WO2022071030A1 - 粉体搬送装置、ガス供給装置及び粉体除去方法 - Google Patents

粉体搬送装置、ガス供給装置及び粉体除去方法 Download PDF

Info

Publication number
WO2022071030A1
WO2022071030A1 PCT/JP2021/034619 JP2021034619W WO2022071030A1 WO 2022071030 A1 WO2022071030 A1 WO 2022071030A1 JP 2021034619 W JP2021034619 W JP 2021034619W WO 2022071030 A1 WO2022071030 A1 WO 2022071030A1
Authority
WO
WIPO (PCT)
Prior art keywords
valve
purge gas
powder
raw material
powder transfer
Prior art date
Application number
PCT/JP2021/034619
Other languages
English (en)
French (fr)
Inventor
栄一 小森
Original Assignee
東京エレクトロン株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 東京エレクトロン株式会社 filed Critical 東京エレクトロン株式会社
Priority to CN202180064121.0A priority Critical patent/CN116209630A/zh
Priority to KR1020237013326A priority patent/KR20230070032A/ko
Priority to US18/245,618 priority patent/US20230332285A1/en
Publication of WO2022071030A1 publication Critical patent/WO2022071030A1/ja

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C14/00Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
    • C23C14/22Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material characterised by the process of coating
    • C23C14/54Controlling or regulating the coating process
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G53/00Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
    • B65G53/34Details
    • B65G53/66Use of indicator or control devices, e.g. for controlling gas pressure, for controlling proportions of material and gas, for indicating or preventing jamming of material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G53/00Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
    • B65G53/04Conveying materials in bulk pneumatically through pipes or tubes; Air slides
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G53/00Conveying materials in bulk through troughs, pipes or tubes by floating the materials or by flow of gas, liquid or foam
    • B65G53/34Details
    • B65G53/40Feeding or discharging devices
    • B65G53/50Pneumatic devices
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C14/00Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
    • C23C14/22Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material characterised by the process of coating
    • C23C14/24Vacuum evaporation
    • C23C14/246Replenishment of source material
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C16/00Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes
    • C23C16/44Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes characterised by the method of coating
    • C23C16/448Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes characterised by the method of coating characterised by the method used for generating reactive gas streams, e.g. by evaporation or sublimation of precursor materials
    • C23C16/4481Chemical coating by decomposition of gaseous compounds, without leaving reaction products of surface material in the coating, i.e. chemical vapour deposition [CVD] processes characterised by the method of coating characterised by the method used for generating reactive gas streams, e.g. by evaporation or sublimation of precursor materials by evaporation using carrier gas in contact with the source material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2201/00Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
    • B65G2201/04Bulk
    • B65G2201/042Granular material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2812/00Indexing codes relating to the kind or type of conveyors
    • B65G2812/16Pneumatic conveyors
    • B65G2812/1608Pneumatic conveyors for bulk material
    • B65G2812/1616Common means for pneumatic conveyors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G2812/00Indexing codes relating to the kind or type of conveyors
    • B65G2812/16Pneumatic conveyors
    • B65G2812/1608Pneumatic conveyors for bulk material
    • B65G2812/1641Air pressure systems

Definitions

  • the present disclosure relates to a powder transfer device, a gas supply device, and a powder removal method.
  • a substrate processing system that vaporizes a solid raw material and supplies a raw material gas to a film forming processing apparatus is known.
  • Patent Document 1 includes a powdery source supply system and a film forming processing apparatus, and the powdery source supply system includes an ample for accommodating the powdery source and a carrier gas for supplying carrier gas into the ampol. It has a powder source introduction pipe for connecting a supply device, an ampol and a film forming processing device, a purge pipe branching from the powder source introduction pipe, and an on-off valve for opening and closing the powder source introduction pipe. When the on-off valve is closed and the inside of the purge pipe is exhausted prior to the film forming process, the carrier gas supply device makes the viscous force of the carrier gas larger than the viscous force of the carrier gas during the film forming process.
  • a substrate processing system that supplies carrier gas to the vehicle is disclosed.
  • the present disclosure provides a powder transfer device, a gas supply device, and a powder removal method for suppressing internal leaks.
  • a powder transfer pipe connecting the powder raw material supply source to the vaporizer and a first valve provided on the side of the powder transfer pipe on the powder raw material supply source side.
  • a first purge gas supply pipe that supplies purge gas from the buffer tank to the second valve, a first purge gas valve provided in the first purge gas supply pipe, a first valve, the second valve, and the first purge gas valve.
  • a powder transfer device including a control unit for controlling opening and closing is provided.
  • FIG. 1 An example of a configuration diagram of a substrate processing system including the powder transfer device according to the first embodiment.
  • the flowchart explaining an example of operation of a powder transfer apparatus.
  • the figure explaining the opening and closing of a valve and the formation of a flow path at the time of supplying a purge gas to a 2nd valve An example of a configuration diagram of a substrate processing system including a powder transfer device according to a second embodiment.
  • FIG. 1 is an example of a configuration diagram of a substrate processing system including the powder transfer device 2 according to the first embodiment.
  • the substrate processing system includes a powder raw material supply source 1, a powder transfer device 2, a purge gas supply source 3, a vaporizer 4, a processing container 5, and an exhaust device 6.
  • the substrate processing system supplies the powder raw material from the powder raw material supply source 1 to the vaporizer 4 via the powder transfer device 2.
  • the substrate processing system vaporizes the powder raw material with the vaporizer 4 and supplies the vaporized raw material gas to the processing container 5, so that the substrate W in the processing container 5 is subjected to a desired treatment (for example, film formation treatment).
  • a desired treatment for example, film formation treatment.
  • the powder raw material supply source 1, the powder transfer device 2, and the vaporizer 4 function as gas supply devices for supplying the raw material gas to the processing container 5.
  • the powder raw material supply source 1 stores the powder raw material. Further, the powder raw material supply source 1 sends (extrudes) the powder raw material to the powder transport pipe 11 of the powder transport device 2.
  • the powder transfer device 2 includes a powder transfer pipe 11, a first valve 21, a second valve 22, a third valve 23, a buffer tank 30, a first purge gas supply pipe 41, and a second purge gas supply pipe.
  • a 42, a first purge gas valve 51, a second purge gas valve 52, and a control device 60 are provided.
  • One end of the powder transfer pipe 11 is connected to the powder raw material supply source 1, and the other end is connected to the vaporizer 4.
  • the powder raw material sent from the powder raw material supply source 1 to the powder transfer pipe 11 is conveyed to the powder transfer pipe 11 by the gravity acting on the powder raw material and is supplied to the vaporizer 4.
  • the powder transport pipe 11 functions as a powder raw material transport path for transporting the powder raw material from the powder raw material supply source 1 to the vaporizer 4.
  • the powder transfer pipe 11 is provided with a first valve 21 and a second valve 22 for opening and closing the flow path of the powder transfer pipe 11.
  • the first valve 21 is provided in the powder transfer pipe 11 which is the secondary side pipe of the powder raw material supply source 1.
  • the second valve 22 is provided in the powder transfer pipe 11 which is the primary side pipe of the vaporizer 4. Further, the first valve 21 is provided on the upstream side (the side of the powder raw material supply source 1) of the second valve 22.
  • the second valve 22 is provided on the downstream side (the side of the vaporizer 4) of the first valve 21.
  • the first valve 21 is provided in the powder transfer pipe 11 on the side of the powder raw material supply source 1 from the branch point (first branch point) between the powder transfer pipe 11 and the first purge gas supply pipe 41.
  • the second valve 22 is provided in the powder transfer pipe 11 on the side of the vaporizer 4 with respect to the branch point (first branch point) between the powder transfer pipe 11 and the first purge gas supply pipe 41.
  • the first valve 21 is provided in the powder transfer pipe 11 on the side of the powder raw material supply source 1 from the branch point (second branch point) between the powder transfer pipe 11 and the second purge gas supply pipe 42.
  • the second valve 22 is provided in the powder transfer pipe 11 on the side of the vaporizer 4 with respect to the branch point (second branch point) between the powder transfer pipe 11 and the second purge gas supply pipe 42.
  • the powder transfer pipe 11 is provided with a third valve 23 that opens and closes the flow path of the powder transfer pipe 11.
  • the third valve 23 is provided between the first valve 21 and the second valve 22.
  • the third valve 23 is a branch point (second branch point) between the powder transfer pipe 11 and the second purge gas supply pipe 42 and a branch point (first) between the powder transfer pipe 11 and the first purge gas supply pipe 41. It is provided between the branch points).
  • valves 21 to 23 arranged in the powder transfer pipe 11 have a valve body (not shown) and a valve seat (not shown).
  • the valve body When the valve body is separated from the valve seat, the flow path is opened and the valves 21 to 23 are opened.
  • the valve body is in close contact with the valve seat, the flow path is blocked and the valves 21 to 23 are closed.
  • the purge gas supply source 3 supplies the purge gas to the buffer tank 30.
  • the buffer tank 30 is supplied with purge gas from the purge gas supply source 3 and is filled with high pressure (for example, 0.1 MPa to 0.3 MPa) purge gas.
  • the purge gas for example, N 2 gas can be used.
  • the first purge gas supply pipe 41 is connected to the powder transfer pipe 11 at one end at a branch point (first branch point) upstream of the second valve 22 (between the third valve 23 and the second valve 22). The other end is connected to the buffer tank 30.
  • the first purge gas supply pipe 41 functions as a first purge gas supply path for supplying the purge gas from the buffer tank 30 to the powder transfer pipe 11.
  • the first purge gas supply pipe 41 is provided with a first purge gas valve 51 that opens and closes the flow path of the first purge gas supply pipe 41.
  • the second purge gas supply pipe 42 is connected to the powder transfer pipe 11 at one end at a branch point (second branch point) upstream of the third valve 23 (between the first valve 21 and the third valve 23). The other end is connected to the buffer tank 30.
  • the second purge gas supply pipe 42 functions as a second purge gas supply path for supplying the purge gas from the buffer tank 30 to the powder transfer pipe 11.
  • the second purge gas supply pipe 42 is provided with a second purge gas valve 52 that opens and closes the flow path of the second purge gas supply pipe 42.
  • the control device 60 controls the opening and closing of the valves 21 to 23 and the purge gas valves 51 to 52.
  • the powder raw material is supplied from the powder transfer pipe 11 as the primary side pipe.
  • the vaporizer 4 has a heating unit (not shown) such as a heater for heating the powder raw material.
  • the vaporizer 4 heats and vaporizes the powder raw material to obtain a raw material gas.
  • the vaporizer 4 has a filter (not shown) for collecting the powder raw material. This prevents the powder raw material from flowing into the processing container 5 through the secondary side pipe of the vaporizer 4.
  • the secondary side pipe of the vaporizer 4 is connected to the processing container 5 via the valve 71.
  • the raw material gas is supplied from the vaporizer 4 to the processing container 5 by opening the valve 71, and the supply of the raw material gas to the processing container 5 is cut off by closing the valve 71.
  • the secondary side pipe of the vaporizer 4 is connected to the exhaust device 6 via the valve 72.
  • the gas is exhausted from the vaporizer 4 to the exhaust device 6 by opening the valve 72, and the exhaust gas to the exhaust device 6 is shut off by closing the valve 72.
  • the processing container 5 has a mounting portion 5a on which the substrate W is mounted.
  • the inside of the processing container 5 can be depressurized by the exhaust device 6. Further, by supplying the raw material gas from the vaporizer 4 into the processing container 5, the substrate W mounted on the mounting portion 5a is subjected to a desired treatment.
  • the exhaust device 6 is connected to the processing container 5 to reduce the pressure inside the processing container 5. Further, the exhaust device 6 is connected to the vaporizer 4 to reduce the pressure inside the vaporizer 4.
  • FIG. 2 is a flowchart illustrating an example of the operation of the powder transfer device 2.
  • 3 to 7 are diagrams illustrating opening / closing of valves 21 to 23, 51 to 52 and formation of a flow path in each step.
  • the valve in the open state is shown in white
  • the valve in the closed state is shown in black
  • the flow path formed by opening and closing the valve is shown by a thick line.
  • step S101 the control device 60 transfers the powder raw material from the powder raw material supply source 1 to the vaporizer 4.
  • FIG. 3 is a diagram illustrating opening and closing of a valve and formation of a flow path during transportation of a powder raw material.
  • the control device 60 opens the first valve 21, the third valve 23, and the second valve 22.
  • the control device 60 opens the first purge gas valve 51 and the second purge gas valve 52.
  • the powder transfer pipe 11 of the powder transfer device 2 communicates the powder raw material supply source 1 and the vaporizer 4. Further, the first purge gas supply pipe 41 and the second purge gas supply pipe 42 are closed.
  • the powder raw material sent out from the powder raw material supply source 1 is conveyed to the vaporizer 4 through the powder transfer pipe 11. At this time, a part of the powder raw material adheres to the inner wall surface of the powder transfer pipe 11, the valve body of the valves 21 to 23, the surface of the valve seat, and the like.
  • step S102 the control device 60 fills the buffer tank 30 with purge gas.
  • FIG. 4 is a diagram illustrating opening and closing of a valve and formation of a flow path during filling of purge gas.
  • the buffer tank 30 is filled with purge gas before the purge step shown in step S103 described later.
  • the control device 60 closes the first purge gas valve 51 and the second purge gas valve 52.
  • the first purge gas supply pipe 41 and the second purge gas supply pipe 42 are closed. Therefore, the purge gas supplied from the purge gas supply source 3 is filled in the buffer tank 30.
  • step S103 which will be described later, the control device 60 closes the first valve 21 and opens the third valve 23 and the second valve 22.
  • the buffer tank 30 may be filled with the purge gas at the same time as step S101.
  • the process of the control device 60 may skip step S102 and proceed to step S103.
  • step S103 the control device 60 supplies purge gas to the third valve 23.
  • FIG. 5 is a diagram illustrating opening and closing of a valve and formation of a flow path when supplying purge gas to the third valve 23.
  • the control device 60 closes the first valve 21, the first purge gas valve 51, and the second purge gas valve 52, and opens the third valve 23 and the second valve 22 (see FIG. 4).
  • the valve 52 is opened.
  • the second purge gas supply pipe 42 communicates with the powder transfer pipe 11.
  • the high-pressure purge gas filled in the buffer tank 30 is supplied to the third valve 23 through the second purge gas supply pipe 42.
  • the purge gas blows off the powder raw material remaining on the valve body, valve seat, and the like of the third valve 23. Further, the purge gas is supplied from the third valve 23 to the second valve 22.
  • the purge gas blows off the powder raw material remaining on the valve body, valve seat, and the like of the second valve 22.
  • the purge gas and the powder raw material blown off by the purge gas flow into the vaporizer 4.
  • the powder raw material is collected by the filter (not shown) of the vaporizer 4.
  • the purge gas passes through the valve 72 and is exhausted to the exhaust device 6.
  • the first valve 21 is closed to prevent the purge gas from flowing into the powder raw material supply source 1.
  • step S104 the control device 60 fills the buffer tank 30 with purge gas.
  • FIG. 6 is a diagram illustrating opening and closing of a valve and formation of a flow path during filling of purge gas.
  • the buffer tank 30 is filled with purge gas before the purge step shown in step S105 described later.
  • the control device 60 closes the first purge gas valve 51 and the second purge gas valve 52.
  • the first purge gas supply pipe 41 and the second purge gas supply pipe 42 are closed. Therefore, the purge gas supplied from the purge gas supply source 3 is filled in the buffer tank 30.
  • step S105 which will be described later, the control device 60 closes the first valve 21 and the third valve 23, and opens the second valve 22.
  • step S105 the control device 60 supplies purge gas to the second valve 22.
  • FIG. 7 is a diagram illustrating opening and closing of a valve and formation of a flow path when supplying purge gas to the second valve 22.
  • the control device 60 closes the first valve 21, the third valve 23, the first purge gas valve 51, and the second purge gas valve 52, and opens the second valve 22 (see FIG. 6).
  • the valve 51 is opened.
  • the first purge gas supply pipe 41 communicates with the powder transfer pipe 11.
  • the high-pressure purge gas filled in the buffer tank 30 is supplied to the second valve 22 through the first purge gas supply pipe 41.
  • the purge gas blows off the powder raw material remaining on the valve body, valve seat, and the like of the second valve 22.
  • the purge gas and the powder raw material blown off by the purge gas flow into the vaporizer 4.
  • the powder raw material is collected by the filter (not shown) of the vaporizer 4.
  • the purge gas passes through the valve 72 and is exhausted to the exhaust device 6.
  • the first valve 21, the third valve 23, and the second purge gas valve 52 are closed to prevent the purge gas from flowing into the powder raw material supply source 1.
  • step S106 the control device 60 determines whether or not the purge of the second valve 22 has reached a predetermined number of repetitions.
  • the predetermined number of repetitions has not been reached (S106, NO)
  • the process of the control device 60 returns to step S104, and the buffer tank 30 is filled with the purge gas (S104) and the second valve 22 is purged (S105). repeat.
  • the control device 60 closes the valves 21 to 23 and the purge gas valves 51 to 52, and ends the process.
  • the third valve 23 is purged (S102, S103) and the second valve 22 is purged (S104 to S106). Then, before the powder raw material filled in the vaporizer 4 is heated and vaporized, the inside of the vaporizer 4 is exhausted by the exhaust device 6 to obtain a high vacuum.
  • a plurality of valves (first valve 21) provided in the powder transfer pipe 11 connected from the powder raw material supply source 1 to the vaporizer 4. , 3rd valve 23, 2nd valve 22), the powder raw material remaining inside the 2nd valve 22 closest to the vaporizer 4 can be removed, so that the valve body and valve seat of the 2nd valve 22 can be removed. It is possible to improve the adhesion with and prevent the occurrence of internal leaks. As a result, the inside of the vaporizer 4 can be made into a high vacuum.
  • the powder raw material remaining inside the second valve 22 can be removed.
  • the number of repetitions is preferably 3 or more. As a result, the powder raw material remaining inside the second valve 22 can be removed.
  • the powder raw material remaining inside the third valve 23 can be removed, so that the valve body of the third valve 23 and the valve seat are in close contact with each other. It is possible to improve the property and prevent the occurrence of internal leaks. As a result, the powder transfer pipe 11 can be reliably closed by the second valve 22 and the third valve 23, so that the occurrence of internal leaks can be further prevented. As a result, the inside of the vaporizer 4 can be made into a high vacuum.
  • the filling of the buffer tank 30 with the purge gas (S102) and the purging of the third valve 23 (S103) may be repeated.
  • the powder raw material remaining inside the third valve 23 can be removed.
  • the number of repetitions is preferably 3 or more. As a result, the powder raw material remaining inside the third valve 23 can be removed.
  • the airtightness check (leak check) of the second valve 22 and the third valve 23 is performed as a method of confirming whether or not the powder raw material remaining inside the second valve 22 and the third valve 23 has been removed. good.
  • the airtightness check of the second valve 22 and the third valve 23 is performed after the purge (S105) of the second valve 22.
  • the control device 60 opens the first purge gas valve 51 with the second valve 22 and the third valve 23 closed.
  • the purge gas is supplied from the buffer tank 30 to the powder transfer pipe 11 between the second valve 22 and the third valve 23 via the first purge gas valve 51.
  • the control device 60 closes the first purge gas valve 51.
  • the powder transfer pipe 11 between the second valve 22 and the third valve 23 is filled with the purge gas.
  • the control device 60 confirms the pressure fluctuation of the gauge pressure gauge (not shown) installed between the second valve 22 and the third valve 23 of the powder transfer pipe 11. If there is no pressure fluctuation within a predetermined time, or if the pressure fluctuation is within a predetermined range, the control device 60 determines that the powder raw material remaining inside the second valve 22 and the third valve 23 has been removed. , Complete the powder removal process.
  • the airtightness check may be performed every time the second valve 22 and the third valve 23 are purged once, or may be performed after the purging is performed a plurality of times (three times or more). ..
  • FIG. 8 is an example of a configuration diagram of a substrate processing system including the powder transfer device 2 according to the second embodiment.
  • the substrate processing system of the first embodiment (see FIG. 1) and the substrate processing system of the second embodiment (see FIG. 8) are different in that the powder transfer device 2A is provided in place of the powder transfer device 2. There is.
  • the powder transfer device 2A includes a powder transfer pipe 11, a first valve 21, a second valve 22, a buffer tank 30, a first purge gas supply pipe 41, a first purge gas valve 51, and a control device 60. , Equipped with. That is, the powder transfer device 2A differs from the powder transfer device 2 (see FIG. 1) in that the third valve 23, the second purge gas supply pipe 42, and the second purge gas valve 52 are omitted. There is. Other configurations are the same, and duplicate explanations are omitted.
  • FIG. 9 is a flowchart illustrating an example of the operation of the powder transfer device 2.
  • 10 to 12 are diagrams illustrating opening / closing of valves 21 to 23, 51 to 52 and formation of a flow path in each step.
  • step S201 the control device 60 transfers the powder raw material from the powder raw material supply source 1 to the vaporizer 4.
  • FIG. 10 is a diagram illustrating opening and closing of a valve and formation of a flow path during transportation of a powder raw material.
  • the control device 60 opens the first valve 21 and the second valve 22.
  • the control device 60 opens the first purge gas valve 51.
  • the powder transfer pipe 11 of the powder transfer device 2 communicates the powder raw material supply source 1 and the vaporizer 4. Further, the first purge gas supply pipe 41 is closed.
  • the powder raw material sent out from the powder raw material supply source 1 is conveyed to the vaporizer 4 through the powder transfer pipe 11. At this time, a part of the powder raw material adheres to the inner wall surface of the powder transfer pipe 11, the valve body of the valves 21 to 22, the surface of the valve seat, and the like.
  • step S202 the control device 60 fills the buffer tank 30 with purge gas.
  • FIG. 11 is a diagram illustrating opening and closing of a valve and formation of a flow path when filling with purge gas.
  • the buffer tank 30 is filled with purge gas before the purge step shown in step S203 described later.
  • the control device 60 closes the first purge gas valve 51.
  • the first purge gas supply pipe 41 is closed. Therefore, the purge gas supplied from the purge gas supply source 3 is filled in the buffer tank 30.
  • step S203 which will be described later, the control device 60 closes the first valve 21 and opens the second valve 22.
  • step S203 the control device 60 supplies purge gas to the second valve 22.
  • FIG. 12 is a diagram illustrating opening and closing of a valve and formation of a flow path when supplying purge gas to the second valve 22.
  • the control device 60 closes the first valve 21 and the first purge gas valve 51, and opens the first purge gas valve 51 from the state where the second valve 22 is opened (see FIG. 11).
  • the first purge gas supply pipe 41 communicates with the powder transfer pipe 11.
  • the high-pressure purge gas filled in the buffer tank 30 is supplied to the second valve 22 through the first purge gas supply pipe 41.
  • the purge gas blows off the powder raw material remaining on the valve body, valve seat, and the like of the second valve 22.
  • the purge gas and the powder raw material blown off by the purge gas flow into the vaporizer 4.
  • the powder raw material is collected by the filter (not shown) of the vaporizer 4.
  • the purge gas passes through the valve 72 and is exhausted to the exhaust device 6.
  • the first valve 21 is closed to prevent the purge gas from flowing into the powder raw material supply source 1.
  • step S204 the control device 60 determines whether or not the purge of the second valve 22 has reached a predetermined number of repetitions.
  • the process of the control device 60 returns to step S202, and the buffer tank 30 is filled with the purge gas (S202) and the second valve 22 is purged (S203). repeat.
  • the control device 60 closes the valves 21 and 22 and the purge gas valve 51, and ends the process.
  • the second valve 22 is purged (S202 to S204). Then, before the powder raw material filled in the vaporizer 4 is heated and vaporized, the inside of the vaporizer 4 is exhausted by the exhaust device 6 to obtain a high vacuum.
  • a plurality of valves (first valve 21) provided in the powder transfer pipe 11 connected from the powder raw material supply source 1 to the vaporizer 4.
  • the powder raw material remaining inside the second valve 22 closest to the vaporizer 4 can be removed, so that the valve body of the second valve 22 and the valve seat can be in close contact with each other. It can be improved and the occurrence of internal leaks can be prevented. As a result, the inside of the vaporizer 4 can be made into a high vacuum.
  • Powder raw material supply source 2 Powder transfer device 3 Purge gas supply source 4 Vaporizer 5 Processing container 6 Exhaust device 11 Powder transfer piping 21 1st valve 22 2nd valve 23 3rd valve 30 Buffer tank 41 1st purge gas supply piping 42 Second purge gas supply pipe 51 First purge gas valve 52 Second purge gas valve 60 Control device (control unit)

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Chemical Vapour Deposition (AREA)
  • Air Transport Of Granular Materials (AREA)
  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Abstract

内部リークを抑制する粉体搬送装置、ガス供給装置及び粉体除去方法を提供する。 粉体原料供給源から気化器に接続する粉体搬送配管と、前記粉体搬送配管の前記粉体原料供給源の側に設けられる第1バルブと、前記粉体搬送配管の前記気化器の側に設けられる第2バルブと、パージガスを充填するバッファタンクと、前記第2バルブよりも上流側で前記粉体搬送配管と接続し、前記バッファタンクから前記第2バルブにパージガスを供給する第1パージガス供給配管と、前記第1パージガス供給配管に設けられる第1パージガスバルブと、記第1バルブ、前記第2バルブ及び前記第1パージガスバルブの開閉を制御する制御部と、を備える、粉体搬送装置。

Description

粉体搬送装置、ガス供給装置及び粉体除去方法
 本開示は、粉体搬送装置、ガス供給装置及び粉体除去方法に関する。
 固体原料を気化させて、成膜処理装置に原料ガスを供給する基板処理システムが知られている。
 特許文献1には、粉体状ソース供給系と成膜処理装置とを備え、粉体状ソース供給系は、粉体状ソースを収容するアンプルと、該アンプル内へキャリアガスを供給するキャリアガス供給装置と、アンプル及び成膜処理装置を接続する粉体状ソース導入管と、該粉体状ソース導入管から分岐するパージ管と、粉体状ソース導入管を開閉する開閉弁とを有し、成膜処理に先立って、開閉弁が閉弁し且つパージ管内を排気する際に、キャリアガス供給装置が、キャリアガスによる粘性力が成膜処理時におけるキャリアガスによる粘性力よりも大きくなるようにキャリアガスを供給する基板処理システムが開示されている。
特開2008-251905号公報
 一の側面では、本開示は、内部リークを抑制する粉体搬送装置、ガス供給装置及び粉体除去方法を提供する。
 上記課題を解決するために、一の態様によれば、粉体原料供給源から気化器に接続する粉体搬送配管と、前記粉体搬送配管の前記粉体原料供給源の側に設けられる第1バルブと、前記粉体搬送配管の前記気化器の側に設けられる第2バルブと、パージガスを充填するバッファタンクと、前記第2バルブよりも上流側で前記粉体搬送配管と接続し、前記バッファタンクから前記第2バルブにパージガスを供給する第1パージガス供給配管と、前記第1パージガス供給配管に設けられる第1パージガスバルブと、記第1バルブ、前記第2バルブ及び前記第1パージガスバルブの開閉を制御する制御部と、を備える、粉体搬送装置が提供される。
 一の側面によれば、内部リークを抑制する粉体搬送装置、ガス供給装置及び粉体除去方法を提供することができる。
第1実施形態に係る粉体搬送装置を備える基板処理システムの構成図の一例。 粉体搬送装置の動作の一例を説明するフローチャート。 粉体原料の搬送時におけるバルブの開閉と流路の形成を説明する図。 パージガスの充填時におけるバルブの開閉と流路の形成を説明する図。 第3バルブにパージガスを供給する際のバルブの開閉と流路の形成を説明する図。 パージガスの充填時におけるバルブの開閉と流路の形成を説明する図。 第2バルブにパージガスを供給する際のバルブの開閉と流路の形成を説明する図。 第2実施形態に係る粉体搬送装置を備える基板処理システムの構成図の一例。 粉体搬送装置の動作の一例を説明するフローチャート。 粉体原料の搬送時におけるバルブの開閉と流路の形成を説明する図。 パージガスの充填時におけるバルブの開閉と流路の形成を説明する図。 第2バルブにパージガスを供給する際のバルブの開閉と流路の形成を説明する図。
 以下、図面を参照して本開示を実施するための形態について説明する。各図面において、同一構成部分には同一符号を付し、重複した説明を省略する場合がある。
<第1実施形態>
 第1実施形態に係る粉体搬送装置2を備える基板処理システムについて、図1を用いて説明する。図1は、第1実施形態に係る粉体搬送装置2を備える基板処理システムの構成図の一例である。基板処理システムは、粉体原料供給源1と、粉体搬送装置2と、パージガス供給源3と、気化器4と、処理容器5と、排気装置6と、を備える。基板処理システムは、粉体原料供給源1から粉体搬送装置2を介して気化器4に粉体原料を供給する。また、基板処理システムは、気化器4で粉体原料を気化させて気化した原料ガスを処理容器5に供給することにより、処理容器5内の基板Wに所望の処理(例えば、成膜処理)を施す。なお、粉体原料供給源1、粉体搬送装置2及び気化器4は、処理容器5に原料ガスを供給するガス供給装置として機能する。
 粉体原料供給源1は、粉体原料を貯留する。また、粉体原料供給源1は、粉体原料を粉体搬送装置2の粉体搬送配管11に送り出す(押し出す)。
 粉体搬送装置2は、粉体搬送配管11と、第1バルブ21と、第2バルブ22と、第3バルブ23と、バッファタンク30と、第1パージガス供給配管41と、第2パージガス供給配管42と、第1パージガスバルブ51と、第2パージガスバルブ52と、制御装置60と、を備える。
 粉体搬送配管11は、一端が粉体原料供給源1と接続し、他端が気化器4と接続する。粉体原料供給源1から粉体搬送配管11に送り出された粉体原料は、粉体原料に作用する重力によって粉体搬送配管11を搬送され、気化器4へと供給される。これにより、粉体搬送配管11は、粉体原料供給源1から気化器4に粉体原料を搬送する粉体原料搬送路として機能する。
 粉体搬送配管11には、粉体搬送配管11の流路を開閉する第1バルブ21及び第2バルブ22が設けられている。換言すれば、第1バルブ21は、粉体原料供給源1の二次側配管である粉体搬送配管11に設けられる。第2バルブ22は、気化器4の一次側配管である粉体搬送配管11に設けられる。また、第1バルブ21は、第2バルブ22よりも上流側(粉体原料供給源1の側)に設けられる。第2バルブ22は、第1バルブ21よりも下流側(気化器4の側)に設けられる。
 また、第1バルブ21は、粉体搬送配管11と第1パージガス供給配管41との分岐点(第1分岐点)よりも粉体原料供給源1の側の粉体搬送配管11に設けられる。第2バルブ22は、粉体搬送配管11と第1パージガス供給配管41との分岐点(第1分岐点)よりも気化器4の側の粉体搬送配管11に設けられる。また、第1バルブ21は、粉体搬送配管11と第2パージガス供給配管42との分岐点(第2分岐点)よりも粉体原料供給源1の側の粉体搬送配管11に設けられる。第2バルブ22は、粉体搬送配管11と第2パージガス供給配管42との分岐点(第2分岐点)よりも気化器4の側の粉体搬送配管11に設けられる。
 また、粉体搬送配管11には、粉体搬送配管11の流路を開閉する第3バルブ23が設けられている。第3バルブ23は、第1バルブ21と第2バルブ22との間に設けられる。また、第3バルブ23は、粉体搬送配管11と第2パージガス供給配管42との分岐点(第2分岐点)と粉体搬送配管11と第1パージガス供給配管41との分岐点(第1分岐点)の間に設けられる。
 また、粉体搬送配管11に配置されるバルブ21~23は、弁体(図示せず)及び弁座(図示せず)を有する。弁体が弁座から離間することで流路が開放され、バルブ21~23が開弁する。弁体が弁座と密着することで流路が閉塞され、バルブ21~23が閉弁する。
 パージガス供給源3は、バッファタンク30にパージガスを供給する。バッファタンク30は、パージガス供給源3からパージガスが供給され、高圧(例えば、0.1MPa~0.3MPa)のパージガスが充填される。パージガスとしては、例えばNガスを用いることができる。
 第1パージガス供給配管41は、一端が第2バルブ22よりも上流側(第3バルブ23と第2バルブ22との間)の分岐点(第1分岐点)で粉体搬送配管11と接続し、他端がバッファタンク30と接続する。これにより、第1パージガス供給配管41は、バッファタンク30から粉体搬送配管11にパージガスを供給する第1のパージガス供給路として機能する。第1パージガス供給配管41には、第1パージガス供給配管41の流路を開閉する第1パージガスバルブ51が設けられている。
 第2パージガス供給配管42は、一端が第3バルブ23よりも上流側(第1バルブ21と第3バルブ23との間)の分岐点(第2分岐点)で粉体搬送配管11と接続し、他端がバッファタンク30と接続する。これにより、第2パージガス供給配管42は、バッファタンク30から粉体搬送配管11にパージガスを供給する第2のパージガス供給路として機能する。第2パージガス供給配管42には、第2パージガス供給配管42の流路を開閉する第2パージガスバルブ52が設けられている。
 制御装置60は、バルブ21~23及びパージガスバルブ51~52の開閉を制御する。
 気化器4は、一次側配管としての粉体搬送配管11から粉体原料が供給される。気化器4は、粉体原料を加熱するヒータ等の加熱部(図示せず)を有する。気化器4は、粉体原料を加熱し気化させて、原料ガスとする。また、気化器4には、粉体原料を捕集するフィルタ(図示せず)を有する。これにより、粉体原料が気化器4の二次側配管を介して処理容器5へと流入することを防止する。
 気化器4の二次側配管は、バルブ71を介して処理容器5と接続される。これにより、バルブ71を開くことで気化器4から処理容器5に原料ガスを供給し、バルブ71を閉じることで処理容器5への原料ガスの供給を遮断する。
 また、気化器4の二次側配管は、バルブ72を介して排気装置6と接続される。これにより、バルブ72を開くことで気化器4から排気装置6にガスを排気し、バルブ72を閉じることで排気装置6へのガスの排気を遮断する。
 処理容器5は、基板Wを載置する載置部5aを有する。処理容器5内は、排気装置6によって減圧可能となっている。また、気化器4から処理容器5内に原料ガスが供給されることにより、載置部5aに載置された基板Wに所望の処理を施す。
 排気装置6は、処理容器5と接続され、処理容器5内を減圧する。また、排気装置6は、気化器4と接続され、気化器4内を減圧する。
 次に、粉体搬送装置2の動作の一例について、図2から図7を用いて説明する。図2は、粉体搬送装置2の動作の一例を説明するフローチャートである。図3から図7は、各工程におけるバルブ21~23,51~52の開閉と流路の形成を説明する図である。なお、図3から図7(及び後述する図10から図12)において、開弁状態のバルブを白抜きで図示し、閉弁状態のバルブを黒塗りで図示する。また、バルブの開閉により形成される流路を太線で図示する。
 ステップS101において、制御装置60は、粉体原料供給源1から気化器4に粉体原料の搬送を行う。図3は、粉体原料の搬送時におけるバルブの開閉と流路の形成を説明する図である。制御装置60は、第1バルブ21、第3バルブ23、第2バルブ22を開弁する。制御装置60は、第1パージガスバルブ51、第2パージガスバルブ52を開弁する。これにより、粉体搬送装置2の粉体搬送配管11は粉体原料供給源1と気化器4とを連通する。また、第1パージガス供給配管41及び第2パージガス供給配管42は閉塞している。
 粉体原料供給源1から送り出された粉体原料は、粉体搬送配管11を通り気化器4へと搬送される。この際、粉体原料の一部は、粉体搬送配管11の内壁面、バルブ21~23の弁体や弁座の表面等に付着する。
 ステップS102において、制御装置60は、バッファタンク30にパージガスを充填する。図4は、パージガスの充填時におけるバルブの開閉と流路の形成を説明する図である。ここでは、後述するステップS103に示すパージ工程の前にバッファタンク30にパージガスを充填する。制御装置60は、第1パージガスバルブ51及び第2パージガスバルブ52を閉弁する。これにより、第1パージガス供給配管41及び第2パージガス供給配管42は閉塞している。よって、パージガス供給源3から供給されたパージガスがバッファタンク30に充填される。また、後述するステップS103の準備として、制御装置60は、第1バルブ21を閉弁し、第3バルブ23及び第2バルブ22を開弁する。
 なお、バッファタンク30へのパージガスの充填は、ステップS101と同時に行われていてもよい。バッファタンク30にパージガスが充填されている場合、制御装置60の処理は、ステップS102を省略してステップS103に進んでもよい。
 ステップS103において、制御装置60は、第3バルブ23にパージガスを供給する。図5は、第3バルブ23にパージガスを供給する際のバルブの開閉と流路の形成を説明する図である。制御装置60は、第1バルブ21、第1パージガスバルブ51及び第2パージガスバルブ52を閉弁し、第3バルブ23及び第2バルブ22を開弁した状態(図4参照)から、第2パージガスバルブ52を開弁する。これにより、第2パージガス供給配管42は粉体搬送配管11と連通する。
 バッファタンク30に充填された高圧のパージガスは、第2パージガス供給配管42を通り第3バルブ23に供給される。パージガスは、第3バルブ23の弁体や弁座等に残留した粉体原料を吹き飛ばす。また、パージガスは、第3バルブ23から第2バルブ22に供給される。パージガスは、第2バルブ22の弁体や弁座等に残留した粉体原料を吹き飛ばす。パージガス及びパージガスによって吹き飛ばされた粉体原料は、気化器4へと流入する。気化器4のフィルタ(図示せず)で粉体原料は捕集される。パージガスは、バルブ72を通り、排気装置6へと排気される。なお、第1バルブ21は閉弁しており、パージガスが粉体原料供給源1に流入することを防止している。
 ステップS104において、制御装置60は、バッファタンク30にパージガスを充填する。図6は、パージガスの充填時におけるバルブの開閉と流路の形成を説明する図である。ここでは、後述するステップS105に示すパージ工程の前にバッファタンク30にパージガスを充填する。制御装置60は、第1パージガスバルブ51及び第2パージガスバルブ52を閉弁する。これにより、第1パージガス供給配管41及び第2パージガス供給配管42は閉塞している。よって、パージガス供給源3から供給されたパージガスがバッファタンク30に充填される。また、後述するステップS105の準備として、制御装置60は、第1バルブ21及び第3バルブ23を閉弁し、第2バルブ22を開弁する。
 ステップS105において、制御装置60は、第2バルブ22にパージガスを供給する。図7は、第2バルブ22にパージガスを供給する際のバルブの開閉と流路の形成を説明する図である。制御装置60は、第1バルブ21、第3バルブ23、第1パージガスバルブ51及び第2パージガスバルブ52を閉弁し、第2バルブ22を開弁した状態(図6参照)から、第1パージガスバルブ51を開弁する。これにより、第1パージガス供給配管41は粉体搬送配管11と連通する。
 バッファタンク30に充填された高圧のパージガスは、第1パージガス供給配管41を通り第2バルブ22に供給される。パージガスは、第2バルブ22の弁体や弁座等に残留した粉体原料を吹き飛ばす。パージガス及びパージガスによって吹き飛ばされた粉体原料は、気化器4へと流入する。気化器4のフィルタ(図示せず)で粉体原料は捕集される。パージガスは、バルブ72を通り、排気装置6へと排気される。なお、第1バルブ21、第3バルブ23及び第2パージガスバルブ52は閉弁しており、パージガスが粉体原料供給源1に流入することを防止している。
 ステップS106において、制御装置60は、第2バルブ22のパージが所定の繰り返し回数に到達したか否かを判定する。所定の繰り返し回数に到達していない場合(S106・NO)、制御装置60の処理はステップS104に戻り、バッファタンク30へのパージガスの充填(S104)と第2バルブ22のパージ(S105)とを繰り返す。所定の繰り返し回数に到達した場合(S106・YES)、制御装置60は、バルブ21~23及びパージガスバルブ51~52を閉じ、処理を終了する。
 このように、気化器4に粉体原料を充填(S101)した後に、第3バルブ23のパージ(S102,S103)及び第2バルブ22のパージ(S104~S106)を行う。そして、気化器4に充填した粉体原料を加熱して気化させる前に、気化器4内は、排気装置6によって排気され、高真空となる。
 ここで、第1実施形態に係る粉体搬送装置2によれば、粉体原料供給源1から気化器4へと接続される粉体搬送配管11に設けられた複数のバルブ(第1バルブ21、第3バルブ23、第2バルブ22)のうち、気化器4に最も近い第2バルブ22の内部に残留した粉体原料を除去することができるので、第2バルブ22の弁体と弁座との密着性を向上させ、内部リークの発生を防止することができる。これにより、気化器4内を高真空とすることができる。
 また、バッファタンク30へのパージガスの充填(S104)と第2バルブ22のパージ(S105)とを繰り返すことにより、第2バルブ22の内部に残留した粉体原料を除去することができる。また、繰り返し回数は、3回以上が好ましい。これにより、第2バルブ22の内部に残留した粉体原料を除去することができる。
 また、第1実施形態に係る粉体搬送装置2によれば、第3バルブ23の内部に残留した粉体原料を除去することができるので、第3バルブ23の弁体と弁座との密着性を向上させ、内部リークの発生を防止することができる。これにより、粉体搬送配管11を第2バルブ22及び第3バルブ23で確実に閉塞することができるので、内部リークの発生を更に防止することができる。これにより、気化器4内を高真空とすることができる。
 また、バッファタンク30へのパージガスの充填(S102)と第3バルブ23のパージ(S103)とを繰り返してもよい。これにより、第3バルブ23の内部に残留した粉体原料を除去することができる。また、繰り返し回数は、3回以上が好ましい。これにより、第3バルブ23の内部に残留した粉体原料を除去することができる。
 なお、第2バルブ22、第3バルブ23の内部に残留した粉体原料が除去されたか否かの確認方法として、第2バルブ22、第3バルブ23の気密チェック(リークチェック)を行ってもよい。第2バルブ22、第3バルブ23の気密チェックは、第2バルブ22のパージ(S105)の後に実施される。気密チェックの方法として、まず、制御装置60は、第2バルブ22及び第3バルブ23を閉じた状態で第1パージガスバルブ51を開く。これにより、バッファタンク30から第1パージガスバルブ51を介して第2バルブ22と第3バルブ23との間の粉体搬送配管11にパージガスが供給される。次に、制御装置60は、第1パージガスバルブ51を閉じる。これにより、第2バルブ22と第3バルブ23との間の粉体搬送配管11にパージガスが充填される。次に、制御装置60は、粉体搬送配管11の第2バルブ22と第3バルブ23との間に設置されたゲージ圧力計(図示せず)の圧力変動を確認する。所定の時間内で圧力変動が無い、または、圧力変動が所定の範囲内である場合、制御装置60は第2バルブ22、第3バルブ23の内部に残留した粉体原料が除去されたと判断し、粉体除去の処理を完了する。
 なお、気密チェック(リークチェック)は、第2バルブ22、第3バルブ23のパージを1回行う毎に実施してもよく、パージを複数回(3回以上)行った後に実施してもよい。
<第2実施形態>
 次に、第2実施形態に係る粉体搬送装置2Aを備える基板処理システムについて、図8を用いて説明する。図8は、第2実施形態に係る粉体搬送装置2を備える基板処理システムの構成図の一例である。第1実施形態の基板処理システム(図1参照)と第2実施形態の基板処理システム(図8参照)とは、粉体搬送装置2に替えて粉体搬送装置2Aがを備える点で異なっている。
 粉体搬送装置2Aは、粉体搬送配管11と、第1バルブ21と、第2バルブ22と、バッファタンク30と、第1パージガス供給配管41と、第1パージガスバルブ51と、制御装置60と、を備える。即ち、粉体搬送装置2Aは、粉体搬送装置2(図1参照)と比較して、第3バルブ23、第2パージガス供給配管42及び第2パージガスバルブ52が省略されている点で異なっている。その他の構成は同様であり、重複する説明は省略する。
 次に、粉体搬送装置2の動作の一例について、図9から図12を用いて説明する。図9は、粉体搬送装置2の動作の一例を説明するフローチャートである。図10から図12は、各工程におけるバルブ21~23,51~52の開閉と流路の形成を説明する図である。
 ステップS201において、制御装置60は、粉体原料供給源1から気化器4に粉体原料の搬送を行う。図10は、粉体原料の搬送時におけるバルブの開閉と流路の形成を説明する図である。制御装置60は、第1バルブ21、第2バルブ22を開弁する。制御装置60は、第1パージガスバルブ51を開弁する。これにより、粉体搬送装置2の粉体搬送配管11は粉体原料供給源1と気化器4とを連通する。また、第1パージガス供給配管41は閉塞している。
 粉体原料供給源1から送り出された粉体原料は、粉体搬送配管11を通り気化器4へと搬送される。この際、粉体原料の一部は、粉体搬送配管11の内壁面、バルブ21~22の弁体や弁座の表面等に付着する。
 ステップS202において、制御装置60は、バッファタンク30にパージガスを充填する。図11は、パージガスの充填時におけるバルブの開閉と流路の形成を説明する図である。ここでは、後述するステップS203に示すパージ工程の前にバッファタンク30にパージガスを充填する。制御装置60は、第1パージガスバルブ51を閉弁する。これにより、第1パージガス供給配管41は閉塞している。よって、パージガス供給源3から供給されたパージガスがバッファタンク30に充填される。また、後述するステップS203の準備として、制御装置60は、第1バルブ21を閉弁し、第2バルブ22を開弁する。
 ステップS203において、制御装置60は、第2バルブ22にパージガスを供給する。図12は、第2バルブ22にパージガスを供給する際のバルブの開閉と流路の形成を説明する図である。制御装置60は、第1バルブ21及び第1パージガスバルブ51を閉弁し、第2バルブ22を開弁した状態(図11参照)から、第1パージガスバルブ51を開弁する。これにより、第1パージガス供給配管41は粉体搬送配管11と連通する。
 バッファタンク30に充填された高圧のパージガスは、第1パージガス供給配管41を通り第2バルブ22に供給される。パージガスは、第2バルブ22の弁体や弁座等に残留した粉体原料を吹き飛ばす。パージガス及びパージガスによって吹き飛ばされた粉体原料は、気化器4へと流入する。気化器4のフィルタ(図示せず)で粉体原料は捕集される。パージガスは、バルブ72を通り、排気装置6へと排気される。なお、第1バルブ21は閉弁しており、パージガスが粉体原料供給源1に流入することを防止している。
 ステップS204において、制御装置60は、第2バルブ22のパージが所定の繰り返し回数に到達したか否かを判定する。所定の繰り返し回数に到達していない場合(S204・NO)、制御装置60の処理はステップS202に戻り、バッファタンク30へのパージガスの充填(S202)と第2バルブ22のパージ(S203)とを繰り返す。所定の繰り返し回数に到達した場合(S204・YES)、制御装置60は、バルブ21,22及びパージガスバルブ51を閉じ、処理を終了する。
 このように、気化器4に粉体原料を充填(S201)した後に、第2バルブ22のパージ(S202~S204)を行う。そして、気化器4に充填した粉体原料を加熱して気化させる前に、気化器4内は、排気装置6によって排気され、高真空となる。
 ここで、第2実施形態に係る粉体搬送装置2によれば、粉体原料供給源1から気化器4へと接続される粉体搬送配管11に設けられた複数のバルブ(第1バルブ21、第2バルブ22)のうち、気化器4に最も近い第2バルブ22の内部に残留した粉体原料を除去することができるので、第2バルブ22の弁体と弁座との密着性を向上させ、内部リークの発生を防止することができる。これにより、気化器4内を高真空とすることができる。
 以上、第1~第2実施形態に係る粉体搬送装置について説明したが、本開示は上記実施形態等に限定されるものではなく、特許請求の範囲に記載された本開示の要旨の範囲内において、種々の変形、改良が可能である。
 尚、本願は、2020年9月29日に出願した日本国特許出願2020-163475号に基づく優先権を主張するものであり、これらの日本国特許出願の全内容を本願に参照により援用する。
1     粉体原料供給源
2     粉体搬送装置
3     パージガス供給源
4     気化器
5     処理容器
6     排気装置
11    粉体搬送配管
21    第1バルブ
22    第2バルブ
23    第3バルブ
30    バッファタンク
41    第1パージガス供給配管
42    第2パージガス供給配管
51    第1パージガスバルブ
52    第2パージガスバルブ
60    制御装置(制御部)

Claims (15)

  1.  粉体原料供給源を気化器に接続し、前記粉体原料供給源から前記気化器に粉体を供給する粉体搬送配管と、
     第1分岐点にてバッファタンクを前記粉体搬送配管に接続し、前記バッファタンクから前記粉体搬送配管にパージガスを供給する第1パージガス供給配管と、
     前記粉体搬送配管の前記第1分岐点よりも前記粉体原料供給源の側に設けられる第1バルブと、
     前記粉体搬送配管の前記第1分岐点よりも前記気化器の側に設けられる第2バルブと、
     前記第1パージガス供給配管に設けられる第1パージガスバルブと、
    前記第1バルブ、前記第2バルブ及び前記第1パージガスバルブの開閉を制御する制御部と、を備える、
    粉体搬送装置。
  2.  前記制御部は、
     前記第1バルブ及び前記第2バルブを開き、前記第1パージガスバルブを閉じて前記粉体原料供給源から前記気化器に粉体原料を搬送する工程と、
     前記第1パージガスバルブを閉じて前記バッファタンクにパージガスを充填する工程と、
     前記第1バルブを閉じ、前記第2バルブ及び前記第1パージガスバルブを開いて、前記第2バルブにパージガスを供給する工程と、を実行する、
    請求項1に記載の粉体搬送装置。
  3.  前記制御部は、
     前記バッファタンクにパージガスを充填する工程と前記第2バルブにパージガスを供給する工程とを繰り返して実行する、
    請求項2に記載の粉体搬送装置。
  4.  前記制御部は、
     前記バッファタンクにパージガスを充填する工程と前記第2バルブにパージガスを供給する工程とを3回以上繰り返して実行する、
    請求項3に記載の粉体搬送装置。
  5.  前記第2バルブにパージガスを供給する工程の後に、前記第2バルブの気密チェックを実行する、
    請求項3または請求項4に記載の粉体搬送装置。
  6.  前記第1バルブと前記第2バルブの間の前記粉体搬送配管に設けられ、前記制御部に開閉が制御される第3バルブと、
     前記第1バルブと第3バルブとの間の第2分岐点にて前記バッファタンクを前記粉体搬送配管に接続し、前記バッファタンクから前記粉体搬送配管にパージガスを供給する第2パージガス供給配管と、
     前記第2パージガス供給配管に設けられ、前記制御部に開閉が制御される第2パージガスバルブと、を更に備える、
    請求項1に記載の粉体搬送装置。
  7.  前記制御部は、
     前記第1バルブ、前記第2バルブ及び前記第3バルブを開き、前記第1パージガスバルブ及び、前記第2パージガスバルブを閉じて前記粉体原料供給源から前記気化器に粉体原料を搬送する工程と、
     前記第1パージガスバルブ及び前記第2パージガスバルブを閉じて前記バッファタンクにパージガスを充填する工程と、
     前記第1バルブ及び前記第1パージガスバルブを閉じ、前記第2バルブ、前記第3バルブ及び前記第2パージガスバルブを開いて、前記第3バルブにパージガスを供給する工程と、
     前記第1パージガスバルブ及び前記第2パージガスバルブを閉じて前記バッファタンクにパージガスを充填する工程と、
     前記第1バルブ、前記第3バルブ及び前記第2パージガスバルブを閉じ、前記第2バルブ及び前記第1パージガスバルブを開いて、前記第2バルブにパージガスを供給する工程と、を実行する、
    請求項6に記載の粉体搬送装置。
  8.  前記制御部は、
     前記バッファタンクにパージガスを充填する工程と前記第3バルブにパージガスを供給する工程とを3回以上繰り返して実行する、
    請求項7に記載の粉体搬送装置。
  9.  前記制御部は、
     前記バッファタンクにパージガスを充填する工程と前記第2バルブにパージガスを供給する工程とを3回以上繰り返して実行する、
    請求項7または請求項8に記載の粉体搬送装置。
  10.  前記第2バルブにパージガスを供給する工程の後に、前記第2バルブの気密チェックを実行する、
    請求項7乃至請求項9のいずれか1項に記載の粉体搬送装置。
  11.  請求項1乃至請求項10のいずれか1項に記載の粉体搬送装置と、
     前記粉体原料供給源と、
     前記気化器と、を備える、ガス供給装置。
  12.  粉体原料供給源から気化器に接続する粉体搬送配管と、前記粉体搬送配管の前記粉体原料供給源の側に設けられる第1バルブと、前記粉体搬送配管の前記気化器の側に設けられる第2バルブと、パージガスを充填するバッファタンクと、前記第2バルブよりも上流側で前記粉体搬送配管と接続し、前記バッファタンクから前記第2バルブにパージガスを供給するパージガス供給配管と、前記パージガス供給配管に設けられるパージガスバルブと、を備える粉体搬送装置の粉体除去方法であって、
     前記第1バルブ及び前記第2バルブを開き、前記パージガスバルブを閉じて前記粉体原料供給源から前記気化器に粉体原料を搬送する工程と、
     前記パージガスバルブを閉じて前記バッファタンクにパージガスを充填する工程と、
     前記第1バルブを閉じ、前記第2バルブ及び前記パージガスバルブを開いて、前記第2バルブにパージガスを供給して、前記第2バルブ内の前記粉体原料を除去する程と、を有する、
    粉体除去方法。
  13.  前記バッファタンクにパージガスを充填する工程と前記第2バルブにパージガスを供給する工程とを繰り返して実行する、
    請求項12に記載の粉体除去方法。
  14.  前記バッファタンクにパージガスを充填する工程と前記第2バルブにパージガスを供給する工程とを3回以上繰り返して実行する、
    請求項13に記載の粉体除去方法。
  15.  前記第2バルブにパージガスを供給する工程の後に、前記第2バルブの気密チェックを実行する、
    請求項13または請求項14に記載の粉体除去方法。
PCT/JP2021/034619 2020-09-29 2021-09-21 粉体搬送装置、ガス供給装置及び粉体除去方法 WO2022071030A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN202180064121.0A CN116209630A (zh) 2020-09-29 2021-09-21 粉体输送装置、气体供给装置及粉体除去方法
KR1020237013326A KR20230070032A (ko) 2020-09-29 2021-09-21 분말체 반송 장치, 가스 공급 장치 및 분말체 제거 방법
US18/245,618 US20230332285A1 (en) 2020-09-29 2021-09-21 Powder conveying apparatus, gas supply apparatus, and method for removing powder

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2020-163475 2020-09-29
JP2020163475A JP2022055823A (ja) 2020-09-29 2020-09-29 粉体搬送装置、ガス供給装置及び粉体除去方法

Publications (1)

Publication Number Publication Date
WO2022071030A1 true WO2022071030A1 (ja) 2022-04-07

Family

ID=80950184

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2021/034619 WO2022071030A1 (ja) 2020-09-29 2021-09-21 粉体搬送装置、ガス供給装置及び粉体除去方法

Country Status (5)

Country Link
US (1) US20230332285A1 (ja)
JP (1) JP2022055823A (ja)
KR (1) KR20230070032A (ja)
CN (1) CN116209630A (ja)
WO (1) WO2022071030A1 (ja)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008251905A (ja) * 2007-03-30 2008-10-16 Tokyo Electron Ltd 粉体状ソース供給系の洗浄方法、記憶媒体、基板処理システム及び基板処理方法
WO2010007981A1 (ja) * 2008-07-18 2010-01-21 東京エレクトロン株式会社 成膜装置及び粉体気化装置
JP2019052346A (ja) * 2017-09-14 2019-04-04 東京エレクトロン株式会社 ガス供給装置及び成膜装置
CN209178332U (zh) * 2018-11-09 2019-07-30 南京诚志清洁能源有限公司 一种粉煤加压输送系统中自动控制阀门吹扫气的装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008251905A (ja) * 2007-03-30 2008-10-16 Tokyo Electron Ltd 粉体状ソース供給系の洗浄方法、記憶媒体、基板処理システム及び基板処理方法
WO2010007981A1 (ja) * 2008-07-18 2010-01-21 東京エレクトロン株式会社 成膜装置及び粉体気化装置
JP2019052346A (ja) * 2017-09-14 2019-04-04 東京エレクトロン株式会社 ガス供給装置及び成膜装置
CN209178332U (zh) * 2018-11-09 2019-07-30 南京诚志清洁能源有限公司 一种粉煤加压输送系统中自动控制阀门吹扫气的装置

Also Published As

Publication number Publication date
US20230332285A1 (en) 2023-10-19
CN116209630A (zh) 2023-06-02
JP2022055823A (ja) 2022-04-08
KR20230070032A (ko) 2023-05-19

Similar Documents

Publication Publication Date Title
KR100981162B1 (ko) 처리 가스 공급 시스템 및 처리 가스 공급 방법
JPH03208889A (ja) 液体ソース容器
JP6836601B2 (ja) 容器をプラズマ処理するための方法および装置
US20040115584A1 (en) Heat treating method and heat treating device
JP2018176886A5 (ja)
WO2022071030A1 (ja) 粉体搬送装置、ガス供給装置及び粉体除去方法
EP0976969B2 (fr) Installation et procédé de fourniture d'hélium à plusiers lignes de production
CN103298974B (zh) 装置、方法以及反应腔室
KR20220111662A (ko) 분말체 반송 장치, 가스 공급 장치 및 분말체 제거 방법
WO2019245592A1 (en) Purge system for gas supply equipment capable of high-temperature high-pressure purging
US12018368B2 (en) Powder transfer apparatus, gas supply apparatus, and powder removal method
JP4681325B2 (ja) 逆流防止監視付きガス供給システムの使用方法
JP5280928B2 (ja) 真空処理装置の運転方法
CN117355633A (zh) 原料气体供给系统、粉末原料补充机构以及粉末原料补充方法
CN113056962B (zh) 气体供给装置和气体供给方法
KR20020049146A (ko) 반도체 제조용 공정가스 공급 캐비넷
WO2023189948A1 (ja) 機器のメンテナンス方法
KR20040079469A (ko) 소스 가스 공급 장치
WO2020049900A1 (ja) フッ素ガス含有ガスの供給方法及び供給設備
JP2009115179A (ja) 液化天然ガス受入システム及び受入方法
US20240068098A1 (en) Flow control arrangements, semiconductor processing systems having flow control arrangements, and flow control methods
KR101426776B1 (ko) 화학용액이송 연결배관용 보강방법
CN101121161A (zh) 药液供给方法
TW202340518A (zh) 原料氣體供應方法及原料氣體供應機構、以及成膜系統
JP2832847B2 (ja) 減圧気相成長法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21875332

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 20237013326

Country of ref document: KR

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21875332

Country of ref document: EP

Kind code of ref document: A1