WO2021124458A1 - 冷凍サイクル装置 - Google Patents

冷凍サイクル装置 Download PDF

Info

Publication number
WO2021124458A1
WO2021124458A1 PCT/JP2019/049458 JP2019049458W WO2021124458A1 WO 2021124458 A1 WO2021124458 A1 WO 2021124458A1 JP 2019049458 W JP2019049458 W JP 2019049458W WO 2021124458 A1 WO2021124458 A1 WO 2021124458A1
Authority
WO
WIPO (PCT)
Prior art keywords
flow path
heat exchanger
path switching
refrigerant
outdoor heat
Prior art date
Application number
PCT/JP2019/049458
Other languages
English (en)
French (fr)
Inventor
駿哉 行徳
正紘 伊藤
Original Assignee
三菱電機株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 三菱電機株式会社 filed Critical 三菱電機株式会社
Priority to EP19956282.8A priority Critical patent/EP4080136A4/en
Priority to JP2021565216A priority patent/JP7350888B2/ja
Priority to PCT/JP2019/049458 priority patent/WO2021124458A1/ja
Priority to CN201980102825.5A priority patent/CN114787565A/zh
Priority to US17/769,837 priority patent/US20220381483A1/en
Publication of WO2021124458A1 publication Critical patent/WO2021124458A1/ja

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B5/00Compression machines, plants or systems, with several evaporator circuits, e.g. for varying refrigerating capacity
    • F25B5/02Compression machines, plants or systems, with several evaporator circuits, e.g. for varying refrigerating capacity arranged in parallel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B13/00Compression machines, plants or systems, with reversible cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B49/00Arrangement or mounting of control or safety devices
    • F25B49/02Arrangement or mounting of control or safety devices for compression type machines, plants or systems
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B6/00Compression machines, plants or systems, with several condenser circuits
    • F25B6/02Compression machines, plants or systems, with several condenser circuits arranged in parallel
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/023Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units
    • F25B2313/0233Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units in parallel arrangements
    • F25B2313/02331Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple indoor units in parallel arrangements during cooling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/025Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple outdoor units
    • F25B2313/0253Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple outdoor units in parallel arrangements
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/025Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple outdoor units
    • F25B2313/0253Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple outdoor units in parallel arrangements
    • F25B2313/02531Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple outdoor units in parallel arrangements during cooling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/025Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple outdoor units
    • F25B2313/0253Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple outdoor units in parallel arrangements
    • F25B2313/02533Compression machines, plants or systems with reversible cycle not otherwise provided for using multiple outdoor units in parallel arrangements during heating
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/027Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
    • F25B2313/02731Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using one three-way valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/027Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
    • F25B2313/02741Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using one four-way valve
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/027Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
    • F25B2313/0276Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using six-way valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/027Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means
    • F25B2313/02792Compression machines, plants or systems with reversible cycle not otherwise provided for characterised by the reversing means using reversing valve changing the refrigerant flow direction due to pressure differences of the refrigerant and not by external actuation
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2313/00Compression machines, plants or systems with reversible cycle not otherwise provided for
    • F25B2313/029Control issues
    • F25B2313/0292Control issues related to reversing valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/02Compressor control
    • F25B2600/025Compressor control by controlling speed
    • F25B2600/0253Compressor control by controlling speed with variable speed
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2600/00Control issues
    • F25B2600/25Control of valves
    • F25B2600/2513Expansion valves
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/19Pressures
    • F25B2700/193Pressures of the compressor
    • F25B2700/1931Discharge pressures
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F25REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
    • F25BREFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
    • F25B2700/00Sensing or detecting of parameters; Sensors therefor
    • F25B2700/19Pressures
    • F25B2700/193Pressures of the compressor
    • F25B2700/1933Suction pressures
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/70Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating

Definitions

  • This disclosure relates to a refrigeration cycle device.
  • refrigeration cycle devices such as multi air conditioners for buildings are equipped with divided outdoor heat exchangers in order to adjust the amount of heat exchange between outdoor air and refrigerant and improve the coefficient of performance (COP). is there.
  • the refrigeration cycle device capable of cooling operation and heating operation is equipped with a flow path switching valve in the refrigerant circuit.
  • the flow path switching valve switches the refrigerant circuit between the cooling circuit and the heating circuit, so that the operation of the refrigeration cycle device can be changed.
  • the flow path switching valve includes, for example, a pilot solenoid valve together with the valve body. In such a flow path switching valve, the high-pressure and low-pressure pressure chambers of the valve body are connected to the high-pressure pipe on the discharge side of the compressor and the low-pressure pipe on the suction side of the compressor, respectively, through a pilot solenoid valve.
  • the high and low pressures of the refrigerant filled in the left and right pressure chambers of the valve body are switched by operating the pilot solenoid valve.
  • the differential pressure between the two pressure chambers acts as a power to switch the valve body, so that the refrigerant circuit can be switched between the cooling circuit and the heating circuit.
  • the outdoor heat exchanger has a divided refrigerant circuit, and when switching between cooling operation and heating operation, a plurality of flow paths are switched. You need to switch the valve.
  • a bypass circuit is formed in which the refrigerant flows directly from the high-pressure piping to the low-pressure piping in the switching process between the cooling operation and the heating operation, and the difference that is the power source of the flow path switching valve. The pressure drops. When the differential pressure decreases, the switching of the flow path may stop and the operation may not switch properly.
  • the present disclosure has been made to explain an embodiment for solving the above-mentioned problems, and an object of the present disclosure is to provide a refrigeration cycle apparatus having improved switching performance.
  • the refrigeration cycle device is connected to the refrigerant expansion mechanism and the indoor heat exchanger, and constitutes the refrigerant circuit, the compressor, the first outdoor heat exchanger and the second outdoor heat exchanger, and the compressor and the first outdoor in the refrigerant circuit. It is provided between the heat exchanger, the second outdoor heat exchanger, and the indoor heat exchanger, and has a flow path switching mechanism for switching the flow direction of the refrigerant compressed by the compressor in the refrigerant circuit.
  • the first outdoor heat exchanger and the second outdoor heat exchanger are arranged so that the refrigerant flows in parallel.
  • the refrigeration cycle device further includes a flow rate adjusting mechanism for adjusting the amount of refrigerant flowing through the second outdoor heat exchanger.
  • a flow rate adjusting mechanism for adjusting the amount of refrigerant flowing through the second outdoor heat exchanger.
  • the differential pressure required for switching the flow path switching mechanism is secured when switching the operation between the cooling operation and the heating operation, so that the operation can be smoothly switched.
  • FIG. It is a refrigerant circuit diagram of the refrigerating cycle apparatus in Embodiment 1.
  • FIG. It is a figure which shows the state of the flow path switching valve at the time of a cooling operation. It is a figure which shows the state of the flow path switching valve at the time of a heating operation. It is a figure which shows the state of the refrigerating cycle apparatus 100 at the time of a low capacity cooling operation. It is a figure which shows the state of the refrigerating cycle apparatus 100 at the time of a heating operation. It is a flowchart for demonstrating the transition operation from a cooling operation to a heating operation. It is a figure which shows the state which the flow rate adjustment mechanism 7 was closed in step S1 of FIG.
  • FIG. 1 is a refrigerant circuit diagram of the refrigeration cycle device according to the first embodiment.
  • FIG. 1 shows a refrigerant circuit and a flow of the refrigerant during the cooling operation.
  • the refrigeration cycle device 100 includes an outdoor unit 50 and an indoor unit 60.
  • the outdoor unit 50 and the indoor unit 60 are connected by two pipes 26 and 28 for circulating the refrigerant.
  • the outdoor unit 50 includes a compressor 1, a first outdoor heat exchanger 4, a first fan 14, a second outdoor heat exchanger 5, a second fan 15, flow rate adjusting mechanisms 6 and 7, and a flow path.
  • a switching mechanism 20 and a control device 30 are provided.
  • the indoor unit 60 includes a refrigerant expansion mechanism 8, an indoor heat exchanger 9, and a fan 19.
  • the flow path switching valve 2 is a four-way valve
  • the flow path switching valve 3 is a three-way valve in which one port of the four-way valve is closed.
  • the refrigerant discharged from the compressor 1 is the flow path switching mechanism 20, the pipes 22, 23, the first outdoor heat exchanger 4, the second outdoor heat exchanger 5, and the pipes 24, 25.
  • the flow path switching mechanism 20 After passing through the flow rate adjusting mechanisms 6 and 7, the piping 26, the refrigerant expansion mechanism 8, the piping 27, the indoor heat exchanger 9, and the piping 28, the flow path switching mechanism 20 is passed again to reach the compressor 1. It is composed.
  • FIG. 2 is a diagram showing a state of the flow path switching valve during the cooling operation.
  • the flow path switching valve 2 will be described as a representative, but the structure of the flow path switching valve 3 is the same.
  • reference numerals indicating connection destinations are shown in parentheses.
  • the flow path switching valve 2 is connected to a pipe 21 connected to the discharge port of the compressor 1 and a pipe 29 connected to the suction port of the compressor 1.
  • the flow path switching valve 2 is provided with a pressure switching unit 145 using a pilot solenoid valve separately from the valve body.
  • the valve body and the pressure switching unit 145 are connected by a high-pressure connection pipe 131, a low-pressure connection pipe 132, a first communication flow path 147a, and a second communication flow path 147b.
  • the high-pressure connection pipe 131 is connected to the pipe 21 connected to the inlet side of the flow path 2a of the flow path switching valve 2.
  • the low-voltage connection pipe 132 is connected to a pipe 29 connected to the outlet side of the flow path 2b of the flow path switching valve 2.
  • the high-pressure connection pipe 131 is connected to the pipe 21 connected to the inlet side of the flow path 3a of the flow path switching valve 3, and the low-pressure connection pipe 132 is the flow path of the flow path switching valve 3. It is connected to the pipe 29 connected to the outlet side of 3b.
  • a high-pressure refrigerant is introduced into the high-pressure connecting pipe 131. Further, a low pressure refrigerant is introduced into the low pressure connecting pipe 132.
  • the flow path switching valve 2 has a first pressure chamber 134 and a second pressure chamber 135 formed in the first container 133.
  • the high-pressure refrigerant from the high-pressure connecting pipe 131 is introduced into either the first pressure chamber 134 or the second pressure chamber 135, and the low-pressure refrigerant from the low-pressure connecting pipe 132 is introduced into the other.
  • the high-pressure refrigerant and the low-pressure refrigerant introduced into the first pressure chamber 134 and the second pressure chamber 135 can be replaced with each other.
  • the flow path switching valve 2 has a first partition portion 136 that partitions the inside of the first container 133 into a first pressure chamber 134, and a second partition portion 137 that partitions the inside of the first container 133 into a second pressure chamber 135.
  • a valve body chamber 140 is formed between the first partition portion 136 and the second partition portion 137.
  • the flow path switching valve 2 has a connecting portion 138 that connects the first partition portion 136 and the second partition portion 137 in the valve body chamber 140.
  • the flow path switching valve 2 has a valve body 139 provided in the middle of the connecting portion 138.
  • the distance between the first partition portion 136 and the second partition portion 137 is fixed by the connecting portion 138 and the valve body 139. Therefore, the total of the volume of the first pressure chamber 134 and the volume of the second pressure chamber 135 in the first container 133 is constant, and the volume increases or decreases in a complementary manner so that when one increases, the other decreases. It is configured.
  • the valve body 139 is slidably arranged in conjunction with the first partition portion 136 and the second partition portion 137.
  • the flow path switching valve 2 In the case of the flow path switching valve 2, four pipes 21, 22, 28 and 29 constituting the flow paths 2a and 2b are connected to the valve body chamber 140 in the first container 133.
  • the flow path switching valve 2 includes a pipe 21 connected to the inlet side of the flow path 2a, a pipe 29 connected to the outlet side of the flow path 2b, a pipe 28 connected to the inlet side of the flow path 2b, and a flow path. It has a pipe 22 connected to the outlet side of 2a.
  • the pipe 21 is connected to the inlet side of the flow path 3a
  • the pipe 29 is connected to the outlet side of the flow path 3b
  • the pipe 28 is connected to the inlet side of the flow path 3b
  • the pipe 22 is connected. Is connected to the outlet side of the flow path 3a.
  • the first container 133 is connected to the pipe 23 instead of the pipe 22, and is connected to the closed pipe instead of the pipe 28.
  • valve body 139 internally communicates the pipe 29 connected to the outlet side of the flow path 2b and the pipe 28 connected to the inlet side of the flow path 2b. Further, in the case of the flow path switching valve 3, the valve body 139 internally communicates the pipe 29 connected to the outlet side of the flow path 3b and the pipe 28 connected to the inlet side of the flow path 3b.
  • the valve body 139 On the outside of the valve body 139, the pipe 21 and one of the pipes 22 and 28 are connected via the valve body chamber 140. Therefore, the high-pressure refrigerant flows in the valve body chamber 140 between the first partition portion 136 and the second partition portion 137 in the first container 133.
  • the valve body 139 When the high-pressure refrigerant flows into the valve body chamber 140, the valve body 139 is pressed against the inner wall of the first container 133, and the inflow of the high-pressure refrigerant into the valve body 139 in which the low-pressure refrigerant flows is prevented.
  • FIG. 3 is a diagram showing a state of the flow path switching valve during the heating operation.
  • the valve body 139 slides from the state shown in FIG. 2 to the state shown in FIG. 3, the flow paths 2c and 2d are formed in the flow path switching valve 2, and the flow path is formed in the flow path switching valve 3. 3c and 3d are formed.
  • valve body 139 internally communicates the pipe 29 connected to the outlet side of the flow path 2d and the pipe 22 connected to the inlet side of the flow path 2d.
  • valve body 139 internally communicates the pipe 29 connected to the outlet side of the flow path 3d and the pipe 23 connected to the inlet side of the flow path 3d.
  • the valve body 139 is configured to be movable within the slide range according to the differential pressure of the refrigerant pressures of the first pressure chamber 134 and the second pressure chamber 135.
  • the flow path switching valve 2 and the flow path switching valve 3 can be switched between the state shown in FIG. 2 and the state shown in FIG.
  • the high-pressure refrigerant from the pipe 21 flows in the valve body chamber 140 between both the first partition portion 136 and the second partition portion 137 in the first container 133.
  • the valve body 139 is pressed against the inner wall of the first container 133, and the inflow of the high-pressure refrigerant into the valve body 139 in which the low-pressure refrigerant flows is prevented.
  • the flow path switching valve 2 has a pressure switching unit 145 that switches between the high-pressure refrigerant and the low-pressure refrigerant introduced into the high-pressure connection pipe 131 and the low-pressure connection pipe 132.
  • the flow path switching valve 3 is also provided with a pressure switching unit having a similar configuration to that of the pressure switching unit used for the flow path switching valve 2.
  • the pressure switching unit 145 has a second container 146 to which the high pressure connecting pipe 131 and the low pressure connecting pipe 132 are connected.
  • the pressure switching unit 145 has a second valve body 148.
  • the second valve body 148 is arranged in the second container 146 and is configured to slide. Within this slide range, the inside of the second valve body 148 always communicates with the connection portion of the low pressure connecting pipe 132. Further, either one of the connection portion of the first communication flow path 147a communicating with the first pressure chamber 134 and the connection portion of the second communication flow path 147b communicating with the second pressure chamber 135 is inside the second valve body 148. Communicate with.
  • the pressure switching unit 145 has a drive unit 149 that slides the second valve body 148.
  • the drive unit 149 is composed of an electromagnet 150, a plunger 151 attracted by the energized electromagnet 150, and a spring 152 that repels the attraction direction of the plunger 151.
  • a connecting rod 153 is provided between the second valve body 148 and the plunger 151.
  • the electromagnet 150 attracts the plunger 151 to the electromagnet 150 side by the supplied electric power.
  • the second valve body 148 is interlocked with the plunger 151.
  • the spring 152 is arranged around the rod-shaped electromagnet 150. The spring 152 is arranged so that the second valve body 148 is moved away from the electromagnet 150 by the elastic force.
  • the pressure switching unit 145 is connected to a first communication flow path 147a communicating with the first pressure chamber 134 and a second communication flow path 147b communicating with the second pressure chamber 135.
  • the control device 30 does not supply electric power to the electromagnet 150 of the pressure switching unit 145.
  • the repulsive force of the spring 152 causes the second valve body 148 to move away from the electromagnet 150 side.
  • the connection portion of the low-pressure connection pipe 132 and the connection portion of the first communication flow path 147a communicating with the first pressure chamber 134 communicate with each other inside the second valve body 148.
  • the connection portion of the high-pressure connection pipe 131 and the connection portion of the second communication flow path 147b communicating with the second pressure chamber 135 communicate with each other outside the second valve body 148.
  • the second valve body 148 is moved to the second valve body 148 by the high-pressure refrigerant flowing inside the second container 146 of the pressure switching unit 145 and outside the second valve body 148.
  • the high-pressure refrigerant is pressed against the inner wall of the two containers 146 to prevent the high-pressure refrigerant from flowing into the second valve body 148 in which the low-pressure refrigerant is flowing.
  • the steam refrigerant that has been made high temperature and high pressure by the compressor 1 passes through the flow path switching valve 2 and the flow path switching valve 3 and flows into the first outdoor heat exchanger 4 and the second outdoor heat exchanger 5, respectively.
  • the first outdoor heat exchanger 4 and the second outdoor heat exchanger 5 function as condensers at this time.
  • the high-temperature and high-pressure vapor refrigerant condenses by dissipating heat to the outdoor air, which is lower than the refrigerant, and becomes a high-pressure liquid refrigerant.
  • the flow rate of this high-pressure liquid refrigerant is adjusted when it passes through the flow rate adjusting mechanisms 6 and 7.
  • the high-pressure liquid refrigerant expands by the refrigerant expansion mechanism 8 to become a low-temperature low-pressure gas-liquid two-phase refrigerant, which flows into the indoor heat exchanger 9.
  • the indoor heat exchanger 9 then functions as an evaporator.
  • the low-pressure, low-temperature gas-liquid two-phase refrigerant evaporates by absorbing heat from indoor air, which is hotter than the refrigerant, and becomes a low-pressure vapor refrigerant.
  • the low-pressure vapor refrigerant passes through the flow path switching valve 2 again and is sucked into the compressor 1. After that, the refrigerant circulates in the refrigeration cycle in the same process.
  • the capacity of the outdoor unit may be reduced to perform the cooling operation.
  • a cooling operation will be referred to as a low-capacity cooling operation below.
  • FIG. 4 is a diagram showing a state of the refrigeration cycle device 100 during low-capacity cooling operation.
  • the flow path switching valve 2 communicates the discharge side of the compressor 1 with the first outdoor heat exchanger 4, and the flow path switching valve 3 connects the suction side of the compressor and the second outdoor heat exchanger 5.
  • the flow path 2a and the flow path 2b of the flow path switching valve 2 and the flow path 3c and the flow path 3d of the flow path switching valve 3 are opened.
  • the flow path 2c and the flow path 2d of the flow path switching valve 2 and the flow path 3a and the flow path 3b of the flow path switching valve 3 are closed.
  • the flow rate adjusting mechanism 7 is closed, and in the low capacity cooling operation, the refrigerant does not flow into the second outdoor heat exchanger 5.
  • the heat exchange capacity of the second outdoor heat exchanger 5 is reduced.
  • FIG. 5 is a diagram showing a state of the refrigeration cycle device 100 during the heating operation.
  • the discharge side of the compressor 1 and the indoor heat exchanger 9 communicate with each other by the flow path switching valve 2 and the flow path switching valve 3 as shown in FIG. Specifically, in the heating operation, the flow path 2c and the flow path 3c and the flow path 2d and the flow path 3d are opened in the flow path switching valve 2 and the flow path switching valve 3. Further, in the flow path switching valve 2 and the flow path switching valve 3, the flow path 2a and the flow path 3a and the flow path 2b and the flow path 3b are closed.
  • the steam refrigerant compressed to high temperature and high pressure in the compressor 1 passes through the flow path switching valve 2 and flows into the indoor heat exchanger 9.
  • the indoor heat exchanger 9 then functions as a condenser.
  • the high-temperature and high-pressure steam refrigerant condenses and becomes a high-pressure liquid refrigerant.
  • the refrigerant expansion mechanism 8 By passing through the refrigerant expansion mechanism 8, the high-pressure liquid refrigerant expands to become a cold-temperature low-pressure gas-liquid two-phase refrigerant.
  • the cold / low pressure gas-liquid two-phase refrigerant flows into the first outdoor heat exchanger 4 and the second outdoor heat exchanger 5 after passing through the flow rate adjusting mechanisms 6 and 7.
  • the first outdoor heat exchanger 4 and the second outdoor heat exchanger 5 function as evaporators at this time.
  • the low-pressure, low-temperature gas-liquid two-phase refrigerant evaporates and becomes a low-pressure vapor refrigerant.
  • the low-pressure vapor refrigerant is sucked into the compressor 1 via the flow path switching valve 2 and the flow path switching valve 3, and thereafter, the refrigeration cycle is circulated in the same process.
  • FIG. 6 is a flowchart for explaining the transition operation from the cooling operation to the heating operation.
  • the transition operation from the heating operation to the cooling operation is also controlled as shown in FIG.
  • the discharge gas of the compressor 1 is the flow path switching valve 2, the first outdoor heat exchanger 4, and the flow rate adjusting mechanism 6. , 7, a circuit is formed that bypasses the high-pressure portion and the low-pressure portion that pass through the second outdoor heat exchanger 5 and the flow path switching valve 3 in this order and flow to the suction side of the compressor 1 without decompression by the expansion mechanism.
  • the differential pressure between the discharge side and the suction side of the compressor 1 required for switching the flow path switching valves 2 and 3 is reduced, and the switching power is reduced.
  • control device 30 In order to cut off this closing circuit, as shown in step S1 of FIG. 6, the control device 30 first closes the flow rate adjusting mechanism 7.
  • FIG. 7 is a diagram showing a state in which the flow rate adjusting mechanism 7 is closed in step S1 of FIG. In FIG. 7, the flow rate adjusting mechanism 7 is closed, so that the refrigerant passing through the second outdoor heat exchanger 5 is shut off.
  • step S2 of FIG. 6 the control device 30 starts switching the flow path switching valve 3.
  • the valve body 139 moves from the state shown in FIG. 2 to the state shown in FIG.
  • a bypass path from the pipe 21 to the pipe 29 is temporarily formed inside the flow path switching valve 3.
  • the connection port of the pipe 28 communicates with the valve body chamber 140 without being completely closed by the valve body 139.
  • a bypass path through which the refrigerant flows is formed in the order of the pipe 21, the valve body chamber 140, the inlet of the pipe 28, the inside of the valve body 139, and the pipe 29.
  • the differential pressure drops to some extent during the movement of the valve body 139.
  • the flow rate adjusting mechanism 7 is closed, the amount of decrease in the differential pressure is small, the valve body 139 moves completely, and when the switching of the flow path switching valve 3 is completed, the amount of decrease in the differential pressure is based on the decrease. Return.
  • step S3 the control device 30 monitors the differential pressure according to the difference between the detected values of the pressure sensors 10 and 11.
  • the control device 30 confirms whether or not the flow path switching valve can be switched in step S3 by using the pressure sensor 10 in the high pressure section and the pressure sensor 11 in the low pressure section in FIG.
  • the control device 30 determines that the switching is in progress.
  • the control device 30 determines that the switching is completed (step S4).
  • control device 30 starts switching of the flow path switching valve 2 in step S5, similarly monitors the differential pressure in step S6, and when the current differential pressure becomes equal to or higher than the determination value, the flow path switching valve It is determined that the switching of 2 is completed (step S7).
  • FIG. 8 is a diagram showing a state in which switching of the flow path switching valve 2 and the flow path switching valve 3 is completed in step S7 of FIG.
  • step S8 the flow rate adjusting mechanism 7 is finally opened in step S8 to shift to the heating operation shown in FIG.
  • the flow path switching valve 3 is switched first, and then the flow path switching valve 2 is switched, but the switching order may be reversed. That is, the flow path switching valve 2 may be switched first, and then the flow path switching valve 3 may be switched.
  • FIG. 9 is a flowchart showing the procedure of the transition operation from the low-capacity cooling operation to the heating operation.
  • switching of the flow path switching valve 2 is started in step S11.
  • step S12 the switching of the flow path switching valve 2 is completed after waiting until the current differential pressure becomes equal to or higher than the determination value. The state at this time is as shown in FIG.
  • step S14 the flow rate adjusting mechanism 7 is finally opened in step S14 to shift to the heating operation shown in FIG.
  • FIG. 10 is a flowchart showing the procedure of the transition operation from the heating operation to the low capacity cooling operation. From the state in which the heating operation shown in FIG. 5 is being executed, the flow rate adjusting mechanism 7 is fully closed in step S21. The state at this time is as shown in FIG. Then, in step S22, switching of the flow path switching valve 2 is started, and in step S23, it waits until the current differential pressure becomes equal to or higher than the determination value. When the switching of the flow path switching valve 2 is completed in step S24, the operation shifts to the low capacity cooling operation shown in FIG.
  • FIG. 11 is a flowchart showing the procedure of the transition operation from the cooling operation to the low capacity cooling operation. From the state in which the cooling operation shown in FIG. 1 is being executed, the flow rate adjusting mechanism 7 is fully closed in step S31. The state at this time is as shown in FIG. Then, in step S32, switching of the flow path switching valve 3 is started, and in step S33, it waits until the current differential pressure becomes equal to or higher than the determination value. When the switching of the flow path switching valve 3 is completed in step S34, the operation shifts to the low capacity cooling operation shown in FIG.
  • FIG. 12 is a flowchart showing the procedure of the transition operation from the low capacity cooling operation to the cooling operation.
  • switching of the flow path switching valve 3 is started in step S41, and waits until the current differential pressure becomes equal to or higher than the determination value in step S42.
  • the switching of the flow path switching valve 3 is completed in step S43, the state shown in FIG. 7 is reached.
  • step S44 the flow rate adjusting mechanism 7 is finally opened in step S44 to shift to the cooling operation shown in FIG.
  • the flow path switching valve requires a certain amount of differential pressure for switching, but if the differential pressure increases too much, the connecting portion 138 or valve body 139 may be damaged due to sudden pressure fluctuations that occur inside the flow path switching valve. .. Further, if the pressure in the high pressure portion increases or the pressure in the low pressure portion decreases significantly during the switching control, it is conceivable that the control for protecting the refrigerant circuit operates. These problems will be described with reference to FIGS. 13, 14, and 15.
  • FIG. 13 is a waveform diagram showing a first control example when the differential pressure decreases.
  • the flow path switching valves 2 and 3 are switched while the operating frequency of the compressor 1 is constant at the maximum frequency and the flow rate adjusting mechanism 7 is open, the time is reached after the flow path switching valve 3 is switched. Since the flow path switching valve 2 is switched in a state where the differential pressure is reduced in t3 to t4, the switching may be stopped in the middle.
  • FIG. 14 is a waveform diagram showing a control example when the differential pressure rises.
  • the differential pressure increases at times t2 to t5.
  • the differential pressure may be excessive with respect to the pressure required for switching, which may lead to internal damage to the flow path switching valves 2 and 3. ..
  • FIG. 15 is a waveform diagram showing a second control example when the differential pressure decreases.
  • the time t3 is set after the flow path switching valve 3 is switched. Since the flow path switching valve 2 is switched in the state where the differential pressure is reduced at ⁇ t4, the switching may be stopped in the middle.
  • FIG. 16 is a flowchart showing a control procedure for switching the flow path switching valves 2 and 3 in a state where the flow rate adjusting mechanism 7 is closed and the operating frequency of the compressor 1 is changed.
  • step S51 of FIG. 16 the operating frequency of the compressor 1 is first set to the lowest frequency.
  • the lowest frequency is the lower limit of the operating frequency that can be set to operate the compressor 1.
  • step S52 the control device 30 closes the flow rate adjusting mechanism 7.
  • step S53 the control device 30 starts switching of the flow path switching valve 3.
  • step S54 the control device 30 monitors the differential pressure according to the difference between the detected values of the pressure sensors 10 and 11.
  • the control device 30 determines that the switching is in progress when the differential pressure is lower than the determination value due to the temporary internal bypass generated in the flow path switching valve. On the other hand, when the differential pressure equal to or higher than the determination value is secured, the control device 30 determines that the switching is completed (step S55).
  • control device 30 starts switching of the flow path switching valve 2 in step S56, similarly monitors the differential pressure in step S57, and when the current differential pressure becomes equal to or higher than the determination value, the flow path switching valve It is determined that the switching of 2 is completed (step S58).
  • step S59 When the switching between the flow path switching valve 2 and the flow path switching valve 3 is completed, the flow rate adjusting mechanism 7 is opened in step S59. Finally, in step S60, the reduced operating frequency of the compressor 1 is returned to the frequency at the time of normal control.
  • the flow path switching valve 3 is switched first, and then the flow path switching valve 2 is switched, but the switching order may be reversed. That is, the flow path switching valve 2 may be switched first, and then the flow path switching valve 3 may be switched.
  • FIG. 17 is a waveform diagram showing a control example when the flow path switching valves 2 and 3 are switched in a state where the flow rate adjusting mechanism 7 is closed and the operating frequency of the compressor 1 is changed.
  • the differential pressure at times t2 to t5 is an appropriate difference. Adjusted to pressure. Therefore, it is possible to switch the flow path switching valves 2 and 3 in an appropriate state without causing an excessive differential pressure that causes a failure and without insufficient differential pressure.
  • Embodiment 2 In the second embodiment, the description of the same items as in the first embodiment is omitted, and only the characteristic portion thereof is described.
  • the flow path switching valve when switching from the cooling operation to the heating operation, the flow path switching valve is switched while maintaining the differential pressure by adjusting the frequency of the compressor 1 with the flow rate adjusting mechanism 7 open.
  • FIG. 18 is a flowchart for explaining the transition operation from the cooling operation to the heating operation in the second embodiment.
  • the control device 30 first starts switching the flow path switching valve 3. Since the differential pressure drops during the switching, the control device 30 adjusts the frequency of the compressor 1 so that the differential pressure is appropriate for the switching in step S72. Then, in step S73, the switching of the flow path switching valve 3 is completed.
  • FIG. 19 is a diagram showing a state in which switching of the flow path switching valve 3 is completed in step S73 of FIG.
  • a part of the refrigerant that has passed through the first outdoor heat exchanger 4 returns to the compressor 1 via the second outdoor heat exchanger 5.
  • a bypass route is formed. Since the operating frequency of the compressor 1 is raised in advance in order to compensate for the decrease in the differential pressure at this time, the differential pressure for subsequently switching the flow path switching valve 2 is secured.
  • step S74 the control device 30 subsequently starts switching the flow path switching valve 2 in step S74. Since the frequency of the compressor 1 is adjusted so as to obtain an appropriate differential pressure required for switching in step S75, switching of the flow path switching valve 2 is completed without any problem in step S76.
  • FIG. 20 is a flowchart for explaining the operation of shifting from the low-capacity cooling operation to the heating operation in the second embodiment.
  • step S81 the control device 30 starts switching the flow path switching valve 2.
  • step S82 the control device 30 adjusts the frequency of the compressor 1 so as to have an appropriate differential pressure required for switching, and switches the flow path switching valve 2 so as to be in the state shown in FIG.
  • step S83 the control device 30 opens the flow rate adjusting mechanism 7 in step S84.
  • FIG. 21 is a flowchart for explaining the operation of shifting from the heating operation to the low-capacity cooling operation in the second embodiment.
  • the control device 30 closes the flow rate adjusting mechanism 7 so as to be in the state shown in FIG.
  • the control device 30 starts switching the flow path switching valve 2.
  • the control device 30 adjusts the frequency of the compressor 1 so that the differential pressure is appropriate for switching, and in step S94, the switching of the flow path switching valve 2 is completed.
  • FIG. 22 is a flowchart for explaining the transition operation from the cooling operation to the low capacity cooling operation in the second embodiment.
  • step S101 the control device 30 closes the flow rate adjusting mechanism 7 so as to be in the state shown in FIG.
  • step S102 the control device 30 starts switching the flow path switching valve 3.
  • step S103 the control device 30 adjusts the frequency of the compressor 1 so as to obtain an appropriate differential pressure required for switching, and completes switching of the flow path switching valve 3 in step S104.
  • FIG. 23 is a flowchart for explaining the transition operation from the low-capacity cooling operation to the cooling operation.
  • the control device 30 starts switching the flow path switching valve 3.
  • the control device 30 adjusts the frequency of the compressor 1 so that the differential pressure is appropriate for switching, and switches the flow path switching valve 3 so as to be in the state shown in FIG.
  • the control device 30 opens the flow rate adjusting mechanism 7 in step S114.
  • the flow path switching valves 2 and 3 are switched in order to increase the operating frequency of the compressor 1 and maintain the differential pressure appropriately. It can be completed without any problems.
  • Embodiment 3 In the third embodiment, the description of the same items as those in the first and second embodiments is omitted, and only the characteristic portion thereof is described.
  • the flow path switching mechanism 20 is composed of flow path switching valves 2 and 3, a three-way valve is used as the flow path switching valve 2, and a four-way valve is used as the flow path switching valve 3. Was being done.
  • another configuration of the flow path switching mechanism will be described.
  • FIG. 24 is a refrigerant circuit diagram of the refrigeration cycle device according to the third embodiment.
  • FIG. 24 shows the refrigerant circuit and the flow of the refrigerant during the cooling operation.
  • the refrigeration cycle device 200 includes an outdoor unit 250 and an indoor unit 260.
  • the outdoor unit 250 and the indoor unit 260 are connected by two pipes for circulating the refrigerant.
  • the outdoor unit 250 includes a compressor 201, a first outdoor heat exchanger 204, a second outdoor heat exchanger 205, flow rate adjusting mechanisms 206 and 207, and a flow path switching mechanism 220.
  • the indoor unit 260 includes a refrigerant expansion mechanism 218, 228, 238, an indoor heat exchanger 219, 229, 239, a three-way valve 246, 247, 248, a gas-liquid separator 242, and a flow rate adjusting valve 208, 243. Including.
  • the flow path switching valve 202 is a hexagonal valve
  • the flow path switching valve 203 is a valve in which a check valve is connected to one port of a four-way valve.
  • the refrigerant discharged from the compressor 201 is the flow path switching mechanism 220, the pipes 222, 223, the first outdoor heat exchanger 204, the second outdoor heat exchanger 205, the flow rate adjusting mechanism 206, After passing through the 207 and the pipe 226, the flow path switching mechanism 220 is passed again. Then, the refrigerant passes through the gas-liquid separator 242, the refrigerant expansion mechanism 218, 228, 238, the indoor heat exchangers 219, 229, 239, and the three-way valves 246, 247, 248, and then passes through the flow path switching mechanism 220 again. , To the compressor 201.
  • control device 30 of FIG. 1 is not shown in FIG. 24 in order to avoid complicating the drawings, a control device for controlling the flow path switching mechanism 220 is similarly provided. The same applies to the figures after FIG. 27.
  • the flow path switching valve 203 is a four-way valve, and its structure is the same as that described with reference to FIGS. 2 and 3, so the description thereof will not be repeated.
  • the flow path switching valve 202 is a hexagonal valve, and the valve body is driven by the same differential pressure. The structure will be briefly described.
  • FIG. 25 is a diagram showing a state of the flow path switching valve 202 during the cooling operation.
  • FIG. 26 is a diagram showing a state of the flow path switching valve 202 during the heating operation.
  • the ports P1 to P6 indicating the connection destination correspond to FIG. 24.
  • the flow path switching valve 202 has a port P1 connected to the discharge port of the compressor 201 and a port P2 connected to the suction port of the compressor 201.
  • the pressure of the refrigerant flowing through the port P1 is higher than the pressure of the refrigerant flowing through the port P2. This pressure difference becomes the differential pressure required for switching the flow path switching valve 202.
  • the flow path switching valve 202 further has a first pressure chamber 334 and a second pressure chamber 335 formed in the container 333. Although not shown in FIGS. 25 and 26, a high-pressure refrigerant similar to the port P1 is provided in either the first pressure chamber 334 or the second pressure chamber 335 by a switching unit similar to the pressure switching unit 145 in FIG. Is introduced, and a low-pressure refrigerant similar to port P2 is introduced to the other.
  • the flow path switching valve 202 further has a first partition portion 336 that partitions the inside of the container 333 into a first pressure chamber 334 and a second partition portion 337 that partitions the inside of the container 333 into a second pressure chamber 335.
  • the flow path switching valve 202 further has a connecting portion 338 that connects the first partition portion 336 and the second partition portion 337 in the valve body chamber 340 between the two.
  • the flow path switching valve 302 further has a valve body 339 provided in the middle of the connecting portion 338.
  • the distance between the first partition portion 336 and the second partition portion 337 is fixed by the connecting portion 338 and the valve body 339. Therefore, the total of the volume of the first pressure chamber 334 and the volume of the second pressure chamber 335 in the container 333 is constant, and the volume is configured to increase or decrease in a complementary manner so that when one increases, the other decreases. ing.
  • the valve body 339 is slidably arranged in conjunction with the first partition portion 336 and the second partition portion 337.
  • valve body 339 in the flow path switching valve 202 is set to the state shown in FIG. 25.
  • a flow path is formed so that the refrigerant flows from the port P1 to the port P6, the refrigerant flows from the port P5 to the port P3, and the refrigerant flows from the port P4 to the port P2.
  • valve body 339 in the flow path switching valve 202 is set to the state shown in FIG. 26.
  • a flow path is formed so that the refrigerant flows from the port P1 to the port P3, the refrigerant flows from the port P4 to the port P5, and the refrigerant flows from the port P6 to the port P2.
  • the cooling operation and the low outside temperature are low as in the first embodiment. It is possible to switch the operation between the capacity cooling operation, the heating operation, and the heating operation (weak) at high outside temperature.
  • FIG. 24 shows the flow of the refrigerant during the cooling operation in the refrigeration cycle apparatus of the third embodiment.
  • the flow path switching valve 202 in FIG. 24 is in the OFF state, and the state of the flow path switching valve 203 is in the OFF state.
  • the flow rate adjusting mechanism 207 is in the open state.
  • FIG. 27 is a diagram showing the flow of the refrigerant during the low-capacity cooling operation in the refrigeration cycle apparatus of the third embodiment.
  • the flow path switching valve 202 is controlled to the OFF state
  • the state of the flow path switching valve 203 is controlled to the ON state
  • the flow rate adjusting mechanism 207 is controlled to the closed state.
  • the refrigerant does not flow to the second outdoor heat exchanger 205.
  • FIG. 28 is a diagram showing the flow of the refrigerant during the heating operation in the refrigeration cycle apparatus of the third embodiment.
  • the flow path switching valve 202 is controlled to the ON state
  • the state of the flow path switching valve 203 is controlled to the ON state
  • the flow rate adjusting mechanism 207 is controlled to the open state.
  • the refrigerant discharged from the compressor 1 is a gas-liquid separator 242, a refrigerant expansion mechanism 218, 228, 238, an indoor heat exchanger 219, 229, 239, and a three-way valve 246, 247, 248.
  • the flow path switching mechanism 220 is passed again.
  • the refrigerant passes through the pipe 226, the flow rate adjusting mechanisms 206 and 207, the first outdoor heat exchanger 204, the second outdoor heat exchanger 205, and the pipes 222 and 223, and then passes through the flow path switching mechanism 220 again. It leads to the compressor 201.
  • FIG. 29 is a diagram showing the flow of the refrigerant during the low-capacity heating operation in the refrigeration cycle apparatus of the third embodiment.
  • the flow path switching valve 202 is controlled to the ON state
  • the state of the flow path switching valve 203 is controlled to the OFF state
  • the flow rate adjusting mechanism 207 is controlled to the closed state.
  • the refrigerant does not flow to the second outdoor heat exchanger 205.
  • the refrigerant flows through all of the indoor heat exchangers 219, 229, and 239, but the refrigerant expands depending on the presence or absence of air conditioning requirements in the room in which each indoor heat exchanger is arranged.
  • a part of the mechanisms 218, 228, and 238 may be closed to prevent the refrigerant from flowing. This makes it possible to change the number of indoor heat exchangers in operation.
  • the check valve is connected to the port of the flow path switching valve 203 to prevent the backflow of the refrigerant, but as shown in FIG. 1, a four-way valve in which the port is closed is used. You may.
  • ⁇ A1 Switching from Fig. 24 (cooling operation) to Fig. 27 (cooling operation-weak)> (1)
  • the flow rate adjusting mechanism 207 existing at the outlet of the second outdoor heat exchanger 205 is closed.
  • the flow path switching valve 203 is switched.
  • ⁇ A2 Switching from Fig. 27 (cooling operation-weak) to Fig. 24 (cooling operation)> (1)
  • the flow path switching valve 203 is switched.
  • the flow rate adjusting mechanism 207 existing at the outlet of the second outdoor heat exchanger 205 is opened.
  • ⁇ B1 Switching from Fig. 24 (cooling operation) to Fig. 29 (heating operation-weak)> (1)
  • the flow rate adjusting mechanism 207 existing at the outlet of the second outdoor heat exchanger 205 is closed.
  • the flow path switching valve 202 is switched.
  • ⁇ B2 Switching from Fig. 29 (heating operation-weak) to Fig. 24 (cooling operation)> (1)
  • the flow path switching valve 202 is switched.
  • the flow rate adjusting mechanism 207 existing at the outlet of the second outdoor heat exchanger 205 is opened.
  • ⁇ C1 Switching from Fig. 24 (cooling operation) to Fig. 28 (heating operation)> (1)
  • the flow rate adjusting mechanism 207 existing at the outlet of the second outdoor heat exchanger 205 is closed.
  • the flow rate adjusting mechanism 207 existing at the outlet of the second outdoor heat exchanger 205 is opened.
  • ⁇ C2 Switching from Fig. 28 (heating operation) to Fig. 24 (cooling operation)> (1)
  • the flow rate adjusting mechanism 207 existing at the outlet of the second outdoor heat exchanger 205 is closed.
  • the flow rate adjusting mechanism 207 existing at the outlet of the second outdoor heat exchanger 205 is opened.
  • ⁇ D1 Switching from Fig. 27 (cooling operation-weak) to Fig. 29 (heating operation-weak)> (1) Either one of the flow path switching valve 203 and the flow path switching valve 202 is switched first. (2) Either one of the flow path switching valve 203 and the flow path switching valve 202 is switched next.
  • ⁇ D2 Switching from Fig. 29 (heating operation-weak) to Fig. 27 (cooling operation-weak)> (1) Either one of the flow path switching valve 203 and the flow path switching valve 202 is switched first. (2) Either one of the flow path switching valve 203 and the flow path switching valve 202 is switched next.
  • the flow rate adjusting mechanism 207 existing at the outlet of the second outdoor heat exchanger 205 connected in series with the flow path switching valve 203 is used before and after the switching of the flow path switching valve 203.
  • the bypass path from the high pressure portion to the low pressure portion passing through the second outdoor heat exchanger 205 is closed, so that the differential pressure is secured.
  • the refrigeration cycle device 100 shown in FIG. 1 is connected to a refrigerant expansion mechanism 8 and an indoor heat exchanger 9, and includes a compressor 1, a first outdoor heat exchanger 4, and a second outdoor heat exchanger 5 which are connected to a refrigerant expansion mechanism 8 and constitute a refrigerant circuit.
  • the flow direction of the refrigerant connected by the compressor 1, the first outdoor heat exchanger 4, the second outdoor heat exchanger 5, and the indoor heat exchanger 9 and compressed by the compressor 1 in the refrigerant circuit It is provided with a flow path switching mechanism 20 for switching between.
  • the first outdoor heat exchanger 4 and the second outdoor heat exchanger 5 are arranged so that the refrigerant flows in parallel.
  • the refrigeration cycle device 100 further includes a flow rate adjusting mechanism 7 for adjusting the amount of refrigerant flowing through the second outdoor heat exchanger 5.
  • the flow rate adjusting mechanism 7 temporarily closes the refrigerant flow path to the second outdoor heat exchanger 5, while the flow path switching mechanism 20 switches the flow direction of the refrigerant. Be done.
  • the flow path switching mechanism 20 is configured to switch the flow path using the differential pressure between the suction port and the discharge port of the compressor 1 as a drive source.
  • the flow path switching mechanism 20 includes a flow path switching valve 3 which is a three-way valve connected between the second outdoor heat exchanger 5 and the suction port and the discharge port of the compressor 1. 1 Includes a flow path switching valve 2 which is a four-way valve connected between the outdoor heat exchanger, the compressor, and the indoor heat exchanger.
  • the flow path switching mechanism 220 includes a flow path switching valve 203, which is a four-way valve connected between the second outdoor heat exchanger 205 and the suction port and the discharge port of the compressor 201. 1 includes an outdoor heat exchanger 204, a compressor 201, and a flow path switching valve 202, which is at least a six-way valve connected to the indoor heat exchanger 219.
  • the flow rate adjusting mechanisms 7, 207 include an electronic expansion valve.
  • the flow path switching mechanism 20 is configured to switch the flow path by using the differential pressure between the suction port and the discharge port of the compressor 1 as a drive source.
  • the refrigerating cycle device 100 temporarily changes the operating frequency of the compressor 1 when switching between the cooling operation and the heating operation, and maintains the differential pressure required for switching the flow path switching mechanism 20.
  • the refrigeration cycle apparatus is connected to the refrigerant expansion mechanism 8 and the indoor heat exchanger 9, and constitutes a refrigerant circuit.
  • a flow path switching mechanism 20 for switching the flow direction of the compressed refrigerant in the refrigerant circuit is provided.
  • the flow path switching mechanism 20 is configured to switch the flow path by using the differential pressure between the suction port and the discharge port of the compressor 1 as a drive source.
  • the refrigerating cycle device 100 temporarily changes the operating frequency of the compressor 1 when switching between the cooling operation and the heating operation, and maintains the differential pressure required for switching the flow path switching mechanism 20.

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • Thermal Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Compression-Type Refrigeration Machines With Reversible Cycles (AREA)

Abstract

冷凍サイクル装置(100)は、冷媒膨張機構(8)および室内熱交換器(9)に接続され、冷媒回路を構成する圧縮機(1)、第1室外熱交換器(4)および第2室外熱交換器(5)と、冷媒回路において、圧縮機(1)と第1室外熱交換器(4)と第2室外熱交換器(5)と室内熱交換器(9)との間に接続され、圧縮機(1)によって圧縮された冷媒の冷媒回路における流通方向を切り替える流路切替機構(20)とを備える。冷媒回路において、第1室外熱交換器(4)および第2室外熱交換器(5)は冷媒が並行して流れるように配置される。冷凍サイクル装置(100)は、第2室外熱交換器(5)に流れる冷媒量を調整する流量調整機構(7)をさらに備える。冷房運転と暖房運転との切替時に、流量調整機構(7)によって、一時的に第2室外熱交換器(5)への冷媒流路を閉止した状態としつつ、流路切替機構(20)によって冷媒の流通方向が切り替えられる。

Description

冷凍サイクル装置
 本開示は、冷凍サイクル装置に関する。
 従来、ビル用マルチエアコンなどの冷凍サイクル装置では、室外空気と冷媒の熱交換量を調整し成績係数(COP:Coefficient Of Performance)を向上させるために、分割された室外熱交換器を備えるものがある。
 また、冷房運転と暖房運転とが可能な冷凍サイクル装置では、冷媒回路に流路切替弁を備えている。流路切替弁が冷媒回路を冷房回路と暖房回路との間で切り替えることにより、冷凍サイクル装置は運転の変更が可能となる。流路切替弁は、たとえば、弁本体とともにパイロット電磁弁を備える。このような流路切替弁では、パイロット電磁弁を通して弁本体の高圧と低圧の圧力室が、それぞれ圧縮機の吐出側の高圧配管および圧縮機の吸入側の低圧配管に接続されている。回路切替時には、パイロット電磁弁を作動させることにより、弁本体の左右の圧力室に充満された冷媒の高低圧が入れ替わる。この2つの圧力室の差圧が弁本体を切替える動力として作用することにより、冷媒回路を冷房回路と暖房回路との間で切り替えることができる。
国際公開第2017/138108号
 国際公開第2017/138108号(特許文献1)に記載された冷凍サイクル装置では、室外熱交換器が分割された冷媒回路を有し、冷房運転と暖房運転を切り替える際に、複数の流路切替弁を切り替える必要がある。一部の流路切替弁が切り替わると、冷房運転と暖房運転との間の切替過程において、高圧配管から低圧配管へ冷媒が直接流れるバイパス回路が形成され、流路切替弁の動力源である差圧が低下する。差圧が低下すると、やがて流路の切り替えが停止し、運転がうまく切り替わらない場合がある。
 本開示は、上記のような課題を解決する実施の形態を説明するためになされたもので、切り替え性能が改善された冷凍サイクル装置を提供することを目的とする。
 本開示は、冷凍サイクル装置に関する。冷凍サイクル装置は、冷媒膨張機構および室内熱交換器に接続され、冷媒回路を構成する圧縮機、第1室外熱交換器および第2室外熱交換器と、冷媒回路において、圧縮機と第1室外熱交換器と第2室外熱交換器と室内熱交換器との間に接続され、圧縮機によって圧縮された冷媒の冷媒回路における流通方向を切り替える流路切替機構とを備える。冷媒回路において、第1室外熱交換器および第2室外熱交換器は冷媒が並行して流れるように配置される。冷凍サイクル装置は、第2室外熱交換器に流れる冷媒量を調整する流量調整機構をさらに備える。冷房運転と暖房運転との切替時に、流量調整機構によって、一時的に第2室外熱交換器への冷媒流路を閉止した状態としつつ、流路切替機構によって冷媒の流通方向が切り替えられる。
 本開示の冷凍サイクル装置によれば、冷房運転と暖房運転などの間の運転の切り替え時に流路切替機構の切替に必要な差圧が確保されるため、スムーズに運転を切り替えることができる。
実施の形態1における冷凍サイクル装置の冷媒回路図である。 冷房運転時の流路切替弁の状態を示す図である。 暖房運転時の流路切替弁の状態を示す図である。 低容量冷房運転時の冷凍サイクル装置100の状態を示す図である。 暖房運転時の冷凍サイクル装置100の状態を示す図である。 冷房運転から暖房運転への移行動作を説明するためのフローチャートである。 図6のステップS1において流量調整機構7が閉止された状態を示す図である。 図6のステップS7において流路切替弁2および流路切替弁3の切替が完了した状態を示す図である。 低容量冷房運転から暖房運転への移行動作の手順を示すフローチャートである。 暖房運転から低容量冷房運転への移行動作の手順を示すフローチャートである。 冷房運転から低容量冷房運転への移行動作の手順を示すフローチャートである。 低容量冷房運転から冷房運転の移行動作の手順を示すフローチャートである。 差圧が低下する場合の第1制御例を示す波形図である。 差圧が上昇する場合の制御例を示す波形図である。 差圧が低下する場合の第2制御例を示す波形図である。 流量調整機構7の閉止と圧縮機1の運転周波数の変更を組み合わせた状態で流路切替弁2,3を切り替える制御の手順を示すフローチャートである。 流量調整機構7の閉止と圧縮機1の運転周波数の変更を組み合わせた状態で流路切替弁2,3を切り替えた場合の制御例を示す波形図である。 実施の形態2における冷房運転から暖房運転への移行動作を説明するためのフローチャートである。 図18のステップS73において流路切替弁3の切替が完了した状態を示す図である。 実施の形態2における、低容量冷房運転から暖房運転への移行動作を説明するためのフローチャートである。 実施の形態2における、暖房運転から低容量冷房運転への移行動作を説明するためのフローチャートである。 実施の形態2における冷房運転から低容量冷房運転の移行動作を説明するためのフローチャートである。 低容量冷房運転から冷房運転の移行動作を説明するためのフローチャートである。 実施の形態3における冷凍サイクル装置の冷媒回路図である。 冷房運転時の流路切替弁202の状態を示す図である。 暖房運転時の流路切替弁202の状態を示す図である。 実施の形態3の冷凍サイクル装置における低容量冷房運転時の冷媒の流れを示す図である。 実施の形態3の冷凍サイクル装置における暖房運転時の冷媒の流れを示す図である。 実施の形態3の冷凍サイクル装置における低容量暖房運転時の冷媒の流れを示す図である。
 以下、本発明の実施の形態について、図面を参照しながら詳細に説明する。以下では、複数の実施の形態について説明するが、各実施の形態で説明された構成を適宜組み合わせることは出願当初から予定されている。なお、図中同一または相当部分には同一符号を付してその説明は繰返さない。
 実施の形態1.
 <冷凍サイクル装置100の構成>
 図1は、実施の形態1における冷凍サイクル装置の冷媒回路図である。図1には、冷房運転時の冷媒回路と冷媒の流れが示される。冷凍サイクル装置100は、室外機50と、室内機60とを備える。室外機50と室内機60とは、冷媒を流通させる二本の配管26,28で接続されている。
 室外機50は、圧縮機1と、第1室外熱交換器4と、第1ファン14と、第2室外熱交換器5と、第2ファン15と、流量調整機構6,7と、流路切替機構20と、制御装置30とを備える。室内機60は、冷媒膨張機構8と、室内熱交換器9と、ファン19とを含む。
 流路切替機構は、さまざまな構成が考えられるが、本実施の形態では、流路切替弁2,3を含んで構成される例が示される。流路切替弁2は、四方弁であり、流路切替弁3は四方弁の1ポートが閉止された三方弁である。
 冷凍サイクル装置100の冷媒回路は、圧縮機1から吐出された冷媒が、流路切替機構20、配管22,23、第1室外熱交換器4、第2室外熱交換器5、配管24,25、流量調整機構6,7、配管26、冷媒膨張機構8、配管27、室内熱交換器9、配管28を通過した後、流路切替機構20を再度通過し、圧縮機1へと至るように構成される。
 <流路切替機構20の流路切替弁の構成>
 図2は、冷房運転時の流路切替弁の状態を示す図である。図2においては、代表として流路切替弁2について説明するが、流路切替弁3についても構造は同様である。流路切替弁3については、接続先を示す参照符号を括弧内に示す。
 流路切替弁2は、圧縮機1の吐出口に接続された配管21と、圧縮機1の吸入口に接続された配管29とに接続されている。圧縮機1が作動しているときは、配管21を流通する冷媒の圧力は、配管29を流通する冷媒の圧力よりも高い。流路切替弁2には、弁本体とは別にパイロット電磁弁を用いた圧力切替部145が設けられている。弁本体と圧力切替部145とは、高圧接続管131、低圧接続管132、第1連通流路147a、第2連通流路147bによって接続されている。高圧接続管131は、流路切替弁2の流路2aの入口側に繋がる配管21と接続される。低圧接続管132は、流路切替弁2の流路2bの出口側に繋がる配管29と接続される。
 なお、流路切替弁3については、高圧接続管131は、流路切替弁3の流路3aの入口側に繋がる配管21と接続され、低圧接続管132は、流路切替弁3の流路3bの出口側に繋がる配管29と接続される。
 したがって、高圧接続管131には、高圧冷媒が導入される。また、低圧接続管132には、低圧冷媒が導入される。
 図2に示すように、流路切替弁2は、第1容器133内に形成される第1圧力室134および第2圧力室135を有する。第1圧力室134および第2圧力室135のいずれか一方には、高圧接続管131からの高圧冷媒が導入され、他方には低圧接続管132からの低圧冷媒が導入される。第1圧力室134および第2圧力室135に導入される高圧冷媒と低圧冷媒は、入れ替えることが可能である。流路切替弁2は、第1容器133内を第1圧力室134に仕切る第1仕切部136と、第1容器133内を第2圧力室135に仕切る第2仕切部137とを有する。第1容器133において、第1仕切部136と第2仕切部137と間には弁体室140が形成される。流路切替弁2は、第1仕切部136と第2仕切部137とを弁体室140において連結する連結部138を有する。流路切替弁2は、連結部138の途中に設けられた弁体139を有する。
 第1仕切部136と第2仕切部137との間の距離は、連結部138および弁体139によって固定長とされている。したがって、第1容器133内における第1圧力室134の容積と第2圧力室135の容積との合計は、一定であり、一方が増加すると他方は減少するように相補に容積が増減するように構成されている。弁体139は、第1仕切部136および第2仕切部137に連動してスライド可能に配置される。
 流路切替弁2の場合は、第1容器133における弁体室140には、流路2a,2bを構成する4つの配管21,22,28および29が接続されている。具体的には、流路切替弁2は、流路2aの入口側に繋がる配管21と、流路2bの出口側に繋がる配管29と、流路2bの入口側に繋がる配管28と、流路2aの出口側に繋がる配管22とを有する。
 なお、流路切替弁3の場合には、弁体室140には、流路3a,3bを構成する4つの配管21,22,28および29が接続されている。流路切替弁3の場合には、配管21は流路3aの入口側に繋がり、配管29は、流路3bの出口側に繋がり、配管28は、流路3bの入口側に繋がり、配管22は、流路3aの出口側に繋がる。
 流路切替弁2に接続されている4つの配管21,22,28,29のうち3つの配管22,28,29は、弁体139のスライド範囲内において並んで配置されている。配管29は、配管22と配管28との間に配置されている。流路切替弁3の場合には、弁体139のスライド範囲内において、第1容器133は、配管22の代わりに配管23に接続され、配管28の代わりに閉止された管に接続される。
 図2においては、弁体139は、流路切替弁2の場合は、流路2bの出口側に繋がる配管29と流路2bの入口側に繋がる配管28とを内部で疎通させる。また、流路切替弁3の場合は、弁体139は、流路3bの出口側に繋がる配管29と流路3bの入口側に繋がる配管28とを内部で疎通させる。
 弁体139の外側において、配管21と、配管22,28のいずれか一方とが弁体室140を介して繋がっている。このため、第1容器133における第1仕切部136と第2仕切部137との間の弁体室140内には、高圧冷媒が流通する。弁体室140内に高圧冷媒が流通することにより、弁体139が第1容器133の内壁に押し付けられ、低圧冷媒が流通している弁体139内への高圧冷媒の流入が防止される。
 図3は、暖房運転時の流路切替弁の状態を示す図である。図3においては、図2に示した状態から図3に示す状態に弁体139がスライドし、流路切替弁2には流路2c,2dが形成され、流路切替弁3には流路3c,3dが形成される。
 流路切替弁2の場合、弁体139は、流路2dの出口側に繋がる配管29と流路2dの入口側に繋がる配管22とを内部で疎通させる。流路切替弁3の場合、弁体139は、流路3dの出口側に繋がる配管29と流路3dの入口側に繋がる配管23とを内部で疎通させる。
 弁体139は、スライド範囲内で、第1圧力室134および第2圧力室135の冷媒圧力の差圧に応じて、移動可能に構成される。流路切替弁2および流路切替弁3は、図2に示した状態と図3に示した状態との間で切替自在である。
 図3に示した状態においても、第1容器133における第1仕切部136と第2仕切部137との双方の間の弁体室140内には、配管21からの高圧冷媒が流通する。弁体室140内に高圧冷媒が流通することにより、弁体139が第1容器133の内壁に押し付けられ、低圧冷媒が流通している弁体139内への高圧冷媒の流入が防止される。
 <圧力切替部145の構成>
 流路切替弁2は、高圧接続管131と低圧接続管132に導入される高圧冷媒および低圧冷媒を切り替える圧力切替部145を有する。流路切替弁3に対しても、流路切替弁2に用いられる圧力切替部とは別の同様な構成の圧力切替部が設けられる。
 圧力切替部145は、高圧接続管131および低圧接続管132が接続された第2容器146を有する。圧力切替部145は、第2弁体148を有する。第2弁体148は、第2容器146内に配置され、スライドするように構成される。このスライド範囲内において、第2弁体148の内部は、低圧接続管132の接続部と常時疎通する。また、第1圧力室134に連通した第1連通流路147aの接続部と第2圧力室135に連通した第2連通流路147bの接続部とのいずれか一方が第2弁体148の内部に疎通する。
 圧力切替部145は、第2弁体148をスライドさせる駆動部149を有する。駆動部149は、電磁石150と、通電された電磁石150に吸引されるプランジャ151と、プランジャ151の吸引方向に反発するバネ152と、によって構成されている。第2弁体148とプランジャ151との間には、連結棒153が設けられている。電磁石150は、供給される電力によってプランジャ151を電磁石150側に吸引する。第2弁体148は、プランジャ151と連動する。バネ152は、棒状の電磁石150の周囲に配置される。バネ152は、第2弁体148を弾性力によってプランジャ151を電磁石150から遠ざけるように配置されている。
 圧力切替部145には、第1圧力室134に連通した第1連通流路147aと、第2圧力室135に連通した第2連通流路147bと、が接続されている。
 図2に示す状態では、電力が制御装置30によって圧力切替部145の電磁石150に供給されている。この場合、バネ152の反発力に対抗して第2弁体148が電磁石150側に吸引される。これにより、低圧接続管132の接続部と第2圧力室135に連通した第2連通流路147bの接続部とが第2弁体148の内部にて疎通する。このとき、高圧接続管131の接続部と第1圧力室134に連通した第1連通流路147aの接続部とが第2弁体148の外側にて疎通する。
 一方、図3に示す状態では、制御装置30が圧力切替部145の電磁石150に電力を供給していない。この場合、バネ152の反発力によって第2弁体148が電磁石150側から遠ざかる。これにより、低圧接続管132の接続部と第1圧力室134に連通した第1連通流路147aの接続部とが第2弁体148の内部にて疎通する。このとき、高圧接続管131の接続部と第2圧力室135に連通した第2連通流路147bの接続部とが第2弁体148の外側にて疎通する。
 図2、図3に示した2つの状態のいずれにおいても、圧力切替部145の第2容器146内かつ第2弁体148の外側に高圧冷媒が流通することにより、第2弁体148が第2容器146の内壁に押し付けられ、低圧冷媒が流通している第2弁体148内への高圧冷媒の流入が防止されている。
 <冷房運転>
 冷房運転時は、図1および図2に示すように流路切替弁2および流路切替弁3により圧縮機1の吐出側と第1室外熱交換器4および第2室外熱交換器5が連通する。具体的には、流路切替弁2の流路2aおよび流路2b並びに流路切替弁3の流路3aおよび流路3bが連通状態に設定される。また、流路切替弁2の流路2cおよび2d並びに流路切替弁3の流路3cおよび3dが閉止状態に設定される。
 圧縮機1で高温高圧にされた蒸気冷媒は流路切替弁2および流路切替弁3を通過し、それぞれ第1室外熱交換器4および第2室外熱交換器5に流入する。第1室外熱交換器4および第2室外熱交換器5はこのとき凝縮器として機能する。高温高圧の蒸気冷媒が、冷媒よりも低温の室外空気へ放熱を行なうことにより凝縮し、高圧の液冷媒となる。この高圧の液冷媒は、流量調整機構6,7を通過する際に流量が調整される。その後、高圧の液冷媒は冷媒膨張機構8で膨張し、低温低圧の気液二相冷媒となり、室内熱交換器9に流入する。室内熱交換器9はこのとき蒸発器として機能する。低圧低温の気液二相冷媒は、冷媒よりも高温の室内空気から吸熱を行なうことにより蒸発し、低圧の蒸気冷媒となる。その後、低圧の蒸気冷媒は、流路切替弁2を再度経由し、圧縮機1に吸入される。以降同様の過程で冷媒は冷凍サイクルを循環する。
 また、室内温度よりも室外温度が低い場合の冷房運転(例えば、外気7℃、室内25℃)で運転効率を向上させるために、室外機の能力を落として冷房運転を行なう場合がある。このような冷房運転を以下において低容量冷房運転と言うことにする。
 図4は、低容量冷房運転時の冷凍サイクル装置100の状態を示す図である。図4に示すように流路切替弁2により圧縮機1の吐出側と第1室外熱交換器4が連通し、流路切替弁3により圧縮機の吸入側と第2室外熱交換器5が連通する。具体的には、流路切替弁2の流路2aおよび流路2b並びに流路切替弁3の流路3cおよび流路3dが開かれる。また、流路切替弁2の流路2cおよび流路2d並びに流路切替弁3の流路3aおよび流路3bが閉じられる。その後、流量調整機構7は閉止され、低容量冷房運転では、第2室外熱交換器5には冷媒が流入しない。これにより、第2室外熱交換器5の熱交換容量が低減される。
 <暖房運転>
 図5は、暖房運転時の冷凍サイクル装置100の状態を示す図である。
 暖房運転は、図5のように流路切替弁2および流路切替弁3により圧縮機1の吐出側と室内熱交換器9が連通する。具体的には、暖房運転では、流路切替弁2および流路切替弁3において、流路2cおよび流路3c並びに流路2dおよび流路3dが開かれる。また、流路切替弁2および流路切替弁3において、流路2aおよび流路3a並びに流路2bおよび流路3bが閉じられる。
 圧縮機1において高温高圧に圧縮された蒸気冷媒は、流路切替弁2を通過し、室内熱交換器9に流入する。室内熱交換器9はこのとき凝縮器として機能する。冷媒よりも低温の室内空気へ放熱を行なうことによって、高温高圧の蒸気冷媒は凝縮し、高圧の液冷媒となる。冷媒膨張機構8を通過することで、高圧の液冷媒は膨張し冷温低圧の気液二相冷媒となる。冷温低圧の気液二相冷媒は、流量調整機構6,7を通過した後、第1室外熱交換器4および第2室外熱交換器5に流入する。第1室外熱交換器4および第2室外熱交換器5は、このとき蒸発器として機能する。冷媒よりも高温の室外空気から吸熱を行なうことによって、低圧低温の気液二相冷媒は蒸発し、低圧の蒸気冷媒となる。その後、低圧の蒸気冷媒は、流路切替弁2、流路切替弁3を経由し、圧縮機1に吸入され、以降同様の過程で冷凍サイクルを循環する。
 <冷房運転と暖房運転の移行>
 図6は、冷房運転から暖房運転への移行動作を説明するためのフローチャートである。なお、暖房運転から冷房運転への移行動作も同様に図6のように制御される。
 図1の冷房運転中に流路切替弁2よりも流路切替弁3が先に切り替わると、圧縮機1の吐出ガスが流路切替弁2、第1室外熱交換器4、流量調整機構6,7、第2室外熱交換器5、流路切替弁3を順に通過し、圧縮機1の吸入側へ流れる高圧部と低圧部とを膨張機構による減圧なしにバイパスする回路が形成される。この回路により、流路切替弁2,3の切替に必要な圧縮機1の吐出側と吸入側の差圧が低下し、切替動力が低下する。
 この閉回路を遮断するため、図6のステップS1に示すように、制御装置30は、まず流量調整機構7を閉止する。
 図7は、図6のステップS1において流量調整機構7が閉止された状態を示す図である。図7においては、流量調整機構7が閉止されたことにより、第2室外熱交換器5を通過していた冷媒が遮断される。
 続いて、図6のステップS2において、制御装置30は、流路切替弁3の切替を開始する。流路切替弁3は、図2に示す状態から図3に示す状態に向けて弁体139が移動する。この過程において、流路切替弁3の内部で配管21から配管29へバイパスする経路が一時的に形成される。たとえば、図2の状態から弁体139がわずかに第1圧力室134に向けて移動すると、配管28の接続口が弁体139で完全に閉止されない状態で、弁体室140と連通する。すると、配管21、弁体室140、配管28の入口部、弁体139の内部、配管29の順に冷媒が流れるバイパス経路が形成される。したがって、弁体139の移動中は、差圧はある程度低下する。ただし、流量調整機構7が閉止されているので、差圧の低下量はわずかで済み、弁体139が完全に移動し、流路切替弁3の切り替えが完了すると差圧の低下分は元に戻る。
 ステップS3においては、制御装置30は、圧力センサ10,11の検出値の差によって差圧を監視する。
 制御装置30は、ステップS3における流路切替弁の切り替え可否の確認を、図1の高圧部の圧力センサ10と低圧部の圧力センサ11を用いて行なう。制御装置30は、流路切替弁内で生じる一時的な内部バイパスで差圧が判定値よりも低下している場合は、切り替えが途中であると判断する。一方、制御装置30は、判定値以上の差圧が確保されている場合には、切替が完了したと判断する(ステップS4)。
 その後、制御装置30は、ステップS5において流路切替弁2の切替を開始し、同様にステップS6で差圧を監視し、現在の差圧が判定値以上となったことによって、流路切替弁2の切替が完了したと判断する(ステップS7)。
 図8は、図6のステップS7において流路切替弁2および流路切替弁3の切替が完了した状態を示す図である。
 図8のように、流路切替弁2および流路切替弁3の切替が完了すると、最後にステップS8において流量調整機構7を開放し、図5に示した暖房運転に移行する。以上図6に示した動作順序で切替を行なうことによって、流路切替弁2,3の切替動力となる差圧を確保した状態で冷房運転から暖房運転へ移行することができる。
 なお、図6においては、流路切替弁3を先に切り替え、その後流路切替弁2を切り替えたが、切替順は逆でもよい。すなわち、流路切替弁2を先に切り替え、その後流路切替弁3を切り替えてもよい。
 暖房運転から冷房運転への移行動作においても、図6に示した動作順序で切り替えを実施する。
 <低容量冷房運転と暖房運転の移行>
 図9は、低容量冷房運転から暖房運転への移行動作の手順を示すフローチャートである。図4に示した低容量冷房運転中に、ステップS11において、流路切替弁2の切替を開始する。そして、ステップS12において現在の差圧が判定値以上となるまで待って、ステップS13において流路切替弁2の切替が完了する。このときの状態は、図8に示すようになる。
 流路切替弁2が切替完了した後、最後にステップS14において流量調整機構7を開放し、図5に示した暖房運転に移行する。
 図10は、暖房運転から低容量冷房運転への移行動作の手順を示すフローチャートである。図5に示した暖房運転を実行中の状態から、ステップS21において、流量調整機構7が全閉状態とされる。このときの状態は、図8に示すようになる。そして、ステップS22において、流路切替弁2の切替を開始し、ステップS23において現在の差圧が判定値以上となるまで待つ。ステップS24において流路切替弁2の切替が完了すると、図4に示した低容量冷房運転に移行する。
 <冷房運転と低容量冷房運転の移行>
 図11は、冷房運転から低容量冷房運転への移行動作の手順を示すフローチャートである。図1に示した冷房運転を実行中の状態から、ステップS31において、流量調整機構7が全閉状態とされる。このときの状態は、図7に示すようになる。そして、ステップS32において、流路切替弁3の切替を開始し、ステップS33において現在の差圧が判定値以上となるまで待つ。ステップS34において流路切替弁3の切替が完了すると、図4に示した低容量冷房運転に移行する。
 図12は、低容量冷房運転から冷房運転の移行動作の手順を示すフローチャートである。図4に示した低容量冷房運転中に、ステップS41において、流路切替弁3の切替を開始し、ステップS42において現在の差圧が判定値以上となるまで待つ。ステップS43において流路切替弁3の切替が完了すると、図7に示す状態になる。
 流路切替弁3が切替完了した後、最後にステップS44において流量調整機構7を開放し、図1に示した冷房運転に移行する。
 <圧縮機と流量調整機構を併用した弁切り替え>
 流路切替弁は切り替えにある程度の差圧が必要であるが、差圧が増加しすぎると、流路切替弁内部で生じる急激な圧力変動により連結部138または弁体139が破損する恐れがある。また、切り替え制御の途中に、高圧部の圧力の増加または低圧部の圧力の低下が大きいと、冷媒回路を保護するための制御が作動することも考えられる。図13、図14、図15を用いてこれらの問題を説明する。
 図13は、差圧が低下する場合の第1制御例を示す波形図である。図13に示すように、圧縮機1の運転周波数を最大周波数で一定とし、かつ流量調整機構7を開放した状態で流路切替弁2,3を切り替えると、流路切替弁3の切り替え後に時刻t3~t4において差圧が低下した状態で流路切替弁2を切り替えるため、切り替えが途中で停止する可能性がある。
 図14は、差圧が上昇する場合の制御例を示す波形図である。図14に示すように、圧縮機1の運転周波数を最大周波数で一定とし、流量調整機構7を閉止した状態で切り替えると、時刻t2~t5において、差圧が上昇する。このときに、流路切替弁2,3を切り替えると、切替に必要な圧力に対して、差圧が過大である可能性があり、流路切替弁2,3の内部破損につながる恐れがある。差圧が過大となることを防止するには、圧縮機1の運転周波数を下げることが考えられる。
 図15は、差圧が低下する場合の第2制御例を示す波形図である。図15に示すように、圧縮機1の運転周波数を最低周波数に下げ、かつ流量調整機構7を開放した状態で流路切替弁2,3を切り替えると、流路切替弁3の切り替え後に時刻t3~t4において差圧が低下した状態で流路切替弁2を切り替えるため、切り替えが途中で停止する可能性がある。
 よって、これらを防止するために、流量調整機構7を閉止した状態で、圧縮機1を最低周波数で運転させ差圧を適切にした状態で流路切替弁を切り替えるのが良い。
 図16は、流量調整機構7の閉止と圧縮機1の運転周波数の変更を組み合わせた状態で流路切替弁2,3を切り替える制御の手順を示すフローチャートである。
 図16のステップS51においては、まず最初に圧縮機1の運転周波数が最低周波数に設定される。ここで、最低周波数は、圧縮機1を運転させるために設定可能な運転周波数の下限である。続いて、ステップS52に示すように、制御装置30は、流量調整機構7を閉止する。さらにステップS53において、制御装置30は、流路切替弁3の切替を開始する。
 ステップS54においては、制御装置30は、圧力センサ10,11の検出値の差によって差圧を監視する。
 制御装置30は、流路切替弁内で生じる一時的な内部バイパスで差圧が判定値よりも低下している場合は、切り替えが途中であると判断する。一方、制御装置30は、判定値以上の差圧が確保されている場合には、切替が完了したと判断する(ステップS55)。
 その後、制御装置30は、ステップS56において流路切替弁2の切替を開始し、同様にステップS57で差圧を監視し、現在の差圧が判定値以上となったことによって、流路切替弁2の切替が完了したと判断する(ステップS58)。
 流路切替弁2および流路切替弁3の切替が完了すると、ステップS59において流量調整機構7を開放する。最後に、ステップS60において、低下させていた圧縮機1の運転周波数を通常制御時の周波数に戻す。
 以上図16に示した動作順序で切替を行なうことによって、流路切替弁2,3の切替動力となる差圧を適切な圧力とした状態で冷房運転から暖房運転へ移行することができる。
 なお、図16においては、流路切替弁3を先に切り替え、その後流路切替弁2を切り替えたが、切替順は逆でもよい。すなわち、流路切替弁2を先に切り替え、その後流路切替弁3を切り替えてもよい。
 暖房運転から冷房運転への移行動作においても、図16に示した動作順序で切り替えを実施することができる。
 図17は、流量調整機構7の閉止と圧縮機1の運転周波数の変更を組み合わせた状態で流路切替弁2,3を切り替えた場合の制御例を示す波形図である。
 図17のように、圧縮機1の運転周波数を時刻t1~t6において最低周波数とし、時刻t2~t5において流量調整機構7を閉止した状態とすると、時刻t2~t5における差圧は、適切な差圧に調整される。したがって、故障を招くような過剰な差圧が生じることなく、差圧が不足することなく、適切な状態で流路切替弁2,3を切り替えることが可能となる。
 実施の形態2.
 実施の形態2では、実施の形態1と同事項の説明が省略され、その特徴部分のみが説明されている。実施の形態2では、冷房運転から暖房運転に切り替える際に、流量調整機構7を開いたままの状態で圧縮機1の周波数を調整することにより差圧を維持つつ、流路切替弁を切り替える。
 <冷房運転と暖房運転の移行>
 図18は、実施の形態2における冷房運転から暖房運転への移行動作を説明するためのフローチャートである。ステップS71において、制御装置30は、最初に流路切替弁3の切替を開始する。切替途中は差圧が低下するため、ステップS72において制御装置30は切替に必要な適切な差圧となるよう圧縮機1の周波数を調整する。そしてステップS73において流路切替弁3の切替が完了する。
 図19は、図18のステップS73において流路切替弁3の切替が完了した状態を示す図である。図19においては、流路切替弁3が切り替えられたことによって、第1室外熱交換器4を通過した冷媒の一部が第2室外熱交換器5を経由して圧縮機1に戻ってしまうバイパス経路が形成されている。このときの差圧の低下を補うために、圧縮機1の運転周波数が予め高められているので、続いて流路切替弁2を切り替えるための差圧は確保されている。
 流路切替弁3の切替完了後、続いて、ステップS74において制御装置30は、流路切替弁2の切り替えを開始する。ステップS75において、切替に必要な適切な差圧となるよう圧縮機1の周波数の調整が行なわれているため、ステップS76において、流路切替弁2を切り替えが問題なく完了する。
 暖房運転から冷房運転への移行動作も図18と同様に実施することができる。
 <冷房運転と低容量冷房運転の移行>
 図20は、実施の形態2における、低容量冷房運転から暖房運転への移行動作を説明するためのフローチャートである。ステップS81において、制御装置30は、流路切替弁2の切り替えを開始する。ステップS82において、制御装置30は、切替に必要な適切な差圧となるよう圧縮機1の周波数を調整し、図8に示した状態となるように流路切替弁2を切り替える。ステップS83における切替完了後、ステップS84において、制御装置30は、流量調整機構7を開放する。
 図21は、実施の形態2における、暖房運転から低容量冷房運転への移行動作を説明するためのフローチャートである。最初にステップS91において制御装置30は図8に示した状態となるように流量調整機構7を閉止する。次にステップS92において制御装置30は、流路切替弁2の切り替えを開始する。ステップS93において制御装置30は切替に必要な適切な差圧となるよう圧縮機1の周波数を調整し、ステップS94において流路切替弁2の切り替えを完了する。
 <冷房運転と低容量冷房運転の移行>
 図22は、実施の形態2における冷房運転から低容量冷房運転の移行動作を説明するためのフローチャートである。最初に、ステップS101において、制御装置30は、図7に示した状態となるように流量調整機構7を閉止する。次にステップS102において、制御装置30は、流路切替弁3の切り替えを開始する。ステップS103において、制御装置30は、切替に必要な適切な差圧となるよう圧縮機1の周波数を調整し、ステップS104において流路切替弁3の切替を完了する。
 図23は、低容量冷房運転から冷房運転の移行動作を説明するためのフローチャートである。最初にステップS111において、制御装置30は、流路切替弁3の切り替えを開始する。ステップS112において、制御装置30は、切替に必要な適切な差圧となるよう圧縮機1の周波数を調整し、図7に示した状態となるように流路切替弁3を切り替える。ステップS113における切替完了後、ステップS114において、制御装置30は、流量調整機構7を開放する。
 以上説明したように、実施の形態2では、バイパス経路によって差圧が低下する場合に圧縮機1の運転周波数を増加させて差圧を適切に保つため、流路切替弁2,3の切替を問題なく完了することができる。
 実施の形態3.
 実施の形態3では、実施の形態1および2と同事項の説明が省略され、その特徴部分のみが説明されている。実施の形態1および2では、流路切替機構20は、流路切替弁2および3によって構成され、流路切替弁2としては三方弁が用いられ、流路切替弁3としては四方弁が用いられていた。実施の形態3では、流路切替機構の他の構成について説明する。
 <冷凍サイクル装置200の構成>
 図24は実施の形態3における冷凍サイクル装置の冷媒回路図である。図24には、冷房運転時の冷媒回路と冷媒の流れが示される。冷凍サイクル装置200は、室外機250と、室内機260とを備える。室外機250と室内機260とは、冷媒を流通させる二本の配管で接続されている。
 室外機250は、圧縮機201と、第1室外熱交換器204と、第2室外熱交換器205と、流量調整機構206,207と、流路切替機構220とを備える。室内機260は、冷媒膨張機構218,228,238と、室内熱交換器219,229,239と、三方弁246,247,248と、気液分離器242と、流量調整弁208,243とを含む。
 流路切替機構は、実施の形態3では、流路切替弁202,203を含んで構成される例が示される。流路切替弁202は、六方弁であり、流路切替弁203は四方弁の1ポートに逆止弁が接続された弁である。
 図24に示す冷房運転では、圧縮機201から吐出された冷媒が、流路切替機構220、配管222,223、第1室外熱交換器204、第2室外熱交換器205、流量調整機構206,207、配管226、を通過した後に流路切替機構220を再度通過する。そして冷媒は、気液分離器242、冷媒膨張機構218,228,238、室内熱交換器219,229,239、三方弁246,247,248を通過した後、流路切替機構220を再度通過し、圧縮機201へと至る。
 図面が複雑になるのを避けるため、図1の制御装置30は、図24には記載していないが、流路切替機構220を制御する制御装置は同様に設けられている。図27以降の図においても同様である。
 <流路切替機構220の流路切替弁の構成>
 流路切替機構220を構成する弁のうち流路切替弁203は、四方弁であり、その構造は図2、図3で説明した構造と同じであるので説明は繰り返さない。流路切替機構220を構成する弁のうち流路切替弁202は、六方弁であり同様な差圧で弁体が駆動される。その構造について簡単に説明する。
 図25は、冷房運転時の流路切替弁202の状態を示す図である。図26は、暖房運転時の流路切替弁202の状態を示す図である。図25、図26において、接続先を示すポートP1~P6は、図24に対応している。
 流路切替弁202は、圧縮機201の吐出口に接続されたポートP1と、圧縮機201の吸入口に接続されたポートP2とを有する。ポートP1を流通する冷媒の圧力は、ポートP2を流通する冷媒の圧力よりも高い。この圧力差が流路切替弁202の切替に必要な差圧となる。
 流路切替弁202は、さらに、容器333内に形成される第1圧力室334および第2圧力室335を有する。図25、図26には図示しないが、図2の圧力切替部145と同様な切替部によって、第1圧力室334および第2圧力室335のいずれか一方には、ポートP1と同様の高圧冷媒が導入され、他方にはポートP2と同様の低圧冷媒が導入される。流路切替弁202は、さらに、容器333内を第1圧力室334に仕切る第1仕切部336および容器333内を第2圧力室335に仕切る第2仕切部337を有する。流路切替弁202は、さらに、第1仕切部336と第2仕切部337とを双方の間の弁体室340において双方を連結する連結部338を有する。流路切替弁302は、さらに、連結部338の途中に設けられた弁体339を有する。
 第1仕切部336と第2仕切部337との間の距離は、連結部338および弁体339によって固定長とされている。したがって、容器333内における第1圧力室334の容積と第2圧力室335の容積との合計は、一定であり、一方が増加すると他方は減少するように相補に容積が増減するように構成されている。弁体339は、第1仕切部336および第2仕切部337に連動してスライド可能に配置される。
 冷房運転時には、流路切替弁202中の弁体339は図25に示した状態に設定される。この場合、ポートP1からポートP6に冷媒が流れ、ポートP5からポートP3に冷媒が流れ、ポートP4からポートP2に冷媒が流れるように流路が形成される。
 暖房運転時には、流路切替弁202中の弁体339は図26に示した状態に設定される。この場合、ポートP1からポートP3に冷媒が流れ、ポートP4からポートP5に冷媒が流れ、ポートP6からポートP2に冷媒が流れるように流路が形成される。
 以上のように、流路切替機構220において、流路切替弁202,203を切り替えるとともに、流量調整機構207を開閉することによって、実施の形態1と同様に、冷房運転、低外気温時の低容量冷房運転、暖房運転、高外気温時の暖房運転(弱)の間で運転切替を行なうことが可能となる。
 図24には、実施の形態3の冷凍サイクル装置における冷房運転時の冷媒の流れが示される。図24における流路切替弁202をOFF状態、流路切替弁203の状態をOFF状態とする。流量調整機構207は開状態である。
 図27は、実施の形態3の冷凍サイクル装置における低容量冷房運転時の冷媒の流れを示す図である。図27においては流路切替弁202がOFF状態に制御され、流路切替弁203の状態がON状態に制御され、流量調整機構207は閉状態に制御される。これにより、図27に示した場合には、第2室外熱交換器205には冷媒が流れなくなる。
 図28は、実施の形態3の冷凍サイクル装置における暖房運転時の冷媒の流れを示す図である。図27においては流路切替弁202がON状態に制御され、流路切替弁203の状態がON状態に制御され、流量調整機構207は開状態に制御される。
 図28に示す暖房運転では、圧縮機1から吐出された冷媒が、気液分離器242、冷媒膨張機構218,228,238、室内熱交換器219,229,239、三方弁246,247,248を通過した後、流路切替機構220を再度通過する。そして、冷媒は、配管226、流量調整機構206,207、第1室外熱交換器204、第2室外熱交換器205、配管222,223、を通過した後に流路切替機構220を再度通過し、圧縮機201へと至る。
 図29は、実施の形態3の冷凍サイクル装置における低容量暖房運転時の冷媒の流れを示す図である。図29においては流路切替弁202がON状態に制御され、流路切替弁203の状態がOFF状態に制御され、流量調整機構207は閉状態に制御される。これにより、図29に示した場合には、第2室外熱交換器205には冷媒が流れなくなる。
 なお、図24,27~29においては、室内熱交換器219,229,239のすべてに冷媒を流しているが、各室内熱交換器が配置されている室の空調要求の有無によって、冷媒膨張機構218,228,238の一部を閉止して冷媒を流さないようにしてもよい。これにより、稼働する室内熱交換器の台数を変更することもできる。
 図24,27~29においては、逆止弁が流路切替弁203のポートに接続されて冷媒の逆流を防いでいるが、図1に示すように、そのポートが閉止された四方弁を用いても良い。
 図24,27~29に示した4状態の間の切替時においても、実施の形態1と同様に流量調整機構207の開閉を適宜行なうことにより、流路切替機構220の切替に必要な差圧を確保することができる。
 すなわち、流路切替弁202と流路切替弁203の切り替え前に、流路切替弁203と直列に接続された第2室外熱交換器205の出口にある流量調整機構207を一時的に閉じることにより、差圧を確保する。冷凍サイクル装置200における流路切替弁202と流路切替弁203の状態は図24,27-29に示す4通り存在する。以下、4通りの状態の相互間における状態遷移の手順を簡単に述べる。
 <A1:図24(冷房運転)から図27(冷房運転-弱)への切替>
(1) 第2室外熱交換器205の出口に存在する流量調整機構207を閉じる。
(2) 流量調整機構207の切替完了後、流路切替弁203を切り替える。
 <A2:図27(冷房運転-弱)から図24(冷房運転)への切替>
(1) 流路切替弁203を切り替える。
(2) 第2室外熱交換器205の出口に存在する流量調整機構207を開く。
 <B1:図24(冷房運転)から図29(暖房運転-弱)への切替>
(1) 第2室外熱交換器205の出口に存在する流量調整機構207を閉じる。
(2) 流量調整機構207の切替完了後、流路切替弁202を切り替える。
 <B2:図29(暖房運転-弱)から図24(冷房運転)への切替>
(1) 流路切替弁202を切り替える。
(2) 第2室外熱交換器205の出口に存在する流量調整機構207を開く。
 <C1:図24(冷房運転)から図28(暖房運転)への切替>
(1) 第2室外熱交換器205の出口に存在する流量調整機構207を閉じる。
(2) 流量調整機構207の切替完了後、
(2-1) 流路切替弁203と流路切替弁202のいずれか一方を最初に切り替える。
(2-2) 流路切替弁203と流路切替弁202のいずれか他方を次に切り替える。
(3) 第2室外熱交換器205の出口に存在する流量調整機構207を開く。
 <C2:図28(暖房運転)から図24(冷房運転)への切替>
(1) 第2室外熱交換器205の出口に存在する流量調整機構207を閉じる。
(2) 流量調整機構207の切替完了後、
(2-1) 流路切替弁203と流路切替弁202のいずれか一方を最初に切り替える。
(2-2) 流路切替弁203と流路切替弁202のいずれか他方を次に切り替える。
(3) 第2室外熱交換器205の出口に存在する流量調整機構207を開く。
 <D1:図27(冷房運転-弱)から図29(暖房運転-弱)への切替>
(1) 流路切替弁203と流路切替弁202のいずれか一方を最初に切り替える。
(2) 流路切替弁203と流路切替弁202のいずれか他方を次に切り替える。
 <D2:図29(暖房運転-弱)から図27(冷房運転-弱)への切替>
(1) 流路切替弁203と流路切替弁202のいずれか一方を最初に切り替える。
(2) 流路切替弁203と流路切替弁202のいずれか他方を次に切り替える。
 <E1:図27(冷房運転-弱)から図28(暖房運転)への切替>
(1) 流路切替弁202を切り替える。
(2) 第2室外熱交換器205の出口に存在する流量調整機構207を開く。
 <E2:図28(暖房運転)から図27(冷房運転-弱)への切替>
(1) 第2室外熱交換器205の出口に存在する流量調整機構207を閉じる。
(2) 流量調整機構207の切替完了後、流路切替弁202を切り替える。
 <F1:図29(暖房運転-弱)から図28(暖房運転)への切替>
(1) 流路切替弁203を切り替える。
(2) 第2室外熱交換器205の出口に存在する流量調整機構207を開く。
 <F2:図28(暖房運転)から図29(暖房運転-弱)への切替>
(1) 第2室外熱交換器205の出口に存在する流量調整機構207を閉じる。
(2) 流量調整機構207の切替完了後、流路切替弁203を切り替える。
 以上説明したように、実施の形態3においても、流路切替弁203と直列に接続された第2室外熱交換器205の出口に存在する流量調整機構207を流路切替弁203の切替前後に閉止することによって、第2室外熱交換器205を通過する高圧部から低圧部へのバイパス経路が閉止されるため、差圧が確保される。
 (まとめ)
 以下において、再び図面を参照して実施の形態1~3について、総括する。
 図1に示す冷凍サイクル装置100は、冷媒膨張機構8および室内熱交換器9に接続され、冷媒回路を構成する圧縮機1、第1室外熱交換器4および第2室外熱交換器5と、冷媒回路において、圧縮機1と第1室外熱交換器4と第2室外熱交換器5と室内熱交換器9との間に接続され、圧縮機1によって圧縮された冷媒の冷媒回路における流通方向を切り替える流路切替機構20とを備える。冷媒回路において、第1室外熱交換器4および第2室外熱交換器5は冷媒が並行して流れるように配置される。冷凍サイクル装置100は、第2室外熱交換器5に流れる冷媒量を調整する流量調整機構7をさらに備える。冷房運転と暖房運転との切替時に、流量調整機構7によって、一時的に第2室外熱交換器5への冷媒流路を閉止した状態としつつ、流路切替機構20によって冷媒の流通方向が切り替えられる。
 流路切替機構20は、圧縮機1の吸入口および吐出口との差圧を駆動源として流路を切り替えるように構成される。流量調整機構7によって第2室外熱交換器5への冷媒流路を閉止すると、冷媒が室内熱交換器9および冷媒膨張機構8をバイパスして第2室外熱交換器5を冷媒が通過する流路が遮断される。
 図1に示すように、流路切替機構20は、第2室外熱交換器5と圧縮機1の吸入口および吐出口との間に接続された三方弁である流路切替弁3と、第1室外熱交換器と圧縮機と室内熱交換器との間に接続された四方弁である流路切替弁2とを含む。
 図24に示すように、流路切替機構220は、第2室外熱交換器205と圧縮機201の吸入口および吐出口との間に接続された四方弁である流路切替弁203と、第1室外熱交換器204と圧縮機201と室内熱交換器219とに少なくとも接続された六方弁である流路切替弁202とを含む。
 流量調整機構7,207は、電子膨張弁を備える。
 流路切替機構20は、圧縮機1の吸入口および吐出口との差圧を駆動源として流路を切り替えるように構成される。冷凍サイクル装置100は、冷房運転と暖房運転との切替時に、一時的に圧縮機1の運転周波数を変更して、流路切替機構20を切替えるために必要な差圧を維持する。
 実施の形態2で示した本開示の他の局面に係る冷凍サイクル装置は、冷媒膨張機構8および室内熱交換器9に接続され、冷媒回路を構成する圧縮機1、第1室外熱交換器4および第2室外熱交換器5と、冷媒回路において、圧縮機1と第1室外熱交換器4および第2室外熱交換器5と室内熱交換器9との間に接続され、圧縮機1によって圧縮された冷媒の冷媒回路における流通方向を切り替える流路切替機構20とを備える。流路切替機構20は、圧縮機1の吸入口および吐出口との差圧を駆動源として流路を切り替えるように構成される。冷凍サイクル装置100は、冷房運転と暖房運転との切替時に、一時的に圧縮機1の運転周波数を変更して、流路切替機構20を切替えるために必要な差圧を維持する。
 今回開示された実施の形態は、すべての点で例示であって制限的なものではないと考えられるべきである。本発明の範囲は、上記した実施の形態の説明ではなくて請求の範囲によって示され、請求の範囲と均等の意味および範囲内でのすべての変更が含まれることが意図される。
 1,201 圧縮機、2,3,202,203,302 流路切替弁、2a,2b,2c,2d,3a,3b,3c,3d 流路、4,204 第1室外熱交換器、5,205 第2室外熱交換器、6,7,206,207 流量調整機構、8,218,228,238 冷媒膨張機構、9,219,229,239 室内熱交換器、10,11 圧力センサ、15 第1ファン、16 第2ファン、19 ファン、20,220 流路切替機構、21,22,23,24,25,26,27,28,29,222,223,226 配管、30 制御装置、50,250 室外機、60,260 室内機、100,200 冷凍サイクル装置、131 高圧接続管、132 低圧接続管、133 第1容器、134,334 第1圧力室、135,335 第2圧力室、136,336 第1仕切部、137,337 第2仕切部、138,338 連結部、139,339 弁体、140,340 弁体室、145 圧力切替部、146 第2容器、147a 第1連通流路、147b 第2連通流路、148 第2弁体、149 駆動部、150 電磁石、151 プランジャ、152 バネ、153 連結棒、208,243 流量調整弁、242 気液分離器、246,247,248 三方弁、P1,P2,P3,P4,P5,P6 ポート。

Claims (7)

  1.  冷媒膨張機構および室内熱交換器に接続され、冷媒回路を構成する圧縮機、第1室外熱交換器および第2室外熱交換器と、
     前記冷媒回路において、前記圧縮機と前記第1室外熱交換器と前記第2室外熱交換器と前記室内熱交換器との間に接続され、前記圧縮機によって圧縮された冷媒の前記冷媒回路における流通方向を切り替える流路切替機構とを備え、
     前記冷媒回路において、前記第1室外熱交換器および前記第2室外熱交換器は前記冷媒が並行して流れるように配置され、
     前記第2室外熱交換器に流れる冷媒量を調整する流量調整機構をさらに備え、
     冷房運転と暖房運転との切替時に、前記流量調整機構によって、一時的に前記第2室外熱交換器への冷媒流路を閉止した状態としつつ、前記流路切替機構によって前記冷媒の流通方向が切り替えられる、冷凍サイクル装置。
  2.  前記流路切替機構は、前記圧縮機の吸入口および吐出口との差圧を駆動源として流路を切り替えるように構成され、
     前記流量調整機構によって前記第2室外熱交換器への冷媒流路を閉止すると、前記冷媒が前記室内熱交換器および前記冷媒膨張機構をバイパスして前記第2室外熱交換器を通過する流路が遮断される、請求項1に記載の冷凍サイクル装置。
  3.  前記流路切替機構は、
     前記第2室外熱交換器と前記圧縮機の吸入口および吐出口との間に接続された三方弁と、
     前記第1室外熱交換器と前記圧縮機と前記室内熱交換器との間に接続された四方弁とを含む、請求項1または2に記載の冷凍サイクル装置。
  4.  前記流路切替機構は、
     前記第2室外熱交換器と前記圧縮機の吸入口および吐出口との間に接続された四方弁と、
     前記第1室外熱交換器と前記圧縮機と前記室内熱交換器とに少なくとも接続された六方弁とを含む、請求項1または2に記載の冷凍サイクル装置。
  5.  前記流量調整機構は、電子膨張弁を備える、請求項1~4のいずれか1項に記載の冷凍サイクル装置。
  6.  前記流路切替機構は、前記圧縮機の吸入口および吐出口との差圧を駆動源として流路を切り替えるように構成され、
     前記冷房運転と前記暖房運転との切替時に、一時的に前記圧縮機の運転周波数を変更して、前記流路切替機構を切替えるために必要な前記差圧を維持する、請求項1に記載の冷凍サイクル装置。
  7.  冷媒膨張機構および室内熱交換器に接続され、冷媒回路を構成する圧縮機、第1室外熱交換器および第2室外熱交換器と、
     前記冷媒回路において、前記圧縮機と前記第1室外熱交換器および前記第2室外熱交換器と前記室内熱交換器との間に接続され、前記圧縮機によって圧縮された冷媒の前記冷媒回路における流通方向を切り替える流路切替機構とを備え、
     前記流路切替機構は、前記圧縮機の吸入口および吐出口との差圧を駆動源として流路を切り替えるように構成され、
     冷房運転と暖房運転との切替時に、一時的に前記圧縮機の運転周波数を変更して、前記流路切替機構を切替えるために必要な前記差圧を維持する、冷凍サイクル装置。
PCT/JP2019/049458 2019-12-17 2019-12-17 冷凍サイクル装置 WO2021124458A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
EP19956282.8A EP4080136A4 (en) 2019-12-17 2019-12-17 REFRIGERATION CYCLE DEVICE
JP2021565216A JP7350888B2 (ja) 2019-12-17 2019-12-17 冷凍サイクル装置
PCT/JP2019/049458 WO2021124458A1 (ja) 2019-12-17 2019-12-17 冷凍サイクル装置
CN201980102825.5A CN114787565A (zh) 2019-12-17 2019-12-17 制冷循环装置
US17/769,837 US20220381483A1 (en) 2019-12-17 2019-12-17 Refrigeration Cycle Apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/049458 WO2021124458A1 (ja) 2019-12-17 2019-12-17 冷凍サイクル装置

Publications (1)

Publication Number Publication Date
WO2021124458A1 true WO2021124458A1 (ja) 2021-06-24

Family

ID=76477337

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/049458 WO2021124458A1 (ja) 2019-12-17 2019-12-17 冷凍サイクル装置

Country Status (5)

Country Link
US (1) US20220381483A1 (ja)
EP (1) EP4080136A4 (ja)
JP (1) JP7350888B2 (ja)
CN (1) CN114787565A (ja)
WO (1) WO2021124458A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023073872A1 (ja) * 2021-10-28 2023-05-04 三菱電機株式会社 冷凍サイクル装置
EP4361528A1 (en) * 2022-10-25 2024-05-01 LG Electronics Inc. Air conditioner

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05264113A (ja) * 1992-03-23 1993-10-12 Daikin Ind Ltd 空気調和装置の運転制御装置
JP2005049051A (ja) * 2003-07-30 2005-02-24 Mitsubishi Electric Corp 空気調和装置
WO2017138108A1 (ja) 2016-02-10 2017-08-17 三菱電機株式会社 空気調和装置

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6244057B1 (en) * 1998-09-08 2001-06-12 Hitachi, Ltd. Air conditioner
JP2013139897A (ja) * 2011-12-28 2013-07-18 Daikin Industries Ltd 冷凍装置
JP5976333B2 (ja) * 2012-02-13 2016-08-23 三菱重工業株式会社 空気調和装置及び空気調和装置の四方弁制御方法
KR101639837B1 (ko) * 2012-11-15 2016-07-14 엘지전자 주식회사 공기 조화기
JP2015068571A (ja) * 2013-09-30 2015-04-13 ダイキン工業株式会社 冷凍装置
KR20180114453A (ko) * 2017-04-10 2018-10-18 엘지전자 주식회사 공기조화기
US10935284B2 (en) * 2018-01-19 2021-03-02 Arctic Cool Chillers Limited Apparatuses and methods for modular heating and cooling system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05264113A (ja) * 1992-03-23 1993-10-12 Daikin Ind Ltd 空気調和装置の運転制御装置
JP2005049051A (ja) * 2003-07-30 2005-02-24 Mitsubishi Electric Corp 空気調和装置
WO2017138108A1 (ja) 2016-02-10 2017-08-17 三菱電機株式会社 空気調和装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4080136A4

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023073872A1 (ja) * 2021-10-28 2023-05-04 三菱電機株式会社 冷凍サイクル装置
EP4361528A1 (en) * 2022-10-25 2024-05-01 LG Electronics Inc. Air conditioner

Also Published As

Publication number Publication date
EP4080136A1 (en) 2022-10-26
EP4080136A4 (en) 2022-12-14
US20220381483A1 (en) 2022-12-01
CN114787565A (zh) 2022-07-22
JP7350888B2 (ja) 2023-09-26
JPWO2021124458A1 (ja) 2021-06-24

Similar Documents

Publication Publication Date Title
JP6758500B2 (ja) 空気調和装置
JP4475278B2 (ja) 冷凍装置及び空気調和装置
KR100757442B1 (ko) 공기조화기
US20090282849A1 (en) Refrigeration System
EP2610559A2 (en) Heat pump and control method thereof
WO2011080805A1 (ja) ヒートポンプシステム
WO2011080802A1 (ja) ヒートポンプシステム
US20060090487A1 (en) Air conditioner
JP6880204B2 (ja) 空気調和装置
WO2015030173A1 (ja) 熱回収型冷凍装置
JP6847239B2 (ja) 空気調和装置
US11226112B2 (en) Air-conditioning system
JP7350888B2 (ja) 冷凍サイクル装置
JP3781046B2 (ja) 空気調和装置
CN114270111A (zh) 热源机组和制冷装置
JP7150194B2 (ja) 室外機および空気調和装置
KR100688168B1 (ko) 공기조화기의 열교환기
EP3441696B1 (en) Refrigeration cycle device
WO2020261387A1 (ja) 空気調和装置
JP6964776B2 (ja) 冷凍サイクル装置
JPWO2022157821A5 (ja)
KR102078278B1 (ko) 공기조화기
JP2017142027A (ja) 空気調和装置
JPWO2019225005A1 (ja) 熱交換器及び冷凍サイクル装置
JP6264633B2 (ja) 空気調和装置

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19956282

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021565216

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2019956282

Country of ref document: EP

Effective date: 20220718