WO2022139030A1 - 나셀 라이다를 이용한 풍력발전기 제어시스템 및 이를 이용한 풍력발전기 제어방법 - Google Patents
나셀 라이다를 이용한 풍력발전기 제어시스템 및 이를 이용한 풍력발전기 제어방법 Download PDFInfo
- Publication number
- WO2022139030A1 WO2022139030A1 PCT/KR2020/018984 KR2020018984W WO2022139030A1 WO 2022139030 A1 WO2022139030 A1 WO 2022139030A1 KR 2020018984 W KR2020018984 W KR 2020018984W WO 2022139030 A1 WO2022139030 A1 WO 2022139030A1
- Authority
- WO
- WIPO (PCT)
- Prior art keywords
- wind
- future
- power generator
- nacelle
- lidar
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000005259 measurement Methods 0.000 claims abstract description 25
- 238000010586 diagram Methods 0.000 description 4
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D7/00—Controlling wind motors
- F03D7/02—Controlling wind motors the wind motors having rotation axis substantially parallel to the air flow entering the rotor
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D80/00—Details, components or accessories not provided for in groups F03D1/00 - F03D17/00
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01S—RADIO DIRECTION-FINDING; RADIO NAVIGATION; DETERMINING DISTANCE OR VELOCITY BY USE OF RADIO WAVES; LOCATING OR PRESENCE-DETECTING BY USE OF THE REFLECTION OR RERADIATION OF RADIO WAVES; ANALOGOUS ARRANGEMENTS USING OTHER WAVES
- G01S17/00—Systems using the reflection or reradiation of electromagnetic waves other than radio waves, e.g. lidar systems
- G01S17/88—Lidar systems specially adapted for specific applications
- G01S17/95—Lidar systems specially adapted for specific applications for meteorological use
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01W—METEOROLOGY
- G01W1/00—Meteorology
- G01W1/02—Instruments for indicating weather conditions by measuring two or more variables, e.g. humidity, pressure, temperature, cloud cover or wind speed
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A90/00—Technologies having an indirect contribution to adaptation to climate change
- Y02A90/10—Information and communication technologies [ICT] supporting adaptation to climate change, e.g. for weather forecasting or climate simulation
Definitions
- the present invention relates to a wind power generator control system using a nacelle lidar and a method for controlling a wind generator using the same, and more particularly, by detecting changes in wind speed and direction based on the measurement results of the nacelle lidar of the wind generator in advance to generate a wind power generator. It relates to a wind turbine control system using a nacelle lidar capable of controlling the pitch and yaw of the wind turbine and a method for controlling the wind turbine using the same.
- a wind vane and anemometer for measuring the speed and direction of wind are provided on the upper part of the nacelle of the wind generator.
- control of the wind generator is performed based on the direction of the wind measured by the wind vane, and the anemometer is the wind generator. It is not used to control
- Korean Patent Registration No. 10-1280764 discloses a wind turbine control method using wind speed feedforward control. It discloses a technique to perform.
- Korean Patent No. 10-1956715 discloses a wind direction prediction method light device for yaw control of a wind turbine, and discloses a technology for performing yaw control of a wind turbine based on past wind direction data.
- the wind power generator is controlled based on measured data, that is, past measurement data. It is difficult and causes problems such as an increase in the load applied to the wind power generator.
- an object of the present invention is to detect a change in wind speed and a change in wind direction in advance based on the measurement result of the nacelle lidar of the wind power generator to determine the pitch and yaw ( It is to provide a wind turbine control system using a nacelle lidar that can control yaw).
- Another object of the present invention is to provide a method for controlling a wind power generator using the wind power generator control system.
- a wind turbine control system includes a nacelle lidar, an operation unit and a control unit.
- the nacelle lidar measures forward future wind speed, and forward past and future wind directions.
- the calculation unit includes a wind speed calculation unit for calculating a future wind speed change based on the measurement result of the nacelle lidar, and a wind direction calculation unit for calculating a future wind direction change based on the measurement result of the nacelle lidar.
- the control unit includes a pitch control unit for controlling the pitch of the wind power generator based on the calculation result of the wind speed calculation unit, and a yaw control unit for controlling the yaw of the wind power generator based on the calculation result of the wind direction calculation unit.
- the pitch control unit may control the angle of the wing portion of the wind power generator
- the yaw control unit may control the direction in which the wind power generator faces.
- the pitch control unit may control the turbine of the wind power generator and, at the same time, control the pitch of the wind power generator based on the calculation result of the wind speed calculating unit.
- the nacelle lidar measures the wind speed in front of the nacelle lidar by a predetermined distance, and the nacelle lidar measures the wind direction through the nacelle lidar, and at a predetermined distance ahead of the nacelle lidar Wind direction can be measured.
- the wind direction calculating unit may calculate the future wind direction change by simultaneously considering a yaw error from a specific time in the past to the present and a current yaw error.
- the wind direction calculating unit may calculate the future wind direction change by applying a first weight to the yaw error from the specific time in the past to the present and applying a second weight to the future yaw error. have.
- a method for controlling a wind power generator includes the steps of measuring a future wind speed with a nacelle lidar, and calculating a change in future wind speed based on the measurement result of the nacelle lidar Step, calculating a pitch control value of the wind generator based on the future wind speed change, measuring the past and future wind directions with the nacelle lidar, future wind direction change based on the measurement result of the nacelle lidar calculating a yaw control value of the wind power generator based on the future wind direction change, and controlling the pitch and yaw of the wind power generator based on the calculated pitch control value and yaw control value includes
- the nacelle lidar measures the wind speed in a predetermined distance ahead of the nacelle lidar to measure a future wind speed, and the nacelle lidar measures a wind direction through the nacelle lidar, and the nacelle lidar By measuring the wind direction ahead of a predetermined distance, it is possible to measure the wind direction in the past and the future.
- both future wind speed changes and wind direction changes can be calculated based on the measurement results of the nacelle lidar, and accordingly, the change in wind speed or direction is changed in real time without following the already changed wind speed or wind direction. It can follow the wind speed and direction.
- the calculation of future wind direction change takes into account the yaw error from a specific time in the past to the present and the future yaw error at the same time, and can be predicted by applying different weights as needed or by changing the coefficients of the low-pass filter. Therefore, a more accurate prediction of future wind direction changes is possible.
- FIG. 1 is a perspective view showing a wind power generator controlled by a wind power generator control system according to an embodiment of the present invention.
- FIG. 2 is a block diagram illustrating the wind power generator control system of FIG. 1 .
- FIG. 3 is a schematic diagram illustrating a wind speed change or a wind direction change considered by the wind power generator control system of FIG. 1 .
- FIG. 4 is a graph showing comparison of the control results of the wind power generator control system and the wind power generator control system of FIG. 1 according to the prior art.
- FIG. 5 is a flowchart illustrating a wind power generator control method using the wind power generator control system of FIG. 1 .
- FIG. 1 is a perspective view showing a wind power generator controlled by a wind power generator control system according to an embodiment of the present invention.
- FIG. 2 is a block diagram illustrating the wind power generator control system of FIG. 1 .
- 3 is a schematic diagram illustrating a wind speed change or a wind direction change considered by the wind power generator control system of FIG. 1 .
- the wind power generator control system 1 includes a wind power generator 10 , a Nacelle Lidar 20 , an operation unit 30 , and a control unit 40 . do.
- the wind power generator 10 includes a pillar portion 11 extending from the ground in an upward direction, a wing portion 12 rotating toward the front at the end of the pillar portion 11 , and the blade portion 12 . It includes a nacelle 13 that is located on the rear side of or at the upper end of the column part 11 and is provided with a controller 40 for controlling the operation of the wing part 12 .
- the nacelle lidar 20 is located in the nacelle 13 , and measures the wind speed or direction in front of the wind power generator 10 .
- the nacelle lidar 20 measures the direction and speed of the wind in the front, and the direction of the wind in the X, Y, and Z directions at a specific position in the front, and the speed of the wind in each direction will measure
- the nacelle lidar 20 measures the wind speed in front of the wind power generator 10 , thereby measuring a future wind speed that eventually reaches the wind power generator 10 .
- the third wind speed of the wind 53 located at the third distance S3 may be measured. (In this case, it is assumed that S1 ⁇ S2 ⁇ S3)
- the first wind speed of the wind 51 located at the first distance S1 reaches the wind generator 10 after a first time t1 from the present, and the wind located at the second distance S2
- the second wind speed of 52 reaches the wind power generator 10 after a second time t2 from the present
- the third wind speed of the wind 53 located at the third distance S3 is the third Since it arrives at the wind power generator 10 after time t3 (in this case, t1 ⁇ t2 ⁇ t3)
- the nacelle lidar 20 measures the wind speed of the front wind, and the wind power generator 10 to measure the future wind speed reaching
- the nacelle lidar 20 continuously measures the first wind speed of the wind 51 located at a predetermined first distance S1, and reaches the wind generator 10 after the first time t1. It is also possible to measure the wind speed continuously.
- the nacelle lidar 20 measures the future wind speed reaching the wind power generator 10 and provides it to the calculating unit 30 .
- the nacelle lidar 20 not only measures the wind direction that has passed through the wind power generator 10 in the past, but also measures the wind direction in front of the wind power generator 10, so that the wind power generator 10 is eventually The past wind direction reached and the future wind direction reaching the wind generator 10 are measured.
- the nacelle lidar 20 is not shown, but measures the wind direction that has passed through the nacelle lidar 20 in the past and provides a corresponding measurement result to the operation unit 30 .
- the wind direction information of the forward wind in the past time can be referred to as the past wind direction information, so it is better to measure the wind direction in the past. It is possible.
- the first wind direction of the wind 51 located at the first distance S1 from the wind generator 10 , the second distance S2 ), the second wind direction of the wind 52 located at , and the third wind direction of the wind 53 located at the third distance S3 may be measured, respectively.
- the first wind direction of the wind 51 located at the first distance S1 reaches the wind generator 10 after a first time t1 from the present, and the wind located at the second distance S2
- the second wind direction of 52 reaches the wind generator 10 after a second time t2 from the present
- the third wind direction of the wind 53 located at the third distance S3 is the third Since it arrives at the wind power generator 10 after time t3, the nacelle lidar 20 measures the wind direction of the front wind, thereby measuring the future wind direction reaching the wind power generator 10. .
- the nacelle lidar 20 continuously measures the first wind direction of the wind 51 located at a predetermined first distance S1, and thus reaches the wind generator 10 after a first time t1. It is also possible to continuously measure the wind direction of the wind.
- the nacelle lidar 20 measures the future wind direction reaching the wind generator 10 and provides it to the calculating unit 30 .
- the calculating unit 30 includes a wind speed calculating unit 31 and a wind direction calculating unit 32 .
- the wind speed calculating unit 31 calculates a future wind speed change based on the measurement result of the future wind speed reaching the wind power generator 10 from the nacelle lidar 20 .
- the wind speed calculating unit 31 the measurement result of the wind speed of the wind located a predetermined distance forward from the wind power generator 10 measured by the nacelle lidar 20, and the predetermined distance to the front where the wind is located Based on information on the distance, information on the expected time until the wind reaches the wind power generator 10, etc., the wind speed is calculated in the future, that is, a time after a certain time has elapsed from the present, and thus the constant By continuously performing the wind speed calculation results at the time after the elapse of time, the future wind speed change is continuously calculated.
- the pitch control value of the wind power generator can be calculated based on this.
- the wind direction calculating unit 32 includes a measurement result of a past wind direction passing through the wind power generator 10 from the nacelle lidar 20 and a measurement result of a future wind direction reaching the wind power generator 10 . Based on this, the future wind direction change is calculated.
- the wind direction calculating unit 32 calculates a yaw error defined as a difference between the direction in which the wind power generator 10 is heading and the direction in which the wind travels. Calculate wind direction change.
- the wind direction calculating unit 32 based on the measurement result of the wind direction of the wind passing through the wind generator 10 measured by the nacelle lidar 20 , the yaw error from a specific time in the past to the present calculate
- the wind direction calculation unit 32 calculates the measurement result of the wind direction of the wind located a predetermined distance ahead from the wind power generator 10 measured by the nacelle lidar 20 and the predetermined distance to the front where the wind is located Based on the distance information and information on the expected time until the wind reaches the wind generator 10, the yaw error due to the wind direction is calculated in the future, that is, after a certain time has elapsed from the present. In this way, by continuously performing the calculation result of the yaw error at the time after the elapse of a predetermined time, the future yaw error is continuously calculated.
- the wind direction calculating unit 32 calculates a yaw error from a specific time in the past to the present from the past wind direction, calculates a future yaw error from the future wind direction, and calculates the yaw error between the past yaw error and the future
- the future wind direction change is calculated by considering the yaw error at the same time.
- the wind direction calculating unit 32 may calculate the future wind direction change by applying a first weight to the past yaw error and applying a second weight to the future yaw error. .
- the first weight and the second weight can be set in various ways. Considering that future wind direction change is predicted, and information on the future wind direction should be further taken into consideration, the first weight can be set to the first weight. It may be set smaller than 2 weights.
- the wind direction calculating unit 320 may calculate a future wind direction change by changing the coefficients of a low path filter differently for the past yaw error and the future yaw error.
- the wing portion 12 of the wind power generator 10 is controlled to match the wind direction.
- Rotating the wing unit 12 requires a relatively large amount of time, since a future yaw error may be further changed in the process of rotating the wing unit 12 .
- the wing 12 is rotated to match the future yaw error in consideration of only the future yaw error, the wing 12 is rotated to match the yaw error at a specific future time.
- the yaw error of may be changed, and accordingly, if only the future yaw error is followed, the control of the wing unit 12 becomes difficult to accurately follow the wind direction.
- the wing part By compensating for the limit of the rotation speed of 12), it is possible to control the wind power generator 10 to minimize the yaw error.
- the yaw control value of the wind power generator can be calculated based on this.
- the control unit 40 includes a pitch control unit 41 and a yaw control unit 42 .
- the pitch control unit 41 controls the angle of the wing unit 12 of the wind power generator 10 to match the future wind speed based on the calculation result of the future wind speed change calculated by the wind speed calculating unit 31 . .
- the pitch of the wind power generator 10 that is, the angle of the blade part 12 is controlled based on this.
- the output of the wind power generator 10 can be maintained constant.
- the pitch control unit 41 merely controls the turbine of the wind generator to maintain the output constant, but in this embodiment, the control of the turbine as well as the future wind speed as described above By controlling the angle of the wing portion 12 to match, the output of the wind power generator 10 can be more uniformly controlled.
- the yaw control unit 42 controls the direction in which the wing unit 12 of the wind power generator 10 faces to match the future wind direction based on the calculation result of the future wind direction change calculated by the wind direction calculating unit 32 . do.
- the yaw control value is calculated from the calculation result of the future wind direction change
- the yaw of the wind power generator 10 that is, the direction in which the wind power generator 10 faces
- FIG. 4 is a graph showing comparison of the control results of the wind power generator control system and the wind power generator control system of FIG. 1 according to the prior art.
- the wind power generator in the case of a sudden change in wind speed at a specific time (t), according to the conventional control system, the wind power generator only after a predetermined time elapses from the time (t) at which the sudden change in wind speed occurs.
- the pitch angle of the wind power generator changes at a time almost identical to the time t when the wind speed change occurs, and follows the wind speed change almost as it is. can be checked.
- the rotational direction of the blades follows the direction of the wind well, as well as the rotational speed of the blades and the load applied to the wind turbine as a whole changes the wind speed. It can be seen that it remains constant irrespective of
- FIG. 5 is a flowchart illustrating a wind power generator control method using the wind power generator control system of FIG. 1 .
- the wind speed calculating unit 31 calculates a change in the future wind speed based on the measurement result of the measured future wind speed (step S20).
- the wind speed calculating unit 31 calculates the pitch control value of the wind power generator 10 based on the information on the future wind speed change (step S30), and based on the calculated pitch control value, , the pitch control unit 41 controls the pitch of the wind power generator 10 (step S40).
- the past and future wind directions are measured using the nacelle lidar 20 (step S11), and the wind direction calculation unit 32 based on the measured past and future wind directions. calculates future wind direction change (step S21).
- the wind direction calculating unit 32 calculates the yaw control value of the wind power generator 10 based on the change in the future wind direction (step S31), and based on the calculated yaw control value, the yaw control value
- the control unit 42 controls the yaw of the wind power generator 10 (step S40).
- both the future wind speed change and the wind direction change can be calculated based on the measurement result of the nacelle lidar, and accordingly, the changed wind speed or wind direction is not followed in real time without following. It can follow the changing wind speed and direction.
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Combustion & Propulsion (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- General Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Computer Networks & Wireless Communication (AREA)
- Atmospheric Sciences (AREA)
- Biodiversity & Conservation Biology (AREA)
- Ecology (AREA)
- Environmental Sciences (AREA)
- Wind Motors (AREA)
Abstract
나셀 라이다를 이용한 풍력발전기 제어시스템 및 이를 이용한 풍력발전기 제어방법에서, 상기 풍력발전기 제어시스템은 나셀 라이다, 연산부 및 제어부를 포함한다. 상기 나셀 라이다는 전방의 미래의 풍속, 및 전방의 과거 및 미래의 풍향을 측정한다. 상기 연산부는 상기 나셀 라이다의 측정 결과를 바탕으로 미래의 풍속변화를 연산하는 풍속 연산부, 및 상기 나셀 라이다의 측정 결과를 바탕으로 미래의 풍향변화를 연산하는 풍향 연산부를 포함한다. 상기 제어부는 상기 풍속 연산부의 연산 결과를 바탕으로 풍력 발전기의 피치(pitch)를 제어하는 피치 제어부, 및 상기 풍향 연산부의 연산 결과를 바탕으로 풍력 발전기의 요(yaw)를 제어하는 요 제어부를 포함한다.
Description
본 발명은 나셀 라이다를 이용한 풍력발전기 제어시스템 및 이를 이용한 풍력발전기 제어방법에 관한 것으로, 더욱 상세하게는 풍력발전기의 나셀 라이다의 측정 결과를 바탕으로 풍속 변화 및 풍향 변화를 미리 감지하여 풍력발전기의 피치(pitch)와 요(yaw)를 제어할 수 있는 나셀 라이다를 이용한 풍력발전기 제어시스템 및 이를 이용한 풍력발전기 제어방법에 관한 것이다.
풍력 발전기의 나셀(Nacelle) 상부에는 바람의 속도와 방향을 계측하는 풍향계 및 풍속계가 구비되는데, 일반적으로, 풍향계에서 측정되는 바람의 방향을 바탕으로 풍력발전기에 대한 제어가 수행되며, 풍속계는 풍력발전기에 대한 제어에는 사용되지 않는다.
이러한 풍력 발전기에 제어와 관련하여, 대한민국 등록특허 제10-1280764호에서는 풍속 피드포워드 제어를 이용한 풍력 터빈 제어방법을 개시하고 있으며, 풍력 발전기의 거동에서 풍속을 추정하여 이를 바탕으로 풍력 터빈의 제어를 수행하는 기술을 개시하고 있다.
또한, 대한민국 등록특허 제10-1956715호에서는 풍력 터빈의 요 제어를 위한 풍향 예측 방법 빛 장치를 개시하며, 과거의 풍향 데이터를 바탕으로 풍력 터빈의 요 제어를 수행하는 기술을 개시하고 있다.
이상과 같이, 종래 대부분의 풍력 발전기의 제어에서는, 측정된 데이터, 즉 과거의 측정 데이터를 바탕으로 풍력 발전기를 제어하는 것으로 이러한 제어의 경우, 풍속 변화 이후에 풍력 발전기가 후속하여 제어되는 것으로 정확한 제어가 어려우며, 풍력 발전기에 인가되는 하중이 증가하는 등의 문제를 야기하게 된다.
이에, 본 발명의 기술적 과제는 이러한 점에서 착안된 것으로 본 발명의 목적은 풍력발전기의 나셀 라이다의 측정결과를 바탕으로 풍속 변화 및 풍향 변화를 미리 감지하여 풍력발전기의 피치(pitch)와 요(yaw)를 제어할 수 있는 나셀 라이다를 이용한 풍력발전기 제어시스템을 제공하는 것이다.
또한, 본 발명의 다른 목적은 상기 풍력발전기 제어시스템을 이용한 풍력발전기 제어방법을 제공하는 것이다.
상기한 본 발명의 목적을 실현하기 위한 일 실시예에 의한 풍력발전기 제어시스템은 나셀 라이다, 연산부 및 제어부를 포함한다. 상기 나셀 라이다는 전방의 미래의 풍속, 및 전방의 과거 및 미래의 풍향을 측정한다. 상기 연산부는 상기 나셀 라이다의 측정 결과를 바탕으로 미래의 풍속변화를 연산하는 풍속 연산부, 및 상기 나셀 라이다의 측정 결과를 바탕으로 미래의 풍향변화를 연산하는 풍향 연산부를 포함한다. 상기 제어부는 상기 풍속 연산부의 연산 결과를 바탕으로 풍력 발전기의 피치(pitch)를 제어하는 피치 제어부, 및 상기 풍향 연산부의 연산 결과를 바탕으로 풍력 발전기의 요(yaw)를 제어하는 요 제어부를 포함한다.
일 실시예에서, 상기 피치 제어부는 상기 풍력 발전기의 날개부의 각도를 제어하고, 상기 요 제어부는 상기 풍력 발전기가 향하는 방향을 제어할 수 있다.
일 실시예에서, 상기 피치 제어부는, 상기 풍력 발전기의 터빈을 제어함과 동시에, 상기 풍속 연산부의 연산 결과를 바탕으로 풍력 발전기의 피치를 제어할 수 있다.
일 실시예에서, 상기 나셀 라이다는 상기 나셀 라이다보다 소정 거리 전방에서의 풍속을 측정하며, 상기 나셀 라이다는 상기 나셀 라이다를 통과한 풍향, 및 상기 나셀 라이다보다 소정 거리 전방에서의 풍향을 측정할 수 있다.
일 실시예에서, 상기 풍향 연산부는, 과거의 특정 시간으로부터 현재까지의 요에러(yaw error)와 현재의 요에러를 동시에 고려하여 상기 미래의 풍향변화를 연산할 수 있다.
일 실시예에서, 상기 풍향 연산부는, 상기 과거의 특정 시간으로부터 현재까지의 요에러에 제1 가중치를 인가하고, 상기 미래의 요에러에 제2 가중치를 인가하여 상기 미래의 풍향변화를 연산할 수 있다.
상기한 본 발명의 목적을 실현하기 위한 일 실시예에 의한 풍력발전기 제어방법은, 나셀 라이다로 미래의 풍속을 측정하는 단계, 상기 나셀 라이다의 측정 결과를 바탕으로 미래의 풍속 변화를 연산하는 단계, 상기 미래의 풍속 변화를 바탕으로 풍력 발전기의 피치 제어값을 연산하는 단계, 상기 나셀 라이다로 과거 및 미래의 풍향을 측정하는 단계, 상기 나셀 라이다의 측정 결과를 바탕으로 미래의 풍향 변화를 연산하는 단계, 상기 미래의 풍향변화를 바탕으로 상기 풍력 발전기의 요 제어값을 연산하는 단계, 및 상기 연산된 피치 제어값 및 요 제어값을 바탕으로 상기 풍력발전기의 피치와 요를 제어하는 단계를 포함한다.
일 실시예에서, 상기 나셀 라이다는 상기 나셀 라이다보다 소정 거리 전방에서의 풍속을 측정하여 미래의 풍속을 측정하고, 상기 나셀 라이다는 상기 나셀 라이다를 통과한 풍향, 및 상기 나셀 라이다보다 소정 거리 전방에서의 풍향을 측정하여, 과거 및 미래의 풍향을 측정할 수 있다.
본 발명의 실시예들에 의하면, 나셀 라이다의 측정 결과를 바탕으로, 미래의 풍속변화 및 풍향변화를 모두 연산할 수 있으며, 이에 따라 이미 변화된 풍속이나 풍향을 후속하여 추종하지 않고 실시간으로 변화하는 풍속과 풍향을 추종할 수 있다.
이를 통해, 특히 풍속변화를 바탕으로 한 피치의 실시간 제어를 통해, 갑자기 돌풍이 부는 등의 상황에서의 효과적인 추종으로 풍력 발전기에 인가되는 하중을 최소화할 수 있다.
또한, 풍향변화를 바탕으로 한 요의 실시간 제어도 가능하여, 풍력 발전기의 요 에러를 크게 감소시킬 수 있어, 풍력 발전기의 출력 증가를 도모할 수 있다.
특히, 미래의 풍향변화의 연산을 과거의 특정 시간으로부터 현재까지의 요에러와, 미래의 요에러를 동시에 고려하며, 필요에 따라 서로 다른 가중치를 인가하거나, 나아가 로우패스필터의 계수를 변경하여 예측할 수 있으므로, 미래의 풍향변화에 대한 보다 정확한 예측이 가능하게 된다.
도 1은 본 발명의 일 실시예에 의한 풍력발전기 제어시스템에 의해 제어되는 풍력 발전기를 도시한 사시도이다.
도 2는 도 1의 풍력발전기 제어시스템을 도시한 블록도이다.
도 3은 도 1의 풍력발전기 제어시스템에 의해 고려되는 풍속 변화 또는 풍향 변화를 도시한 모식도이다.
도 4는 종래기술에 의한 풍력발전기 제어시스템과 도 1의 풍력발전기 제어시스템의 제어 결과를 비교하여 도시한 그래프들이다.
도 5는 도 1의 풍력발전기 제어시스템을 이용한 풍력발전기 제어방법을 도시한 흐름도이다.
본 발명은 다양한 변경을 가할 수 있고 여러 가지 형태를 가질 수 있는 바, 실시예들을 본문에 상세하게 설명하고자 한다. 그러나 이는 본 발명을 특정한 개시 형태에 대해 한정하려는 것이 아니며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. 각 도면을 설명하면서 유사한 참조부호를 유사한 구성요소에 대해 사용하였다. 제1, 제2 등의 용어는 다양한 구성요소들을 설명하는데 사용될 수 있지만, 상기 구성요소들은 상기 용어들에 의해 한정되어서는 안 된다.
상기 용어들은 하나의 구성요소를 다른 구성요소로부터 구별하는 목적으로만 사용된다. 본 출원에서 사용한 용어는 단지 특정한 실시예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아니다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다.
본 출원에서, "포함하다" 또는 "이루어진다" 등의 용어는 명세서상에 기재된 특징, 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것이 존재함을 지정하려는 것이지, 하나 또는 그 이상의 다른 특징들이나 숫자, 단계, 동작, 구성요소, 부분품 또는 이들을 조합한 것들의 존재 또는 부가 가능성을 미리 배제하지 않는 것으로 이해되어야 한다.
다르게 정의되지 않는 한, 기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가지고 있다. 일반적으로 사용되는 사전에 정의되어 있는 것과 같은 용어들은 관련 기술의 문맥 상 가지는 의미와 일치하는 의미를 가지는 것으로 해석되어야 하며, 본 출원에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.
이하, 첨부한 도면들을 참조하여, 본 발명의 바람직한 실시예를 보다 상세하게 설명하고자 한다.
도 1은 본 발명의 일 실시예에 의한 풍력발전기 제어시스템에 의해 제어되는 풍력 발전기를 도시한 사시도이다. 도 2는 도 1의 풍력발전기 제어시스템을 도시한 블록도이다. 도 3은 도 1의 풍력발전기 제어시스템에 의해 고려되는 풍속 변화 또는 풍향 변화를 도시한 모식도이다.
도 1 내지 도 3을 참조하면, 본 실시예에 의한 풍력발전기 제어시스템(1)은 풍력 발전기(10), 나셀 라이다(Nacelle Lidar)(20), 연산부(30) 및 제어부(40)를 포함한다.
상기 풍력 발전기(10)는 상부 방향으로 지면으로부터 연장되는 기둥부(11), 상기 기둥부(11)의 끝단에 전면(前面)을 향하며 회전하는 날개부(12), 및 상기 날개부(12)의 후측이나 상기 기둥부(11)의 상측 끝단에 위치하여, 상기 날개부(12)의 동작을 제어하는 제어부(40) 등이 구비되는 나셀(13)을 포함한다.
상기 나셀 라이다(Nacelle Lidar)(20)는 상기 나셀(13)에 위치하여, 상기 풍력 발전기(10)가 향하는 전방의 풍속이나 풍향을 측정한다.
이 경우, 상기 나셀 라이다(20)는 전방의 바람의 방향 및 속도를 측정하는 것으로, 전방의 특정 위치에서의 X, Y, Z 방향으로의 바람의 방향, 및 각 방향으로의 바람의 속도를 측정하게 된다.
보다 구체적으로, 상기 나셀 라이다(20)는 풍력 발전기(10)의 전방에서의 풍속을 측정함으로써, 결국 상기 풍력 발전기(10)에 도달하는 미래의 풍속을 측정한다.
즉, 도 3에 도시된 바와 같이, 상기 풍력 발전기(10)로부터 제1 거리(S1)에 위치한 바람(51)의 제1 풍속, 제2 거리(S2)에 위치한 바람(52)의 제2 풍속, 제3 거리(S3)에 위치한 바람(53)의 제3 풍속 등을 각각 측정할 수 있다. (이 경우, S1<S2<S3라 가정함)
즉, 상기 제1 거리(S1)에 위치한 바람(51)의 제1 풍속이 현재로부터 제1 시간(t1) 후에 상기 풍력 발전기(10)로 도달하게 되며, 상기 제2 거리(S2)에 위치한 바람(52)의 제2 풍속이 현재로부터 제2 시간(t2) 후에 상기 풍력 발전기(10)로 도달하게 되며, 상기 제3 거리(S3)에 위치한 바람(53)의 제3 풍속이 현재로부터 제3 시간(t3) 후에 상기 풍력 발전기(10)로 도달하게 되므로(이 경우, t1<t2<t3), 상기 나셀 라이다(20)는 상기 전방의 바람의 풍속을 측정함으로써, 상기 풍력 발전기(10)에 도달하는 미래의 풍속을 측정하게 된다.
이와 달리, 상기 나셀 라이다(20)는 일정한 제1 거리(S1)에 위치한 바람(51)의 제1 풍속을 지속적으로 측정함으로써, 상기 풍력 발전기(10)로 제1 시간(t1) 이후에 도달하는 바람의 풍속을 연속적으로 측정할 수도 있다.
이와 같이, 상기 나셀 라이다(20)에서는 상기 풍력 발전기(10)에 도달하는 미래의 풍속을 측정하여, 상기 연산부(30)로 제공한다.
상기 나셀 라이다(20)는 상기 풍력 발전기(10)를 기 통과한 과거의 풍향을 측정하는 것은 물론, 상기 풍력 발전기(10)의 전방에서의 풍향을 측정함으로써, 결국 상기 풍력 발전기(10)에 도달한 과거의 풍향 및 상기 풍력 발전기(10)에 도달하는 미래의 풍향을 측정한다.
즉, 상기 나셀 라이다(20)는 도시하지는 않았으나, 상기 나셀 라이다(20)를 기 통과한 과거의 풍향을 측정하여 해당 측정 결과를 상기 연산부(30)로 제공한다. 이 경우, 상기 나셀 라이다(20)는 전방의 바람의 풍향을 측정할 수 있으므로, 과거 시간에서의 전방의 바람의 풍향 정보가 곧 과거의 풍향 정보라 할 수 있으므로, 과거의 풍향을 측정하는 것이 가능하다.
또한, 상기 나셀 라이다(20)와 유사하게, 도 3에 도시된 바와 같이, 상기 풍력 발전기(10)로부터 제1 거리(S1)에 위치한 바람(51)의 제1 풍향, 제2 거리(S2)에 위치한 바람(52)의 제2 풍향, 제3 거리(S3)에 위치한 바람(53)의 제3 풍향 등을 각각 측정할 수 있다.
즉, 상기 제1 거리(S1)에 위치한 바람(51)의 제1 풍향이 현재로부터 제1 시간(t1) 후에 상기 풍력 발전기(10)로 도달하게 되며, 상기 제2 거리(S2)에 위치한 바람(52)의 제2 풍향이 현재로부터 제2 시간(t2) 후에 상기 풍력 발전기(10)로 도달하게 되며, 상기 제3 거리(S3)에 위치한 바람(53)의 제3 풍향이 현재로부터 제3 시간(t3) 후에 상기 풍력 발전기(10)로 도달하게 되므로, 상기 나셀 라이다(20)는 상기 전방의 바람의 풍향을 측정함으로써, 상기 풍력 발전기(10)에 도달하는 미래의 풍향을 측정하게 된다.
이와 달리, 상기 나셀 라이다(20)는 일정한 제1 거리(S1)에 위치한 바람(51)의 제1 풍향을 지속적으로 측정함으로써, 상기 풍력 발전기(10)로 제1 시간(t1) 이후에 도달하는 바람의 풍향을 연속적으로 측정할 수도 있다.
이와 같이, 상기 나셀 라이다(20)에서는 상기 풍력 발전기(10)에 도달하는 미래의 풍향을 측정하여, 상기 연산부(30)로 제공한다.
상기 연산부(30)는 풍속 연산부(31) 및 풍향 연산부(32)를 포함한다.
상기 풍속 연산부(31)는 상기 나셀 라이다(20)로부터, 상기 풍력 발전기(10)로 도달하는 미래의 풍속에 대한 측정 결과를 바탕으로, 미래의 풍속변화를 연산한다.
즉, 상기 풍속 연산부(31)에서는, 상기 나셀 라이다(20)에서 측정된 상기 풍력 발전기(10)로부터 소정 거리 전방에 위치한 바람의 풍속에 대한 측정 결과와, 상기 바람이 위치하는 전방까지의 소정 거리에 대한 정보, 상기 바람이 상기 풍력 발전기(10)에 도달하기까지의 예상 시간에 대한 정보 등을 바탕으로, 미래, 즉 현재로부터 일정 시간 경과한 이후의 시간에서의 풍속을 연산하고, 이렇게 일정 시간 경과한 이후의 시간에서의 풍속 연산결과를 연속적으로 수행함으로써, 미래의 풍속 변화를 연속적으로 연산하게 된다.
이상과 같이, 상기 풍속 연산부(31)에서 미래의 풍속 변화를 연산하면, 이를 바탕으로 풍력 발전기의 피치 제어값을 연산할 수 있다.
상기 풍향 연산부(32)는 상기 나셀 라이다(20)로부터, 상기 풍력 발전기(10)를 통과한 과거의 풍향에 대한 측정 결과와, 상기 풍력 발전기(10)로 도달하는 미래의 풍향에 대한 측정 결과를 바탕으로, 미래의 풍향변화를 연산한다.
이 경우, 상기 풍향 연산부(32)에서는, 풍향과 관련하여 결국, 상기 풍력 발전기(10)가 향하는 방향과, 바람이 진행하는 방향의 차이로 정의되는 요 에러(yaw error)를 연산함으로써, 미래의 풍향 변화를 연산한다.
즉, 상기 풍향 연산부(32)에서는, 상기 나셀 라이다(20)에서 측정된 상기 풍력 발전기(10)를 통과한 바람의 풍향에 대한 측정 결과를 바탕으로, 과거의 특정 시간으로부터 현재까지의 요에러를 연산한다.
또한, 상기 풍향 연산부(32)에서는, 상기 나셀 라이다(20)에서 측정된 상기 풍력 발전기(10)로부터 소정 거리 전방에 위치한 바람의 풍향에 대한 측정 결과와, 상기 바람이 위치하는 전방까지의 소정 거리에 대한 정보, 상기 바람이 상기 풍력 발전기(10)에 도달하기까지의 예상 시간에 대한 정보 등을 바탕으로, 미래, 즉 현재로부터 일정 시간 경과한 이후의 시간에서의 풍향에 의한 요에러를 연산하고, 이렇게 일정 시간 경과한 이후의 시간에서의 요에러의 연산결과를 연속적으로 수행함으로써, 미래의 요에러를 연속적으로 연산하게 된다.
이상과 같이, 상기 풍향 연산부(32)에서는, 과거의 풍향으로부터 과거의 특정시간으로부터 현재까지의 요에러를 연산하고, 미래의 풍향으로부터 미래의 요에러를 연산하며, 상기 과거의 요에러와 미래의 요에러를 동시에 고려하여 미래의 풍향변화를 연산한다.
예를 들어, 상기 풍향 연산부(32)에서는, 상기 과거의 요에러에 대하여 제1 가중치를 인가하고, 상기 미래의 요에러에 대하여 제2 가중치를 인가하여, 상기 미래의 풍향변화를 연산할 수 있다.
이 경우, 상기 제1 가중치와 상기 제2 가중치는 다양하게 설정할 수 있으며, 미래의 풍향 변화를 예측하는 것으로, 미래의 풍향에 대한 정보가 더 고려되어야 함을 고려하면, 상기 제1 가중치가 상기 제2 가중치보다 작게 설정될 수 있다.
이와 달리, 상기 풍향 연산부(320)에서는 상기 과거의 요에러와 상기 미래의 요에러에 대하여, 각각 로우패스필터(low path filter)의 계수를 서로 다르게 변경하여 미래의 풍향변화를 연산할 수도 있다.
이상과 같이, 상기 풍향 연산부(32)에서, 미래의 요에러에 추가하여 과거의 요에러를 고려하는 것은, 상기 풍력 발전기(10)의 날개부(12)를 제어하여 바람의 방향에 맞도록 상기 날개부(12)를 회전시키는 것은 상대적으로 많은 시간이 필요한 것으로, 상기 날개부(12)를 회전시키는 과정에서 미래의 요에러가 추가로 변화할 수 있기 때문이다.
즉, 단순히 미래의 요에러만 고려하여 미래의 요에러에 부합하도록 상기 날개부(12)를 회전시키는 경우, 날개부(12)가 특정 미래 시간에서의 요에러에 부합하도록 회전하여 위치하기도 전에 미래의 요에러가 변화될 수 있으며, 이에 따라 미래의 요에러만을 추종하게 되면 상기 날개부(12)에 대한 제어는 정확한 바람의 방향을 추종하기 어려워진다.
따라서, 과거의 요에러도 동시에 고려함으로써, 미래의 요에러의 변화 요인을 일정 부분 상쇄하면서, 상대적으로 많은 시간이 소요됨에 따라 급격하게 변화하는 경우의 미래의 요에러를 정확하게 추정하지 못하는 날개부(12)의 회전 속도의 한계를 보상하여, 요에러를 최소화하도록 상기 풍력 발전기(10)를 제어할 수 있다.
이상과 같이, 상기 풍향 연산부(32)에서 미래의 풍향 변화를 연산하면, 이를 바탕으로 풍력 발전기의 요 제어값을 연산할 수 있다.
상기 제어부(40)는 피치 제어부(41) 및 요 제어부(42)를 포함한다.
상기 피치 제어부(41)는 상기 풍속 연산부(31)에서 연산된 미래의 풍속 변화의 연산 결과를 바탕으로, 미래의 풍속에 부합하도록 상기 풍력 발전기(10)의 날개부(12)의 각도를 제어한다.
즉, 상기 미래의 풍속 변화의 연산 결과로부터 피치 제어값이 연산되면, 이를 바탕으로 상기 풍력 발전기(10)의 피치, 즉 날개부(12)의 각도를 제어하게 된다.
이와 같이, 상기 풍력 발전기(10)의 날개부(12)의 각도를 제어함으로써, 상기 풍력 발전기(10)의 출력을 일정하게 유지시킬 수 있다.
한편, 종래의 경우, 상기 피치 제어부(41)에서는 단순히 상기 풍력 발전기의 터빈을 제어하여 출력을 일정하게 유지시키는 것만 수행하였으나, 본 실시예의 경우, 상기 터빈의 제어는 물론, 상기와 같이 미래의 풍속에 부합하도록 상기 날개부(12)의 각도를 제어함으로서, 상기 풍력 발전기(10)의 출력을 보다 일정하게 제어할 수 있다.
상기 요 제어부(42)는 상기 풍향 연산부(32)로부터 연산된 미래의 풍향 변화의 연산 결과를 바탕으로, 미래의 풍향에 부합하도록 상기 풍력 발전기(10)의 날개부(12)가 향하는 방향을 제어한다.
즉, 상기 미래의 풍향 변화의 연산 결과로부터 요 제어값이 연산되면, 이를 바탕으로 상기 풍력 발전기(10)의 요, 즉 상기 풍력 발전기(10)가 향하는 방향을 제어하게 된다.
이 경우, 앞서 설명한 바와 같이, 상기 풍력 발전기(10)가 향하는 방향을 제어하는 것은, 상대적으로 시간이 많이 소요되는 것으로, 상기 미래의 풍향 변화의 연산에서 이러한 제어 속도의 특성을 고려하여 과거의 풍향에 대한 정보도 동시에 고려하여 최적화된 제어를 수행하게 된다.
도 4는 종래기술에 의한 풍력발전기 제어시스템과 도 1의 풍력발전기 제어시스템의 제어 결과를 비교하여 도시한 그래프들이다.
도 4에서는, 시간의 경과에 따른 풍속 변화에 대하여, 종래의 풍력발전기 제어시스템, 즉 현재의 풍속에 대한 정보만을 바탕으로 풍력발전기를 제어하는 경우의 피치각도, 로터 속도 및 하중의 변화와, 도 1 내지 도 3을 참조하여 설명한 실시예에서의 풍력발전기 제어시스템을 이용하여 풍력발전기를 제어하는 경우의 피치각도, 로터 속도 및 하중의 변화를 도시하였다.
도 4를 참조하면, 특정 시간(t)에서 급격한 풍속이 변화하는 경우에 대하여, 종래의 제어시스템에 의하면, 상기 급격한 풍속 변화가 발생하는 시간(t)으로부터 소정 시간이 경과한 이후에 비로소 풍력 발전기의 피치 각도가 상기 풍속 변화를 추종하고 있으나, 본 실시예에 의하면, 상기 풍속 변화가 발생하는 시간(t)과 거의 일치하는 시간에 풍력 발전기의 피치 각도가 변화하여, 상기 풍속 변화를 거의 그대로 추종함을 확인할 수 있다.
또한, 종래 제어시스템의 경우, 풍속이 급격하게 변화하는 시간(t) 이후, 날개부의 회전속도, 즉 로터 속도의 변화량이 증가함을 확인할 수 있지만, 본 실시예의 경우, 상기 풍속의 급격한 변화와 무관하게 날개부의 회전속도가 일정하게 유지함을 확인할 수 있다.
나아가, 종래 제어시스템의 경우, 풍속이 급격하게 변화하는 시간(t) 이후, 상기 풍력 발전기의 전방 및 후방의 하중이 급격하게 변화하여 하중 변화가 매우 큰 것을 확인할 수 있으나, 본 실시예의 경우, 상기 풍속의 변화와 무관하게 하중은 거의 일정하게 유지되는 것을 확인할 수 있다.
이상과 같이, 본 실시예에 의한 풍력발전기 제어시스템을 통한 제어의 경우, 날개부의 회전방향이 바람의 방향을 잘 추종하는 것은 물론, 날개부의 회전속도 및 풍력발전기에 인가되는 하중은 전체적으로 풍속의 변화와 무관하게 일정하게 유지되는 것을 확인할 수 있다.
도 5는 도 1의 풍력발전기 제어시스템을 이용한 풍력발전기 제어방법을 도시한 흐름도이다.
도 5를 참조하면, 도 1 내지 도 3을 참조하여 설명한 상기 풍력발전기 제어시스템(1)을 이용한 풍력발전기 제어방법에서는, 우선, 상기 나셀 라이다(20)를 이용하여 미래의 풍속을 측정하고(단계 S10), 상기 측정된 미래의 풍속의 측정 결과를 바탕으로 상기 풍속 연산부(31)에서 미래의 풍속 변화를 연산한다(단계 S20).
이 경우, 상기 풍속 연산부(31)에서는 상기 미래의 풍속 변화에 대한 정보를 바탕으로, 상기 풍력 발전기(10)의 피치 제어값을 연산하며(단계 S30), 이렇게 연산된 상기 피치 제어값을 바탕으로, 상기 피치 제어부(41)에서는 상기 풍력발전기(10)의 피치를 제어한다(단계 S40).
이와 동시에, 상기 풍력발전기 제어방법에서는, 상기 나셀 라이다(20)를 이용하여 과거 및 미래의 풍향을 측정하고(단계 S11), 상기 측정된 과거 및 미래의 풍향을 바탕으로 상기 풍향 연산부(32)는 미래의 풍향 변화를 연산한다(단계 S21).
이 경우, 상기 풍향 연산부(32)에서는, 상기 미래의 풍향 변화를 바탕으로, 상기 풍력 발전기(10)의 요 제어값을 연산하며(단계 S31), 이렇게 연산된 요 제어값을 바탕으로, 상기 요 제어부(42)에서는 상기 풍력발전기(10)의 요를 제어한다(단계 S40).
한편, 상기 풍력발전기 제어방법에서, 각 단계에서의 나셀 라이다(20)의 풍속 및 풍향 측정, 연산부(30)의 풍속 및 풍향 연산, 제어부(40)의 피치 및 요 제어에 대하여는 도 1 내지 도 3을 참조하여 설명한 상기 풍력발전기 제어시스템(1)에 대한 설명과 동일하므로 중복되는 설명은 이를 생략한다.
상기와 같은 본 발명의 실시예들에 의하면, 나셀 라이다의 측정 결과를 바탕으로, 미래의 풍속변화 및 풍향변화를 모두 연산할 수 있으며, 이에 따라 이미 변화된 풍속이나 풍향을 후속하여 추종하지 않고 실시간으로 변화하는 풍속과 풍향을 추종할 수 있다.
이를 통해, 특히 풍속변화를 바탕으로 한 피치의 실시간 제어를 통해, 갑자기 돌풍이 부는 등의 상황에서의 효과적인 추종으로 풍력 발전기에 인가되는 하중을 최소화할 수 있다.
또한, 풍향변화를 바탕으로 한 요의 실시간 제어도 가능하여, 풍력 발전기의 요 에러를 크게 감소시킬 수 있어, 풍력 발전기의 출력 증가를 도모할 수 있다.
특히, 미래의 풍향변화의 연산을 과거의 특정 시간으로부터 현재까지의 요에러와, 미래의 요에러를 동시에 고려하며, 필요에 따라 서로 다른 가중치를 인가하여 예측할 수 있으므로, 미래의 풍향변화에 대한 보다 정확한 예측이 가능하게 된다.
상기에서는 본 발명의 바람직한 실시예를 참조하여 설명하였지만, 해당 기술 분야의 숙련된 당업자는 하기의 특허 청구 범위에 기재된 본 발명의 사상 및 영역으로부터 벗어나지 않는 범위 내에서 본 발명을 다양하게 수정 및 변경시킬 수 있음을 이해할 수 있을 것이다.
Claims (8)
- 전방의 미래의 풍속, 및 전방의 과거 및 미래의 풍향을 측정하는 나셀 라이다;상기 나셀 라이다의 측정 결과를 바탕으로 미래의 풍속변화를 연산하는 풍속 연산부, 및 상기 나셀 라이다의 측정 결과를 바탕으로 미래의 풍향변화를 연산하는 풍향 연산부를 포함하는 연산부; 및상기 풍속 연산부의 연산 결과를 바탕으로 풍력 발전기의 피치(pitch)를 제어하는 피치 제어부, 및 상기 풍향 연산부의 연산 결과를 바탕으로 풍력 발전기의 요(yaw)를 제어하는 요 제어부를 포함하는 제어부를 포함하는 풍력발전기 제어시스템.
- 제1항에 있어서,상기 피치 제어부는 상기 풍력 발전기의 날개부의 각도를 제어하고,상기 요 제어부는 상기 풍력 발전기가 향하는 방향을 제어하는 것을 특징으로 하는 풍력발전기 제어시스템.
- 제1항에 있어서, 상기 피치 제어부는,상기 풍력 발전기의 터빈을 제어함과 동시에, 상기 풍속 연산부의 연산 결과를 바탕으로 풍력 발전기의 피치를 제어하는 것을 특징으로 하는 풍력발전기 제어시스템.
- 제1항에 있어서,상기 나셀 라이다는 상기 나셀 라이다보다 소정 거리 전방에서의 풍속을 측정하며,상기 나셀 라이다는 상기 나셀 라이다를 통과한 풍향, 및 상기 나셀 라이다보다 소정 거리 전방에서의 풍향을 측정하는 것을 특징으로 하는 풍력발전기 제어시스템.
- 제1항에 있어서, 상기 풍향 연산부는,상기 나셀 라이다의 측정 결과를 바탕으로, 과거의 특정 시간으로부터 현재까지의 요에러(yaw error)와 미래의 요에러를 동시에 고려하여 상기 미래의 풍향변화를 연산하는 것을 특징으로 하는 풍력발전기 제어시스템.
- 제5항에 있어서,상기 풍향 연산부는, 상기 과거의 특정 시간으로부터 현재까지의 요에러에 제1 가중치를 인가하고, 상기 미래의 요에러에 제2 가중치를 인가하여 상기 미래의 풍향변화를 연산하는 것을 특징으로 하는 풍력발전기 제어시스템.
- 나셀 라이다로 미래의 풍속을 측정하는 단계;상기 나셀 라이다의 측정 결과를 바탕으로 미래의 풍속 변화를 연산하는 단계;상기 미래의 풍속 변화를 바탕으로 풍력 발전기의 피치 제어값을 연산하는 단계;상기 나셀 라이다로 과거 및 미래의 풍향을 측정하는 단계;상기 나셀 라이다의 측정 결과를 바탕으로 미래의 풍향 변화를 연산하는 단계;상기 미래의 풍향변화를 바탕으로 상기 풍력 발전기의 요 제어값을 연산하는 단계; 및상기 연산된 피치 제어값 및 요 제어값을 바탕으로 상기 풍력발전기의 피치와 요를 제어하는 단계를 포함하는 풍력발전기 제어방법.
- 제7항에 있어서,상기 나셀 라이다는 상기 나셀 라이다보다 소정 거리 전방에서의 풍속을 측정하여 미래의 풍속을 측정하고,상기 나셀 라이다는 상기 나셀 라이다를 통과한 풍향, 및 상기 나셀 라이다보다 소정 거리 전방에서의 풍향을 측정하여, 과거 및 미래의 풍향을 측정하는 것을 특징으로 하는 풍력발전기 제어방법.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/KR2020/018984 WO2022139030A1 (ko) | 2020-12-23 | 2020-12-23 | 나셀 라이다를 이용한 풍력발전기 제어시스템 및 이를 이용한 풍력발전기 제어방법 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/KR2020/018984 WO2022139030A1 (ko) | 2020-12-23 | 2020-12-23 | 나셀 라이다를 이용한 풍력발전기 제어시스템 및 이를 이용한 풍력발전기 제어방법 |
Publications (1)
Publication Number | Publication Date |
---|---|
WO2022139030A1 true WO2022139030A1 (ko) | 2022-06-30 |
Family
ID=82159943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
PCT/KR2020/018984 WO2022139030A1 (ko) | 2020-12-23 | 2020-12-23 | 나셀 라이다를 이용한 풍력발전기 제어시스템 및 이를 이용한 풍력발전기 제어방법 |
Country Status (1)
Country | Link |
---|---|
WO (1) | WO2022139030A1 (ko) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004301116A (ja) * | 2003-03-19 | 2004-10-28 | Mitsubishi Electric Corp | 風力発電システム |
JP2005188455A (ja) * | 2003-12-26 | 2005-07-14 | Daiwa House Ind Co Ltd | プロペラ型風力発電システム |
KR20120031337A (ko) * | 2010-09-24 | 2012-04-03 | 한국전력공사 | 풍력터빈의 발전량 향상 시스템 및 그 방법 |
EP2918827A1 (en) * | 2012-12-26 | 2015-09-16 | MHI Vestas Offshore Wind A/S | Control device, method, and program, and floating body wind-powered electricity generation device equipped with same |
KR101956715B1 (ko) * | 2017-09-01 | 2019-03-11 | 군산대학교산학협력단 | 풍력 터빈의 요 제어를 위한 풍향 예측 방법 및 장치 |
KR102221576B1 (ko) * | 2019-12-05 | 2021-03-02 | 한국에너지기술연구원 | 풍력 발전기의 출력증가 및 하중감소를 위한 나셀 라이다를 이용한 풍력발전기 제어시스템 및 이를 이용한 풍력발전기 제어방법 |
-
2020
- 2020-12-23 WO PCT/KR2020/018984 patent/WO2022139030A1/ko active Application Filing
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004301116A (ja) * | 2003-03-19 | 2004-10-28 | Mitsubishi Electric Corp | 風力発電システム |
JP2005188455A (ja) * | 2003-12-26 | 2005-07-14 | Daiwa House Ind Co Ltd | プロペラ型風力発電システム |
KR20120031337A (ko) * | 2010-09-24 | 2012-04-03 | 한국전력공사 | 풍력터빈의 발전량 향상 시스템 및 그 방법 |
EP2918827A1 (en) * | 2012-12-26 | 2015-09-16 | MHI Vestas Offshore Wind A/S | Control device, method, and program, and floating body wind-powered electricity generation device equipped with same |
KR101956715B1 (ko) * | 2017-09-01 | 2019-03-11 | 군산대학교산학협력단 | 풍력 터빈의 요 제어를 위한 풍향 예측 방법 및 장치 |
KR102221576B1 (ko) * | 2019-12-05 | 2021-03-02 | 한국에너지기술연구원 | 풍력 발전기의 출력증가 및 하중감소를 위한 나셀 라이다를 이용한 풍력발전기 제어시스템 및 이를 이용한 풍력발전기 제어방법 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2011068368A2 (ko) | 전력 제어 방법 및 장치 | |
WO2015186957A1 (ko) | 엔진 제어 장치 및 방법 | |
KR102221576B1 (ko) | 풍력 발전기의 출력증가 및 하중감소를 위한 나셀 라이다를 이용한 풍력발전기 제어시스템 및 이를 이용한 풍력발전기 제어방법 | |
WO2022139030A1 (ko) | 나셀 라이다를 이용한 풍력발전기 제어시스템 및 이를 이용한 풍력발전기 제어방법 | |
ITRM20130272A1 (it) | Metodo e relativo sistema per la conversione di energia meccanica, proveniente da un generatore comandato da una turbina, in energia elettrica. | |
WO2011019235A2 (ko) | 출입문 이중 제어 장치 및 그 방법 | |
WO2012008627A1 (ko) | 건설기계의 선회 제어 장치 및 그 방법 | |
CN111638654A (zh) | 一种故障自适应的运载火箭智能控制半实物仿真方法 | |
WO2013058481A1 (ko) | 공작기계의 볼스크류 변형에 의한 실시간 위치 보정 방법 및 장치 | |
WO2022108287A1 (ko) | 전자 장치에 의해 수행되는 고정밀 위치 제어를 위한 강인한 최적 외란 관측기를 포함하는 시스템 및 제어 방법 | |
WO2018016707A1 (ko) | 전기자동차 절연안정성 평가 장치 | |
WO2022092476A1 (ko) | 게인-스케쥴링을 이용한 풍력터빈 개별피치제어 시스템 및 제어방법 | |
KR920704207A (ko) | 인크리멘털 측정 시스템에서의 속도 시뮬레이팅 방법 및 장치 | |
WO2022102895A1 (ko) | 블레이드 모드 노치필터를 적용한 풍력터빈의 개별피치제어 시스템 및 제어방법 | |
WO2018124570A1 (ko) | 변전소의 자산 관리 방법 | |
WO2024205003A1 (ko) | 고속 샘플링이 가능한 디지털 제어 장치 및 그 방법 | |
WO2020105983A1 (ko) | 로봇팔을 이용한 정밀 가공장치 및 이의 작동방법 | |
WO2024101719A1 (ko) | 장치 이상 감지 센서 | |
Danis | Investigating forward flight multirotor wind tunnel testing in a 3-by 4-foot wind tunnel | |
WO2017104889A1 (ko) | 파력 발전 설비 제어 시스템 및 방법 | |
WO2018216931A1 (ko) | 와류 생성핀을 포함하는 선박 | |
WO2024128460A1 (ko) | 다수 재생에너지 발전 모델의 테스트 시스템 및 방법 | |
WO2020096385A1 (ko) | Bldc 모터 제어 장치 및 방법 | |
WO2020105744A1 (en) | Method and apparatus for diagnosing abnormal state of valve | |
WO2023204515A1 (ko) | 태양광 모듈의 절연 상태 점검 장치 및 이를 이용한 절연 상태 점검 방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
121 | Ep: the epo has been informed by wipo that ep was designated in this application |
Ref document number: 20967101 Country of ref document: EP Kind code of ref document: A1 |
|
NENP | Non-entry into the national phase |
Ref country code: DE |
|
122 | Ep: pct application non-entry in european phase |
Ref document number: 20967101 Country of ref document: EP Kind code of ref document: A1 |