,固定绕绳后的所述缠绕轮组件的下轮和所述下层绳系;
拆卸砝码,将所述下层绳系的另一端沿所述缠绕轮组件的下轮的出绳方向绕过导向轮组件的下轮,预留第一绳长后固定在所述驱动轮组件的下轮。使用工艺绳栓紧所诉下层绳系并水平通过定滑轮,牵引与所述绕绳缠绕力相同重量的砝码,再沿所述驱动轮组件的下轮出绳的反方向旋转所述驱动轮组件的下轮,直至所述下层绳系绷紧后,固定绕绳后的所述驱动轮组件的下轮和所述下层绳系;
其中,所述缠绕轮组件的下轮旋转的周数大于所述驱动轮组件的下轮旋转的周数,所述缠绕轮组件的下轮旋转的周数和所述驱动轮组件的上轮旋转的周数相同,所述缠绕轮组件的上轮旋转的周数和所述驱动轮组件的下轮旋转的周数相同。根据本发明的一个方面,所述缠绕轮组件的上轮和所述驱动轮组件的下轮均旋转3周,所述缠绕轮组件的下轮和所述驱动轮组件的上轮均旋转5周,且所述预留第一绳长为:
Figure 669058dest_path_image008
其中,R表示所述缠绕轮组件的上、下轮和所述驱动轮组件的上、下轮的半径,h表示所述第一上层绳系、所述第二上层绳系和所述下层绳系的绳的直径。
根据本发明的一个方面,所述步骤f包括:
将所述第一上层绳系的另一端绕过所述导向轮组件的上轮,使用牵引工装对所述第一上层绳系的另一端和所述第二上层绳系的另一端施力,使所述张紧摆杆恢复至所述初始位置;
将所述第一上层绳系和所述第二上层绳系的另一端预留第二绳长后分别固定在牵引点组件的第一缠绕座和第二缠绕座,再分别沿所述第一缠绕座和所述第二缠绕座的出绳的反方向旋转所述第一缠绕座和所述第二缠绕座相同周数,固定所述牵引点组件。
根据本发明的一个方面,所述第一缠绕座和所述第二缠绕座旋转3周,且所述预留第二绳长为:
Figure dest_path_image009
其中,R'表示所述第一缠绕座和所述第二缠绕座的半径,h表示所述第一上层绳系和所述第二上层绳系的绳的直径。
根据本发明的一个方面,所述上层绳系或所述下层绳系固定在轮上的过程为:将所述上层绳系或所述下层绳系的固定端沿轮上的绳槽并穿过所述绳槽底部且位于轮的出绳方向的切点处的绳槽穿绳孔,打结后用压板固定所述上层绳系或所述下层绳系的固定端。
有益效果
根据本发明的方案,通过该双层联动闭环绳系机构的安装方法,解决了电动舱门绳系机构的装调问题,保证双层绳系不松脱失效。同时,通过绕绳过程的缠绕力值来精确控制机构运行时的绳系张紧力,解决了绕绳后无法调整绳系张紧力的问题。
通过牵引点组件的装调,解决了上层绳系闭合时施力和绳系张紧力保持的问题,实现了绳系安装不并排、不交叠。
附图说明
图1示意性表示本发明的一种实施方式的双层联动闭环绳系安装方法流程图;
图2示意性表示本发明的一种实施方式的双层联动闭环绳系安装方法中双层联动闭环绳系机构的结构示意图;
图3示意性表示本发明的一种实施方式的双层联动闭环绳系安装方法中驱动轮组件和缠绕轮组件的绳系固定端的固定示意图;
图4示意性表示本发明的一种实施方式的双层联动闭环绳系安装方法中导向轮组件2的局部结构示意图;
图5示意性表示本发明的一种实施方式的双层联动闭环绳系安装方法中驱动轮组件的轮轴示意图;
图6示意性表示本发明的一种实施方式的双层联动闭环绳系安装方法中牵引点组件的结构示意图;
图7示意性表示本发明的一种实施方式的双层联动闭环绳系安装方法中牵引点组件的绳系固定端的固定示意图;
图8示意性表示本发明的一种实施方式的双层联动闭环绳系安装方法中楔块固定绕绳后的绳系示意图;
图9示意性表示本发明的一种实施方式的双层联动闭环绳系安装方法中牵引工装的结构示意图。
本发明的实施方式
为了更清楚地说明本发明实施方式或现有技术中的技术方案,下面将
对实施方式中所需要使用的附图作简单地介绍。显而易见地,下面描述中的附图仅仅是本发明的一些实施方式,对于本领域普通技术人员而言,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
在针对本发明的实施方式进行描述时,术语“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”所表达的方位或位置关系是基于相关附图所示的方位或位置关系,其仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此上述术语不能理解为对本发明的限制。
下面结合附图和具体实施方式对本发明作详细地描述,实施方式不能在此一一赘述,但本发明的实施方式并不因此限定于以下实施方式。
根据本发明的构思,针对双层联动闭环绳系机构中双层绳系安装的问题,本发明的安装方法对绕绳顺序、绕绳牵引的方向和绳长预留的设计,同时在安装的过程中对双层联动闭环绳系机构运行时由于收放绳差而产生的绳系张紧力进行考虑,实现双层绳系张紧力的精确控制,同时保证双层绳系不松脱失效。
如图1所示,本实施方式的双层联动闭环绳系安装方法的步骤包括:
首先,计算双层联动闭环绳系机构中驱动轮组件和缠绕轮组件的收放绳差。
双层联动闭环绳系机构的结构如图2所示。双层联动闭环绳系机构的缠绕轮组件的上轮绕绳的周数和驱动轮组件的下轮绕绳的周数相同,缠绕轮组件的下轮绕绳的周数和驱动轮组件的上轮绕绳的周数也相同,而且缠绕轮组件的上轮绕绳的周数小于驱动轮组件的上轮绕绳的周数,也就是驱动轮组件的下轮绕绳的周数小于缠绕轮组件的下轮绕绳的周数。以下层绳系为例,在双层联动闭环绳系机构安装的初始状态,驱动轮组件下轮的回转半径R1为驱动轮组件下轮的绳槽半径R与在驱动轮组件下轮上缠绕多周的绳系的直径h之和。缠绕轮组件下轮的回转半径R2为缠绕轮组件下轮的绳槽半径R与在缠绕轮组件下轮上缠绕多周的绳系的直径h之和。当驱动轮组件和缠绕轮组件的下轮同时转动
Figure 182078dest_path_image010
时,驱动轮组件的下轮收绳量与缠绕轮组件的下轮放绳量的差为收放绳差。收放绳差为:
Figure dest_path_image011
如图2所示,缠绕轮组件和驱动轮组件的上轮绕绳的周数不同,下轮绕绳的周数也不同,导致上层绳系和下层绳系的张紧力都会发生变化。上层绳系的张紧力通过缠绕轮组件上轮设置的扭簧调节,下层绳系的张紧力通过导向轮组件下轮设置的压簧调节。上述导向轮组件可以设置为多个,在本实施方式中,导向轮组件设置两个,仅在图2中的导向轮组件2的下轮上设置一个压簧。压簧的结构以及设置方式如图4所示。由于上层绳系的张紧力和下层绳系的张紧力相同,而压簧的变形量便于测量,因此利用压簧的变形量来反映上下绳系张紧力的变化。
在双层联动闭环绳系机构开始运行时,当各轮转动一周前,回转半径不变,收绳量小于放绳量,收放绳差随各轮的回转角度增加而增大,且呈线性变化,压簧的变形量随之缩小而进行调节,控制绳系张紧力亦变小。当各轮转动一周时,收放绳差达到最大,绳系张紧力达到最小。当各轮转动第二周时,回转半径大小正与前述相反,收绳量大于放绳量,收放绳差随回转角度增加而增大,绳系张紧力亦随压簧调节而变大。
其次,根据上述收放绳差计算双层联动闭环绳系机构中导向轮组件的压簧的变形量。根据双层联动闭环绳系机构运行过程中产生的最大收放绳差
Figure 610392dest_path_image012
,计算绳系最大张紧力降至最小张紧力时压簧的变形量
Figure dest_path_image013
为:
Figure 601482dest_path_image014
其中,
Figure dest_path_image015
表示导向轮组件下轮两端绳之间的夹角。
设定压簧的最小受力F′,根据压簧的变形量及压簧的刚度计算压簧的最大受力为
Figure 175683dest_path_image016
,其中,K表示压簧的弹性系数。
然后,再根据上述压簧的变形量计算双层联动闭环绳系机构的绕绳缠绕力。根据压簧刚度曲线和压簧的最大变形量
Figure 374452dest_path_image013
,在压簧工作范围选择最小压簧力及最大压簧力,从而确定对应的压簧变形量。以最大压簧力F和最大压簧变形量
Figure 870155dest_path_image013
为绕绳控制依据,计算得到绕绳缠绕力为:
Figure 196095dest_path_image017
其中,
Figure 155960dest_path_image018
表示导向轮组件下轮(有压簧)两端绳之间的夹角。
接下来根据上述绕绳缠绕力对上层绳系和下层绳系进行安装。先在驱动轮组件的上层绳系施加上述绕绳缠绕力,对驱动轮组件和缠绕轮组件的上层绳系进行绕绳。具体过程是:
对驱动轮组件和缠绕轮组件的上轮分别单独绕绳,每轮使用一根绳,绕绳方法一致。上层绳系包括第一上层绳系和第二上层绳系。如图3所示,将第一上层绳系的一端(或称为固定端)沿设置在缠绕轮组件的上轮的绳槽并穿过绳槽底部且位于上轮的出绳方向的切点处的绳槽穿绳孔,打结后用压板将该一端固定在缠绕轮组件的上轮上。再使用内六角扳手插入缠绕轮组件上轮轮轴的六方孔内,沿缠绕轮组件的上轮出绳的反方向旋转缠绕轮组件的上轮,将第一上层绳系绕在缠绕轮组件的上轮上。绕绳后,使用多个楔块卡入绳槽固定第一上层绳系,如图8所示。进一步地,本实施方式的缠绕轮组件的上轮绕绳旋转3周。
如图3所示,将第二上层绳系的一端(或称为固定端)同样沿设置在驱动轮组件的上轮的绳槽并穿过绳槽底部且位于上轮的出绳方向的切点处的绳槽穿绳孔,打结后用压板将该一端固定在驱动轮组件的上轮上。如图2所示,另一端沿驱动轮组件的上轮的出绳方向绕过在驱动轮组件上设置的张紧摆杆,并水平通过定滑轮,牵引与绕绳缠绕力
Figure 276363dest_path_image019
相同重量的砝码。如图5所示,再使用内六角扳手插入驱动轮组件上轮轮轴的六方孔内,沿驱动轮组件的上轮出绳的反方向旋转驱动轮组件的上轮,同时标记张紧摆杆旋转角度的初始位置,将第二上层绳系绕在驱动轮组件的上轮上。绕绳后,使用多个楔块卡入绳槽固定第二上层绳系。进一步地,本实施方式的驱动轮组件的上轮绕绳旋转5周。
然后,在驱动轮组件和缠绕轮组件的下层绳系施加绕绳缠绕力,对下层绳系进行绕绳。具体过程是:
下层绳系使用一根绳。将下层绳系的一端(或称为固定端)使用与缠绕轮组件的上轮相同的绕绳方法缠绕在缠绕轮组件的下轮,使用多个楔块固定绕绳后的下层绳系,使用工艺螺钉固定缠绕轮组件的下轮并限制下轮转动。进一步地,本实施方式的缠绕轮组件的下轮绕绳旋转5周。
将下层绳系的另一端沿缠绕轮组件的下轮的出绳方向绕过导向轮组件的下轮,沿着设置在驱动轮组件的下轮的绳槽穿过绳槽底部且位于下轮的出绳方向的切点处的绳槽穿绳孔,预留第一绳长K1后剪断打结,并使用工艺螺钉固定驱动轮组件的下轮并限制其转动,再将打结后的该另一端(或称为固定端)用压板固定在驱动轮组件的下轮上。其中,预留第一绳长K1的起点从绳槽穿绳孔算起,具体的计算方式为:
Figure 275674dest_path_image020
其中,R表示缠绕轮组件的上、下轮和驱动轮组件的上、下轮的半径,h表示第一上层绳系、第二上层绳系和下层绳系的绳的直径。
拆除所有的工艺螺钉,将缠绕轮组件和驱动轮组件的下轮的固定拆除,在下层绳系的中间拴上工艺绳沿出绳方向通过定滑轮,并牵引与绕绳缠绕力
Figure 139725dest_path_image019
相同重量的砝码,再使用内六角扳手插入驱动轮组件下轮轮轴的六方孔内,沿驱动轮组件的下轮出绳的反方向旋转驱动轮组件的下轮,直至压簧最大变形量为
Figure 954097dest_path_image012
L。进一步地,本实施方式的驱动轮组件的下轮绕绳旋转3周。
最后,对驱动轮组件和缠绕轮组件的上层绳系进行闭绳。
如图2所示,将第一上层绳系的另一端绕过导向轮组件的上轮,在牵引点组件安装的位置上使用牵引工装两端的夹片(如图9所示)对第一上层绳系的另一端和第二上层绳系的另一端施力,使张紧摆杆恢复至标记的初始位置。
将第一上层绳系和第二上层绳系的另一端分别沿着牵引点组件的两个缠绕座绳槽底部的穿绳孔,预留第二绳长K2(预留绳长起点从穿绳孔边缘算起)后剪断打结。如图7所示,再将打结后的第一上层绳系和第二上层绳系的另一端分别固定在牵引点组件的第一缠绕座(如图6所示的绳缠绕座1)和第二缠绕座(如图6所示的绳缠绕座2),再分别沿第一缠绕座和第二缠绕座的出绳的反方向旋转第一缠绕座和第二缠绕座相同周数并合并到一起,使用盖板和连接板固定牵引点组件。实现了绳系安装不并排、不交叠。
进一步地,本实施方式的第一缠绕座和第二缠绕座均绕绳旋转3周,且预留第二绳长K2为:
Figure dest_path_image021
其中,R'表示第一缠绕座和第二缠绕座的半径,h表示第一上层绳系和第二上层绳系的绳的直径。
通过上述双层联动闭环绳系机构的安装方法,解决了电动舱门绳系机构的装调问题,实现了绳系安装不并排、不交叠。同时,通过绕绳过程的缠绕力值来精确控制机构运行时的绳系张紧力,解决了绕绳后无法调整绳系张紧力的问题。
以上所述仅为本发明的一个实施方式而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包括在本发明的保护范围之内。

Claims (10)

  1. 一种双层联动闭环绳系安装方法,包括:
    a、计算双层联动闭环绳系机构中的驱动轮组件和缠绕轮组件的收放绳差;
    b、根据所述收放绳差计算所述双层联动闭环绳系机构中的导向轮组件的弹簧的变形量;
    c、设定所述弹簧的最小受力F′,根据所述弹簧的变形量及所述弹簧的刚度计算所述弹簧的最大受力为F;
    d、根据所述弹簧的最大受力F计算所述双层联动闭环绳系机构的绕绳缠绕力;
    e、对所述驱动轮组件的上层绳系施加所述绕绳缠绕力,对所述驱动轮组件和所述缠绕轮组件的上层绳系进行绕绳;
    f、对所述驱动轮组件和所述缠绕轮组件的下层绳系施加所述绕绳缠绕力,对所述下层绳系进行绕绳;
    g、对所述驱动轮组件和所述缠绕轮组件的上层绳系进行闭绳。
  2. 根据权利要求1所述的方法,其特征在于,当所述驱动轮组件和所述缠绕轮组件的下轮同时转动时,所述收放绳差为所述驱动轮组件的下轮收绳量与所述缠绕轮组件的下轮放绳量的差,为:
    Figure dest_path_image001
    其中,R1表示所述驱动轮组件的下轮的回转半径,R2表示所述缠绕轮组件的下轮的回转半径,
    Figure 478601dest_path_image002
    表示所述驱动轮组件和所述缠绕轮组件的下轮的转动角度。
  3. 根据权利要求1所述的方法,其特征在于,所述弹簧为所述导向轮组件的下轮上设置的一个压簧,所述压簧的最大变形量为:
    Figure dest_path_image003
    其中,
    Figure 667006dest_path_image004
    表示最大收放绳差,
    Figure dest_path_image005
    表示所述导向轮组件下轮两端绳之间的夹角;
    所述压簧的最大受力为
    Figure 600327dest_path_image006
    ,其中,K表示压簧的弹性系数。
  4. 根据权利要求3所述的方法,其特征在于,根据所述压簧的最大受力F计算的所述绕绳缠绕力为:
    Figure 472468dest_path_image007
  5. 根据权利要求1所述的方法,其特征在于,所述步骤d包括:
    所述上层绳系包括第一上层绳系和第二上层绳系,将所述第一上层绳系的一端固定在所述缠绕轮组件的上轮,另一端沿所述缠绕轮组件的上轮的出绳方向绕过在所述缠绕轮组件上设置的张紧摆杆,并水平通过定滑轮,牵引与所述绕绳缠绕力相同重量的砝码,再沿所述缠绕轮组件的上轮出绳的反方向旋转所述缠绕轮组件的上轮,固定绕绳后的所述第一上层绳系;
    将所述第二上层绳系的一端固定在所述驱动轮组件的上轮,另一端沿所述驱动轮组件的上轮的出绳方向绕过在所述驱动轮组件上设置的张紧摆杆,并水平通过定滑轮,牵引与所述绕绳缠绕力相同重量的砝码,再沿所述驱动轮组件的上轮出绳的反方向旋转所述驱动轮组件的上轮,标记所述张紧摆杆旋转角度的初始位置,固定绕绳后的所述第二上层绳系;
    其中,所述缠绕轮组件的上轮旋转的周数小于所述驱动轮组件的上轮旋转的周数。
  6. 根据权利要求5所述的方法,其特征在于,所述步骤e包括:
    将所述下层绳系的一端缠绕在所述缠绕轮组件的下轮,另一端沿所述缠绕轮组件的下轮的出绳方向水平通过定滑轮,牵引与所述绕绳缠绕力相同重量的砝码,再沿所述缠绕轮组件的上轮出绳的反方向旋转所述缠绕轮组件的上轮,固定绕绳后的所述缠绕轮组件的下轮和所述下层绳系;
    拆卸砝码,将所述下层绳系的另一端沿所述缠绕轮组件的下轮的出绳方向绕过导向轮组件的下轮,预留第一绳长后固定在所述驱动轮组件的下轮。使用工艺绳栓紧所述下层绳系并水平通过定滑轮,牵引与所述绕绳缠绕力相同重量的砝码,再沿所述驱动轮组件的下轮出绳的反方向旋转所述驱动轮组件的下轮,直至所述下层绳系绷紧后,固定绕绳后的所述驱动轮组件的下轮和所述下层绳系;
    其中,所述缠绕轮组件的下轮旋转的周数大于所述驱动轮组件的下轮旋转的周数,所述缠绕轮组件的下轮旋转的周数和所述驱动轮组件的上轮旋转的周数相同,所述缠绕轮组件的上轮旋转的周数和所述驱动轮组件的下轮旋转的周数相同。
  7. 根据权利要求6所述的方法,其特征在于,所述缠绕轮组件的上轮和所述驱动轮组件的下轮均旋转3周,所述缠绕轮组件的下轮和所述驱动轮组件的上轮均旋转5周,且所述预留第一绳长为:
    Figure 950985dest_path_image008
    其中,R表示所述缠绕轮组件的上、下轮和所述驱动轮组件的上、下轮的半径,h表示所述第一上层绳系、所述第二上层绳系和所述下层绳系的绳的直径。
  8. 根据权利要求6所述的方法,其特征在于,所述步骤f包括:
    将所述第一上层绳系的另一端绕过所述两处导向轮组件的上轮,使用牵引工装对所述第一上层绳系的另一端和所述第二上层绳系的另一端施力,使所述张紧摆杆恢复至所述初始位置;
    将所述第一上层绳系和所述第二上层绳系的另一端预留第二绳长后分别固定在牵引点组件的第一缠绕座和第二缠绕座,再分别沿所述第一缠绕座和所述第二缠绕座的出绳的反方向旋转所述第一缠绕座和所述第二缠绕座相同周数,固定所述牵引点组件。
  9. 根据权利要求8所述的方法,其特征在于,所述第一缠绕座和所述第二缠绕座旋转3周,且所述预留第二绳长为:
    Figure dest_path_image009
    其中,R'表示所述第一缠绕座和所述第二缠绕座的半径,h表示所述第一上层绳系和所述第二上层绳系的绳的直径。
  10. 根据权利要求5至9任一项所述的方法,其特征在于,将所述上层绳系或所述下层绳系固定在轮上的过程为:将所述上层绳系或所述下层绳系的固定端沿轮上的绳槽并穿过所述绳槽底部且位于轮的出绳方向的切点处的绳槽穿绳孔,打结后用压板固定所述上层绳系或所述下层绳系的固定端。
PCT/CN2022/115617 2021-12-06 2022-08-29 双层联动闭环绳系安装方法 WO2023103473A1 (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202111478183.4 2021-12-06
CN202111478183.4A CN114233137B (zh) 2021-12-06 2021-12-06 双层联动闭环绳系安装方法

Publications (1)

Publication Number Publication Date
WO2023103473A1 true WO2023103473A1 (zh) 2023-06-15

Family

ID=80753401

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2022/115617 WO2023103473A1 (zh) 2021-12-06 2022-08-29 双层联动闭环绳系安装方法

Country Status (2)

Country Link
CN (1) CN114233137B (zh)
WO (1) WO2023103473A1 (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114233137B (zh) * 2021-12-06 2023-04-18 北京卫星制造厂有限公司 双层联动闭环绳系安装方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040209720A1 (en) * 2003-04-21 2004-10-21 Chapman David J. Drive assembly with dynamic tensioning device
CN102296901A (zh) * 2011-08-22 2011-12-28 南京航空航天大学 紧凑舱体内自动启闭舱门装置
CN105110225A (zh) * 2015-09-29 2015-12-02 上海振华重工(集团)股份有限公司 一种双层缠绕的钢丝绳葫芦
CN112343447A (zh) * 2020-09-30 2021-02-09 北京空间飞行器总体设计部 一种航天用电动滑移式圆弧形出舱舱门
CN114233137A (zh) * 2021-12-06 2022-03-25 北京卫星制造厂有限公司 双层联动闭环绳系安装方法

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720294B (zh) * 2012-04-04 2014-07-16 中国航空规划建设发展有限公司 一种改善索穹顶性能的构造方法
JP5796239B2 (ja) * 2014-02-07 2015-10-21 三井金属アクト株式会社 車両用ドアの開閉装置
CN104319543A (zh) * 2014-10-13 2015-01-28 北京卫星制造厂 一种支架及航天器电缆网装联方法
CN105089415B (zh) * 2015-05-29 2017-01-04 厦门奥普拓自控科技有限公司 一种手动自动可切换式开关门系统
CN205604950U (zh) * 2016-05-05 2016-09-28 盐城工学院 一种门
DE202020100715U1 (de) * 2020-02-11 2021-05-12 Gebr. Bode Gmbh & Co. Kg Antrieb für eine Schiebetür, Schwenkschiebetür oder Schiebetritt mit Verriegelung, Schiebetür, Schwenkschiebetür oder Schiebetritt und Fahrzeug
CN213085317U (zh) * 2020-06-05 2021-04-30 兴平西铁养路机械有限公司 一种起重装置用钢绳张紧系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040209720A1 (en) * 2003-04-21 2004-10-21 Chapman David J. Drive assembly with dynamic tensioning device
CN102296901A (zh) * 2011-08-22 2011-12-28 南京航空航天大学 紧凑舱体内自动启闭舱门装置
CN105110225A (zh) * 2015-09-29 2015-12-02 上海振华重工(集团)股份有限公司 一种双层缠绕的钢丝绳葫芦
CN112343447A (zh) * 2020-09-30 2021-02-09 北京空间飞行器总体设计部 一种航天用电动滑移式圆弧形出舱舱门
CN114233137A (zh) * 2021-12-06 2022-03-25 北京卫星制造厂有限公司 双层联动闭环绳系安装方法

Also Published As

Publication number Publication date
CN114233137B (zh) 2023-04-18
CN114233137A (zh) 2022-03-25

Similar Documents

Publication Publication Date Title
WO2023103473A1 (zh) 双层联动闭环绳系安装方法
US9227488B2 (en) Tensioning device and sunscreen assembly provided therewith
CN101264728A (zh) 车用遮阳卷帘
JP2009114848A5 (zh)
CN101980895A (zh) 皮带张紧器
CN114678805A (zh) 一种拉力可控的电动紧线装置及其使用方法
JP2005320849A (ja) ケーブル張力調整器
JP7095843B2 (ja) 抵抗装置
DE10158428A1 (de) Rolloanordnung
CN208183173U (zh) 一种整经机的固定装置
CN217362357U (zh) 一种拉力可控的电动紧线装置
TW200409712A (en) Control cable adjustment device
JP3619563B2 (ja) オイルフェンス巻取装置
CN108639351B (zh) 一种航空绞车传动机构的保护装置
CN217805341U (zh) 太阳翼展开引导和恒力张紧机构
CN113697602B (zh) 一种用于变压器线盘的刹车装置
CN113697601B (zh) 一种用于变压器线盘的刹车方法
CN204592185U (zh) 皮带张紧机构
JP2002371777A (ja) 建物その他の物品の開口部の開閉装置
CN103832391A (zh) 一种卷收器框架总成及盖板、安全装置
JP2622587B2 (ja) テンショナー
JP3231558U (ja) 風力発電装置用ブレード
JP2003253955A (ja) 窓開閉装置
DE1572481C3 (de) Vorrichtung an Magnetband-Aufzeichnungsgeräten, insbesondere an solchen mit Drei-Motoren-Antrieb und federnden Bandspannmitteln
JP2003191828A (ja) パーキングブレーキ及び/又は緊急ブレーキを電気的に制御するための装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22902905

Country of ref document: EP

Kind code of ref document: A1