WO2022065676A1 - 배터리 저항 산출 장치 및 방법 - Google Patents

배터리 저항 산출 장치 및 방법 Download PDF

Info

Publication number
WO2022065676A1
WO2022065676A1 PCT/KR2021/010384 KR2021010384W WO2022065676A1 WO 2022065676 A1 WO2022065676 A1 WO 2022065676A1 KR 2021010384 W KR2021010384 W KR 2021010384W WO 2022065676 A1 WO2022065676 A1 WO 2022065676A1
Authority
WO
WIPO (PCT)
Prior art keywords
battery pack
insulation resistance
voltage
battery
resistance
Prior art date
Application number
PCT/KR2021/010384
Other languages
English (en)
French (fr)
Inventor
윤호병
Original Assignee
주식회사 엘지에너지솔루션
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 주식회사 엘지에너지솔루션 filed Critical 주식회사 엘지에너지솔루션
Priority to EP21872708.9A priority Critical patent/EP4174506A4/en
Priority to US18/017,814 priority patent/US20230280409A1/en
Priority to CN202180057683.2A priority patent/CN116194786A/zh
Priority to JP2023504608A priority patent/JP7475769B2/ja
Publication of WO2022065676A1 publication Critical patent/WO2022065676A1/ko

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/389Measuring internal impedance, internal conductance or related variables
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/025Measuring very high resistances, e.g. isolation resistances, i.e. megohm-meters
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R27/00Arrangements for measuring resistance, reactance, impedance, or electric characteristics derived therefrom
    • G01R27/02Measuring real or complex resistance, reactance, impedance, or other two-pole characteristics derived therefrom, e.g. time constant
    • G01R27/08Measuring resistance by measuring both voltage and current
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/382Arrangements for monitoring battery or accumulator variables, e.g. SoC
    • G01R31/3842Arrangements for monitoring battery or accumulator variables, e.g. SoC combining voltage and current measurements
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/385Arrangements for measuring battery or accumulator variables
    • G01R31/387Determining ampere-hour charge capacity or SoC
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/36Arrangements for testing, measuring or monitoring the electrical condition of accumulators or electric batteries, e.g. capacity or state of charge [SoC]
    • G01R31/396Acquisition or processing of data for testing or for monitoring individual cells or groups of cells within a battery
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/52Testing for short-circuits, leakage current or ground faults
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01MPROCESSES OR MEANS, e.g. BATTERIES, FOR THE DIRECT CONVERSION OF CHEMICAL ENERGY INTO ELECTRICAL ENERGY
    • H01M10/00Secondary cells; Manufacture thereof
    • H01M10/42Methods or arrangements for servicing or maintenance of secondary cells or secondary half-cells
    • H01M10/48Accumulators combined with arrangements for measuring, testing or indicating the condition of cells, e.g. the level or density of the electrolyte
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Definitions

  • An object of the present invention is to provide an apparatus and method for calculating battery resistance for calculating the insulation resistance of a battery.
  • the secondary battery is a battery capable of charging and discharging, and includes all of the conventional Ni/Cd batteries, Ni/MH batteries, and the latest lithium ion batteries.
  • lithium ion batteries have an advantage in that their energy density is much higher than that of conventional Ni/Cd batteries and Ni/MH batteries.
  • lithium ion batteries can be manufactured in a small size and light weight, so they are used as power sources for mobile devices.
  • the lithium ion battery is receiving attention as a next-generation energy storage medium as the range of use has been expanded as a power source for electric vehicles.
  • the secondary battery is generally used as a battery pack including a battery module in which a plurality of battery cells are connected in series and/or in parallel.
  • the state and operation of the battery pack are managed and controlled by the battery management system.
  • a high-voltage battery pack used in an energy storage system (ESS), an electric vehicle, or the like needs to maintain a certain level of insulation between the battery pack and the chassis in order to prevent the battery pack from being discharged or a user's electric shock.
  • a battery management system performs an insulation resistance measurement function between a battery pack and a chassis through an insulation resistance measurement circuit.
  • the measurement resistance is connected between the positive (+, -) of the battery pack and the chassis, and the insulation resistance is calculated by measuring the voltage after connecting the battery pack positive and the chassis sequentially through a switch. method was used.
  • the measuring resistor or switching element included in the insulation resistance measuring circuit is connected between the high voltage battery and the chassis, clearance or creepage has to be considered, so bulky and expensive parts are mostly used. .
  • high-spec parts are required.
  • the present invention has been devised to solve the above problems, and by connecting the measurement circuit only between one of the (+) or (-) terminals of the battery pack and the chassis, the size of the battery management system is reduced and the cost is reduced.
  • An object of the present invention is to provide an apparatus and method for calculating battery resistance that can be used.
  • an apparatus and method for calculating battery resistance according to the present invention aims to realize performance substantially equivalent to that of an existing measurement circuit even if one section of the measurement circuit is removed.
  • a battery resistance calculating apparatus includes a measuring circuit connected between one of a (+) terminal and a (-) terminal of a battery pack, a chassis, and a voltage measuring unit measuring a voltage from the measuring circuit and an insulation resistance calculator configured to calculate the insulation resistance of the battery pack based on the voltage measured by the voltage measurer, wherein the insulation resistance calculator calculates the insulation resistance at a time of the battery pack when the calculated insulation resistance is less than a preset threshold.
  • the insulation resistance may be recalculated based on the voltage change amount.
  • a method of calculating battery resistance includes measuring a voltage by connecting a measuring circuit between one of a (+) terminal and a (-) terminal of a battery pack and a chassis, and measuring a voltage based on the measured voltage to calculate the insulation resistance of the battery pack, wherein the calculating of the insulation resistance of the battery pack is based on the time-dependent voltage change amount of the battery pack when the calculated insulation resistance is less than a preset threshold. Insulation resistance can be recalculated.
  • the apparatus and method for calculating battery resistance by connecting the measurement circuit only between one of the (+) or (-) terminals of the battery pack and the chassis, it is possible to reduce the size and cost of the battery management system.
  • FIG. 1 is a block diagram showing the configuration of a general battery pack.
  • FIG. 2 is a block diagram illustrating a configuration of an apparatus for calculating battery resistance according to an embodiment of the present invention.
  • 3A is a diagram illustrating calculation of insulation resistance in a conventional battery pack.
  • 3B is a diagram illustrating an equivalent circuit for calculating insulation resistance in a conventional battery pack.
  • 4A is a diagram illustrating calculation of insulation resistance of a battery pack using the battery resistance calculating apparatus according to an embodiment of the present invention.
  • 4B is a diagram illustrating an equivalent circuit for calculating the insulation resistance of a battery pack using the battery resistance calculating apparatus according to an embodiment of the present invention.
  • FIG. 5 is a diagram illustrating an OCV-SOC table (graph) of a battery pack for calculating insulation resistance in an apparatus for calculating battery resistance according to an embodiment of the present invention.
  • FIG. 6 is a flowchart illustrating a method of calculating battery resistance according to an embodiment of the present invention.
  • FIG. 7 is a block diagram illustrating a hardware configuration of an apparatus for calculating battery resistance according to an embodiment of the present invention.
  • first, second, first, or second used in various embodiments may modify various components regardless of order and/or importance, do not limit
  • a first component may be referred to as a second component, and similarly, the second component may also be renamed as a first component.
  • FIG. 1 is a block diagram showing the configuration of a general battery pack.
  • FIG. 1 it schematically shows a battery control system including a battery pack 1 and a host controller 2 included in the upper system according to an embodiment of the present invention.
  • the battery pack 1 includes a plurality of battery modules 10 that are composed of one or more battery cells and are capable of being charged and discharged, and the (+) terminal side or (-) side of the plurality of battery modules 10 .
  • a switching unit 14 connected in series to the terminal side to control the charging/discharging current flow of the battery module 10, and monitoring the voltage, current, temperature, etc. of the battery pack 1 to prevent overcharging and overdischarging and a battery management system 20 (eg, BMS) that controls and manages to prevent.
  • BMS battery management system 20
  • the switching unit 14 is a semiconductor switching element for controlling the current flow for charging or discharging of the plurality of battery modules 10, for example, according to the specification of the battery pack 1, at least one MOSFET or Relays, magnetic contactors, etc. may be used.
  • the battery management system 20 may measure or calculate the voltage and current of the gate, the source, and the drain of the semiconductor switching element in order to monitor the voltage, current, temperature, etc. of the battery pack 1 .
  • the battery management system 20 may measure the current of the battery pack 1 using the sensor 12 provided adjacent to the semiconductor switching element.
  • the sensor 12 may correspond to a voltage measuring unit to be described later.
  • the battery management system 20 is an interface for receiving measured values of the various parameters described above, and may include a plurality of terminals and a circuit connected to these terminals to process the received values. Also, the battery management system 20 may control ON/OFF of the switching unit 14 , for example, a MOSFET, and may be connected to the battery module 10 to monitor the state of each battery module 10 . .
  • the insulation resistance of the battery pack 1 is calculated through a resistance calculation program based on data measured using a measurement circuit connected to the battery pack 1 as described below. can be calculated.
  • the upper controller 2 may transmit a control signal for the battery module 10 to the battery management system 20 . Accordingly, the operation of the battery management system 20 may be controlled based on a signal applied from the upper controller.
  • the battery cell of the present invention may be a configuration included in the battery module 10 used in a vehicle or ESS (Energy Storage System).
  • the host controller 2 may be an ESS controller.
  • the battery pack 1 is not necessarily limited to this use.
  • FIG. 2 is a block diagram illustrating a configuration of an apparatus for calculating battery resistance according to an embodiment of the present invention.
  • an apparatus 200 for calculating battery resistance includes a measuring circuit 210 , a voltage measuring unit 220 , an insulation resistance calculating unit 230 , and a storage unit 240 . can do.
  • the battery resistance calculating apparatus 200 shown in FIG. 2 may be a component included in the battery management system (BMS) of the battery pack.
  • BMS battery management system
  • the measurement circuit 210 may connect the measurement circuit between one of the (+) terminal and the (-) terminal of the battery pack and the chassis.
  • a chassis connected to the measurement circuit 210 may include a chassis provided in a vehicle.
  • the measurement circuit 210 may include a measurement resistor and a switch connected in series, and may be connected in parallel to the insulation resistance of the battery pack. Also, the measuring circuit 210 may further include a measuring resistor and a voltage dividing resistor connected in parallel to the switch. For example, the measuring resistance of the voltage measuring unit 220 and the switch may be respectively connected in parallel to the insulation resistance of the battery pack, and the voltage dividing resistor may be connected in parallel to one of the insulation resistances. In addition, the voltage division resistor may serve to divide the voltage of the measurement circuit 210 to adjust the voltage to a measurable level.
  • the voltage measuring unit 220 may measure the voltage from the measuring circuit.
  • the voltage measuring unit 220 may be a sensor of the battery management system connected to the voltage division resistor side of the measuring circuit 210 .
  • the insulation resistance calculator 230 may calculate the insulation resistance of the battery pack based on the voltage measured by the voltage measurer 220 . In this case, the insulation resistance calculator 230 may calculate the insulation resistance of the battery pack using at least one equivalent circuit according to the switching state of the switch included in the measurement circuit 210 . This will be described later with reference to FIG. 4B .
  • the insulation resistance calculator 230 may recalculate the insulation resistance based on the time-dependent voltage change of the battery pack.
  • a preset threshold eg, 100 k ⁇
  • the insulation resistance calculator 230 may recalculate the insulation resistance based on the time-dependent voltage change of the battery pack.
  • the measurement circuit 210 is provided on only one of the (+) or (-) terminals of the battery pack like the battery resistance calculating device 200 according to an embodiment of the present invention, insulation of less than a certain value due to asymmetry For resistors, the accuracy may be poor. Accordingly, in the battery resistance calculating apparatus 200 according to an embodiment of the present invention, the insulation resistance is calculated again through a separate method for the calculated insulation resistance less than the threshold in consideration of this limitation.
  • the insulation resistance calculator 230 may recalculate the insulation resistance by calculating the amount of change in capacity of the battery pack using the amount of change in voltage according to time of the battery pack. In this case, the insulation resistance calculator 230 may calculate the amount of change in capacity of the battery pack based on, for example, an OCV-SOC table pre-stored in the storage unit 240 .
  • the insulation resistance calculator 230 may calculate a leakage current from the capacity change amount of the battery pack, and recalculate the insulation resistance based on the voltage change amount and the leakage current of the battery pack over time.
  • the insulation resistance calculator 230 may calculate a voltage of a previous driving completion time of the battery pack (eg, a previous ignition-off time of the vehicle) and a driving start of the battery pack. Insulation resistance may be recalculated based on the voltage difference value at the previous time point (eg, the starting point of the vehicle).
  • the insulation resistance calculator 230 wakes up by the battery management system after a preset time elapses from the voltage at the time when the previous driving of the battery pack is completed and when the previous driving of the battery pack is completed. Insulation resistance may be recalculated based on the difference in voltages of the battery packs being increased. In this case, the preset time from the completion of the previous driving of the battery pack may be measured through a real-time clock (RTC).
  • RTC real-time clock
  • the insulation resistance calculator 230 may be various methods for the insulation resistance calculator 230 to recalculate insulation resistance when the insulation resistance is less than a preset threshold, and an exemplary process thereof will be described in detail later in FIG. 5 . .
  • the storage unit 240 may store various data such as voltage data measured by the voltage measuring unit 220 , insulation resistance data calculated based on the voltage data, the amount of change in capacity of the battery pack, and a leakage current value. Also, the storage unit 240 may store the OCV-SOC table. However, the battery resistance calculating apparatus 200 according to an embodiment of the present invention does not necessarily include the storage unit 240, but includes a communication unit (not shown) to transmit and receive data from the database of an external server through this. could be configured.
  • the apparatus for calculating battery resistance may further include an alarm unit (not shown).
  • the alarm unit may provide a warning alarm to the user when the insulation resistance calculated by the insulation resistance calculator 230 is out of a preset reference range.
  • the alarm unit may provide a warning alarm to the user in various ways, such as providing a warning notification as a visual signal through a lamp or generating a warning notification sound or message through a speaker. Accordingly, it is possible to protect the user from the risk of electric shock or the like occurring due to the insulation resistance.
  • the battery management system can reduce the size and reduce the cost. Also, according to the apparatus for calculating battery resistance according to an embodiment of the present invention, even if one section of the measurement circuit 210 is removed, performance substantially equivalent to that of the existing measurement circuit can be implemented.
  • FIG. 3A is a diagram illustrating calculation of insulation resistance in a conventional battery pack. Also, FIG. 3B is a diagram illustrating an equivalent circuit for calculating insulation resistance in a conventional battery pack.
  • R p and R n ( 10 ) represent the insulation resistance of the battery pack
  • R 1 and R 2 represent the measured resistance and the switch 110a of the measuring circuit
  • R m1 and R m2 are voltage division represents the resistance 110b.
  • a measurement terminal 110c is provided between the resistors R m1 and R m2 .
  • a measurement resistor and a switch 110a are connected to both (+) and (-) terminals of the battery pack, and the switches of both terminals are alternately turned on/off to control R 1 and The voltage of the battery pack was measured by sequentially connecting R 2 .
  • FIG. 3B an equivalent circuit for measuring a voltage by alternately turning on or off the switch on the side of the measurement resistor R 1 and the switch on the side of R 2 of FIG. 3A is shown.
  • the value measured at the voltage measurement terminal 110c and the formula for calculating the insulation resistance can be summarized and expressed as follows.
  • R p and R n are the (+) and (-) side insulation resistances of the battery pack, respectively, R1, R2 are the measured resistances of the measuring circuit, E is R m1 +R m2 , C is the battery pack voltage, and D is R m2 /(R m1 +R m2 ), A is the voltage on the terminal side for measurement of the equivalent circuit (a), B indicates the voltage on the terminal side for measurement of the equivalent circuit (b))
  • the insulation resistance can be calculated as follows.
  • the insulation resistance may be calculated by omitting the measurement resistance and the switch provided at one end of the battery pack.
  • FIG. 4A is a diagram illustrating calculation of insulation resistance of a battery pack using the battery resistance calculating apparatus according to an embodiment of the present invention.
  • FIG. 4B is a diagram illustrating an equivalent circuit for calculating the insulation resistance of a battery pack using the battery resistance calculating apparatus according to an embodiment of the present invention.
  • R p and R n ( 20 ) represent the insulation resistance of the battery pack
  • R 1 and R 2 represent the measurement resistance
  • R m1 and R m2 represents the resistor 210b for voltage division.
  • a measurement terminal 210c is provided between the resistors R m1 and R m2 .
  • the measurement resistance and the switch 210a are connected to only one of the (+) terminal and the (-) terminal of the battery pack, and the switch By controlling on/off to connect or disconnect R 1 , the voltage of the battery pack can be measured.
  • FIG. 4B an equivalent circuit for measuring a voltage by turning on/off the switch on the side of the measurement resistor R 1 of FIG. 4A is shown.
  • the value measured at the voltage measurement terminal 210c and the calculation formula of the insulation resistance can be summarized and expressed as follows.
  • R p and R n are the (+) and (-) side insulation resistances of the battery pack, respectively, R1, R2 are the measured resistances of the measuring circuit, E is R m1 +R m2 , C is the battery pack voltage, and D is R m2 /(R m1 +R m2 ), A is the voltage on the terminal side for measurement of the equivalent circuit (a), B indicates the voltage on the terminal side for measurement of the equivalent circuit (b))
  • the insulation resistance can be calculated as follows.
  • the size of the battery management system is reduced by connecting the measurement circuit only between one of the (+) or (-) terminals of the battery pack and the chassis. and can reduce costs.
  • the method for calculating battery resistance according to an embodiment of the present invention even if one section of the measurement circuit is removed, performance substantially equivalent to that of the existing measurement circuit can be implemented.
  • the battery resistance calculating apparatus since the battery resistance calculating apparatus according to an embodiment of the present invention omits one of the (+) or (-) terminals of the battery pack, the measurement accuracy is lower than that of the conventional method due to the asymmetry of the circuit. there is This problem is mainly conspicuous as the calculated insulation resistance value decreases.
  • a threshold for example, 100 k ⁇
  • the battery pack The insulation resistance can be recalculated by measuring the voltage for a certain period of time and calculating the leakage current. This will be described below.
  • FIG. 5 is a diagram illustrating an OCV-SOC table (graph) of a battery pack for calculating insulation resistance in an apparatus for calculating battery resistance according to an embodiment of the present invention.
  • the x-axis represents state of charge (SOC) (%)
  • the y-axis represents open circuit voltage (OCV) (V).
  • the battery pack voltage (V 1 ) measured when the vehicle is turned off in FIG. 5 is 500V
  • the amount of change in capacity of the battery pack is 100 Ah for a total of 500 Ah.
  • the battery pack voltage difference was calculated at the time when the vehicle was turned off and when the vehicle was turned on again. Even when the pack is woken up, the insulation resistance can be calculated in the same way as described above.
  • FIG. 6 is a flowchart illustrating a method of calculating battery resistance according to an embodiment of the present invention.
  • a voltage is measured by connecting a measurement circuit between one of the (+) and (-) terminals of the battery pack and the chassis ( S110 ).
  • the measuring circuit in step S110 may include a measuring resistor and a switch, and may further include a voltage dividing resistor in addition.
  • the insulation resistance of the battery pack is calculated based on the measured voltage (S120).
  • the insulation resistance of the battery pack may be calculated using at least one equivalent circuit according to the switching state of the switch included in the measurement circuit. Since this has been described with reference to FIGS. 4A and 4B , a detailed description thereof will be omitted.
  • the calculated insulation resistance is less than a preset threshold (eg, 10 k ⁇ ) (S130). If the insulation resistance is equal to or greater than the threshold value (NO), the calculated insulation resistance is determined as a final value.
  • a preset threshold eg, 10 k ⁇
  • the insulation resistance may be recalculated based on the time-dependent voltage change amount of the battery pack. Specifically, first, a voltage change amount with respect to time of the battery pack is measured ( S140 ). In this case, the amount of voltage change with respect to the time of the battery pack is the amount of voltage change between the time when the previous driving of the battery pack is completed and the start of the next driving, or the voltage between the time when the battery pack is woken up after a predetermined time from the time when the previous driving of the battery pack is completed. The amount of change can be measured.
  • the amount of change in capacity of the battery pack is calculated based on the amount of change in voltage with respect to time of the battery pack (S150).
  • the amount of change in capacity of the battery pack may be calculated based on the pre-stored OCV-SOC table.
  • the leakage current is calculated based on the calculated amount of change in the capacity of the battery pack ( S160 ). Then, the insulation resistance is recalculated based on the voltage change amount of the battery pack calculated in step S140 and the leakage current calculated in step S160 ( S170 ).
  • the measurement circuit is provided only at one of the (+) or (-) terminals of the battery pack, so that accuracy is improved for insulation resistance less than a certain value due to asymmetry can fall Accordingly, in the battery resistance calculation method according to an embodiment of the present invention, more accurate insulation resistance can be calculated again through the methods shown in steps S140 to S170 for the calculated insulation resistance value less than the threshold value in consideration of this limitation.
  • the size of the battery management system is reduced by connecting the measurement circuit only between the chassis and one of the (+) or (-) terminals of the battery pack. and can reduce costs.
  • the method for calculating battery resistance according to an embodiment of the present invention even if one section of the measurement circuit is removed, performance substantially equivalent to that of the existing measurement circuit can be implemented.
  • FIG. 7 is a block diagram illustrating a hardware configuration of an apparatus for calculating battery resistance according to an embodiment of the present invention.
  • the apparatus 300 for calculating battery resistance may include an MCU 310 , a memory 320 , an input/output I/F 330 , and a communication I/F 340 .
  • the MCU 310 executes various programs (eg, a battery voltage measurement program, a battery insulation resistance calculation program, etc.) stored in the memory 320 , and through these programs, various programs for calculating the insulation resistance of the battery pack, etc. It may be a processor that processes data and performs the functions of FIG. 2 described above.
  • various programs eg, a battery voltage measurement program, a battery insulation resistance calculation program, etc.
  • It may be a processor that processes data and performs the functions of FIG. 2 described above.
  • the memory 320 may store various programs related to voltage measurement of battery cells, calculation of insulation resistance, and the like.
  • the memory 720 may store various data such as a measured voltage of a battery, insulation resistance data, a capacity change amount, a leakage current value, an OCV-SOC table, and the like.
  • the memory 320 may be a volatile memory or a non-volatile memory.
  • the volatile memory the memory 320 may be RAM, DRAM, SRAM, or the like.
  • the memory 320 as a non-volatile memory ROM, PROM, EAROM, EPROM, EEPROM, flash memory, or the like may be used. Examples of the above-listed memories 320 are merely examples and are not limited to these examples.
  • the input/output I/F 330 is an interface that connects between an input device (not shown) such as a keyboard, mouse, and touch panel, and an output device such as a display (not shown) and the MCU 310 to transmit and receive data. can provide an input device (not shown) such as a keyboard, mouse, and touch panel, and an output device such as a display (not shown) and the MCU 310 to transmit and receive data. can provide an input device (not shown) such as a keyboard, mouse, and touch panel, and an output device such as a display (not shown) and the MCU 310 to transmit and receive data. can provide
  • the communication I/F 340 is a configuration capable of transmitting and receiving various data to and from the server, and may be various devices capable of supporting wired or wireless communication. For example, a program or various data for voltage measurement and insulation resistance calculation of the battery pack may be transmitted/received from an external server provided separately through the communication I/F 340 .
  • the computer program according to an embodiment of the present invention is recorded in the memory 320 and processed by the MCU 310 to be implemented as a module that performs each functional block shown in FIG. 2 , for example. there is.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Secondary Cells (AREA)
  • Measurement Of Resistance Or Impedance (AREA)
  • Tests Of Electric Status Of Batteries (AREA)

Abstract

본 발명의 일 실시 예에 따른 배터리 저항 산출 장치는 배터리 팩의 (+) 단자 및 (-) 단자 중 하나의 단자와, 샤시 사이에 연결되는 측정 회로, 상기 측정 회로로부터 전압을 측정하는 전압 측정부 및 상기 전압 측정부에서 측정된 전압에 기초하여 상기 배터리 팩의 절연 저항을 산출하는 절연 저항 산출부를 포함하고, 상기 절연 저항 산출부는 산출된 절연 저항이 미리 설정된 임계치 미만인 경우, 상기 배터리 팩의 시간에 따른 전압 변화량에 기초하여 상기 절연 저항을 재산출할 수 있다.

Description

배터리 저항 산출 장치 및 방법
관련출원과의 상호인용
본 발명은 2020.09.22.에 출원된 한국 특허 출원 제10-2020-0122615호에 기초한 우선권의 이익을 주장하며, 해당 한국 특허 출원의 문헌에 개시된 모든 내용을 본 명세서의 일부로서 포함한다.
기술분야
본 발명은 배터리의 절연 저항을 산출하기 위한 배터리 저항 산출 장치 및 방법을 제공하는 것을 목적으로 한다.
최근 이차 전지에 대한 연구 개발이 활발히 이루어지고 있다. 여기서 이차 전지는 충방전이 가능한 전지로서, 종래의 Ni/Cd 전지, Ni/MH 전지 등과 최근의 리튬 이온 전지를 모두 포함하는 의미이다. 이차 전지 중 리튬 이온 전지는 종래의 Ni/Cd 전지, Ni/MH 전지 등에 비하여 에너지 밀도가 훨씬 높다는 장점이 있다, 또한, 리튬 이온 전지는 소형, 경량으로 제작할 수 있어서, 이동 기기의 전원으로 사용된다. 또한, 리튬 이온 전지는 전기 자동차의 전원으로 사용 범위가 확장되어 차세대 에너지 저장 매체로 주목을 받고 있다.
또한, 이차 전지는 일반적으로 복수 개의 배터리 셀들이 직렬 및/또는 병렬로 연결된 배터리 모듈을 포함하는 배터리 팩으로 이용된다. 그리고 배터리 팩은 배터리 관리 시스템에 의하여 상태 및 동작이 관리 및 제어된다.
특히, 에너지 저장 시스템(Energy Storage System, ESS), 전기 차량 등에 사용되는 고전압 배터리 팩은 배터리 팩의 방전이나 사용자의 감전 등을 방지하기 위해 배터리 팩과 샤시 간에 일정 수준 이상의 절연이 유지되어야 한다. 따라서, 배터리 관리 시스템(Battery Management System, BMS)에서는 절연 저항 측정 회로를 통해 배터리 팩과 샤시 간의 절연 저항 측정 기능을 수행한다.
기존에는 절연 저항을 측정하기 위해 배터리 팩의 양극(+, -)과 샤시 사이에 측정 저항을 각각 연결하고 스위치를 통해 순차적으로 배터리 팩 양극과 샤시 간을 연결한 후 전압을 측정하여 절연 저항을 계산하는 방법을 사용하였다. 그러나, 절연 저항의 측정 회로에 포함되는 측정 저항이나 스위칭 소자는 고전압 배터리와 샤시 간에 연결되어 클리런스(clearance)나 크리피지(creepage) 등을 고려해야 하기 때문에 대부분 부피가 크고 가격이 비싼 부품이 사용된다. 특히, 배터리 팩의 전압이 증가할수록 고사양의 부품이 필요하다.
배터리 관리 시스템의 부피와 가격이 점차적으로 낮아지는 추세를 고려할 때 이러한 절연 저항 측정 회로 역시 크기와 비용을 절감할 수 있는 방안이 필요하다.
본 발명은 상기와 같은 과제를 해결하기 위해 고안된 것으로서, 배터리 팩의 (+) 또는 (-) 단자 중 하나의 단자와 샤시 사이에만 측정 회로를 연결함으로써, 배터리 관리 시스템의 크기를 축소시키고 비용을 절감할 수 있는 배터리 저항 산출 장치 및 방법을 제공하는 것을 목적으로 한다.
또한, 본 발명에 따른 배터리 저항 산출 장치 및 방법은 측정 회로 중 하나의 구간을 제거하더라도 기존의 측정 회로와 실질적으로 동등한 성능을 구현하는 것을 목적으로 한다.
본 발명의 일 실시 예에 따른 배터리 저항 산출 장치는 배터리 팩의 (+) 단자 및 (-) 단자 중 하나의 단자와, 샤시 사이에 연결되는 측정 회로, 상기 측정 회로로부터 전압을 측정하는 전압 측정부 및 상기 전압 측정부에서 측정된 전압에 기초하여 상기 배터리 팩의 절연 저항을 산출하는 절연 저항 산출부를 포함하고, 상기 절연 저항 산출부는 산출된 절연 저항이 미리 설정된 임계치 미만인 경우, 상기 배터리 팩의 시간에 따른 전압 변화량에 기초하여 상기 절연 저항을 재산출할 수 있다.
본 발명의 일 실시 예에 따른 배터리 저항 산출 방법은 배터리 팩의 (+) 단자 및 (-) 단자 중 하나의 단자와, 샤시 사이에 측정 회로를 연결하여 전압을 측정하는 단계 및 측정된 전압에 기초하여 상기 배터리 팩의 절연 저항을 산출하는 단계를 포함하고, 상기 배터리 팩의 절연 저항을 산출하는 단계는 산출된 절연 저항이 미리 설정된 임계치 미만인 경우, 상기 배터리 팩의 시간에 따른 전압 변화량에 기초하여 상기 절연 저항을 재산출할 수 있다.
본 발명에 따른 배터리 저항 산출 장치 및 방법에 의하면, 배터리 팩의 (+) 또는 (-) 단자 중 하나의 단자와 샤시 사이에만 측정 회로를 연결함으로써, 배터리 관리 시스템의 크기를 축소시키고 비용을 절감할 수 있다.
또한, 본 발명에 따른 배터리 저항 산출 장치 및 방법에 의하면, 측정 회로 중 하나의 구간을 제거하더라도 기존의 측정 회로와 실질적으로 동등한 성능을 구현할 수 있다.
도 1은 일반적인 배터리 팩의 구성을 나타내는 블록도이다.
도 2는 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치의 구성을 나타내는 블록도이다.
도 3a는 종래의 배터리 팩에서 절연 저항을 산출하는 것을 나타내는 도면이다.
도 3b는 종래의 배터리 팩에서 절연 저항을 산출하기 위한 등가 회로를 나타내는 도면이다.
도 4a는 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치를 이용하여 배터리 팩의 절연 저항을 산출하는 것을 나타내는 도면이다.
도 4b는 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치를 이용하여 배터리 팩의 절연 저항을 산출하기 위한 등가 회로를 나타내는 도면이다.
도 5는 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치에서 절연 저항을 산출하기 위한 배터리 팩의 OCV-SOC 테이블(그래프)을 나타내는 도면이다.
도 6은 본 발명의 일 실시 예에 따른 배터리 저항 산출 방법을 나타내는 흐름도이다.
도 7은 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치의 하드웨어 구성을 나타내는 블록도이다.
이하, 첨부한 도면을 참조하여 본 발명의 다양한 실시 예들에 대해 상세히 설명하고자 한다. 본 문서에서 도면상의 동일한 구성 요소에 대해서는 동일한 참조 부호를 사용하고 동일한 구성요소에 대해서 중복된 설명은 생략한다.
본 문서에 개시되어 있는 본 발명의 다양한 실시 예들에 대해서, 특정한 구조적 내지 기능적 설명들은 단지 본 발명의 실시 예를 설명하기 위한 목적으로 예시된 것으로, 본 발명의 다양한 실시 예들은 여러 가지 형태로 실시될 수 있으며 본 문서에 설명된 실시 예들에 한정되는 것으로 해석되어서는 아니 된다.
다양한 실시 예에서 사용된 "제1", "제2", "첫째", 또는 "둘째" 등의 표현들은 다양한 구성요소들을, 순서 및/또는 중요도에 상관없이 수식할 수 있고, 해당 구성 요소들을 한정하지 않는다. 예를 들면, 본 발명의 권리 범위를 벗어나지 않으면서 제1 구성 요소는 제2 구성 요소로 명명될 수 있고, 유사하게 제2 구성요소도 제1 구성 요소로 바꾸어 명명될 수 있다.
본 문서에서 사용된 용어들은 단지 특정한 실시 예를 설명하기 위해 사용된 것으로, 다른 실시 예의 범위를 한정하려는 의도가 아닐 수 있다. 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함할 수 있다.
기술적이거나 과학적인 용어를 포함해서 여기서 사용되는 모든 용어들은 본 발명의 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미를 가질 수 있다. 일반적으로 사용되는 사전에 정의된 용어들은 관련 기술의 문맥 상 가지는 의미와 동일 또는 유사한 의미를 가지는 것으로 해석될 수 있으며, 본 문서에서 명백하게 정의되지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다. 경우에 따라서, 본 문서에서 정의된 용어일지라도 본 발명의 실시 예들을 배제하도록 해석될 수 없다.
도 1은 일반적인 배터리 팩의 구성을 나타내는 블록도이다.
도 1을 참조하면, 본 발명의 일 실시 예에 따른 배터리 팩(1)과 상위 시스템에 포함되어 있는 상위 제어기(2)를 포함하는 배터리 제어 시스템을 개략적으로 나타낸다.
도 1에 도시된 바와 같이, 배터리 팩(1)은 하나의 이상의 배터리 셀로 이루어지고 충방전 가능한 복수의 배터리 모듈(10)과, 복수의 배터리 모듈(10)의 (+) 단자 측 또는 (-) 단자 측에 직렬로 연결되어 배터리 모듈(10)의 충방전 전류 흐름을 제어하기 위한 스위칭부(14)와, 배터리 팩(1)의 전압, 전류, 온도 등을 모니터링하여, 과충전 및 과방전 등을 방지하도록 제어 관리하는 배터리 관리 시스템(20)(예를 들면, BMS)을 포함한다.
여기서, 스위칭부(14)는 복수의 배터리 모듈(10)의 충전 또는 방전에 대한 전류 흐름을 제어하기 위한 반도체 스위칭 소자로서, 예를 들면, 배터리 팩(1)의 사양에 따라서 적어도 하나의 MOSFET이나 릴레이, 마그네틱 접촉기 등이 이용될 수 있다.
또한, 배터리 관리 시스템(20)은, 배터리 팩(1)의 전압, 전류, 온도 등을 모니터링하기 위해서, 반도체 스위칭 소자의 게이트, 소스 및 드레인 등의 전압 및 전류를 측정하거나 계산할 수 있다. 또한, 배터리 관리 시스템(20)은 반도체 스위칭 소자에 인접해서 마련된 센서(12)를 이용하여 배터리 팩(1)의 전류를 측정할 수 있다. 여기서, 센서(12)는 후술하는 전압 측정부에 해당할 수 있다.
배터리 관리 시스템(20)은 상술한 각종 파라미터를 측정한 값을 입력받는 인터페이스로서, 복수의 단자와, 이들 단자와 연결되어 입력받은 값들의 처리를 수행하는 회로 등을 포함할 수 있다. 또한, 배터리 관리 시스템(20)은, 스위칭부(14) 예를 들어 MOSFET의 ON/OFF를 제어할 수도 있으며, 배터리 모듈(10)에 연결되어 배터리 모듈(10) 각각의 상태를 감시할 수 있다.
한편, 본 발명의 배터리 관리 시스템(20)에서는 이하에서 후술하는 바와 같이 배터리 팩(1)에 연결된 측정 회로를 이용하여 측정된 데이터에 기초하여 저항 산출 프로그램을 통해 배터리 팩(1)의 절연 저항을 산출할 수 있다.
상위 제어기(2)는 배터리 관리 시스템(20)으로 배터리 모듈(10)에 대한 제어 신호를 전송할 수 있다. 이에 따라, 배터리 관리 시스템(20)은 상위 제어기로부터 인가되는 신호에 기초하여 동작이 제어될 수 있을 것이다. 한편, 본 발명의 배터리 셀은 차량이나 ESS(Energy Storage System)에 이용되는 배터리 모듈(10)에 포함된 구성일 수 있다. 예를 들면, 상위 제어기(2)는 ESS 제어기일 수 있을 것이다. 다만, 배터리 팩(1)이 이러한 용도에 반드시 한정되는 것은 아니다.
이와 같은 배터리 팩(1)의 구성 및 배터리 관리 시스템(20)의 구성은 공지된 구성이므로, 보다 구체적인 설명은 생략하기로 한다.
도 2는 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치의 구성을 나타내는 블록도이다.
도 2를 참조하면, 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치(200)는 측정 회로(210), 전압 측정부(220), 절연 저항 산출부(230) 및 저장부(240)를 포함할 수 있다. 예를 들면, 도 2에 나타낸 배터리 저항 산출 장치(200)는 배터리 팩의 배터리 관리 시스템(BMS)에 포함된 구성일 수 있다.
측정 회로(210)는 배터리 팩의 (+) 단자 및 (-) 단자 중 하나의 단자와, 샤시 사이에 측정 회로를 연결될 수 있다. 예를 들면, 측정 회로(210)와 연결되는 샤시는 차량에 구비된 샤시를 포함할 수 있다.
또한, 측정 회로(210)는 직렬 연결된 측정 저항과 스위치를 포함하고, 배터리 팩의 절연 저항에 병렬로 접속될 수 있다. 또한, 측정 회로(210)는 측정 저항과 스위치에 병렬로 접속된 전압 분배용 저항을 더 포함할 수 있다. 예를 들어, 전압 측정부(220)의 측정 저항과 스위치는 배터리 팩의 절연 저항 각각 병렬로 연결될 수 있으며, 전압 분배용 저항은 절연 저항 중 하나에 병렬로 연결될 수 있다. 또한, 전압 분배용 저항은 측정 회로(210)의 전압을 분배하여 측정 가능한 레벨로 조정하는 역할을 할 수 있다.
전압 측정부(220)는 측정 회로로부터의 전압을 측정할 수 있다. 예를 들면, 전압 측정부(220)는 측정 회로(210)의 전압 분배용 저항 측에 연결되는 배터리 관리 시스템의 센서일 수 있다.
절연 저항 산출부(230)는 전압 측정부(220)에서 측정된 전압에 기초하여 배터리 팩의 절연 저항을 산출할 수 있다. 이 경우, 절연 저항 산출부(230)는 측정 회로(210)에 포함된 스위치의 스위칭 상태에 따른 적어도 하나의 등가 회로를 이용하여 배터리 팩의 절연 저항을 산출할 수 있다. 이에 관해서는 도 4b에서 후술한다.
또한, 절연 저항 산출부(230)는 산출된 절연 저항이 미리 설정된 임계치(예를 들면, 100kΩ) 미만인 경우, 배터리 팩의 시간에 따른 전압 변화량에 기초하여 절연 저항을 재산출할 수 있다. 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치(200)와 같이 배터리 팩의 (+) 또는 (-) 단자 중 하나의 단자에만 측정 회로(210)가 마련된 경우, 비대칭성에 의해 일정한 값 미만의 절연 저항에 대해서는 정확도가 떨어질 수 있다. 따라서, 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치(200)에서는 이러한 한계점을 고려하여 임계치 미만의 절연 저항 산출치에 대해서는 별도의 방법을 통해 절연 저항을 다시 산출하도록 하고 있다.
구체적으로, 절연 저항 산출부(230)는 산출된 절연 저항이 미리 설정된 임계치 미만인 경우, 배터리 팩의 시간에 따른 전압 변화량을 이용하여 배터리 팩의 용량 변화량을 계산함으로써 절연 저항을 재산출할 수 있다. 이 때, 절연 저항 산출부(230)는, 예를 들면 저장부(240)에 사전 저장된 OCV-SOC 테이블에 기초하여 배터리 팩의 용량 변화량을 산출할 수 있다.
또한, 절연 저항 산출부(230)는 배터리 팩의 용량 변화량으로부터 누설 전류를 계산하고, 배터리 팩의 시간에 따른 전압 변화량과 누설 전류에 기초하여 절연 저항을 재산출할 수 있다.
예를 들면, 절연 저항 산출부(230)는 산출된 절연 저항이 미리 설정된 임계치 미만인 경우, 배터리 팩의 이전 구동 완료 시점(예를 들어, 차량의 이전 시동 오프 시점)의 전압과 배터리 팩의 구동 시작 전 시점(예를 들면, 차량의 시동 온 시점)의 전압 차이값에 기초하여 절연 저항을 재산출할 수 있다.
또한, 절연 저항 산출부(230)는 산출된 절연 저항이 미리 설정된 임계치 미만인 경우, 배터리 팩의 이전 구동 완료 시점의 전압과 배터리 팩의 이전 구동 완료 시점으로부터 미리 설정된 시간 경과 후 배터리 관리 시스템 등에 의해 웨이크업되는 배터리 팩의 전압의 차이값에 기초하여 절연 저항을 재산출할 수 있다. 이 때, 배터리 팩의 이전 구동 완료 시점으로부터의 미리 설정된 시간은 RTC(real-time clock)을 통해 측정될 수 있다.
이상에서 설명한 것과 같이, 절연 저항 산출부(230)가 절연 저항이 미리 설정된 임계치 미만인 경우에 대해 절연 저항을 재산출하는 방법은 다양할 수 있으며, 그 예시적인 과정에 관해서는 도 5에서 자세하게 후술한다.
저장부(240)는 전압 측정부(220)에 의해 측정된 전압 데이터, 이에 기초하여 산출된 절연 저항 데이터, 배터리 팩의 용량 변화량 및 누설 전류값 등의 각종 데이터들을 저장할 수 있다. 또한, 저장부(240)는 OCV-SOC 테이블을 저장할 수 있다. 그러나, 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치(200)가 반드시 저장부(240)를 포함해야 하는 것은 아니며, 통신부(미도시)를 포함하고 이를 통해 외부 서버의 데이터베이스로부터 데이터를 송수신하도록 구성될 수 있을 것이다.
한편, 도 2에는 나타내지 않았으나, 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치는 알람부(미도시)를 더 포함할 수 있다. 알람부는 절연 저항 산출부(230)에 의해 산출된 절연 저항이 미리 설정된 기준 범위를 벗어난 경우 사용자에게 경고 알람을 제공할 수 있다. 예를 들어, 알람부는 램프를 통해 시각 신호로 경고 알림을 제공하거나, 스피커를 통해 경고 알림음 또는 메시지를 생성하는 등 다양한 방식으로 사용자에게 경고 알람을 제공할 수 있다. 따라서, 사용자를 절연 저항으로 인해 발생하는 감전 사고 등의 위험으로부터 보호할 수 있다.
이와 같이, 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치에 의하면, 배터리 팩의 (+) 또는 (-) 단자 중 하나의 단자와 샤시 사이에만 측정 회로(210)를 연결함으로써, 배터리 관리 시스템의 크기를 축소시키고 비용을 절감할 수 있다. 또한, 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치에 의하면, 측정 회로(210) 중 하나의 구간을 제거하더라도 기존의 측정 회로와 실질적으로 동등한 성능을 구현할 수 있다.
도 3a는 종래의 배터리 팩에서 절연 저항을 산출하는 것을 나타내는 도면이다. 또한, 도 3b는 종래의 배터리 팩에서 절연 저항을 산출하기 위한 등가 회로를 나타내는 도면이다.
도 3a를 참조하면, Rp 및 Rn(10)은 배터리 팩의 절연 저항을 나타내고, R1 및 R2는 측정 회로의 측정 저항 및 스위치(110a)를 나타내며, Rm1 및 Rm2는 전압 분배용 저항(110b)을 나타낸다. 또한, 저항 Rm1과 Rm2 사이에는 측정용 단자(110c)가 마련되어 있다.
도 3a에 나타낸 것과 같이, 종래에는 배터리 팩의 (+) 단자와 (-) 단자 양측 모두에 측정 저항 및 스위치(110a)를 연결하고, 양 단자의 스위치를 교대로 온/오프 제어하여 R1과 R2를 순차적으로 연결함으로써 배터리 팩의 전압을 측정하였다.
구체적으로, 도 3b를 참조하면, 도 3a의 측정 저항 R1 측 스위치와 R2 측 스위치를 교대로 온 또는 오프로 하여 전압을 측정하기 위한 등가 회로를 나타내고 있다. 이처럼 도 3b의 (a)와 (b)에 대해 전압 측정용 단자(110c)에서 측정된 값과 절연 저항의 산출식은 다음과 같이 정리하여 나타낼 수 있다.
Figure PCTKR2021010384-appb-M000001
Figure PCTKR2021010384-appb-M000002
(여기서, Rp, Rn은 각각 배터리 팩의 (+) 및 (-) 측 절연 저항, R1, R2는 측정 회로의 측정 저항, E는 Rm1+Rm2, C는 배터리 팩 전압, D는 Rm2/(Rm1+Rm2), A는 등가 회로 (a)의 측정용 단자 측 전압, B는 등가 회로 (b)의 측정용 단자 측 전압을 나타냄)
상기 수학식 1 및 수학식 2를 정리하면, 절연 저항은 다음과 같이 산출될 수 있다.
Figure PCTKR2021010384-appb-M000003
Figure PCTKR2021010384-appb-I000001
이처럼, 종래의 절연 저항 산출 방식에 따르면, 비교적 절연 저항을 정확하게 산출할 수는 있으나 측정 저항과 스위치 등으로 인해 측정 회로의 크기가 증가하고 비용이 많이 소요될 수 밖에 없다. 따라서, 이하에서 설명하는 것과 같이 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치에서는 배터리 팩의 일단에 마련된 측정 저항과 스위치를 생략하여 절연 저항을 산출할 수 있다.
도 4a는 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치를 이용하여 배터리 팩의 절연 저항을 산출하는 것을 나타내는 도면이다. 또한, 도 4b는 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치를 이용하여 배터리 팩의 절연 저항을 산출하기 위한 등가 회로를 나타내는 도면이다.
도 4a를 참조하면, 도 3a와 마찬가지로 Rp 및 Rn(20)은 배터리 팩의 절연 저항을 나타내고, R1 및 R2는 측정 회로의 측정 저항 및 스위치(210a)를 나타내며, Rm1 및 Rm2는 전압 분배용 저항(210b)을 나타낸다. 또한, 저항 Rm1과 Rm2 사이에는 측정용 단자(210c)가 마련되어 있다.
도 4a에 나타낸 것과 같이, 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치에서는 배터리 팩의 (+) 단자와 (-) 단자 중 하나의 단자에만 측정 저항 및 스위치(210a)를 연결하고, 이러한 스위치를 온/오프 제어하여 R1을 연결 또는 차단함으로써 배터리 팩의 전압을 측정할 수 있다.
구체적으로, 도 4b를 참조하면, 도 4a의 측정 저항 R1 측 스위치를 온/오프 제어함으로써 전압을 측정하기 위한 등가 회로를 나타내고 있다. 이처럼 도 4b의 (a)와 (b)에 대해 전압 측정용 단자(210c)에서 측정된 값과 절연 저항의 산출식은 다음과 같이 정리하여 나타낼 수 있다.
Figure PCTKR2021010384-appb-M000004
Figure PCTKR2021010384-appb-M000005
(여기서, Rp, Rn은 각각 배터리 팩의 (+) 및 (-) 측 절연 저항, R1, R2는 측정 회로의 측정 저항, E는 Rm1+Rm2, C는 배터리 팩 전압, D는 Rm2/(Rm1+Rm2), A는 등가 회로 (a)의 측정용 단자 측 전압, B는 등가 회로 (b)의 측정용 단자 측 전압을 나타냄)
상기 수학식 1 및 수학식 2를 정리하면, 절연 저항은 다음과 같이 산출될 수 있다.
Figure PCTKR2021010384-appb-M000006
Figure PCTKR2021010384-appb-I000002
이와 같이, 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치에 의하면, 배터리 팩의 (+) 또는 (-) 단자 중 하나의 단자와 샤시 사이에만 측정 회로를 연결함으로써, 배터리 관리 시스템의 크기를 축소시키고 비용을 절감할 수 있다. 또한, 본 발명의 일 실시 예에 따른 배터리 저항 산출 방법에 의하면, 측정 회로 중 하나의 구간을 제거하더라도 기존의 측정 회로와 실질적으로 동등한 성능을 구현할 수 있다.
다만, 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치는 배터리 팩의 (+) 또는 (-) 단자 중 하나의 측정 회로를 생략하였으므로 회로의 비대칭성으로 인해 종래의 방식에 비해 측정 정확도가 떨어지는 문제가 있다. 이러한 문제는 주로 산출된 절연 저항값이 작아질수록 두드러지는데, 이처럼 절연 저항이 작은 경우에 대해 측정 정확도를 향상시키기 위해 산출된 절연 저항이 임계치(예를 들면, 100kΩ) 미만이 되는 경우 배터리 팩의 전압을 일정 시간 동안 측정하고, 누설 전류를 계산하여 절연 저항을 재산출할 수 있다. 이에 관해서는 이하에서 설명한다.
도 5는 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치에서 절연 저항을 산출하기 위한 배터리 팩의 OCV-SOC 테이블(그래프)을 나타내는 도면이다. 도 5에서 x축은 SOC(state of charge)(%)를 나타내고, y축은 OCV(open circuit voltage)(V)를 나타낸다.
도 5에서는 산출된 절연 저항이 미리 설정된 임계치보다 미만인 경우에 관하여 설명한다. 예를 들어, 차량에 탑재된 배터리 팩의 경우라면 도 5에서 차량의 시동을 오프시켰을 시점에 측정된 배터리 팩 전압(V1)이 500V이고, 차량의 시동을 다시 온으로 하였을 시점에 측정된 배터리 팩의 전압(V2)이 400V라고 가정한다.
이러한 경우, 도 5에 나타낸 OCV-SOC 테이블을 참조하면 배터리 팩의 용량 변화량은 총 500Ah에 대해 100Ah임을 알 수 있다. 또한, 차량이 주차되어 있던 시간(Δt)이 100시간이라고 하면, 배터리의 누설 전류(i)는 배터리 용량 변화량/시간 변화량이므로, 100Ah/100h = 1A임을 알 수 있다. 이처럼, 배터리 팩의 전압 변화량(V1-V2)과 누설 전류(i)에 기초하여 계산하면, 절연 저항은 100V/1A= 100Ω으로 산출될 수 있다.
한편, 도 5에서는 차량의 시동이 오프된 시점과 다시 온으로 된 시점에서의 배터리 팩 전압 차이를 산출하였으나, 시동이 온으로 되기 전에 차량이 주차 중인 경우에 대해서도 RTC를 이용하여 일정 시간 경과 후 배터리 팩을 웨이크업한 경우에도 이상에서 설명한 것과 동일한 방법으로 절연 저항을 산출해낼 수 있다.
도 6은 본 발명의 일 실시 예에 따른 배터리 저항 산출 방법을 나타내는 흐름도이다.
도 6을 참조하면, 먼저 배터리 팩의 (+) 단자 및 (-) 단자 중 하나의 단자와 샤시 사이에 측정 회로를 연결하여 전압을 측정한다(S110). 예를 들면, 단계 S110에서의 측정 회로는 측정 저항과 스위치를 포함할 수 있고, 추가적으로 전압 분배용 저항을 더 포함할 수 있다.
그리고, 측정된 전압에 기초하여 배터리 팩의 절연 저항을 산출한다(S120). 이 경우, 단계 S120에서는 측정 회로에 포함된 스위치의 스위칭 상태에 따른 적어도 하나의 등가 회로를 이용하여 배터리 팩의 절연 저항을 산출할 수 있다. 이에 관해서는 도 4a 및 4b에서 설명하였으므로, 자세한 설명은 생략한다.
다음으로, 산출된 절연 저항이 미리 설정된 임계치(예를 들면, 10kΩ) 미만인지 판단한다(S130). 만약, 절연 저항이 임계치 이상인 경우(NO), 산출된 절연 저항을 최종값으로 결정한다.
반면, 산출된 절연 저항이 미리 설정된 임계치 미만인 경우(YES), 배터리 팩의 시간에 따른 전압 변화량에 기초하여 절연 저항을 재산출할 수 있다. 구체적으로, 먼저 배터리 팩의 시간에 대한 전압 변화량을 측정한다(S140). 이 때, 배터리 팩의 시간에 대한 전압 변화량은 배터리 팩의 이전 구동 완료 시점으로부터 다음 구동 시작 시점 사이의 전압 변화량 또는 배터리 팩의 이전 구동 완료 시점으로부터 일정 시간 후에 배터리 팩이 웨이크업되는 시점 사이의 전압 변화량 등을 측정할 수 있다.
그리고, 배터리 팩의 시간에 대한 전압 변화량에 기초하여 배터리 팩의 용량 변화량을 산출한다(S150). 이 때, 단계 S150에서는 사전 저장된 OCV-SOC 테이블에 기초하여 배터리 팩의 용량 변화량을 산출할 수 있다.
또한, 산출된 배터리 팩의 용량 변화량에 기초하여 누설 전류를 계산한다(S160). 그리고, 단계 S140에 산출된 배터리 팩의 전압 변화량과 단계 S160에서 산출된 누설 전류에 기초하여 절연 저항을 재산출한다(S170).
이처럼, 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치는 배터리 팩의 (+) 또는 (-) 단자 중 하나의 단자에만 측정 회로가 마련되어 있어, 비대칭성에 의해 일정한 값 미만의 절연 저항에 대해서는 정확도가 떨어질 수 있다. 따라서, 본 발명의 일 실시 예에 따른 배터리 저항 산출 방법에서는 이러한 한계점을 고려하여 임계치 미만의 절연 저항 산출치에 대해서는 단계 S140 내지 S170에 나타낸 방법을 통해 보다 정확한 절연 저항을 다시 산출할 수 있다.
이와 같이, 본 발명의 일 실시 예에 따른 배터리 저항 산출 방법에 의하면, 배터리 팩의 (+) 또는 (-) 단자 중 하나의 단자와 샤시 사이에만 측정 회로를 연결함으로써, 배터리 관리 시스템의 크기를 축소시키고 비용을 절감할 수 있다. 또한, 본 발명의 일 실시 예에 따른 배터리 저항 산출 방법에 의하면, 측정 회로 중 하나의 구간을 제거하더라도 기존의 측정 회로와 실질적으로 동등한 성능을 구현할 수 있다.
도 7은 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치의 하드웨어 구성을 나타내는 블록도이다.
도 7을 참조하면, 본 발명의 일 실시 예에 따른 배터리 저항 산출 장치(300)는 MCU(310), 메모리(320), 입출력 I/F(330) 및 통신 I/F(340)를 포함할 수 있다.
MCU(310)는 메모리(320)에 저장되어 있는 각종 프로그램(예를 들면, 배터리 전압 측정 프로그램, 배터리 절연 저항 산출 프로그램 등)을 실행시키고, 이러한 프로그램들을 통해 배터리 팩의 절연 저항 산출 등을 위한 각종 데이터를 처리하며, 전술한 도 2의 기능들을 수행하도록 하는 프로세서일 수 있다.
메모리(320)는 배터리 셀의 전압 측정, 절연 저항 산출 등에 관한 각종 프로그램을 저장할 수 있다. 또한, 메모리(720)는 배터리의 측정 전압, 절연 저항 데이터, 용량 변화량, 누설 전류값, OCV-SOC 테이블 등 각종 데이터를 저장할 수 있다.
이러한 메모리(320)는 필요에 따라서 복수 개 마련될 수도 있을 것이다. 메모리(320)는 휘발성 메모리일 수도 있으며 비휘발성 메모리일 수 있다. 휘발성 메모리로서의 메모리(320)는 RAM, DRAM, SRAM 등이 사용될 수 있다. 비휘발성 메모리로서의 메모리(320)는 ROM, PROM, EAROM, EPROM, EEPROM, 플래시 메모리 등이 사용될 수 있다. 상기 열거한 메모리(320)들의 예를 단지 예시일 뿐이며 이들 예로 한정되는 것은 아니다.
입출력 I/F(330)는, 키보드, 마우스, 터치 패널 등의 입력 장치(미도시)와 디스플레이(미도시) 등의 출력 장치와 MCU(310) 사이를 연결하여 데이터를 송수신할 수 있도록 하는 인터페이스를 제공할 수 있다.
통신 I/F(340)는 서버와 각종 데이터를 송수신할 수 있는 구성으로서, 유선 또는 무선 통신을 지원할 수 있는 각종 장치일 수 있다. 예를 들면, 통신 I/F(340)를 통해 별도로 마련된 외부 서버로부터 배터리 팩의 전압 측정과 절연 저항 산출을 위한 프로그램이나 각종 데이터 등을 송수신할 수 있다.
이와 같이, 본 발명의 일 실시 예에 따른 컴퓨터 프로그램은 메모리(320)에 기록되고, MCU(310)에 의해 처리됨으로써, 예를 들면 도 2에서 도시한 각 기능 블록들을 수행하는 모듈로서 구현될 수도 있다.
이상에서, 본 발명의 실시예를 구성하는 모든 구성 요소들이 하나로 결합하거나 결합하여 동작하는 것으로 설명되었다고 해서, 본 발명이 반드시 이러한 실시예에 한정되는 것은 아니다. 즉, 본 발명의 목적 범위 안에서라면, 그 모든 구성 요소들이 하나 이상으로 선택적으로 결합하여 동작할 수도 있다.
또한, 이상에서 기재된 "포함하다", "구성하다" 또는 "가지다" 등의 용어는, 특별히 반대되는 기재가 없는 한, 해당 구성 요소가 내재할 수 있음을 의미하는 것이므로, 다른 구성 요소를 제외하는 것이 아니라 다른 구성 요소를 더 포함할 수 있는 것으로 해석되어야 한다. 기술적이거나 과학적인 용어를 포함한 모든 용어들은, 다르게 정의되지 않는 한, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자에 의해 일반적으로 이해되는 것과 동일한 의미가 있다. 사전에 정의된 용어와 같이 일반적으로 사용되는 용어들은 관련 기술의 문맥상의 의미와 일치하는 것으로 해석되어야 하며, 본 발명에서 명백하게 정의하지 않는 한, 이상적이거나 과도하게 형식적인 의미로 해석되지 않는다.
이상의 설명은 본 발명의 기술 사상을 예시적으로 설명한 것에 불과한 것으로서, 본 발명이 속하는 기술 분야에서 통상의 지식을 가진 자라면 본 발명의 본질적인 특성에서 벗어나지 않는 범위에서 다양한 수정 및 변형이 가능할 것이다. 따라서, 본 발명에 개시된 실시예들은 본 발명의 기술 사상을 한정하기 위한 것이 아니라 설명하기 위한 것이고, 이러한 실시예에 의하여 본 발명의 기술 사상의 범위가 한정되는 것은 아니다. 본 발명의 보호 범위는 아래의 청구 범위에 의하여 해석되어야 하며, 그와 동등한 범위 내에 있는 모든 기술 사상은 본 발명의 권리 범위에 포함되는 것으로 해석되어야 할 것이다.

Claims (10)

  1. 배터리 팩의 (+) 단자 및 (-) 단자 중 하나의 단자와, 샤시 사이에 연결되는 측정 회로;
    상기 측정 회로로부터 전압을 측정하는 전압 측정부; 및
    상기 전압 측정부에서 측정된 전압에 기초하여 상기 배터리 팩의 절연 저항을 산출하는 절연 저항 산출부를 포함하고,
    상기 절연 저항 산출부는 산출된 절연 저항이 미리 설정된 임계치 미만인 경우, 상기 배터리 팩의 시간에 따른 전압 변화량에 기초하여 상기 절연 저항을 재산출하는 배터리 저항 산출 장치.
  2. 청구항 1에 있어서,
    상기 측정 회로는 직렬 연결된 측정 저항과 스위치를 포함하고, 상기 측정 저항과 상기 스위치는 상기 절연 저항에 병렬로 접속된 배터리 저항 산출 장치.
  3. 청구항 2에 있어서,
    상기 측정 회로는 상기 배터리 팩의 절연 저항 중 하나에 병렬로 접속된 전압 분배용 저항을 더 포함하는 배터리 저항 산출 장치.
  4. 청구항 1에 있어서,
    상기 절연 저항 산출부는 산출된 절연 저항이 미리 설정된 임계치 미만인 경우, 상기 배터리 팩의 시간에 따른 전압 변화량을 이용하여 상기 배터리 팩의 용량 변화량을 계산함으로써 상기 절연 저항을 재산출하는 배터리 저항 산출 장치.
  5. 청구항 4에 있어서,
    상기 절연 저항 산출부는 상기 배터리 팩의 용량 변화량으로부터 누설 전류를 계산하고, 상기 배터리 팩의 시간에 따른 전압 변화량과 상기 누설 전류에 기초하여 상기 절연 저항을 재산출하는 배터리 저항 산출 장치.
  6. 청구항 4에 있어서,
    상기 절연 저항 산출부는 사전 저장된 OCV-SOC 테이블에 기초하여 상기 배터리 팩의 용량 변화량을 산출하는 배터리 저항 산출 장치.
  7. 청구항 1에 있어서,
    상기 절연 저항 산출부는 산출된 절연 저항이 미리 설정된 임계치 미만인 경우, 상기 배터리 팩의 이전 구동 완료 시점의 전압과 상기 배터리 팩의 구동 시작 전 시점의 전압 차이값에 기초하여 상기 절연 저항을 재산출하는 배터리 저항 산출 장치.
  8. 청구항 1에 있어서,
    상기 절연 저항 산출부는 산출된 절연 저항이 미리 설정된 임계치 미만인 경우, 상기 배터리 팩의 이전 구동 완료 시점의 전압과 상기 배터리 팩의 이전 구동 완료 시점으로부터 미리 설정된 시간 경과 후 웨이크업되는 상기 배터리 팩의 전압의 차이값에 기초하여 상기 절연 저항을 재산출하는 배터리 저항 산출 장치.
  9. 청구항 8에 있어서,
    상기 배터리 팩의 이전 구동 완료 시점으로부터의 미리 설정된 시간은 RTC(real-time clock)을 통해 측정되는 배터리 저항 산출 장치.
  10. 배터리 팩의 (+) 단자 및 (-) 단자 중 하나의 단자와, 샤시 사이에 측정 회로를 연결하여 전압을 측정하는 단계; 및
    측정된 전압에 기초하여 상기 배터리 팩의 절연 저항을 산출하는 단계를 포함하고,
    상기 배터리 팩의 절연 저항을 산출하는 단계는 산출된 절연 저항이 미리 설정된 임계치 미만인 경우, 상기 배터리 팩의 시간에 따른 전압 변화량에 기초하여 상기 절연 저항을 재산출하는 배터리 저항 산출 방법.
PCT/KR2021/010384 2020-09-22 2021-08-06 배터리 저항 산출 장치 및 방법 WO2022065676A1 (ko)

Priority Applications (4)

Application Number Priority Date Filing Date Title
EP21872708.9A EP4174506A4 (en) 2020-09-22 2021-08-06 DEVICE AND METHOD FOR CALCULATION OF BATTERY RESISTANCE
US18/017,814 US20230280409A1 (en) 2020-09-22 2021-08-06 Apparatus and method for calculating battery resistance
CN202180057683.2A CN116194786A (zh) 2020-09-22 2021-08-06 用于计算电池电阻的装置和方法
JP2023504608A JP7475769B2 (ja) 2020-09-22 2021-08-06 バッテリ抵抗算出装置および方法

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2020-0122615 2020-09-22
KR1020200122615A KR102673263B1 (ko) 2020-09-22 2020-09-22 배터리 저항 산출 장치 및 방법

Publications (1)

Publication Number Publication Date
WO2022065676A1 true WO2022065676A1 (ko) 2022-03-31

Family

ID=80846678

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2021/010384 WO2022065676A1 (ko) 2020-09-22 2021-08-06 배터리 저항 산출 장치 및 방법

Country Status (6)

Country Link
US (1) US20230280409A1 (ko)
EP (1) EP4174506A4 (ko)
JP (1) JP7475769B2 (ko)
KR (1) KR102673263B1 (ko)
CN (1) CN116194786A (ko)
WO (1) WO2022065676A1 (ko)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20220038921A (ko) * 2020-09-21 2022-03-29 주식회사 엘지에너지솔루션 배터리 팩 내부에서 무선 통신 방법 및 그 방법을 제공하는 마스터 bms
CN117269803B (zh) * 2023-11-21 2024-02-06 江苏林洋亿纬储能科技有限公司 电储能系统电池簇电阻检测系统的无源测量系统及方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015076075A1 (ja) * 2013-11-22 2015-05-28 三菱電機株式会社 絶縁検出器及び電気機器
KR20160110184A (ko) * 2015-03-10 2016-09-21 주식회사 엘지화학 절연저항측정 장치 및 방법
US20190237815A1 (en) * 2018-02-01 2019-08-01 Contemporary Amperex Technology Co., Limited Insulation detection circuit and method, and battery management system
KR101984326B1 (ko) * 2014-01-07 2019-09-03 에스케이이노베이션 주식회사 배터리의 절연 저항 측정 장치 및 방법
KR20200039215A (ko) * 2018-10-05 2020-04-16 주식회사 엘지화학 이차전지 셀의 저전압 진단 방법 및 장치
KR20200122615A (ko) 2019-04-18 2020-10-28 이동일 손가락 착용 스캐너를 위한 스캐너 어댑터

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5552218B2 (ja) * 2008-07-08 2014-07-16 株式会社日立製作所 電源装置
JP2014081267A (ja) 2012-10-16 2014-05-08 Sanyo Electric Co Ltd 電源装置
KR20160046420A (ko) * 2014-10-20 2016-04-29 현대자동차주식회사 차량 배터리 관리 시스템의 릴레이 재접속 방법
US9630520B2 (en) * 2015-01-13 2017-04-25 Ford Global Technologies, Llc Circuit and method for battery leakage detection
DE102015101074B4 (de) * 2015-01-26 2021-10-07 Lisa Dräxlmaier GmbH Verfahren und Vorrichtung zur Bestimmung einer Isolationsgröße sowie Kraftfahrzeug mit dieser Vorrichtung
US9579977B2 (en) * 2015-01-28 2017-02-28 Ford Global Technologies, Llc Bus leakage resistance estimation for electric vehicle
CN109884391A (zh) * 2017-12-04 2019-06-14 宝沃汽车(中国)有限公司 电池包绝缘电阻检测方法、装置及电池管理系统
JP6986004B2 (ja) * 2018-12-03 2021-12-22 株式会社デンソー 絶縁抵抗検出装置
KR20200084517A (ko) * 2019-01-03 2020-07-13 주식회사 엘지화학 절연저항 측정 장치 및 방법

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015076075A1 (ja) * 2013-11-22 2015-05-28 三菱電機株式会社 絶縁検出器及び電気機器
KR101984326B1 (ko) * 2014-01-07 2019-09-03 에스케이이노베이션 주식회사 배터리의 절연 저항 측정 장치 및 방법
KR20160110184A (ko) * 2015-03-10 2016-09-21 주식회사 엘지화학 절연저항측정 장치 및 방법
US20190237815A1 (en) * 2018-02-01 2019-08-01 Contemporary Amperex Technology Co., Limited Insulation detection circuit and method, and battery management system
KR20200039215A (ko) * 2018-10-05 2020-04-16 주식회사 엘지화학 이차전지 셀의 저전압 진단 방법 및 장치
KR20200122615A (ko) 2019-04-18 2020-10-28 이동일 손가락 착용 스캐너를 위한 스캐너 어댑터

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4174506A4

Also Published As

Publication number Publication date
US20230280409A1 (en) 2023-09-07
KR102673263B1 (ko) 2024-06-10
JP2023535441A (ja) 2023-08-17
JP7475769B2 (ja) 2024-04-30
EP4174506A4 (en) 2024-01-03
CN116194786A (zh) 2023-05-30
EP4174506A1 (en) 2023-05-03
KR20220039484A (ko) 2022-03-29

Similar Documents

Publication Publication Date Title
WO2020076127A1 (ko) 배터리 관리 장치 및 방법
WO2018124511A1 (ko) 배터리의 충전 상태를 캘리브레이션하기 위한 배터리 관리 장치 및 방법
KR101497602B1 (ko) 배터리 밸런싱 시스템 및 이를 이용한 배터리 밸런싱 방법
WO2017095066A1 (ko) 언노운 방전 전류에 의한 배터리 셀의 불량 검출 장치 및 방법
WO2012128445A1 (ko) 배터리 팩 연결 제어 장치 및 방법
WO2022065676A1 (ko) 배터리 저항 산출 장치 및 방법
WO2021006566A1 (ko) 배터리 셀 진단 장치 및 방법
WO2020080881A1 (ko) 배터리 관리 장치
WO2018124514A1 (ko) 배터리 관리 장치 및 이를 이용한 리튬인산철 셀의 과전압 보호 방법
WO2021049753A1 (ko) 배터리 진단 장치 및 방법
TWI790872B (zh) 電池管理系統以及電池管理方法
US20220376316A1 (en) Electric quantity measuring apparatus, method, and electronic device
WO2019088746A1 (ko) 배터리 soc 추정 장치 및 방법
WO2019117487A1 (ko) 전압 측정 장치 및 방법
WO2021054618A1 (ko) 배터리 관리 장치, 배터리 관리 방법, 배터리 팩 및 전기 차량
WO2021020817A1 (ko) 배터리 상태 예측 장치 및 배터리 상태 예측 방법
WO2022145830A1 (ko) 배터리 진단 장치, 배터리 진단 방법, 배터리 팩 및 전기 차량
WO2022097931A1 (ko) 배터리 관리 장치 및 방법
WO2021256864A1 (ko) 배터리 관리 시스템, 배터리 관리 방법, 배터리 팩 및 전기 차량
WO2022039505A1 (ko) 배터리 관리 시스템, 배터리 관리 방법, 배터리 팩 및 전기 차량
WO2022035131A1 (ko) 배터리 관리 시스템, 배터리 관리 방법, 배터리 팩 및 전기 차량
WO2019245215A1 (ko) 전류 측정 장치, 전류 측정 방법 및 상기 전류 측정 장치를 포함하는 배터리 팩
WO2019107978A1 (ko) 배터리 팩
WO2021118312A1 (ko) 배터리 관리 시스템, 배터리 팩, 전기 차량 및 배터리 관리 방법
WO2023136512A1 (ko) 배터리 충전 심도 산출 장치 및 그것의 동작 방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21872708

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2023504608

Country of ref document: JP

Kind code of ref document: A

ENP Entry into the national phase

Ref document number: 2021872708

Country of ref document: EP

Effective date: 20230127

NENP Non-entry into the national phase

Ref country code: DE