WO2023013980A1 - 건축물의 현관 바닥구조 - Google Patents

건축물의 현관 바닥구조 Download PDF

Info

Publication number
WO2023013980A1
WO2023013980A1 PCT/KR2022/011142 KR2022011142W WO2023013980A1 WO 2023013980 A1 WO2023013980 A1 WO 2023013980A1 KR 2022011142 W KR2022011142 W KR 2022011142W WO 2023013980 A1 WO2023013980 A1 WO 2023013980A1
Authority
WO
WIPO (PCT)
Prior art keywords
base
additional
floor structure
finishing
fixing groove
Prior art date
Application number
PCT/KR2022/011142
Other languages
English (en)
French (fr)
Inventor
이준호
Original Assignee
이준호
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 이준호 filed Critical 이준호
Publication of WO2023013980A1 publication Critical patent/WO2023013980A1/ko

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/024Sectional false floors, e.g. computer floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F19/00Other details of constructional parts for finishing work on buildings
    • E04F19/02Borders; Finishing strips, e.g. beadings; Light coves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V33/00Structural combinations of lighting devices with other articles, not otherwise provided for

Definitions

  • the present invention relates to a floor structure of a porch of a building, and more particularly, to a floor structure of a porch of a building in which a stepping plate and a molding configuration can be installed in an assembly method.
  • the entrance floor is finished using a flooring material such as a tile and is installed lower than the floor.
  • the sill of the front door is installed as needed and is located at a slightly higher height than the entrance floor, and a shoe rack is usually provided to store shoes.
  • the corner surface where the entrance floor and the vertical plane of the building come into contact that is, the entrance floor and the floor, the entrance floor and the threshold, the entrance floor and the wall, etc. are in contact with each other forms an L shape and is almost at right angles.
  • PVC mats or carpets are installed on the floor of the entrance so that foreign substances attached to the soles of shoes can be easily removed after going out according to the season or weather conditions.
  • the present invention has been made to solve the above problems of the prior art, and the stepping plate and the molding configuration can be installed on the porch in an assembly method, and the components of the stepping board are combined in an assembly method, so that the stepping plate after completing the interior work
  • the purpose is to provide a front door floor structure of a building that can prevent scratches or damage to the finishing materials by simply combining the constituting finishing materials.
  • the entrance hall floor structure of the building according to the present invention includes a base disposed on the entrance side; Elevating guides arranged to be spaced apart from each other on the lower side of the base; and a height adjusting unit fastened to the elevating guide and raising or lowering the base by forward or reverse rotation.
  • a fixing groove is formed at an inclined angle at the upper edge of the base, and a finishing unit for closing the upper surface of the base and the front facing the front door, respectively;
  • a fixing part including a body part accommodated in the fixing groove and a head part formed on one side of the body part and having a pair of pressing pieces formed on one side and the other side to press the finishing parts disposed on the upper and front surfaces of the base, respectively.
  • a hanging portion is formed to support the closing portion that closes the front surface of the base.
  • the height adjustment unit is seated on the upper surface of the height adjustment unit, and further includes an anti-vibration pad supporting the lower surface of the base.
  • the molding unit may further include a molding part installed on a bottom edge surface of the entrance hall, wherein the molding unit may include: a fastening part embedded in the wall surface of the entrance hall and a part of which protrudes outward from the wall surface; A sliding groove that is seated on the bottom of the vestibule and slides along the fastening portion protruding outward from the wall surface is formed along the longitudinal direction on the rear side, and additional hooking portions are formed on the upper and lower front surfaces, respectively, and an additional portion is formed on the upper edge of the front side.
  • the stepping plate and molding components can be installed in the entrance hall in an assembly method, and the components of the stepping board are combined in an assembly method, so that the finishing materials constituting the stepping board are combined after completing the interior construction. Since it can be done, it has an effect of preventing scratches or damage to the finishing materials.
  • FIG. 1 is a plan view showing a floor structure of a front door of a building according to an embodiment of the present invention.
  • FIG. 2 is a cross-sectional view showing a construction state of a base, an elevation guide, a height control unit, a finishing unit, a fixing unit, and an anti-vibration pad applied to a floor structure of a front door of a building according to an embodiment of the present invention.
  • FIG 3 is a cross-sectional view showing a construction state of a molding part applied to a floor structure of a front door of a building according to an embodiment of the present invention.
  • FIG. 1 is a plan view showing a floor structure of an entrance hall of a building according to an embodiment of the present invention
  • FIG. 2 is a base applied to the floor structure of an entrance hall of a building according to an embodiment of the present invention, a lift guide, and a height control unit. It is a cross-sectional view showing the construction state of the finishing part, the fixing part, and the anti-vibration pad.
  • the entrance floor structure of a building is a product that is installed on the entrance side when constructing a building such as an apartment or a villa and can easily install a stepping plate connected to an indoor floor in a prefabricated manner.
  • the entrance hall floor structure of a building may include at least one or more of a base 10, a finishing unit 40, an elevation guide 20, and a height adjusting unit 30.
  • the base 10 may be formed in a rectangular block shape having a certain width and length to be disposed in front of the middle door on the front door side.
  • the base 10 performs the function of a stepping board on which a resident entering the front door takes off his shoes and steps on it.
  • the resident enters the room through the base 10 and the middle door sequentially.
  • the base 10 may be manufactured by extruding aluminum into a block shape having a certain length and width.
  • the base 10 may be formed in a cylindrical shape with open sides and an empty interior so that the operator does not use much force during transportation to reduce the manufacturing cost.
  • the base 10 may include reinforcing ribs 11 because it bears the load of residents entering the room from the front door or coming out of the front door from the inside.
  • the reinforcing lip 11 may be formed in a substantially rectangular plate shape.
  • the reinforcing ribs 11 are arranged to be spaced apart from each other in the inner space of the base 10 to distribute and support the load of residents, thereby preventing the base 10 from being deformed.
  • At least one insertion groove 10a may be formed on the rear upper surface of the base 10 .
  • a closing cap 13 for fixing the closing portion 40 is inserted into the insertion groove 10a.
  • a pressure head 131 for pressing the closing part 40 seated on the upper surface of the base 10 is formed.
  • the base 10 may further include a front plate 12 .
  • the other side of the base 10 becomes the front side.
  • the front plate 12 may be formed to have the same length as the base 10 .
  • the front plate 12 may be applied after adjusting the height of the base 10 through the height adjusting unit 30 to be described later to support the front bottom surface of the base 10 .
  • the front plate 12 may be fixed to the bottom surface of the porch through bolts or adhesive.
  • the front plate 12 may be formed in the same shape as the base 10 in the shape of a square block cylinder with an empty inside.
  • a reinforcing lip 121 may also be formed in the inner space of the front plate 12 .
  • a bent hooking portion 122 supporting a closing portion 40 to be described below may be formed on the lower side of the front surface of the front plate 12 .
  • the bending-type hooking portion 122 is formed in a substantially 'L' cross-sectional shape.
  • the bent hooking portion 122 may be formed in a panel shape having the same length as the front plate 12 or may be applied in a unit form in multiple units and disposed on the front plate 12 at regular intervals.
  • finishing unit 40 is to finish the upper surface of the base 10 and the front surface of the front plate 12, respectively, and may be formed of a known tile.
  • the finishing part 40 may be formed to have the same length as the base 10 and the front plate 12, respectively, or may be applied in a plurality so that the side surfaces contact each other.
  • sides contacting each other may be bonded through silicone or an adhesive.
  • the finishing unit 40 is configured to close the entire upper surface of the base 10 and the entire front surface of the front plate 12, respectively.
  • a middle door may be installed on the upper surface of the finishing unit 40 disposed on the upper surface of the base 10 .
  • the upper and lower sides of the finishing portion 40 that closes the front surface of the front plate 12 are fixed by the fixing portion 50 and the above-described bending hooking portion 122, respectively, and the upper surface of the base 10
  • the closing part 40 to be closed is fixed by the above-described closing cap 13 and the fixing part 50.
  • the fixing part 50 is coupled to the fixing groove 10b inclined at the edge of the upper surface of the front side of the base 10 to jointly fix the finishing part 40 disposed on the upper surface and the front of the base 10.
  • the fixing groove 10b may be formed as one and formed along the longitudinal direction of the base 10, or may be applied in plural to be spaced apart from each other on the base 10.
  • the fixing part 50 may be applied as one when the fixing groove 10b is formed as one, and when a plurality of fixing grooves 10b are applied, a plurality may be applied corresponding to the fixing groove 10b.
  • the fixing part 50 may include a body part 51 and a head part 52 .
  • the body portion 51 is accommodated in the fixing groove 10b to form an inclined structure.
  • the body portion 51 is made of metal or synthetic resin, and a fixing cap 511 made of rubber or silicon may be mounted on the outer surface.
  • the body portion 51 may be formed of rubber or silicon material to cause friction with the inner wall surface of the fixing groove 10b by being coupled with an interference fit of the fixing groove 10b.
  • the head portion 52 is formed on one side of the body portion 51 and protrudes out of the fixing groove 10b.
  • a pair of pressing pieces 521 are formed on one side and the other side of the head portion 52 to press the finishing portion 40 disposed on the upper and front surfaces of the base 10, respectively.
  • the pressing piece 521 moves to the finishing part.
  • the elevation guide 20 may be formed of known bolts.
  • the head of the elevating guide 20 may be embedded in the bottom surface of the vestibule.
  • the spirally formed portion of the elevating guide 20 protrudes upward from the bottom surface of the vestibule.
  • the elevation guide 20 guides the elevation of the height controller 30 so that the height of the base 10 can be adjusted.
  • the height adjusting unit 30 performs a function of adjusting the height while supporting the base 10 .
  • the height adjustment unit 30 may be applied as a known nut.
  • the height control unit 30 is fastened to the elevating guide 20, respectively.
  • the height adjusting unit 30 When the height adjusting unit 30 is rotated in the forward direction, the height adjusting unit 30 is raised and the base 10 is raised. Also, when the height adjusting unit 30 is rotated in the reverse direction, the height adjusting unit 30 is lowered and the base 10 is lowered.
  • the height of the finishing unit 40 seated on the upper surface of the base 10 and the floor of the room may be matched by rotating the height adjusting unit 30 in a forward or reverse direction.
  • the height of the base 10 can be precisely adjusted.
  • an antivibration pad 60 for vibration isolation may be disposed on the upper surface of the height adjusting unit 30 .
  • the anti-vibration pad 60 supports the lower surface of the base 10 while being seated on the upper surface of the height adjusting unit 30 .
  • the entrance floor structure of a building includes a base 10, an elevation guide 20, and a height control unit 30 ) and the finishing unit 40 to form a prefabricated stepping plate, it is possible to provide the advantage of easy construction and shortened construction time.
  • finishing part 40 when the finishing part 40 is coupled to the base 10 after the interior construction is completed, scratches or damage to the finishing part 40 can be prevented from occurring.
  • the floor structure of the entrance hall of a building may further include a molding part 70 to interior the edge surface of the entrance hall.
  • FIG 3 is a cross-sectional view showing a construction state of a molding part applied to a floor structure of a front door of a building according to an embodiment of the present invention.
  • the molding part 70 may include a fastening part 71 , a case 72 , an additional finishing part 73 , and an additional fixing part 74 .
  • the fastening unit 71 performs a function of fastening the fastening unit 71 .
  • the coupling part 71 may be formed in an approximate 'H' cross-sectional shape when viewed from the front.
  • the fastening part 71 is formed on one side of the embedding part 711, which is buried in the wall surface disposed at the edge of the porch, and the protrusion 712 having a cross-sectional shape of 'q' that is formed on one side of the embedding part 711 and protrudes to the outside of the wall surface.
  • the protrusion 712 having a cross-sectional shape of 'q' that is formed on one side of the embedding part 711 and protrudes to the outside of the wall surface.
  • the embedding part 711 of the fastening part 71 may be fixed to the wall surface with adhesive or silicone instead of being embedded in the wall surface.
  • the case 72 may be formed in a rectangular block shape having a predetermined width and length.
  • the case 72 can form a raised ridge at a certain height at the edge of the vestibule.
  • the case 72 may be manufactured by extruding aluminum into a block shape having a certain length and width.
  • both sides of the case 72 are open and the inside thereof may be formed in an empty barrel shape so as to reduce the manufacturing cost and prevent the operator from using much force during transportation.
  • a closing cover (not shown) may be coupled with pieces or bolts.
  • a fastener 721 to which a piece or a bolt is fastened may be formed inside the case 72 .
  • a sliding groove 72a sliding along the protrusion 712 may be formed on the rear surface of the case 72 along the longitudinal direction.
  • the case 72 maintains a state in close contact with the wall surface due to the protrusion 712 being inserted into the sliding groove 72a.
  • a bent portion holding portion 722 for fixing the closing portion 40 to be described below may be formed on the rear side of the upper surface and the lower side of the front surface of the case 72, respectively.
  • the bending-type additional hooking part 722 formed on the upper surface of the case 72 is formed in an approximately 'L' cross-sectional shape, and the additional closing part 73 disposed on the upper surface of the case 72 is in contact with the upper surface and side surface, The additional finishing portion 73 is prevented from escaping upward.
  • the bending-type additional hooking portion 722 formed on the lower side of the case 72 is formed in an approximately 'L' cross-sectional shape, and the lower front portion and bottom surface of the additional closing portion 73 disposed on the front surface of the case 72 , and prevents the additional finishing portion 73 from departing forward.
  • an additional fixing groove 72b to which the additional fixing part 74 is coupled is inclined at the edge of the upper surface of the front side of the case 72 .
  • the additional finishing part 73 finishes the upper and front surfaces of the case 72, respectively, and may be formed of a known tile.
  • Each of the additional finishing parts 73 may be formed to have the same length as the case 72, or may be applied in a plurality so that their side surfaces come into contact with each other.
  • sides contacting each other may be bonded through silicone or an adhesive.
  • the additional finishing part 73 is configured to close the entire top surface and the entire front surface of the case 72, respectively.
  • the left side of the additional closing portion 73 that closes the upper surface of the case 72 is fixed by the hooking portion 722 of the bent portion formed on the upper side of the case 72, and the right side thereof is an additional fixing portion (described later) 74) is fixed by
  • the upper side of the additional closing portion 73 that closes the front surface of the case 72 is fixed by an additional fixing portion 74, which will be described later, and the lower side is caught by a bent portion formed on the lower front side of the case 72. It is fixed by part 722.
  • the additional fixing part 74 may include an additional body part 741 and an additional head part 742 .
  • the body portion 51 is accommodated in the additional fixing groove 72b to form an inclined structure.
  • a plurality of additional engagement protrusions 7411 are formed on the circumferential surface of the body portion 51 at regular intervals.
  • the additional engagement protrusion 7411 may be formed of rubber or silicon to generate friction while being engaged with the inner wall surface of the additional fixing groove 72b.
  • the additional head portion 742 is formed on one side of the additional body portion 741 and protrudes out of the additional fixing groove 72b.
  • one-phase additional pressing pieces 7421 are formed to press the additional closing portions 73 disposed on the upper and front surfaces of the case 72, respectively.
  • the additional pressing piece 7421 is additionally finished.
  • the closing part 40 can be easily and stably coupled to the case 72.
  • FIG. 4 shows that the rail unit 80, the lighting unit 90, and the pressing unit 100 are more applied than in FIG. 2, and hereinafter, the rail unit 80, the lighting unit 90, and the pressing unit 100 It will be explained in writing.
  • a plurality of fitting grooves 10c spaced apart from each other are formed in a certain region of the upper surface of the base 10 .
  • a guide rail 81 is formed on the upper surface of the rail unit 80 .
  • the guide rail 81 is formed as a groove and is formed along the longitudinal direction of the rail unit 80 .
  • the lower side of the interlocking triple door (not shown) is slidably coupled to the guide rail 81, respectively.
  • the interlocking triple door is coupled to the guide rail 81 located at the leftmost side with reference to FIG. It is coupled to the second door and the guide rail 81 located in the center and may include a third door located between the first door and the second door.
  • interlocking triple door when the first door or the second door is opened or closed, the third door is interlocked and operated. Since this interlocking triple door is a commercialized technology, a detailed description thereof will be omitted.
  • a buried groove 10d is formed on the lower front side of the base 10, and the lighting unit 90 is buried in the buried groove 10d.
  • the lighting unit 90 is arranged to be spaced apart at a predetermined interval on the lower side of the closing unit 40 located in the front of the base 10.
  • the pressing unit 100 is inserted into the space between the closing unit 40 and the lighting unit 90 .
  • the pressing unit 100 has a bolt structure, the body is fitted into the space between the closing unit 40 and the lighting unit 90, and the head protrudes to the outside so that the closing unit 40 and the lighting unit (90) is jointly pressed and fixed.
  • the body of the pressing unit 100 is formed of rubber or silicone material, and is fitted and fixed between the closing unit 40 and the lighting unit 90 by an interference fit, stably fixing the closing unit 40 and the lighting unit 90.
  • the lower side of the lighting unit 90 is fixed by the bending hooking unit 122 .
  • the lighting unit 90 may be formed of an LED that receives external power and generates light.
  • the LED may be formed of a known three-color LED or a product having various colors.
  • the entrance can be directed in various forms.
  • finishing part 50 fixing part
  • attachment part 711 embedding part

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Floor Finish (AREA)

Abstract

본 발명은 건축물의 현관 바닥구조에 관한 것으로, 현관에 디딤판과 몰딩구성을 조립방식으로 시공할 수 있고, 디딤판의 구성들이 조립방식으로 결합됨으로, 실내 공사를 완료한 후 디딤판을 구성하는 마감자재를 결합하면 되기 때문에 마감자재에 스크래치나 파손이 발생되는 것을 방지할 수 있도록 함을 목적으로 한다. 본 발명에 따른 건축물의 현관 바닥구조는, 현관측에 배치되는 베이스; 상기 베이스의 하측에 서로 이격되도록 배치되는 승강가이드; 및 상기 승강가이드에 각각 체결되며, 정방향 또는 역방향 회전에 의해 상기 베이스를 상승 또는 하강시키는 높낮이 조절부;를 포함한다.

Description

건축물의 현관 바닥구조
본 발명은 건축물의 현관 바닥구조에 관한 것으로, 더욱 상세하게는 현관에 디딤판과 몰딩구성을 조립방식으로 시공할 수 있는 건축물의 현관 바닥구조에 관한 것이다.
일반적으로 주거용 건축물에서 현관바닥은 타일과 같은 바닥재를 사용하여 마무리하고 마루바닥보다 낮게 시설된다.
현관문의 문턱은 필요에 따라 시설되며 현관바닥보다 약간 높은 높이에 위치되고 신발을 보관할 수 있도록 통상적으로 신발장이 마련된다.
현관바닥과 건축물의 수직면이 접하는면 즉, 현관바닥과 마루바닥, 현관바닥과 문턱 현관바닥과 벽면 등이 서로 접하는 모서리면은 L형상으로 거의 직각을 이루게 된다.
그런데 현관바닥에 모래나 흙 등이 쌓여 지저분하게 되면 청소를 하여야 하나, 현관바닥이 주위보다 낮게 위치되어 있어서 청소가 용이하지 않았다. 예를 들어, L형상의 모서리면에 흙과 모래가 쌓여서 빗자루나 진공청소기 등으로 청소를 할 경우에 틈새에 쌓여 있는 이물질을 깨끗하게 청소하기란 쉽지 않으며 특히 빗자루로 쓸어 한 장소에 모은 경우에도 다시금 쓰레받기를 이용하여 받아내야 하는 불편함이 있다.
따라서, 현관바닥에 모래나 흙이 쌓이는 것을 방지하기 위하여 PVC매트나 카펫트 등을 현관바닥에 설치하여 해당 계절이 나 일기상태에 따라 외출후 신발 밑바닥에 부착된 이물질을 간단히 제거할 수 있도록 하고 있다.
한편, 건축물에서 현관을 시공함에 있어, 종래에는 거푸집을 설치하고, 거푸집의 내부에 석재와 시멘트 및 모래를 혼합한 혼합물을 타설 및 양생하여 마루바닥과 연결되며 중문이 설치되는 디딤판을 형성하였는 바, 시공이 용이하지 못하고 시공 시간이 오래 소요되며, 실내 공사를 하기 위해 현관을 통해 출입하는 과정에서 디딤판에 스크래치나 파손이 발생되는 문제점이 있다.
본 발명이 속하는 기술분야의 선행기술문헌에는 한국 등록특허공보 제10-0604238호 등이 있다.
본 발명은 상기한 종래기술의 문제점을 해결하기 위하여 안출된 것으로, 현관에 디딤판과 몰딩구성을 조립방식으로 시공할 수 있고, 디딤판의 구성들이 조립방식으로 결합됨으로, 실내 공사를 완료한 후 디딤판을 구성하는 마감자재를 결합하면 되기 때문에 마감자재에 스크래치나 파손이 발생되는 것을 방지할 수 있는 건축물의 현관 바닥구조를 제공하는데 그 목적이 있다.
본 발명에 따른 건축물의 현관 바닥구조는, 현관측에 배치되는 베이스; 상기 베이스의 하측에 서로 이격되도록 배치되는 승강가이드; 및 상기 승강가이드에 각각 체결되며, 정방향 또는 역방향 회전에 의해 상기 베이스를 상승 또는 하강시키는 높낮이 조절부;를 포함한다.
그리고, 상기 베이스의 상측 가장자리에는 고정홈이 경사지게 형성되고, 상기 베이스의 상면 및 현관문과 마주하는 전면을 각각 마감하는 마감부; 및 상기 고정홈에 수용되는 바디부 및 상기 바디부의 일측에 형성되고, 일측과 타측에 상기 베이스의 상면과 전면에 배치된 마감부를 각각 가압하는 한 쌍의 가압편이 형성된 헤드부를 포함하는 고정부를 포함하며, 상기 베이스의 전면 하측에는 상기 베이스의 전면을 마감하는 마감부를 지지하는 걸림부가 형성된다.
또한, 상기 높낮이 조절부의 상면에 안착되며, 상기 베이스의 저면을 지지하는 방진패드를 더 포함한다.
그리고, 상기 현관의 바닥 가장자리면에 설치되는 몰딩부를 더 포함하고, 상기 몰딩부는, 상기 현관의 벽면에 매립되고, 일부분이 벽면의 외부로 돌출되는 결착부; 상기 현관의 바닥에 안착되고, 후면에 상기 벽면의 외부로 돌출된 결착부를 따라 슬라이딩되는 슬라이딩홈이 길이방향을 따라 형성되며, 상면과 전면 하측에 부가 걸림부가 각각 형성되며, 전측의 상측 가장자리에 부가 고정홈이 경사지게 형성되는 케이스; 상기 케이스의 상면과 전면에 각각 배치되며, 상기 일측 가장자리 부분이 상기 걸림부에 각각 걸려 고정되는 부가 마감부; 및 상기 부가 고정홈에 수용되고 외면에 부가 고정홈의 내벽면과 맞물리는 부가 맞물림돌기가 형성된 부가 바디부 및 상기 부가 바디부의 일측에 형성되고, 일측과 타측에 상기 케이스의 상면과 전면에 배치된 부가 마감부를 각각 가압하는 한 쌍의 부가 가압편이 형성된 부가 헤드부를 포함하는 부가 고정부를 포함한다.
본 발명에 따른 건축물의 현관 바닥구조는, 현관에 디딤판과 몰딩구성을 조립방식으로 시공할 수 있고, 디딤판의 구성들이 조립방식으로 결합됨으로, 실내 공사를 완료한 후 디딤판을 구성하는 마감자재를 결합하면 되기 때문에 마감자재에 스크래치나 파손이 발생되는 것을 방지할 수 있는 효과가 있다.
도 1은 본 발명의 일 실시예에 따른 건축물의 현관 바닥구조를 도시한 평면도이다.
도 2는 본 발명의 일 실시예에 따른 건축물의 현관 바닥구조에 적용된 베이스와, 승강가이드와, 높낮이 조절부와, 마감부와, 고정부 및 방진패드의 시공상태를 도시한 단면도이다.
도 3은 본 발명의 일 실시예에 따른 건축물의 현관 바닥구조에 적용된 몰딩부의 시공상태를 도시한 단면도이다.
본 발명의 이점 및 특징, 그리고 그것들을 달성하는 방법은 첨부되는 도면과 함께 상세하게 후술되어 있는 실시예들을 참조하면 명확해질 것이다.
그러나 본 발명은 이하에서 개시되는 실시예들에 한정되는 것이 아니라 서로 다른 다양한 형태로 구현될 수 있으며, 단지 본 실시예들은 본 발명의 개시가 완전하도록 하고, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위해 제공되는 것이며, 본 발명은 청구항의 범주에 의해 정의될 뿐이다. 명세서 전체에 걸쳐 동일 참조 부호는 동일 구성 요소를 지칭한다.
이하, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자가 용이하게 실시할 수 있도록 본 발명의 실시예에 대하여 첨부한 도면을 참고로 하여 상세히 설명한다. 그러나 본 발명은 여러 가지 상이한 형태로 구현될 수 있으며 여기에서 설명하는 실시예에 한정되지 않는다. 명세서 전체를 통하여 유사한 부분에 대해서는 동일한 도면 부호를 붙였다.
도 1은 본 발명의 일 실시예에 따른 건축물의 현관 바닥구조를 도시한 평면도이고, 도 2는 본 발명의 일 실시예에 따른 건축물의 현관 바닥구조에 적용된 베이스와, 승강가이드와, 높낮이 조절부와, 마감부와, 고정부 및 방진패드의 시공상태를 도시한 단면도이다.
본 발명의 일 실시예에 따른 건축물의 현관 바닥구조는, 아파트나 빌라등의 건축물을 시공할 경우 현관측에 설치되며 실내 바닥과 연결되는 디딤판을 조립식으로 간편하게 설치할 수 있는 제품이다.
이를 위해 본 발명의 일 실시예에 따른 건축물의 현관 바닥구조는, 베이스(10)와, 마감부(40)와, 승강가이드(20) 및 높낮이 조절부(30) 중 적어도 어느 하나 이상을 포함할 수 있다.
베이스(10)는 현관측에서 중문의 앞쪽에 배치되는 것으로 일정한 폭과 길이를 갖는 직사각형 블록 형상으로 형성될 수 있다.
베이스(10)는 일반적인 건축물에 있어서, 현관으로 들어온 거주자가 신발을 벗고 디디게 되는 디딤판 기능을 수행한다.
즉, 거주자는 베이스(10)와 중문을 순차적으로 거쳐 실내로 들어가게 된다.
이러한 베이스(10)는 알루미늄을 일정한 길이와 폭을 갖는 블록 형상으로 압출성형하여 제작될 수 있다.
이때, 베이스(10)는 제조단가를 절감하고, 운반 시 작업자가 많은 힘을 쓰지 아니하도록 양면이 개방되고 내부가 빈 통 형상으로 형성될 수 있다.
아울러, 베이스(10)는 현관에서 실내로 들어가거나 또는, 실내에서 현관으로 나오는 거주자의 하중을 부담하기 때문에, 보강립(11)을 포함할 수 있다.
보강립(11)은 대략 직사각형 판 형상으로 형성될 수 있다.
보강립(11)은 베이스(10)의 내부공간에 서로 이격되도록 배치되어 거주자의 하중을 분산하여 지지함으로써, 베이스(10)가 변형되는 것을 방지한다.
베이스(10)의 후측 상면에는 적어도 하나 이상의 삽입홈(10a)이 형성될 수 있다.
삽입홈(10a)에는 마감부(40)를 고정하기 위한 마감캡(13)이 삽입된다.
마감캡(13)의 상단에는 베이스(10)의 상면에 안착된 마감부(40)를 가압하는 가압헤드(131)가 형성된다.
베이스(10)는 전면판(12)을 더 포함할 수 있다.
이때, 베이스(10) 중 중문이나 실내 바닥면과 마주하는 일측을 후측이라고 했을 때, 베이스(10)의 타측은 전측이 된다.
전면판(12)은 베이스(10)와 동일한 길이를 갖도록 형성될 수 있다.
전면판(12)은 후술되는 높낮이 조절부(30)를 통해 베이스(10)의 높낮이를 조절한 이후에 적용되어 베이스(10)의 전측 저면을 지지할 수 있다.
이때, 전면판(12)은 현관의 바닥면에 볼트나 접착를 통해 고정될 수 있다.
그리고, 전면판(12)은 베이스(10)와 동일하게 내부가 빈 사각블록 통 형상으로 형성될 수 있다.
전면판(12)의 내부공간에도 보강립(121)이 형성될 수 있다.
전면판(12)의 전면 하측에는 후술되는 마감부(40)를 지지하는 절곡형 걸림부(122)가 형성될 수 있다.
절곡형 걸림부(122)는 대략 'ㄴ'자 단면 형상으로 형성된다.
절곡형 걸림부(122)는 전면판(12)과 동일한 길이를 갖는 패널 형상으로 형성되거나 또는, 다수개가 유닛 형태로 적용되어 전면판(12)에 일정간격으로 배치될 수 있다.
한편, 마감부(40)는 베이스(10)의 상면 및 전면판(12)의 전면을 각각 마감하는 것으로, 공지의 타일로 형성될 수 있다.
마감부(40)는 각각 베이스(10) 및 전면판(12)과 동일한 길이를 갖도록 형성되거나 또는, 복수개로 적용되어 측면이 서로 접촉되는 형태로 시공될 수 있다.
마감부(40)는 복수개로 적용될 경우 서로 접촉되는 측면이 실리콘이나 접착제를 통해 결합될 수 있다.
마감부(40)는 각각 베이스(10)의 상면 전체와 전면판(12)의 전면 전체를 마감하도록 구성된다.
베이스(10)의 상면에 배치되는 마감부(40)의 상면에는 중문(3중 도어)이 설치될 수 있다.
이때, 전면판(12)의 전면을 마감하는 마감부(40)는 상측과 하측이 고정부(50) 및 전술한 절곡형 걸림부(122)에 의해 각각 고정되고, 베이스(10)의 상면을 마감하는 마감부(40)는 전술한 마감캡(13) 및 고정부(50)에 의해 고정된다.
고정부(50)는 베이스(10)의 전면측 상면의 가장자리에 경사지게 형성되는 고정홈(10b)에 결합되어 베이스(10)부의 상면과 전면에 배치되는 마감부(40)를 공동으로 고정한다.
이때, 고정홈(10b)은 하나로 형성되어 베이스(10)의 길이방향을 따라 형성되거나 또는, 복수개로 적용되어 베이스(10)에 서로 이격되도록 형성될 수 있다.
고정부(50)는 고정홈(10b)이 하나로 형성될 경우 하나로 적용되고, 고정홈(10b)이 복수개로 적용될 경우 고정홈(10b)과 대응되게 복수개로 적용될 수 있다.
고정부(50)는 바디부(51) 및 헤드부(52)를 포함할 수 있다.
바디부(51)는 고정홈(10b)에 수용되어 경사진 구조를 이룬다.
일 예로, 바디부(51)는 금속이나 합성수지 재질로 형성되며, 외면에 고무나 실리콘 재질로 형성되는 고정캡(511)이 장착될 수 있다.
다른 일예로, 바디부(51)는 고정홈(10b)의 억지끼움으로 결합되어 고정홈(10b)의 내벽면과 마찰을 일으키도록 고무나 실리콘 재질로 형성될 수 있다.
헤드부(52)는 바디부(51)의 일측에 형성되고, 고정홈(10b)의 외부로 돌출된다.
헤드부(52)의 일측과 타측에는 베이스(10)의 상면과 전면에 배치된 마감부(40)를 각각 가압하는 한 쌍의 가압편(521)이 형성된다.
즉, 베이스(10)의 상면과 전면판(12)에 마감부(40)를 각각 배치한 다음, 바디부(51)를 고정홈(10b)에 삽입하기만 하면 가압편(521)이 마감부(40)를 각각 가압함으로, 베이스(10)에 마감부(40)를 쉽고 안정적으로 결합할 수 있는 것이다.
한편, 승강가이드(20)는 공지의 볼트로 형성될 수 있다.
승강가이드(20)의 헤드는 현관의 바닥면에 매립될 수 있다.
따라서, 승강가이드(20) 중 나선이 형성된 부분은 현관의 바닥면 상측으로 돌출된다.
이러한 승강가이드(20)는 높낮이 조절부(30)의 승강을 가이드하여 베이스(10)의 높낮이가 조절될 수 있도록 한다.
한편, 높낮이 조절부(30)는 베이스(10)를 지지하면서 높낮이를 조절하는 기능을 수행한다.
높낮이 조절부(30)는 공지의 너트로 적용될 수 있다.
높낮이 조절부(30)는 승강가이드(20)에 각각 체결된다.
높낮이 조절부(30)를 정방향으로 회전시키면, 높낮이 조절부(30)가 상승되면서 베이스(10)를 상승시키게 된다. 그리고, 높낮이 조절부(30)를 역방향으로 회전시키면, 높낮이 조절부(30)가 하강되면서 베이스(10)를 하강시키게 된다.
따라서, 높낮이 조절부(30)를 정방향 또는 역방향으로 회전시켜 베이스(10)의 상면에 안착된 마감부(40)와 실내의 바닥면 높이를 일치시키면 된다.
이때, 승강가이드(20)에 형성된 나선의 피치 간격을 좁게 형성할 경우, 베이스(10)의 높낮이를 정밀하게 조절할 수 있을 것이다.
이때, 높낮이 조절부(30)의 상면에는 방진을 위한 방진패드(60)가 배치될 수 있다.
방진패드(60)는 높낮이 조절부(30)의 상면에 안착되면서 베이스(10)의 저면을 지지하게 된다.
종래에는 거푸집을 설치하고, 거푸집의 내부에 석재와 시멘트 및 모래를 혼합한 혼합물을 타설 및 양생하여 디딤판을 형성하였는 바, 시공이 용이하지 못하고 시공 시간이 오래 소요되며, 실내 공사를 하기 위해 현관을 통해 출입하는 과정에서 디딤판에 스크래치나 파손이 발생되는 문제점이 있으나, 본 발명의 일 실시 예에 따른 건축물의 현관 바닥 구조는, 베이스(10)와, 승강가이드(20)와, 높낮이 조절부(30) 및 마감부(40)를 통해 조립식으로 디딤판을 형성할 수 있어, 시공이 용이하고 시공 시간이 단축되는 장점을 제공할 수 있다.
그리고, 실내 공사가 완료된 이후에 베이스(10)에 마감부(40)를 결합하면, 마감부(40)에 스크래치나 파손이 발생되는 것을 방지할 수 있다.
한편, 본 발명의 일 실시예에 따른 건축물의 현관 바닥구조는, 현관의 가장자리면을 인테리어 하기 위한 몰딩부(70)를 더 포함할 수 있다.
도 3은 본 발명의 일 실시예에 따른 건축물의 현관 바닥구조에 적용된 몰딩부의 시공상태를 도시한 단면도이다.
몰딩부(70)는 결착부(71)와, 케이스(72)와, 부가 마감부(73) 및 부가 고정부(74)를 포함할 수 있다.
결착부(71)는 결착부(71)를 결착하는 기능을 수행한다.
결착부(71)는 정면에서 바라본 단면 형상이 대략 'H'단면 형상으로 형성될 수 있다.
결착부(71)는 현관의 가장자리에 배치된 벽면에 각각 매립되는 매립부(711), 매립부(711)의 일측에 형성되며 벽면의 외부로 돌출되는 'ㅓ'자 단면 형상의 돌출부(712)를 포함할 수 있다.
이때, 결착부(71)의 매립부(711)는 벽면에 매립되지 않고, 벽면에 접착제나 실리콘으로 고정될 수도 있다.
케이스(72)는 일정한 폭과 길이를 갖는 직사각형 블록 형상으로 형성될 수 있다.
따라서, 케이스(72)는 현관의 가장자리에 일정 높이의 턱을 형성할 수 있다.
이러한 케이스(72)는 알루미늄을 일정한 길이와 폭을 갖는 블록 형상으로 압출성형하여 제작될 수 있다.
이때, 케이스(72)는 제조단가를 절감하고, 운반 시 작업자가 많은 힘을 쓰지 아니하도록 양면이 개방되고 내부가 빈 통 형상으로 형성될 수 있다.
케이스(72)의 양면에는 마감덮개(미도시)가 피스나 볼트로 결합될 수 있다.
따라서, 케이스(72)의 내부에는 피스나 볼트가 체결되는 체결구(721)가 형성될 수 있다.
케이스(72)의 후면에는 돌출부(712)를 따라 슬라이딩되는 슬라이딩홈(72a)이 길이방향을 따라 형성될 수 있다.
따라서, 케이스(72)는 슬라이딩홈(72a)에 돌출부(712)가 삽입됨으로 인해 벽면에 밀착된 상태를 유지한다.
케이스(72)의 상면 후측과 전면 하측에는 후술되는 마감부(40)를 고정하는 절곡형 부가 걸림부(722)가 각각 형성될 수 있다.
케이스(72)의 상면에 형성되는 절곡형 부가 걸림부(722)는 대략 'ㄱ'자 단면 형상으로 형성되어 케이스(72)의 상면에 배치되는 부가 마감부(73) 상면과 측면에 접촉되어, 해당 부가 마감부(73)가 상측으로 이탈하는 것을 방지한다.
그리고, 케이스(72)의 하측에 형성된 절곡형 부가 걸림부(722)는 대략 'ㄴ'자 단면 형상으로 형성되어 케이스(72)의 전면에 배치되는 부가 마감부(73)의 전면 하측부분과 저면에 접촉되어, 해당 부가 마감부(73)가 전측으로 이탈하는 것을 방지한다.
그리고, 케이스(72)의 전면측 상면의 가장자리에는 부가 고정부(74)가 결합되는 부가 고정홈(72b)이 경사지게 형성된다.
부가 마감부(73)는 케이스(72)의 상면 및 전면을 각각 마감하는 것으로, 공지의 타일로 형성될 수 있다.
부가 마감부(73)는 각각 케이스(72)와 동일한 길이를 갖도록 형성되거나 또는, 복수개로 적용되어 측면이 서로 접촉되는 형태로 시공될 수 있다.
부가 마감부(73)는 복수개로 적용될 경우 서로 접촉되는 측면이 실리콘이나 접착제를 통해 결합될 수 있다.
부가 마감부(73)는 각각 케이스(72)의 상면 전체와 전면 전체를 마감하도록 구성된다.
이때, 케이스(72)의 상면을 마감하는 부가 마감부(73)는 그 좌측이 케이스(72)의 상측에 형성된 절곡형 부가 걸림부(722)에 의해 고정되고 그 우측은 후술되는 부가 고정부(74)에 의해 고정된다.
그리고, 케이스(72)의 전면을 마감하는 부가 마감부(73)는 그 상측이 후술되는 부가 고정부(74)에 의해 고정되고, 그 하측은 케이스(72)의 전면 하측에 형성된 절곡형 부가 걸림부(722)에 의해 고정된다.
부가 고정부(74)는 부가 바디부(741) 및 부가 헤드부(742)를 포함할 수 있다.
바디부(51)는 부가 고정홈(72b)에 수용되어 경사진 구조를 이룬다.
바디부(51)의 둘레면에는 복수개의 부가 맞물림돌기(7411)가 일정간격으로 형성된다.
부가 맞물림돌기(7411)는 부가 고정홈(72b)의 내벽면과 맞물리면서 마찰을 발생시키도록 고무나 실리콘 재질로 형성될 수 있다.
부가 헤드부(742)는 부가 바디부(741)의 일측에 형성되고 부가 고정홈(72b)의 외부로 돌출된다.
부가 헤드부(742)의 일측과 타측에는 케이스(72)의 상면과 전면에 배치된 부가 마감부(73)를 각각 가압하는 한 상의 부가 가압편(7421)이 형성된다.
즉, 케이스(72)의 상면과 전면에 부가 마감부(73)를 각각 배치한 다음, 부가 바디부(741)를 부가 고정홈(72b)에 삽입하기만 하면 부가 가압편(7421)이 부가 마감부(73)를 각각 가압함으로, 케이스(72)에 마감부(40)를 쉽고 안정적으로 결합할 수 있는 것이다.
다음으로, 도 4를 참고하여 본 발명의 일 실시예에 따른 건축물의 현관 바닥구조에 적용된 레일부(80)와, 조명부(90) 및 가압부(100)에 대해 설명한다.
도 4는 도 2에 비해 레일부(80)와, 조명부(90) 및 가압부(100)가 더 적용된 것으로, 이하에서는 레일부(80)와, 조명부(90) 및 가압부(100)에 대해서면 중점으로 설명하기로 한다.
베이스(10)의 상면 일정 영역에는 서로 이격되게 배치되는 복수개의 끼움홈(10c)이 형성된다.
그리고, 레일부(80)의 저면에는 끼움홈(10c)에 각각 끼움되는 끼움돌출부가 형성된다.
레일부(80)의 상면에는 가이드레일(81)이 형성된다.
가이드레일(81)은 홈으로 형성되며 레일부(80)의 길이방향을 따라 형성된다.
가이드레일(81)에는 연동식 3중 도어(미도시)의 하측이 각각 슬라이딩 가능하게 결합된다.
연동식 3중 도어는 도 4를 기준으로 가장 좌측에 위치된 가이드레일(81)에 결합되어 실내측에 위치되는 제1 도어와, 가장 우측에 위치된 가이드레일(81)에 결합되어 현관측에 위치되는 제2 도어 및 중앙에 위치된 가이드레일(81)에 결합되어 제1 도어와 제2 도어의 사이에 위치되는 제3 도어를 포함할 수 있다.
연동식 3중 도어는 제1 도어 또는 제2 도어를 개방 또는 폐쇄할 때 제3 도어가 연동하여 작동한다. 이러한 연동식 3중 도어는 상용화 된 기술이므로, 구체적인 설명은 생략한다.
베이스(10)의 전면 하측에는 매립홈(10d)이 형성되고, 매립홈(10d)에는 조명부(90)가 매립된다.
이때, 조명부(90)는 베이스(10)의 전면에 위치된 마감부(40)의 하측에 소정간격 이격되도록 배치된다.
그리고, 마감부(40)와 조명부(90)의 사이 공간에는 가압부(100)가 삽입된다.
도 4에 도시된 바와 같이, 가압부(100)는 볼트 구조로써, 몸체가 마감부(40)와 조명부(90)의 사이 공간에 끼움되고, 헤드는 외부로 돌출되어 마감부(40) 및 조명부(90)를 공동으로 가압하여 고정시킨다.
이때, 가압부(100)의 몸체는 고무나 실리콘 재질로 형성되어 마감부(40)와 조명부(90)의 사이에 억지끼움으로 끼움고정되면서 마감부(40) 및 조명부(90)를 안정적으로 고정하게 된다.
그리고, 조명부(90)의 하측은 절곡형 걸림부(122)에 의해 고정된다.
조명부(90)는 외부전원을 공급받아 빛을 발생시키는 LED로 형성될 수 있다.
LED는 공지의 3색 LED나 색상이 다양하게 가변되는 제품으로 형성될 수 있다.
이러한 조명부(90)를 통해 현관을 다양한 형태로 연출할 수 있다.
본 발명이 속하는 기술분야의 통상의 지식을 가진 자는 본 발명이 그 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 실시될 수 있다는 것을 이해할 수 있을 것이다. 그러므로 이상에서 기술한 실시예들은 모든 면에서 예시적인 것이며 한정적이 아닌 것으로 이해해야만 한다. 본 발명의 범위는 상기 상세한 설명보다는 후술하는 특허청구의 범위에 의하여 나타내어지며, 특허청구의 범위의 의미 및 범위 그리고 그 균등 개념으로부터 도출되는 모든 변경 또는 변형된 형태가 본 발명의 범위에 포함되는 것으로 해석되어야 한다.
* 부호의 설명 *
10 : 베이스 10a : 삽입홈
10b : 고정홈 11,121 : 보강립
12 : 전면판 122 : 걸림부
13 : 마감캡 131 : 가압헤드
20 : 승강가이드 30 : 높낮이 조절부
40 : 마감부 50 : 고정부
51 : 바디부 511 : 고정캡
52 : 헤드부 521 : 가압편
60 : 방진패드 70 : 몰딩부
71 : 결착부 711 : 매립부
712 : 돌출부 72 : 케이스
72a : 슬라이딩홈 72b : 부가 고정홈
721 : 체결구 722 : 부가 걸림부
73 : 부가 마감부 74 : 부가 고정부
741 : 부가 바디부 7411 : 부가 맞물림돌기
742 : 부가 헤드부 7421 : 부가 가압편
80 : 레일부 81 : 가이드레일
90 : 조명부 100 : 가압부

Claims (6)

  1. 현관측에 배치되는 베이스;
    상기 베이스의 하측에 서로 이격되도록 배치되는 승강가이드; 및
    상기 승강가이드에 각각 체결되며, 정방향 또는 역방향 회전에 의해 상기 베이스를 상승 또는 하강시키는 높낮이 조절부;를 포함하는 건축물의 현관 바닥구조.
  2. 제1항에 있어서,
    상기 베이스의 상측 가장자리에는 고정홈이 경사지게 형성되고,
    상기 베이스의 상면 및 현관문과 마주하는 전면을 각각 마감하는 마감부; 및
    상기 고정홈에 수용되는 바디부 및 상기 바디부의 일측에 형성되고, 일측과 타측에 상기 베이스의 상면과 전면에 배치된 마감부를 각각 가압하는 한 쌍의 가압편이 형성된 헤드부를 포함하는 고정부를 포함하며,
    상기 베이스의 전면 하측에는 상기 베이스의 전면을 마감하는 마감부를 지지하는 걸림부가 형성된 건축물의 현관 바닥구조.
  3. 제1항에 있어서,
    상기 높낮이 조절부의 상면에 안착되며, 상기 베이스의 저면을 지지하는 방진패드를 더 포함하는 건축물의 현관 바닥구조.
  4. 제1항에 있어서,
    상기 현관의 바닥 가장자리면에 설치되는 몰딩부를 더 포함하고,
    상기 몰딩부는,
    상기 현관의 벽면에 매립되고, 일부분이 벽면의 외부로 돌출되는 결착부;
    상기 현관의 바닥에 안착되고, 후면에 상기 벽면의 외부로 돌출된 결착부를 따라 슬라이딩되는 슬라이딩홈이 길이방향을 따라 형성되며, 상면과 전면 하측에 부가 걸림부가 각각 형성되며, 전측의 상측 가장자리에 부가 고정홈이 경사지게 형성되는 케이스;
    상기 케이스의 상면과 전면에 각각 배치되며, 상기 일측 가장자리 부분이 상기 걸림부에 각각 걸려 고정되는 부가 마감부; 및
    상기 부가 고정홈에 수용되고 외면에 부가 고정홈의 내벽면과 맞물리는 부가 맞물림돌기가 형성된 부가 바디부 및 상기 부가 바디부의 일측에 형성되고, 일측과 타측에 상기 케이스의 상면과 전면에 배치된 부가 마감부를 각각 가압하는 한 쌍의 부가 가압편이 형성된 부가 헤드부를 포함하는 부가 고정부를 포함하는 건축물의 현관 바닥구조.
  5. 제1항에 있어서,
    상기 베이스의 상면 일정 영역에는 서로 이격되는 복수개의 끼움홈이 길이방향을 따라 형성되고,
    상기 끼움홈에 각각 끼움되고 상면에 도어의 슬라이딩을 가이드하는 가이드레일이 형성된 레일부를 더 포함하는 현관 바닥구조.
  6. 제1항에 있어서,
    상기 베이스의 전면에는 매립홈이 형성되고,
    상기 매립홈에 매립되는 조명부를 더 포함하는 현관 바닥구조.
PCT/KR2022/011142 2021-08-02 2022-07-28 건축물의 현관 바닥구조 WO2023013980A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020210101141A KR102419822B1 (ko) 2021-08-02 2021-08-02 건축물의 현관 바닥구조
KR10-2021-0101141 2021-08-02

Publications (1)

Publication Number Publication Date
WO2023013980A1 true WO2023013980A1 (ko) 2023-02-09

Family

ID=82419737

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2022/011142 WO2023013980A1 (ko) 2021-08-02 2022-07-28 건축물의 현관 바닥구조

Country Status (2)

Country Link
KR (1) KR102419822B1 (ko)
WO (1) WO2023013980A1 (ko)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102419822B1 (ko) * 2021-08-02 2022-07-12 이준호 건축물의 현관 바닥구조

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200236843Y1 (ko) * 2001-03-30 2001-10-10 (주) 성록 실내경기장용 바닥구조 및 이에 사용되는 레벨쿠션조절볼트
KR20040070359A (ko) * 2003-02-03 2004-08-09 김태일 건축물용 바닥재
KR102180018B1 (ko) * 2020-03-19 2020-11-17 장윤호 흔들림 방지 도어 시스템
US10920430B1 (en) * 2019-11-11 2021-02-16 Hae Kwang Co., Ltd. Support structure for supporting floor panel and access floor system including support structure
KR102272240B1 (ko) * 2020-10-15 2021-07-02 (주)부산건축종합건축사사무소 공동주택 현관 입구의 논슬립 및 공기청정 먼지 흡입 발판
KR102419822B1 (ko) * 2021-08-02 2022-07-12 이준호 건축물의 현관 바닥구조

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100604238B1 (ko) 2005-12-22 2006-07-28 주식회사 길종합건축사사무소 청소가 용이한 공동주택의 현관바닥의 구조

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200236843Y1 (ko) * 2001-03-30 2001-10-10 (주) 성록 실내경기장용 바닥구조 및 이에 사용되는 레벨쿠션조절볼트
KR20040070359A (ko) * 2003-02-03 2004-08-09 김태일 건축물용 바닥재
US10920430B1 (en) * 2019-11-11 2021-02-16 Hae Kwang Co., Ltd. Support structure for supporting floor panel and access floor system including support structure
KR102180018B1 (ko) * 2020-03-19 2020-11-17 장윤호 흔들림 방지 도어 시스템
KR102272240B1 (ko) * 2020-10-15 2021-07-02 (주)부산건축종합건축사사무소 공동주택 현관 입구의 논슬립 및 공기청정 먼지 흡입 발판
KR102419822B1 (ko) * 2021-08-02 2022-07-12 이준호 건축물의 현관 바닥구조

Also Published As

Publication number Publication date
KR102419822B1 (ko) 2022-07-12

Similar Documents

Publication Publication Date Title
WO2023013980A1 (ko) 건축물의 현관 바닥구조
WO2010114236A2 (ko) 바닥재
WO2019160234A1 (ko) 레벨 조절 및 충격 흡수가 가능한 우드블럭 모듈
WO2018030571A1 (ko) 블록 설치용 파레트
WO2015016426A1 (ko) 벽체 마감장치
WO2019160233A1 (ko) 퀵 클립 모듈을 포함하는 데크재 모듈
WO2010101351A2 (ko) 시공이 용이한 창호장치
WO2019074283A1 (ko) 강합성콘크리트용 선조립 철골 조립체와 경량 영구거푸집의 결합 구조
WO2014025165A1 (ko) 외단열 패널 어셈블리 및 이를 이용한 건축물의 외단열 시공방법
WO2020256449A1 (ko) 높이조절부를 구비한 벽체 시스템
WO2011096635A2 (ko) 건축용 패널과 보강판
WO2014021498A1 (ko) 건축 내외장재 설치용 고정구
WO2018016888A1 (ko) 화장실 바닥 방수체 및 그 제조방법과 시공방법
WO2015102353A1 (ko) 조립식 벽돌
WO2011139123A2 (ko) 커튼월시스템
WO2018070634A1 (ko) 철근콘크리트 프레임 내진 보강용 pc 벽 패널, pc 벽 패널을 이용한 철근콘크리트 프레임 내진 보강 구조 및 이의 시공 방법
WO2021025354A1 (ko) 외장패널 설치구조
WO2014046388A2 (ko) 구조 변경이 용이한 창호장치
WO2016200131A1 (ko) 단열 시스템 및 이를 이용한 시공방법
WO2024096296A1 (ko) 수조용 타일과 그 제조방법
WO2024076082A1 (ko) 가벽용 무피스 조립블록 어셈블리
WO2013009001A1 (ko) 가변형 저장창고
WO2013154357A1 (ko) 건축용 몰딩장치
WO2012128503A1 (ko) 에어 시일드 윈도우
WO2021177515A1 (ko) 조립이 용이한 용마루 구조

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 22853358

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE