WO2022010066A1 PCT/KR2021/002879 KR2021002879W WO2022010066A1 WO 2022010066 A1 WO2022010066 A1 WO 2022010066A1 KR 2021002879 W KR2021002879 W KR 2021002879W WO 2022010066 A1 WO2022010066 A1 WO 2022010066A1
Authority
WO
WIPO (PCT)
Prior art keywords
current
value
leakage
ratio
detected
Prior art date
Application number
PCT/KR2021/002879
Other languages
English (en)
French (fr)
Inventor
임종웅
Original Assignee
엘에스일렉트릭 (주)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 엘에스일렉트릭 (주) filed Critical 엘에스일렉트릭 (주)
Publication of WO2022010066A1 publication Critical patent/WO2022010066A1/ko

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H83/00Protective switches, e.g. circuit-breaking switches, or protective relays operated by abnormal electrical conditions otherwise than solely by excess current
    • H01H83/14Protective switches, e.g. circuit-breaking switches, or protective relays operated by abnormal electrical conditions otherwise than solely by excess current operated by imbalance of two or more currents or voltages, e.g. for differential protection
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/52Testing for short-circuits, leakage current or ground faults

Definitions

  • the present invention relates to an earth leakage circuit breaker and a method for controlling the earth leakage circuit breaker.
  • An earth leakage breaker is a device used to prevent the risk of electric shock due to short circuit in a circuit to which a load such as an electric machine is connected.
  • the earth leakage breaker may include a detector for detecting a current from a circuit to which power is supplied and a circuit breaker for opening and closing a contact connected to the circuit and a load, and when a short circuit or a ground fault is detected, the circuit breaker trips. In this way, the connection between the converter and the load can be cut off.
  • a conventional earth leakage breaker converts the detected current into a balanced current or a current (leakage current or ground fault current).
  • the balanced current may mean a current in a balanced state having a value of 0, and may be a current detected in a state in which the leakage or ground fault does not occur.
  • the load can be cut off by classifying it as a ground fault current or as a leakage current based on the magnitude of the peak value.
  • leakage current is a pure sinusoidal AC component current that does not contain a DC component. It can be divided into type A leakage current having a half-wave waveform including only one of polarity and negative polarity. The divided currents are as shown in FIG. 1 .
  • the balanced current is a current flowing in a steady state, and the sum of the input current and the output current is ideally 0, and the output waveform should not be output.
  • a waveform may be output at a time point crossing the zero point.
  • noise generated due to a start current according to a start of a motor or a harmonic generated from an inverter may be included.
  • the noise may be detected in the form of a current signal having a positive or negative value for a short time.
  • the type A leakage current having a large phase angle has a short duration of a waveform having a non-zero value and has a predetermined peak value. This can be similar.
  • the waveform of the 135 degree A-type leakage current with a high high frequency ratio it may be difficult to distinguish the waveform from the balanced current containing noise because the waveform is very similar.
  • An object of the present invention is to provide an earth leakage breaker capable of more precisely distinguishing between a balanced current containing noise and a type A leakage current, and a method for controlling the earth leakage breaker.
  • Another object of the present invention is to provide an earth leakage breaker capable of preventing an erroneous trip operation with respect to a balanced current including noise, and a method for controlling the earth leakage breaker.
  • the earth leakage breaker in order to achieve the above or other objects, includes a current detector for detecting a current flowing in a circuit, and a connection between a circuit and a load when a trip control signal is received Detects positive and negative peak values, rms values, fundamental wave amplitude, and third harmonic ratio from the current detected by the trip unit and the current detection unit, and calculates the average value for a preset period First determining the detected current as either a first leakage current having a preset waveform or a second leakage current having a waveform different from the preset waveform based on a feature detection unit and a ratio of the detected peak values, When it is determined that the detected current is the first leakage current as a result of the first determination, the trip control signal is output to the trip unit based on at least one of the rms value, third harmonic ratio, and fundamental amplitude and the average value. It is characterized in that it comprises a control unit.
  • control unit based on the sensitivity current of the earth leakage breaker, a reference value based on any one of the average magnitudes during the one period of the first leakage currents according to a plurality of different phase control values and outputting the trip control signal based on a result of comparing the reference value with the average value for one period calculated from the detected current signal.
  • the controller sets a smaller value among average magnitudes of the first leakage currents for one period according to the plurality of different phase control values as the reference value.
  • the first leakage currents according to the plurality of different phase control values are a first leakage current whose phase is controlled by 90 degrees or a first leakage current whose phase is controlled by 135 degrees.
  • the sensitivity current of the earth leakage breaker is set differently according to each of the first leakage currents having different phase control values.
  • the feature detection unit detects, from the detected current, a time at which a current signal having a magnitude greater than or equal to a preset value is generated, and calculates a ratio of the detected time and a time corresponding to the one period to an effective current time ratio, and when it is determined that the detected current is the first leakage current as a result of the first determination, the control unit is configured to calculate the first leakage current based on at least one of an average value for one period and the effective current time ratio. It is characterized in that a trip control signal is output.
  • the control unit when the effective current time ratio is greater than the reference ratio as a result of comparing the effective current time ratio with a preset reference ratio, the control unit outputs the trip control signal based on the magnitude average value characterized in that
  • the current detection unit sets a smaller value among the peak values as a reference value, and sets the detected current to the first leakage when a ratio of the calculated peak values exceeds a preset peak value reference ratio It is determined as a current, and when the ratio of the calculated peak values is less than or equal to the reference ratio of the peak value, the detected current is determined as the second leakage current.
  • the reference ratio of the peak value is 1.
  • the control unit based on the determination result according to any one of the first determination process according to the first leakage current and the second determination process according to the second leakage current according to the first determination result
  • the trip control signal is output
  • the first determination process is a process of determining whether leakage current is present based on the rms value and the third harmonic ratio
  • the second determination process includes the magnitude of the fundamental wave and the 3 It is characterized in that it is a process of determining whether leakage current is present based on the harmonic ratio.
  • the controller when the detected current is determined to be a leakage current according to the first determination process, the controller outputs the trip control signal according to a result of comparing the magnitude average value with a preset reference value, or Alternatively, the second determination process is further performed on the detected current, and the trip control signal is output based on a determination result according to the further performed second determination process.
  • the control method of the earth leakage breaker includes the steps of detecting a current flowing in a circuit, and from the detected current, a positive peak value and detecting a negative peak value. According to a ratio of the detected peak values, the detected current is selected from among a first leakage current having a preset waveform or a second leakage current having a waveform different from the preset waveform.
  • the outputting of the trip control signal comprises: comparing the magnitude average value with a preset reference value when the detected current is determined to be the first leakage current as a result of the first determination; outputting the trip control signal based on a determination result according to any one of a first determination process according to the first leakage current and a second determination process according to the second leakage current based on a comparison result characterized in that
  • the reference value is set based on any one of the average magnitudes during the one period of the first leakage currents according to a plurality of different phase control values based on the sensitivity current of the earth leakage breaker It is characterized as a value.
  • the reference value is a smaller value among the average magnitudes of the first leakage currents for one period according to the plurality of different phase control values, and the first value according to the plurality of different phase control values.
  • the leakage currents are characterized as a first leakage current whose phase is controlled by 90 degrees or a first leakage current whose phase is controlled by 135 degrees.
  • the comparing of the magnitude average value with a preset reference value comprises: an effective current time ratio calculated based on a time when a current signal having a magnitude greater than or equal to a preset value is generated from the detected current signal and a preset reference It is characterized in that it is a step of comparing the ratio and comparing the size average value with a preset reference value according to the comparison result.
  • the comparing of the magnitude average value with a preset reference value includes comparing the effective current time ratio with the reference ratio, and when the effective current time ratio is greater than the reference ratio, the magnitude average value and the group value Comparing a set reference value, and outputting a trip control signal according to a determination result according to the second determination process when the effective current time ratio is less than or equal to the reference ratio.
  • the detection in the first determining of the detected current, a smaller value among the peak values is set as a reference value, and when a ratio of the calculated peak values exceeds a preset reference ratio of the peak values, the detection It is characterized in that the step of determining the detected current as the first leakage current, and determining the detected current as the second leakage current when the ratio of the calculated peak values is less than or equal to the reference ratio of the peak values.
  • the reference ratio of the peak value is 1.
  • the outputting of the trip control signal may include, as a result of the first determination, when it is determined that the detected current is the first leakage current, according to a first determination process according to the first leakage current. Determining whether there is a leakage current, as a result of the determination according to the first determination process, comparing the magnitude average value with a preset reference value when the detected current is a leakage current, and comparing the magnitude average value with a preset reference value and outputting the trip control signal according to one result or outputting the trip control signal according to a determination result according to a second determination process according to the second leakage current.
  • the average current signal magnitude for one period is calculated, and the calculated average current signal magnitude is a preset reference value If it is smaller, the detected current can be classified as a balanced current.
  • the present invention has an effect that it is possible to prevent in advance that a trip operation is performed because the balanced current including temporary noise is mistaken for the type A leakage current.
  • 1 is a diagram illustrating an example of classification of leakage current.
  • Figure 2a is a block diagram for explaining the structure of the earth leakage circuit breaker related to the present invention.
  • 2B is a block diagram illustrating an example in which the earth leakage breaker according to the present invention is connected to a circuit.
  • FIG. 3 is an example illustrating an operation process in which the earth leakage breaker according to an embodiment of the present invention performs a trip operation according to a current detection result.
  • 4A and 4B are exemplary views for explaining an average current signal magnitude and an average current signal reference value according to an embodiment of the present invention.
  • FIG. 5 is an example illustrating another operation process in which the earth leakage breaker according to an embodiment of the present invention performs a trip operation according to a current detection result.
  • FIG. 6 is an exemplary view for explaining an effective current time ratio according to an embodiment of the present invention.
  • FIG. 7 is a diagram illustrating an operation process of a ground leakage breaker according to an embodiment of the present invention for classifying whether a type A leakage current is present based on an average current signal magnitude and an effective current time ratio.
  • FIG 8 is an exemplary view for explaining an example in which the detected current is divided into a balanced current by the earth leakage breaker according to the present invention when a current including noise is detected.
  • Figure 2a is a block diagram for explaining the structure of the earth leakage circuit breaker 10 related to the present invention.
  • Figure 2b is a block diagram showing an example in which the earth leakage circuit breaker related to the present invention is connected to the circuit.
  • the earth leakage breaker 10 includes a control unit 100 and a leakage current detection unit 110 that detects a current input to and output from a load through a circuit, and detection A conversion unit 120 for converting the current, a first characteristic detection unit 130 for detecting features for primarily classifying the detected current into a specific type of leakage current, the method according to the primary classification result A second characteristic detection unit 140 for detecting characteristics for determining whether the detected current is a leakage current, a trip unit 150 for performing a trip operation by controlling a switch connected to the electric circuit, and a memory 160 . can be configured.
  • the output unit 170 may be further included.
  • the leakage current detection unit 110 may detect currents flowing through a plurality of circuits.
  • the leakage current detection unit 110 includes a ring-shaped core installed so that a plurality of converters pass therethrough, as shown in FIG. 2B , and a secondary wound around the core to output a current detection signal. It may include a zero current transformer (ZCT) 111 composed of windings.
  • ZCT zero current transformer
  • the zero phase current transformer (ZCT) 111 theoretically, the sum of the electric vectors detected in the converter should be '0' in the normal state, but when a ground fault (electrical leakage) occurs, the sum of the vectors does not become 0.
  • the leakage current flowing through the converter can be detected. That is, in the case of the current flowing in the converter through the zero-phase current transformer (ZCT) 111, when no leakage occurs, the current input to the load and the current outputted are the same, so the current in the balanced state (the magnitude is '0') A current close to ') can be output.
  • ZCT zero phase current transformer
  • the leakage current detection unit 110 may include a shunt resistor 113 for measuring the magnitude of the current signal, and a low-pass filter 112 for removing high-frequency noise that may be mixed in the leakage current detection signal. It may be composed of
  • the detection of the leakage current from three circuits to which the R, S, and T 3 phase currents are supplied has been described as an example, but the present invention is not applied thereto. That is, the present invention can also be applied to a circuit connected to a single-phase load supplied with two of the three-phase currents. That is, of course, the leakage current detection unit 110 may detect a leakage current from all three-phase circuits through which the three-phase current flows, or may detect a leakage current from some of the three-phase circuits.
  • the converter 120 may convert the current detected by the leakage current detector 110 into a digital signal.
  • the converter 120 may include an analog digital converter (ADC) module 121, and the current signal detected by the leakage current detector 110 is sampled through the ADC module 121, and the sampled current signal can be converted into a digital signal in the time domain.
  • the transform unit 120 may include a Discrete Fourier Transform (DFT) module 122, and the DFT module 122 converts a digital signal in the time domain into a digital signal in the frequency domain through discrete Fourier transform. can do.
  • DFT Discrete Fourier Transform
  • the first characteristic detection unit 130 may detect characteristics for classifying the current detected by the leakage current detection unit 110 into a specific type of leakage current. These characteristics are the maximum value of positive (+) or negative (-) of the current signal detected for one period, that is, the peak value or the magnitude of the current signal detected during the first period, or the value of the current signal detected during the one period. It may be a time when a positive or negative current signal equal to or greater than a set level is detected.
  • the first feature detector 130 may include a peak value detector 131 , an average current signal magnitude calculator 132 , and an effective current time ratio calculator 133 .
  • the peak value detection unit 131 determines the maximum value of the current signal having a positive value from the current detected during the one cycle by the leakage current detection unit 110 , that is, the maximum value of the current signal having a positive peak value and a negative value. A value (negative peak value) can be detected.
  • the positive peak value is the current signal detected during the one cycle. It may mean a highest voltage among voltages corresponding to , and the negative peak value may mean a lowest voltage among voltages corresponding to the current signal detected during the first period.
  • the average current signal may mean an average of magnitudes of the detected current signals during the preset one cycle. Accordingly, the average current signal magnitude calculator 132 may calculate the sum of the magnitudes of the current signals detected during the one period, and may calculate the average signal magnitude per preset unit time for the one period.
  • the average current signal magnitude calculator 132 sums up both the positive voltage and the negative voltage detected during the one period. and the summed voltage value may be converted into an average value per unit time during the one cycle.
  • the average current signal level calculator 132 calculates an average of 1 mV per unit time (1 ms) for one period. It is possible to calculate the magnitude of the average current signal that is detected. In this case, the magnitude of the calculated average current signal may be calculated as a positive value through absolute value calculation.
  • the effective current time may mean a time during which a current signal having a magnitude greater than or equal to a preset magnitude is detected during the one cycle. For example, if the effective current is +1 mV or -1 mV, the effective current time may mean a time for which a voltage corresponding to the current signal is +1 mV or more or -1 mV or less is detected.
  • the effective current time ratio calculator 133 calculates a ratio of the effective current time detected for one period and a time corresponding to the one period, and a current signal having a magnitude greater than a preset effective current value for the first period. It is possible to calculate the detected ratio, that is, the effective current time ratio.
  • the first characteristic detection unit 130 may detect various characteristics for determining whether the detected current is a leakage current or a ground fault current according to the type of current detected by the leakage current detection unit 110 . These characteristics may be the magnitude or the root mean square (RMS, Root Mean Square) of the fundamental wave, or the ratio of the third harmonic. It may include a value calculator 142 and a third harmonic ratio calculator 143 .
  • RMS root mean square
  • the fundamental wave may mean a lowest frequency component among frequency components among a plurality of sinusoids for synthesizing a non-sinusoidal wave
  • the fundamental wave magnitude detector 141 may detect the magnitude of the fundamental wave.
  • a fundamental wave 50 Hz in Europe and 60 Hz in Korea are generally used. Accordingly, the fundamental wave size detector 141 detects the size of a frequency component of 60 Hz in Korea and a size of a frequency component of 50 Hz in Europe. can do.
  • the rms value may mean a square root value of a value obtained by averaging the squares of instantaneous values during one period of the same periodic wave as the input AC current.
  • the rms value calculator 142 may calculate an rms value for the current for one period detected by the leakage current detector 110 .
  • the effective value of the AC current is 0.707 times the maximum amplitude, and may mean the same electrical energy as the electrical energy of the DC current corresponding to the RMS value.
  • the third harmonic may mean a harmonic of a frequency that is three times the fundamental wave.
  • the third harmonic ratio may mean a ratio (%) of the third harmonic component with respect to the magnitude of the fundamental component in the frequency domain.
  • the third harmonic ratio calculating unit 143 may calculate the magnitude of the fundamental component and the third harmonic component based on the discrete Fourier result detected by the transforming unit 120 , and based on the calculated ratio of the magnitudes Thus, the third harmonic ratio can be calculated.
  • the trip unit 150 includes an opening/closing unit 153 capable of tripping the contact point between each circuit and the load, and according to the trip control signal output from the control unit 100, it is possible to block the connection between each circuit and the load. have.
  • the trip unit 150 may be configured as a semiconductor switch that is turned on or off according to a gate control signal, such as a thyristor.
  • the switching element 151 may be connected to the controller 100 and may receive a trip control signal as the gate control signal. Accordingly, the switching element 151 may be switched to an on state when a trip control signal is output from the controller 100 .
  • the trip coil unit 152 may include a trip coil that is magnetized when the switching element 151 is in an on state. and an armature that moves by magnetic suction force when the trip coil is energized.
  • the armature of the trip coil unit 152 may serve to trigger the opening/closing unit 153 to trip a contact point between each circuit and the load. Accordingly, when the switching element 151 is turned on, the opening/closing unit 153 may trip a contact point between each circuit and a single-phase load.
  • a trip may mean opening between each circuit and a single-phase load. That is, when the circuit is opened, the connection between the converter and the single-phase load may be cut off.
  • the memory 160 may store various data supporting the function of the earth leakage breaker 10 according to an embodiment of the present invention.
  • the memory 160 divides the current detected by the leakage current detection unit 110 into a specific type of leakage current by the control unit 100 based on the characteristics detected by the first characteristic detection unit 130 according to an embodiment of the present invention.
  • Various data related to the algorithm can be stored.
  • the memory 160 may store control data that can be compared with the features detected by the first feature detection unit 130 .
  • the memory 160 may include a peak value ratio corresponding to a specific leakage current type as a peak reference value, and the magnitude of the average current signal of type A leakage current according to a specific phase control value may be included as a reference value of the average current signal.
  • an effective current value which is a reference for calculating the effective current time, and a time value corresponding to one period, etc. may be stored.
  • the memory 160 stores data related to algorithms for determining the detected current as a leakage current or a ground fault current in different ways based on the features detected by the second feature detection unit 140 .
  • the memory 160 may include information related to a preset fundamental wave, an algorithm for calculating an RMS, and data related to an algorithm for calculating a third harmonic component.
  • various reference data for determining whether the leakage current and the ground fault current may be included.
  • the memory 160 may store a specification of the earth leakage breaker 10 related to the present invention or information related to the specification.
  • the memory 160 may store information on the amount of current allowed by the earth leakage breaker 10 , that is, the sensitivity current.
  • the sensitivity current may mean a current that can be determined as not a leakage current or a ground fault current.
  • the average current signal reference value may be determined according to the magnitude of the sensitivity current of the earth leakage breaker 10, and the magnitude of the sensitivity current may have different values depending on the type of leakage current as a reference.
  • the magnitude of the sensitivity current corresponding to the 90 degree leakage current and the magnitude of the sensitivity current corresponding to the 135 degree leakage current among the type A leakage currents may be set differently from each other. Accordingly, the average current signal reference value corresponding to the 90 degree leakage current (type A) and the average current signal reference value corresponding to the 135 degree leakage current (type A) may be determined differently.
  • control unit 100 may control each connected component, and may control the overall operation of the earth leakage breaker 10 .
  • the control unit 100 may calculate a peak value by controlling the first characteristic detection unit 130 with respect to the current signal detected by the leakage current detection unit 110 . Then, the calculated peak value is compared with a preset peak value ratio, and the current detected by the leakage current detection unit 110 (hereinafter, the current detected current) according to the comparison result is set to either the A type leakage current or the AC type leakage current. One can be judged first.
  • control unit 100 may finally determine whether the currently detected current is a leakage current, a ground fault current, or a balanced current in different ways according to the type of the firstly determined leakage current.
  • a trip control signal for controlling the trip unit 150 may be output.
  • the process of detecting the leakage current may be continued without a trip.
  • a process of finally determining whether the current is a type A leakage current will be referred to as a type A leakage current determination procedure.
  • a process of finally determining whether an AC type leakage current or a balanced current is an AC type leakage current determination process will be referred to as an AC type leakage current determination process.
  • the control unit 100 determines whether the leakage current is present through the A-type leakage current determination process, and according to the final determination result A trip control signal can be output.
  • the control unit 100 may check again whether the currently detected current is an A-type leakage current based on at least one of an average current signal magnitude or an effective current time ratio of the currently detected current signal. . And, as a result of checking again, when the detected current is the A-type leakage current, the trip control signal may be output. On the other hand, if it is determined that the detected current is not the A-type leakage current, the controller 100 may further perform an AC-type leakage current determination process to determine whether the currently detected current is a balanced current or an AC-type leakage current.
  • the current determination process of the controller 100 will be described in more detail with reference to FIG. 3 below.
  • the control unit 100 determines the average current signal magnitude and the effective current time ratio from the current signal of the currently detected current. At least one of them can be calculated. In addition, based on at least one of the calculated average current signal and the effective current time ratio, it may be reconfirmed whether the currently detected current is the A-type leakage current.
  • the control unit 100 determines the current detected as leakage current or ground fault current through either the A-type leakage current determination process or the AC type leakage current determination process, and outputs a trip control signal. have. Alternatively, the trip control signal may not be output by determining the balanced current.
  • the current determination process of the controller 100 will be described in more detail with reference to FIG. 5 .
  • the earth leakage breaker 10 may further include an output unit 170 .
  • the output unit 170 may display a result of determining that the current detected by the current leakage current detection unit 110 is a balanced current, a leakage current, or a ground fault current and whether or not a trip occurs. In this case, if the determination result is leakage current, of course, the output unit 170 may display type A leakage current or AC type leakage current according to the determination result of the detected current.
  • the output unit 170 may further include a wireless communication unit (not shown). In addition, it may be connected to at least one wireless communication device including a preset mobile terminal through the wireless communication unit. In addition, the current determination result and whether the trip operation is performed may be transmitted to at least one wireless communication device through the wireless communication unit.
  • FIG. 3 is an example illustrating an operation process in which the earth leakage breaker 10 performs a trip operation according to a current detection result according to an embodiment of the present invention.
  • 4A and 4B are exemplary views for explaining the average current signal magnitude and the average current signal reference value according to an embodiment of the present invention.
  • the control unit 100 of the earth leakage breaker 10 first detects a current signal (voltage corresponding to the current) from the current flowing through the circuit through the leakage current detection unit 110 . can be detected. Then, the controller 100 may control the converter 120 to convert the current signal detected in analog form into a digital signal in the time domain or into a digital signal in the frequency domain ( S300 ).
  • control unit 100 may detect at least one characteristic for determining whether leakage current from the current signal converted to the digital signal (S302). For example, in step S302, a positive peak value and a negative peak value may be detected from the converted current signal. In addition, at least one of the magnitude of the fundamental wave, the RMS value, and the third harmonic ratio may be calculated. Then, the magnitude of the average current signal is calculated based on the magnitude of the summed current signal during one cycle, or the effective current time ratio is calculated by measuring the time at which a current signal having a magnitude greater than or equal to a preset effective current value is detected during one cycle. can do.
  • the controller 100 may calculate the ratio of the peak values, that is, the peak ratio, based on the magnitude of the positive peak value and the magnitude of the negative peak value among the features detected in step S302. And it may be detected whether the calculated peak ratio exceeds a preset peak reference value (S304). And if the calculated peak ratio is greater than the peak reference value, the control unit 100 may first determine that the currently detected current is an A-type leakage current type.
  • the peak reference value may be '1'.
  • a positive peak value that is, a maximum value of a positive current signal and a negative peak value, that is, a negative current signal
  • the current signal maximum values may be equal to each other. Therefore, the closer to the current having a sinusoidal shape, that is, the AC type leakage current, the closer the peak ratio may be to '1'.
  • the control unit 100 calculates the peak ratio based on the smaller of the two peak values, as the positive current signal and the negative current signal are not symmetrical, the peak ratio is greater than '1'. can have Therefore, if the detected current signal includes only one of a positive polarity component or a negative polarity component, such as type A leakage current, the peak ratio may have a value much greater than '1'.
  • control unit 100 detects the degree to which the current detected through the peak ratio is symmetrical with the positive current signal and the negative current signal, and divides it according to a preset reference value, that is, the peak reference value, so that the currently detected current is Whether it is an AC type leakage current type or an A type leakage current type can be primarily determined.
  • control unit 100 may determine whether the currently detected current is a leakage current (type A leakage current) by comparing the rms value calculated from the currently detected current with a preset reference rms value ( S306 ).
  • step S306 if the rms value calculated from the currently detected current is smaller than the preset reference value, that is, the reference rms value, the control unit 100 controls the current detected current (hereinafter, the current detected in step S300) to equalize current can be identified. Accordingly, the controller 100 may proceed to step S300 again without outputting the trip control signal, and perform the process of detecting the current signal and converting the detected current signal again.
  • the control unit 100 controls the current detected current (hereinafter, the current detected in step S300) to equalize current can be identified. Accordingly, the controller 100 may proceed to step S300 again without outputting the trip control signal, and perform the process of detecting the current signal and converting the detected current signal again.
  • step S306 if the effective value calculated from the currently detected current is greater than the preset reference value, that is, the reference effective value, the controller 100 may determine that the currently detected current is the leakage current.
  • the control unit 100 determines once again whether the currently detected current is a balanced current or a leakage current based on the ratio of 3 harmonics It can be done (S308).
  • the 3rd harmonic reference ratio may be a 3rd harmonic ratio reference value for determining whether a type A leakage current is present, and preferably may be set to 70%.
  • step S308 if the 3 harmonic ratio calculated from the currently detected current signal is smaller than the preset A-type 3 harmonic reference ratio, the control unit 100 can determine that the currently detected current is a balanced current. have.
  • step S308 if the calculated 3rd harmonic ratio is smaller than the preset A-type 3-harmonic reference ratio, the control unit 100 may determine that the currently detected current is the A-type leakage current.
  • the process from step S306 to step S308 will be referred to as the A-type leakage current determination process (S400) for determining the A-type leakage current.
  • step S304 if the calculated peak ratio is less than or equal to a preset peak reference value, the controller 100 may first determine that the currently detected current is an AC type leakage current type.
  • the controller 100 may calculate a ratio between the fundamental wave of the current detected current and the magnitude of the current allowable by the earth leakage breaker 10 , that is, the magnitude ratio of the sensitivity current of the earth leakage breaker 10 . Then, the calculated ratio, that is, the fundamental wave amplitude ratio may be compared with a preset reference ratio (S312).
  • the magnitude ratio of the fundamental wave may be calculated as 60%.
  • the controller 100 may determine that the currently detected current is a balanced current. Then, the controller 100 may not output the trip control signal, and proceed to step S300 to start the process of detecting the current again.
  • the controller 100 may determine that the currently detected current is the leakage current. And if the currently detected current is determined to be a leakage current according to the comparison result of step S312, the control unit 100 determines once again whether the currently detected current is a balanced current or a leakage current based on the ratio of 3 harmonics It can be done (S314).
  • the control unit 100 may compare the ratio of the third harmonic detected from the detected current signal with a preset harmonic reference ratio.
  • the 3rd harmonic reference ratio may be a 3rd harmonic ratio reference value for determining whether an AC type leakage current is present, and preferably may be set to 50%.
  • this is an embodiment of the present invention, and the reference value may be set differently.
  • the former is referred to as the A-type 3-harmonic reference ratio.
  • the latter be referred to as the AC type 3 harmonic reference ratio.
  • step S3144 if the AC type 3 harmonic reference ratio is greater than the ratio of the 3 harmonics detected from the detected current signal, the control unit 100 may determine that the currently detected current is a balanced current. Then, the controller 100 may not output the trip control signal, and proceed to step S300 to start the process of detecting the current again.
  • step S314 if the AC type 3 harmonic reference ratio is less than or equal to the ratio of the 3 harmonics detected from the detected current signal, the controller 100 determines that the current detected current is the leakage current, that is, the AC type leakage current. can be judged that Then, the controller 100 may control the trip unit 150 to output a trip control signal for performing a trip operation (S316).
  • the process from step S312 to step S314 will be referred to as an AC-type leakage current determination process (S450) for determining the AC-type leakage current.
  • the controller 100 determines the magnitude of the average current signal calculated from the currently detected current and the preset average current signal. Reference values may be compared (S310).
  • the average current signal magnitude may mean an average of magnitude values of currents detected during one preset period.
  • the current signal detected during one period (eg, 16 ms) preset by the leakage current detection unit 110 includes both positive and negative values, and the sum of the magnitudes of the positive current signals is +4 mV, negative
  • the sum of magnitudes of the current signals received during the first period may be a current signal having a negative value of -16 mV.
  • the current signal detected by the leakage current detector 110 may be a current signal having an average magnitude of 1 mv (
  • the controller 100 may compare the calculated magnitude of the average current signal with a preset average current signal reference value (S310).
  • the preset average current signal reference value is a sensitive current of the earth leakage breaker 10 , and may vary depending on the amount of current allowable by the earth leakage breaker 10 .
  • 4A and 4B are exemplary views for explaining the average current signal reference value determined according to the size of the allowable current in the earth leakage breaker 10, that is, the sensitivity current.
  • a current in which a DC component is mixed may mean a current signal having either a positive or a negative value.
  • the type A leakage current can be largely divided into 0 degree, 90 degree, and 135 degree A type leakage current according to the waveform.
  • the earth leakage breaker 10 may determine the detected current as a type A leakage current and output a trip control signal.
  • FIG. 4A shows the magnitude of the current signal corresponding to the magnitude of the sensitivity current of the earth leakage breaker 10 in the case of the A-type leakage current.
  • the dotted line graph 400 may mean a 0 degree A-type leakage current corresponding to the sensitivity current magnitude of the earth leakage breaker 10 .
  • the The 90 degree A-type leakage current corresponding to the magnitude of the sensitivity current may have a higher voltage value.
  • the voltage value may correspond to a current value indirectly measured through the shunt resistor.
  • An average current signal magnitude (per unit time) may be calculated.
  • FIG. 4B (b) shows a 135 degree A-type leakage current corresponding to the sensitivity current magnitude of the earth leakage breaker 10 .
  • the 135 degree A-type leakage current since the phase section having a non-zero current value is shorter than the 90-degree A-type leakage current, as shown in the solid line graph 450 shown in (b) of FIG. 4B, a higher voltage value is used. can have
  • the 135 degree A type leakage current corresponding to the sensitivity current of the earth leakage breaker 10 during one cycle.
  • An average current signal magnitude may be calculated.
  • both the 90 degree A type leakage current shown in FIG. 4A and the 135 degree A type leakage current shown in FIG. 4B depend on the sensitivity current size according to the specification of the earth leakage breaker 10, and the sum of the magnitudes of the current signals is may be identical to each other. In addition, as the sum of the magnitudes of the current signals is the same, the magnitudes of the average current signals may be the same.
  • the leakage current breaker 10 may be set to a sensitivity current of different magnitudes according to the type of leakage current.
  • the magnitude of the sensitivity current corresponding to the 90-degree A-type leakage current and the magnitude of the sensitivity current corresponding to the 135-degree A-type leakage current may be different from each other.
  • the average current signal magnitude corresponding to 90 degree A-type leakage current for one cycle (Fig. 4A (b), 90-degree average current signal magnitude) and the average current corresponding to 135 degree A-type leakage current for one cycle
  • the signal magnitude ((b) of FIG. 4B, the average current signal magnitude of 135 degrees) may have different values.
  • control unit 100 of the earth leakage breaker 10 may set any one of the 90 degree average current signal level and the 135 degree average current signal level as the average current signal reference value of step S310.
  • the controller 100 may set a smaller value among the 90 degree average current signal magnitude and the 135 degree average current signal magnitude as the average current signal reference value. And it can be compared with the average current signal magnitude calculated from the currently detected current.
  • step S310 if the average magnitude (average current signal magnitude) for one period calculated from the currently detected current is equal to or greater than the average current signal reference value, the controller 100 controls the current detected current It can be judged that is type A leakage current. Then, the controller 100 may control the trip unit 150 to output a trip control signal for performing a trip operation (S316).
  • step S310 if the average magnitude (average current signal magnitude) for one period of the current signal detected from the leakage current detection unit 110 is smaller than the average current signal reference value, the controller 100 controls the current It can be determined that the detected current is not an A-type leakage current.
  • control unit 100 may determine again whether the current detected leakage current is AC type leakage current through the process of determining whether the current detected current is AC type leakage current (S450) based on the characteristics detected from the detected current. Therefore, the control unit 100 enters the step S312 and further performs the process from steps S312 to S314 to determine whether the currently detected current is a balanced current or a leakage current (AC type leakage current). have.
  • the balanced current including the starting current of the motor or the noise caused by the harmonics of the inverter may be determined as the balanced current in the process (S450) of determining whether the AC type leakage current is present, and accordingly It is possible to further reduce the possibility of trip operation error caused by the balanced current being identified as type A leakage current.
  • the controller 100 may further determine whether the currently detected current is a ground fault current. For example, the controller 100 determines whether the positive or negative peak value of the current detected as a result of the determination in step S312 is greater than a preset reference value for detecting the ground fault current, depending on whether the current detected current is It is also possible to determine whether it is a ground fault current.
  • step S314 determines whether a leakage current is present according to the third harmonic ratio.
  • the controller 100 may immediately proceed to step S316 to output a trip control signal and block the connection between the load and the circuit.
  • the A-type leakage current determination process ( S400 ) may be a preceding process. That is, since both the process of determining the A-type leakage current (S400) and the process of determining the AC-type leakage current (S450) have to go through, the time required to determine the equilibrium current becomes longer, and unnecessary calculations may be further performed. .
  • the process ( S400 ) of determining whether the type A leakage current is present it is of course also possible to first perform the process of determining whether the type A leakage current is present based on the average current signal level. That is, as a result of determining the primary current type in step S304 of FIG. 3 , if the currently detected current is determined to be a type A leakage current, the A type leakage current determination process ( S400 ) or AC by performing the step S310 first It goes without saying that the equilibrium current may be detected through any one of the type leakage current determination process ( S450 ).
  • FIG. 5 is an example illustrating an operation process of the earth leakage breaker 10 according to an embodiment of the present invention in this case.
  • a current may be detected through the leakage current detection unit 110 in step S300 in the same manner as in FIG. 3 , and a peak value, an rms value, a magnitude of a fundamental wave, and a third harmonic ratio from the current detected in step S300 . and various characteristics such as the magnitude of the current signal for one period can be detected.
  • step S304 calculates a peak ratio from the currently detected current and compare the calculated peak ratio with a preset peak reference value, whether the currently detected current is an A-type leakage current or an AC-type leakage current It can be judged first whether or not
  • the control unit 100 determines whether the current detected is a balanced current or a leakage current through the process of determining the AC type leakage current (S450) can do. In addition, it is possible to determine whether the currently detected current is a ground fault current by comparing the peak value with a preset maximum peak value. And if the currently detected current is a leakage current or a ground fault current, the process proceeds to step S316 to output a trip control signal.
  • the control unit 100 proceeds to step S310 and the reference value of the average current signal level for one period for the currently detected current and the preset average current signal level can be compared.
  • the process may proceed to step S316 to output a trip control signal.
  • the controller 100 may perform the process of determining the AC-type leakage current ( S450 ). Further, through the step 450 of determining the AC type leakage current, it is determined whether the currently detected current is a balanced current, and if it is not the balanced current, the process proceeds to step S316 to output a trip control signal.
  • step S310 only rechecking whether the type A leakage current is present (step S310) according to the average current signal magnitude for one cycle has been described.
  • FIG. 6 is an exemplary diagram for explaining such an effective current time ratio.
  • FIG. 6 shows an example of a current signal detected by the leakage current detection unit 110 during one preset period.
  • the detected current signal may have a negative or positive value other than 0 even if it is a balanced current due to problems such as noise or impedance mismatch. Accordingly, when this is detected through the zero-phase current transformer, a current signal having a waveform as shown in FIG. 6 may be detected.
  • the control unit 100 may measure a time for which a current signal having a value greater than or equal to a certain level is detected. That is, when a current signal having a magnitude out of a preset positive (+) voltage value and a negative (-) voltage value is detected, the controller 100 determines that a non-zero current, that is, an effective current, is detected. can do.
  • the effective current time ratio may be calculated by calculating a ratio between a preset time for one period and a time at which the effective current is detected.
  • the controller 100 may reconfirm whether the type A leakage current is present in step S310 based on at least one of the calculated effective current time ratio and the average current signal magnitude.
  • FIG. 7 shows an operation process of classifying type A leakage current based on the average current signal magnitude and the effective current time ratio in step S310 of the present invention.
  • step S310 of FIG. 3 or FIG. 5 starts, the control unit 100 of the earth leakage breaker 10 according to an embodiment of the present invention first has an effective current time ratio and a preset time ratio, that is, A reference time ratio may be compared (S700).
  • the effective current time ratio can be calculated to be very small.
  • the reference time ratio may be set to a very small value (eg, 1 ms). Therefore, if the effective current time ratio is very small to the same extent as or smaller than the preset reference time ratio, the controller 100 can determine that the currently detected current is a balanced current including noise, and immediately determines the AC type leakage current. In the process (S450), it is possible to determine whether a balanced current is present.
  • the controller 100 may calculate the average current signal magnitude from the currently detected current.
  • the process of determining the AC-type leakage current ( S450 ) according to the result of comparing the calculated average current signal magnitude with the preset reference value may be further performed to determine whether a balanced current is present ( FIG. 3 ).
  • the preset reference value may mean a smaller value among average current signal magnitudes for one cycle of type A leakage current according to a plurality of different phase control values according to the sensitivity current of the earth leakage breaker 10 .
  • the sensitivity current may be set differently for each type A leakage current having different phases.
  • the control unit 100 may directly determine the currently detected current as a balanced current. may be
  • step S700 when the effective current time ratio is less than or equal to the reference time ratio in step S700 or the average current signal magnitude is less than or equal to the reference value (average current signal reference value) in step S702, the control unit 100 is shown in FIG. 3 or FIG. 5
  • step S300 of the leakage current detection unit 110 may start the process of detecting the current again. Therefore, since the AC type leakage current determination process is not performed, the trip control signal is not output, and the trip operation may not be performed. Therefore, the state that the load is connected to the converter can be maintained.
  • FIG 8 is an exemplary view for explaining an example in which the detected current is divided into a balanced current by the earth leakage breaker 10 according to the present invention when a current including noise is detected.
  • FIG. 8(a) shows an example in which a motor starting current or a current including noise due to harmonics of an inverter is detected.
  • the noise may appear as a current signal having a positive or negative voltage value greater than or equal to a predetermined value as shown in FIG. 8A .
  • the control unit 100 of the earth leakage breaker 10 When the current as shown in (a) of FIG. 8 is detected, the control unit 100 of the earth leakage breaker 10 according to an embodiment of the present invention first detects a positive or negative peak value, and the smaller of the two values. A peak ratio can be calculated based on . In this case, a positive peak value may be detected as a value close to 0, and a negative peak value has a value corresponding to the maximum voltage of the noise, and thus the peak ratio may be calculated as a value much greater than 1. Therefore, if the peak reference value is '1', the controller 100 may first determine that the currently detected current is an A-type leakage current.
  • the control unit 100 passes through the A-type leakage current determination process (S400) (in the case of FIG. 3 (the A-type leakage current determination process 400)) (assuming the case is determined as type A leakage current) ), or immediately after the first determination (in the case of FIG. 5), the average current signal level and the reference level according to the detected current signal (average current signal reference value) can be compared.
  • S400 A-type leakage current determination process
  • the reference value that is, the magnitude of the average current signal for one cycle for 90 degree A type leakage current or 135 degree leakage current required for trip driving, is as shown in the dotted line graph 800 shown in FIG. may appear
  • the average size is calculated in a time corresponding to one cycle, as shown in Fig. 8 (b) It may appear as a solid line graph 810 in Therefore, it may have a value smaller than the magnitude of the average current signal for one period for the 90 degree A-type leakage current or the 135 degree leakage current as a reference.
  • the control unit 100 of the earth leakage breaker 10 even if the detected current is determined to be a type A leakage current based on the peak ratio, the average current signal level during the one cycle According to the comparison result, the currently detected current may be determined as the equilibrium current. Accordingly, a case in which a trip operation is performed because a current signal including noise is mistaken for an A-type leakage current can be prevented in advance.
  • step S304 since the peak ratio was calculated based on the smaller of the positive peak value and the negative peak value, when the peak ratio is greater than the peak reference value, the type A leakage current is determined, and when the peak ratio is smaller than the peak reference value, the type A leakage current is determined.
  • the configuration to be determined by if the criterion for calculating the peak ratio is different, that is, if the larger of the positive peak value and the negative peak value becomes the standard, if the peak ratio is smaller than the peak reference value, it is determined as type A leakage current, and if it is large, AC Of course, it can be determined by the type leakage current.
  • the step S304 may further include a process of detecting a positive peak value and a negative peak value from the current signal converted in the step S302 for comparison of the peak ratio, and in the step S306, the comparison of the rms value is performed.
  • the method may further include calculating an rms value from the converted current signal.
  • the step S312 may further include the step of detecting the magnitude of the fundamental wave from the converted current signal for comparison of the magnitude of the fundamental wave, and in steps S308 and S314, the converted current signal for comparison of the 3 harmonic ratio
  • the method may further include calculating a third harmonic ratio from In this case, the step S302 may be omitted.
  • the present invention described above can be implemented as computer-readable codes on a medium in which a program is recorded.
  • the computer-readable medium includes all types of recording devices in which data readable by a computer system is stored. Examples of computer-readable media include Hard Disk Drive (HDD), Solid State Disk (SSD), Silicon Disk Drive (SDD), ROM, RAM, CD-ROM, magnetic tape, floppy disk, optical data storage device, etc.
  • HDD Hard Disk Drive
  • SSD Solid State Disk
  • SDD Silicon Disk Drive
  • ROM Read Only Memory
  • RAM Compact Disc
  • CD-ROM Compact Disk Read Only Memory
  • magnetic tape floppy disk
  • optical data storage device etc.
  • carrier wave eg, transmission over the Internet
  • the computer may include the control unit. Accordingly, the above detailed description should not be construed as restrictive in all respects but as exemplary. The scope of the present invention should be determined by a reasonable interpretation of the appended claims, and all modifications within the equivalent scope of the present invention are included in the scope of the present invention.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Breakers (AREA)
  • Emergency Protection Circuit Devices (AREA)

Abstract

본 발명은 누전 차단기 및 그 누전 차단기에 대한 것으로, 전로에 흐르는 전류를 검출하는 전류 검출부와, 트립 제어 신호가 수신되면 전로와 부하 사이의 연결을 차단하는 트립부와, 전류 검출부에서 검출된 전류로부터, 양의 피크값과 음의 피크값, 실효값, 기본파 크기, 3고조파 비율을 검출 및, 기 설정된 1주기 동안의 크기 평균값을 산출하는 특징 검출부 및, 검출된 피크값들의 비율에 근거하여 상기 검출된 전류를, 기 설정된 파형을 가지는 제1 누설 전류 또는 상기 기 설정된 파형과 다른 파형을 가지는 제2 누설 전류 중 어느 하나로 1차 판단하고, 상기 1차 판단 결과 상기 검출된 전류가 상기 제1 누설 전류로 판단되는 경우, 상기 실효값, 3고조파 비율 및 기본파 크기 중 적어도 하나와 상기 크기 평균값에 근거하여 상기 트립 제어 신호를 상기 트립부로 출력하는 제어부를 포함하는 것을 특징으로 한다.

Description

누전 차단기 및 그 누전 차단기의 제어 방법
본 발명은 누전 차단기 및 그 누전 차단기의 제어 방법에 대한 것이다.
누전 차단기는 전동기계기구와 같은 부하가 접속되어 있는 전로에서 누전으로 인한 감전 위험을 방지하기 위해 사용되는 기기이다. 이를 위해 누전 차단기는, 전력이 공급되는 전로로부터 전류를 검출하는 검출부와 상기 전로와 부하가 연결된 접점을 개폐 구동하는 차단부를 포함할 수 있으며, 누전 또는 지락이 검출되는 경우에 상기 차단부의 트립 동작를 수행하여 전로와 부하의 연결을 차단할 수 있다.
한편 통상적인 누전 차단기는, 전로로부터 검출된 전류의 기본파, 제3 고조파, 피크(peak)값 등 다양한 특징들에 근거하여, 검출된 전류를 평형 전류 또는 누전 또는 지락에 따른 전류(누설 전류 또는 지락 전류)로 판별할 수 있다. 여기서 평형 전류는 0의 값을 가지는 평형 상태의 전류를 의미할 수 있으며, 상기 누전 또는 지락이 발생하지 않은 상태에서 검출되는 전류일 수 있다.
반면 검출된 전류가 평형 전류가 아니라고 판단하는 경우, 피크값의 크기에 근거하여 지락 전류로 구분하거나 또는 누설 전류로 판별하여 전로로부터 부하를 차단시킬 수 있다.
한편 누설 전류는 직류 성분을 포함하지 않는 순수한 정현파의 교류 성분의 전류로서 양의 극성과 음의 극성을 모두 포함하는 파형을 가지는 AC형 누설 전류와, 직류 성분이 포함된 교류 맥동 전류를 포함하여 양의 극성과 음의 극성 중 어느 하나만을 포함하는 반파 파형을 가지는 A형 누설 전류로 구분될 수 있다. 이처럼 구분된 전류들은 도 1에서 보이고 있는 바와 같다.
도 1에서 평형 전류는 정상 상태에서 흐르는 전류로서, 입력 전류와 출력 전류의 합이 이상적으로는 0으로 출력 파형이 출력되지 않아야 하나, 실질적으로는 임피던스 부정합, 영상 변류기의 포화 현상 등 물리 현상으로 인해 0점을 교차하는 시점에 파형이 출력될 수 있다.
그런데 정상적인 평형 전류라고 할지라도, 도 1에서 보이고 있는 바와 같이, 모터의 기동에 따른 기동 전류 또는 인버터에서 발생하는 고조파의 영향으로 발생하는 노이즈가 포함될 수 있다. 이 경우 노이즈는 짧은 시간 동안 양 또는 음의 값을 가지는 전류 신호의 형태로 검출될 수 있다. 한편 도 1에서 보이고 있는 바와 같이, 위상각이 큰 A형 누설 전류는 0이 아닌 값을 가지는 파형의 지속 시간이 짧고, 소정의 피크값을 가지므로, 평형 전류에 노이즈가 포함된 형태와 그 파형이 유사할 수 있다. 특히 고주파 비율이 높은 135도 A형 누설 전류의 파형의 경우, 노이즈가 포함된 평형 전류와 그 파형이 매우 유사하여 구분이 어려울 수 있다.
따라서 노이즈가 포함된 정상 상태의 평형 전류인 경우, A형 누설 전류(예 : 135도 A형 누설 전류)와 그 파형이 유사함에 따라 평형 전류임에도 불구하고 A형 누설 전류로 오 판단될 가능성이 있으며, 평형 전류임에도 불구하고 트립 동작이 수행되는 문제점이 있다.
본 발명은 노이즈를 포함하는 평형 전류와 A형 누설 전류를 보다 정밀하게 구분할 수 있는 누전 차단기 및 그 누전 차단기의 제어 방법을 제공하는 것을 그 목적으로 한다.
또한 본 발명은 노이즈를 포함하는 평형 전류에 대해 트립 동작이 잘못 수행되는 것을 방지할 수 있는 누전 차단기 및 그 누전 차단기의 제어 방법을 제공하는 것을 그 목적으로 한다.
상기 또는 다른 목적을 달성하기 위해 본 발명의 일 측면에 따르면, 본 발명의 실시 예에 따른 누전 차단기는, 전로에 흐르는 전류를 검출하는 전류 검출부와, 트립 제어 신호가 수신되면 전로와 부하 사이의 연결을 차단하는 트립부와, 전류 검출부에서 검출된 전류로부터, 양의 피크값과 음의 피크값, 실효값, 기본파 크기, 3고조파 비율을 검출 및, 기 설정된 1주기 동안의 크기 평균값을 산출하는 특징 검출부 및, 검출된 피크값들의 비율에 근거하여 상기 검출된 전류를, 기 설정된 파형을 가지는 제1 누설 전류 또는 상기 기 설정된 파형과 다른 파형을 가지는 제2 누설 전류 중 어느 하나로 1차 판단하고, 상기 1차 판단 결과 상기 검출된 전류가 상기 제1 누설 전류로 판단되는 경우, 상기 실효값, 3고조파 비율 및 기본파 크기 중 적어도 하나와 상기 크기 평균값에 근거하여 상기 트립 제어 신호를 상기 트립부로 출력하는 제어부를 포함하는 것을 특징으로 한다.
일 실시 예에 있어서, 상기 제어부는, 상기 누전 차단기의 감도 전류를 기준으로, 복수의 서로 다른 위상 제어값에 따른 제1 누설 전류들의 상기 1주기 동안의 평균 크기들 중 어느 하나에 근거하여 기준값을 설정하고, 상기 검출된 전류 신호로부터 산출된 상기 1주기 동안의 크기 평균값과 상기 기준값을 비교한 결과에 근거하여 상기 트립 제어 신호를 출력하는 것을 특징으로 한다.
일 실시 예에 있어서, 상기 제어부는, 상기 복수의 서로 다른 위상 제어값에 따른 제1 누설 전류들의 상기 1주기 동안의 평균 크기들 중 작은 값을 상기 기준값으로 설정하는 것을 특징으로 한다.
일 실시 예에 있어서, 상기 복수의 서로 다른 위상 제어값에 따른 제1 누설 전류들은, 90도로 위상이 제어된 제1 누설 전류 또는 135도로 위상이 제어된 제1 누설 전류임을 특징으로 한다.
일 실시 예에 있어서, 상기 누전 차단기의 감도 전류는, 서로 다른 위상 제어값을 가지는 제1 누설 전류들 각각에 따라 서로 다르게 설정되는 것을 특징으로 한다.
일 실시 예에 있어서, 상기 특징 검출부는, 상기 검출된 전류로부터, 기 설정된 값 이상의 크기를 가지는 전류 신호가 발생한 시간을 검출하고, 검출된 시간과 상기 1주기에 대응하는 시간의 비율을 유효 전류 시간비로 더 산출하고, 상기 제어부는, 상기 1차 판단 결과, 상기 검출된 전류가 상기 제1 누설 전류로 판단되는 경우, 상기 1주기 동안의 크기 평균값과 상기 유효 전류 시간비 중 적어도 하나에 근거하여 상기 트립 제어 신호를 출력하는 것을 특징으로 한다.
일 실시 예에 있어서, 상기 제어부는, 상기 유효 전류 시간비와 기 설정된 기준비율을 비교한 결과, 상기 유효 전류 시간비가 상기 기준비율 보다 더 큰 경우, 상기 크기 평균값에 근거하여 상기 트립 제어 신호를 출력하는 것을 특징으로 한다.
일 실시 예에 있어서, 상기 전류 검출부는, 상기 피크값들 중 작은 값을 기준값으로 설정하고, 산출된 피크값들의 비율이 기 설정된 피크값 기준 비율을 초과하는 경우 상기 검출된 전류를 상기 제1 누설 전류로 판별하며, 산출된 피크값들의 비율이 상기 피크값 기준 비율보다 작거나 같은 경우 상기 검출된 전류를 상기 제2 누설 전류로 판별하는 것을 특징으로 한다.
일 실시 예에 있어서, 상기 피크값 기준 비율은 1임을 특징으로 한다.
일 실시 예에 있어서, 상기 제어부는, 상기 1차 판단 결과에 따라 상기 제1 누설 전류에 따른 제1 판별 과정 및 상기 제2 누설 전류에 따른 제2 판별 과정 중 어느 하나에 따른 판별 결과에 근거하여 상기 트립 제어 신호를 출력하며, 상기 제1 판별 과정은, 상기 실효값과 상기 3고조파 비율에 근거하여 누설 전류 여부를 판별하는 과정이며, 상기 제2 판별 과정은, 상기 기본파의 크기와 상기 3고조파 비율에 근거하여 누설 전류 여부를 판별하는 과정임을 특징으로 한다.
일 실시 예에 있어서, 상기 제어부는, 상기 제1 판별 과정에 따라 상기 검출된 전류가 누설 전류로 판별된 경우, 상기 크기 평균값과 기 설정된 기준값을 비교한 결과에 따라 상기 트립 제어 신호를 출력하거나, 또는 상기 검출된 전류에 대해 상기 제2 판별 과정을 더 수행하고, 더 수행된 상기 제2 판별 과정에 따른 판별 결과에 근거하여 상기 트립 제어 신호를 출력하는 것을 특징으로 한다.
상기 또는 다른 목적을 달성하기 위해 본 발명의 일 측면에 따르면, 본 발명의 실시 예에 따른 누전 차단기의 제어 방법은, 전로에 흐르는 전류를 검출하는 단계와, 상기 검출된 전류로부터, 양의 피크값 및 음의 피크값을 검출하는 단계와, 상기 검출된 피크값들의 비율에 따라, 상기 검출된 전류를 기 설정된 파형을 가지는 제1 누설 전류 또는 상기 기 설정된 파형과 다른 파형을 가지는 제2 누설 전류 중 어느 하나로 1차 판단하는 단계 및, 상기 1차 판단 결과 상기 검출된 전류가 상기 제1 누설 전류로 판단되는 경우, 상기 검출된 전류로부터 측정된 실효값, 3고조파 비율 및 기본파 크기 중 적어도 하나와 상기 검출된 전류로부터 산출된 기 설정된 1주기 동안의 크기 평균값에 근거하여 상기 전로로부터 부하를 차단시키기 위한 트립 제어 신호를 출력하는 단계를 포함하는 것을 특징으로 한다.
일 실시 예에 있어서, 상기 트립 제어 신호를 출력하는 단계는, 상기 1차 판단 결과 상기 검출된 전류가 상기 제1 누설 전류로 판단되는 경우, 상기 크기 평균값과 기 설정된 기준값을 비교하는 단계 및, 상기 비교 결과에 근거하여, 상기 제1 누설 전류에 따른 제1 판별 과정 및, 상기 제2 누설 전류에 따른 제2 판별 과정 중 어느 하나에 따른 판별 결과에 근거하여 상기 트립 제어 신호를 출력하는 단계를 포함하는 것을 특징으로 한다.
일 실시 예에 있어서, 상기 기준값은, 상기 누전 차단기의 감도 전류를 기준으로, 복수의 서로 다른 위상 제어값에 따른 제1 누설 전류들의 상기 1주기 동안의 평균 크기들 중 어느 하나에 근거하여 설정되는 값임을 특징으로 한다.
일 실시 예에 있어서, 상기 기준값은, 상기 복수의 서로 다른 위상 제어값에 따른 제1 누설 전류들의 상기 1주기 동안의 평균 크기들 중 작은 값이며, 상기 복수의 서로 다른 위상 제어값에 따른 제1 누설 전류들은, 90도로 위상이 제어된 제1 누설 전류 또는 135도로 위상이 제어된 제1 누설 전류임을 특징으로 한다.
일 실시 예에 있어서, 상기 크기 평균값과 기 설정된 기준값을 비교하는 단계는, 상기 검출된 전류 신호로부터 기 설정된 값 이상의 크기를 가지는 전류 신호가 발생한 시간에 근거하여 산출되는 유효 전류 시간비와 기 설정된 기준비율을 비교하고, 비교 결과에 따라 상기 크기 평균값과 기 설정된 기준값을 비교하는 단계임을 특징으로 한다.
일 실시 예에 있어서, 상기 크기 평균값과 기 설정된 기준값을 비교하는 단계는, 상기 유효 전류 시간비와 기준 비율을 비교한 결과, 상기 유효 전류 시간비가 상기 기준비율 보다 더 큰 경우에 상기 크기 평균값과 기 설정된 기준값을 비교하고, 상기 유효 전류 시간비가 상기 기준비율 보다 작거나 같은 경우 상기 제2 판별 과정에 따른 판별 결과에 따라 트립 제어 신호를 출력하는 단계임을 특징으로 한다.
일 실시 예에 있어서, 상기 검출된 전류를 1차 판단하는 단계는, 상기 피크값들 중 작은 값을 기준값으로 설정하고, 산출된 피크값들의 비율이 기 설정된 피크값 기준 비율을 초과하는 경우 상기 검출된 전류를 상기 제1 누설 전류로 판별하며, 산출된 피크값들의 비율이 상기 피크값 기준 비율보다 작거나 같은 경우 상기 검출된 전류를 상기 제2 누설 전류로 판별하는 단계임을 특징으로 한다.
일 실시 예에 있어서, 상기 피크값 기준 비율은 1임을 특징으로 한다.
일 실시 예에 있어서, 상기 트립 제어 신호를 출력하는 단계는, 상기 1차 판단 결과, 상기 검출된 전류가 상기 제1 누설 전류로 판단되는 경우, 상기 제1 누설 전류에 따른 제1 판별 과정에 따라 누설 전류 여부를 판단하는 단계와, 상기 제1 판별 과정에 따른 판별 결과, 상기 검출된 전류가 누설 전류인 경우 상기 크기 평균값과 기 설정된 기준값을 비교하는 단계 및, 상기 크기 평균값과 기 설정된 기준값을 비교한 결과에 따라 상기 트립 제어 신호를 출력하거나, 또는 상기 제2 누설 전류에 따른 제2 판별 과정에 따른 판별 결과에 따라 상기 트립 제어 신호를 출력하는 단계를 포함하는 것을 특징으로 한다.
본 발명에 따른 누전 차단기 및 그 누전 차단기의 제어 방법의 효과에 대해 설명하면 다음과 같다.
본 발명의 실시 예들 중 적어도 하나에 의하면, 본 발명은 검출된 전류가 A형 누설 전류로 구분되는 경우에, 1주기 동안의 전류 신호 평균 크기를 산출하고, 산출된 평균 전류 신호 크기가 기 설정된 기준값보다 작은 경우 검출된 전류를 평형 전류로 구분할 수 있다.
이에 따라 본 발명은 일시적인 노이즈를 포함하는 평형 전류가 A형 누설 전류로 오인되어 트립 동작이 수행되는 것을 사전에 방지할 수 있다는 효과가 있다.
도 1은 누설 전류의 구분 예를 도시한 도면이다.
도 2a는 본 발명과 관련된 누전 차단기의 구조를 설명하기 위한 블록도이다.
도 2b는 본 발명과 관련된 누전 차단기가 전로에 연결되는 예를 도시한 블록도이다.
도 3은 본 발명의 실시 예에 따른 누전 차단기가 전류 검출 결과에 따라 트립 동작을 수행하는 동작 과정을 도시한 예이다.
도 4a와 도 4b는, 본 발명의 실시 예에 따른 평균 전류 신호 크기 및 평균 전류 신호 기준값을 설명하기 위한 예시도이다.
도 5는 본 발명의 실시 예에 따른 누전 차단기가 전류 검출 결과에 따라 트립 동작을 수행하는 다른 동작 과정을 도시한 예이다.
도 6은 본 발명의 실시 예에 따른 유효 전류 시간비를 설명하기 위한 예시도이다.
도 7은 본 발명의 실시 예에 따른 누전 차단기가, 평균 전류 신호 크기와 유효 전류 시간비에 근거하여 A형 누설 전류 여부를 구분하는 동작 과정을 도시한 것이다.
도 8은 노이즈를 포함하는 전류가 검출되는 경우, 본 발명에 따른 누전 차단기가 검출된 전류가 평형 전류로 구분하는 예를 설명하기 위한 예시도이다.
본 명세서에서 사용되는 기술적 용어는 단지 특정한 실시 예를 설명하기 위해 사용된 것으로, 본 발명을 한정하려는 의도가 아님을 유의해야 한다. 또한, 본 명세서에서 사용되는 단수의 표현은 문맥상 명백하게 다르게 뜻하지 않는 한, 복수의 표현을 포함한다. 이하의 설명에서 사용되는 구성요소에 대한 접미사 "모듈" 및 "부"는 명세서 작성의 용이함만이 고려되어 부여되거나 혼용되는 것으로서, 그 자체로 서로 구별되는 의미 또는 역할을 갖는 것은 아니다
본 명세서에서, "구성된다." 또는 "포함한다." 등의 용어는 명세서상에 기재된 여러 구성 요소들, 또는 여러 단계를 반드시 모두 포함하는 것으로 해석되지 않아야 하며, 그 중 일부 구성 요소들 또는 일부 단계들은 포함되지 않을 수도 있고, 또는 추가적인 구성 요소 또는 단계들을 더 포함할 수 있는 것으로 해석되어야 한다.
또한, 본 명세서에 개시된 기술을 설명함에 있어서 관련된 공지 기술에 대한 구체적인 설명이 본 명세서에 개시된 기술의 요지를 흐릴 수 있다고 판단되는 경우 그 상세한 설명을 생략한다.
또한, 첨부된 도면은 본 명세서에 개시된 실시 예를 쉽게 이해할 수 있도록 하기 위한 것일 뿐, 첨부된 도면에 의해 본 명세서에 개시된 기술적 사상이 제한되지 않으며, 본 발명의 사상 및 기술 범위에 포함되는 모든 변경, 균등물 내지 대체물을 포함하는 것으로 이해되어야 한다. 또한 이하에서 설명되는 각각의 실시 예들 뿐만 아니라, 실시 예들의 조합은 본 발명의 사상 및 기술 범위에 포함되는 변경, 균등물 내지 대체물로서, 본 발명의 사상 및 기술 범위에 해당될 수 있음은 물론이다.
도 2a는 본 발명과 관련된 누전 차단기(10)의 구조를 설명하기 위한 블록도이다. 그리고 도 2b는 본 발명과 관련된 누전 차단기가 전로에 연결되는 예를 도시한 블록도이다.
먼저 도 2a를 참조하여 살펴보면, 본 발명의 실시 예에 따른 누전 차단기(10)는 제어부(100)와, 전로를 통해 부하로 입력 및 부하로부터 출력되는 전류를 검출하는 누설 전류 검출부(110), 검출된 전류를 변환하는 변환부(120), 상기 검출된 전류를 1차적으로 특정 유형의 누설 전류로 구분하기 위한 특징들을 검출하는 제1 특징 검출부(130), 상기 1차 구분 결과에 따른 방식으로 상기 검출된 전류가 누설 전류 인지 여부를 판별하기 위한 특징들을 검출하는 제2 특징 검출부(140), 상기 전로에 연결된 개폐기를 제어하여 트립 동작을 수행하는 트립부(150), 그리고 메모리(160)를 포함하여 구성될 수 있다. 또한 출력부(170)를 더 포함하여 구성될 수 있다.
누설 전류 검출부(110)는, 복수의 전로에 흐르는 전류를 검출할 수 있다. 이를 위해 누설 전류 검출부(110)는, 도 2b에 도시된 바와 같이 복수의 전로가 관통하도록 설치되는 링(ring)형의 코어(core)와, 해당 코어에 감겨서 전류 검출 신호를 출력하는 2차 권선으로 구성된 영상 변류기(ZCT; zero current transformer)(111)를 포함하여 이루어질 수 있다.
상기 영상 변류기(ZCT)(111)는, 이론적으로 전로에서 검출되는 전기 벡터의 합이 정상 상태에서는 '0'이 되어야 하지만, 지락(누전)이 발생한 경우 벡터의 합이 0이 되지 않는 것을 이용하여 전로에 흐르는 누설 전류를 검출할 수 있다. 즉, 영상 변류기(ZCT)(111)를 통과하여 전로에 흐르는 전류의 경우, 누전이 발생하지 않은 경우에는 부하로 입력되는 전류와 출력되는 전류가 서로 같으므로, 평형 상태의 전류(크기가'0'에 가까운 전류)가 출력될 수 있다. 그러나 전로에서 누전 또는 지락이 발생한 경우에는, 부하에 입력되는 전류와 부하로부터 출력되는 전류의 차이가 발생하고, 이 차이만큼의 전류가 지락 전류 또는 누설 전류로서 검출될 수 있다.
또한 상기 누설 전류 검출부(110)는 전류 신호의 크기를 측정하기 위한 션트 저항(113)을 포함할 수 있으며, 상기 누설 전류 검출 신호에 혼입될 수 있는 고주파 노이즈를 제거하기 위한 저역 통과 필터(112)를 포함하여 구성될 수 있다.
한편 상기 도 2b의 설명에서는 R, S, T 3상의 전류가 공급되는 3개의 전로로부터 누설 전류를 검출하는 것을 예로 들어 설명하였으나 본 발명이 이에 적용되는 것은 아니다. 즉, 상기 3상 전류 중 두 개의 전류를 공급받는 단상 부하에 연결되는 전로에도 본 발명이 적용될 수 있다. 즉 누설 전류 검출부(110)는 3상의 전류가 흐르는 3상 전로 모두로부터 누설 전류를 검출하거나 또는 3상 중 일부의 전로로부터 누설 전류를 검출할 수도 있음은 물론이다.
그리고 변환부(120)는 누설 전류 검출부(110)에서 검출된 전류를 디지털 신호로 변환할 수 있다. 보다 자세하게 변환부(120)는 ADC(Analog Digital Converter) 모듈(121)을 포함할 수 있으며, ADC 모듈(121)을 통해 상기 누설 전류 검출부(110)에서 검출된 전류 신호를 샘플링하고 샘플링된 전류 신호를 시간 영역의 디지털 신호로 변환할 수 있다. 또한 상기 변환부(120)는 DFT(Discrete Fourier Transform) 모듈(122)을 포함할 수 있으며, 상기 DFT 모듈(122)을 통해 시간 영역의 디지털 신호를 이산 푸리에 변환을 통해 주파수 영역의 디지털 신호로 변환할 수 있다.
그리고 제1 특징 검출부(130)는 상기 누설 전류 검출부(110)에서 검출된 전류를 특정 유형의 누설 전류로 구분하기 위한 특징들을 검출할 수 있다. 이러한 특징들은 기 설정된 1주기 동안 검출된 전류 신호의 양(+) 또는 음(-)의 최대값, 즉 피크(peak)값이나 상기 1주기 동안 검출된 전류 신호의 크기, 또는 상기 1주기 동안 기 설정된 크기 이상의 양 또는 음의 전류 신호가 검출된 시간일 수 있다. 이러한 특징들을 검출하기 위해 상기 제1 특징 검출부(130)는 피크값 검출부(131), 평균 전류 신호 크기 산출부(132), 유효 전류 시간비 산출부(133)를 포함할 수 있다.
먼저 피크값 검출부(131)는 상기 누설 전류 검출부(110)에서 상기 1주기 동안에 검출된 전류로부터 양의 값을 가지는 전류 신호의 최대값, 즉 양의 피크값과 음의 값을 가지는 전류 신호의 최대값(음의 피크값)을 검출할 수 있다.
일 예로 상기 누설 전류 검출부(110)에서 검출되는 전류 신호를, 션트 저항(Shunt register)을 통해 상기 전류 신호에 대응하는 전압으로 측정하는 경우, 상기 양의 피크값은 상기 1주기 동안에 검출된 전류 신호에 대응하는 전압들 중 최고 전압을 의미할 수 있으며, 상기 음의 피크값은 상기 1주기 동안에 검출된 전류 신호에 대응하는 전압들 중 최저 전압을 의미할 수 있다.
한편 상기 평균 전류 신호는 상기 기 설정된 1주기 동안의 검출된 전류 신호의 크기 평균을 의미할 수 있다. 따라서 상기 평균 전류 신호 크기 산출부(132)는 상기 1주기 동안에 검출된 전류 신호 크기의 합을 산출할 수 있으며, 상기 1주기 동안의 기 설정된 단위 시간당 평균 신호 크기를 산출할 수 있다.
이 경우 상술한 바와 같이 상기 검출되는 전류 신호가, 대응하는 전압값으로 측정되는 경우라면, 상기 평균 전류 신호 크기 산출부(132)는 상기 1주기 동안 검출되는 양의 전압과 음의 전압을 모두 합산하고, 합산된 전압값을 상기 1주기 동안의 단위 시간당 평균값으로 환산할 수 있다.
일 예로 상기 합산된 전압값이 16mv이고, 1주기가 16ms이며, 기 설정된 단위 시간이 1ms인 경우라면, 상기 평균 전류 신호 크기 산출부(132)는 1주기 동안 단위 시간(1ms)당 평균 1mV가 검출된 것으로 평균 전류 신호의 크기를 산출할 수 있다. 이 경우 산출된 평균 전류 신호의 크기는 절대값 연산을 통해 양의 값으로 산출될 수 있다.
한편 상기 유효 전류 시간은 상기 1주기 동안에 기 설정된 크기 이상의 크기를 가지는 전류 신호가 검출된 시간을 의미할 수 있다. 일 예로 유효 전류가 +1mV 또는 -1mV인 경우라면 상기 유효 전류 시간은 전류 신호에 대응하는 전압값이 +1mV 이상 또는 -1mV 이하인 전압이 검출된 시간을 의미할 수 있다. 그리고 유효 전류 시간비 산출부(133)는 상기 1주기 동안 검출된 유효 전류 시간과 상기 1주기에 대응하는 시간의 비율을 산출하여, 상기 1주기 동안 기 설정된 유효 전류값 보다 큰 크기를 가지는 전류 신호가 검출된 비율, 즉 유효 전류 시간비를 산출할 수 있다.
한편 상기 제1 특징 검출부(130)는 상기 누설 전류 검출부(110)에서 검출된 전류의 유형에 따라 검출된 전류가 누설 전류인지 또는 지락 전류인지 여부를 판별하기 위한 다양한 특징들을 검출할 수 있다. 이러한 특징들은 기본파의 크기나 실효값(RMS, Root Mean Square), 또는 3고조파의 비율일 수 있으며, 상기 특징들을 검출하기 위해 제1 특징 검출부(130)는 기본파 크기 검출부(141), 실효값 산출부(142) 및 3고조파 비율 산출부(143)를 포함할 수 있다.
먼저 기본파는 비정현파를 합성하는 복수의 정현파 중 주파수 성분 중 가장 낮은 주파수 성분을 의미할 수 있으며, 기본파 크기 검출부(141)는 상기 기본파의 크기를 검출할 수 있다. 기본파로서, 유럽은 50Hz, 대한민국은 60Hz 주파수를 일반적으로 사용하며, 이에 따라 상기 기본파 크기 검출부(141)는 대한민국의 경우 60Hz의 주파수 성분의 크기를, 유럽의 경우 50Hz 주파수 성분의 크기를 검출할 수 있다.
그리고 실효값은 입력된 교류 전류와 같은 주기파의 1주기 동안의 순시값의 제곱을 평균한 값에 대한 제곱근값을 의미할 수 있다. 실효값 산출부(142)는 누설 전류 검출부(110)에서 검출된 1주기 동안의 전류에 대한 실효값을 산출할 수 있다. 정편파의 경우 교류 전류의 실효값은 최대 진폭의 0.707배이며, 실효값에 대응하는 직류 전류의 전기 에너지와 동일한 전기 에너지를 의미할 수 있다.
또한 3고조파는 기본파의 3배가 되는 주파수의 고조파를 의미할 수 있다. 그리고 3고조파 비율은 주파수 영역에서 기본파 성분의 크기에 대비하여 상기 3고조파 성분의 비율(%)을 의미할 수 있다. 상기 3고조파 비율 산출부(143)는 상기 변환부(120)에서 검출된 이산 푸리에 결과에 근거하여 상기 기본파 성분의 크기와 3고조파 성분의 크기를 산출할 수 있으며, 산출된 크기들의 비율에 근거하여 상기 3고조파 비율을 산출할 수 있다.
또한 트립부(150)는 각 전로와 부하 사이의 접점을 트립시킬 수 있는 개폐부(153)를 포함하며, 상기 제어부(100)로부터 출력되는 트립 제어 신호에 따라 각 전로와 부하 사이의 연결을 차단할 수 있다.
보다 자세하게 상기 트립부(150)는 사이리스터(thyristor)와 같이 게이트 제어 신호에 따라 온 또는 오프되는 반도체 스위치로 구성될 수 있다. 그리고 상기 스위칭 소자(151)는 상기 제어부(100)와 연결될 수 있으며, 상기 게이트 제어 신호로서 트립 제어 신호를 입력받을 수 있다. 따라서 스위칭 소자(151)는 상기 제어부(100)에서 트립 제어 신호가 출력되는 경우 온 된 상태로 전환될 수 있다.
한편 트립 코일부(152)는 상기 스위칭 소자(151)가 온 된 상태일 때 여자(magnetizing)되는 트립 코일(trip coil)을 포함할 수 있다. 그리고 트립 코일이 여자될 때 자기 흡입력에 의해 이동하는 아마추어(armature)를 포함할 수 있다. 그리고 상기 트립 코일부(152)의 아마추어는 상기 개폐부(153)가 각 전로와 부하 사이의 접점을 트립시키도록 트리거(trigger)하는 역할을 수행할 수 있다. 따라서 상기 스위칭 소자(151)가 온 상태로 전환되면, 상기 개폐부(153)는 각 전로와 단상 부하 사이의 접점을 트립할 수 있다. 여기서 트립(trip)은 각 전로와 단상 부하 사이를 개방하는 것을 의미할 수 있다. 즉, 회로가 개방됨으로써 전로와 단상 부하 사이의 연결이 차단될 수 있다.
그리고 메모리(160)는 본 발명의 실시 예에 따른 누전 차단기(10)의 기능을 지원하는 다양한 데이터를 저장할 수 있다. 메모리(160)는 본 발명의 실시 예에 따라 제1 특징 검출부(130)에서 검출된 특징들에 근거하여 제어부(100)가 누설 전류 검출부(110)에서 검출된 전류를 특정 유형의 누설 전류로 구분하는 알고리즘과 관련된 다양한 데이터들을 저장할 수 있다.
일 예로 메모리(160)는 상기 제1 특징 검출부(130)에서 검출된 특징들과 비교할 수 있는 대조군의 데이터들이 저장될 수 있다. 일 예로 메모리(160)에는 특정 누설 전류 유형에 대응하는 피크값 비율이 피크 기준값으로 포함될 수 있으며, 특정 위상 제어값에 따른 A형 누설 전류의 평균 전류 신호의 크기가, 평균 전류 신호의 기준값으로 포함될 수 있다. 또한 유효 전류 시간을 산출하기 위한 기준인 유효 전류값과, 1주기에 대응하는 시간값 등이 저장될 수 있다.
뿐만 아니라 상기 메모리(160)에는 상기 제2 특징 검출부(140)에서 검출된 특징들에 근거하여 서로 다른 방식으로, 상기 검출된 전류를 누설 전류 또는 지락 전류로 판단하기 위한 알고리즘들과 관련된 데이터들을 저장할 수 있다. 일 예로 메모리(160)에는 기 설정된 기본파에 관련된 정보와 실효값을 산출하기 위한 알고리즘 및, 3고조파 성분을 산출하기 위한 알고리즘과 관련된 데이터들이 포함될 수 있다. 또한 상기 누설 전류와 지락 전류 여부를 판별하기 위한 다양한 기준 데이터들이 포함될 수 있다.
한편 상기 메모리(160)에는 본 발명에 관련된 누전 차단기(10)의 사양(specification) 또는 규격에 관련된 정보들이 저장될 수 있다. 일 예로 메모리(160)에는 누전 차단기(10)에서 허용되는 전류 크기, 즉 감도 전류에 대한 정보들이 저장될 수 있다.
여기서 상기 감도 전류는 누설 전류 또는 지락 전류가 아닌 것으로 판단될 수 있는 전류 크기를 의미할 수 있다. 여기서 상기 평균 전류 신호 기준값은 상기 누전 차단기(10)의 감도 전류의 크기에 따라 결정될 수 있으며, 기준이 되는 누설 전류의 유형에 따라 상기 감도 전류의 크기는 서로 다른 값을 가질 수 있다.
일 예로 A형 누설 전류 중 90도 누설 전류에 대응하는 감도 전류 크기와 135도 누설 전류에 대응하는 감도 전류의 크기는 서로 다르게 설정될 수 있다. 따라서 90도 누설 전류(A형)에 대응하는 평균 전류 신호 기준값과 135도 누설 전류(A형)에 대응하는 평균 전류 신호 기준값은 서로 다르게 결정될 수 있다.
한편 제어부(100)는 연결된 각 구성 요소를 제어하며, 누전 차단기(10)의 전반적인 동작을 제어할 수 있다. 보다 자세하게 제어부(100)는 누설 전류 검출부(110)에서 검출된 전류 신호에 대해 제1 특징 검출부(130)를 제어하여 피크값을 산출할 수 있다. 그리고 산출된 피크값을 기 설정된 피크값 비율과 비교하고, 비교 결과에 따라 상기 누설 전류 검출부(110)에서 검출된 전류(이하, 현재 검출된 전류)를 A형 누설 전류 또는 AC형 누설 전류 중 어느 하나로 1차 판단할 수 있다.
그리고 제어부(100)는 1차 판단된 누설 전류의 유형에 따라, 서로 다른 방식으로 현재 검출된 전류가 누설 전류나 지락 전류인지 또는 평형 전류인지 여부를 최종 판단할 수 있다. 그리고 최종 판단 결과 현재 검출된 전류가 누설 전류(A형 누설 전류 또는 AC형 누설 전류)이거나 지락 전류인 경우에는 상기 트립부(150)를 제어하기 위한 트립 제어 신호를 출력할 수 있다. 그러나 상기 최종 판단 결과 현재 검출된 전류가 평형 전류인 경우에는 트립 없이 누설 전류를 검출하는 과정을 계속 수행할 수 있다.
이하 상기 1차 판별 결과, 현재 검출된 전류가 A형 누설 전류로 판별된 경우에 A형 누설 전류인지 여부를 최종 판별하는 과정을 A형 누설 전류 판별 과정이라고 하기로 한다. 그리고 상기 1차 판별 결과, 현재 검출된 전류가 AC형 누설 전류로 판별된 경우에 AC형 누설 전류인지 또는 평형 전류인지를 최종 판별하는 과정을 AC형 누설 전류 판별 과정이라고 하기로 한다.
그리고 제어부(100)는, 상기 1차 판별 결과, 현재 검출된 전류가 A형 누설 전류로 판별되는 경우, 상기 A형 누설 전류 판별 과정을 통해 누설 전류 여부를 최종 판별하고, 최종 판별된 결과에 따라 트립 제어 신호를 출력할 수 있다.
여기서 제어부(100)는 트립 제어 신호를 출력하기 전에 현재 검출된 전류 신호의 평균 전류 신호 크기 또는 유효 전류 시간비 중 적어도 하나에 근거하여 현재 검출된 전류가 A형 누설 전류인지 여부를 다시 확인할 수 있다. 그리고 다시 확인한 결과 검출된 전류가 A형 누설 전류인 경우에는 상기 트립 제어 신호를 출력할 수 있다. 반면, 검출된 전류가 A형 누설 전류가 아니라고 판단되면, 제어부(100)는 AC형 누설 전류 판별 과정을 더 수행하여 현재 검출된 전류가 평형 전류인지 AC형 누설 전류인지 여부를 판별할 수 있다. 이하 이러한 제어부(100)의 전류 판별 과정을 하기 도 3을 참조하여 보다 자세하게 살펴보기로 한다.
또는 제어부(100)는, 상기 누설 전류 검출부(110)에서 검출된 전류가 1차 판별 과정을 통해 A형 누설 전류로 판별되면, 현재 검출된 전류의 전류 신호로부터 평균 전류 신호 크기 및 유효 전류 시간비 중 적어도 하나를 산출할 수 있다. 그리고 산출된 평균 전류 신호 및 유효 전류 시간비 중 적어도 하나에 근거하여, 현재 검출된 전류가 A형 누설 전류인지 여부를 재확인할 수 있다.
그리고 제어부(100)는 상기 재확인 결과에 따라 A형 누설 전류 판별 과정 또는 AC형 누설 전류 판별 과정 중 어느 하나를 통해, 현재 검출된 전류를 누설 전류나 지락 전류로 판별하여 트립 제어 신호를 출력할 수 있다. 또는 평형 전류로 판별하여 트립 제어 신호를 출력하지 않을 수 있다. 이하 이러한 제어부(100)의 전류 판별 과정을 하기 도 5를 참조하여 보다 자세하게 살펴보기로 한다.
한편 본 발명의 실시 예에 따른 누전 차단기(10)는 출력부(170)를 더 포함할 수 있다. 상기 출력부(170)는 현재 누설 전류 검출부(110)에서 검출된 전류가 평형 전류 또는 누설 전류나 지락 전류로 판별된 결과 및 트립 여부를 표시할 수 있다. 이 경우 판별 결과가 누설 전류인 경우라면 출력부(170)는 검출된 전류의 판별 결과에 따라 A형 누설 전류 또는 AC형 누설 전류임을 표시할 수도 있음은 물론이다.
상기 출력부(170)는 무선 통신부(도시되지 않음)를 더 포함할 수 있다. 그리고 무선 통신부를 통해 기 설정된 이동 단말기를 포함하여 적어도 하나의 무선 통신 기기에 연결될 수 있다. 그리고 상기 무선 통신부를 통해 상기 전류 판별 결과와 트립 동작 수행 여부를 적어도 하나의 무선 통신 기기에 전송할 수 있다.
도 3은 본 발명의 실시 예에 따른 누전 차단기(10)가 전류 검출 결과에 따라 트립 동작을 수행하는 동작 과정을 도시한 예이다. 그리고 도 4a와 도 4b는, 본 발명의 실시 예에 따른 평균 전류 신호 크기 및 평균 전류 신호 기준값을 설명하기 위한 예시도이다.
먼저 도 3을 참조하여 살펴보면, 본 발명의 실시 예에 따른 누전 차단기(10)의 제어부(100)는 먼저 누설 전류 검출부(110)를 통해 전로에 흐르는 전류로부터 전류 신호(전류에 대응하는 전압)를 검출할 수 있다. 그러면 제어부(100)는 변환부(120)를 제어하여 아날로그 형태로 검출된 전류 신호를 시간 영역의 디지털 신호로 변환하거나 또는 주파수 영역의 디지털 신호로 변환할 수 있다(S300).
그리고 제어부(100)는 디지털 신호로 변환된 전류 신호로부터 누설 전류 여부를 판단하기 위한 적어도 하나의 특징들을 검출할 수 있다(S302). 예를 들어 S302 단계는 상기 변환된 전류 신호로부터 양의 피크값과 음의 피크값을 검출할 수 있다. 또한 기본파의 크기와 실효값, 그리고 3고조파 비율 중 적어도 하나를 산출할 수 있다. 그리고 1주기 동안 합산된 전류 신호의 크기에 근거하여 평균 전류 신호의 크기를 산출하거나, 또는 1주기 동안에 기 설정된 유효 전류값 이상의 크기를 가지는 전류 신호가 검출된 시간을 측정하여 유효 전류 시간비를 산출할 수 있다.
그러면 제어부(100)는 상기 S302 단계에서 검출된 특징들 중 양의 피크값의 크기와 음의 피크값의 크기에 근거하여 피크값의 비, 즉 피크비를 산출할 수 있다. 그리고 산출된 피크비가 기 설정된 피크 기준값을 초과하는지 여부를 검출할 수 있다(S304). 그리고 산출된 피크비가 상기 피크 기준값보다 큰 경우라면, 제어부(100)는 현재 검출된 전류가 A형 누설 전류 유형이라고 1차 판단할 수 있다.
여기서 상기 피크 기준값은 '1'일 수 있다. 일 예로, 현재 검출된 전류 신호가 순수 정현파와 같이, 양의 전류 신호와 음의 전류 신호가 대칭을 이루는 경우에는 양의 피크값, 즉 양의 전류 신호 최대값과 음의 피크값, 즉 음의 전류 신호 최대값은 서로 동일할 수 있다. 따라서 정현파와 유사한 형태를 가지는 전류, 즉 AC형 누설 전류에 가까울수록 피크비는 '1'에 가까울 수 있다.
반면 검출된 전류 신호가 순수 정현파와 다른 경우, 즉 양의 전류 신호와 음의 전류 신호가 대칭을 이루지 않는 경우, 양의 피크값과 음의 피크값 중 어느 하나는 다른 하나보다 그 크기가 작을 수 있다. 한편 제어부(100)는 두 개의 피크값 중 작은 값을 기준으로 상기 피크비를 산출하므로, 양의 전류 신호와 음의 전류 신호가 대칭을 이루지 않을수록, 상기 피크비는 '1'보다 큰 값을 가질 수 있다. 따라서 만약 검출된 전류 신호가 A형 누설 전류와 같이 양의 극성 성분이나 음의 극성 성분 중 어느 하나만을 포함하는 경우라면, 상기 피크비는 '1'보다 훨씬 큰 값을 가질 수 있다.
따라서 제어부(100)는 상기 피크비를 통해 검출된 전류가 양의 전류 신호와 음의 전류 신호가 대칭되는 정도를 검출하고, 이를 기 설정된 기준값, 즉 피크 기준값에 따라 구분함으로써, 현재 검출된 전류가 AC형 누설 전류 유형인지 또는 A형 누설 전류 유형인지 여부를 1차 판단할 수 있다.
한편, A형 누설 전류의 경우, 양의 값과 음의 값을 모두 가지는 AC형 누설 전류와 달리, 양의 값 또는 음의 값 하나만을 가지므로, 실효값의 크기를 산출하여 트립 여부를 판단할 수 있다. 따라서 제어부(100)는 현재 검출된 전류로부터 산출된 실효값을 기 설정된 기준 실효값과 비교하여, 현재 검출된 전류가 누설 전류(A형 누설 전류)인지 여부를 판별할 수 있다(S306).
상기 S306 단계의 비교 결과, 현재 검출된 전류로부터 산출된 실효값이 기 설정된 기준값, 즉 기준 실효값보다 작은 경우라면 제어부(100)는 현재 검출된 전류(이하 상기 S300 단계에서 검출된 전류)가 평형 전류라고 판별할 수 있다. 따라서 제어부(100)는 트립 제어 신호를 출력하지 않고 다시 S300 단계로 진행하여 전류 신호를 검출 및 검출된 전류 신호를 변환하는 과정을 다시 수행할 수 있다.
그러나 상기 S306 단계의 비교 결과, 현재 검출된 전류로부터 산출된 실효값이 기 설정된 기준값, 즉 기준 실효값보다 큰 경우라면 제어부(100)는 현재 검출된 전류가 누설 전류라고 판별할 수 있다.
그리고 상기 S306 단계의 비교 결과에 따라 현재 검출된 전류가 누설 전류로 판별된 경우라면, 제어부(100)는 현재 검출된 전류가 평형 전류인지 누설 전류인지 여부를 3고조파의 비율에 근거하여 다시 한번 판단할 수 있다(S308). 여기서 상기 3고조파 기준 비율은 A형 누설 전류 여부를 판별하기 위한 3고조파 비율 기준값일 수 있으며, 바람직하게는 70%로 설정될 수 있다. 다만 이는 본 발명의 일 실시 예로서 그 기준값은 다르게 설정될 수 있다.
상기 S308 단계의 3고조파 비율 비교 결과, 현재 검출된 전류 신호로부터 산출되는 3고조파 비율이 기 설정된 A형 3고조파 기준 비율보다 작은 경우라면 제어부(100)는 현재 검출된 전류가 평형 전류라고 판별할 수 있다. 반면 상기 S308 단계의 3고조파 비율 비교 결과, 상기 산출된 3고조파 비율이 기 설정된 A형 3고조파 기준 비율보다 작은 경우라면 제어부(100)는 현재 검출된 전류가 A형 누설 전류라고 판별할 수 있다. 이하 상기 S306 단계에서 S308 단계에 이르는 과정을, A형 누설 전류를 판별하기 위한 A형 누설 전류 판별 과정(S400)이라고 하기로 한다.
한편 상기 S304 단계에서, 산출된 피크비가 기 설정된 피크 기준값보다 같거나 작은 경우라면, 제어부(100)는 현재 검출된 전류가 AC형 누설 전류 유형이라고 1차 판단할 수 있다.
그러면 제어부(100)는 현재 검출된 전류의 기본파와 누전 차단기(10)에서 허용 가능한 전류의 크기, 즉 누전 차단기(10)의 감도 전류의 크기 비율을 산출할 수 있다. 그리고 산출된 비율, 즉 기본파 크기 비율을 기 설정된 기준비와 비교할 수 있다(S312).
예를 들어, 감도 전류가 100mA이고, 기본파의 크기가 60mA일 때, 기본파의 크기 비율은 60%로 산출될 수 있다. 이 경우 상기 기준비가 70%로 설정된 경우라면, 상기 기본파의 크기 비율이 기준비보다 작으므로 제어부(100)는 현재 검출된 전류가 평형 전류라고 판단할 수 있다. 그러면 제어부(100)는 트립 제어 신호를 출력하지 않을 수 있으며, S300 단계로 진행하여 전류를 검출하는 과정을 다시 시작할 수 있다.
반면 감도 전류에 대한 기본파의 크기 비율이 상기 기준비보다 큰 경우라면, 제어부(100)는 현재 검출된 전류가 누설 전류라고 판별할 수 있다. 그리고 상기 S312 단계의 비교 결과에 따라 현재 검출된 전류가 누설 전류로 판별된 경우라면, 제어부(100)는 현재 검출된 전류가 평형 전류인지 누설 전류인지 여부를 3고조파의 비율에 근거하여 다시 한번 판단할 수 있다(S314).
보다 구체적으로 상기 S314 단계에서, 제어부(100)는 검출된 전류 신호로부터 검출된 3고조파의 비율과 기 설정된 고조파 기준 비율을 비교할 수 있다. 여기서 상기 3고조파 기준 비율은 AC형 누설 전류 여부를 판별하기 위한 3고조파 비율 기준값일 수 있으며, 바람직하게는 50%로 설정될 수 있다. 다만 이는 본 발명의 일 실시 예로서 그 기준값은 다르게 설정될 수 있다.
이하 상기 S308 단계에서 A형 누설 전류 판단에 사용되는 3고조파 기준 비율과, 상기 S314 단계에서 AC형 누설 전류 판단에 사용되는 3고조파 기준 비율을 구분하기 위하여, 전자를 A형 3고조파 기준 비율이라고 하기로 하고, 후자를 AC형 3고조파 기준 비율이라고 하기로 한다.
그리고 상기 S314 단계의 판별 결과, 검출된 전류 신호로부터 검출된 3고조파의 비율 보다 AC형 3고조파 기준 비율이 큰 경우라면 제어부(100)는 현재 검출된 전류가 평형 전류라고 판단할 수 있다. 그러면 제어부(100)는 트립 제어 신호를 출력하지 않을 수 있으며, S300 단계로 진행하여 전류를 검출하는 과정을 다시 시작할 수 있다.
그러나 상기 S314 단계의 판별 결과, 검출된 전류 신호로부터 검출된 3고조파의 비율 보다 AC형 3고조파 기준 비율이 작거나 같은 경우라면 제어부(100)는 현재 검출된 전류가 누설 전류, 즉 AC형 누설 전류라고 판단할 수 있다. 그러면 제어부(100)는 트립부(150)를 제어하여 트립 동작을 수행하기 위한 트립 제어 신호를 출력할 수 있다(S316). 이하 상기 S312 단계에서 S314 단계에 이르는 과정을, AC형 누설 전류를 판별하기 위한 AC형 누설 전류 판별 과정(S450)이라고 하기로 한다.
한편 상기 A형 누설 전류 판별 과정(S400)을 통해, 현재 검출된 전류가 A형 누설 전류로 판별되면, 제어부(100)는 현재 검출된 전류로부터 산출된 평균 전류 신호의 크기와 기 설정된 평균 전류 신호 기준값을 비교할 수 있다(S310).
여기서 상기 평균 전류 신호 크기는, 기 설정된 1주기 동안에 검출된 전류의 크기값의 평균을 의미할 수 있다. 일 예로 누설 전류 검출부(110)에서 기 설정된 1주기(예 : 16ms) 동안에 검출된 전류 신호가, 양의 값과 음의 값을 모두 포함하고, 양의 전류 신호 크기의 합이 +4mV, 음의 전류 신호 크기의 합이 -16mV이면, 상기 1주기 동안에 수신된 전류 신호의 크기합은 -16mV의 음의 값을 가지는 전류 신호일 수 있다. 이러한 경우 상기 누설 전류 검출부(110)에서 검출된 전류 신호는, 기 설정된 단위 시간 1mv 마다 평균 1mv의 크기(|- 1mV|)를 가지는 전류 신호일 수 있다.
이처럼 1주기 동안의 평균 전류 신호의 크기가 산출되면, 제어부(100)는 산출된 평균 전류 신호의 크기를 기 설정된 평균 전류 신호 기준값과 비교할 수 있다(S310).
여기서 상기 기 설정된 평균 전류 신호 기준값은 누전 차단기(10)의 감도 전류로서, 누전 차단기(10)에서 허용 가능한 전류의 크기에 따라 달라질 수 있다.
도 4a 및 도 4b는 이와 같이 누전 차단기(10)에서 허용 가능한 전류, 즉 감도 전류의 크기에 따라 결정되는 평균 전류 신호 기준값을 설명하기 위한 예시도이다.
상술한 바와 같이, A형 누설 전류의 경우 직류 성분이 혼합된 전류로서, 양 또는 음의 값 중 어느 하나의 값을 가지는 전류 신호를 의미할 수 있다. 이러한 A형 누설 전류는 상기 도 1에서 보이고 있는 바와 같이, 파형에 따라 크게 0도, 90도, 135도 A형 누설 전류로 구분할 수 있다.
한편 A형 누설 전류의 경우 상술한 바와 같이 양 또는 음의 값 중 어느 하나의 값만을 가지므로, 한 주기에 해당하는 전류 신호 크기의 합은 양의 전류 신호의 합 또는 음의 전류 신호의 합이 될 수 있다. 그리고 상기 전류 신호 크기의 합이 누전 차단기(10)의 감도 전류 크기보다 큰 경우에 누전 차단기(10)는 검출된 전류를 A형 누설 전류로 판단하고 트립 제어 신호를 출력할 수 있다.
먼저 도 4a를 참조하여 살펴보면, 도 4a는 A형 누설 전류의 경우에 누전 차단기(10)의 감도 전류 크기에 대응하는 전류 신호의 크기를 보이고 있다. 일 예로 상기 점선 그래프(400)는 누전 차단기(10)의 감도 전류 크기에 대응하는 0도 A형 누설 전류를 의미할 수 있다.
그런데 0이 아닌 전류값을 가지는 위상 구간이, 0도 A형 누설 전류 보다 짧은 90도 A형 누설 전류의 경우, 도 4a의 (a)에서 보이는 실선 그래프(410)와 같이 누전 차단기(10)의 감도 전류 크기에 대응하는 90도 A형 누설 전류는 보다 높은 전압값을 가질 수 있다. 여기서 전압값은 션트 저항을 통해 간접적으로 측정되는 전류값에 대응될 수 있다. 그리고 이를 1주기 동안의 시간에 따른 평균을 산출하면, 도 4a의 (b)에서 보이고 있는 바와 같이 상기 누전 차단기(10)의 감도 전류 크기에 대응하는 90도 A형 누설 전류에 대한 1주기 동안의 (단위 시간 별) 평균 전류 신호 크기가 산출될 수 있다.
한편 도 4b의 (b)는, 누전 차단기(10)의 감도 전류 크기에 대응하는 135도 A형 누설 전류를 도시한 것이다. 135도 A형 누설 전류의 경우, 0이 아닌 전류값을 가지는 위상 구간이 90도 A형 누설 전류 보다 짧으므로, 도 4b의 (b)에서 보이는 실선 그래프(450)와 같이, 더 높은 전압값을 가질 수 있다.
그리고 이를 1주기 동안의 시간에 따른 평균을 산출하면, 도 4b의 (b)에서 보이고 있는 바와 같이 상기 누전 차단기(10)의 감도 전류 크기에 대응하는 135도 A형 누설 전류에 대한 1주기 동안의 (단위 시간 별) 평균 전류 신호 크기가 산출될 수 있다.
이론적으로는 도 4a에서 도시한 90도 A형 누설 전류와 도 4b에서 도시한 135도 A형 누설 전류 모두, 누전 차단기(10)의 사양에 따른 감도 전류 크기에 따른 것으로, 전류 신호의 크기 합은 서로 동일할 수 있다. 그리고 전류 신호 크기의 합이 동일함에 따라 평균 전류 신호의 크기는 서로 동일할 수 있다.
그러나 135도 A형 누설 전류의 크기의 경우, 도 4b의 (a)에서 보이고있는 바와 같이 위상 구간에 비하여 높은 전압값을 가지므로, 위상 차이에 따른 전압값의 차이가 크다. 따라서 샘플링 간격에 따라 오차가 크게 발생할 수 있다. 이에 따라 전류 신호의 크기 합이 달라질 수 있으며, 이러한 오차로 인해 90도 A형 누설 전류의 평균 전류 신호 크기와 서로 다른 값을 가질 수 있다.
뿐만 아니라 누전 차단기(10)는 누설 전류의 유형에 따라 서로 다른 크기의 감도 전류가 설정될 수 있다. 일 예로 90도 A형 누설 전류에 대응하는 감도 전류 크기와, 135도 A형 누설 전류에 대응하는 감도 전류 크기는 서로 다를 수 있다. 이 경우 1주기 동안의 90도 A형 누설 전류에 대응하는 평균 전류 신호 크기(도 4a의 (b), 90도 평균 전류 신호 크기)와 1주기 동안의 135도 A형 누설 전류에 대응하는 평균 전류 신호 크기(도 4b의 (b), 135도 평균 전류 신호 크기)는 서로 다른 값을 가질 수 있다.
한편 본 발명의 실시 예에 따른 누전 차단기(10)의 제어부(100)는 상기 90도 평균 전류 신호 크기와 135도 평균 전류 신호 크기 중 어느 하나를, 상기 S310 단계의 평균 전류 신호 기준값으로 설정할 수 있다. 예를 들어 제어부(100)는 S310 단계에서, 상기 90도 평균 전류 신호 크기와 135도 평균 전류 신호 크기 중, 작은 값을 상기 평균 전류 신호 기준값으로 설정할 수 있다. 그리고 현재 검출된 전류로부터 산출된 평균 전류 신호 크기와 비교할 수 있다.
한편 상기 S310 단계의 비교 결과, 현재 검출된 전류로부터 산출된 1주기 동안의 평균 크기(평균 전류 신호 크기)가, 상기 평균 전류 신호 기준값보다 같거나 큰 경우라면, 제어부(100)는 현재 검출된 전류가 A형 누설 전류라고 판단할 수 있다. 그러면 제어부(100)는 트립부(150)를 제어하여 트립 동작을 수행하기 위한 트립 제어 신호를 출력할 수 있다(S316).
그러나 상기 S310 단계의 비교 결과, 누설 전류 검출부(110)로부터 검출된 전류 신호의 1주기 동안의 평균 크기(평균 전류 신호 크기)가, 상기 평균 전류 신호 기준값보다 작은 경우라면, 제어부(100)는 현재 검출된 전류가 A형 누설 전류가 아니라고 판단할 수 있다.
그러면 제어부(100)는 검출된 전류로부터 검출되는 특징들에 근거하여 현재 검출된 전류가 AC형 누설 전류인지 여부를 판별하는 과정(S450)을 통해 AC형 누설 전류인지 여부를 다시 판별할 수 있다. 따라서 제어부(100)는 상기 S312 단계로 진입하여, 상기 S312 단계 내지 S314 단계에 이르는 과정을 더 수행하여, 현재 검출된 전류가 평형 전류인지 또는 누설 전류(AC형 누설 전류)인지 여부를 판별할 수 있다.
이 경우, 모터의 기동 전류 또는 인버터의 고조파로 인한 노이즈 등이 포함된 평형 전류는, AC형 누설 전류 여부를 판별하는 과정(S450)에서 평형 전류로 판별될 수 있으며, 이에 따라 상기 노이즈를 포함하는 평형 전류가 A형 누설 전류로 판별되어 발생하는 트립 동작 오류가 발생할 가능성을 보다 낮출 수 있다.
한편, 상기 S312 단계에서 기본파의 크기 비율을 판단한 결과, 기본파의 크기 비율이 기준비보다 큰 경우, 제어부(100)는 현재 검출된 전류가 지락 전류인지 여부를 더 판단할 수도 있다. 일 예로 제어부(100)는 상기 S312 단계의 판단 결과 검출된 전류의 양 또는 음의 피크값이, 상기 지락 전류를 검출하기 위해 기 설정된 기준값보다 큰 값을 가지는지 여부에 따라, 현재 검출된 전류가 지락 전류인지 여부를 판단할 수도 있다.
그리고 지락 전류로 판단되지 않는 경우에 한해 상기 S314 단계로 진행하여 3고조파 비율에 따라 누설 전류 여부를 판단할 수도 있다. 이 경우 만약 현재 검출된 전류가 지락 전류로 판단되면, 제어부(100)는 바로 상기 S316 단계로 진행하여 트립 제어 신호를 출력하고, 부하와 전로 사이의 연결을 차단할 수도 있다.
한편 상술한 도 3에서는 피크비에 근거하여 현재 검출된 전류가 A형 누설 전류인지 여부를 1차 판단하고, 1차 판단 결과 A형 누설 전류인 경우 A형 누설 전류 판별 과정(S400)을 통해 누설 전류 여부를 판별하고, 판별 결과 누설 전류(A형 누설 전류)로 판별되는 경우, 트립 동작을 수행하기 전에 검출된 전류의 평균 전류 신호 크기를 이용하여 다시 한번 평형 전류 여부를 판별하는 구성을 설명하였다.
그러나 도 3에서 설명한 과정은, 먼저 A형 누설 전류를 판별하는 과정(S400)을 통해 누설 전류 여부가 판단된 이후에, 다시 AC형 누설 전류를 판별하는 과정(S450)을 통해 평형 전류로 판별하는 과정으로서, A형 누설 전류 판별 과정(S400)이 선행되는 과정일 수 있다. 즉, A형 누설 전류를 판별하는 과정(S400)과 AC형 누설 전류를 판별하는 과정(S450)을 모두 거쳐야 하므로, 평형 전류로 판별되는데 소요되는 시간이 길어지고, 불필요한 연산이 더 수행될 수도 있다.
이에 A형 누설 전류 여부를 판별하는 과정(S400)을 수행하기 전에, 상기 평균 전류 신호 크기에 근거하여 A형 누설 전류 여부를 판별하는 과정을 먼저 수행할 수도 있음은 물론이다. 즉, 상기 도 3의 S304 단계에서 1차 전류 유형을 판별한 결과, 현재 검출된 전류가 A형 누설 전류로 판별되는 경우, 상기 S310 단계를 먼저 수행함으로써 A형 누설 전류 판별 과정(S400) 또는 AC형 누설 전류 판별 과정(S450) 중 어느 하나의 과정을 통해 평형 전류 여부가 검출되도록 할 수도 있음은 물론이다.
도 5는 이러한 경우에 본 발명의 실시 예에 따른 누전 차단기(10)의 동작 과정을 도시한 예이다.
도 5를 살펴보면, 상기 도 3과 동일하게 S300 단계에서 누설 전류 검출부(110)를 통해 전류가 검출될 수 있으며, S300 단계에서 검출된 전류로부터 피크값, 실효값, 기본파의 크기, 3고조파 비율 및 1주기 동안의 전류 신호 크기와 같은 다양한 특징들이 검출될 수 있다.
그리고 제어부(100)는 S304 단계로 진행하여 현재 검출된 전류로부터 피크비를 산출하고 산출된 피크비를 기 설정된 피크 기준값과 비교하여, 현재 검출된 전류가 A형 누설 전류인지 또는 AC형 누설 전류 인지 여부를 1차 판단할 수 있다.
한편 상기 1차 판단된 전류의 유형이 AC형 누설 전류인 경우, 제어부(100)는 AC형 누설 전류를 판별하는 과정(S450)을 통해 현재 검출된 전류가 평형 전류인지, 누설 전류인지 여부를 판별할 수 있다. 뿐만 아니라 피크값과 기 설정된 최대 피크값을 비교하여 현재 검출된 전류가 지락 전류인지 여부를 판별할 수 있다. 그리고 현재 검출된 전류가 누설 전류 또는 지락 전류인 경우라면 S316 단계로 진행하여 트립 제어 신호를 출력할 수 있다.
반면 상기 1차 판단된 전류의 유형이 A형 누설 전류인 경우, 제어부(100)는 S310 단계로 진행하여 현재 검출된 전류에 대한 1주기 동안의 평균 전류 신호 크기와 기 설정된 평균 전류 신호 크기의 기준값을 비교할 수 있다.
그리고 비교 결과 현재 검출된 전류에 대한 평균 전류 신호 크기가 기준값보다 더 큰 경우라면, A형 누설 전류를 판별하는 과정(S400)을 통해 현재 검출된 전류가 평형 전류인지, 누설 전류인지 여부를 판별할 수 있다. 그리고 현재 검출된 전류가 누설 전류인 경우라면 S316 단계로 진행하여 트립 제어 신호를 출력할 수 있다.
그러나 비교 결과 현재 검출된 전류에 대한 평균 전류 신호 크기가 기준값보다 더 작거나 같은 경우라면, 제어부(100)는 AC형 누설 전류를 판별하는 과정(S450)을 수행할 수 있다. 그리고 상기 AC형 누설 전류를 판별하는 과정(450)을 통해 현재 검출된 전류가 평형 전류인지 여부를 판별하고, 평형 전류가 아닌 경우 S316 단계로 진행하여 트립 제어 신호를 출력할 수 있다.
따라서 도 5에서 설명된 과정의 경우, 1차 판단된 전류의 유형이 A형 누설 전류인 경우에도, 1주기 동안의 평균 전류 신호 크기에 근거하여 A형 누설 전류 여부를 재확인한 이후에 A형 누설 전류 판별 과정(S400)을 수행하므로, 어느 하나의 누설 전류 판별 과정만으로 평형 전류인지 여부가 판별될 수 있다. 따라서 보다 짧은 시간에 보다 작은 연산량으로 평형 전류 여부가 검출될 수 있다.
한편 상술한 설명에서는, 1주기 동안의 평균 전류 신호 크기에 따라 A형 누설 전류 여부를 재확인(S310 단계)하는 것만을 설명하였으나, 상기 평균 전류 신호 크기 뿐만 아니라, 1주기 동안에 유효한 크기를 가지는 전류 신호가 검출된 시간의 비율, 즉 유효 전류 시간비를 더 고려하여 A형 누설 전류 여부를 재확인할 수도 있음은 물론이다.
도 6은 이러한 유효 전류 시간비를 설명하기 위한 예시도이다.
도 6을 참조하여 살펴보면, 도 6은 기 설정된 1주기 동안에 누설 전류 검출부(110)에서 검출된 전류 신호의 예를 보이고 있다. 이 경우 검출된 전류 신호는 노이즈나 임피던스 부정합 등의 문제로 평형 전류라고 할지라도 0이 아닌 음 또는 양의 값을 가질 수 있다. 따라서 영상 변류기를 통해 이를 검출할 경우, 도 6에서 보이고 있는 바와 같은 파형을 가지는 전류 신호가 검출될 수 있다.
이러한 경우 제어부(100)는 일정 크기 이상의 값을 가지는 전류 신호가 검출되는 시간을 측정할 수 있다. 즉, 제어부(100)는 기 설정된 양(+)의 전압값과 음(-)의 전압값을 벗어나는 크기를 가지는 전류 신호가 검출되는 경우에 이를 0이 아닌 전류, 즉 유효한 전류가 검출된 것으로 판단할 수 있다. 그리고 기 설정된 1주기 동안의 시간과 상기 유효한 전류가 검출된 시간의 비율을 산출하여 상기 유효 전류 시간비를 산출할 수 있다.
한편 유효 전류 시간비가 산출되면, 제어부(100)는 산출된 유효 전류 시간비와 상기 평균 전류 신호 크기 중 적어도 하나에 근거하여, 상기 S310 단계에서 A형 누설 전류 여부를 재확인할 수도 있다.
도 7은 이처럼 본 발명의 S310 단계에서, 평균 전류 신호 크기와 유효 전류 시간비에 근거하여 A형 누설 전류 여부를 구분하는 동작 과정을 도시한 것이다.
도 7을 참조하여 살펴보면, 본 발명의 실시 예에 따른 누전 차단기(10)의 제어부(100)는 상기 도 3 또는 도 5에서 S310 단계가 시작되면, 먼저 유효 전류 시간비와 기 설정된 시간비, 즉 기준 시간비를 비교할 수 있다(S700).
일 예로 상기 도 1에서 보이고 있는 바와 같이, 노이즈의 경우 전류 신호가 검출되는 위상 구간이 매우 짧기 때문에 이에 대한 유효 전류 시간비를 검출하는 경우 유효 전류 시간비가 매우 작게 산출될 수 있다. 그리고 상기 기준 시간비 역시 매우 작은 값이 설정될 수 있다(예 : 1ms). 따라서 상기 유효 전류 시간비가 기 설정된 기준 시간비와 작거나 같은 정도로 매우 작은 경우라면, 제어부(100)는 현재 검출된 전류가 노이즈가 포함된 평형 전류로 판단할 수 있으며, 바로 AC형 누설 전류를 판별하는 과정(S450)으로 진입하여 평형 전류 여부를 판별할 수 있다.
그러나 유효 전류 시간비가 기 설정된 기준 시간비보다 큰 경우라면, 제어부(100)는 현재 검출된 전류로부터 평균 전류 신호 크기를 산출할 수 있다. 그리고 산출된 평균 전류 신호 크기와 기 설정된 기준값을 비교한 결과에 따라 AC형 누설 전류를 판별하는 과정(S450)을 더 수행하여 평형 전류 여부를 판별할 수 있다(도 3). 또는 상기 AC형 누설 전류를 판별하는 과정(S450) 또는 A형 누설 전류를 판별하는 과정(S400) 중 어느 하나를 통해 평형 전류 여부를 판별할 수 있다(도 5).
여기서 상기 기 설정된 기준값은, 누전 차단기(10)의 감도 전류에 따른 복수의 서로 다른 위상 제어값에 따른 A형 누설 전류의 1주기 동안의 평균 전류 신호 크기들 중 작은 값을 의미할 수 있다. 또한 상기 감도 전류는 위상이 서로 다른 A형 누설 전류 별로 다르게 설정될 수도 있다.
한편 제어부(100)는 상기 유효 전류 시간비 및 평균 전류 신호 크기 중 적어도 하나에 근거한 판단 결과, 현재 검출된 전류가 A형 누설 전류로 판별되지 않는 경우, 현재 검출된 전류를 평형 전류로 바로 판별할 수도 있다.
그러면 제어부(100)는 상기 S700 단계에서 유효 전류 시간비가 기준 시간비보다 작거나 같거나, 상기 S702 단계에서 평균 전류 신호 크기가 기준값(평균 전류 신호 기준값)보다 작거나 같은 경우, 도 3 또는 도 5의 S300 단계로 진입하여 누설 전류 검출부(110)가 전류를 검출하는 과정을 다시 시작할 수도 있다. 따라서 AC형 누설 전류 판별 과정이 수행되지 않으므로 트립 제어 신호가 출력되지 않으며, 트립 동작이 수행되지 않을 수 있다. 그러므로 전로에 부하가 연결되는 상태가 유지될 수 있다.
도 8은 노이즈를 포함하는 전류가 검출되는 경우, 본 발명에 따른 누전 차단기(10)가 검출된 전류가 평형 전류로 구분하는 예를 설명하기 위한 예시도이다.
도 8을 참조하여 살펴보면, 도 8의 (a)는 모터 기동 전류 또는 인버터의 고조파로 인한 노이즈가 포함된 전류가 검출되는 예를 도시한 것이다. 이 경우 노이즈는 도 8의 (a)에서 보이고 있는 바와 같이 일정값 이상의 양 또는 음의 전압값을 가지는 전류 신호로 나타날 수 있다.
본 발명의 실시 예에 따른 누전 차단기(10)의 제어부(100)는 도 8의 (a)에서 도시된 바와 같은 전류가 검출되는 경우, 먼저 양 또는 음의 피크값을 검출하고, 둘 중 작은 값을 기준으로 피크비를 산출할 수 있다. 이 경우 양의 피크값은 0에 가까운 값으로 검출될 수 있으며, 음의 피크값은 노이즈의 최대 전압에 해당되는 값을 가지므로 피크비는 1보다 훨씬 큰 값으로 산출될 수 있다. 따라서 피크 기준값이 '1'인 경우라면, 제어부(100)는 현재 검출된 전류를 A형 누설 전류라고 1차 판단할 수 있다.
한편, 검출된 전류가 A형 누설 전류로 1차 판단된 경우, 제어부(100)는 A형 누설 전류 판별 과정(S400)을 거친 후(도 3에 따른 경우(A형 누설 전류 판별 과정(400)에서 A형 누설 전류로 판별된 경우를 가정함) ), 또는 상기 1차 판단 이후 바로(도 5에 따른 경우), 상기 검출된 전류 신호에 따른 평균 전류 신호 크기와 기준 크기(평균 전류 신호 기준값)를 비교할 수 있다.
이 경우 기준값, 즉 트립 구동이 요구되는 90도 A형 누설 전류 또는 135도 누설 전류에 대한 1주기 동안의 평균 전류 신호의 크기는, 도 8의 (b)에서 보이고 있는 점선 그래프(800)와 같이 나타날 수 있다.
반면 도 8의 (a)에서 보이고 있는 전류의 경우, 노이즈로 인해 극히 짧은 시간 동안에 일정 크기 이상의 전류가 발생한 경우이므로, 1주기에 해당하는 시간으로 평균 크기를 산출하면 도 8의 (b)에서 보이고 있는 실선 그래프(810)와 같이 나타날 수 있다. 따라서 기준이 되는 상기 90도 A형 누설 전류 또는 135도 누설 전류에 대한 1주기 동안의 평균 전류 신호의 크기보다 작은 값을 가질 수 있다.
그러므로 본 발명의 실시 예에 따른 누전 차단기(10)의 제어부(100)는, 검출된 전류가 피크비에 근거하여 A형 누설 전류로 판별되는 경우라고 할지라도 상기 1주기 동안의 평균 전류 신호 크기를 비교한 결과에 따라 현재 검출된 전류를 평형 전류로 판단할 수 있다. 이에 따라 노이즈등을 포함하는 전류 신호가 A형 누설 전류로 오인되어 트립 동작이 수행되는 경우가 사전에 방지될 수 있다.
한편 상술한 설명에서는 피크 기준값으로 1이 설정되는 예를 가정하여 설명하였으나, 본 발명이 이에 한정되는 것이 아니며, 얼마든지 1 외에 다른 값이 설정될 수 있다.
또한 상기 S304 단계의 경우 양의 피크값과 음의 피크값 중 작은 값을 기준으로 피크비를 산출하였기에, 피크비가 피크 기준값보다 큰 경우에 A형 누설 전류로 판별하고, 작은 경우에 AC형 누설 전류로 판별하는 구성을 설명하였다. 그러나 피크비를 산출하는 기준이 달라지는 경우, 즉 양의 피크값과 음의 피크값 중 큰 값이 기준이 되는 경우, 피크비가 피크 기준값보다 작은 경우에 A형 누설 전류로 판별하고, 큰 경우에 AC형 누설 전류로 판별될 수 있음은 물론이다.
한편 상술한 설명에서는 S302 단계에서, 누설 전류 검출부(110)로부터 검출된 전류를 변환한 결과에 대하여, 전류 유형을 구분하기 위한 다양한 특징들이 검출되는 것으로 설명하였다. 그러나 이와는 달리, 각 특징별로 전류 유형을 판단하는 과정에서 필요한 특징들이 검출될 수도 있음은 물론이다.
즉, 상기 S304 단계에서는 피크비의 비교를 위해 상기 S302 단계에서 변환된 전류 신호로부터 양의 피크값 및 음의 피크값을 검출하는 과정을 더 포함할 수 있으며, 상기 S306 단계에서는 실효값의 비교를 위해 상기 변환된 전류 신호로부터 실효값을 산출하는 과정을 더 포함할 수 있다. 또한 S312 단계에서는 기본파의 크기 비교를 위해 상기 변환된 전류 신호로부터 기본파의 크기를 검출하는 과정을 더 포함할 수 있으며, S308 단계 및 S314 단계에서는 3고조파 비율의 비교를 위해 상기 변환된 전류 신호로부터 3고조파 비율을 산출하는 단계를 더 포함할 수 있다. 이 경우 상기 S302 단계는 생략될 수도 있다.
전술한 본 발명은, 프로그램이 기록된 매체에 컴퓨터가 읽을 수 있는 코드로서 구현하는 것이 가능하다. 컴퓨터가 읽을 수 있는 매체는, 컴퓨터 시스템에 의하여 읽혀질 수 있는 데이터가 저장되는 모든 종류의 기록장치를 포함한다. 컴퓨터가 읽을 수 있는 매체의 예로는, HDD(Hard Disk Drive), SSD(Solid State Disk), SDD(Silicon Disk Drive), ROM, RAM, CD-ROM, 자기 테이프, 플로피 디스크, 광 데이터 저장 장치 등이 있으며, 또한 캐리어 웨이브(예를 들어, 인터넷을 통한 전송)의 형태로 구현되는 것도 포함한다.
또한, 상기 컴퓨터는 상기 제어부를 포함할 수도 있다. 따라서 상기의 상세한 설명은 모든 면에서 제한적으로 해석되어서는 아니되고 예시적인 것으로 고려되어야 한다. 본 발명의 범위는 첨부된 청구항의 합리적 해석에 의해 결정되어야 하고, 본 발명의 등가적 범위 내에서의 모든 변경은 본 발명의 범위에 포함된다.

Claims (20)

  1. 전로에 흐르는 전류를 검출하는 전류 검출부;
    트립 제어 신호가 수신되면 전로와 부하 사이의 연결을 차단하는 트립부;
    전류 검출부에서 검출된 전류로부터, 양의 피크값과 음의 피크값, 실효값, 기본파 크기, 3고조파 비율을 검출 및, 기 설정된 1주기 동안의 크기 평균값을 산출하는 특징 검출부; 및,
    검출된 피크값들의 비율에 근거하여 상기 검출된 전류를, 기 설정된 파형을 가지는 제1 누설 전류 또는 상기 기 설정된 파형과 다른 파형을 가지는 제2 누설 전류 중 어느 하나로 1차 판단하고,
    상기 1차 판단 결과 상기 검출된 전류가 상기 제1 누설 전류로 판단되는 경우, 상기 실효값, 3고조파 비율 및 기본파 크기 중 적어도 하나와 상기 크기 평균값에 근거하여 상기 트립 제어 신호를 상기 트립부로 출력하는 제어부를 포함하는 것을 특징으로 하는 누전 차단기.
  2. 제1항에 있어서, 상기 제어부는,
    상기 누전 차단기의 감도 전류를 기준으로, 복수의 서로 다른 위상 제어값에 따른 제1 누설 전류들의 상기 1주기 동안의 평균 크기들 중 어느 하나에 근거하여 기준값을 설정하고,
    상기 검출된 전류 신호로부터 산출된 상기 1주기 동안의 크기 평균값과 상기 기준값을 비교한 결과에 근거하여 상기 트립 제어 신호를 출력하는 것을 특징으로 하는 누전 차단기.
  3. 제2항에 있어서, 상기 제어부는,
    상기 복수의 서로 다른 위상 제어값에 따른 제1 누설 전류들의 상기 1주기 동안의 평균 크기들 중 작은 값을 상기 기준값으로 설정하는 것을 특징으로 하는 누전 차단기.
  4. 제2항에 있어서,
    상기 복수의 서로 다른 위상 제어값에 따른 제1 누설 전류들은,
    90도로 위상이 제어된 제1 누설 전류 또는 135도로 위상이 제어된 제1 누설 전류임을 특징으로 하는 누전 차단기.
  5. 제2항에 있어서, 상기 누전 차단기의 감도 전류는,
    서로 다른 위상 제어값을 가지는 제1 누설 전류들 각각에 따라 서로 다르게 설정되는 것을 특징으로 하는 누전 차단기.
  6. 제1항에 있어서,
    상기 특징 검출부는,
    상기 검출된 전류로부터, 기 설정된 값 이상의 크기를 가지는 전류 신호가 발생한 시간을 검출하고, 검출된 시간과 상기 1주기에 대응하는 시간의 비율을 유효 전류 시간비로 더 산출하고,
    상기 제어부는,
    상기 1차 판단 결과, 상기 검출된 전류가 상기 제1 누설 전류로 판단되는 경우, 상기 1주기 동안의 크기 평균값과 상기 유효 전류 시간비 중 적어도 하나에 근거하여 상기 트립 제어 신호를 출력하는 것을 특징으로 하는 누전 차단기.
  7. 제6항에 있어서, 상기 제어부는,
    상기 유효 전류 시간비와 기 설정된 기준비율을 비교한 결과, 상기 유효 전류 시간비가 상기 기준비율 보다 더 큰 경우, 상기 크기 평균값에 근거하여 상기 트립 제어 신호를 출력하는 것을 특징으로 하는 누전 차단기.
  8. 제1항에 있어서, 상기 전류 검출부는,
    상기 피크값들 중 작은 값을 기준값으로 설정하고,
    산출된 피크값들의 비율이 기 설정된 피크값 기준 비율을 초과하는 경우 상기 검출된 전류를 상기 제1 누설 전류로 판별하며,
    산출된 피크값들의 비율이 상기 피크값 기준 비율보다 작거나 같은 경우 상기 검출된 전류를 상기 제2 누설 전류로 판별하는 것을 특징으로 하는 누전 차단기.
  9. 제8항에 있어서,
    상기 피크값 기준 비율은 1임을 특징으로 하는 누전 차단기.
  10. 제1항에 있어서,
    상기 제어부는,
    상기 1차 판단 결과에 따라 상기 제1 누설 전류에 따른 제1 판별 과정 및 상기 제2 누설 전류에 따른 제2 판별 과정 중 어느 하나에 따른 판별 결과에 근거하여 상기 트립 제어 신호를 출력하며,
    상기 제1 판별 과정은,
    상기 실효값과 상기 3고조파 비율에 근거하여 누설 전류 여부를 판별하는 과정이며,
    상기 제2 판별 과정은,
    상기 기본파의 크기와 상기 3고조파 비율에 근거하여 누설 전류 여부를 판별하는 과정임을 특징으로 하는 누전 차단기.
  11. 제10항에 있어서, 상기 제어부는,
    상기 제1 판별 과정에 따라 상기 검출된 전류가 누설 전류로 판별된 경우, 상기 크기 평균값과 기 설정된 기준값을 비교한 결과에 따라 상기 트립 제어 신호를 출력하거나, 또는 상기 검출된 전류에 대해 상기 제2 판별 과정을 더 수행하고, 더 수행된 상기 제2 판별 과정에 따른 판별 결과에 근거하여 상기 트립 제어 신호를 출력하는 것을 특징으로 하는 누전 차단기.
  12. 전로에 흐르는 전류를 검출하는 단계;
    상기 검출된 전류로부터, 양의 피크값 및 음의 피크값을 검출하는 단계;
    상기 검출된 피크값들의 비율에 따라, 상기 검출된 전류를 기 설정된 파형을 가지는 제1 누설 전류 또는 상기 기 설정된 파형과 다른 파형을 가지는 제2 누설 전류 중 어느 하나로 1차 판단하는 단계; 및,
    상기 1차 판단 결과 상기 검출된 전류가 상기 제1 누설 전류로 판단되는 경우, 상기 검출된 전류로부터 측정된 실효값, 3고조파 비율 및 기본파 크기 중 적어도 하나와 상기 검출된 전류로부터 산출된 기 설정된 1주기 동안의 크기 평균값에 근거하여 상기 전로로부터 부하를 차단시키기 위한 트립 제어 신호를 출력하는 단계를 포함하는 것을 특징으로 하는 누전 차단기의 제어 방법.
  13. 제12항에 있어서, 상기 트립 제어 신호를 출력하는 단계는,
    상기 1차 판단 결과 상기 검출된 전류가 상기 제1 누설 전류로 판단되는 경우, 상기 크기 평균값과 기 설정된 기준값을 비교하는 단계; 및,
    상기 비교 결과에 근거하여, 상기 제1 누설 전류에 따른 제1 판별 과정 및, 상기 제2 누설 전류에 따른 제2 판별 과정 중 어느 하나에 따른 판별 결과에 근거하여 상기 트립 제어 신호를 출력하는 단계를 포함하는 것을 특징으로 하는 누전 차단기의 제어 방법.
  14. 제13항에 있어서, 상기 기준값은,
    상기 누전 차단기의 감도 전류를 기준으로, 복수의 서로 다른 위상 제어값에 따른 제1 누설 전류들의 상기 1주기 동안의 평균 크기들 중 어느 하나에 근거하여 설정되는 값임을 특징으로 하는 누전 차단기의 제어 방법.
  15. 제14항에 있어서,
    상기 기준값은,
    상기 복수의 서로 다른 위상 제어값에 따른 제1 누설 전류들의 상기 1주기 동안의 평균 크기들 중 작은 값이며,
    상기 복수의 서로 다른 위상 제어값에 따른 제1 누설 전류들은,
    90도로 위상이 제어된 제1 누설 전류 또는 135도로 위상이 제어된 제1 누설 전류임을 특징으로 하는 누전 차단기의 제어 방법.
  16. 제13항에 있어서,
    상기 크기 평균값과 기 설정된 기준값을 비교하는 단계는,
    상기 검출된 전류 신호로부터 기 설정된 값 이상의 크기를 가지는 전류 신호가 발생한 시간에 근거하여 산출되는 유효 전류 시간비와 기 설정된 기준비율을 비교하고, 비교 결과에 따라 상기 크기 평균값과 기 설정된 기준값을 비교하는 단계임을 특징으로 하는 누전 차단기의 제어 방법.
  17. 제16항에 있어서,
    상기 크기 평균값과 기 설정된 기준값을 비교하는 단계는,
    상기 유효 전류 시간비와 기준 비율을 비교한 결과,
    상기 유효 전류 시간비가 상기 기준비율 보다 더 큰 경우에 상기 크기 평균값과 기 설정된 기준값을 비교하고,
    상기 유효 전류 시간비가 상기 기준비율 보다 작거나 같은 경우 상기 제2 판별 과정에 따른 판별 결과에 따라 트립 제어 신호를 출력하는 단계임을 특징으로 하는 누전 차단기의 제어 방법.
  18. 제12항에 있어서, 상기 검출된 전류를 1차 판단하는 단계는,
    상기 피크값들 중 작은 값을 기준값으로 설정하고,
    산출된 피크값들의 비율이 기 설정된 피크값 기준 비율을 초과하는 경우 상기 검출된 전류를 상기 제1 누설 전류로 판별하며,
    산출된 피크값들의 비율이 상기 피크값 기준 비율보다 작거나 같은 경우 상기 검출된 전류를 상기 제2 누설 전류로 판별하는 단계임을 특징으로 하는 누전 차단기의 제어 방법.
  19. 제18항에 있어서,
    상기 피크값 기준 비율은 1임을 특징으로 하는 누전 차단기의 제어 방법.
  20. 제12항에 있어서, 상기 트립 제어 신호를 출력하는 단계는,
    상기 1차 판단 결과, 상기 검출된 전류가 상기 제1 누설 전류로 판단되는 경우, 상기 제1 누설 전류에 따른 제1 판별 과정에 따라 누설 전류 여부를 판단하는 단계;
    상기 제1 판별 과정에 따른 판별 결과, 상기 검출된 전류가 누설 전류인 경우 상기 크기 평균값과 기 설정된 기준값을 비교하는 단계; 및,
    상기 크기 평균값과 기 설정된 기준값을 비교한 결과에 따라 상기 트립 제어 신호를 출력하거나, 또는 상기 제2 누설 전류에 따른 제2 판별 과정에 따른 판별 결과에 따라 상기 트립 제어 신호를 출력하는 단계를 포함하는 것을 특징으로 하는 누전 차단기의 제어 방법.
PCT/KR2021/002879 2020-07-09 2021-03-09 누전 차단기 및 그 누전 차단기의 제어 방법 WO2022010066A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR10-2020-0084922 2020-07-09
KR1020200084922A KR102468642B1 (ko) 2020-07-09 2020-07-09 누전 차단기 및 그 누전 차단기의 제어 방법

Publications (1)

Publication Number Publication Date
WO2022010066A1 true WO2022010066A1 (ko) 2022-01-13

Family

ID=79553280

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2021/002879 WO2022010066A1 (ko) 2020-07-09 2021-03-09 누전 차단기 및 그 누전 차단기의 제어 방법

Country Status (2)

Country Link
KR (1) KR102468642B1 (ko)
WO (1) WO2022010066A1 (ko)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102656937B1 (ko) * 2023-11-09 2024-04-12 (주)플루토테크놀로지 미소전류 측정을 위한 측정 전류 구간 자동 절환 및 노이즈 제거 기술을 이용한 피뢰기 접지선 누설전류 측정장치

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07312823A (ja) * 1994-05-16 1995-11-28 Toshiba Fa Syst Eng Kk 直流漏電検出保護装置
JP2002199579A (ja) * 2000-12-28 2002-07-12 Tokyo Electric Power Co Inc:The 配電系統の監視方法
KR20040072538A (ko) * 2001-10-04 2004-08-18 가부시키가이샤 히타치세이사쿠쇼 감시 장치
KR20160041868A (ko) * 2016-03-28 2016-04-18 엘에스산전 주식회사 누전차단기
KR102017805B1 (ko) * 2018-03-28 2019-09-03 엘에스산전 주식회사 누전 차단기

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07312823A (ja) * 1994-05-16 1995-11-28 Toshiba Fa Syst Eng Kk 直流漏電検出保護装置
JP2002199579A (ja) * 2000-12-28 2002-07-12 Tokyo Electric Power Co Inc:The 配電系統の監視方法
KR20040072538A (ko) * 2001-10-04 2004-08-18 가부시키가이샤 히타치세이사쿠쇼 감시 장치
KR20160041868A (ko) * 2016-03-28 2016-04-18 엘에스산전 주식회사 누전차단기
KR102017805B1 (ko) * 2018-03-28 2019-09-03 엘에스산전 주식회사 누전 차단기

Also Published As

Publication number Publication date
KR102468642B1 (ko) 2022-11-18
KR20220006917A (ko) 2022-01-18

Similar Documents

Publication Publication Date Title
WO2020159026A1 (ko) 누전 차단기 및 그 누설 전류 검출 방법
AU2005288465B2 (en) Leak current breaker and method
WO2021194063A1 (ko) 모듈러 멀티레벨 컨버터의 제어장치 및 제어방법
WO2018208057A1 (ko) 전도성 노이즈 억제 장치, 전력 변환 장치 및 모터 장치
WO2021251739A1 (ko) 아크 감지 시스템 및 방법
WO2014077596A1 (ko) 인버터의 리플 및 옵셋 보상 장치 및 그 방법
WO2022010066A1 (ko) 누전 차단기 및 그 누전 차단기의 제어 방법
WO2019190018A1 (ko) 누전 차단기
WO2017043750A1 (ko) 마이크로그리드용 인버터 장치 및 이를 제어하는 방법
WO2019212125A1 (ko) 차단기 제어 모듈
WO2012043938A1 (ko) 전력조류 제어 시스템 및 방법
US8411400B2 (en) Method and apparatus for mitigation of dynamic overvoltage
KR20080087654A (ko) 누전 검출 장치
WO2019027144A1 (ko) Dc-dc 전압 컨버터 및 전압 레귤레이터를 갖는 차량 전기 시스템을 위한 진단 시스템
WO2013151217A1 (en) Protection apparatus and control method for the same
WO2018124467A1 (ko) 모터 제어 장치 및 모터 제어 장치의 제어 방법
WO2019221362A1 (ko) 셀프 파워 계전기 및 이의 오동작 방지 방법
WO2020105844A1 (ko) 누전 차단기 및 그 누전 차단기의 제어 방법
WO2021118071A2 (ko) 보호 계전기 및 그 보호 계전기의 단선 검출 방법
WO2023085616A1 (ko) 절연 감시 장치 및 그 절연 감시 장치의 제어 방법
WO2021221258A1 (ko) 제어 파라미터 설정 및 양품 판정을 수행하는 생산 장비
WO2015174569A1 (ko) 태양광발전 인버터 시스템용 afd 단독운전 검출 모듈 및 이를 이용한 afd 단독운전 검출 방법
WO2022203257A1 (ko) 차단기
WO2019074251A1 (ko) 리니어 압축기의 제어 장치 및 리니어 압축기의 제어 방법
WO2019190170A1 (ko) 안정도 향상된 고압 전력선 경로 탐사 장치 및 방법

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21836997

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21836997

Country of ref document: EP

Kind code of ref document: A1