WO2021222981A1 - Système de broyage de site minier et méthodologie - Google Patents

Système de broyage de site minier et méthodologie Download PDF

Info

Publication number
WO2021222981A1
WO2021222981A1 PCT/AU2021/050414 AU2021050414W WO2021222981A1 WO 2021222981 A1 WO2021222981 A1 WO 2021222981A1 AU 2021050414 W AU2021050414 W AU 2021050414W WO 2021222981 A1 WO2021222981 A1 WO 2021222981A1
Authority
WO
WIPO (PCT)
Prior art keywords
conveyor
stockpile
arrangement
grizzly
stacker
Prior art date
Application number
PCT/AU2021/050414
Other languages
English (en)
Inventor
Heath Lawrence WILLIAMS
John Alec SEXTON
Original Assignee
Leschenault Industries Pty Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from AU2020901418A external-priority patent/AU2020901418A0/en
Application filed by Leschenault Industries Pty Ltd filed Critical Leschenault Industries Pty Ltd
Priority to AU2021267559A priority Critical patent/AU2021267559B2/en
Publication of WO2021222981A1 publication Critical patent/WO2021222981A1/fr

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B15/00Combinations of apparatus for separating solids from solids by dry methods applicable to bulk material, e.g. loose articles fit to be handled like bulk material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C21/00Disintegrating plant with or without drying of the material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/08Separating or sorting of material, associated with crushing or disintegrating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/08Separating or sorting of material, associated with crushing or disintegrating
    • B02C23/14Separating or sorting of material, associated with crushing or disintegrating with more than one separator
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C23/00Auxiliary methods or auxiliary devices or accessories specially adapted for crushing or disintegrating not provided for in preceding groups or not specially adapted to apparatus covered by a single preceding group
    • B02C23/08Separating or sorting of material, associated with crushing or disintegrating
    • B02C23/16Separating or sorting of material, associated with crushing or disintegrating with separator defining termination of crushing or disintegrating zone, e.g. screen denying egress of oversize material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B1/00Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
    • B07B1/12Apparatus having only parallel elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B1/00Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
    • B07B1/28Moving screens not otherwise provided for, e.g. swinging, reciprocating, rocking, tilting or wobbling screens
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B1/00Sieving, screening, sifting, or sorting solid materials using networks, gratings, grids, or the like
    • B07B1/28Moving screens not otherwise provided for, e.g. swinging, reciprocating, rocking, tilting or wobbling screens
    • B07B1/40Resonant vibration screens
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07BSEPARATING SOLIDS FROM SOLIDS BY SIEVING, SCREENING, SIFTING OR BY USING GAS CURRENTS; SEPARATING BY OTHER DRY METHODS APPLICABLE TO BULK MATERIAL, e.g. LOOSE ARTICLES FIT TO BE HANDLED LIKE BULK MATERIAL
    • B07B13/00Grading or sorting solid materials by dry methods, not otherwise provided for; Sorting articles otherwise than by indirectly controlled devices
    • B07B13/14Details or accessories
    • B07B13/16Feed or discharge arrangements

Definitions

  • This invention relates to the field of mining, in general, and more specifically to a comminution arrangement for a mine site, a comminution methodology, a mine site having such a comminution arrangement and a method of mining comprising such a comminution methodology.
  • Run of Mine For example, in a typical mining environment, such as an iron ore mine, Run of Mine (ROM) is delivered to a primary crusher by haul trucks, conveyors and related material moving equipment. At the ROM pad, mined material or ROM is dumped into a primary crusher where large rock fragments are broken into smaller sizes. Crushing to the proper size usually occurs in stages as rapid size reduction, accomplished by applying large forces, commonly results in the production of excessive fines. For this reason, after primary crushing, the material is typically run through one or more secondary crushers. The material is screened after each crushing cycle to separate properly sized particles ("throughs") from those needing additional crushing ("overs"). Additional washing, screening, or other processing may be required to remove undesirable material. The crushed material is then stockpiled awaiting shipment.
  • ROM Run of Mine
  • any delays at the primary crusher generally delays the entire processing of mined ore, which delays mine production and has significant adverse financial effects.
  • delays include oversized rocks delivered to the primary crusher, foreign material entering the crusher (such as ground engaging tools or GET that combine with ore during the mining process), continuity of delivering mined material to the crusher, and the like.
  • reference herein to an apron feeder generally includes reference to a suitable feeder in which mined material is carried on an apron conveyor and in which the rate of feed is adjusted either by varying a depth of material or the speed of the conveyor, or both.
  • reference herein to Run of Mine (ROM) generally refers to ore that has been mined and ready to go to a mine processing plant, i.e. raw mined materials prior to processing by a mining processing plant, such as a primary crusher, or the like.
  • a comminution arrangement for a mine site, said arrangement comprising: a feed bin for receiving mined material and including: i) a grizzly at an upper portion thereof configured to allow material below a predetermined size to pass whilst filtering larger material; ii) an apron feeder at a lower portion thereof for regulating feeding of material; and iii) a vibrating grizzly feeder operatively fed with material from the apron feeder; a stacker conveyor configured to receive material from the grizzly feeder, said stacker conveyor feeding a radial stacker for stacking at least one ore stockpile with material; for each ore stockpile, a stockpile reclaim conveyor arranged within a reclaim tunnel below said stockpile and configured to selectively convey material from such stockpile; and a crusher feed conveyor operatively fed with material from at least one stockpile reclaim conveyor, said crusher feed conveyor for supplying Run of Mine (ROM
  • the feed bin is sized and dimensioned to receive mined material from a plurality of haul trucks simultaneously.
  • the feed bin is sized and dimensioned to accommodate five haul trucks simultaneously dumping mined material therein.
  • the feed bin defines a funnel-like structure for guiding received material towards the apron feeder under the influence of gravity.
  • the arrangement comprises a rockbreaker proximate the grizzly for reducing the filtered larger material below the predetermined size.
  • the rockbreaker comprises a mobile and/or stationary rockbreaker, i.e. mounted on a pedestal or slew frame, and/or mounted on an excavator platform.
  • the grizzly is configured such that the predetermined size of material is selectable according to mining process requirements.
  • the apron feeder is configured to regulate and control a rate of feeding of material from the feed bin to the vibrating grizzly feeder.
  • the stacker conveyor stacks three to five ore stockpiles.
  • the stacker conveyor stacks the ore stockpiles according to a grade of material, e.g. a high- grade stockpile, a medium grade stockpile, a low-grade stockpile, etc.
  • the stacker conveyor includes at least one belt magnet configured to remove unwanted magnetic material from the conveyed material.
  • the at least one belt magnet is arranged along a length of the stacker conveyor between the grizzly feeder and the radial stacker.
  • each stockpile reclaim conveyor is selectively operable to allow blending of material conveyed to the crusher feed conveyor.
  • the crusher feed conveyor includes at least one secondary belt magnet configured to remove unwanted magnetic material from the conveyed material.
  • the feed bin is arranged at a higher level, the radial stacker at an intermediate level, and the stockpiles and crusher feed conveyor at a lower level relative to each other on the mine site.
  • a comminution methodology comprising the steps of: receiving, via a feed bin, mined material, said feed bin comprising: i) a grizzly at an upper portion thereof configured to allow material below a predetermined size to pass whilst filtering larger material; ii) an apron feeder at a lower portion thereof for regulating feeding of material; and iii) a vibrating grizzly feeder operatively fed with material from the apron feeder; stacking, via a radial stacker fed by a stacker conveyor which receives material from the grizzly feeder, at least one ore stockpile with material; selectively reclaiming from a stockpile, via a stockpile reclaim conveyor arranged within a reclaim tunnel below said stockpile, material from a desired stockpile; and feeding, via a crusher feed conveyor operatively fed with material from a stockpile reclaim conveyor, Run of Mine (ROM) material to
  • the method includes the step of reducing a size of larger material filtered by the grizzly via a rockbreaker positioned proximate the grizzly for reducing such filtered larger material below the predetermined size.
  • the step of stacking comprises stacking three to five ore stockpiles.
  • the step of stacking comprises stacking the ore stockpiles according to a grade of material, e.g. a high-grade stockpile, a medium grade stockpile, a low- grade stockpile, etc.
  • a grade of material e.g. a high-grade stockpile, a medium grade stockpile, a low- grade stockpile, etc.
  • the method includes the step of removing unwanted magnetic material, via a belt magnet, from the material conveyed on the stacker conveyor.
  • the step of selectively reclaiming comprises reclaiming from each stockpile, via a stockpile reclaim conveyor, to allow blending of material conveyed to the crusher feed conveyor.
  • a mine site having a comminution arrangement in accordance with the first aspect of the invention above.
  • a fourth aspect of the invention there is provided a method of mining comprising a comminution methodology in accordance with the second aspect of the invention above.
  • Figure 1 is a diagrammatic perspective overview representation of a comminution arrangement for a mine site, in accordance with an aspect of the present invention
  • Figure 2 is a diagrammatic perspective sectional representation of the arrangement of Figure 1;
  • Figure 3 is diagrammatic side sectional representation of a feed bin of the arrangement
  • Figure 4 is a diagrammatic front view sectional representation of the feed bin of Figure 3;
  • Figure 5 is a diagrammatic side sectional overview representation of the arrangement of Figure 1;
  • Figure 6 is a diagrammatic front view representation of the arrangement of Figure 1;
  • Figure 7 is a diagrammatic top-view overview representation of the arrangement of Figure 1.
  • the arrangement 10 generally comprises a feed bin 12 for receiving mined material, a stacker conveyor 22, a radial stacker 24 for stacking stockpiles 24, stockpile reclaim conveyors 30, and a crusher feed conveyor 34 for feeding a primary crusher 36.
  • the feed bin 12 comprises a grizzly 14 at an upper portion thereof (shown more clearly in Figures 3 and 4) which is configured to allow material below a predetermined size to pass into feed bin 12 whilst filtering larger material, and a rockbreaker 16 proximate the grizzly 14 for reducing such filtered larger material below the predetermined size so that it may pass into the bin 12.
  • the rockbreaker 16 may comprise a mobile and/or stationary rockbreaker, i.e. mounted on a pedestal or slew frame, and/or mounted on an excavator platform, or the like, as is known in the art.
  • the rockbreaker 16 generally reduces larger material below the predetermined size as such larger material lies on the grizzly 14, or it may do so on a surface besides or proximate the grizzly before such reduced material is transferred by means of front-end-loader, or the like, into the feed bin 12, onto the grizzly, etc.
  • front-end-loader or the like
  • Feed bin 12 further typically includes an apron feeder 18 at a lower portion thereof, as shown, for regulating feeding of material, and a vibrating grizzly feeder 20 which is operatively fed with material from the apron feeder 18.
  • Arrangement 10 then features a stacker conveyor 22 which is configured to receive material from the grizzly feeder 20, with said stacker conveyor 22 for feeding a radial stacker 24 with material from the feed bin 12 for stacking on at least one ore stockpile 26.
  • arrangement 10 For each ore stockpile 26, arrangement 10 includes a stockpile reclaim conveyor 30 which is arranged within a reclaim tunnel 32 below that particular stockpile 26 and which is configured to selectively convey material from such a stockpile 26. Finally, arrangement 10 includes a crusher feed conveyor 34 which is operatively fed with material from at least one stockpile reclaim conveyor 30, requirements depending, with the crusher feed conveyor 34 supplying Run of Mine (ROM) to a primary crusher 36.
  • ROM Run of Mine
  • the feed bin 12 is typically sized and dimensioned to receive mined material from a plurality of haul trucks simultaneously.
  • the feed bin 12 may be sized and dimensioned to accommodate, for example, five haul trucks simultaneously dumping mined material therein. Variations hereon are possible and within the scope of the invention .
  • the feed bin 12 typically defines a funnel-like structure for guiding received material towards the apron feeder 18 under the influence of gravity.
  • the grizzly 14 is generally configured such that the predetermined size of material is selectable according to mining process requirements, e.g. 500mm, or the like.
  • the apron feeder 18 is generally configured to regulate and control a rate of feeding of material from the feed bin 12 to the vibrating grizzly feeder 20, as is known in the art.
  • the stacker conveyor 22 typically stacks three to five ore stockpiles 26, although variations hereon as possible and expected.
  • the stacker conveyor 22 stacks the ore stockpiles 26 according to a grade of material, e.g. a high-grade stockpile, a medium grade stockpile, a low-grade stockpile, etc.
  • the stacker conveyor 22 also generally includes at least one belt magnet 28 which is configured to remove unwanted magnetic material, such as GET gear, from the conveyed material.
  • the at least one belt magnet 28 is arranged along a length of the stacker conveyor 22 between the grizzly feeder 20 and the radial stacker 24.
  • the skilled addressee is to appreciate that a plurality of belt magnets may be arranged as desired along the stacker conveyor 24. Variations on the number and location (s) of the at least one belt magnet 28 are possible and within the scope of the present invention.
  • each stockpile reclaim conveyor 30 is selectively operable to allow blending of material conveyed to the crusher feed conveyor 34.
  • the crusher feed conveyor 34 also includes at least one secondary belt magnet 38 which is additionally configured to remove unwanted magnetic material, such as GET gear, from the conveyed material.
  • the at least one belt magnet 28 above variations on a number and location (s) of the at least one secondary belt magnet 38 are possible and expected .
  • the feed bin 12 is arranged at a higher level, the radial stacker 24 at an intermediate level, and the stockpiles 26 and crusher feed conveyor 34 at a lower level relative to each other on the mine site.
  • Such an arrangement facilitates operation of arrangement 10, as understood in the field of mine planning.
  • the present invention further includes a comminution methodology which generally comprises the steps of receiving mined material into feed bin 12, stacking (via radial stacker 14) at least one ore stockpile 26 with material, selectively reclaiming from a stockpile (via stockpile reclaim conveyor 30) material from a desired stockpile, and feeding (via crusher feed conveyor 34) Run of Mine (ROM) material to primary crusher 36.
  • a comminution methodology which generally comprises the steps of receiving mined material into feed bin 12, stacking (via radial stacker 14) at least one ore stockpile 26 with material, selectively reclaiming from a stockpile (via stockpile reclaim conveyor 30) material from a desired stockpile, and feeding (via crusher feed conveyor 34) Run of Mine (ROM) material to primary crusher 36.
  • such a methodology may include steps of receiving mined material from a plurality of haul trucks simultaneously, reducing a size of larger material filtered by the grizzly 14 via the rockbreaker 16, stacking three to five ore stockpiles 26 with radial stacker 24, and/or stacking the ore stockpiles 26 according to a grade of material, e.g. a high-grade stockpile, a medium grade stockpile, a low-grade stockpile, etc.
  • a grade of material e.g. a high-grade stockpile, a medium grade stockpile, a low-grade stockpile, etc.
  • the methodology may include the step of removing unwanted magnetic material, via belt magnet 18, from the material conveyed on the stacker conveyor 22, and/or the step of selectively reclaiming from each stockpile 26, via stockpile reclaim conveyor 30, to allow blending of material conveyed to the crusher feed conveyor 34.
  • Applicant believes it particularly advantageous that the present invention provides for a comminution arrangement 10 and associated methodology which is able to function as intermediary between mined material and ROM supplied for mining processing, such as primary crushing.
  • arrangement 10 is able to provide a buffer against delays in supplying ROM, whilst also enabling blending of ROM material supplied to mining processing.
  • Optional embodiments of the present invention may also be said to broadly consist in the parts, elements and features referred to or indicated herein, individually or collectively, in any or all combinations of two or more of the parts, elements or features, and wherein specific integers are mentioned herein which have known equivalents in the art to which the invention relates, such known equivalents are deemed to be incorporated herein as if individually set forth.
  • well- known processes, well-known device structures, and well-known technologies are not described in detail, as such will be readily understood by the skilled addressee.
  • Spatially relative terms such as “inner, “ “outer, “ “beneath, “ “below, “ “lower, “ “above, “ “upper, “ and the like, may be used herein for ease of description to describe one element or feature's relationship to another element(s) or feature (s) as illustrated in the figures.
  • Spatially relative terms may be intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the figures. For example, if the device in the figures is turned over, elements described as “below” or “beneath” other elements or features would then be oriented “above” the other elements or features.
  • the example term “below” can encompass both an orientation of above and below.
  • the device may be otherwise oriented (rotated 90 degrees or at other orientations) and the spatially relative descriptors used herein interpreted accordingly.

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Disintegrating Or Milling (AREA)

Abstract

L'invention concerne un système (10) de broyage pour un site minier, ledit système (10) comprenant un bac d'alimentation (12) pour recevoir un matériau extrait. Le bac d'alimentation (12) comprend une grille (14) au niveau d'une partie supérieure permettant au matériau plus petit par rapport à une taille prédéfinie de passer tout en filtrant un matériau plus grand, et un brise-roche (16) à proximité de la grille pour réduire un tel matériau plus grand filtré à une taille inférieure à la taille prédéfinie. Le bac d'alimentation (12) comprend également un distributeur à palettes métalliques (18) au niveau d'une partie inférieure pour réguler l'alimentation en matériau, et un alimentateur à grille vibrante (20) alimenté en fonctionnement avec le matériau provenant du distributeur à palettes métalliques (18). Le système (10) comprend également un convoyeur empileur (22) conçu pour recevoir un matériau provenant de l'alimentateur à grille (20), ledit convoyeur empileur (22) alimentant une empileuse radiale (24) pour réaliser un empilement d'au moins une pile de stockage (26) de minerai avec un matériau. Pour chaque pile de stockage (26) de minerai, un convoyeur de récupération (30) de pile de stockage est disposé à l'intérieur d'un tunnel de récupération (32) au-dessous de la pile de stockage (26) et est conçu pour transporter sélectivement un matériau à partir d'une telle pile de stockage (26). Enfin, le système (10) comprend un convoyeur alimentateur de concasseur (34) alimenté en fonctionnement avec un matériau provenant d'au moins un convoyeur de récupération (30) de pile de stockage, ledit convoyeur alimentateur de concasseur (34) permet de fournir un minerai brut (ROM) à un concasseur primaire (36).
PCT/AU2021/050414 2020-05-05 2021-05-05 Système de broyage de site minier et méthodologie WO2021222981A1 (fr)

Priority Applications (1)

Application Number Priority Date Filing Date Title
AU2021267559A AU2021267559B2 (en) 2020-05-05 2021-05-05 Mine site comminution arrangement and methodology

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
AU2020901418 2020-05-05
AU2020901418A AU2020901418A0 (en) 2020-05-05 Mine Site Comminution Arrangement and Methodology

Publications (1)

Publication Number Publication Date
WO2021222981A1 true WO2021222981A1 (fr) 2021-11-11

Family

ID=78467705

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/AU2021/050414 WO2021222981A1 (fr) 2020-05-05 2021-05-05 Système de broyage de site minier et méthodologie

Country Status (2)

Country Link
AU (1) AU2021267559B2 (fr)
WO (1) WO2021222981A1 (fr)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024040282A1 (fr) * 2022-08-23 2024-02-29 Newcrest Mining Limited Traitement sélectif

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06292863A (ja) * 1993-04-09 1994-10-21 Ube Ind Ltd 砕砂製造設備
CA2440312A1 (fr) * 2003-09-04 2005-03-04 S. Ramsis Shehata Schema de traitement pour concassage en une seule passe
US20100193618A1 (en) * 2007-09-26 2010-08-05 Gekko Systems Pty Ltd Modular ore processor
WO2013108201A1 (fr) * 2012-01-18 2013-07-25 Emtee Mining Engineering (Proprietary) Limited Agencement d'exploitation de minerai
CN206276488U (zh) * 2016-12-12 2017-06-27 山西环能工程项目管理有限公司 一种红土镍矿的原矿处理装置
WO2018031517A1 (fr) * 2016-08-09 2018-02-15 Superior Industries, Inc. Classificateurs vibratoires
CN209452003U (zh) * 2019-01-16 2019-10-01 山东联创矿业设计有限公司 一种矿石破碎筛分系统
WO2019204595A1 (fr) * 2018-04-20 2019-10-24 Terra Nova Technologies, Inc. Procédé d'exploitation à ciel ouvert mettant en oeuvre un système de convoyeur

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06292863A (ja) * 1993-04-09 1994-10-21 Ube Ind Ltd 砕砂製造設備
CA2440312A1 (fr) * 2003-09-04 2005-03-04 S. Ramsis Shehata Schema de traitement pour concassage en une seule passe
US20100193618A1 (en) * 2007-09-26 2010-08-05 Gekko Systems Pty Ltd Modular ore processor
WO2013108201A1 (fr) * 2012-01-18 2013-07-25 Emtee Mining Engineering (Proprietary) Limited Agencement d'exploitation de minerai
WO2018031517A1 (fr) * 2016-08-09 2018-02-15 Superior Industries, Inc. Classificateurs vibratoires
CN206276488U (zh) * 2016-12-12 2017-06-27 山西环能工程项目管理有限公司 一种红土镍矿的原矿处理装置
WO2019204595A1 (fr) * 2018-04-20 2019-10-24 Terra Nova Technologies, Inc. Procédé d'exploitation à ciel ouvert mettant en oeuvre un système de convoyeur
CN209452003U (zh) * 2019-01-16 2019-10-01 山东联创矿业设计有限公司 一种矿石破碎筛分系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
SANDVIK MINING AND ROCK SOLUTIONS: "A complete comminution solution", YOUTUBE, 31 August 2014 (2014-08-31), XP055872083, Retrieved from the Internet <URL:https://www.youtube.com/watch?v=r2m7qXJO3ws> [retrieved on 20210622] *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2024040282A1 (fr) * 2022-08-23 2024-02-29 Newcrest Mining Limited Traitement sélectif

Also Published As

Publication number Publication date
AU2021267559A1 (en) 2022-11-24
AU2021267559B2 (en) 2023-02-16

Similar Documents

Publication Publication Date Title
Van der Meer et al. Flowsheet considerations for optimal use of high pressure grinding rolls
CN103041920B (zh) 一种适合于贫磁铁矿的选矿方法和选矿系统
CN201596527U (zh) 矿石破碎选矿装置
CN104549692B (zh) 一种含高品位自然铜硫化铜矿的选矿工艺
CN110560387A (zh) 一种铅锌块状矿石智能分选方法
AU2017422813B2 (en) Iron fine removal and sorting system for magnetic hard rocks
CN104888952B (zh) 一种物料分选设备
CN103464275A (zh) 一种石英脉型金矿的选矿方法及装置
CN102230070B (zh) 低品位磁铁矿三段预选破碎工艺
CN102626669A (zh) 铜矿山废石综合利用系统和方法
Jankovic Developments in iron ore comminution and classification technologies
AU2021267559B2 (en) Mine site comminution arrangement and methodology
CN101537410B (zh) 排土场干选粗选、精选一体化设备及其工艺
CN205868519U (zh) 选矿集中破碎系统
CN102230071B (zh) 低品位磁铁矿两段预选破碎工艺
CN104841550B (zh) 一种尾矿资源回收工艺
CN112642564A (zh) 一种金属矿选矿生产精品骨料的方法
WO2014075696A1 (fr) Concasseur de graviers mobile
CN112844816B (zh) 一种处理尼尔森产品的重选再磨工艺及设备
CN210080112U (zh) 一种磷矿色选系统
CN210411073U (zh) 一种高效矿石碎磨系统
CN203764370U (zh) 深采矿山铁矿石的破碎运输系统
RU2693203C1 (ru) Линия трехстадийного измельчения магнетито-гематитовых руд
RU2149695C1 (ru) Комплекс переработки золотосодержащих руд
CN102120216B (zh) 滚筒渣在线分离分选方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 21799945

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021267559

Country of ref document: AU

Date of ref document: 20210505

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 21799945

Country of ref document: EP

Kind code of ref document: A1