WO2023053195A1 - 蓄電池管理装置および蓄電池の管理方法 - Google Patents

蓄電池管理装置および蓄電池の管理方法 Download PDF

Info

Publication number
WO2023053195A1
WO2023053195A1 PCT/JP2021/035619 JP2021035619W WO2023053195A1 WO 2023053195 A1 WO2023053195 A1 WO 2023053195A1 JP 2021035619 W JP2021035619 W JP 2021035619W WO 2023053195 A1 WO2023053195 A1 WO 2023053195A1
Authority
WO
WIPO (PCT)
Prior art keywords
soc
storage battery
correction
ocv
unit
Prior art date
Application number
PCT/JP2021/035619
Other languages
English (en)
French (fr)
Inventor
健志 ▲濱▼田
Original Assignee
武蔵精密工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 武蔵精密工業株式会社 filed Critical 武蔵精密工業株式会社
Priority to DE112021008290.6T priority Critical patent/DE112021008290T5/de
Priority to JP2023550781A priority patent/JPWO2023053195A1/ja
Priority to PCT/JP2021/035619 priority patent/WO2023053195A1/ja
Priority to CN202180102786.6A priority patent/CN118043691A/zh
Publication of WO2023053195A1 publication Critical patent/WO2023053195A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/374Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC] with means for correcting the measurement for temperature or ageing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • G01R31/3828Arrangements for monitoring battery or accumulator variables, e.g. SoC using current integration
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the technology disclosed in this specification relates to a storage battery management device and a storage battery management method.
  • an OCV (Open Circuit Voltage) method As a method for estimating the SOC (State of Charge) of a storage battery, an OCV (Open Circuit Voltage) method is known (see, for example, Patent Document 1).
  • OCV Open Circuit Voltage
  • the OCV of the storage battery is acquired, and the SOC is estimated based on the acquired OCV and the correspondence relationship in the SOC-OCV (Open Circuit Voltage) characteristic curve of the storage battery.
  • the time when the SOC can be estimated is restricted to the time when the OCV of the storage battery can be obtained, or the absolute value of the OCV change with respect to the SOC change is relatively small.
  • a storage battery having SOC-OCV characteristics may not be able to accurately estimate the SOC.
  • a current integration method is known as another method for estimating the SOC of a storage battery.
  • the amount of change in the capacity of the storage battery from the initial time is specified by integrating the measurement result of the current flowing in the storage battery, and the amount of change in the capacity specified as the initial capacity and the FCC (Full Charge Capacity)
  • the SOC is estimated based on the charge capacity).
  • the current integration method unlike OCV, it is possible to estimate the SOC without being affected by restrictions on when OCV can be acquired or the plateau region. The SOC may not be accurately estimated due to measurement errors.
  • a method using both the current integration method and the OCV method is known (see Patent Document 2, for example). In this method, a method is known in which the initial capacity is reset to the SOC estimated by the OCV method at each timing when the OCV can be measured, thereby canceling the integration error due to the measurement error of the current measurement unit.
  • JP 2021-81244 A Japanese Patent Application Laid-Open No. 2020-60581
  • the factors that affect the accuracy of SOC estimation are not only the measurement error of the current measurement unit, but also the error between the assumed state and the actual state of the storage battery (hereinafter referred to as "state error of the storage battery"). is assumed.
  • Factors that cause state errors in storage batteries include, for example, individual differences in storage batteries at the time of shipment and secular changes in storage batteries. For example, if the state error of the storage battery is relatively large, the FCC used in the current integration method may also contain a large error, which may have a greater impact on the SOC estimation accuracy than the measurement error of the current measurement unit. .
  • the SOC estimated by the current integration method includes the current measurement unit.
  • errors due to battery state errors will continue to be included.
  • This specification discloses a technology capable of solving the above-described problems.
  • the storage battery management device disclosed in the present specification includes a first region in which the OCV change rate, which is the absolute value of the change in OCV with respect to the change in SOC, is equal to or less than a predetermined value;
  • a storage battery management device for managing a storage battery having SOC-OCV characteristics including a second region exceeding a value, wherein the current measurement unit measures the current flowing in the storage battery, and the current measured by the current measurement unit
  • a coulomb counting processing unit that calculates the capacity of the storage battery by integration, an SOC at a reference time, an amount of change in the capacity of the storage battery from the reference time calculated by the coulomb counting processing unit, and an FCC of the storage battery.
  • an SOC estimation unit that estimates the SOC of the storage battery
  • an OCV acquisition unit that acquires the OCV of the storage battery
  • a correction SOC that is the SOC corresponding to the OCV of the storage battery acquired by the OCV acquisition unit is the a correcting unit that corrects the FCC of the storage battery used in the SOC estimating unit based on the correcting SOC when a correction condition including being within a second region as a necessary condition is satisfied.
  • the SOC of the storage battery is estimated based on the SOC at the reference time, the amount of change in the capacity of the storage battery based on the integration of the current flowing through the storage battery, and the FCC of the storage battery (hereinafter referred to as "current integration method based SOC estimation").
  • the FCC used for SOC estimation based on this current integration method is corrected based on the correction SOC.
  • This correction SOC is the SOC corresponding to the OCV of the storage battery acquired by the OCV acquisition unit, and the second region (OCV change rate, which is the absolute value of the OCV change amount with respect to the SOC change amount, exceeds a predetermined value.
  • the SOC is the SOC within the
  • the acquisition accuracy of the SOC corresponding to the OCV is higher than when the SOC is within the first region (the region in which the OCV change rate is equal to or less than a predetermined value).
  • the correction SOC obtained with relatively high accuracy is different from the actual state of the storage battery (individual differences and aging of the storage battery) compared to the SOC estimated based on the current integration method because there is no integration error. etc.). Therefore, using this correction SOC, it is possible to accurately correct the FCC used for SOC estimation based on the current integration method.
  • the FCC is corrected, so the SOC estimation based on the current integration method can be performed with high accuracy.
  • the correcting unit causes the SOC estimating unit to The FCC of the storage battery used may be corrected.
  • the FCC is corrected based on the difference between the SOC at the reference time and the correction SOC, which correlates with the actual state change of the storage battery, the SOC estimation based on the current integration method can be performed more accurately. It can be carried out.
  • the configuration may further include a provisional correction unit that provisionally corrects the FCC of the storage battery based on the provisional correction SOC that is the SOC on the estimated SOC side in the first region where the correction SOC is present. According to this storage battery management device, even when the correction SOC is not within the second region, the provisional correction enables accurate SOC estimation based on the current integration method.
  • the storage battery management device further includes a history unit that records a history of FCC correction of the storage battery in the correction unit each time the correction condition is satisfied, and the correction condition is recorded in the history unit.
  • the configuration may further include, as a necessary condition, that the average value of the FCC correction amounts for the most recent predetermined number of times (two or more times) is equal to or greater than the threshold. According to this storage battery management device, it is possible to suppress deterioration in the accuracy of FCC correction due to, for example, noise and measurement errors in the current measurement unit.
  • a provisional correction unit that provisionally corrects the SOC at a reference time based on the provisional correction SOC that is the SOC on the estimated SOC side in the first region where the correction SOC is present, wherein the correction condition is the predetermined number of times
  • the configuration may further include as a necessary condition that the provisional correction is not performed in a period corresponding to . According to this storage battery management device, it is possible to suppress, for example, an error due to execution of provisional correction from having an adverse effect on the determination of necessity of FCC correction.
  • the SOC-OCV characteristic of the storage battery includes a plurality of the second regions, and the correction condition is that the SOC at the reference time is different from the correction SOC.
  • the configuration may further include being within the second region as a necessary condition. According to this storage battery management device, for example, the SOC at the reference time and the SOC for correction are in the same second region, the amount of charge transfer in the storage battery is extremely small, and FCC correction is performed even when FCC correction is not required. can reduce the burden of
  • the correction condition may further include, as a necessary condition, that the difference between the reference SOC and the correction SOC is equal to or greater than a lower limit value.
  • the difference between the reference SOC and the correction SOC is extremely small, and even if the FCC correction is not required, the burden of executing the FCC correction is reduced. be able to.
  • the storage battery management device further includes a temperature measurement unit that measures the temperature of the storage battery, and the correction condition is that the temperature measured by the temperature measurement unit is within a predetermined temperature range. It is good also as a structure containing. According to this storage battery management device, it is possible to suppress a decrease in FCC correction accuracy due to the temperature of the storage battery being outside the predetermined temperature range.
  • the storage battery management device may further include an SOC updating unit that updates the SOC at the reference time to the correction SOC when the correction condition is satisfied. According to this storage battery management device, it is possible to suppress deterioration in accuracy of estimating the SOC of the storage battery due to, for example, an error in current integration by the current measurement unit.
  • the storage battery management method disclosed in the present specification includes a first region in which the OCV change rate, which is the absolute value of the OCV change with respect to the SOC change, is equal to or less than a predetermined value;
  • a method for managing a storage battery having SOC-OCV characteristics including a second region exceeding a predetermined value comprising: measuring the current flowing through the storage battery; and integrating the measured current to determine the capacity of the storage battery estimating the SOC of the storage battery based on the SOC at the reference time, the calculated amount of change in the capacity of the storage battery from the reference time, and the FCC of the storage battery; and the OCV of the storage battery.
  • the correction SOC which is the SOC corresponding to the acquired OCV of the storage battery, being within the second region is satisfied, based on the correction SOC and a step of correcting the FCC of the storage battery used in the step of estimating the SOC of the storage battery.
  • the FCC is corrected, so the SOC estimation based on the current integration method can be accurately performed.
  • the technology disclosed in this specification can be implemented in various forms. It can be implemented in the form of a computer program to be implemented, a non-temporary recording medium recording the computer program, or the like.
  • Explanatory drawing which shows roughly the structure of the battery apparatus 100 in embodiment Explanatory drawing schematically showing the SOC-OCV characteristics of the storage battery 12 Explanatory diagram showing an example of the SOC-OCV table T1 Explanatory diagram showing an example of area division-OCV table T2 Flowchart showing OCV acquisition processing Flowchart showing correction processing Explanatory drawing schematically showing the SOC-OCV characteristics of the storage battery 12 Flowchart showing correction processing in a modified example
  • FIG. 1 is an explanatory diagram schematically showing the configuration of a battery device 100 according to this embodiment.
  • the battery device 100 includes an assembled battery 10 and a storage battery management device 20 .
  • the assembled battery 10 has a configuration in which a plurality of storage batteries 12 are connected in series.
  • the assembled battery 10 is composed of four storage batteries 12 .
  • the assembled battery 10 is connected to a load (not shown) and an external power supply via a positive terminal 42 and a negative terminal 44 .
  • Each storage battery 12 constituting the assembled battery 10 is a storage battery having SOC (State of Charge, charging rate)-OCV (Open Circuit Voltage) characteristics including a plateau region PR.
  • FIG. 2 is an explanatory diagram schematically showing the SOC-OCV characteristics of the storage battery 12. As shown in FIG.
  • the plateau region PR is a region in which the curve representing the SOC-OCV characteristic is substantially flat. area. Examples of the storage battery 12 having the SOC-OCV characteristic including the plateau region PR include an iron phosphate-based lithium ion battery and a titanate-based lithium ion battery.
  • the SOC-OCV characteristic of the storage battery 12 further has a change region CR.
  • the change region CR is the region (non-plateau region) where the OCV rate of change exceeds 2 mV/%.
  • the SOC-OCV characteristic of the storage battery 12 has three plateau regions PR (first plateau region PR1, second plateau region PR2, third plateau region PR3) and four change regions CR ( A first changing region CR1, a second changing region CR2, a third changing region CR3, and a fourth changing region CR4) are arranged alternately.
  • the plateau region PR is an example of the first region in the claims
  • the change region CR is an example of the second region in the claims
  • 2 mV / % is an example of the second region in the claims. It is an example of a predetermined value.
  • the storage battery management device 20 is a device for managing the battery device 100 including the assembled battery 10 .
  • the storage battery management device 20 includes a voltmeter 22, an ammeter 24, a thermometer 26, a monitoring unit 28, a line switch 40, a control unit 60, a recording unit 72, a history unit 74, and an interface (I/ F) portion 76;
  • One voltmeter 22 is provided for each storage battery 12 .
  • Each voltmeter 22 is connected in parallel to each storage battery 12 , measures the voltage of each storage battery 12 , and outputs a signal indicating the voltage measurement value to the monitoring unit 28 .
  • Ammeter 24 is connected in series with assembled battery 10 . The ammeter 24 measures the current flowing through the assembled battery 10 and outputs a signal indicating the current measurement value to the monitoring unit 28 .
  • the thermometer 26 is arranged near the assembled battery 10 . The thermometer 26 measures the temperature of the assembled battery 10 (each storage battery 12) and outputs a signal indicating the temperature measurement value to the monitoring unit 28.
  • the monitoring unit 28 Based on the signals received from the voltmeter 22, the ammeter 24, and the thermometer 26, the monitoring unit 28 generates a signal indicating the voltage of each storage battery 12, the current flowing through the assembled battery 10, and the temperature of the assembled battery 10 (each storage battery 12). Output to the control unit 60 .
  • the voltmeter 22 and the monitoring unit 28 are examples of the voltage measuring unit
  • the ammeter 24 and the monitoring unit 28 are examples of the current measuring unit
  • the thermometer 26 and the monitoring unit 28 are examples of the battery temperature measuring unit. be.
  • the line switch 40 is installed between the assembled battery 10 and the negative terminal 44 .
  • the line switch 40 opens and closes the connection between the assembled battery 10 and the load and the external power supply by being controlled on/off by the control unit 60 .
  • the control unit 60 is configured using, for example, a CPU, a multi-core CPU, and programmable devices (Field Programmable Gate Array (FPGA), Programmable Logic Device (PLD), etc.), and controls the operation of the storage battery management device 20.
  • the control unit 60 has functions as an OCV acquisition unit 62 , a Coulomb counting processing unit 64 , an SOC estimation unit 66 , a correction unit 68 , an SOC update unit 70 and a provisional correction unit 71 . The functions of these units will be described together with the description of the SOC estimation process described later.
  • the recording unit 72 is composed of, for example, a ROM, a RAM, a hard disk drive (HDD), etc., and stores various programs and data, and is used as a work area and a data storage area when executing various processes. .
  • the recording unit 72 stores a computer program for executing SOC estimation processing, which will be described later.
  • the computer program is provided in a state stored in a computer-readable recording medium (not shown) such as a CD-ROM, DVD-ROM, USB memory, etc., and installed in the battery device 100 to the recording unit 72. Stored.
  • the recording unit 72 stores an SOC-OCV table T1 and an area division-OCV table T2.
  • the SOC-OCV table T1 is a table used for SOC estimation of each storage battery 12 based on the OCV method.
  • FIG. 3 is an explanatory diagram showing an example of the SOC-OCV table T1.
  • the SOC-OCV table T1 is a table that associates OCV, battery temperature, and SOC.
  • the relationship defined in the SOC-OCV table T1 is determined experimentally in advance.
  • the SOC-OCV characteristic fluctuates according to changes in battery temperature.
  • the SOC of each storage battery 12 can be estimated based on the OCV and battery temperature of each storage battery 12 by referring to the SOC-OCV table T1.
  • the OCVs are indicated as Va0, Va1, . 3 also shows a discharging SOC-OCV table used when the storage battery 12 is discharged and a charging SOC-OCV table used when the storage battery 12 is charged.
  • the area division-OCV table T2 (FIG. 1) recorded in the recording unit 72 indicates which area (plateau area PR, change area CR) in the SOC-OCV characteristic the estimated SOC belongs to (which area belongs to)
  • FIG. 4 is an explanatory diagram showing an example of the area division-OCV table T2.
  • the relationship between the OCV, each area segment in the SOC-OCV characteristic, and the battery temperature is defined in the area segment-OCV table T2.
  • the SOC-OCV characteristic fluctuates according to changes in the battery temperature, so each region section in the SOC-OCV characteristic fluctuates in accordance with the fluctuation of the SOC-OCV characteristic.
  • the OCVs are indicated as Vo0, Vo1, .
  • the history unit 74 is composed of, for example, a ROM, a RAM, a hard disk drive (HDD), etc., and records various histories related to the battery device 100 .
  • Such history includes, for example, the OCV of the storage battery 12, and the history of correction contents of FCC correction processing and provisional correction processing, which will be described later.
  • the interface unit 76 and the like communicate with other devices by wire or wirelessly. For example, the history recorded in the history section 74 is updated by communication with another device via the interface section 76 .
  • the SOC estimation process executed by the storage battery management device 20 in the battery device 100 of this embodiment will be described.
  • the SOC estimation process mainly performs SOC estimation based on the current integration method. This is a process of correcting the FCC (Full Charge Capacity) used for SOC estimation based on .
  • the SOC estimation process is assumed to individually estimate the SOC of each of the storage batteries 12 forming the assembled battery 10 . In the following description, one storage battery 12 will be taken up and described.
  • the SOC estimation process is started automatically or in response to an instruction from the administrator, for example, when the storage battery management device 20 is activated.
  • A-2-1. Estimation process of integrated SOC(t) In the battery device 100 of the present embodiment, a process of estimating the SOC (hereinafter referred to as "integrated SOC(t)") based on the current integration method is executed. Specifically, the coulomb counting processing unit 64 ( FIG. 1 ) of the storage battery management device 20 calculates the capacity of each storage battery 12 by integrating the currents measured by the ammeter 24 and the monitoring unit 28 .
  • the SOC estimating unit 66 of the storage battery management device 20 calculates the SOC (0) at the reference time and the amount of change Q(t) in the capacity of the storage battery 12 from the reference time calculated by the coulomb counting processing unit 64 (charge transfer amount ) and the FCC of the storage battery 12, the integrated SOC(t) of the storage battery is estimated.
  • the reference time is the time of shipment of the battery device 100, and after that, the reference time is the execution time of the reference SOC update process in the correction process, which will be described later. Note that the process of estimating the integrated SOC(t) is continuously executed during the SOC estimation process.
  • FIG. 5 is a flowchart showing OCV acquisition processing executed in the battery device 100 of this embodiment.
  • the control unit 60 determines that the storage battery 12 is in a stopped state when the charging or discharging current to the storage battery 12 falls below a predetermined threshold value or when the line switch 40 shifts from the closed state to the open state.
  • the OCV acquisition unit 62 ( FIG. 1 ) of 20 executes the OCV acquisition process ( FIG. 5 ) of the storage battery 12 .
  • the OCV acquisition unit 62 determines whether or not the OCV acquisition timing has arrived, and if it determines that the OCV acquisition timing has arrived, executes the OCV acquisition process (S110 to S140).
  • the OCV acquisition timing of the storage battery 12 is the timing at which the polarization of the storage battery 12 is resolved to the extent that the OCV of the storage battery 12 can be acquired and the battery voltage is in a stable state.
  • the OCV acquisition unit 62 (FIG. 1) of the control unit 60 determines again whether the line switch 40 is in the closed state (S110).
  • the closed state of the line switch 40 means that the storage battery 12 (assembled battery 10) is electrically connected to the load, and the open state of the line switch 40 means that the storage battery 12 is connected to the load ( (not shown) is in a no-load state.
  • the OCV acquisition unit 62 determines whether the line switch 40 is in the closed state (S110: YES), it determines whether the stopped state in which no current flows to the storage battery 12 has continued for a predetermined time or longer (S120).
  • the control unit 60 constantly determines whether there is current flowing through the storage battery 12 based on the signal input from the monitoring unit 28, and stores the determination result as a history associated with the elapsed time. Based on this history, it can be determined whether or not the storage battery 12 has been stopped for a predetermined period of time or longer.
  • the OCV acquisition unit 62 determines that the current state of the storage battery 12 is in a stopped state if the current flowing through the storage battery 12 is equal to or less than a reference current value (a value at which the current can be regarded as approximately zero). Measurement of the current of the storage battery 12 is continuously performed during the SOC estimation process.
  • the process returns to S110.
  • the OCV acquisition unit 62 determines that the stop state of the storage battery 12 has continued for a predetermined time or more (S120: YES)
  • the battery voltage of the storage battery 12 within the predetermined time is less than a predetermined reference rate (a value at which the battery voltage of the storage battery 12 can be considered to be generally stable) (S130). Note that the measurement of the voltage of the storage battery 12 is continuously performed during the SOC estimation process.
  • the process returns to S110.
  • the OCV acquisition unit 62 determines that the change rate of the battery voltage of the storage battery 12 within the predetermined time period is equal to or higher than the reference rate (S130: NO)
  • the process returns to S110.
  • the OCV acquisition unit 62 determines that the change rate of the battery voltage of the storage battery 12 within the predetermined time is less than the reference rate (S130: YES)
  • the measured battery voltage of the storage battery 12 is converted to the OCV of the storage battery 12. is recorded in the history unit 74 (S140), and the process proceeds to correction processing (S150).
  • FIG. 6 is a flowchart showing correction processing.
  • the correction process is a process of updating the reference time SOC(0) used in the process of estimating the integrated SOC(t) and correcting the integrated SOC(t) and FCC of the storage battery 12 .
  • the SOC (hereinafter referred to as “correction SOC”) corresponding to the OCV of the storage battery 12 acquired in the OCV acquisition process is estimated. Specifically, it is determined whether the current state immediately before the storage battery 12 shifts to the stopped state is the charging state or the discharging state (S210).
  • the signal output from the ammeter 24 is a signal corresponding to the presence or absence of current flowing in the storage battery 12 and the direction of flow (a signal corresponding to the level of the voltage across a detection resistor (not shown) provided in the ammeter 24).
  • control unit 60 determines the current state (charged state, discharged state, stopped state) of the storage battery 12 based on the level of the signal output from the ammeter 24 and the level inversion of the signal.
  • the control unit 60 determines that the current state immediately before the storage battery 12 shifts to the stopped state is the charging state, the control unit 60 refers to the charging SOC-OCV table recorded in the recording unit 72, and acquires the SOC-OCV table through the OCV processing.
  • the SOC corresponding to the obtained OCV is estimated as the correction SOC (S220).
  • control unit 60 determines that the current state immediately before the storage battery 12 shifts to the stopped state is the discharging state, the control unit 60 refers to the discharging SOC-OCV table recorded in the recording unit 72, and performs OCV processing.
  • the SOC corresponding to the OCV obtained in 1 is estimated as the SOC for correction (S230).
  • the control unit 60 of the storage battery management device 20 calculates the integrated SOC (t) and the correction SOC based on the current (at the time of OCV acquisition) integrated SOC (t), the correction SOC, and the area division-OCV table T2. It is determined to which region (plateau region PR, change region CR) in the SOC-OCV characteristic of the storage battery 12 each belongs. As will be described below, in the present embodiment, depending on the combination of regions to which the integrated SOC(t) and the correction SOC belong, the presence or absence of correction processing and processing with different correction contents are executed.
  • the integrated SOC update process is a process of updating (resetting) the integrated SOC(t) to the correction SOC.
  • SOC updating unit 70 (FIG. 1) of the storage battery management device 20
  • S270 an integrated SOC update process is performed (S270).
  • SOC updating unit 70 SOC(t) update processing is performed (S270).
  • the SOC update unit 70 performs the integrated SOC update process when the condition that the correction SOC is within the change region CR (hereinafter referred to as "first condition") is satisfied.
  • first condition the condition that the correction SOC is within the change region CR
  • the estimation accuracy of the correction SOC estimation processing (S220, S230) is higher than when the correction SOC is within the plateau region PR. Therefore, by performing the cumulative SOC update process using the correction SOC estimated when the first condition is satisfied, the SOC estimation accuracy can be improved.
  • the FCC correction process is a process of correcting the FCC of the storage battery 12 used in the process of estimating the integrated SOC(t) based on the correction SOC.
  • the FCC correction process is executed when the following correction conditions are satisfied.
  • the correction conditions include the following conditions in addition to the first condition as necessary conditions.
  • Second condition The change region CR to which the SOC (0) at the reference time belongs and the change region CR to which the correction SOC belongs are different from each other.
  • the control unit 60 can determine whether or not the second condition is satisfied based on the determination result of the area determination process.
  • Third condition The provisional reference SOC update process (S340), which will be described later, has not been executed since the previous FCC correction process (S310) was executed.
  • the execution information (provisional correction SOC, etc.) of the provisional reference SOC update process is recorded in the history unit 74 as history information in association with the execution time. Based on the history information stored in the history section 74, the control section 60 can determine whether or not the third condition is satisfied.
  • Fourth condition The average value (moving average value) of the FCC correction amounts (for example, the difference ⁇ SOC1 in FIG. 2) for the most recent predetermined number of times (two or more times) recorded in the history unit 74 is equal to or greater than a threshold.
  • the FCC correction amount is recorded in the history unit 74 when predetermined conditions (first to third conditions in this embodiment) are satisfied in each correction process. Based on the history information stored in the history section 74, the control section 60 can determine whether or not the fourth condition is satisfied.
  • the control unit 60 calculates the FCC correction amount and stores it in the history unit 74. It is recorded in the history unit 74 as history information in association with the execution time of the OCV acquisition process (S290).
  • the FCC correction amount is the difference between the FCC after correction based on the correction SOC and the FCC before correction.
  • the correction unit 68 executes the FCC correction process (S310). Specifically, the correction unit 68 corrects the FCC of the storage battery 12 used in the process of estimating the integrated SOC(t) to the post-correction FCC, and proceeds to S320. If it is determined that the fourth condition is not satisfied (S300: NO), the FCC correction process is not executed, and the process proceeds to S320.
  • the reference SOC update process is a process of updating (resetting) the SOC (0) at the reference time in the equation (1) used in the process of estimating the integrated SOC(t) to the correction SOC.
  • the reference SOC update process is a process of updating (resetting) the SOC (0) at the reference time in the equation (1) used in the process of estimating the integrated SOC(t) to the correction SOC.
  • the estimation accuracy of the correction SOC estimation processing (S220, S230) is higher than when the correction SOC is within the plateau region PR. Therefore, by performing the reference SOC update process when the first condition is satisfied, it is possible to improve the accuracy of the estimation process of the integrated SOC(t) thereafter. Further, when it is determined that both the integrated SOC(t) and the correction SOC are within the plateau region PR (S240: NO and S260: NO), the FCC correction process and the reference SOC update process are not executed.
  • control unit 60 may estimate the SOH (State of Health) of the storage battery 12 based on the corrected FCC and notify the outside via the interface unit 76 .
  • the control unit 60 estimates the SOH of the storage battery 12 based on the FCC of the new storage battery 12 recorded in advance in the recording unit 72 and the corrected FCC.
  • Temporal correction processing In the provisional correction process, when the correction SOC is within the plateau region PR, the integrated SOC(t) is updated (reset) to the provisional correction SOC, and the equation (1 ) is updated (reset) to the SOC for provisional correction from the SOC (0) at the reference time.
  • the storage battery management device 20 of the provisional correction unit 71 executes provisional integrated SOC update processing (S330).
  • the provisional correction unit 71 determines the SOC closest to the accumulated SOC(t) in the plateau region PR having the correction SOC as the provisional correction SOC, and sets the accumulated SOC(t) to the provisional correction SOC. Update to correction SOC.
  • the provisional correction unit 71 executes provisional reference SOC update processing (S340).
  • the provisional correction unit 71 updates the reference time SOC (0) to the provisional correction SOC.
  • the storage battery management device 20 of the present embodiment is a device for managing the assembled battery 10 in which a plurality of storage batteries 12 having SOC-OCV characteristics including the plateau region PR are connected in series.
  • the storage battery management device 20 includes an ammeter 24, a thermometer 26, a monitoring unit 28, an OCV acquiring unit 62, a coulomb counting processing unit 64, an SOC estimating unit 66, a correcting unit 68, an SOC updating unit 70, and a provisional correction unit.
  • a unit 71 and a control unit 60 are provided.
  • Voltmeter 22 and monitoring unit 28 measure the voltage of storage battery 12 .
  • Ammeter 24 and monitoring unit 28 measure the current flowing through assembled battery 10 .
  • the coulomb counting processing unit 64 calculates the capacity of the storage battery 12 by integrating the current measured by the ammeter 24 and the monitoring unit 28 and the current during the constant current control.
  • the SOC estimating unit 66 calculates the value of the storage battery 12 based on the SOC (0) at the reference time, the amount of change Q(t) in the capacity of the storage battery 12 from the reference time calculated by the coulomb counting processing unit 64, and the FCC of the storage battery 12.
  • Estimate the SOC of The OCV acquisition unit 62 acquires the OCV of the storage battery 12 .
  • the correction unit 68 determines that the correction SOC, which is the SOC corresponding to the OCV of the storage battery 12 acquired by the OCV acquisition unit 62, is within the change region CR (first condition S250: YES or S260: YES in FIG. 6). When the correction condition included as a necessary condition is satisfied, the estimated SOC by the SOC estimation unit 66 and the FCC of the storage battery 12 used by the SOC estimation unit 66 are corrected based on the correction SOC (S310).
  • the correction SOC is an SOC that corresponds to the OCV of the storage battery 12 acquired by the OCV acquisition unit 62 and that is within the change region CR.
  • the acquisition accuracy of the SOC corresponding to the OCV is higher than when it is within the plateau region PR.
  • the correction SOC obtained with relatively high accuracy has a state error of the storage battery 12 ( (Individual differences at the time of shipment or at the manufacturing stage, changes over time, etc.) are remarkably reflected. Therefore, using this correction SOC, it is possible to accurately correct the FCC used in the process of estimating the integrated SOC(t).
  • the process of estimating the integrated SOC(t) can be performed with higher accuracy than in a configuration in which the FCC is not corrected.
  • the FCC is corrected based on the difference between the SOC (0) at the reference time and the correction SOC, which correlates with the state error of the storage battery 12 (S310). It can be done more accurately.
  • provisional correction processing (S330, S340) is performed even when the correction SOC is not within the change region CR.
  • the process of estimating the integrated SOC(t) can be performed with higher accuracy than in a configuration in which the provisional correction process is not performed.
  • the average value of the FCC correction amount in the FCC correction process for the latest predetermined number of times (two or more times) is a threshold or more (fourth condition) as a necessary condition (S300: YES), FCC correction Processing is performed.
  • a threshold or more (fourth condition) as a necessary condition (S300: YES)
  • FCC correction Processing is performed.
  • the change region CR to which the SOC (0) at the reference time belongs and the change region CR to which the correction SOC belongs are different from each other (second condition) (S280: YES). Processing is performed.
  • S280: YES second condition
  • Processing is performed.
  • the present embodiment for example, even if the reference SOC (0) and the correction SOC are within the same change region CR, the amount of charge transfer in the storage battery 12 is extremely small, and FCC correction is not required. The burden of performing FCC corrections can be reduced.
  • the FCC correction process is executed with the necessary condition (S280: YES) that the provisional correction process, which will be described later, has not been executed since the previous execution of the FCC correction process (third condition). .
  • S280: YES the necessary condition that the provisional correction process, which will be described later, has not been executed since the previous execution of the FCC correction process
  • the integrated SOC is updated.
  • a process (S270) and a reference SOC update process (S320) are executed to update the integrated SOC(t) and the reference time SOC(0) to the correction SOC.
  • ⁇ SOC1 there is a difference ⁇ SOC1 between the integrated SOC(t) and the correction SOC due to the influence of the state error of the storage battery 12 and the like.
  • the reference SOC (0) and the correction SOC are in different change regions CR2 and CR3 (S280: YES), so the FCC correction process is executed. Even if the reference SOC (0) and the correction SOC are in the same change region (S280: NO), if the difference between the reference SOC (0) and the correction SOC is equal to or greater than the lower limit value, may perform the FCC correction process.
  • FIG. 7 is an explanatory diagram schematically showing the SOC-OCV characteristics of the storage battery 12.
  • the integrated SOC(t) is within the third change region CR3, but the correction SOC is within the third plateau region PR3 (S240 in FIG. 6: YES and S250 : NO), the FCC correction process is not executed, and instead the temporary accumulated SOC update process (S330) and the temporary reference SOC update process (S340) are executed.
  • the SOC value S2 closest to the integrated SOC(t) in the third plateau region PR3 is determined as the provisional correction SOC.
  • the integrated SOC(t) and the reference time SOC(0) of the storage battery 12 used in the process of estimating the integrated SOC(t) are provisionally corrected. Therefore, compared with the case where the provisional reference SOC update process is not performed, the process of estimating the integrated SOC(t) can be performed with higher accuracy.
  • the FCC correction accuracy may be lower than in the FCC correction process. be. Therefore, as described above, when the third condition is not satisfied (S280: NO), the calculation and recording of the FCC correction amount (S290) and the FCC correction process (S310) are not executed.
  • the configuration of the battery device 100 in the above embodiment is merely an example, and various modifications are possible.
  • the number of storage batteries 12 forming the assembled battery 10 can be arbitrarily changed.
  • the thermometer 26 may be provided for each storage battery 12 . Note that the thermometer 26 may be omitted.
  • an iron phosphate-based lithium-ion battery was exemplified as the storage battery, but the OCV rate includes a first region in which the OCV rate is equal to or less than a predetermined value and a second region in which the OCV change rate exceeds a predetermined value.
  • Other secondary batteries or primary batteries may be used as long as they have SOC-OCV characteristics.
  • the predetermined value is not limited to 2 mV/% and can be set arbitrarily. Also, the numbers of the first regions and the second regions can be changed arbitrarily.
  • the contents of the SOC-OCV table T1 and the area division-OCV table T2 are merely examples, and various modifications are possible. Also, the SOC-OCV table T1 and/or the area division-OCV table T2 are not necessarily recorded in the recording unit 72. FIG. Further, in each of the above embodiments, at least one of the functional units included in the control unit 60 may be omitted.
  • the SOC estimation process estimates the SOC individually for each of the storage batteries 12 that make up the assembled battery 10, but the SOC may be estimated for the entire assembled battery 10.
  • a method of acquiring the battery voltage in a state where the battery voltage of the storage battery 12 is stable as the OCV was adopted (S110 to S130 in FIG. 5), but for example, the internal resistance of the storage battery 12 and the battery voltage
  • a known method, such as a method of estimating OCV based on changes such as may be employed.
  • the reference SOC update process may not be executed. Even with such a configuration, the accuracy of the estimation process of the integrated SOC(t) can be improved by executing the FCC correction process.
  • the correction conditions for executing the FCC correction process may not include at least one of the second to fourth conditions. Further, the correction condition may further include, for example, that the provisional correction is not executed in a period corresponding to the predetermined number of times as a necessary condition. As a result, for example, it is possible to prevent the error due to the execution of the provisional correction from adversely affecting the FCC correction necessity determination.
  • the correction condition may further include as a necessary condition that the difference between the reference SOC (0) and the correction SOC is equal to or greater than the lower limit value.
  • the difference between the SOC (0) at the reference time and the correction SOC is extremely small, and even if the FCC correction is not required, the burden of executing the FCC correction can be reduced. can be done.
  • the correction condition may further include as a necessary condition that the temperature measured by the thermometer 26 is within a predetermined temperature range. As a result, it is possible to prevent the FCC correction accuracy from deteriorating due to the temperature of the storage battery 12 being outside the predetermined temperature range.
  • the integrated SOC (t) by the current integration method is Although the configuration in which the FCC is corrected by replacing it with the correction SOC and substituting it into the FCC calculation formula (2) has been mentioned, for example, the correction SOC (for example, 20%) may be replaced with an SOC (for example, 27%) and substituted into the FCC calculation formula to correct the FCC. Further, in the FCC process, the FCC may be corrected according to the difference between the integrated SOC(t) obtained by the current integration method and the correction SOC.
  • the SOC closest to the integrated SOC(t) (SOC at the boundary between the plateau region PR and the change region CR) among the plateau regions PR having the correction SOC is provisionally
  • the correction SOC if the SOC is on the integrated SOC(t) side, for example, an SOC slightly deviating from the boundary SOC may be determined as the provisional correction SOC.
  • the history of the FCC correction amount is recorded in the history unit 74 (S290). may be recorded in the history unit 74 .
  • FIG. 8 is a flowchart showing correction processing in a modified example.
  • the FCC correction amount is calculated and recorded (S290) shown in FIG. determination processing (S300) is not executed, and FCC correction processing (S310) is executed.
  • the provisional correction unit 71 executes FCC provisional correction processing (S350).
  • the FCC provisional correction process is a process of provisionally correcting the FCC of the storage battery 12 used in the process of estimating the integrated SOC(t).
  • the FCC of the storage battery 12 used in the process of estimating the integrated SOC(t) is corrected to the FCC after provisional correction.
  • a provisional reference SOC update process is executed (S340).

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Tests Of Electric Status Of Batteries (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)

Abstract

電流積算法に基づくSOC推定を精度よく行う。 蓄電池管理装置は、SOCの変化量に対するOCVの変化量の絶対値であるOCV変化率が所定値以下の第1の領域と、OCV変化率が所定値を超える第2の領域と、を含むSOC-OCV特性を有する蓄電池を管理する。蓄電池管理装置は、電流計測部が計測した電流を積算することにより、蓄電池の容量を算出するクーロンカウンティング処理部と、基準時のSOCと、基準時からの蓄電池の容量の変化量と、蓄電池のFCCとに基づき、蓄電池のSOCを推定するSOC推定部と、蓄電池のOCVを取得するOCV取得部と、OCV取得部が取得した蓄電池のOCVに対応するSOCである補正用SOCが第2の領域内にあることを必要条件として含む補正条件が満たされた場合、補正用SOCに基づき、SOC推定部で用いる蓄電池のFCCを補正する補正部と、を備える。

Description

蓄電池管理装置および蓄電池の管理方法
 本明細書に開示される技術は、蓄電池管理装置および蓄電池の管理方法に関する。
 蓄電池のSOC(State of Charge、充電率)を推定する方法として、OCV(Open Circuit Voltage、開回路電圧)法が知られている(例えば、特許文献1参照)。OCV法では、蓄電池のOCVを取得し、取得したOCVと、蓄電池が有するSOC-OCV(Open Circuit Voltage、開回路電圧)の特性曲線における対応関係とに基づいてSOCを推定する。OCV法では、例えばSOCの推定可能な時期が蓄電池のOCVを取得可能な時期に制約されたり、SOCの変化量に対するOCVの変化量の絶対値が比較的に小さい領域(例えばプラトー領域)を含むSOC-OCV特性を有する蓄電池では、SOCを精度よく推定できなかったりするおそれがある。
 一方、蓄電池のSOCを推定する別の方法として、電流積算法が知られている。電流積算法では、蓄電池に流れる電流の計測結果を積算することにより初期時からの蓄電池の容量の変化量を特定し、初期容量と特定された容量の変化量と、FCC(Full Charge Capacity、満充電容量)とに基づいてSOCを推定する。電流積算法では、OCVとは異なり、OCVを取得可能な時期の制約やプラトー領域の影響を受けることなく、SOCを推定することが可能であるが、蓄電池に流れる電流を計測する電流計測部の計測誤差に起因してSOCを精度よく推定できないおそれがある。これに対して、従来、電流積算法とOCV法とを併用する方法が知られている(例えば、特許文献2参照)。この方法では、OCVを計測できるタイミングごとに、OCV法により推定したSOCに初期容量をリセットすることにより、電流計測部の計測誤差による積算誤差を解消する方法が知られている。
特開2021-81244号公報 特開2020-60581号公報
 電流積算法においてSOCの推定精度に影響を与える要因は、電流計測部の計測誤差だけではなく、蓄電池について想定された状態と実際の状態との誤差(以下、「蓄電池の状態誤差」という)が想定される。蓄電池の状態誤差の発生要因は、例えば、蓄電池の出荷時の固体差や蓄電池の経年変化が挙げられる。例えば、蓄電池の状態誤差が相対的に大きければ、電流積算法に使用されるFCCも大きな誤差を含んでいる可能性があり、電流計測部の計測誤差よりもSOCの推定精度に大きく影響し得る。電流積算法に限らず、電流積算法とOCV法とを併用する上述の方法であっても、精度の低いFCCを用いている限り、電流積算法によって推定されるSOCには、電流計測部の計測誤差に加えて、蓄電池の状態誤差に起因する誤差が継続的に含まれることになる。その結果、電流積算法によってSOCを精度よく推定できない、という課題がある。
 本明細書では、上述した課題を解決することが可能な技術を開示する。
 本明細書に開示される技術は、例えば、以下の形態として実現することが可能である。
(1)本明細書に開示される蓄電池管理装置は、SOCの変化量に対するOCVの変化量の絶対値であるOCV変化率が所定値以下の第1の領域と、前記OCV変化率が前記所定値を超える第2の領域と、を含むSOC-OCV特性を有する蓄電池を管理する蓄電池管理装置であって、前記蓄電池に流れる電流を計測する電流計測部と、前記電流計測部が計測した電流を積算することにより、前記蓄電池の容量を算出するクーロンカウンティング処理部と、基準時のSOCと、前記クーロンカウンティング処理部が算出した前記基準時からの前記蓄電池の容量の変化量と、前記蓄電池のFCCとに基づき、前記蓄電池のSOCを推定するSOC推定部と、前記蓄電池のOCVを取得するOCV取得部と、前記OCV取得部が取得した前記蓄電池のOCVに対応するSOCである補正用SOCが前記第2の領域内にあることを必要条件として含む補正条件が満たされた場合、前記補正用SOCに基づき、前記SOC推定部で用いる前記蓄電池のFCCを補正する補正部と、を備える。
 本蓄電池管理装置では、基準時のSOCと、蓄電池に流れる電流の積算に基づく蓄電池の容量の変化量と、蓄電池のFCCとに基づき、蓄電池のSOCが推定される(以下、「電流積算法に基づくSOC推定」という)。この電流積算法に基づくSOC推定に用いられるFCCは、補正用SOCに基づき補正される。この補正用SOCは、OCV取得部が取得した蓄電池のOCVに対応するSOCであり、かつ、第2の領域(SOCの変化量に対するOCVの変化量の絶対値であるOCV変化率が所定値を超える領域)内にあるSOCである。SOCが第2の領域内にある場合、SOCが第1の領域(上記OCV変化率が所定値以下の領域)内にある場合に比べて、OCVに対応するSOCの取得精度が高い。そして、その相対的に高い精度で取得された補正用SOCは、積算誤差がない分だけ、電流積算法に基づき推定されるSOCに比べて、蓄電池の実際の状態(蓄電池の固体差や経年変化など)を顕著に反映する。このため、この補正用SOCを用いて、電流積算法に基づくSOC推定に用いられるFCCを精度よく補正することができる。これにより、本蓄電池管理装置によれば、FCCが補正されるので、電流積算法に基づくSOC推定を精度よく行うことができる。
(2)上記蓄電池管理装置において、前記補正部は、前記基準時のSOCと前記補正用SOCとの差と前記基準時からの前記蓄電池の容量の変化量とに応じて、前記SOC推定部で用いる前記蓄電池のFCCを補正する構成としてもよい。本蓄電池管理装置によれば、蓄電池の実際の状態変化に相関する、基準時のSOCと補正用SOCとの差に基づきFCCが補正されるため、電流積算法に基づくSOC推定を、より精度よく行うことができる。
(3)上記蓄電池管理装置において、前記補正用SOCが前記第1の領域内にあり、かつ、前記SOC推定部による推定SOCが、前記補正用SOCのある前記第1の領域外にある場合、前記補正用SOCのある前記第1の領域における前記推定SOC側のSOCである仮補正用SOCに基づき、前記蓄電池のFCCを仮補正する仮補正部をさらに備える構成としてもよい。本蓄電池管理装置によれば、補正用SOCが第2の領域内にない場合でも、仮補正によって、電流積算法に基づくSOC推定を精度よく行うことができる。
(4)上記蓄電池管理装置において、前記補正条件が満たされるごとに、前記補正部における前記蓄電池のFCCの補正の履歴を記録する履歴部をさらに備え、前記補正条件は、前記履歴部に記録された直近の所定回数(2回以上)分のFCCの補正量の平均値が閾値以上であることを必要条件としてさらに含む構成としてもよい。本蓄電池管理装置によれば、例えば電流計測部のノイズや測定誤差等によりFCCの補正の精度が低下することを抑制することができる。
(5)上記蓄電池管理装置において、前記補正用SOCが前記第1の領域内にあり、かつ、前記SOC推定部による推定SOCが、前記補正用SOCのある前記第1の領域外にある場合、前記補正用SOCのある前記第1の領域における前記推定SOC側のSOCである仮補正用SOCに基づき、基準時のSOCを仮補正する仮補正部をさらに備え、前記補正条件は、前記所定回数に相当する期間において前記仮補正が実行されないことを必要条件としてさらに含む構成としてもよい。本蓄電池管理装置によれば、例えば仮補正の実行による誤差が、FCCの補正の要否判断に悪影響を及ぼすことを抑制することができる。
(6)上記蓄電池管理装置において、前記蓄電池が有するSOC-OCV特性は、複数の前記第2の領域を含んでおり、前記補正条件は、前記基準時のSOCが、前記補正用SOCとは異なる前記第2の領域内にあることを必要条件としてさらに含む構成としてもよい。本蓄電池管理装置によれば、例えば基準時のSOCと補正用SOCとが同じ第2の領域内にあり、蓄電池の電荷移動量が極めて少なく、FCCの補正を要しない場合でもFCCの補正が実行される負担を軽減することができる。
(7)上記蓄電池管理装置において、前記補正条件は、前記基準時のSOCと前記補正用SOCとの差が下限値以上であることを必要条件としてさらに含む構成としてもよい。本蓄電池管理装置によれば、例えば基準時のSOCと補正用SOCとの差(蓄電池における電荷移動量)が極めて少なく、FCCの補正を要しない場合でもFCCの補正が実行される負担を軽減することができる。
(8)上記蓄電池管理装置において、前記蓄電池の温度を計測する温度計測部をさらに備え、前記補正条件は、前記温度計測部が計測した温度が所定の温度範囲内であることを必要条件としてさらに含む構成としてもよい。本蓄電池管理装置によれば、蓄電池の温度が所定の温度範囲外であることに起因してFCCの補正精度が低下することを抑制することができる。
(9)上記蓄電池管理装置において、前記補正条件が満たされた場合、前記基準時のSOCを、前記補正用SOCに更新するSOC更新部をさらに備える構成としてもよい。本蓄電池管理装置によれば、例えば電流計測部による電流の積算誤差に起因する蓄電池のSOCの推定精度の低下を抑制することができる。
(10)本明細書に開示される蓄電池の管理方法は、SOCの変化量に対するOCVの変化量の絶対値であるOCV変化率が所定値以下の第1の領域と、前記OCV変化率が前記所定値を超える第2の領域と、を含むSOC-OCV特性を有する蓄電池の管理方法であって、前記蓄電池に流れる電流を計測する工程と、計測した電流を積算することにより、前記蓄電池の容量を算出する工程と、基準時のSOCと、算出した前記基準時からの前記蓄電池の容量の変化量と、前記蓄電池のFCCとに基づき、前記蓄電池のSOCを推定する工程と、前記蓄電池のOCVを取得する工程と、取得した前記蓄電池のOCVに対応するSOCである補正用SOCが前記第2の領域内にあることを必要条件として含む補正条件が満たされた場合、前記補正用SOCに基づき、前記蓄電池のSOCを推定する工程で用いる前記蓄電池のFCCを補正する工程と、を含む。本蓄電池の管理方法によれば、FCCが補正されるので、電流積算法に基づくSOC推定を精度よく行うことができる。
 なお、本明細書に開示される技術は、種々の形態で実現することが可能であり、例えば、蓄電池管理装置、蓄電池管理装置と蓄電池とを備える電池装置、それらの管理方法、それらの方法を実現するコンピュータプログラム、そのコンピュータプログラムを記録した一時的でない記録媒体等の形態で実現することができる。
実施形態における電池装置100の構成を概略的に示す説明図 蓄電池12のSOC-OCV特性を概略的に示す説明図 SOC-OCVテーブルT1の一例を示す説明図 領域区分-OCVテーブルT2の一例を示す説明図 OCV取得処理を示すフローチャート 補正処理を示すフローチャート 蓄電池12のSOC-OCV特性を概略的に示す説明図 変形例における補正処理を示すフローチャート
A.実施形態:
A-1.電池装置100の構成:
 図1は、本実施形態における電池装置100の構成を概略的に示す説明図である。電池装置100は、組電池10と、蓄電池管理装置20とを備える。
 組電池10は、複数の蓄電池12が直列に接続された構成を有している。本実施形態では、組電池10は、4つの蓄電池12から構成されている。組電池10は、プラス端子42およびマイナス端子44を介して、図示しない負荷および外部電源に接続される。
 組電池10を構成する各蓄電池12は、プラトー領域PRを含むSOC(State of Charge、充電率)-OCV(Open Circuit Voltage、開回路電圧)特性を有する蓄電池である。図2は、蓄電池12のSOC-OCV特性を概略的に示す説明図である。プラトー領域PRとは、SOC-OCV特性を表す曲線がほぼ平坦となる領域であり、より詳細には、OCV変化率(SOCの変化量に対するOCVの変化量の絶対値)が2mV/%以下の領域である。プラトー領域PRを含むSOC-OCV特性を有する蓄電池12としては、例えばリン酸鉄系のリチウムイオン電池やチタン酸系のリチウムイオン電池が挙げられる。また、蓄電池12のSOC-OCV特性は、さらに変化領域CRを有している。変化領域CRは、OCV変化率が2mV/%を超える領域(非プラトー領域)である。図2に示すように、蓄電池12のSOC-OCV特性は、3つのプラトー領域PR(第1のプラトー領域PR1、第2のプラトー領域PR2、第3のプラトー領域PR3)と4つの変化領域CR(第1の変化領域CR1、第2の変化領域CR2、第3の変化領域CR3、第4の変化領域CR4)とが交互に並んでいる。なお、プラトー領域PRは、特許請求の範囲における第1の領域の一例であり、変化領域CRは、特許請求の範囲における第2の領域の一例であり、2mV/%は、特許請求の範囲における所定値の一例である。
 蓄電池管理装置20は、組電池10を含む電池装置100を管理するための装置である。蓄電池管理装置20は、電圧計22と、電流計24と、温度計26と、監視部28と、ラインスイッチ40と、制御部60と、記録部72と、履歴部74と、インターフェース(I/F)部76とを備えている。
 電圧計22は、各蓄電池12に対して1つ設けられている。各電圧計22は、各蓄電池12に対して並列に接続され、各蓄電池12の電圧を計測して、電圧計測値を示す信号を監視部28に向けて出力する。電流計24は、組電池10に対して直列に接続されている。電流計24は、組電池10に流れる電流を計測して、電流計測値を示す信号を監視部28に向けて出力する。温度計26は、組電池10の近くに配置されている。温度計26は、組電池10(各蓄電池12)の温度を計測して、温度計測値を示す信号を監視部28に向けて出力する。監視部28は、電圧計22、電流計24および温度計26から受け取った信号に基づき、各蓄電池12の電圧、組電池10に流れる電流および組電池10(各蓄電池12)の温度を示す信号を制御部60に向けて出力する。電圧計22および監視部28は、電圧計測部の一例であり、電流計24および監視部28は、電流計測部の一例であり、温度計26および監視部28は、電池温度計測部の一例である。
 ラインスイッチ40は、組電池10とマイナス端子44との間に設置されている。ラインスイッチ40は、制御部60によってオン・オフ制御されることにより、組電池10と負荷および外部電源との間の接続を開閉する。
 制御部60は、例えば、CPU、マルチコアCPU、プログラマブルなデバイス(Field Programmable Gate Array(FPGA)、Programmable Logic Device(PLD)等)を用いて構成され、蓄電池管理装置20の動作を制御する。制御部60は、OCV取得部62、クーロンカウンティング処理部64と、SOC推定部66と、補正部68、SOC更新部70、仮補正部71としての機能を有する。これら各部の機能については、後述のSOC推定処理の説明に合わせて説明する。
 記録部72は、例えばROMやRAM、ハードディスクドライブ(HDD)等により構成され、各種のプログラムやデータを記憶したり、各種の処理を実行する際の作業領域やデータの記憶領域として利用されたりする。例えば、記録部72には、後述のSOC推定処理を実行するためのコンピュータプログラムが格納されている。該コンピュータプログラムは、例えば、CD-ROMやDVD-ROM、USBメモリ等のコンピュータ読み取り可能な記録媒体(不図示)に格納された状態で提供され、電池装置100にインストールすることにより記録部72に格納される。
 また、記録部72には、SOC-OCVテーブルT1と、領域区分-OCVテーブルT2とが格納されている。SOC-OCVテーブルT1は、各蓄電池12のOCV法に基づくSOC推定に用いられるテーブルである。図3は、SOC-OCVテーブルT1の一例を示す説明図である。SOC-OCVテーブルT1は、OCVと、電池温度と、SOCとを関連付けるテーブルである。SOC-OCVテーブルT1に規定される関係は、予め実験的に定められる。図3に示すように、SOC-OCV特性は、電池温度の変化に応じて変動する。SOC-OCVテーブルT1を参照することにより、各蓄電池12のOCVおよび電池温度に基づき、蓄電池12のSOCを推定することができる。なお、図3では、OCVを、Va0,Va1,・・・などと表示しているが、SOC-OCVテーブルT1には、実際にはOCVの数値が規定されている。また、図3では、蓄電池12の放電時に用いられる放電用SOC-OCVテーブルと、蓄電池12の充電時に用いられる充電用SOC-OCVテーブルとが示されている。
 また、記録部72に記録された領域区分-OCVテーブルT2(図1)は、推定されたSOCがSOC-OCV特性におけるどの領域(プラトー領域PR、変化領域CR)にあるか(どの領域に属するか)を判断する際に用いられるテーブルである。図4は、領域区分-OCVテーブルT2の一例を示す説明図である。本実施形態では、領域区分-OCVテーブルT2に、OCVと、SOC-OCV特性における各領域区分と、電池温度との関係が規定されている。上述したように、SOC-OCV特性は電池温度の変化に応じて変動するため、そのSOC-OCV特性の変動に伴って、SOC-OCV特性における各領域区分が変動する。なお、図4では、OCVを、Vo0,Vo1,・・・などと表示しているが、領域区分-OCVテーブルT2には、実際にはOCVの数値が規定されている。
 履歴部74は、例えばROMやRAM、ハードディスクドライブ(HDD)等により構成され、電池装置100に関する各種履歴を記録する。このような履歴としては、例えば、蓄電池12のOCVや、後述のFCC補正処理や仮補正処理の補正内容等の履歴が挙げられる。インターフェース部76等は、有線または無線により他の装置との通信を行う。例えば、インターフェース部76を介した他の装置との通信により、履歴部74に記録された履歴が更新される。
A-2.SOC推定処理:
 次に、本実施形態の電池装置100において蓄電池管理装置20により実行されるSOC推定処理について説明する。本実施形態では、SOC推定処理は、主として、電流積算法に基づくSOC推定を行いつつ、OCV法により取得された補正用SOCが変化領域CRにある場合、その補正用SOCに基づき、電流積算法に基づくSOC推定に用いるFCC(Full Charge Capacity、満充電容量)を補正する処理である。本実施形態では、SOC推定処理は、組電池10を構成する各蓄電池12を対象としてSOCを個別に推定するものとする。以下の説明では、1つの蓄電池12を取り上げて説明する。SOC推定処理は、例えば、蓄電池管理装置20が起動された場合に、自動的に、または、管理者からの指示に応じて開始される。
A-2-1.積算SOC(t)の推定処理:
 本実施形態の電池装置100において、電流積算法に基づくSOC(以下、「積算SOC(t)」という)を推定する処理が実行される。具体的には、蓄電池管理装置20のクーロンカウンティング処理部64(図1)が、電流計24および監視部28により計測される電流を積算することにより、各蓄電池12の容量を算出している。次に、蓄電池管理装置20のSOC推定部66が、基準時のSOC(0)と、クーロンカウンティング処理部64が算出した基準時からの蓄電池12の容量の変化量Q(t)(電荷移動量)と、蓄電池12のFCCとに基づき、蓄電池の積算SOC(t)を推定する。積算SOC(t)は、次の式(1)で示すことができる。
 積算SOC(t)=基準時のSOC(0)+[Q(t)/FCC]・・・(1)
 SOC推定処理の開始当初では、基準時は、電池装置100の出荷時であり、その後は、基準時は、後述する補正処理における基準SOC更新処理の実行時である。なお、積算SOC(t)の推定処理は、SOC推定処理中に継続的に実行される。
A-2-2.OCV取得処理:
 図5は、本実施形態の電池装置100において実行されるOCV取得処理を示すフローチャートである。制御部60は、蓄電池12への充電または放電の電流が所定の閾値を下回るか、ラインスイッチ40がクローズ状態からオープン状態へ移行した場合、蓄電池12が停止状態であると判断し、蓄電池管理装置20のOCV取得部62(図1)が、蓄電池12のOCV取得処理(図5)を実行する。具体的には、OCV取得部62は、OCV取得タイミングが到来したか否かを判断し、OCV取得タイミングが到来したと判断した場合に、OCV取得処理を実行する(S110~S140)。本実施形態では、蓄電池12のOCV取得タイミングは、蓄電池12のOCVを取得可能な程度に蓄電池12の分極が解消して電池電圧が安定した状態になっているタイミングである。
 図5に示すように、制御部60のOCV取得部62(図1)は、再度、ラインスイッチ40がクローズ状態であるか否かを判断する(S110)。ラインスイッチ40がクローズ状態であることは、蓄電池12(組電池10)が負荷に電気的に接続されていることを意味し、ラインスイッチ40がオープン状態であることは、蓄電池12が、負荷(図示しない)に電気的に接続されていない無負荷状態であることを意味する。
 OCV取得部62は、ラインスイッチ40がクローズ状態であると判断すると(S110:YES)、蓄電池12に電流が流れていない停止状態が所定時間以上継続したか否かを判断する(S120)。制御部60は、常時、監視部28から入力される信号に基づき、蓄電池12に流れる電流の有無を判断し、その判断結果を経過時間に関連づけた履歴として残しており、OCV取得部62は、この履歴に基づき、蓄電池12の停止状態が所定時間以上継続したか否かを判断できる。なお、OCV取得部62は、蓄電池12に流れる電流が基準電流値(電流が概ねゼロとみなせる値)以下であれば、蓄電池12の電流状態は停止状態であると判断する。蓄電池12の電流の計測は、SOC推定処理中、継続的に実行される。
 OCV取得部62は、蓄電池12の停止状態が所定時間以上継続していないと判断した場合(S120:NO)、S110に戻る。一方、OCV取得部62は、蓄電池12の停止状態が所定時間以上継続したと判断した場合(S120:YES)、監視部28から入力される信号に基づき、該所定時間内における蓄電池12の電池電圧の変化率が所定の基準率(蓄電池12の電池電圧が概ね安定しているとみなせる値)未満であるか否かを判断する(S130)。なお、蓄電池12の電圧の計測は、SOC推定処理中、継続的に実行される。
 OCV取得部62は、所定時間内における蓄電池12の電池電圧の変化率が基準率以上であると判断した場合(S130:NO)、S110に戻る。一方、OCV取得部62は、所定時間内における蓄電池12の電池電圧の変化率が基準率未満であると判断した場合(S130:YES)、計測された蓄電池12の電池電圧を、蓄電池12のOCVとして履歴部74に記録し(S140)、補正処理に進む(S150)。
A-2-3.補正処理:
 図6は、補正処理を示すフローチャートである。補正処理は、積算SOC(t)の推定処理に用いる基準時のSOC(0)を更新するとともに、蓄電池12の積算SOC(t)およびFCCを補正する処理である。
(補正用SOCの推定処理):
 本実施形態では、まず、OCV取得処理で取得された蓄電池12のOCVに対応するSOC(以下、「補正用SOC」という)を推定する。具体的には、蓄電池12の停止状態に移行する直前の電流状態が、充電状態であるか、放電状態であるかを判断する(S210)。例えば、電流計24から出力される信号は、蓄電池12に流れる電流の有無および流れる向きに応じた信号(当該電流計24に備えられた検出抵抗(図示しない)の両端電圧の高低に応じた信号)であり、制御部60は、電流計24から出力される信号のレベルと、その信号のレベル反転とに基づき、蓄電池12の電流状態(充電状態、放電状態、停止状態)を判断する。制御部60は、蓄電池12の停止状態に移行する直前の電流状態が充電状態であると判断した場合、上記記録部72に記録された充電用SOC-OCVテーブルを参照して、OCV処理で取得したOCVに対応するSOCを補正用SOCとして推定する(S220)。また、制御部60は、蓄電池12の停止状態に移行する直前の電流状態が放電状態であると判断した場合、上記記録部72に記録された放電用SOC-OCVテーブルを参照して、OCV処理で取得したOCVに対応するSOCを補正用SOCとして推定する(S230)。
(各SOCが属する領域判断処理):
 蓄電池管理装置20の制御部60は、現時点(OCV取得時)の積算SOC(t)と、補正用SOCと、領域区分-OCVテーブルT2とに基づき、積算SOC(t)と補正用SOCとがそれぞれ、蓄電池12のSOC-OCV特性におけるどの領域(プラトー領域PR、変化領域CR)に属するかを判断する。次に説明するように、本実施形態では、積算SOC(t)と補正用SOCとがそれぞれ属する領域の組み合わせに応じて、補正処理の有無や補正内容の異なる処理が実行される。
(積算SOC更新処理):
 積算SOC更新処理は、積算SOC(t)を補正用SOCに更新(リセット)する処理である。積算SOC(t)と補正用SOCとがいずれも変化領域CR内にあると判断された場合(S240:YES、かつ、S250:YES)、蓄電池管理装置20のSOC更新部70(図1)は、積算SOC更新処理を行う(S270)。また、積算SOC(t)がプラトー領域PR内にあり、かつ、補正用SOCが変化領域CR内にあると判断した場合も(S240:NO、かつ、S260:YES)、SOC更新部70は、SOC(t)更新処理を行う(S270)。要するに、SOC更新部70は、補正用SOCが変化領域CR内にあること(以下、「第1の条件」という)が満たされた場合に、積算SOC更新処理を行う。補正用SOCが変化領域CR内にある場合、補正用SOCがプラトー領域PRにある場合に比べて、補正用SOCの推定処理(S220,S230)の推定精度が高い。このため、上記第1の条件を満たした場合に推定された補正用SOCを用いて積算SOC更新処理を行うことにより、SOCの推定精度を向上させることができる。
(FCC補正処理):
 FCC補正処理は、上記補正用SOCに基づき、積算SOC(t)の推定処理に用いられる蓄電池12のFCCを補正する処理である。本実施形態では、FCC補正処理は、次の補正条件が満たされた場合に実行される。補正条件には、必要条件として、上記第1の条件に加えて、次の条件が含まれる。
 第2の条件:基準時のSOC(0)が属する変化領域CRと、補正用SOCが属する変化領域CRとが互いに異なること。制御部60は、上記領域判断処理の判断結果に基づき、第2の条件が満たされたか否かを判断することができる。
 第3の条件:前回のFCC補正処理(S310)の実行時以降に、後述の仮基準SOC更新処理(S340)が実行されていないこと。仮基準SOC更新処理が実行されると、仮基準SOC更新処理の実行情報(仮補正用SOC等)が実行時刻に関連付けられて履歴情報として履歴部74に記録される。制御部60は、履歴部74に記憶された履歴情報に基づき、第3の条件が満たされたか否かを判断することができる。
 第4の条件:履歴部74に記録された直近の所定回数(2回以上)分のFCC補正量(例えば図2の差ΔSOC1)の平均値(移動平均値)が閾値以上であること。FCC補正量は、各回の補正処理において、所定の条件(本実施形態では第1から第3の条件)が満たされた場合に、履歴部74に記録される。制御部60は、履歴部74に記憶された上記履歴情報に基づき、第4の条件が満たされたか否かを判断することができる。
 具体的には、上記第2の条件と第3の条件との両方が満たされたと判断された場合(S280:YES)、制御部60は、FCC補正量を算出して履歴部74に今回のOCV取得処理の実行時刻に対応づけて履歴情報として履歴部74に記録する(S290)。FCC補正量は、補正用SOCに基づく補正後のFCCと、補正前のFCCとの差である。補正後のFCCは、次の式(2)によって算出できる。
 補正後のFCC=Q(t)/(補正用SOC-基準時のSOC(0))・・・(2)
 そして、制御部60は、補正後のFCCと補正前のFCCとの差から、FCC補正量(=補正後のFCC-補正前のFCC)を算出する。なお、上記第2の条件と第3の条件との少なくとも一方が満たされないと判断された場合(S280:NO)、FCC補正量の算出および記録(S290)、FCC補正処理(S310)は実行されず、S320に進む。
 次に、第4の条件が満たされたと判断された場合(S300:YES)、補正部68は、上記FCC補正処理を実行する(S310)。具体的には、補正部68は、積算SOC(t)の推定処理に用いられる蓄電池12のFCCを、補正後のFCCに補正し、S320に進む。なお、第4の条件が満たされないと判断された場合(S300:NO)、FCC補正処理は実行されず、S320に進む。
(基準SOC更新処理):
 S320では、SOC更新部70は、基準SOC更新処理を実行する。基準SOC更新処理は、積算SOC(t)の推定処理で用いられる式(1)における基準時のSOC(0)を、補正用SOCに更新(リセット)する処理である。補正用SOCが変化領域CR内にある場合、補正用SOCがプラトー領域PRにある場合に比べて、補正用SOCの推定処理(S220,S230)の推定精度が高い。このため、上記第1の条件を満たした場合に基準SOC更新処理を行うことにより、これ以降における積算SOC(t)の推定処理の精度を向上させることができる。また、積算SOC(t)と補正用SOCとがいずれもプラトー領域PR内にあると判断された場合(S240:NO、かつ、S260:NO)、FCC補正処理および基準SOC更新処理は実行されない。
 なお、制御部60は、補正後のFCCに基づき、蓄電池12のSOH(State of Health、健全度)を推定し、インターフェース部76を介して外部に通知してもよい。制御部60は、予め記録部72に記録された新品の蓄電池12のFCCと、補正後のFCCとに基づき、蓄電池12のSOHを推定する。
(仮補正処理):
 仮補正処理は、補正用SOCがプラトー領域PR内にある場合に、積算SOC(t)を仮補正用SOCに更新(リセット)するとともに、積算SOC(t)の推定処理で用いられる式(1)における基準時のSOC(0)を、仮補正用SOCに更新(リセット)する処理である。本実施形態では、積算SOC(t)が変化領域CR内にあり、かつ、補正用SOCがプラトー領域PR内にあると判断された場合(S240:YES、かつ、S250:NO)、蓄電池管理装置20の仮補正部71(図1)は、仮積算SOC更新処理を実行する(S330)。仮積算SOC更新処理では、仮補正部71は、補正用SOCのあるプラトー領域PRのうち、積算SOC(t)に最も近いSOCを、仮補正用SOCとして決定し、積算SOC(t)を仮補正用SOCに更新する。このように、仮補正用SOCを用いて積算SOC更新処理を行うことにより、SOCの推定精度を向上させることができる。
 次に、仮補正部71は、仮基準SOC更新処理を実行する(S340)。仮基準SOC更新処理では、仮補正部71は、基準時のSOC(0)を仮補正用SOCに更新する。仮基準SOC更新処理を行うことにより、これ以降における積算SOC(t)の推定処理の精度を向上させることができる。
A-3.実施形態の効果:
 以上説明したように、本実施形態の蓄電池管理装置20は、プラトー領域PRを含むSOC-OCV特性を有する複数の蓄電池12が直列に接続された組電池10を管理するための装置である。蓄電池管理装置20は、電流計24と、温度計26と、監視部28と、OCV取得部62、クーロンカウンティング処理部64と、SOC推定部66と、補正部68、SOC更新部70、仮補正部71と、制御部60とを備える。電圧計22および監視部28は、蓄電池12の電圧を計測する。電流計24および監視部28は、組電池10に流れる電流を計測する。クーロンカウンティング処理部64は、電流計24および監視部28が計測した電流と、上記定電流制御中の電流と、を積算することにより、蓄電池12の容量を算出する。
 SOC推定部66は、基準時のSOC(0)と、クーロンカウンティング処理部64が算出した基準時からの蓄電池12の容量の変化量Q(t)と、蓄電池12のFCCとに基づき、蓄電池12のSOCを推定する。OCV取得部62は、蓄電池12のOCVを取得する。補正部68は、OCV取得部62が取得した蓄電池12のOCVに対応するSOCである補正用SOCが変化領域CR内にあること(第1の条件 図6のS250:YESまたはS260:YES)を必要条件として含む補正条件が満たされた場合、前記補正用SOCに基づき、SOC推定部66による推定SOCとSOC推定部66で用いる蓄電池12のFCCを補正する(S310)。
 補正用SOCは、OCV取得部62が取得した蓄電池12のOCVに対応するSOCであり、かつ、変化領域CR内にあるSOCである。SOCが変化領域CR内にある場合、プラトー領域PR内にある場合に比べて、OCVに対応するSOCの取得精度が高い。そして、その相対的に高い精度で取得された補正用SOCは、積算誤差がない分だけ、電流積算法に基づき推定される積算SOC(t)に比べて、蓄電池12の状態誤差(蓄電池12の出荷時や製造段階での固体差や経年変化など)を顕著に反映する。このため、この補正用SOCを用いて、積算SOC(t)の推定処理に用いられるFCCを精度よく補正することができる。これにより、本実施形態によれば、FCCが補正されない構成に比べて、積算SOC(t)の推定処理を精度よく行うことができる。
 本実施形態では、蓄電池12の状態誤差に相関する、基準時のSOC(0)と補正用SOCとの差に基づきFCCが補正されるため(S310)、積算SOC(t)の推定処理を、より精度よく行うことができる。
 本実施形態では、補正用SOCが変化領域CR内にない場合でも、仮補正処理(S330,S340)が行われる。これにより、本実施形態によれば、仮補正処理を行わない構成に比べて、積算SOC(t)の推定処理を精度よく行うことができる。
 本実施形態では、直近の所定回数(2回以上)分のFCC補正処理におけるFCC補正量の平均値が閾値以上であること(第4の条件)が必要条件として(S300:YES)、FCC補正処理が実行される。これにより、本実施形態によれば、例えば電流計24のノイズや測定誤差等によりFCCの補正の精度が低下することを抑制することができる。
 本実施形態では、基準時のSOC(0)が属する変化領域CRと、補正用SOCが属する変化領域CRとが互いに異なること(第2の条件)が必要条件として(S280:YES)、FCC補正処理が実行される。これにより、本実施形態によれば、例えば基準時のSOC(0)と補正用SOCとが同じ変化領域CR内にあり、蓄電池12の電荷移動量が極めて少なく、FCCの補正を要しない場合でもFCCの補正が実行される負担を軽減することができる。
 本実施形態では、前回のFCC補正処理の実行時以降に、後述の仮補正処理が実行されていないこと(第3の条件)が必要条件として(S280:YES)、FCC補正処理が実行される。これにより、本実施形態によれば、例えば仮補正の実行による誤差が、FCCの補正の要否判断に悪影響を及ぼすことを抑制することができる。
 例えば、図2に示す例では、積算SOC(t)と補正用SOCとのいずれも第3の変化領域CR3内にあるため(図6のS240:YES、かつ、S250:YES)、積算SOC更新処理(S270)および基準SOC更新処理(S320)が実行され、積算SOC(t)および基準時のSOC(0)が、補正用SOCに更新される。また、積算SOC(t)と補正用SOCとには、蓄電池12の状態誤差等の影響による差ΔSOC1が存在する。本実施形態では、基準時のSOC(0)と補正用SOCとが別の変化領域CR2,CR3にあるため(S280:YES)、FCC補正処理は実行される。なお、基準時のSOC(0)と補正用SOCとが同じ変化領域にある場合(S280:NO)でも、基準時のSOC(0)と補正用SOCとの差が下限値以上である場合には、FCC補正処理を実行するとしてもよい。
 図7は、蓄電池12のSOC-OCV特性を概略的に示す説明図である。図7に示す例では、積算SOC(t)は第3の変化領域CR3内にあるが、補正用SOCは、第3のプラトー領域PR3内にあるため(図6のS240:YES、かつ、S250:NO)、FCC補正処理は実行されず、代わりに、仮積算SOC更新処理(S330)および仮基準SOC更新処理(S340)が実行される。仮積算SOC更新処理および仮基準SOC更新処理では、第3のプラトー領域PR3のうち、積算SOC(t)に最も近いSOCの値S2が、仮補正用SOCとして決定され、この仮補正用SOCに基づき、積算SOC(t)と、積算SOC(t)の推定処理に用いられる蓄電池12の基準時のSOC(0)とが仮補正される。このため、仮基準SOC更新処理を行わない場合に比べて、積算SOC(t)の推定処理を精度よく行うことができる。但し、積算SOC(t)とSOCの値S2との差ΔSOC2は、蓄電池12の状態誤差を正確に反映したものとは限らないため、FCC補正処理に比べて、FCCの補正精度が低いおそれがある。このため、上述したように、第3の条件が満たされない場合(S280:NO)、FCC補正量の算出および記録(S290)、FCC補正処理(S310)が実行されないようになっている。
B.変形例:
 本明細書で開示される技術は、上述の実施形態に限られるものではなく、その要旨を逸脱しない範囲において種々の形態に変形することができ、例えば次のような変形も可能である。
 上記実施形態における電池装置100の構成は、あくまで一例であり、種々変形可能である。例えば、上記各実施形態において、組電池10を構成する蓄電池12の個数は任意に変更可能である。また、上記実施形態において、温度計26が、各蓄電池12について設けられてもよい。なお、温度計26は省略されてもよい。
 上記実施形態では、蓄電池として、リン酸鉄系のリチウムイオン電池を例示したが、OCV率が所定値以下の第1の領域と、OCV変化率が所定値を超える第2の領域と、を含むSOC-OCV特性を有する蓄電池であれば、他の二次電池でも一次電池でもよい。また、所定値は、2mV/%に限らず、任意に設定することができる。また、第1の領域と第2の領域との数は任意に変更可能である。
 また、上記実施形態において、SOC-OCVテーブルT1や領域区分-OCVテーブルT2の内容は、あくまで一例であり、種々変形可能である。また、必ずしも記録部72にSOC-OCVテーブルT1および/または領域区分-OCVテーブルT2が記録されている必要はない。また、上記各実施形態において、制御部60が有する各機能部の少なくとも1つが省略されてもよい。
 上記実施形態におけるSOC推定処理の内容は、あくまで一例であり、種々変形可能である。例えば、上記実施形態では、SOC推定処理は、組電池10を構成する各蓄電池12を対象としてSOCを個別に推定するものとしたが、組電池10全体を対象としてSOCを推定するものでもよい。上記実施形態のOCV取得処理では、蓄電池12の電池電圧が安定した状態の電池電圧をOCVとして取得する方法が採用されたが(図5のS110~S130)、例えば蓄電池12の内部抵抗や電池電圧等の変化に基づきOCVを推定する方法など、公知の方法が採用されてもよい。
 上記実施形態におけるSOC推定処理において、基準SOC更新処理(S320)が実行されなくてもよい。そのような構成であっても、FCC補正処理が実行されることにより、積算SOC(t)の推定処理の精度を向上させることができる。FCC補正処理を実行するための補正条件は、上記第2の条件から第4の条件の少なくとも1つを含まないとしてもよい。また、補正条件は、例えば、上記所定回数に相当する期間において仮補正が実行されないことを必要条件としてさらに含んでもよい。これにより、例えば仮補正の実行による誤差が、FCCの補正の要否判断に悪影響を及ぼすことを抑制することができる。また、補正条件は、基準時のSOC(0)と補正用SOCとの差が下限値以上であることを必要条件としてさらに含んでもよい。これにより、例えば基準時のSOC(0)と補正用SOCとの差(蓄電池12における電荷移動量)が極めて少なく、FCCの補正を要しない場合でもFCCの補正が実行される負担を軽減することができる。さらに、補正条件は、温度計26が計測した温度が所定の温度範囲内であることを必要条件としてさらに含んでもよい。これにより、蓄電池12の温度が所定の温度範囲外であることに起因してFCCの補正精度が低下することを抑制することができる。
 上記実施形態のFCC補正処理(S310)では、基準時のSOC(0)と補正用SOCとの差に応じてFCCを補正する例として、電流積算法による積算SOC(t)を、OCV法による補正用SOCに置き換えてFCC算出式(2)に代入してFCCを補正する構成を挙げたが、例えば、電流積算法による積算SOC(t)(例えば30%)よりも、補正用SOC(例えば20%)に近いSOC(例えば27%)に置き換えてFCC算出式に代入してFCCを補正してもよい。また、FCC処理では、電流積算法による積算SOC(t)と補正用SOCとの差に応じてFCCを補正してもよい。
 上記実施形態の仮補正処理(S320)では、補正用SOCのあるプラトー領域PRのうち、積算SOC(t)に最も近いSOC(該プラトー領域PRと変化領域CRとの境界のSOC)が、仮補正用SOCとして決定されたが、積算SOC(t)側のSOCであれば、例えば該境界のSOCから若干外れたSOCが、仮補正用SOCとして決定されてもよい。
 上記実施形態では、FCC補正量の履歴が履歴部74に記録されたが(S290)、補正の履歴(例えばFCCの補正量に相関する情報の履歴)であればよく、例えばFCCの値の履歴が履歴部74に記録されてもよい。
 図8は、変形例における補正処理を示すフローチャートである。図8に示すように、本変形例では、上記第2の条件が満たされたと判断された場合(S360:YES)、図6に示すFCC補正量の算出および記録(S290)、第4の条件の判断処理(S300)は実行されず、FCC補正処理(S310)が実行される。また、仮積算SOC更新処理(S330)の実行後、仮補正部71は、FCC仮補正処理を実行する(S350)。FCC仮補正処理は、積算SOC(t)の推定処理に用いられる蓄電池12のFCCを仮補正する処理である。FCC仮補正処理では、積算SOC(t)の推定処理に用いられる蓄電池12のFCCが、仮補正後のFCCに補正される。FCC仮補正処理が終了すると、仮基準SOC更新処理を実行する(S340)。これにより、補正用SOCが変化領域CRにない場合でも、FCC仮補正処理によって、電流積算法に基づくSOC推定を精度よく行うことができる。
10:組電池 12:蓄電池 20:蓄電池管理装置 22:電圧計 24:電流計 26:温度計 28:監視部 40:ラインスイッチ 42:プラス端子 44:マイナス端子 60:制御部 62:OCV取得部 64:クーロンカウンティング処理部 66:SOC推定部 68:補正部 70:SOC更新部 71:仮補正部 72:記録部 74:履歴部 76:インターフェース部 100:電池装置 CR:変化領域 PR:プラトー領域

Claims (10)

  1.  SOCの変化量に対するOCVの変化量の絶対値であるOCV変化率が所定値以下の第1の領域と、前記OCV変化率が前記所定値を超える第2の領域と、を含むSOC-OCV特性を有する蓄電池を管理する蓄電池管理装置であって、
     前記蓄電池に流れる電流を計測する電流計測部と、
     前記電流計測部が計測した電流を積算することにより、前記蓄電池の容量を算出するクーロンカウンティング処理部と、
     基準時のSOCと、前記クーロンカウンティング処理部が算出した前記基準時からの前記蓄電池の容量の変化量と、前記蓄電池のFCCとに基づき、前記蓄電池のSOCを推定するSOC推定部と、
     前記蓄電池のOCVを取得するOCV取得部と、
     前記OCV取得部が取得した前記蓄電池のOCVに対応するSOCである補正用SOCが前記第2の領域内にあることを必要条件として含む補正条件が満たされた場合、前記補正用SOCに基づき、前記SOC推定部で用いる前記蓄電池のFCCを補正する補正部と、
    を備える、蓄電池管理装置。
  2.  請求項1に記載の蓄電池管理装置であって、
     前記補正部は、前記基準時のSOCと前記補正用SOCとの差と前記基準時からの前記蓄電池の容量の変化量とに応じて、前記SOC推定部で用いる前記蓄電池のFCCを補正する、蓄電池管理装置。
  3.  請求項1または請求項2に記載の蓄電池管理装置であって、
     前記補正用SOCが前記第1の領域内にあり、かつ、前記SOC推定部による推定SOCが、前記補正用SOCのある前記第1の領域外にある場合、前記補正用SOCのある前記第1の領域における前記推定SOC側のSOCである仮補正用SOCに基づき、前記蓄電池のFCCを仮補正する仮補正部をさらに備える、蓄電池管理装置。
  4.  請求項1から請求項3までのいずれか一項に記載の蓄電池管理装置であって、
     前記補正条件が満たされるごとに、前記補正部における前記蓄電池のFCCの補正の履歴を記録する履歴部をさらに備え、
     前記補正条件は、前記履歴部に記録された直近の所定回数(2回以上)分のFCCの補正量の平均値が閾値以上であることを必要条件としてさらに含む、蓄電池管理装置。
  5.  請求項4に記載の蓄電池管理装置であって、
     前記補正用SOCが前記第1の領域内にあり、かつ、前記SOC推定部による推定SOCが、前記補正用SOCのある前記第1の領域外にある場合、前記補正用SOCのある前記第1の領域における前記推定SOC側のSOCである仮補正用SOCに基づき、基準時のSOCを仮補正する仮補正部をさらに備え、
     前記補正条件は、前記所定回数に相当する期間において前記仮補正が実行されないことを必要条件としてさらに含む、蓄電池管理装置。
  6.  請求項1から請求項5までのいずれか一項に記載の蓄電池管理装置であって、
     前記蓄電池が有するSOC-OCV特性は、複数の前記第2の領域を含んでおり、
     前記補正条件は、前記基準時のSOCが、前記補正用SOCとは異なる前記第2の領域内にあることを必要条件としてさらに含む、蓄電池管理装置。
  7.  請求項1から請求項5までのいずれか一項に記載の蓄電池管理装置であって、
     前記補正条件は、前記基準時のSOCと前記補正用SOCとの差が下限値以上であることを必要条件としてさらに含む、蓄電池管理装置。
  8.  請求項1から請求項7までのいずれか一項に記載の蓄電池管理装置であって、
     前記蓄電池の温度を計測する温度計測部をさらに備え、
     前記補正条件は、前記温度計測部が計測した温度が所定の温度範囲内であることを必要条件としてさらに含む、蓄電池管理装置。
  9.  請求項1から請求項8までのいずれか一項に記載の蓄電池管理装置であって、
     前記補正条件が満たされた場合、前記基準時のSOCを、前記補正用SOCに更新するSOC更新部をさらに備える、蓄電池管理装置。
  10.  SOCの変化量に対するOCVの変化量の絶対値であるOCV変化率が所定値以下の第1の領域と、前記OCV変化率が前記所定値を超える第2の領域と、を含むSOC-OCV特性を有する蓄電池の管理方法であって、
     前記蓄電池に流れる電流を計測する工程と、
     計測した電流を積算することにより、前記蓄電池の容量を算出する工程と、
     基準時のSOCと、算出した前記基準時からの前記蓄電池の容量の変化量と、前記蓄電池のFCCとに基づき、前記蓄電池のSOCを推定する工程と、
     前記蓄電池のOCVを取得する工程と、
     取得した前記蓄電池のOCVに対応するSOCである補正用SOCが前記第2の領域内にあることを必要条件として含む補正条件が満たされた場合、前記補正用SOCに基づき、前記蓄電池のSOCを推定する工程で用いる前記蓄電池のFCCを補正する工程と、
    を含む、蓄電池の管理方法。
PCT/JP2021/035619 2021-09-28 2021-09-28 蓄電池管理装置および蓄電池の管理方法 WO2023053195A1 (ja)

Priority Applications (4)

Application Number Priority Date Filing Date Title
DE112021008290.6T DE112021008290T5 (de) 2021-09-28 2021-09-28 Speicherbatterieverwaltungsvorrichtung und verfahren zum verwalten einer speicherbatterie
JP2023550781A JPWO2023053195A1 (ja) 2021-09-28 2021-09-28
PCT/JP2021/035619 WO2023053195A1 (ja) 2021-09-28 2021-09-28 蓄電池管理装置および蓄電池の管理方法
CN202180102786.6A CN118043691A (zh) 2021-09-28 2021-09-28 蓄电池管理装置以及蓄电池的管理方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2021/035619 WO2023053195A1 (ja) 2021-09-28 2021-09-28 蓄電池管理装置および蓄電池の管理方法

Publications (1)

Publication Number Publication Date
WO2023053195A1 true WO2023053195A1 (ja) 2023-04-06

Family

ID=85781499

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/035619 WO2023053195A1 (ja) 2021-09-28 2021-09-28 蓄電池管理装置および蓄電池の管理方法

Country Status (4)

Country Link
JP (1) JPWO2023053195A1 (ja)
CN (1) CN118043691A (ja)
DE (1) DE112021008290T5 (ja)
WO (1) WO2023053195A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024004780A1 (ja) * 2022-06-30 2024-01-04 株式会社Gsユアサ 推定装置、蓄電装置、推定方法及びコンピュータプログラム
CN118584360A (zh) * 2024-08-06 2024-09-03 比亚迪股份有限公司 电池剩余电量的确定方法以及电池包剩余电量的确定方法

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010266221A (ja) * 2009-05-12 2010-11-25 Honda Motor Co Ltd 電池状態推定装置
JP2012145403A (ja) * 2011-01-11 2012-08-02 Denso Corp リチウムイオン二次電池の電池容量検出装置
JP2017009577A (ja) * 2015-06-17 2017-01-12 株式会社Gsユアサ 状態推定装置及び状態推定方法
US20170170669A1 (en) * 2014-08-25 2017-06-15 Jiangsu Huadong Institute Of Li-Ion Battery Co., Ltd. Method for managing capacity of lithium ion battery
JP2017122622A (ja) * 2016-01-06 2017-07-13 株式会社Gsユアサ 状態推定装置、状態推定方法
WO2018008469A1 (ja) * 2016-07-08 2018-01-11 株式会社カネカ 蓄電装置、蓄電システム、並びに、電源システム
JP2019057357A (ja) * 2017-09-19 2019-04-11 トヨタ自動車株式会社 二次電池システム
JP2019192517A (ja) * 2018-04-26 2019-10-31 トヨタ自動車株式会社 電池情報処理システム、組電池、電池モジュールの容量算出方法、および、組電池の製造方法
CN110658466A (zh) * 2019-11-01 2020-01-07 四川长虹电器股份有限公司 一种蓄电池剩余容量计算方法
JP2021150076A (ja) * 2020-03-17 2021-09-27 株式会社豊田自動織機 蓄電装置

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6634854B2 (ja) 2015-03-05 2020-01-22 株式会社Gsユアサ 蓄電素子管理装置、蓄電素子管理方法、蓄電素子モジュール、蓄電素子管理プログラム及び移動体
JP7215397B2 (ja) 2019-11-15 2023-01-31 トヨタ自動車株式会社 推定システムおよび推定方法

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010266221A (ja) * 2009-05-12 2010-11-25 Honda Motor Co Ltd 電池状態推定装置
JP2012145403A (ja) * 2011-01-11 2012-08-02 Denso Corp リチウムイオン二次電池の電池容量検出装置
US20170170669A1 (en) * 2014-08-25 2017-06-15 Jiangsu Huadong Institute Of Li-Ion Battery Co., Ltd. Method for managing capacity of lithium ion battery
JP2017009577A (ja) * 2015-06-17 2017-01-12 株式会社Gsユアサ 状態推定装置及び状態推定方法
JP2017122622A (ja) * 2016-01-06 2017-07-13 株式会社Gsユアサ 状態推定装置、状態推定方法
WO2018008469A1 (ja) * 2016-07-08 2018-01-11 株式会社カネカ 蓄電装置、蓄電システム、並びに、電源システム
JP2019057357A (ja) * 2017-09-19 2019-04-11 トヨタ自動車株式会社 二次電池システム
JP2019192517A (ja) * 2018-04-26 2019-10-31 トヨタ自動車株式会社 電池情報処理システム、組電池、電池モジュールの容量算出方法、および、組電池の製造方法
CN110658466A (zh) * 2019-11-01 2020-01-07 四川长虹电器股份有限公司 一种蓄电池剩余容量计算方法
JP2021150076A (ja) * 2020-03-17 2021-09-27 株式会社豊田自動織機 蓄電装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024004780A1 (ja) * 2022-06-30 2024-01-04 株式会社Gsユアサ 推定装置、蓄電装置、推定方法及びコンピュータプログラム
CN118584360A (zh) * 2024-08-06 2024-09-03 比亚迪股份有限公司 电池剩余电量的确定方法以及电池包剩余电量的确定方法

Also Published As

Publication number Publication date
JPWO2023053195A1 (ja) 2023-04-06
DE112021008290T5 (de) 2024-08-01
CN118043691A (zh) 2024-05-14

Similar Documents

Publication Publication Date Title
WO2020216082A1 (zh) 电池健康状态修正方法、装置、管理系统以及存储介质
KR102435037B1 (ko) 배터리를 교정하는 방법, 배터리의 건강 상태를 추정하는 방법 및 이러한 방법들을 수행하기 위한 시스템
WO2023053195A1 (ja) 蓄電池管理装置および蓄電池の管理方法
US20200341067A1 (en) Method and device for determining available capacity of battery, management system, and storage medium
JP5220269B2 (ja) 蓄電池の劣化状態・充電状態の検知方法及びその装置
US10436850B2 (en) Power storage apparatus and controlling method for the same
US8378638B2 (en) Battery status detecting method and battery status detecting apparatus
JP6371415B2 (ja) 劣化状態パラメータの信頼性を判定する方法
KR20140082750A (ko) 배터리 모니터링을 위한 시스템 및 방법
JP5535968B2 (ja) 充電率推定装置、充電率推定方法、及びプログラム
JP6369340B2 (ja) 蓄電装置および蓄電装置の制御方法
JP7452924B2 (ja) バッテリーsoh推定装置及び方法
JPWO2017085869A1 (ja) 容量維持率推定装置又は容量維持率推定方法
US20130158914A1 (en) Apparatus for Measuring the State of Charge of a Battery Pack via Measuring an Open Circuit Voltage
KR20160119556A (ko) 배터리 soh 추정 장치 및 방법
JP7326237B2 (ja) 複数の電池に関する判定装置、蓄電システム、判定方法及び判定プログラム
JPWO2019116815A1 (ja) 二次電池監視装置、二次電池状態演算装置および二次電池状態推定方法
KR20240121779A (ko) 배터리 용량 결정 방법, 장치 및 저장 매체
US20240094303A1 (en) Battery state estimation device, battery state estimation system, and battery state estimation method
US20220407339A1 (en) Power storage device control apparatus, power storage device control system, and power storage device control method
WO2023053197A1 (ja) 蓄電池管理装置および蓄電池の管理方法
WO2024004034A1 (ja) 蓄電池管理装置および蓄電池の管理方法
JP2023102159A (ja) バッテリ制御方法及びバッテリ制御装置
JP5563048B2 (ja) 満充電容量推定装置、満充電容量推定方法及びプログラム
JP2016532107A (ja) バッテリ電力管理

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21959246

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 2023550781

Country of ref document: JP

WWE Wipo information: entry into national phase

Ref document number: 202180102786.6

Country of ref document: CN

WWE Wipo information: entry into national phase

Ref document number: 112021008290

Country of ref document: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21959246

Country of ref document: EP

Kind code of ref document: A1