WO2022071048A1 - コンピュータプログラム、判定装置及び判定方法 - Google Patents

コンピュータプログラム、判定装置及び判定方法 Download PDF

Info

Publication number
WO2022071048A1
WO2022071048A1 PCT/JP2021/034747 JP2021034747W WO2022071048A1 WO 2022071048 A1 WO2022071048 A1 WO 2022071048A1 JP 2021034747 W JP2021034747 W JP 2021034747W WO 2022071048 A1 WO2022071048 A1 WO 2022071048A1
Authority
WO
WIPO (PCT)
Prior art keywords
storage device
power storage
charging system
model
battery
Prior art date
Application number
PCT/JP2021/034747
Other languages
English (en)
French (fr)
Inventor
将輝 大矢
悠 松本
真一 浪床
誠治 高井
英司 林
Original Assignee
株式会社Gsユアサ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from JP2020167186A external-priority patent/JP2022059437A/ja
Priority claimed from JP2020167187A external-priority patent/JP2022059438A/ja
Application filed by 株式会社Gsユアサ filed Critical 株式会社Gsユアサ
Priority to CN202180067618.8A priority Critical patent/CN116235338A/zh
Priority to US18/247,356 priority patent/US20230393205A1/en
Priority to DE112021005215.2T priority patent/DE112021005215T5/de
Publication of WO2022071048A1 publication Critical patent/WO2022071048A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/367Software therefor, e.g. for battery testing using modelling or look-up tables
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/0048Detection of remaining charge capacity or state of charge [SOC]
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/005Testing of electric installations on transport means
    • G01R31/006Testing of electric installations on transport means on road vehicles, e.g. automobiles or trucks
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/44Methods for charging or discharging
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/005Detection of state of health [SOH]
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • H01M2010/4271Battery management systems including electronic circuits, e.g. control of current or voltage to keep battery in healthy state, cell balancing
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/425Structural combination with electronic components, e.g. electronic circuits integrated to the outside of the casing
    • H01M2010/4278Systems for data transfer from batteries, e.g. transfer of battery parameters to a controller, data transferred between battery controller and main controller
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M2220/00Batteries for particular applications
    • H01M2220/20Batteries in motive systems, e.g. vehicle, ship, plane
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2310/00The network for supplying or distributing electric power characterised by its spatial reach or by the load
    • H02J2310/40The network being an on-board power network, i.e. within a vehicle
    • H02J2310/48The network being an on-board power network, i.e. within a vehicle for electric vehicles [EV] or hybrid vehicles [HEV]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • the present invention relates to a computer program, a determination device, and a determination method.
  • Vehicles such as EV (Electric Vehicle) and HEV (Hybrid Electric Vehicle) are equipped with a battery and a charging / discharging system for charging / discharging the battery (see, for example, Patent Document 1).
  • EV Electric Vehicle
  • HEV Hybrid Electric Vehicle
  • Such a charge / discharge system acquires various information such as battery temperature, SOC (StateOfCharge), SOH (StateOfHealth), voltage, and current from BMU (Battery Management Unit), and uses the acquired information as various information. Based on this, charge / discharge control is executed.
  • SOC StateOfCharge
  • SOH StateOfHealth
  • BMU Battery Management Unit
  • the battery will be supplied with more power than allowed and the charging time will be very long. There is a possibility that it will happen. The performance of the battery may not be fully exhibited, or the deterioration of the battery may be accelerated. If the above-mentioned problems are found at the stage of actually installing the battery and conducting comprehensive verification of the vehicle system, the manufacturer will need to review the specifications of the charge / discharge system, or the type of battery to be installed in the vehicle. Since it may be necessary to change it, there is a problem that it is not possible to reach an agreement on the specifications at an early stage.
  • An object of the present invention is to provide a computer program, a determination method, and a determination device for determining compatibility between a charge / discharge system and a power storage device by simulation.
  • the computer program executes a simulation using a battery model simulating a power storage device and a charging system model simulating a charging system for charging the power storage device, thereby performing a charge control behavior for the power storage device. It is a computer program for executing a process of estimating and determining compatibility between the power storage device and the charging system based on the estimated behavior of charge control.
  • the determination device estimates the behavior of charge control for the power storage device by executing a simulation using a battery model that simulates the power storage device and a charging system model that simulates the charging system that charges the power storage device.
  • the determination device executes a simulation using a battery model simulating the power storage device and a charge / discharge system model simulating the power management system for the power storage device, so that at least one of the power storage device and the power management system is executed. It includes an estimation unit that estimates a state, and a determination unit that determines compatibility between the power storage device and the power management system based on the estimated state of the power storage device.
  • the determination method is to control charging of the power storage device by executing a simulation using a battery model that simulates the power storage device and a charging system model that simulates the charging system that charges the power storage device.
  • the behavior is estimated, and the compatibility between the power storage device and the charging system is determined based on the estimated behavior of the charging control.
  • the determination method is to use a computer to execute a simulation using a battery model simulating a power storage device and a charge / discharge system model simulating a power management system for the power storage device, thereby performing the power storage device and the power management.
  • the state of at least one of the systems is estimated, and the compatibility between the power storage device and the power management system is determined based on the estimated state of the power storage device.
  • the compatibility between the charge / discharge system and the power storage device can be determined by simulation.
  • the power storage device and the charging are performed by executing a simulation on the computer using a battery model simulating the power storage device and a charging system model simulating the charging system for charging the power storage device. At least one state of the system is estimated, and a process of determining compatibility between the power storage device and the charging system is executed based on the estimated state.
  • the characteristics of the battery change when the internal structure is changed when designing the power storage device, or when the composition of the active material or the electrolytic solution is changed. When the characteristics of the battery change, it is necessary to change the charge control according to the change in the characteristics. In a power storage device, overcharging and overdischarging must be avoided, and charge control is very important.
  • the state estimated by the simulation includes a time change of the charging system voltage determined according to the state of the power storage device and a time change of the battery voltage which is a voltage across the power storage device.
  • a computer may be allowed to perform a process of determining compatibility between the power storage device and the charging system based on the difference between the charging system voltage and the battery voltage. In verification using an actual machine or a prototype, if the voltage difference between the charging system voltage and the battery voltage becomes large, the current entering the battery may exceed the permissible level, and safety cannot be guaranteed. On the other hand, in the present embodiment, since the suitability is determined by the simulation using the model, the safety can be ensured even in the situation where the current exceeding the permissible flow flows.
  • the state estimated by the simulation includes a time change of the applied current applied to the power storage device during charging, and is set to the computer with respect to the applied current and the applied current.
  • a process of determining compatibility between the power storage device and the charging system may be executed based on the difference from the allowable value. In verification using an actual machine or a prototype, the current entering the battery may exceed the permissible level, and safety cannot be guaranteed. On the other hand, in the present embodiment, since the suitability is determined by the simulation using the model, the safety can be ensured even in the situation where the current exceeding the permissible flow flows.
  • the charging system model may be set by using a transfer function representing the relationship between the control input and the control output in the charging system.
  • a transfer function representing the relationship between the control input and the control output in the charging system.
  • the transfer function is set in the charging system model, and the compatibility between the power storage device and the charging system is determined by simulation. Even in a situation where the charging time continues for a long time in the actual machine or prototype, the suitability judgment result can be obtained promptly.
  • the charging system model may simulate the control delay in the charging system.
  • the transfer function is set in the charging system model, and the compatibility between the power storage device and the charging system is determined by simulation. Can be guaranteed. Even if the actual machine or prototype takes a long time to charge, the suitability judgment result can be obtained promptly.
  • the battery model may include an equivalent circuit of the power storage device. According to this configuration, since the equivalent circuit of the power storage device is used, safety can be ensured even in a situation where a current exceeding an allowable value flows in an actual machine or a prototype.
  • the computer program in the embodiment is such that the power storage device and the power are generated by executing a simulation on the computer using a battery model simulating the power storage device and a charge / discharge system model simulating a power management system for the power storage device.
  • a process of estimating the state of at least one of the management systems and determining the compatibility between the power storage device and the power management system based on the estimated state of the power storage device is executed.
  • the characteristics of the battery change when the internal structure is changed when designing the power storage device, or when the composition of the active material or the electrolytic solution is changed. When the characteristics of the battery change, it is necessary to change the charge / discharge control according to the change in the characteristics.
  • a charging device that generates a high voltage in charging control is unnecessary.
  • the safety is high.
  • power management of the entire power system including a battery such as 12V or 48V, regenerative power, solar power generation, 100V power supply, a power conditioner (power conditioner), and a power storage system incorporating a reused battery is used. It is called a system.
  • Verification using an actual machine or a prototype requires charging and discharging of the actual battery, so it takes time to obtain the compatibility judgment result, but when judging by simulation, charging and discharging of the battery is unnecessary. Therefore, the conformity determination result can be obtained promptly.
  • expectations are high for high-performance and high-safety power storage devices, and the significance of safety design using simulation and shortening of development time is great. ..
  • the battery model is a state estimation model for estimating at least one of SOC, SOH, voltage, current, and temperature of the power storage device, and a component model simulating the components constituting the power storage device.
  • a charge / discharge control model that simulates charge / discharge control for the power storage device, and an event estimation model for estimating at least one of deterioration and heat generation of the power storage device may be included.
  • the suitability can be determined for various combinations of the power storage device and the power management system, so that the suitability can be quickly determined.
  • the judgment result is obtained. Even if the judgment result of low suitability is obtained, it becomes clear which part should be changed in the specifications, so it is an effective development support tool.
  • the charge / discharge system model may be a model that includes at least one of efficiency, resistance, rotation speed, set voltage, and voltage control characteristics in the power management system as parameters.
  • the suitability can be determined for various combinations of the power storage device and the power management system, so that the suitability can be quickly determined.
  • the judgment result is obtained. Even if the judgment result of low suitability is obtained, it becomes clear which part should be changed in the specifications, so it is an effective development support tool.
  • the computer may be made to execute a process of accepting an input of a parameter indicating an initial state of each model.
  • simulation can be executed with any state of the power storage device and power management system as the initial state, so verification using an actual machine or prototype that requires charging and discharging the actual battery to determine compatibility.
  • the time required for determining conformity can be shortened.
  • the computer may be made to execute a process of displaying the estimation result by each model on the display device.
  • the time transition of the parameter obtained by executing the simulation can be displayed. Therefore, when the judgment result that the suitability is low is obtained, which part should be changed in the specification. Can be clarified.
  • the determination device is at least the power storage device and the charging system by executing a simulation using a battery model simulating the power storage device and a charging system model simulating the charging system for charging the power storage device. It includes an estimation unit that estimates one of the states, and a determination unit that determines compatibility between the power storage device and the charging system based on the estimated state.
  • the characteristics of the battery change when the internal structure is changed when designing the power storage device, or when the composition of the active material or the electrolytic solution is changed. When the characteristics of the battery change, it is necessary to change the charge control according to the change in the characteristics. In a power storage device, overcharging and overdischarging must be avoided, and charge control is very important.
  • the determination device is the power storage device and the power management system by executing a simulation using a battery model simulating the power storage device and a charge / discharge system model simulating the power management system for the power storage device. It includes an estimation unit that estimates at least one state, and a determination unit that determines compatibility between the power storage device and the power management system based on the estimated state of the power storage device.
  • the characteristics of the battery change when the internal structure is changed when designing the power storage device, or when the composition of the active material or the electrolytic solution is changed. When the characteristics of the battery change, it is necessary to change the charge / discharge control according to the change in the characteristics. In a power storage device, overcharging and overdischarging must be avoided, and charge / discharge control is very important.
  • a charging device that generates a high voltage in charge control is unnecessary. And the safety is high.
  • power management of the entire power system including a battery such as 12V or 48V, regenerative power, solar power generation, 100V power supply, a power conditioner (power conditioner), and a power storage system incorporating a reused battery is used. It is called a system.
  • a system In verification using an actual machine or a prototype, it takes time to obtain the compatibility judgment result because the actual battery charge / discharge is required.
  • the judgment is made by simulation using the judgment device, the battery Since charging / discharging is not required, the compatibility determination result can be obtained promptly.
  • expectations are high for high-performance and high-safety power storage devices, and the significance of safety design using simulation and shortening of development time is great. ..
  • the determination method in the embodiment is to use a computer to execute a simulation using a battery model simulating a power storage device and a charging system model simulating a charging system for charging the power storage device.
  • the state of at least one of the charging systems is estimated, and the compatibility between the power storage device and the charging system is determined based on the behavior of the estimated states.
  • the characteristics of the battery change when the internal structure is changed when designing the power storage device, or when the composition of the active material or the electrolytic solution is changed. When the characteristics of the battery change, it is necessary to change the charge control according to the change in the characteristics. In a power storage device, overcharging and overdischarging must be avoided, and charge control is very important.
  • the determination method in the embodiment is to use a computer to execute a simulation using a battery model simulating a power storage device and a charge / discharge system model simulating a power management system for the power storage device.
  • the state of at least one of the power management systems is estimated, and the compatibility between the power storage device and the power management system is determined based on the estimated state of the power storage device.
  • the characteristics of the battery change when the internal structure is changed when designing the power storage device, or when the composition of the active material or the electrolytic solution is changed. When the characteristics of the battery change, it is necessary to change the charge / discharge control according to the change in the characteristics. In a power storage device, overcharging and overdischarging must be avoided, and charge / discharge control is very important.
  • the compatibility between the power storage device and the power management system is determined by simulation using a model as in the determination method of the present embodiment, a charging device that generates a high voltage in charge control is unnecessary. And the safety is high.
  • power management of the entire power system including a battery such as 12V or 48V, regenerative power, solar power generation, 100V power supply, a power conditioner (power conditioner), and a power storage system incorporating a reused battery is used. It is called a system.
  • a system In verification using an actual machine or a prototype, it takes time to obtain the compatibility judgment result because the actual battery charge / discharge is required, but when the judgment is made by simulation using a computer, the battery charge is required. Since no discharge is required, the compatibility determination result can be obtained quickly.
  • expectations are high for high-performance and high-safety power storage devices, and the significance of safety design using simulation and shortening of development time is great. ..
  • HEV hybrid electric vehicle
  • EV electric vehicle
  • FIG. 1 is a block diagram illustrating a configuration of a control system in a vehicle.
  • the vehicle C includes a power storage device 10, a charging system 20A for charging the power storage device 10, and a vehicle ECU (Electronic Control Unit) 30 that executes control of the entire vehicle as a control system configuration.
  • the power storage device 10, the charging system 20A, and the vehicle ECU 30 are communicably connected to each other via an in-vehicle line such as a CAN (Controller Area Network) or a LIN (Local Interconnect Network).
  • CAN Controller Area Network
  • LIN Local Interconnect Network
  • the vehicle ECU 30 monitors the running state of the vehicle C, the charging state of the power storage device 10, and the like, and controls to switch the charge / discharge of the power storage device 10 according to the running state of the vehicle C and the charging state of the power storage device 10. And so on.
  • the power storage device 10 includes a power storage element 11 and a BMU 12 (Battery Management Unit) (see FIG. 2).
  • the power storage element 11 is composed of, for example, an assembled battery in which a plurality of batteries are connected in series.
  • the power storage element 11 included in the power storage device 10 is charged by the power supplied from the charging system 20A of the vehicle C, and supplies power to the load in response to a control command from the vehicle ECU 30.
  • An example of a load to which the power storage device 10 supplies electric power is an electric motor 23 that generates a drive torque for driving the vehicle C.
  • Other examples of loads include various equipment of vehicle C such as headlights, turn signal lights, interior lights, power windows and the like.
  • the BMU 12 has a function of managing the power storage device 10.
  • the BMU 12 has a function of estimating the state of the power storage device 10, a function of detecting an abnormality in the power storage device 10, and information on the estimated state of the power storage device 10 (for example, SOC), information on the detected abnormality, and the like. Notify the vehicle ECU 30.
  • the charging system 20A includes a charging ECU 21 and an alternator 22.
  • the alternator 22 is a generator connected to an output shaft of an engine (not shown in the figure), and is configured to generate electricity by rotating the output shaft.
  • the electric power obtained by the power generation of the alternator 22 is supplied to the load included in the power storage device 10 and the vehicle C by the control from the charging ECU 21.
  • the alternator 22 performs regenerative control to generate electric power when the vehicle C is decelerating, thereby acting as a load on the rotation of the engine output shaft to apply braking force to the vehicle C, and the generated electric power is used in the power storage device 10 and the vehicle. It supplies to the load provided by C.
  • FIG. 2 is a block diagram showing the internal configuration of the power storage device 10.
  • the power storage device 10 includes a current sensor 13, a voltage sensor 14, a temperature sensor 15, a relay 16, and the like, in addition to the power storage element 11 and the BMU 12.
  • the power storage element 11 is composed of, for example, a plurality of lithium ion secondary batteries connected in series.
  • the current sensor 13 is provided between the power storage element 11 and the negative electrode terminal 10A, and measures the current flowing into the power storage element 11. The current sensor 13 outputs the measurement result to the BMU 12.
  • the voltage sensor 14 is connected in parallel to the power storage element 11 and measures the voltage across the power storage element 11. The voltage sensor 14 outputs the measurement result to the BMU 12.
  • the temperature sensor 15 is provided inside or outside the power storage device 10 and measures the temperature.
  • a plurality of temperature sensors 15 may be provided.
  • the temperature measured by the temperature sensor 15 is, for example, the temperature of the power storage element 11.
  • the temperature sensor 15 is provided in the vicinity of the power storage element 11 (inside the power storage device).
  • the temperature measured by the temperature sensor 15 may be the temperature of the environment in which the power storage device 10 is installed (environmental temperature).
  • the temperature sensor 15 is provided in the vicinity of the power storage device 10. In the following description, the temperature of the power storage device 10 will be referred to without distinguishing between the temperature of the power storage element 11 and the environmental temperature.
  • the temperature sensor 15 outputs the measurement result to the BMU 12.
  • the relay 16 is provided between the power storage element 11 and the positive electrode terminal 10B, and is a circuit element for blocking or connecting the charge / discharge path of the power storage element 11 in response to a control command from the BMU 12.
  • the charge / discharge path is connected, and it is possible to charge the power storage element 11 from the outside and to supply power (discharge) from the power storage element 11 to the load.
  • the relay 16 is an example of a circuit element for interrupting or connecting a charge / discharge path.
  • a semiconductor switch such as a FET (Field-Effect Transistor) may be used to cut off or connect the charge / discharge path.
  • the BMU 12 is a device for managing the state of the power storage device 10, and includes, for example, a control unit 121, a storage unit 122, a connection unit 123, and a communication unit 124.
  • the control unit 121 includes a CPU (Central Processing Unit), a ROM (ReadOnlyMemory), a RAM (RandomAccessMemory), and the like.
  • the CPU included in the control unit 121 realizes a function of estimating the state of the power storage device 10, a function of detecting an abnormality in the power storage device 10, and the like by executing a control program stored in advance in the ROM.
  • the RAM temporarily stores various types of information generated during the execution of operations by the CPU.
  • the storage unit 122 is configured by an EEPROM (Electronically Erasable Programmable Read Only Memory) or the like, and stores data or the like necessary for control.
  • a current sensor 13, a voltage sensor 14, a temperature sensor 15, a relay 16, and the like are connected to the connection unit 123.
  • the communication unit 124 is communicably connected to the vehicle ECU 30 via an in-vehicle line such as CAN or LIN.
  • the control unit 121 of the BMU 12 acquires the current value measured by the current sensor 13, the voltage value measured by the voltage sensor 14, and the temperature measured by the temperature sensor 15 through the connection unit 123, and based on these data.
  • the target values of the SOC and the charging voltage of the power storage device 10 are calculated.
  • the control unit 121 notifies the vehicle ECU 30 of the calculated SOC and the target value of the charging voltage through the communication unit 124. For example, when the temperature measured by the temperature sensor 15 exceeds a preset threshold value, the control unit 121 determines that an abnormality in the power storage device 10 has been detected, and outputs a control command to cut off the charge / discharge path to the relay 16. do.
  • the power storage device 10 has a built-in BMU 12.
  • the BMU 12 may be provided outside the power storage device 10.
  • the charging system 20A mounted on the vehicle C is developed and manufactured by, for example, a vehicle manufacturer, and the power storage device 10 is developed and manufactured by, for example, a battery manufacturer. If the charge control specifications of the charging system 20A mounted on the vehicle C and the performance of the power storage device 10 incorporated in the vehicle C do not match, the power storage device 10 may be supplied with more power than allowed. The time required for charging can be very long. If the above-mentioned problems are found when the power storage device 10 is incorporated into the vehicle C and the entire vehicle is comprehensively verified, it may be necessary to review the charge control specifications of the charging system 20A, or the power storage device 10 to be incorporated into the vehicle C. Since it may be necessary to change the type, it is not possible to reach an agreement on the specifications at an early stage.
  • a simulation using a model simulating the power storage device 10 and a model simulating the charging system 20A of the vehicle C is executed on a computer (development support device 100 shown in FIG. 3) independent of the vehicle C.
  • the compatibility between the power storage device 10 mounted on the vehicle C and the charging system 20A included in the vehicle C is determined.
  • FIG. 3 is a block diagram illustrating the internal configuration of the development support device 100 according to the first embodiment.
  • the development support device 100 is a general-purpose or dedicated computer, and includes a control unit 101, a storage unit 102, a communication unit 103, an operation unit 104, a display unit 105, and the like.
  • the control unit 101 is composed of a CPU, ROM, RAM, and the like.
  • the CPU included in the control unit 101 expands and executes various computer programs stored in the ROM or the storage unit 102 on the RAM, thereby causing the entire device to function as the determination device of the present application.
  • the control unit 101 is not limited to the above configuration, but may be an arbitrary processing circuit or arithmetic circuit including a plurality of CPUs, a multi-core CPU, a GPU (Graphics Processing Unit), a microcomputer, a volatile or non-volatile memory, and the like. There may be.
  • the control unit 101 may have functions such as a timer for measuring the elapsed time from the instruction for starting measurement to the instruction for ending measurement, a counter for counting the number, and a clock for outputting date and time information.
  • the storage unit 102 includes a storage device that uses an HDD (Hard Disk Drive), SSD (Solid State Drive), or the like.
  • the storage unit 102 stores various computer programs executed by the control unit 101, data necessary for executing the computer programs, and the like.
  • the computer program stored in the storage unit 102 estimates the behavior of charge control for the power storage device 10 by using the battery model BM1 that simulates the power storage device 10 and the charge system model CSM1 that simulates the charge system 20A on the vehicle side.
  • the determination program PG1 may be a single computer program or a program group composed of a plurality of programs.
  • the computer program stored in the storage unit 102 is provided, for example, by a non-temporary recording medium M in which the computer program is readablely recorded.
  • the recording medium M is a portable memory such as a CD-ROM, a USB (Universal Serial Bus) memory, an SD (Secure Digital) card, a micro SD card, and a compact flash (registered trademark).
  • the control unit 101 reads a computer program from the recording medium M using a reading device (not shown), and installs the read computer program in the storage unit 102.
  • the computer program stored in the storage unit 102 may be provided by communication via the communication unit 103. In this case, the control unit 101 may acquire a computer program through the communication unit 103 and install the acquired computer program in the storage unit 102.
  • the storage unit 102 stores a battery model BM1 that simulates the power storage device 10 and a charging system model CSM1 that simulates the charging system 20A.
  • the battery model BM1 includes, for example, an equivalent circuit representing the power storage element 11.
  • the storage unit 102 stores information on the circuit configuration of the equivalent circuit, the value of each element constituting the equivalent circuit, and the like.
  • the battery model BM1 may further include a BMU model that simulates the operation of the BMU12.
  • the charging system model CSM1 is set using a transfer function representing the relationship between the control input and the control output in the charging system 20A.
  • the storage unit 102 stores parameters and the like that describe a transfer function between the control input and the control output.
  • the storage unit 102 may have a battery table BT for storing information of the power storage device 10 in association with an identifier that identifies the power storage device 10.
  • the battery information registered in the battery table BT includes, for example, positive electrode and negative electrode information, electrolytic solution information, tab information, and the like.
  • the information on the positive electrode and the negative electrode is information such as the active material name, thickness, width, depth, and open circuit potential of the positive electrode and the negative electrode.
  • the electrolytic solution and tab information are information such as ion species, transport number, diffusion coefficient, and conductivity.
  • the information registered in the battery table BT may include information such as components constituting the power storage device 10.
  • the information stored in the battery table BT is used as part of the parameters when executing the above-mentioned simulation.
  • the communication unit 103 includes a communication interface for communicating with an external device through a communication network (not shown in the figure).
  • the external device is, for example, an information processing terminal such as a computer or a smartphone used by a user.
  • the communication unit 103 transmits the input information to the external device and outputs the information from the external device received through the communication network to the control unit 101. do.
  • the communication unit 103 may be configured to be able to communicate with the BMU 12 included in the vehicle ECU 30 and the power storage device 10.
  • the control unit 101 may acquire information on the traveling state of the vehicle C, various measured values measured by the power storage device 10, and the like through the communication unit 103, and execute the simulation based on the acquired information.
  • the operation unit 104 is provided with an input interface such as a keyboard, a mouse, and a touch panel, and accepts operations by the user.
  • the display unit 105 includes a liquid crystal display device and the like, and displays information to be notified to the user.
  • the development support device 100 is configured to include the operation unit 104 and the display unit 105, but the operation unit 104 and the display unit 105 are not indispensable and are operated through a computer connected to the outside of the development support device 100. It may be configured to accept and output the information to be notified to an external computer.
  • FIG. 4 is a block diagram showing a configuration of a simulation model used by the development support device 100.
  • the development support device 100 estimates the behavior of charge control in the vehicle C by executing a simulation using the charge system model CSM1 simulating the charge system 20A and the battery model BM1 simulating the power storage device 10.
  • the power pattern assuming the use of the vehicle C and the target value of the charging voltage set based on the estimation result of the battery model BM1 are input.
  • the electric power pattern assuming the use of the vehicle C represents the time change of the electric power when the vehicle C repeatedly starts, runs, and stops, and the electric power generated by the alternator 22 and the vehicle power consumption. Calculated by the difference.
  • the charging system model CSM1 uses this power pattern as the control input x (t), and calculates the control output y (t) based on the target value of the charging voltage.
  • the control output y (t) represents, for example, the charging voltage supplied by the alternator 22 to the power storage device 10.
  • the transfer function G (s) is set between the control input x (t) and the control output y (t) in consideration of the occurrence of control delay in the charging system 20A.
  • the functional form of the transfer function G (s) can be determined based on actual measurements such as a power pattern when the vehicle C is used, a time change of the electric power generated by the alternator 22, and a time change of the electric power consumed by the vehicle C.
  • the transfer function G (s) preferably has a functional form that simulates the slew rate of the control response in the charging system 20A.
  • the control unit 101 of the development support device 100 calculates the control output y (t) with respect to the control input x (t) of the charging system model CSM1 by the following procedure.
  • the control unit 101 Laplace transforms the control input x (t) to obtain the function X (s).
  • the control unit 101 performs an inverse Laplace transform of the output Y (s) to obtain the control output y (t).
  • the battery model BM1 estimates the voltage (opening voltage Vo) and SOC of the power storage element 11 when the charging voltage (that is, the control output y (t) of the charging system model CSM1) is given.
  • the battery model BM1 obtains a target value of the charging voltage based on the estimated SOC and feeds it back to the charging system model CSM1.
  • FIG. 5 is a circuit diagram illustrating an outline of the battery model BM1.
  • the battery model BM1 includes an equivalent circuit of the power storage element 11.
  • the equivalent circuit of the power storage element 11 is, for example, a first RC parallel circuit in which the resistance element R0, the resistance element R1 and the capacitance element C1 are connected in parallel, and a first RC parallel circuit in which the resistance element R2 and the capacitance element C2 are connected in parallel. Described by a 2RC parallel circuit and a constant voltage source V0.
  • the resistance element R0 represents the DC resistance component (DC impedance) of the power storage element 11.
  • the DC resistance component of the power storage element 11 corresponds to, for example, the resistance of the electrode in the power storage element 11.
  • the resistance value of the resistance element R0 is a value that changes depending on the discharge current, charging voltage, SOC, temperature, and the like. Once the resistance value of the resistance element R0 is determined, the voltage generated across the resistance element R0 when the current I (t) flows through this equivalent circuit can be calculated. The voltage generated across the resistance element R0 is defined as the DC resistance voltage Vdc (t).
  • the two RC parallel circuits are circuit elements for describing the transient polarization characteristics of the power storage device 10.
  • the values of the resistance element R1 and the capacitance element C1 constituting the first RC parallel circuit, and the resistance element R2 and the capacitance element C2 constituting the second RC parallel circuit are given as values that vary depending on the SOC of the power storage device 10. Once these values are determined, the impedance in the first RC parallel circuit and the second RC parallel circuit is determined. Once the impedance is determined, the voltage (polarization voltage Vp (t)) generated in the first RC parallel circuit and the second RC parallel circuit when the current I (t) flows through this equivalent circuit can be calculated.
  • the polarization voltage Vp (t) is the total voltage of the polarization voltage Vp1 (t) generated in the first RC parallel circuit and the polarization voltage Vp2 (t) generated in the second RC parallel circuit.
  • the time constant in the first RC parallel circuit is ⁇ 1
  • the time constant in the second RC parallel circuit is ⁇ 2.
  • the time constant ⁇ 1 is determined as a value obtained by multiplying the resistance value of the resistance element R1 constituting the first RC parallel circuit and the capacitance value of the capacitance element C1.
  • the time constant ⁇ 1 is reflected in the time change of the polarization voltage Vp1 (t) generated in the first RC parallel circuit.
  • the time constant ⁇ 2 is determined as a value obtained by multiplying the resistance value of the resistance element R2 constituting the second RC parallel circuit and the capacitance value of the capacitance element C2.
  • the time constant ⁇ 2 is reflected in the time change of the polarization voltage Vp2 (t) generated in the second RC parallel circuit.
  • the constant voltage source V0 is a voltage source that outputs a DC voltage.
  • the voltage output by the constant voltage source V0 represents the open circuit voltage (OCV: Open Circuit Voltage) of the power storage element 11, and is described as Vo (t).
  • OCV Open Circuit Voltage
  • Vo (t) The open circuit voltage Vo (t) is given as a function of SOC, temperature, and the like.
  • the terminal voltage V (t) between the positive electrode terminal PT and the negative electrode terminal NT uses a DC resistance voltage Vdc (t), a polarization voltage Vp (t), and an open circuit voltage Vo (t).
  • V (t) Vdc (t) + Vp (t) + Vo (t) Given as.
  • each element constituting the equivalent circuit is determined based on, for example, the result of actual measurement, in consideration of the relationship such as current and SOC.
  • the following shows the simulation results using the charging system model CSM1 and the battery model BM1.
  • FIG. 6A and 6B are graphs showing the simulation results of the charging voltage and the battery voltage.
  • FIG. 6A shows the simulation result when the slew rate of the control response in the charging system 20A is small
  • FIG. 6B shows the simulation result when the slew rate of the control response in the charging system 20A is large.
  • the horizontal axis of each graph represents time (sec), and the vertical axis represents voltage (V).
  • the simulation results of FIGS. 6A and 6B show the time change of the charging system voltage and the time change of the battery voltage when the power storage device 10 is charged to the target voltage.
  • the charging system voltage represents a voltage determined based on the control input (power pattern) in the charging system 20A.
  • the battery voltage represents the terminal voltage of the power storage device 10 (terminal voltage V (t) shown in FIG. 5).
  • FIG. 7A and 7B are graphs showing the simulation results of the current applied to the power storage device 10.
  • FIG. 7A shows the simulation result when the slew rate of the control response in the charging system 20A is small
  • FIG. 7B shows the simulation result when the slew rate of the control response in the charging system 20A is large.
  • the horizontal axis of each graph represents time (sec), and the vertical axis represents current (mA).
  • the simulation results of FIGS. 7A and 7B show the time change of the current input to the power storage device 10 when the power storage device 10 is charged to the target voltage. From the simulation results of FIGS. 6A, 6B, 7A, and 7B, when the voltage difference between the charging system 20A and the power storage device 10 becomes large, the amount of current entering the power storage device 10 may be more than acceptable. It turns out that there is.
  • the control unit 101 of the development support device 100 determines the compatibility between the power storage device 10 and the charging system 20A based on these simulation results. For example, the control unit 101 sets a determination threshold value for the voltage difference between the charging system voltage and the battery voltage obtained as a simulation result, and based on the magnitude relationship between the calculated voltage difference and the determination threshold value, the power storage device 10 and the charging system 20A. It suffices to judge the compatibility with. In this case, the control unit 101 determines that the compatibility is not good when the calculated voltage difference is equal to or greater than the determination threshold value, and determines that the compatibility is good when the calculated voltage difference is less than the determination threshold value. ..
  • the control unit 101 may compare the magnitude of the applied current obtained as a simulation result and the allowable current, and determine the compatibility between the power storage device 10 and the charging system 20A based on the comparison result. In this case, the control unit 101 determines that the compatibility is not good when the calculated applied current is equal to or greater than the allowable current, and determines that the compatibility is good when the calculated applied current is less than the allowable current. ..
  • FIG. 8 is a flowchart showing the procedure of the process executed by the development support device 100.
  • the control unit 101 of the development support device 100 sets a charging system model CSM1 simulating the charging system 20A included in the vehicle C and a battery model BM1 simulating the power storage device 10 mounted on the vehicle C (step S101).
  • the control unit 101 may set the value of each element constituting the transfer function G (s) used in the charging system model CSM1 and the equivalent circuit of the power storage element 11.
  • the transfer function G (s) and the values of each element may be preset.
  • the control unit 101 may read the transfer function G (s) and the values of each element from the storage unit 102.
  • the control unit 101 acquires a power pattern assuming that the vehicle C is in use and a target value of the charging voltage (step S102).
  • the electric power pattern assuming the use of the vehicle C represents the time change of the electric power when the vehicle C repeatedly starts, runs, and stops.
  • the electric power pattern is preset assuming that the vehicle C is in use.
  • the target value of the charging voltage is a value set based on information such as SOC.
  • a target value (initial value) of the charging voltage may be set according to the power pattern to be used.
  • the control unit 101 executes a simulation using the charging system model CSM1 and the battery model BM1 (step S103).
  • the control unit 101 calculates the charging voltage (control output y (t)) representing the control response of the charging system 20A with respect to the control input x (t) according to the power pattern.
  • the control unit 101 estimates the voltage (opening voltage Vo) and SOC of the power storage element 11 when the charging voltage is given by using the battery model BM1. Based on the estimated SOC, the control unit 101 obtains a target value of the charging voltage, feeds it back to the charging system model CSM1, and sequentially estimates the charging voltage and the battery voltage at each time.
  • the control unit 101 determines whether or not the voltage difference between the charging system voltage and the battery voltage is equal to or greater than the determination threshold value (step S104).
  • the control unit 101 determines that the compatibility between the power storage device 10 and the charging system 20A is good (step S105).
  • the control unit 101 determines that the compatibility between the power storage device 10 and the charging system 20A is not good (step S106).
  • step S104 of the flowchart shown in FIG. 8 the compatibility between the power storage device 10 and the charging system 20A is determined based on the voltage difference between the charging system voltage and the battery voltage.
  • the configuration may be such that the magnitude of the current applied to the power storage device 10 obtained as a result of the simulation and the allowable current are compared, and the compatibility between the power storage device 10 and the charging system 20A is determined based on the comparison result. ..
  • the control unit 101 estimates the time (charging time) required from the start of charging to the end of charging, and determines the compatibility between the power storage device 10 and the charging system 20A according to the length of the charging time and the threshold time. It may be configured.
  • the behavior of the charge control is estimated by executing the simulation using the battery model BM1 simulating the power storage device 10 and the charge system model CSM1 simulating the charge system 20A. Then, based on the estimation result, the compatibility between the power storage device 10 and the charging system 20A is determined. Therefore, it is not necessary to carry out verification using the actual machine or the prototype of the power storage device 10 and the charging system 20A, and the compatibility between the power storage device 10 and the charging system 20A can be determined by simulation. As a result, the development support device 100 can determine the charge control specifications of the charging system 20A and the power storage device 10 mounted on the vehicle C at the initial stage of product development.
  • HEV hybrid electric vehicle
  • EV electric vehicle
  • FIG. 9 is a block diagram illustrating a configuration of a control system in a vehicle.
  • the vehicle C includes a power storage device 10, a charge / discharge system 20B for charging the power storage device 10, and a vehicle ECU 30 that executes control of the entire vehicle as a control system configuration.
  • the power storage device 10, the charge / discharge system 20B, and the vehicle ECU 30 are communicably connected to each other via an in-vehicle line such as CAN or LIN. Since the configurations of the power storage device 10 and the vehicle ECU 30 are the same as those of the first embodiment, the description thereof will be omitted.
  • the charge / discharge system 20B includes the charging ECU 21, the alternator 22, and the electric motor 23 described in the first embodiment.
  • the charge / discharge system 20B mounted on the vehicle C is developed and manufactured by, for example, a vehicle manufacturer, and the power storage device 10 is developed and manufactured by, for example, a battery manufacturer. If the specifications of the charge / discharge system 20B mounted on the vehicle C and the performance of the power storage device 10 incorporated in the vehicle C do not match, the performance of the battery cannot be fully exhibited or the deterioration of the battery is accelerated. There is a possibility of causing it.
  • the power storage device 10 is incorporated into the vehicle C and the entire vehicle is comprehensively verified, it may be necessary to review the specifications of the charge / discharge system 20B, or the type of the power storage device 10 to be incorporated into the vehicle C. It may be necessary to change the specifications, so it is not possible to reach an agreement on the specifications at an early stage.
  • a simulation using a model simulating the power storage device 10 and a model simulating the charge / discharge system 20B of the vehicle C is executed on a computer (development support device 100 shown in FIG. 10) independent of the vehicle C. Then, the compatibility between the power storage device 10 mounted on the vehicle C and the charge / discharge system 20B included in the vehicle C is determined.
  • FIG. 10 is a block diagram illustrating an internal configuration of the development support device 100 according to the second embodiment.
  • the development support device 100 is a general-purpose or dedicated computer, and includes a control unit 101, a storage unit 102, a communication unit 103, an operation unit 104, a display unit 105, and the like. Since these configurations are the same as those of the first embodiment, the description thereof will be omitted.
  • the storage unit 102 included in the development support device 100 stores various computer programs executed by the control unit 101, data necessary for executing the computer programs, and the like.
  • the computer program stored in the storage unit 102 uses the battery model BM2 simulating the power storage device 10 and the charge / discharge system model CSM2 simulating the charge / discharge system 20B on the vehicle side to control the behavior of charge control for the power storage device 10.
  • the determination program PG2 may be a single computer program or a program group composed of a plurality of programs.
  • the computer program stored in the storage unit 102 is provided, for example, by a non-temporary recording medium M in which the computer program is readablely recorded.
  • the computer program stored in the storage unit 102 is provided by communication via the communication unit 103.
  • the storage unit 102 stores a battery model BM2 that simulates the power storage device 10.
  • the battery model BM2 includes, for example, an equivalent circuit representing the power storage element 11.
  • the storage unit 102 stores information on the circuit configuration of the equivalent circuit, the value of each element constituting the equivalent circuit, and the like.
  • the battery model BM2 may further include a model that simulates parts such as the BMU 12, the current sensor 13, the current sensor 13, the voltage sensor 14, the temperature sensor 15, and the relay 16 included in the power storage device 10.
  • the battery model BM2 may further include a model that simulates the control executed by the power storage device 10, and a model that simulates an event such as deterioration and heat generation of the power storage device 10.
  • the storage unit 102 stores the charge / discharge system model CSM2 that simulates the charge / discharge system 20B in the vehicle C.
  • the charge / discharge system model CSM2 is described using control parameters including efficiency, resistance, rotation speed, set voltage, and voltage control measurement of the charge / discharger (alternator 22 and electric motor 23 in the embodiment).
  • FIG. 11 is a block diagram showing a configuration of a simulation model used by the development support device 100.
  • the development support device 100 estimates the state of the power storage device 10 by executing a simulation using the battery model BM2 that simulates the power storage device 10 and the charge / discharge system model CSM2 that simulates the charge / discharge system 20B.
  • the battery model BM2 includes the SOC, SOH, temperature, and current of the power storage device 10 as parameters.
  • the charge / discharge system model CSM2 includes charge / discharger efficiency, resistance, rotation speed, set voltage, and voltage control characteristics as parameters.
  • the parameters of the battery model BM2 and the charge / discharge system model CSM2 in the initial state are set by the user.
  • FIG. 12 is a schematic diagram showing an example of a parameter setting screen in the battery model BM2.
  • the control unit 101 of the development support device 100 When executing the simulation, the control unit 101 of the development support device 100 generates screen data as shown in FIG. 12 and displays it on the display unit 105.
  • the user inputs the current, temperature, SOC, and SOH initial state of the power storage device 10 by using the operation unit 104. For current and temperature, each time variation is set.
  • the user prepares a graph file showing changes in current and temperature over time in advance, and selects a desired file through the file selection screen (not shown) presented when the browse button is pressed. May be good.
  • the user may have a configuration in which a graph showing changes in current and temperature over time is drawn directly in the input field.
  • SOC and SOH numerical values are set through the operation unit 104.
  • SOC and SOH When the power storage element 11 is composed of, for example, four cells, SOC and SOH may be set for each cell.
  • FIG. 13 is a schematic diagram showing an example of a parameter setting screen in the charge / discharge system model CSM2.
  • the control unit 101 of the development support device 100 When executing the simulation, the control unit 101 of the development support device 100 generates screen data as shown in FIG. 13 and displays it on the display unit 105.
  • the user inputs the efficiency, resistance, rotation speed, set voltage, and initial state of the voltage control characteristics of the alternator 22 and the electric motor 23 by using the operation unit 104. Numerical values are set for efficiency, resistance, rotation speed, and set voltage through the operation unit 104.
  • the time change of the voltage is set.
  • the user may prepare a file of a graph showing the time change of the voltage in advance, and select a desired file through the file selection screen (not shown) presented when the browse button is pressed. ..
  • the user may configure the graph showing the time change of the voltage to be drawn directly in the input field.
  • the parameter setting screens of the battery model BM2 and the charge / discharge system model CSM2 are individually prepared, but the parameter setting screens may be integrated.
  • FIG. 14 is a flowchart showing a procedure of processing executed by the development support device 100.
  • the control unit 101 of the development support device 100 displays a parameter setting screen as shown in FIGS. 12 and 13 on the display unit 105 in order to receive the parameters in the initial state (step S201).
  • the control unit 101 accepts the input of the parameter through the displayed parameter setting screen (step S202).
  • the control unit 101 sets the received parameters as the initial state, and executes the simulation using the battery model BM2 and the charge / discharge system model CSM2 (step S203).
  • the control unit 101 may simulate the behavior of the power storage device 10 when the efficiency, resistance, rotation speed, set voltage, and voltage control characteristics of the alternator 22 and the electric motor 23 are set. A known method is used as the simulation method.
  • the control unit 101 can estimate the SOC, SOH, cell voltage, and cell temperature of the power storage element 11 by, for example, executing a simulation using an equivalent circuit of the power storage element 11. By simulating the operation of the BMU 12, the open / closed state of the relay 16 can be estimated.
  • the control unit 101 displays the simulation execution result on the display unit 105 (step S204).
  • FIG. 15 is a schematic diagram showing a display example of the simulation execution result.
  • the control unit 101 displays, for example, the time change of the SOC, SOH, voltage, and temperature of the power storage element 11 as a graph as the execution result of the simulation. In the example of FIG. 15, the voltage and temperature of the power storage element 11 are displayed for each cell.
  • the control unit 101 alerts the power storage element 11 when it detects an overvoltage, low voltage, overcurrent, low current, or temperature abnormality, or when it detects a relay abnormality in which the relay 16 is always in the open state. It may be displayed. In the example of FIG. 15, the control unit 101 indicates to the user that an abnormality has occurred by turning on the alert lamp.
  • the control unit 101 determines the compatibility between the power storage device 10 and the charge / discharge system 20B based on the execution result of the simulation (step S205). As a result of executing the simulation, the control unit 101 has a relay abnormality such that the relay 16 is always in the open state when a battery abnormality such as overvoltage, undervoltage, overcurrent, or undercurrent occurs, or when a temperature abnormality occurs. When it occurs, it is determined that the compatibility between the power storage device 10 and the charge / discharge system 20B is not good. On the other hand, if these abnormalities do not occur, the control unit 101 determines that the compatibility between the power storage device 10 and the charge / discharge system 20B is good.
  • the power storage device 10 is simulated by executing the simulation using the battery model BM2 simulating the power storage device 10 and the charge / discharge system model CSM2 simulating the charge / discharge system 20B.
  • the behavior is estimated, and the compatibility between the power storage device 10 and the charge / discharge system 20B is determined based on the estimation result. Therefore, it is not necessary to carry out verification using the actual machine or the prototype of the power storage device 10 and the charge / discharge system 20B, and the compatibility between the power storage device 10 and the charge / discharge system 20B can be determined by simulation.
  • the development support device 100 can determine the specifications of the charge / discharge system 20B and the power storage device 10 mounted on the vehicle C at the initial stage of product development.
  • the power storage device 10 has been described as a power source for a vehicle.
  • the vehicle is not limited to a four-wheeled vehicle, but may be a two-wheeled vehicle. Alternatively, it may be a train, or a mobile body such as an AGV (Automatic Guided Vehicle), an unmanned aerial vehicle (drone), or an aircraft.
  • the power storage device 10 may be a high-voltage power source for driving a vehicle (several hundred V) or an auxiliary battery (12V or 24V) for supplying a power source other than driving, and may be an engine starting battery (12V or 24V). Or a mild hybrid battery (48V) may be used.
  • Examples of vehicle charging systems include regenerative power recovered when the vehicle decelerates, solar power generation mounted on the roof, 100V power supply and 200V quick charger for parking and charging, and electricity storage incorporating reused batteries. Examples include, but are not limited to, these.
  • the power storage device 10 may be a power source for electronic devices or a power source for power storage. In these cases, the development support device 100 may determine the compatibility between the charging system provided in the electronic device or the power storage facility and the power storage device.
  • the configuration of the power storage element 11 composed of a plurality of lithium ion secondary batteries has been described.
  • the power storage device 10 may be a module to which a plurality of cells are connected, a bank to which a plurality of modules are connected, a domain to which a plurality of banks are connected, and the like.
  • the lithium ion secondary battery any battery such as an all-solid-state lithium ion battery, a zinc air battery, a sodium ion battery, and a lead battery may be adopted.
  • Power storage device 20A Charging system 20B Charging / discharging system 21 Charging ECU 22 Alternator 23 Electric motor 30 Vehicle ECU 100 Development support device 101 Control unit 102 Storage unit 103 Communication unit 104 Operation unit 105 Display unit BM1, BM2 Battery model CSM1, CSM2 Charging system model

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • General Chemical & Material Sciences (AREA)
  • Electrochemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Power Engineering (AREA)
  • Combustion & Propulsion (AREA)
  • Medical Informatics (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

コンピュータプログラム、判定装置及び判定方法の提供。 コンピュータに、蓄電デバイスを模擬するバッテリモデルと、蓄電デバイスを充電する充電システムを模擬する充電システムモデルとを用いたシミュレーションを実行することにより、蓄電デバイス及び充電システムの少なくとも一方の状態を推定し、推定した状態に基づき、蓄電デバイスと充電システムとの間の適合性を判定する処理を実行させる。

Description

コンピュータプログラム、判定装置及び判定方法
 本発明は、コンピュータプログラム、判定装置及び判定方法に関する。
 EV(Electric Vehicle)やHEV(Hybrid Electric Vehicle)などの車両には、バッテリ及びバッテリを充放電するための充放電システムが搭載されている(例えば、特許文献1を参照)。
 このような充放電システムは、BMU(Battery Management Unit)から、バッテリの温度、SOC(State Of Charge)、SOH(State Of Health)、電圧、電流などの各種情報を取得し、取得した各種情報に基づいて、充放電制御を実行する。
特開2011-062018号公報
 しかしながら、車両が備える充放電システムの仕様と車両に搭載されたバッテリの性能とが適合していなかった場合、バッテリに対して許容以上の電力が供給されたり、充電に要する時間が非常に長くなったりする可能性がある。バッテリの性能が十分に発揮されなかったり、バッテリの劣化が加速したりする可能性もある。実際にバッテリを搭載して車両システムの総合検証を行う段階において、上述のような不具合が見つかった場合、メーカは、充放電システムの仕様から見直す必要が生じたり、車両に搭載するバッテリの種類を変更したりする必要が生じたりするので、早期に仕様の合意に達することができないという問題点が生じる。
 本発明は、充放電システムと蓄電デバイスとの適合性をシミュレーションにより判定するコンピュータプログラム、判定方法及び判定装置を提供することを目的とする。
 コンピュータプログラムは、コンピュータに、蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスを充電する充電システムを模擬する充電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイスに対する充電制御の挙動を推定し、推定した充電制御の挙動に基づき、前記蓄電デバイスと前記充電システムとの間の適合性を判定する処理を実行させるためのコンピュータプログラムである。
 コンピュータプログラムは、コンピュータに、蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスに対するパワーマネージメントシステムを模擬する充放電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記パワーマネージメントシステムの少なくとも一方の状態を推定し、推定した前記蓄電デバイスの状態に基づき、前記蓄電デバイスと前記パワーマネージメントシステムとの適合性を判定する処理を実行させるためのコンピュータプログラムである。
 判定装置は、蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスを充電する充電システムを模擬する充電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイスに対する充電制御の挙動を推定する推定部と、推定した充電制御の挙動に基づき、前記蓄電デバイスと前記充電システムとの間の適合性を判定する判定部とを備える。
 判定装置は、蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスに対するパワーマネージメントシステムを模擬する充放電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記パワーマネージメントシステムの少なくとも一方の状態を推定する推定部と、推定した前記蓄電デバイスの状態に基づき、前記蓄電デバイスと前記パワーマネージメントシステムとの適合性を判定する判定部とを備える。
 判定方法は、コンピュータを用いて、蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスを充電する充電システムを模擬する充電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイスに対する充電制御の挙動を推定し、推定した充電制御の挙動に基づき、前記蓄電デバイスと前記充電システムとの間の適合性を判定する。
 判定方法は、コンピュータを用いて、蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスに対するパワーマネージメントシステムを模擬する充放電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記パワーマネージメントシステムの少なくとも一方の状態を推定し、推定した前記蓄電デバイスの状態に基づき、前記蓄電デバイスと前記パワーマネージメントシステムとの適合性を判定する。
 本願によれば、充放電システムと蓄電デバイスとの適合性をシミュレーションにより判定できる。
車両における制御系の構成を説明するブロック図である。 蓄電デバイスの内部構成を示すブロック図である。 第1の実施形態に係る開発支援装置の内部構成を説明するブロック図である。 開発支援装置が用いるシミュレーションモデルの構成を示すブロック図である。 バッテリモデルの概要を説明する回路図である。 充電電圧及びバッテリ電圧のシミュレーション結果を示すグラフである。 充電電圧及びバッテリ電圧のシミュレーション結果を示すグラフである。 蓄電デバイスへの印加電流のシミュレーション結果を示すグラフである。 蓄電デバイスへの印加電流のシミュレーション結果を示すグラフである。 開発支援装置が実行する処理の手順を示すフローチャートである。 車両における制御系の構成を説明するブロック図である。 第2の実施形態に係る開発支援装置の内部構成を説明するブロック図である。 開発支援装置が用いるシミュレーションモデルの構成を示すブロック図である。 バッテリモデルにおけるパラメータ設定画面の一例を示す模式図である。 充放電システムモデルにおけるパラメータ設定画面の一例を示す模式図である。 開発支援装置が実行する処理の手順を示すフローチャートである。 シミュレーション実行結果の表示例を示す模式図である。
 実施形態におけるコンピュータプログラムは、コンピュータに、蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスを充電する充電システムを模擬する充電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記充電システムの少なくとも一方の状態を推定し、推定した状態に基づき、前記蓄電デバイスと前記充電システムとの間の適合性を判定する処理を実行させる。
 蓄電デバイスを設計する際に内部構造を変化させた場合、活物質や電解液の組成を変化させた場合などにおいて、電池の特性は変化する。電池の特性が変化した場合、その特性の変化に合わせて充電制御を変更する必要がある。蓄電デバイスでは、過充電や過放電を避けなければならず、充電制御の重要性は高い。本実施形態のように、蓄電デバイスと充電システムとの適合性の判定を、モデルを用いたシミュレーションによって実行する場合には、充電制御において高い電圧を発生させるような充電装置は不要であり、安全性は高い。実機や試作品を用いた検証では、実際の電池への充電が必要となるため、適合性の判定結果が得られるまでに時間を要するが、シミュレーションによって判定する場合、電池への充電が不要となるため、適合性の判定結果は速やかに得られる。昨今の電気自動車、再生可能エネルギ、スマートグリッドなどの目覚ましい開発進展を考えた場合、高性能・高安全の蓄電デバイスに対する期待は大きく、シミュレーションを活用した安全性設計及び開発時間の短縮の意義は大きい。
 前記コンピュータプログラムにおいて、前記シミュレーションにより推定される状態は、前記蓄電デバイスの状態に応じて定められる充電システム電圧の時間変化と、前記蓄電デバイスの両端電圧であるバッテリ電圧の時間変化とを含み、前記コンピュータに、前記充電システム電圧と前記バッテリ電圧との差に基づき、前記蓄電デバイスと前記充電システムとの間の適合性を判定する処理を実行させてもよい。実機や試作品を用いた検証では、充電システム電圧とバッテリ電圧との電圧差が大きくなると、電池に入る電流が許容以上となる可能性があり、安全性を担保できない。これに対し、本実施形態では、モデルを用いたシミュレーションによって適合性を判定するので、たとえ許容以上の電流が流れる状況下であっても安全性を担保できる。
 前記コンピュータプログラムにおいて、前記シミュレーションにより推定される状態は、充電の際に前記蓄電デバイスに印加される印加電流の時間変化を含み、前記コンピュータに、前記印加電流と、印加電流に対して設定される許容値との差に基づき、前記蓄電デバイスと前記充電システムとの間の適合性を判定する処理を実行させてもよい。実機や試作品を用いた検証では、電池に入る電流が許容以上となる可能性があり、安全性を担保できない。これに対し、本実施形態では、モデルを用いたシミュレーションによって適合性を判定するので、たとえ許容以上の電流が流れる状況下であっても安全性を担保できる。
 前記コンピュータプログラムにおいて、前記充電システムモデルは、前記充電システムにおける制御入力と制御出力との関係を表す伝達関数を用いて設定してもよい。実機や試作品を用いた検証では、充電システムにおける制御入力と制御出力との間に遅延が生じる場合がある。例えば、目標値への電圧降下に時間が掛かる場合、電池に許容以上の電流が流れるため、安全性を担保できない。一方、目標値への電圧上昇に時間が掛かる場合、充電に時間が掛かり、電力が不足した状態が長く続く可能性がある。これに対し、本実施形態では、充電システムモデルにおいて伝達関数を設定し、シミュレーションによって蓄電デバイスと充電システムとの適合性を判定するので、例えば許容以上の電流が流れる状況下であっても安全性を担保でき、実機や試作品では充電時間が長く続く状況下であっても、速やかに適合性の判定結果が得られる。
 前記コンピュータプログラムにおいて、前記充電システムモデルは、前記充電システムにおける制御遅延を模擬してもよい。実機や試作品を用いた検証では、充電システムにおける制御入力と制御出力との間に遅延が生じる場合がある。例えば、目標値への電圧降下に時間が掛かる場合、電池に許容以上の電流が流れるため、安全性を担保できない。目標値への電圧上昇に時間が掛かる場合、電力が不足した状態が長く続く可能性がある。これに対し、本実施形態では、充電システムモデルにおいて伝達関数を設定し、シミュレーションによって蓄電デバイスと充電システムとの適合性を判定するので、例えば許容以上の電流が流れる状況下であっても安全性を担保できる。実機や試作品では充電に要する時間が長くなる場合であっても、速やかに適合性の判定結果が得られる。
 前記コンピュータプログラムにおいて、前記バッテリモデルは、前記蓄電デバイスの等価回路を含んでもよい。この構成によれば、蓄電デバイスの等価回路を用いるので、実機や試作品では許容以上の電流が流れる状況下であっても安全性を担保できる。
 実施形態におけるコンピュータプログラムは、コンピュータに、蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスに対するパワーマネージメントシステムを模擬する充放電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記パワーマネージメントシステムの少なくとも一方の状態を推定し、推定した前記蓄電デバイスの状態に基づき、前記蓄電デバイスと前記パワーマネージメントシステムとの適合性を判定する処理を実行させる。
 蓄電デバイスを設計する際に内部構造を変化させた場合、活物質や電解液の組成を変化させた場合などにおいて、電池の特性は変化する。電池の特性が変化した場合、その特性の変化に合わせて充放電制御を変更する必要がある。蓄電デバイスでは、過充電や過放電を避けなければならず、充放電制御の重要性は高い。本実施形態のように、蓄電デバイスとパワーマネージメントシステムとの適合性の判定を、モデルを用いたシミュレーションによって実行する場合には、充電制御において高い電圧を発生させるような充電装置は不要であり、安全性は高い。本実施の形態において、12Vや48Vなどの電池、回生電力、ソーラ発電、100V電源、パワーコンディショナ(パワコン)、再使用された電池を組み込む蓄電システムなどを含めた電力系のシステム全体をパワーマネージメントシステムという。実機や試作品を用いた検証では、実際の電池の充放電が必要となるため、適合性の判定結果が得られるまでに時間を要するが、シミュレーションによって判定する場合、電池の充放電が不要となるため、適合性の判定結果は速やかに得られる。昨今の電気自動車、再生可能エネルギ、スマートグリッドなどの目覚ましい開発進展を考えた場合、高性能・高安全の蓄電デバイスに対する期待は大きく、シミュレーションを活用した安全性設計及び開発時間の短縮の意義は大きい。
 前記コンピュータプログラムにおいて、前記バッテリモデルは、前記蓄電デバイスのSOC、SOH、電圧、電流、及び温度の少なくとも1つを推定するための状態推定モデル、前記蓄電デバイスを構成する構成部品を模擬する部品モデル、前記蓄電デバイスに対する充放電制御を模擬する充放電制御モデル、並びに前記蓄電デバイスの劣化及び発熱の少なくとも一方を推定するための事象推定モデルを含んでもよい。実機や試作品を用いた検証において、蓄電デバイスとパワーマネージメントシステムとの間の適合性を判定する場合、パワーマネージメントシステムにおける設定値を様々に変更して、実際の電池の充放電を繰り返す必要があり、判定結果が得られるまで時間を要する。適合性が低いとの判定結果が得られた場合には、蓄電デバイス及びパワーマネージメントシステムの組み合わせを変更して、検証を継続する必要があり、更に時間を要する。これに対し、本実施形態では、モデルとして用意されたパワーマネージメントシステムのパラメータを様々に変更することによって、蓄電デバイス及びパワーマネージメントシステムの様々な組み合わせについて適合性を判定できるので、速やかに適合性の判定結果が得られる。適合性が低いとの判定結果が得られた場合であっても、どの部分を仕様変更すれば良いのか明確となるため、有効な開発支援ツールとなる。
 前記コンピュータプログラムにおいて、前記充放電システムモデルは、前記パワーマネージメントシステムにおける効率、抵抗、回転数、設定電圧、及び電圧制御特性の少なくとも1つをパラメータに含むモデルであってもよい。実機や試作品を用いた検証において、蓄電デバイスとパワーマネージメントシステムとの間の適合性を判定する場合、パワーマネージメントシステムにおける設定値を様々に変更して、実際の電池の充放電を繰り返す必要があり、判定結果が得られるまで時間を要する。適合性が低いとの判定結果が得られた場合には、蓄電デバイス及びパワーマネージメントシステムの組み合わせを変更して、検証を継続する必要があり、更に時間を要する。これに対し、本実施形態では、モデルとして用意されたパワーマネージメントシステムのパラメータを様々に変更することによって、蓄電デバイス及びパワーマネージメントシステムの様々な組み合わせについて適合性を判定できるので、速やかに適合性の判定結果が得られる。適合性が低いとの判定結果が得られた場合であっても、どの部分を仕様変更すれば良いのか明確となるため、有効な開発支援ツールとなる。
 前記コンピュータプログラムにおいて、前記コンピュータに、各モデルの初期状態を示すパラメータの入力を受付ける処理を実行させてもよい。この構成によれば、蓄電デバイス及びパワーマネージメントシステムの任意の状態を初期状態としてシミュレーションを実行できるので、実際の電池を充放電して適合性を判定する必要がある実機や試作品を用いた検証方法と比較して、適合性の判定に要する時間を短縮できる。
 前記コンピュータプログラムにおいて、前記コンピュータに、各モデルによる推定結果を表示装置に表示させる処理を実行させてもよい。この構成によれば、例えば、シミュレーションを実行することによって得られるパラメータの時間推移を表示させることができるので、適合性が低いとの判定結果が得られた場合、どの部分を仕様変更すれば良いのかを明確化できる。
 実施形態における判定装置は、蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスを充電する充電システムを模擬する充電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記充電システムの少なくとも一方の状態を推定する推定部と、推定した状態に基づき、前記蓄電デバイスと前記充電システムとの間の適合性を判定する判定部とを備える。
 蓄電デバイスを設計する際に内部構造を変化させた場合、活物質や電解液の組成を変化させた場合などにおいて、電池の特性は変化する。電池の特性が変化した場合、その特性の変化に合わせて充電制御を変更する必要がある。蓄電デバイスでは、過充電や過放電を避けなければならず、充電制御の重要性は高い。本実施形態の判定装置のように、蓄電デバイスと充電システムとの適合性の判定を、モデルを用いたシミュレーションによって実行する場合には、充電制御において高い電圧を発生させるような充電装置は不要であり、安全性は高い。実機や試作品を用いた検証では、実際の電池への充電が必要となるため、適合性の判定結果が得られるまでに時間を要するが、判定装置を用いてシミュレーションによって判定する場合、電池への充電が不要となるため、適合性の判定結果は速やかに得られる。昨今の電気自動車、再生可能エネルギ、スマートグリッドなどの目覚ましい開発進展を考えた場合、高性能・高安全の蓄電デバイスに対する期待は大きく、シミュレーションを活用した安全性設計及び開発時間の短縮の意義は大きい。
 実施形態における判定装置は、蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスに対するパワーマネージメントシステムを模擬する充放電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記パワーマネージメントシステムの少なくとも一方の状態を推定する推定部と、推定した前記蓄電デバイスの状態に基づき、前記蓄電デバイスと前記パワーマネージメントシステムとの適合性を判定する判定部とを備える。
 蓄電デバイスを設計する際に内部構造を変化させた場合、活物質や電解液の組成を変化させた場合などにおいて、電池の特性は変化する。電池の特性が変化した場合、その特性の変化に合わせて充放電制御を変更する必要がある。蓄電デバイスでは、過充電や過放電を避けなければならず、充放電制御の重要性は高い。本実施形態の判定装置のように、蓄電デバイスとパワーマネージメントシステムとの適合性の判定を、モデルを用いたシミュレーションによって実行する場合には、充電制御において高い電圧を発生させるような充電装置は不要であり、安全性は高い。本実施の形態において、12Vや48Vなどの電池、回生電力、ソーラ発電、100V電源、パワーコンディショナ(パワコン)、再使用された電池を組み込む蓄電システムなどを含めた電力系のシステム全体をパワーマネージメントシステムという。実機や試作品を用いた検証では、実際の電池の充放電が必要となるため、適合性の判定結果が得られるまでに時間を要するが、判定装置を用いてシミュレーションによって判定する場合、電池の充放電が不要となるため、適合性の判定結果は速やかに得られる。昨今の電気自動車、再生可能エネルギ、スマートグリッドなどの目覚ましい開発進展を考えた場合、高性能・高安全の蓄電デバイスに対する期待は大きく、シミュレーションを活用した安全性設計及び開発時間の短縮の意義は大きい。
 実施形態における判定方法は、コンピュータを用いて、蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスを充電する充電システムを模擬する充電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記充電システムの少なくとも一方の状態を推定し、推定した状態の挙動に基づき、前記蓄電デバイスと前記充電システムとの間の適合性を判定する。
 蓄電デバイスを設計する際に内部構造を変化させた場合、活物質や電解液の組成を変化させた場合などにおいて、電池の特性は変化する。電池の特性が変化した場合、その特性の変化に合わせて充電制御を変更する必要がある。蓄電デバイスでは、過充電や過放電を避けなければならず、充電制御の重要性は高い。本実施形態の判定方法のように、蓄電デバイスと充電システムとの適合性の判定を、モデルを用いたシミュレーションによって実行する場合には、充電制御において高い電圧を発生させるような充電装置は不要であり、安全性は高い。実機や試作品を用いた検証では、実際の電池への充電が必要となるため、適合性の判定結果が得られるまでに時間を要するが、コンピュータを用いてシミュレーションによって判定する場合、電池への充電が不要となるため、適合性の判定結果は速やかに得られる。昨今の電気自動車、再生可能エネルギ、スマートグリッドなどの目覚ましい開発進展を考えた場合、高性能・高安全の蓄電デバイスに対する期待は大きく、シミュレーションを活用した安全性設計及び開発時間の短縮の意義は大きい。
 実施形態における判定方法は、コンピュータを用いて、蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスに対するパワーマネージメントシステムを模擬する充放電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記パワーマネージメントシステムの少なくとも一方の状態を推定し、推定した前記蓄電デバイスの状態に基づき、前記蓄電デバイスと前記パワーマネージメントシステムとの適合性を判定する。
 蓄電デバイスを設計する際に内部構造を変化させた場合、活物質や電解液の組成を変化させた場合などにおいて、電池の特性は変化する。電池の特性が変化した場合、その特性の変化に合わせて充放電制御を変更する必要がある。蓄電デバイスでは、過充電や過放電を避けなければならず、充放電制御の重要性は高い。本実施形態の判定方法のように、蓄電デバイスとパワーマネージメントシステムとの適合性の判定を、モデルを用いたシミュレーションによって実行する場合には、充電制御において高い電圧を発生させるような充電装置は不要であり、安全性は高い。本実施の形態において、12Vや48Vなどの電池、回生電力、ソーラ発電、100V電源、パワーコンディショナ(パワコン)、再使用された電池を組み込む蓄電システムなどを含めた電力系のシステム全体をパワーマネージメントシステムという。実機や試作品を用いた検証では、実際の電池の充放電が必要となるため、適合性の判定結果が得られるまでに時間を要するが、コンピュータを用いてシミュレーションによって判定する場合、電池の充放電が不要となるため、適合性の判定結果は速やかに得られる。昨今の電気自動車、再生可能エネルギ、スマートグリッドなどの目覚ましい開発進展を考えた場合、高性能・高安全の蓄電デバイスに対する期待は大きく、シミュレーションを活用した安全性設計及び開発時間の短縮の意義は大きい。
 以下、第1の実施形態として、ハイブリッド自動車(HEV)や電気自動車(EV)などの車両に搭載される充電システムへの適用例を説明する。
(第1の実施形態)
 図1は車両における制御系の構成を説明するブロック図である。車両Cは、制御系の構成として、蓄電デバイス10、蓄電デバイス10を充電するための充電システム20A、及び車両全体の制御を実行する車両ECU(Electronic Control Unit)30を備える。蓄電デバイス10、充電システム20A、及び車両ECU30は、CAN(Controller Area Network)やLIN(Local Interconnect Network)などの車内回線を介して互いに通信可能に接続される。実施形態において、車両ECU30は、車両Cの走行状態、蓄電デバイス10の充電状態などを監視し、車両Cの走行状態や蓄電デバイス10の充電状態に応じて、蓄電デバイス10の充放電を切り替える制御等を実行する。
 蓄電デバイス10は、蓄電素子11と、BMU12(Battery Management Unit)とを備える(図2を参照)。蓄電素子11は、例えば複数の電池を直列に接続してなる組電池により構成される。蓄電デバイス10が備える蓄電素子11は、車両Cの充電システム20Aから供給される電力により充電され、車両ECU30からの制御指令に応じて負荷へ電力を供給する。蓄電デバイス10が電力を供給する負荷の一例は、車両Cを走行させるための駆動トルクを発生させる電動モータ23である。負荷の他の例は、ヘッドライト、方向指示灯、車内灯、パワーウィンドウなど車両Cが備える各種の装備品を含む。BMU12は、蓄電デバイス10を管理する機能を有する。BMU12は、蓄電デバイス10の状態を推定する機能、蓄電デバイス10における異常を検知する機能などを有しており、推定した蓄電デバイス10の状態(例えばSOC)に関する情報、検知した異常に関する情報などを車両ECU30へ通知する。
 充電システム20Aは、充電ECU21と、オルタネータ22とを含む。オルタネータ22は、図に示していないエンジンの出力軸に連結される発電機であり、出力軸が回転することによって発電するよう構成されている。オルタネータ22の発電によって得られる電力は、充電ECU21からの制御により、蓄電デバイス10及び車両Cが備える負荷に供給される。オルタネータ22は、車両Cが減速しているときに発電する回生制御を行うことにより、エンジン出力軸の回転に対する負荷となって車両Cに制動力を与えると共に、発電した電力を蓄電デバイス10及び車両Cが備える負荷へ供給する。
 図2は蓄電デバイス10の内部構成を示すブロック図である。蓄電デバイス10は、蓄電素子11及びBMU12に加え、電流センサ13、電圧センサ14、温度センサ15、リレー16などを備える。蓄電素子11は、例えば、直列に接続された複数のリチウムイオン二次電池から構成される。
 電流センサ13は、蓄電素子11と負極端子10Aとの間に設けられており、蓄電素子11に流れ込む電流を計測する。電流センサ13は、計測結果をBMU12へ出力する。
 電圧センサ14は、蓄電素子11に並列に接続されており、蓄電素子11の両端電圧を計測する。電圧センサ14は、計測結果をBMU12へ出力する。
 温度センサ15は、蓄電デバイス10の内部又は外部に設けられており、温度を計測する。温度センサ15は複数設けられてもよい。温度センサ15が計測する温度は、例えば蓄電素子11の温度である。この場合、温度センサ15は蓄電素子11の近傍(蓄電デバイスの内部)に設けられる。温度センサ15が計測する温度は、蓄電デバイス10が設置されている環境の温度(環境温度)であってもよい。この場合、温度センサ15は蓄電デバイス10の近傍に設けられる。以下の説明では、蓄電素子11の温度と、環境温度とを区別せずに、蓄電デバイス10の温度と表記する。温度センサ15は、計測結果をBMU12へ出力する。
 リレー16は、蓄電素子11と正極端子10Bとの間に設けられており、BMU12からの制御指令に応じて、蓄電素子11の充放電経路を遮断又は接続するための回路要素である。蓄電デバイス10が正常に機能している場合、充放電経路は接続され、外部から蓄電素子11への充電、及び蓄電素子11から負荷への給電(放電)が可能である。一方、蓄電デバイス10において何らかの異常が検知された場合、BMU12からの制御指令により、充放電経路は遮断され、蓄電素子11への充電、及び負荷への給電(放電)が停止される。
 実施形態において、リレー16は充放電経路を遮断又は接続するための回路要素の一例である。代替的に、FET(Field-Effect Transistor)などの半導体スイッチを用いて充放電経路を遮断又は接続する構成としてもよい。
 BMU12は、蓄電デバイス10の状態を管理するための装置であり、例えば、制御部121、記憶部122、接続部123、通信部124を備える。制御部121は、CPU(Central Processing Unit)、ROM(Read Only Memory)、RAM(Random Access Memory)などを備える。制御部121が備えるCPUは、ROMに予め格納される制御プログラムを実行することにより、蓄電デバイス10の状態を推定する機能、蓄電デバイス10における異常を検知する機能などを実現する。RAMは、CPUによる演算の実行中に生成される各種の情報を一時的に記憶する。記憶部122は、EEPROM(Electronically Erasable Programmable Read Only Memory)などにより構成されており、制御に必要なデータなどを記憶する。接続部123には、電流センサ13、電圧センサ14、温度センサ15、リレー16などが接続される。通信部124は、CANやLINなどの車内回線を介して、車両ECU30と通信可能に接続される。
 BMU12の制御部121は、接続部123を通じて、電流センサ13により計測される電流値、電圧センサ14により計測される電圧値、温度センサ15により計測される温度を取得し、これらのデータに基づき、蓄電デバイス10のSOCや充電電圧の目標値を算出する。制御部121は、算出したSOCや充電電圧の目標値を、通信部124を通じて、車両ECU30へ通知する。制御部121は、例えば温度センサ15により計測される温度が予め設定される閾値を超えた場合、蓄電デバイス10における異常を検知したと判断し、充放電経路を遮断する制御指令をリレー16へ出力する。
 実施形態では、蓄電デバイス10がBMU12を内蔵する構成とした。代替的に、BMU12は蓄電デバイス10の外部に設けられてもよい。
 車両Cに搭載される充電システム20Aは例えば車両メーカによって開発・製造され、蓄電デバイス10は例えば電池メーカによって開発・製造される。車両Cに搭載される充電システム20Aの充電制御仕様と、車両Cに組み込まれた蓄電デバイス10の性能とが適合していなかった場合、蓄電デバイス10に対して許容以上の電力が供給されたり、充電に要する時間が非常に長くなったりする可能性がある。蓄電デバイス10を車両Cに組み込み、車両全体を総合検証した時点において、上述のような不具合が見つかった場合、充電システム20Aの充電制御仕様を見直す必要が生じたり、車両Cに組み込む蓄電デバイス10の種類を変更する必要が生じたりするので、早期に仕様の合意に達することができない。
 実施形態では、車両Cとは独立したコンピュータ(図3に示す開発支援装置100)において、蓄電デバイス10を模擬するモデルと、車両Cの充電システム20Aを模擬するモデルとを用いたシミュレーションを実行し、車両Cに搭載される蓄電デバイス10と、車両Cが備える充電システム20Aとの間の適合性を判定する。
 図3は第1の実施形態に係る開発支援装置100の内部構成を説明するブロック図である。開発支援装置100は、汎用又は専用のコンピュータであり、制御部101、記憶部102、通信部103、操作部104、表示部105等を備える。
 制御部101は、CPU、ROM、RAMなどにより構成される。制御部101が備えるCPUは、ROMまたは記憶部102に記憶されている各種コンピュータプログラムをRAM上に展開して実行することにより、装置全体を本願の判定装置として機能させる。
 制御部101は、上記の構成に限定されるものではなく、複数のCPU、マルチコアCPU、GPU(Graphics Processing Unit)、マイコン、揮発性または不揮発性のメモリ等を備える任意の処理回路または演算回路であってもよい。制御部101は、計測開始指示を与えてから計測終了指示を与えるまでの経過時間を計測するタイマ、数をカウントするカウンタ、日時情報を出力するクロック等の機能を備えていてもよい。
 記憶部102は、HDD(Hard Disk Drive)、SSD(Solid State Drive)等を用いた記憶装置を備える。記憶部102には、制御部101によって実行される各種コンピュータプログラム、及びコンピュータプログラムの実行に必要なデータ等が記憶される。記憶部102に記憶されるコンピュータプログラムは、蓄電デバイス10を模擬するバッテリモデルBM1と、車両側の充電システム20Aを模擬する充電システムモデルCSM1を用いて、蓄電デバイス10に対する充電制御の挙動を推定し、蓄電デバイス10と充電システム20Aとの間の適合性を判定する判定プログラムPG1を含む。判定プログラムPG1は単一のコンピュータプログラムであってもよく、複数のプログラムから構成されるプログラム群であってもよい。
 記憶部102に記憶されるコンピュータプログラムは、例えば、当該コンピュータプログラムを読み取り可能に記録した非一時的な記録媒体Mにより提供される。記録媒体Mは、CD-ROM、USB(Universal Serial Bus)メモリ、SD(Secure Digital)カード、マイクロSDカード、コンパクトフラッシュ(登録商標)などの可搬型のメモリである。この場合、制御部101は、不図示の読取装置を用いて記録媒体Mからコンピュータプログラムを読み取り、読み取ったコンピュータプログラムを記憶部102にインストールする。代替的に、記憶部102に記憶されるコンピュータプログラムは、通信部103を介した通信により提供されてもよい。この場合、制御部101は、通信部103を通じてコンピュータプログラムを取得し、取得したコンピュータプログラムを記憶部102にインストールすればよい。
 記憶部102には、コンピュータプログラムの他に各種のデータが記憶される。例えば、記憶部102には、蓄電デバイス10を模擬するバッテリモデルBM1、及び充電システム20Aを模擬する充電システムモデルCSM1が記憶される。バッテリモデルBM1は、例えば、蓄電素子11を表す等価回路を含む。記憶部102は、等価回路の回路構成に関する情報や等価回路を構成する各素子の値などを記憶する。バッテリモデルBM1は、更にBMU12の動作を模擬するBMUモデルを含んでもよい。充電システムモデルCSM1は、充電システム20Aにおける制御入力と制御出力との関係を表す伝達関数を用いて設定される。記憶部102は、制御入力及び制御出力間の伝達関数を記述するパラメータなどを記憶する。
 記憶部102は、蓄電デバイス10を識別する識別子に関連付けて、当該蓄電デバイス10の情報を記憶する電池テーブルBTを有していてもよい。電池テーブルBTに登録される電池情報は、例えば、正極及び負極の情報、電解液の情報、タブの情報などを含む。正極及び負極の情報とは、正極及び負極の活物質名、厚み、幅、奥行き、開回路電位などの情報である。電解液及びタブの情報とは、イオン種、輸率、拡散係数、導電率などの情報である。電池テーブルBTに登録される情報は、蓄電デバイス10を構成する構成部品等の情報が含まれていてもよい。電池テーブルBTに記憶されている情報は、上述したシミュレーションを実行する際に、パラメータの一部として利用される。
 通信部103は、図に示してない通信網を通じて外部装置と通信を行うための通信インタフェースを備える。外部装置は、例えば、ユーザが使用するコンピュータやスマートフォンなどの情報処理端末である。通信部103は、外部装置へ送信すべき情報が制御部101から入力された場合、入力された情報を外部装置へ送信する共に、通信網を通じて受信した外部装置からの情報を制御部101へ出力する。
 通信部103は、車両ECU30や蓄電デバイス10が備えるBMU12と通信可能に構成されてもよい。制御部101は、通信部103を通じて、車両Cの走行状態に関する情報、蓄電デバイス10にて計測される各種計測値などを取得し、取得した情報に基づきシミュレーションを実行してもよい。
 操作部104は、キーボード、マウス、タッチパネルなどの入力インタフェースを備えており、ユーザによる操作を受付ける。表示部105は、液晶ディスプレイ装置などを備えており、ユーザに対して報知すべき情報を表示する。なお、実施形態では、開発支援装置100が操作部104及び表示部105を備える構成としたが、操作部104及び表示部105は必須ではなく、開発支援装置100の外部に接続されたコンピュータを通じて操作を受付け、通知すべき情報を外部のコンピュータへ出力する構成であってもよい。
 以下、シミュレーションモデルの構成について説明する。
 図4は開発支援装置100が用いるシミュレーションモデルの構成を示すブロック図である。開発支援装置100は、充電システム20Aを模擬する充電システムモデルCSM1と、蓄電デバイス10を模擬するバッテリモデルBM1とを用いたシミュレーションを実行することにより、車両Cにおける充電制御の挙動を推定する。
 充電システムモデルCSM1には、車両Cの使用時を想定した電力パターンと、バッテリモデルBM1の推定結果に基づき設定される充電電圧の目標値とが入力される。ここで、車両Cの使用時を想定した電力パターンとは、車両Cが発進、走行、停止を繰り返した場合の電力の時間変化を表しており、オルタネータ22が生成した電力と車両消費電力との差分により算出される。充電システムモデルCSM1は、この電力パターンを制御入力x(t)とし、充電電圧の目標値に基づき制御出力y(t)を算出する。制御出力y(t)は、例えば、オルタネータ22が蓄電デバイス10に供給する充電電圧を表す。
 実施形態では、充電システム20Aにおいて制御遅延が発生することを考慮して、制御入力x(t)と制御出力y(t)との間に伝達関数G(s)が設定される。伝達関数G(s)の関数形は、車両Cの使用時の電力パターン、オルタネータ22が生成する電力の時間変化、車両Cが消費する電力の時間変化等の実測に基づき定めることができる。伝達関数G(s)は、充電システム20Aにおける制御応答のスルーレートを模擬するような関数形を有することが好ましい。
 伝達関数G(s)が与えられた場合、開発支援装置100の制御部101は、充電システムモデルCSM1の制御入力x(t)に対する制御出力y(t)を以下の手順で算出する。まず、制御部101は、制御入力x(t)をラプラス変換して、関数X(s)を求める。次いで、制御部101は、関数X(s)に伝達関数G(s)を掛けた出力Y(s)=G(s)X(s)を求める。制御部101は、出力Y(s)を逆ラプラス変換し、制御出力y(t)を求める。
 バッテリモデルBM1は、充電電圧(すなわち、充電システムモデルCSM1の制御出力y(t))が与えられた場合の蓄電素子11の電圧(開放電圧Vo)やSOCを推定する。バッテリモデルBM1は、推定したSOCに基づき、充電電圧の目標値を求め、充電システムモデルCSM1にフィードバックする。
 図5はバッテリモデルBM1の概要を説明する回路図である。バッテリモデルBM1は、蓄電素子11の等価回路を含む。蓄電素子11の等価回路は、例えば、抵抗素子R0、抵抗素子R1と容量素子C1とを並列に接続してなる第1RC並列回路、抵抗素子R2と容量素子C2とを並列に接続してなる第2RC並列回路、及び定電圧源V0によって記述される。
 抵抗素子R0は、蓄電素子11の直流抵抗成分(直流インピーダンス)を表す。蓄電素子11の直流抵抗成分は、例えば蓄電素子11における電極の抵抗に対応する。抵抗素子R0の抵抗値は放電電流、充電電圧、SOC、温度などによって変化する値である。抵抗素子R0の抵抗値が定まれば、この等価回路に電流I(t)が流れたときに抵抗素子R0の両端に発生する電圧を計算できる。抵抗素子R0の両端に発生する電圧を直流抵抗電圧Vdc(t)とする。
 2つのRC並列回路は、蓄電デバイス10の過渡的な分極特性を記述するための回路要素である。第1RC並列回路を構成する抵抗素子R1及び容量素子C1、並びに第2RC並列回路を構成する抵抗素子R2及び容量素子C2の各値は、蓄電デバイス10のSOCに応じて変動する値として与えられる。これらの値が決まれば、第1RC並列回路及び第2RC並列回路におけるインピーダンスが定まる。インピーダンスが定まれば、この等価回路に電流I(t)が流れたときに第1RC並列回路及び第2RC並列回路に発生する電圧(分極電圧Vp(t))を計算できる。分極電圧Vp(t)は、第1RC並列回路に発生する分極電圧Vp1(t)と、第2RC並列回路に発生する分極電圧Vp2(t)との合計電圧である。
 ここで、第1RC並列回路における時定数をτ1とし、第2RC並列回路における時定数をτ2とする。時定数τ1は、第1RC並列回路を構成する抵抗素子R1の抵抗値と容量素子C1の容量値とを乗じた値として定められる。時定数τ1は、第1RC並列回路に発生する分極電圧Vp1(t)の時間変化に反映される。同様に、時定数τ2は、第2RC並列回路を構成する抵抗素子R2の抵抗値と容量素子C2の容量値とを乗じた値として定められる。時定数τ2は、第2RC並列回路に発生する分極電圧Vp2(t)の時間変化に反映される。時定数τ1,τ2を異ならせることにより、蓄電素子11内で生じる様々な現象を表現することができる。
 定電圧源V0は、直流電圧を出力する電圧源である。定電圧源V0が出力する電圧は、蓄電素子11の開放電圧(OCV:Open Circuit Voltage)を表し、Vo(t)と記載する。開放電圧Vo(t)は、SOC、温度などの関数として与えられる。
 正極端子PTと負極端子NTとの間の端子電圧V(t)は、直流抵抗電圧Vdc(t)、分極電圧Vp(t)、及び開放電圧Vo(t)を用いて、
 V(t)=Vdc(t)+Vp(t)+Vo(t)
として与えられる。
 等価回路を構成する各素子の値は、例えば実測の結果に基づき、電流やSOCなどの関係を考慮して決定される。
 以下、充電システムモデルCSM1とバッテリモデルBM1とを用いたシミュレーション結果を示す。
 図6A及び図6Bは充電電圧及びバッテリ電圧のシミュレーション結果を示すグラフである。図6Aは充電システム20Aにおける制御応答のスルーレートが小さい場合のシミュレーション結果を示し、図6Bは充電システム20Aにおける制御応答のスルーレートが大きい場合のシミュレーション結果を示している。各グラフの横軸は時間(sec)を表し、縦軸は電圧(V)を表す。
 図6A及び図6Bのシミュレーション結果は、蓄電デバイス10を目標電圧まで充電した場合の充電システム電圧の時間変化と、バッテリ電圧の時間変化とを示している。ここで、充電システム電圧は、充電システム20Aにおける制御入力(電力パターン)に基づき定められる電圧を表す。バッテリ電圧は、蓄電デバイス10の端子電圧(図5に示す端子電圧V(t))を表す。
 図6Aに示す電圧差のグラフから分かるように、制御応答のスルーレートが小さい場合、充電システム電圧とバッテリ電圧との差は比較的小さい。一方、図6Bに示す電圧差のグラフから分かるように、制御応答のスルーレートが大きい場合、充電システム電圧とバッテリ電圧との差は比較的大きい。
 図7A及び図7Bは蓄電デバイス10への印加電流のシミュレーション結果を示すグラフである。図7Aは充電システム20Aにおける制御応答のスルーレートが小さい場合のシミュレーション結果を示し、図7Bは充電システム20Aにおける制御応答のスルーレートが大きい場合のシミュレーション結果を示している。各グラフの横軸は時間(sec)を表し、縦軸は電流(mA)を表す。
 図7A及び図7Bのシミュレーション結果は、蓄電デバイス10を目標電圧まで充電した場合に蓄電デバイス10に入力される電流の時間変化を示している。図6A、図6B、図7A及び図7Bのシミュレーション結果から、充電システム20Aと蓄電デバイス10との間の電圧差が大きくなった場合、蓄電デバイス10に入る電流量が許容以上となる可能性があることが分かる。
 開発支援装置100の制御部101は、これらのシミュレーション結果に基づき、蓄電デバイス10と充電システム20Aとの適合性を判定する。例えば、制御部101は、シミュレーション結果として得られる充電システム電圧とバッテリ電圧との電圧差に関して判定閾値を設定し、算出した電圧差と判定閾値との大小関係に基づき、蓄電デバイス10と充電システム20Aとの適合性を判定すればよい。この場合、制御部101は、算出した電圧差が判定閾値以上である場合、適合性が良好でないと判定し、算出した電圧差が判定閾値未満である場合、適合性が良好であると判定する。
 制御部101は、シミュレーション結果として得られる印加電流と許容電流との大小を比較し、比較結果に基づき、蓄電デバイス10と充電システム20Aとの適合性を判定してもよい。この場合、制御部101は、算出した印加電流が許容電流以上である場合、適合性が良好でないと判定し、算出した印加電流が許容電流未満である場合、適合性が良好であると判定する。
 図8は開発支援装置100が実行する処理の手順を示すフローチャートである。開発支援装置100の制御部101は、車両Cが備える充電システム20Aを模擬する充電システムモデルCSM1と、車両Cに搭載される蓄電デバイス10を模擬するバッテリモデルBM1とを設定する(ステップS101)。このとき、制御部101は、充電システムモデルCSM1において用いる伝達関数G(s)や蓄電素子11の等価回路を構成する各素子の値を設定すればよい。代替的に、伝達関数G(s)及び各素子の値は予め設定されてもよい。この場合、制御部101は、記憶部102から伝達関数G(s)及び各素子の値を読み出せばよい。
 次いで、制御部101は、車両Cの使用時を想定した電力パターンと、充電電圧の目標値とを取得する(ステップS102)。車両Cの使用時を想定した電力パターンは、車両Cが発進、走行、停止を繰り返した場合の電力の時間変化を表す。電力パターンは車両Cの使用時を想定して予め設定される。充電電圧の目標値は、例えばSOCなどの情報に基づき設定される値である。ステップS102では、使用する電力パターンに応じて、充電電圧の目標値(初期値)を設定すればよい。
 次いで、制御部101は、充電システムモデルCSM1とバッテリモデルBM1とを用いたシミュレーションを実行する(ステップS103)。制御部101は、充電システムモデルCSM1を用いることにより、電力パターンに応じた制御入力x(t)に対し、充電システム20Aの制御応答を表す充電電圧(制御出力y(t))を算出する。更に、制御部101は、バッテリモデルBM1を用いることにより、充電電圧が与えられた場合の蓄電素子11の電圧(開放電圧Vo)やSOCを推定する。制御部101は、推定したSOCに基づき、充電電圧の目標値を求め、充電システムモデルCSM1にフィードバックし、各時刻における充電電圧やバッテリ電圧を順次推定する。
 次いで、制御部101は、充電システム電圧とバッテリ電圧との電圧差が判定閾値以上であるか否かを判断する(ステップS104)。電圧差が判定閾値以上であると判断した場合(S104:YES)、制御部101は、蓄電デバイス10と充電システム20Aとの適合性は良好であると判定する(ステップS105)。一方、電圧差が判定閾値未満であると判断した場合(S104:NO)、制御部101は、蓄電デバイス10と充電システム20Aとの適合性は良好でないと判定する(ステップS106)。
 図8に示すフローチャートのステップS104では、充電システム電圧とバッテリ電圧との電圧差に基づき、蓄電デバイス10と充電システム20Aとの適合性を判定する構成とした。代替的に、シミュレーションの結果として得られる蓄電デバイス10への印加電流と許容電流との大小を比較し、比較結果に基づき、蓄電デバイス10と充電システム20Aとの適合性を判定する構成としてもよい。更に、制御部101は、充電開始から充電終了までに要する時間(充電時間)を推定し、充電時間と閾値時間との長短に応じて、蓄電デバイス10と充電システム20Aとの適合性を判定する構成としてもよい。
 以上のように、第1の実施形態では、蓄電デバイス10を模擬するバッテリモデルBM1と、充電システム20Aを模擬する充電システムモデルCSM1とを用いたシミュレーションを実行することによって、充電制御の挙動を推定し、推定結果に基づき、蓄電デバイス10と充電システム20Aとの適合性を判定する。よって、蓄電デバイス10及び充電システム20Aの実機又は試作品を用いた検証を実施する必要はなく、シミュレーションにより、蓄電デバイス10と充電システム20Aとの適合性を判定できる。その結果、開発支援装置100は、充電システム20Aの充電制御仕様、及び車両Cに搭載する蓄電デバイス10を製品開発の初期段階において決定できる。
 以下、第2の実施形態として、ハイブリッド自動車(HEV)や電気自動車(EV)などの車両に搭載される充電システムへの適用例を説明する。
(第2の実施形態)
 図9は車両における制御系の構成を説明するブロック図である。車両Cは、制御系の構成として、蓄電デバイス10、蓄電デバイス10を充電するための充放電システム20B、及び車両全体の制御を実行する車両ECU30を備える。蓄電デバイス10、充放電システム20B、及び車両ECU30は、CANやLINなどの車内回線を介して互いに通信可能に接続される。蓄電デバイス10及び車両ECU30の構成は、第1の実施形態と同様であるため、その説明を省略する。
 充放電システム20Bは、第1の実施形態において説明した充電ECU21、オルタネータ22、及び電動モータ23を含む。車両Cに搭載される充放電システム20Bは例えば車両メーカによって開発・製造され、蓄電デバイス10は例えば電池メーカによって開発・製造される。車両Cに搭載される充放電システム20Bの仕様と、車両Cに組み込まれた蓄電デバイス10の性能とが適合していなかった場合、バッテリの性能を十分に発揮できなかったり、バッテリの劣化を加速させたりする可能性がある。蓄電デバイス10を車両Cに組み込み、車両全体を総合検証した時点において、上述のような不具合が見つかった場合、充放電システム20Bの仕様を見直す必要が生じたり、車両Cに組み込む蓄電デバイス10の種類を変更する必要が生じたりするので、早期に仕様の合意に達することができない。
 実施形態では、車両Cとは独立したコンピュータ(図10に示す開発支援装置100)において、蓄電デバイス10を模擬するモデルと、車両Cの充放電システム20Bを模擬するモデルとを用いたシミュレーションを実行し、車両Cに搭載される蓄電デバイス10と、車両Cが備える充放電システム20Bとの間の適合性を判定する。
 図10は第2の実施形態に係る開発支援装置100の内部構成を説明するブロック図である。開発支援装置100は、汎用又は専用のコンピュータであり、制御部101、記憶部102、通信部103、操作部104、表示部105等を備える。これらの構成は、第1の実施形態と同様であるため、その説明を省略する。
 開発支援装置100が備える記憶部102には、制御部101によって実行される各種コンピュータプログラム、及びコンピュータプログラムの実行に必要なデータ等が記憶される。記憶部102に記憶されるコンピュータプログラムは、蓄電デバイス10を模擬するバッテリモデルBM2と、車両側の充放電システム20Bを模擬する充放電システムモデルCSM2を用いて、蓄電デバイス10に対する充電制御の挙動を推定し、蓄電デバイス10と充放電システム20Bとの間の適合性を判定する判定プログラムPG2を含む。判定プログラムPG2は単一のコンピュータプログラムであってもよく、複数のプログラムから構成されるプログラム群であってもよい。
 記憶部102に記憶されるコンピュータプログラムは、例えば、当該コンピュータプログラムを読み取り可能に記録した非一時的な記録媒体Mにより提供される。代替的に、記憶部102に記憶されるコンピュータプログラムは、通信部103を介した通信により提供される。
 記憶部102には、コンピュータプログラムの他に各種のデータが記憶される。例えば、記憶部102には、蓄電デバイス10を模擬するバッテリモデルBM2が記憶される。バッテリモデルBM2は、例えば、蓄電素子11を表す等価回路を含む。記憶部102は、等価回路の回路構成に関する情報や等価回路を構成する各素子の値などを記憶する。バッテリモデルBM2は、更に、蓄電デバイス10が備えるBMU12、電流センサ13、電流センサ13、電圧センサ14、温度センサ15、リレー16などの部品を模擬するモデルを含んでもよい。バッテリモデルBM2は、更に、蓄電デバイス10が実行する制御を模擬するモデル、蓄電デバイス10の劣化及び発熱などの事象を模擬するモデルを含んでもよい。
 更に、記憶部102には、車両Cにおける充放電システム20Bを模擬する充放電システムモデルCSM2が記憶される。充放電システムモデルCSM2は、充放電器(実施形態では、オルタネータ22及び電動モータ23)の効率、抵抗、回転数、設定電圧、及び電圧制御測定を含む制御パラメータを用いて記述される。
 記憶部102は、蓄電デバイス10を識別する識別子に関連付けて、当該蓄電デバイス10の情報を記憶する電池テーブルBTを有していてもよい。電池テーブルBTに登録される電池情報は、第1の実施形態において説明した情報と同様である。電池テーブルBTに記憶されている情報は、上述したシミュレーションを実行する際に、パラメータの一部として利用される。
 以下、シミュレーションモデルの構成について説明する。
 図11は開発支援装置100が用いるシミュレーションモデルの構成を示すブロック図である。開発支援装置100は、蓄電デバイス10を模擬するバッテリモデルBM2と、充放電システム20Bを模擬する充放電システムモデルCSM2とを用いたシミュレーションを実行することにより、蓄電デバイス10の状態を推定する。
 バッテリモデルBM2は、パラメータとして、蓄電デバイス10のSOC、SOH、温度、及び電流を含む。充放電システムモデルCSM2は、パラメータとして、充放電器の効率、抵抗、回転数、設定電圧、及び電圧制御特性を含む。初期状態におけるバッテリモデルBM2及び充放電システムモデルCSM2のパラメータは、ユーザによって設定される。
 図12はバッテリモデルBM2におけるパラメータ設定画面の一例を示す模式図である。開発支援装置100の制御部101は、シミュレーションを実行する際、図12に示すような画面データを生成し、表示部105に表示させる。ユーザは、操作部104を用いて、蓄電デバイス10の電流、温度、SOC、SOHの初期状態を入力する。電流及び温度に関しては、それぞれの時間変化が設定される。ユーザは、電流及び温度の時間変化を示すグラフのファイルを事前に用意しておき、参照ボタンが押下操作された場合に提示されるファイル選択画面(不図示)を通じて、所望のファイルを選択してもよい。ユーザは、電流及び温度の時間変化を示すグラフを、入力欄に直接的に描画する構成としてもよい。SOC及びSOHに関しては、操作部104を通じて、数値が設定される。蓄電素子11が例えば4つのセルから構成される場合、セル毎にSOC及びSOHが設定されるとよい。
 図13は充放電システムモデルCSM2におけるパラメータ設定画面の一例を示す模式図である。開発支援装置100の制御部101は、シミュレーションを実行する際、図13に示すような画面データを生成し、表示部105に表示させる。ユーザは、操作部104を用いて、オルタネータ22及び電動モータ23の効率、抵抗、回転数、設定電圧、電圧制御特性の初期状態を入力する。効率、抵抗、回転数、設定電圧に関しては、操作部104を通じて、数値が設定される。電圧制御特性に関しては、電圧の時間変化が設定される。ユーザは、電圧の時間変化を示すグラフのファイルを事前に用意しておき、参照ボタンが押下操作された場合に提示されるファイル選択画面(不図示)を通じて、所望のファイルを選択してもよい。ユーザは、電圧の時間変化を示すグラフを、入力欄に直接的に描画する構成としてもよい。
 実施形態では、バッテリモデルBM2及び充放電システムモデルCSM2のパラメータ設定画面を個別に用意したが、両者が一体化したパラメータ設定画面であってもよい。
 以下、開発支援装置100が実行する処理について説明する。
 図14は開発支援装置100が実行する処理の手順を示すフローチャートである。開発支援装置100の制御部101は、初期状態におけるパラメータを受付けるために、図12及び図13に示すようなパラメータ設定画面を表示部105に表示する(ステップS201)。制御部101は、表示したパラメータ設定画面を通じて、パラメータの入力を受付ける(ステップS202)。
 制御部101は、受付けたパラメータを初期状態とし、バッテリモデルBM2及び充放電システムモデルCSM2を用いて、シミュレーションを実行する(ステップS203)。制御部101は、オルタネータ22及び電動モータ23の効率、抵抗、回転数、設定電圧、電圧制御特性が設定された場合の、蓄電デバイス10の挙動をシミュレーションすればよい。シミュレーション手法には公知の手法が用いられる。制御部101は、例えば蓄電素子11の等価回路を用いたシミュレーションを実行することにより、蓄電素子11のSOC、SOH、セル電圧、セル温度を推定できる。BMU12の動作をシミュレーションすることにより、リレー16の開閉状態を推定できる。
 制御部101は、シミュレーションの実行結果を表示部105表示する(ステップS204)。図15はシミュレーション実行結果の表示例を示す模式図である。制御部101は、シミュレーションの実行結果として、例えば、蓄電素子11のSOC、SOH、電圧、及び温度の時間変化をグラフとして表示する。図15の例では、蓄電素子11の電圧及び温度に関してはセル毎に表示されている。制御部101は、シミュレーションにより、蓄電素子11において過電圧、低電圧、過電流、低電流、温度異常を検知した場合やリレー16が常に開状態となるようなリレー異常を検知した場合、アラートして表示してもよい。図15の例では、制御部101は、アラートランプを点灯させることによって、異常が発生したことをユーザに提示する。
 制御部101は、シミュレーションの実行結果に基づき、蓄電デバイス10と充放電システム20Bとの適合性を判定する(ステップS205)。制御部101は、シミュレーションを実行した結果、過電圧、低電圧、過電流、低電流などの電池異常が発生した場合、温度異常が発生した場合、リレー16が常に開状態となるようなリレー異常が発生した場合等において、蓄電デバイス10と充放電システム20Bとの適合性が良好でないと判定する。一方、制御部101は、これらの異常が発生しない場合、蓄電デバイス10と充放電システム20Bとの適合性が良好であると判定する。
 以上のように、第2の実施形態では、蓄電デバイス10を模擬するバッテリモデルBM2と、充放電システム20Bを模擬する充放電システムモデルCSM2とを用いたシミュレーションを実行することによって、蓄電デバイス10の挙動を推定し、推定結果に基づき、蓄電デバイス10と充放電システム20Bとの適合性を判定する。よって、蓄電デバイス10及び充放電システム20Bの実機又は試作品を用いた検証を実施する必要はなく、シミュレーションにより、蓄電デバイス10と充放電システム20Bとの適合性を判定できる。その結果、開発支援装置100は、充放電システム20Bの仕様、及び車両Cに搭載する蓄電デバイス10を製品開発の初期段階において決定できる。
 今回開示された実施形態は、全ての点において例示であって、制限的なものではないと考えられるべきである。本発明の範囲は、上述した意味ではなく、請求の範囲によって示され、請求の範囲と均等の意味及び範囲内での全ての変更が含まれることが意図される。
 例えば、実施形態では、蓄電デバイス10は車両用の電源であるとして説明した。車両は、四輪車に限らず、二輪車であってもよい。代替的に、電車であってもよく、AGV(Automatic Guided Vehicle)、無人飛行体(ドローン)、航空機などの移動体であってもよい。蓄電デバイス10は、車両駆動用の高電圧電源(数百V)や、駆動以外の電源を供給する補機用電池(12V又は24V)であってもよく、エンジン始動用電池(12V又は24V)やマイルドハイブリッド用電池(48V)であってもよい。車両の充電システムの一例としては、車両の減速時に回収される回生電力、屋根等に搭載されるソーラ発電、駐車して充電する100V電源や200Vの急速充電器、再使用された電池を組み込む蓄電システムなどが挙げられるが、これらに限定されない。蓄電デバイス10は、電子機器用の電源であってもよく、電力貯蔵用の電源であってもよい。これらの場合、開発支援装置100は、電子機器又は電力貯蔵施設が備える充電システムと蓄電デバイスとの適合性を判定すればよい。
 本実施の形態では、複数のリチウムイオン二次電池からなる蓄電素子11の構成について説明した。代替的に、蓄電デバイス10は、複数のセルが接続されたモジュール、複数のモジュールを接続したバンク、複数のバンクを接続したドメイン等であってもよい。リチウムイオン二次電池に代えて、全固体リチウムイオン電池、亜鉛空気電池、ナトリウムイオン電池、鉛電池などの任意の電池を採用してもよい。
 10 蓄電デバイス
 20A 充電システム
 20B 充放電システム
 21 充電ECU
 22 オルタネータ
 23 電動モータ
 30 車両ECU
 100 開発支援装置
 101 制御部
 102 記憶部
 103 通信部
 104 操作部
 105 表示部
 BM1,BM2 バッテリモデル
 CSM1,CSM2 充電システムモデル
 

Claims (15)

  1.  コンピュータに、
     蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスを充電する充電システムを模擬する充電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記充電システムの少なくとも一方の状態を推定し、
     推定した状態に基づき、前記蓄電デバイスと前記充電システムとの間の適合性を判定する
     処理を実行させるためのコンピュータプログラム。
  2.  前記シミュレーションにより推定される状態は、前記蓄電デバイスの状態に応じて定められる充電システム電圧の時間変化と、前記蓄電デバイスの両端電圧であるバッテリ電圧の時間変化とを含み、
     前記コンピュータに、
     前記充電システム電圧と前記バッテリ電圧との差に基づき、前記蓄電デバイスと前記充電システムとの間の適合性を判定する
     処理を実行させるための請求項1に記載のコンピュータプログラム。
  3.  前記シミュレーションにより推定される状態は、充電の際に前記蓄電デバイスに印加される印加電流の時間変化を含み、
     前記コンピュータに、
     前記印加電流と、印加電流に対して設定される許容値との差に基づき、前記蓄電デバイスと前記充電システムとの間の適合性を判定する
     処理を実行させるための請求項1又は請求項2に記載のコンピュータプログラム。
  4.  前記充電システムモデルは、前記充電システムにおける制御入力と制御出力との関係を表す伝達関数を用いて設定してある
     請求項1から請求項3の何れか1つに記載のコンピュータプログラム。
  5.  前記充電システムモデルは、前記充電システムにおける制御遅延を模擬する
     請求項1から請求項4の何れか1つに記載のコンピュータプログラム。
  6.  前記バッテリモデルは、前記蓄電デバイスの等価回路を含む
     請求項1から請求項5の何れか1つに記載のコンピュータプログラム。
  7.  コンピュータに、
     蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスに対するパワーマネージメントシステムを模擬する充放電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記パワーマネージメントシステムの少なくとも一方の状態を推定し、
     推定した前記蓄電デバイスの状態に基づき、前記蓄電デバイスと前記パワーマネージメントシステムとの適合性を判定する
     処理を実行させるためのコンピュータプログラム。
  8.  前記バッテリモデルは、前記蓄電デバイスのSOC、SOH、電圧、電流、及び温度の少なくとも1つを推定するための状態推定モデル、前記蓄電デバイスを構成する構成部品を模擬する部品モデル、前記蓄電デバイスに対する充放電制御を模擬する充放電制御モデル、並びに前記蓄電デバイスの劣化及び発熱の少なくとも一方を推定するための事象推定モデルを含む
     請求項7に記載のコンピュータプログラム。
  9.  前記充放電システムモデルは、前記パワーマネージメントシステムにおける効率、抵抗、回転数、設定電圧、及び電圧制御特性の少なくとも1つをパラメータに含むモデルである
     請求項7又は請求項8に記載のコンピュータプログラム。
  10.  前記コンピュータに、
     各モデルの初期状態を示すパラメータの入力を受付ける
     処理を実行させるための請求項7から請求項9の何れか1つに記載のコンピュータプログラム。
  11.  前記コンピュータに、
     各モデルによる推定結果を表示装置に表示させる
     処理を実行させるための請求項7から請求項10の何れか1つに記載のコンピュータプログラム。
  12.  蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスを充電する充電システムを模擬する充電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記充電システムの少なくとも一方の状態を推定する推定部と、
     推定した状態に基づき、前記蓄電デバイスと前記充電システムとの間の適合性を判定する判定部と
     を備える判定装置。
  13.  蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスに対するパワーマネージメントシステムを模擬する充放電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記パワーマネージメントシステムの少なくとも一方の状態を推定する推定部と、
     推定した前記蓄電デバイスの状態に基づき、前記蓄電デバイスと前記パワーマネージメントシステムとの適合性を判定する判定部と
     を備える判定装置。 
  14.  コンピュータを用いて、
     蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスを充電する充電システムを模擬する充電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記充電システムの少なくとも一方の状態を推定し、
     推定した状態の挙動に基づき、前記蓄電デバイスと前記充電システムとの間の適合性を判定する
     判定方法。
  15.  コンピュータを用いて、
     蓄電デバイスを模擬するバッテリモデルと、前記蓄電デバイスに対するパワーマネージメントシステムを模擬する充放電システムモデルとを用いたシミュレーションを実行することにより、前記蓄電デバイス及び前記パワーマネージメントシステムの少なくとも一方の状態を推定し、
     推定した前記蓄電デバイスの状態に基づき、前記蓄電デバイスと前記パワーマネージメントシステムとの適合性を判定する
     判定方法。
     
PCT/JP2021/034747 2020-10-01 2021-09-22 コンピュータプログラム、判定装置及び判定方法 WO2022071048A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN202180067618.8A CN116235338A (zh) 2020-10-01 2021-09-22 计算机程序、判断装置以及判断方法
US18/247,356 US20230393205A1 (en) 2020-10-01 2021-09-22 Computer program, determining device, and determining method
DE112021005215.2T DE112021005215T5 (de) 2020-10-01 2021-09-22 Computerprogramm, Bestimmungsvorrichtung und Bestimmungsverfahren

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
JP2020167186A JP2022059437A (ja) 2020-10-01 2020-10-01 コンピュータプログラム、判定装置及び判定方法
JP2020-167186 2020-10-01
JP2020-167187 2020-10-01
JP2020167187A JP2022059438A (ja) 2020-10-01 2020-10-01 コンピュータプログラム、判定装置及び判定方法

Publications (1)

Publication Number Publication Date
WO2022071048A1 true WO2022071048A1 (ja) 2022-04-07

Family

ID=80950473

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/034747 WO2022071048A1 (ja) 2020-10-01 2021-09-22 コンピュータプログラム、判定装置及び判定方法

Country Status (4)

Country Link
US (1) US20230393205A1 (ja)
CN (1) CN116235338A (ja)
DE (1) DE112021005215T5 (ja)
WO (1) WO2022071048A1 (ja)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019122251A (ja) * 2017-12-29 2019-07-22 財團法人船舶▲曁▼▲海▼洋▲産▼▲業▼研發中心 バッテリー充放電シミュレーションシステム及びその運用方法
WO2019204705A1 (en) * 2018-04-20 2019-10-24 Cps Technology Holdings Llc System and method for battery selection

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011062018A (ja) 2009-09-11 2011-03-24 Sumitomo Electric Ind Ltd 電源システムおよびコンバータユニット

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019122251A (ja) * 2017-12-29 2019-07-22 財團法人船舶▲曁▼▲海▼洋▲産▼▲業▼研發中心 バッテリー充放電シミュレーションシステム及びその運用方法
WO2019204705A1 (en) * 2018-04-20 2019-10-24 Cps Technology Holdings Llc System and method for battery selection

Also Published As

Publication number Publication date
US20230393205A1 (en) 2023-12-07
DE112021005215T5 (de) 2023-08-10
CN116235338A (zh) 2023-06-06

Similar Documents

Publication Publication Date Title
KR101885279B1 (ko) 충전 상태 밸런싱 시스템을 포함하는 배터리의 배터리 관리 방법, 그리고 배터리 관리 시스템
KR100906907B1 (ko) 자동차 배터리 관리 시스템
JP4510753B2 (ja) 電源装置、及びその制御方法
CN106160065B (zh) 维护车辆电池
US11014469B2 (en) Power relay assembly and method controlling sequence of relays therein
JP5829567B2 (ja) 電気自動車又はハイブリッド電気自動車用試験システム
KR102655790B1 (ko) 배터리 상태 추정 방법 및 장치
CN105467325A (zh) 电池容量退化解决的方法和系统
CN107276140B (zh) 蓄电元件管理装置、蓄电装置以及蓄电系统
EP3349320B1 (en) Storage battery control device
CN104723894B (zh) 用于电池参数估计的车辆、方法和系统
US20230219458A1 (en) A method for predicting state-of-power of a multi-battery electric energy storage system
US9944195B2 (en) Method for operating a battery system
WO2022071048A1 (ja) コンピュータプログラム、判定装置及び判定方法
KR101749731B1 (ko) 양방향 버스 바 체결 상태 확인 장치 및 방법
CN111596248A (zh) 分流器电流采集故障判断方法、装置、设备及存储介质
KR102177723B1 (ko) 차량용 배터리의 가용 용량 연산 방법 및 컴퓨터 판독 가능한 기록 매체
JP2022059438A (ja) コンピュータプログラム、判定装置及び判定方法
JP2022059437A (ja) コンピュータプログラム、判定装置及び判定方法
JP7501290B2 (ja) コンピュータプログラム、判定装置及び判定方法
CN113968136A (zh) 一种电动汽车的低压能量控制方法、系统、设备及介质
JP5978142B2 (ja) 蓄電池システム
CN113267352B (zh) 车辆测试系统
JP2021164223A (ja) 電力制御装置及び電力制御方法
JP2023068954A (ja) 診断方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21875350

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 18247356

Country of ref document: US

122 Ep: pct application non-entry in european phase

Ref document number: 21875350

Country of ref document: EP

Kind code of ref document: A1