WO2021117357A1 - 保守支援システム - Google Patents

保守支援システム Download PDF

Info

Publication number
WO2021117357A1
WO2021117357A1 PCT/JP2020/039927 JP2020039927W WO2021117357A1 WO 2021117357 A1 WO2021117357 A1 WO 2021117357A1 JP 2020039927 W JP2020039927 W JP 2020039927W WO 2021117357 A1 WO2021117357 A1 WO 2021117357A1
Authority
WO
WIPO (PCT)
Prior art keywords
maintenance
equipment
maintenance work
cost
unit
Prior art date
Application number
PCT/JP2020/039927
Other languages
English (en)
French (fr)
Inventor
卓弥 花田
植田 裕樹
Original Assignee
ダイキン工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ダイキン工業株式会社 filed Critical ダイキン工業株式会社
Priority to US17/783,188 priority Critical patent/US20230024909A1/en
Priority to EP20899902.9A priority patent/EP4075349A4/en
Priority to CN202080084905.5A priority patent/CN114766025A/zh
Publication of WO2021117357A1 publication Critical patent/WO2021117357A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/16Real estate
    • G06Q50/163Real estate management

Definitions

  • This disclosure relates to a maintenance support system.
  • Patent Document 1 The technology described in Patent Document 1 is known as a technology related to a maintenance support system.
  • a maintenance plan for the target device is created based on the calculated maintenance time, failure risk, maintenance cost information, wages, downtime loss, and the like.
  • the cost of maintenance work varies depending on the time when maintenance work is carried out, but since the conventional technology lacks a viewpoint regarding the time when maintenance work is carried out, equipment that can grasp the maintenance work cost according to the time when maintenance work is carried out. Difficult to create a maintenance plan.
  • This disclosure provides a maintenance support system that can create an equipment maintenance plan that includes maintenance work costs according to the time when maintenance work is carried out.
  • the maintenance support system that solves this problem is a maintenance support system that outputs an equipment maintenance plan for equipment, and has an acquisition unit that acquires operation data of the equipment, and the content and implementation time of maintenance work for the equipment.
  • a storage unit that stores maintenance work cost data according to the above, and a maintenance work planning unit that plans the content and implementation time of maintenance work required after the acquisition of the operation data based on the operation data of the equipment.
  • the maintenance work cost calculation unit that calculates the maintenance work cost according to the planned contents of the maintenance work and the implementation time by using the maintenance work cost data stored in the storage unit, and the contents and implementation of the maintenance work. It is provided with a maintenance plan output unit that creates an equipment maintenance plan including information related to the timing and the maintenance work cost and outputs the equipment maintenance plan. According to this configuration, it is possible to create an equipment maintenance plan including maintenance work costs according to the time when the maintenance work is carried out.
  • the maintenance plan output unit outputs a facility maintenance plan for each of a plurality of preset setting conditions. According to this configuration, it is possible to create an equipment maintenance plan according to each of various setting conditions.
  • the acquisition unit acquires maintenance work available time information on which the maintenance work can be performed, and the maintenance work planning unit determines the maintenance work implementation time based on the maintenance work possible time information. To plan. According to this configuration, it is possible to create an equipment maintenance plan in which the maintenance work implementation time is set at the maintenance work possible time.
  • the maintenance support system further includes a running cost calculation unit for calculating the running cost of the equipment, and the running cost calculation unit includes the acquired operation data, the characteristic information of the equipment, and the planned said.
  • the running cost is predicted over the maintenance plan period based on at least one of the contents of the maintenance work, the maintenance plan output unit creates the equipment maintenance plan including the running cost, and outputs the equipment maintenance plan. To do. According to this configuration, an equipment maintenance plan including running costs can be created.
  • the maintenance support system further includes an opportunity loss amount calculation unit for calculating the opportunity loss amount due to the suspension of operation of the equipment due to the implementation of maintenance work, and the opportunity loss amount calculation unit is a property in which the equipment is installed.
  • the opportunity loss amount is calculated according to at least one of the property information and the maintenance work implementation time, and the maintenance plan output unit creates the equipment maintenance plan including the opportunity loss amount, and the equipment maintenance plan. Is output. According to this configuration, a facility maintenance plan including the amount of opportunity loss can be created.
  • the maintenance support system further includes a cycle cost calculation unit that calculates a cycle cost including the total of the maintenance work cost in a predetermined period, the running cost in the predetermined period, and the opportunity loss amount in the predetermined period.
  • the maintenance plan output unit creates the equipment maintenance plan including the cycle cost, and outputs the equipment maintenance plan. According to this configuration, it is possible to create an equipment maintenance plan including the cycle cost in a predetermined period.
  • an adjustment unit that adjusts at least one of the content and implementation time of the maintenance work so that the cycle cost is smaller than the initial calculation value of the cycle cost calculated by the cycle cost calculation unit.
  • the maintenance plan output unit creates the equipment maintenance plan including the contents of the maintenance work after adjustment, the implementation time of the maintenance work after adjustment, and the cycle cost, and prepares the equipment maintenance plan. Output. According to this configuration, it is possible to create an equipment maintenance plan in which the cycle cost is adjusted.
  • the adjusting unit adjusts at least one of the content and the implementation time of the maintenance work so that the cycle cost takes the minimum value within the range of the value that the cycle cost can take.
  • the coordinating unit adjusts at least one of the content and implementation time of the maintenance work so that the cycle cost is smaller than the designated cost specified from the outside. According to this configuration, it is possible to create an equipment maintenance plan in which the cycle cost is smaller than the specified cost.
  • the content of the maintenance work includes a maintenance target and a maintenance method of the maintenance target.
  • the maintenance work planning unit determines the degree of deterioration of components based on the operation data acquired during high-load operation of the equipment.
  • the maintenance work planning unit can output the determination result of the degree of deterioration of the component parts or use the determination result.
  • the maintenance support system can use the degree of deterioration to update the equipment maintenance plan, propose parts replacement, and create a report on maintenance.
  • the high load operation is an operation when the equipment operates at a predetermined load factor or more based on the operation control of the equipment, and a predetermined load factor or more based on a diagnostic command. At least one of the operations when the equipment is operated.
  • the maintenance work planning unit can determine the degree of deterioration of the component parts by the high load operation of at least one of the operation based on the operation control and the operation based on the diagnostic command.
  • the equipment includes at least one of an air conditioner, a ventilation device, a total heat exchanger, and a refrigerator.
  • equipment maintenance plans can be created for air conditioners, ventilators, total enthalpy heat exchangers, and refrigerators.
  • Schematic diagram of the maintenance support system Block diagram of the maintenance support system.
  • the first figure of the equipment maintenance plan The second figure of the equipment maintenance plan.
  • the third figure of the equipment maintenance plan The figure which shows the status of the parts inventory.
  • the maintenance support system 1 outputs the equipment maintenance plan of the equipment 2.
  • Maintenance work includes cleaning, parts replacement, parts repair, renewal of a set of equipment 2, and partial renewal of equipment 2.
  • Renewal of a set of equipment 2 means replacing the entire equipment 2 with a new equipment 2 or another equipment 2.
  • Partial update of the equipment 2 means updating the main equipment constituting the equipment 2.
  • Equipment 2 installed in facilities such as factories, sales offices, schools, office buildings, transport ships, etc. of businesses is targeted for support by the maintenance support system 1.
  • Examples of the equipment 2 to be supported by the maintenance support system 1 are an air conditioner, a ventilation device, a total heat exchanger, and a refrigerator.
  • Equipment 2 may be an air conditioning system that includes at least one of an air conditioner, a ventilator, a total heat exchanger, and a refrigerator.
  • the equipment 2 may be a heat pump.
  • the maintenance support system 1 provides information to the user of the maintenance support system 1 regarding the content of the maintenance work, the implementation time, the maintenance work cost, and the cycle cost (also referred to as the life cycle cost).
  • the maintenance support system 1 is configured to be able to communicate with the equipment 2.
  • the maintenance support system 1 communicates with the equipment 2 via the network N.
  • the network N is composed of at least one of the Internet, a local network, a telephone network, and a dedicated network.
  • FIG. 1 is a schematic view of the maintenance support system 1.
  • the maintenance support system 1 communicates with the equipment 2 via the network N.
  • the equipment 2 is an air conditioner 4.
  • the air conditioner 4 includes a plurality of indoor units 5, an outdoor unit 6, and a management device 7.
  • the management device 7 controls the operation of the indoor unit 5 and the operation of the outdoor unit 6.
  • the management device 7 collects operation data from the indoor unit 5 and the outdoor unit 6.
  • the management device 7 is configured to be able to communicate with the maintenance support system 1.
  • the management device 7 includes a communication device.
  • the management device 7 transmits operation data to the maintenance support system 1 based on the request of the maintenance support system 1 or a predetermined condition.
  • the cumulative operation time of the indoor unit 5 As the operation data, the cumulative operation time of the indoor unit 5, the start / stop frequency of the compressor of the outdoor unit 6, the cumulative operation time of the compressor of the outdoor unit 6, the cumulative operation time of the outdoor unit 6, and the continuous operation time of the indoor unit 5 Examples include the number of times the threshold value is exceeded, the number of times the continuous operation time of the outdoor unit 6 exceeds the threshold value, diagnostic data detected by the diagnostic operation, various abnormal data, and the like.
  • the maintenance support system 1 includes an acquisition unit 11, a storage unit 12, a maintenance work planning unit 13, a maintenance work cost calculation unit 14, and a maintenance plan output unit 15.
  • the maintenance support system 1 preferably further includes a running cost calculation unit 16.
  • the maintenance support system 1 preferably further includes an opportunity loss amount calculation unit 17.
  • the maintenance support system 1 preferably further includes a cycle cost calculation unit 18.
  • the maintenance support system 1 preferably further includes an adjusting unit 19.
  • Each of the maintenance work planning unit 13, the maintenance work cost calculation unit 14, the maintenance plan output unit 15, the running cost calculation unit 16, the opportunity loss amount calculation unit 17, the cycle cost calculation unit 18, and the adjustment unit 19 are CPUs (Central). It is composed of arithmetic circuits such as ProcessingUnit) and MPU (MicroProcessingUnit) and programs that operate on the arithmetic circuits. In addition, at least two of the maintenance work planning unit 13, the maintenance work cost calculation unit 14, the maintenance plan output unit 15, the running cost calculation unit 16, the opportunity loss amount calculation unit 17, the cycle cost calculation unit 18, and the adjustment unit 19 It may be composed of one arithmetic circuit and a program operating on the arithmetic circuit.
  • the acquisition unit 11 acquires the operation data of the equipment 2.
  • the acquisition unit 11 acquires the plan creation information for creating the equipment maintenance plan.
  • the planning information includes maintenance work cost data and property information regarding the property where the equipment 2 is installed.
  • the acquisition unit 11 includes at least one of a communication device that communicates with the equipment 2 via the network N and an input device.
  • the input device is a keyboard.
  • the maintenance work cost data is used to calculate the maintenance work cost.
  • the maintenance work cost data includes labor cost data and maintenance equipment cost data.
  • Maintenance equipment cost data includes at least parts cost data and parts cost data.
  • Personnel cost data includes the unit price of labor cost per day and the ratio of increase in labor cost (see FIG. 5).
  • the unit labor cost for maintenance work that requires specialized skills and the unit labor cost for maintenance work that does not require specialized skills are set to different values.
  • the labor cost unit price for maintenance work that requires specialized skills is higher than the labor cost unit price for maintenance work that does not require specialized skills.
  • the technical level related to the technical skill of maintenance work is divided into rank A and rank B, which has a lower technical level than rank A.
  • the labor cost unit price of rank A is set higher than the labor cost unit price of rank B. In the example shown in FIG. 4, the labor cost unit price is set to rank A.
  • the rate of increase in labor costs takes different values depending on the time of year.
  • the ratio of increase in labor costs is the ratio of labor costs for a given year and month to the standard labor costs for the year and month.
  • the rate of increase in labor costs is a value that is predicted in advance for each year and month (see Fig. 3).
  • the ratio of increase in labor costs is different between the off-season and the busy season of the maintenance work of the equipment 2.
  • the rate of increase in labor costs related to the maintenance of the air conditioner 4 changes depending on the season. Due to frequent failures and repairs in the summer and winter when the operating rate of the air conditioner 4 is high, the ratio of increase in labor costs in summer and winter is higher than the ratio of increase in labor costs in spring and autumn (see FIG. 3).
  • labor costs may rise due to social conditions such as the hosting of the Olympic Games and the rush to build skyscrapers.
  • the rate of increase in labor costs is set in advance for each month. Since the price increase ratio changes greatly depending on social conditions and climate change, it is preferable that the price increase ratio can be changed.
  • the labor cost data is set by the operator who operates the maintenance support system 1.
  • Maintenance equipment cost data includes parts cost data and material cost data as described above.
  • Parts cost data is data about parts used in maintenance.
  • the parts constitute the equipment 2 to be maintained. Parts are replaced due to wear, failure, or performance gains.
  • the member cost data is data related to the member used for maintenance.
  • the member is a member other than the parts of the equipment 2 and is used for the maintenance of the equipment 2 to be maintained.
  • examples of the member include a reinforcing member for reinforcing the equipment 2 and a protective member used for protecting the equipment 2 from wind and rain.
  • Parts cost data includes parts unit price and miscellaneous costs.
  • the material cost data includes the material unit price and miscellaneous costs.
  • the unit price of parts and the unit price of parts fluctuate depending on the time. For example, when the demand for equipment 2 to be maintained increases and the production is busy, it becomes difficult to obtain parts and parts, and the parts unit price and the member unit price rise.
  • the miscellaneous costs of parts and the miscellaneous costs of parts vary depending on the time. For example, if the inventory of parts or parts is low and it is necessary to order parts or parts from a factory far from the installation location of the equipment 2 to be maintained, the transportation cost depends on the length of the period until the maintenance work is carried out. Changes. Specifically, if the period until the maintenance work is carried out is short, air transportation of parts or members is required, and miscellaneous expenses increase.
  • the property information includes the business information of the business operator operating in the property where the equipment 2 is installed.
  • the business information is information for calculating the business loss when the equipment 2 is stopped.
  • the business information includes the monthly expected sales amount and the monthly expected profit margin (see FIG. 3).
  • the business information is information that can be set by the business operator using the equipment 2.
  • the acquisition unit 11 acquires information on the maintenance work available time when maintenance work is possible.
  • the maintenance work available time information indicates the time when the maintenance work is carried out, which is convenient for the business operator using the equipment 2 (see FIG. 3). For example, when the support target of the maintenance support system 1 is the equipment 2 of the hotel, it is preferable for the business operator to update the equipment 2 during the off-season, which is not the tourist season.
  • the maintenance work available time information is used for the purpose of setting the maintenance work execution time at an appropriate time.
  • the maintenance work available time information is information that can be set by the business operator using the equipment 2.
  • the storage unit 12 stores the information acquired by the acquisition unit 11.
  • the storage unit 12 stores maintenance work cost data.
  • the storage unit 12 preferably stores the operation data of the equipment 2.
  • the storage unit 12 stores business information. Further, the storage unit 12 stores the maintenance work available time information. Further, the storage unit 12 stores the equipment maintenance plan created by the maintenance plan output unit 15.
  • the storage unit 12 is composed of at least one of a semiconductor memory, an optical disk, a magnetic disk, and a magnetic tape.
  • the maintenance work planning unit 13 plans the content and implementation time of the maintenance work required after the acquisition of the operation data based on the operation data of the equipment 2.
  • the time when the maintenance work is carried out indicates the time when the maintenance work is carried out.
  • the contents of the maintenance work include the maintenance target and the maintenance method of the maintenance target.
  • the maintenance targets are a set of equipment 2, equipment constituting the equipment 2, and components constituting the equipment 2.
  • Maintenance methods include cleaning, parts replacement, parts repair, renewal of a set of equipment 2, and partial renewal of equipment 2.
  • the maintenance work planning unit 13 sets the content of the maintenance work based on the start / stop frequency of the compressor. When the start / stop frequency of the compressor is higher than a preset value, the maintenance work planning unit 13 sets the replacement of the compressor as the content of the maintenance work. In another example, the maintenance work planning unit 13 sets the content of the maintenance work based on the cumulative operating time of the indoor unit 5 and the cumulative operating time of the outdoor unit 6. When the cumulative operation time of the indoor unit 5 and the cumulative operation time of the outdoor unit 6 are larger than the preset values, the maintenance work planning unit 13 sets the update of the equipment 2 set as the content of the maintenance work.
  • the maintenance work planning unit 13 may determine the degree of deterioration of the component parts based on the operation data acquired during the high load operation of the equipment 2.
  • the maintenance work planning unit 13 sets the content of the maintenance work based on the degree of deterioration of the component parts of the equipment 2.
  • the maintenance work planning unit 13 has a determination table of the degree of deterioration with respect to the start / stop frequency of the compressor.
  • the maintenance work planning unit 13 acquires the start / stop frequency as operation data from the equipment 2, determines the degree of deterioration based on the start / stop frequency with reference to the determination table, and predicts the failure based on the determination result of the degree of deterioration. To determine the need for maintenance work.
  • the air conditioner 4 there are two types of high load operation.
  • the first is an operation when the air conditioner 4 operates at a predetermined load factor or higher based on the operation control of the air conditioner 4 (hereinafter, referred to as a normal high load operation).
  • the second is operation when the air conditioner 4 operates at a predetermined load factor or higher based on the diagnostic command (hereinafter, referred to as diagnostic operation).
  • the operation data of at least one of the high load operation of the normal high load operation and the diagnostic operation is used by the maintenance work planning unit 13 for the purpose of determining the degree of deterioration. According to the high load operation, more accurate operation data can be obtained for determining the necessity of maintenance work as compared with the case of the low load operation.
  • the cooling operation and the heating operation correspond to the normal high load operation.
  • the operation data output from the air conditioner 4 is handled by the maintenance work planning unit 13 as the operation data in the high load operation.
  • Blower operation is not high load operation. Since high-load operation is not performed in spring or autumn, it is difficult for the acquisition unit 11 to acquire effective operation data for determining the degree of deterioration at this time. For this reason, diagnostic operation is performed in spring and autumn.
  • the diagnostic operation may be substantially the same operation as the heating operation or the cooling operation.
  • the diagnostic operation may be performed at a time other than spring or autumn. When the maintenance support system 1 requires operation data, the diagnostic operation may be performed as needed.
  • the diagnostic operation may be performed at night regardless of the season.
  • the operation data during the diagnostic operation is handled by the maintenance work planning unit 13 as the operation data in the high load operation.
  • the maintenance work planning unit 13 may issue a diagnostic command for performing the diagnostic operation.
  • the diagnostic operation may be performed according to a preset schedule in the equipment 2. It is preferable that the equipment 2 is configured to output operation data to the maintenance support system 1 via the network N together with the execution of the diagnostic operation.
  • Examples of the diagnostic operation include the diagnosis of the electronic expansion valve in the air conditioner 4, the operation diagnosis of the thermistor, and the abnormality determination in the high load operation. It is preferable that the diagnostic program for performing these diagnoses is preset in the control unit of the air conditioner 4. The maintenance work planning unit 13 may have a diagnostic program for performing these diagnoses.
  • the air conditioner 4 acquires the change in the refrigerant temperature before and after the opening / closing command of the electronic expansion valve, and determines the opening / closing operation abnormality of the electronic expansion valve based on the change in the refrigerant temperature.
  • the air conditioner 4 In the operation diagnosis of the thermistor, the air conditioner 4 simultaneously acquires at least one of the refrigerant temperature and the operating state of the air conditioner 4 and the output value of the thermistor, and determines the operation abnormality of the thermistor based on comparing the two. To do.
  • the air conditioner stores the diagnostic data detected by the diagnostic operation as operation data, and outputs the diagnostic data based on the request of the maintenance support system 1.
  • the maintenance work planning unit 13 plans the implementation time of the maintenance work based on the maintenance work available time information. Preferably, the maintenance work planning unit 13 plans the implementation time of the maintenance work based on the content of the maintenance work and the maintenance work available time information.
  • the maintenance work planning unit 13 sets the recommended maintenance work time based on the content of the maintenance work. When the content of the maintenance work is the update of the entire equipment 2, the recommended maintenance work time is set in consideration of the number of days required for the update. Further, the maintenance work planning unit 13 sets one or a plurality of maintenance work execution times (see the candidate dates in FIG. 3) based on the maintenance work recommended time and the maintenance work possible time information.
  • the maintenance work planning unit 13 may set the implementation time of the maintenance work by referring to the information of the parts inventory management system.
  • the parts inventory management system is a system for managing the inventory of component parts of the equipment 2.
  • the maintenance work planning unit 13 identifies the parts required for maintenance from the contents of the maintenance work, refers to the parts inventory management system, checks whether or not the parts required for maintenance are in stock, and maintains based on the presence or absence of stock. Set the work implementation time.
  • FIG. 6 is an example of a table managed by the parts inventory management system.
  • the parts inventory management system manages the inventory of components of a plurality of models for the equipment 2. Further, the parts inventory management system manages the delivery date required for the procurement of components.
  • the maintenance work cost calculation unit 14 calculates the maintenance work cost according to the content of the planned maintenance work and the implementation time by using the maintenance work cost data stored in the storage unit 12. Preferably, the maintenance work cost calculation unit 14 calculates the labor cost and the maintenance work cost including the maintenance equipment cost.
  • Maintenance equipment costs are calculated based on the content of maintenance work. For example, when the entire air conditioner 4 is renewed, the maintenance equipment cost is the cost of the set of the air conditioner 4 and the construction cost (construction cost for installing the equipment incurred separately from the labor cost).
  • the maintenance equipment cost may be calculated based on the parts cost data and the member cost data.
  • the labor cost is calculated by multiplying the number of days of the maintenance work period for performing maintenance work, the unit labor cost, and the average number of workers per unit period (see FIG. 4).
  • the running cost calculation unit 16 calculates the running cost of the equipment 2. Specifically, the running cost calculation unit 16 determines the maintenance planning period based on at least one of the operation data acquired by the acquisition unit 11, the characteristic information of the equipment 2, and the contents of the planned maintenance work. Predict running costs over.
  • the characteristic information of the equipment 2 is information on the operating cost of the equipment 2.
  • the characteristic information of the equipment 2 includes the power consumption of the equipment 2, the operating time of the equipment 2 per predetermined period, the frequency of use of the equipment 2, and the unit price of the electric power charge.
  • the running cost calculation unit 16 may calculate the operation time per predetermined period based on the operation data.
  • the running cost calculation unit 16 may calculate the frequency of use of the equipment 2 based on the operation data.
  • the running cost calculation unit 16 refers to information on the running cost among the contents of the maintenance work.
  • the running cost calculation unit 16 identifies consumables from the contents of the maintenance work, and acquires the unit price of the consumables from the storage unit 12.
  • the running cost is the cost required to operate the equipment 2.
  • the running cost includes the power charge for operating the equipment 2 and the cost of consumables.
  • the running cost increases with the deterioration of the equipment 2 and the length of the period of use.
  • the running cost calculation unit 16 calculates the running cost based on the operating time, frequency of use, and electric power charge unit price of the air conditioner 4. .. Further, the running cost calculation unit 16 may have a running cost table showing the running cost with respect to the cumulative operating time of the indoor unit 5 and the cumulative operating time of the outdoor unit 6. The running cost calculation unit 16 may set the running cost for each month at a predetermined time based on the cumulative operating time of the indoor unit 5 and the cumulative operating time of the outdoor unit 6 with reference to the running cost table.
  • the running cost calculation unit 16 predicts the running cost for each month during the maintenance planning period (Fig. 3). When the equipment 2 is updated, the monthly running cost until the equipment 2 is updated and the monthly running cost after the equipment 2 is updated will be different, and the latter will be lower than the former. Become.
  • the running cost calculation unit 16 may calculate the running cost over the maintenance planning period.
  • the maintenance planning period is 12 months.
  • the running cost calculation unit 16 calculates the running cost (total running cost) over the maintenance plan period based on the running cost before the renewal and the running cost after the renewal (total running cost). (See FIG. 4).
  • the running cost over the maintenance planning period (total running cost) is defined as the sum of the running costs for each month of the maintenance planning period.
  • the opportunity loss amount calculation unit 17 calculates the opportunity loss amount due to the suspension of operation of the equipment 2 due to the implementation of maintenance work. For example, the opportunity loss amount calculation unit 17 calculates the opportunity loss amount according to at least one of the property information regarding the property in which the equipment 2 is installed and the maintenance work implementation time. For example, the opportunity loss amount calculation unit 17 calculates the opportunity loss amount by multiplying the expected profit rate and the expected sales amount per month, the maintenance work period, and the profit decrease rate (“0.5” in FIG. 4). (See Fig. 4).
  • the cycle cost calculation unit 18 calculates the cycle cost including the total of the maintenance work cost in the predetermined period, the running cost in the predetermined period, and the opportunity loss amount in the predetermined period. Cycle cost is sometimes referred to as "life cycle cost".
  • the preset predetermined period is defined as, for example, one year from the time when the equipment maintenance plan is created. In the present embodiment, the preset predetermined period is the same period as the maintenance planning period.
  • the cycle cost calculation unit 18 acquires the maintenance work cost from the maintenance work cost calculation unit 14.
  • the cycle cost calculation unit 18 acquires the running cost from the running cost calculation unit 16.
  • the cycle cost calculation unit 18 acquires the opportunity loss amount from the opportunity loss amount calculation unit 17.
  • the cycle cost calculation unit 18 takes the sum of the maintenance work cost, the running cost, and the opportunity loss amount, and outputs this sum as the cycle cost (see FIG. 4).
  • the adjustment unit 19 adjusts at least one of the content and implementation time of the maintenance work so that the cycle cost is smaller than the initial calculation value of the cycle cost calculated by the cycle cost calculation unit 18.
  • the maintenance plan output unit 15 outputs the equipment maintenance plan before the adjustment and the equipment maintenance plan after the adjustment.
  • the coordinating unit 19 reduces the cycle cost by changing the implementation time of the maintenance work to a time when the labor cost is lower than that at the time of the initial calculation.
  • the coordinating unit 19 reduces the cycle cost by deleting the non-urgent items from the maintenance work contents and creating a new maintenance work contents.
  • the adjusting unit 19 may adjust at least one of the content and the implementation time of the maintenance work so that the cycle cost takes the minimum value within the range of the values that the cycle cost can take.
  • the adjusting unit 19 may adjust at least one of the content and the implementation time of the maintenance work so that the cycle cost is smaller than the designated cost specified from the outside.
  • the designated cost is a value designated by the business operator operating in the property where the equipment 2 is installed.
  • the designated cost is acquired by the acquisition unit 11 via the input device.
  • the maintenance plan output unit 15 creates an equipment maintenance plan including information associated with the content of maintenance work, implementation time, and maintenance work cost (hereinafter referred to as association information), and outputs the equipment maintenance plan.
  • association information information associated with the content of maintenance work, implementation time, and maintenance work cost
  • the maintenance plan output unit 15 forms a table in which the candidate as the implementation time of the maintenance work, the content of the maintenance work, and the maintenance work cost are associated with each other over the maintenance plan period.
  • the table corresponds to the association information.
  • the maintenance plan output unit 15 forms a chart in which the candidates and the costs as the implementation time of the maintenance work are associated with each other over the maintenance plan period.
  • the chart corresponds to the association information.
  • the maintenance plan output unit 15 creates an equipment maintenance plan including running costs and outputs the equipment maintenance plan.
  • the maintenance plan output unit 15 may further create an equipment maintenance plan including the amount of opportunity loss and output the equipment maintenance plan.
  • the maintenance plan output unit 15 may further create an equipment maintenance plan including a cycle cost and output the equipment maintenance plan.
  • the maintenance plan output unit 15 may output the equipment maintenance plan for each of the plurality of preset setting conditions.
  • the setting conditions include the maintenance work available time, the rate of increase in labor costs for each month, the expected sales amount for each month, and the expected rate of return for each month.
  • the maintenance support system 1 is configured so that a plurality of values can be input for at least one of these setting conditions, and the maintenance plan output unit 15 creates an equipment maintenance plan for each of these plurality of values. Output the equipment maintenance plan.
  • a plurality of times are specified as maintenance work possible times.
  • the maintenance plan output unit 15 creates and outputs an equipment maintenance plan for each of a plurality of maintenance work possible periods.
  • the first candidate and the second candidate are set as the maintenance work possible time, and the equipment maintenance plan is created for each of the first candidate and the second candidate.
  • the maintenance plan output unit 15 includes the content of the maintenance work after the adjustment by the adjustment unit 19, the implementation time of the maintenance work after the adjustment, and the cycle cost. Create a maintenance plan and output the equipment maintenance plan.
  • the equipment maintenance plan is composed of charts as shown in FIGS. 3 to 5.
  • 3 to 5 show an equipment maintenance plan at a time when the equipment 2 is updated.
  • the maintenance planning period is one year.
  • the maintenance work period for updating the equipment 2 is one month.
  • Figure 3 shows the maintenance work available time, expected sales amount, expected profit margin, labor cost increase ratio, running cost before updating equipment 2, and candidates for maintenance work implementation time during the maintenance plan period. It is a figure which shows a day.
  • the maintenance work available time, the expected sales amount, the expected profit margin, and the increase ratio of the labor cost of the business operator are the values input to the maintenance support system 1.
  • the candidate dates for the maintenance work implementation time are set to a plurality of periods in the maintenance planning period. Each candidate date is set within the range of the maintenance work available time of the operator.
  • the first candidate and the second candidate are set as the implementation time of the maintenance work in the maintenance planning period.
  • the first candidate is May.
  • the second candidate is March of the following year.
  • Figure 4 shows personnel cost-related information, maintenance work period, average number of workers engaged in maintenance work per day during maintenance work period, delivery date for renewal of equipment 2, expected sales amount, and expected profit for each candidate. The rate, maintenance work cost, running cost, opportunity loss amount, and cycle cost are shown.
  • the technical level of maintenance work is set to rank A.
  • the labor cost unit price which does not reflect the price increase ratio, does not change between the first candidate and the second candidate, and both are rank A unit prices. Since the first candidate is in the off-season, the rate of increase in labor costs is 1.
  • the second candidate has a rate of increase in labor costs of 1.5 because it is in a busy season.
  • the labor cost which is a breakdown of the maintenance work cost, is calculated by multiplying the labor cost unit price, which reflects the rate of increase, the maintenance work period, and the average number of people.
  • the labor cost of the second candidate is higher than the labor cost of the first candidate.
  • the maintenance work cost is calculated by adding the labor cost and the maintenance equipment cost. In the case of this example, the maintenance equipment cost is the cost required for updating the equipment 2 and is an estimated price that does not fluctuate depending on the time, and is substantially equal to the introduction cost of the new equipment 2.
  • the running cost before updating the equipment 2 will be incurred during the period from April to May. During the period from June to March of the following year, running costs will be incurred after updating equipment 2.
  • the running cost before updating the equipment 2 is incurred during the period from April to March of the following year.
  • the running cost of the first candidate is lower than the running cost of the second candidate.
  • the profit reduction rate is set to 0.5 (see FIG. 4) on the premise that about half of the normal business can be performed during the construction period for renewing the equipment 2.
  • Opportunity loss is calculated as the product of expected profit and profit reduction rate.
  • the first candidate has less expected profit than the second candidate. Therefore, the opportunity loss amount of the first candidate is smaller than the opportunity loss amount of the second candidate.
  • the cycle cost is the sum of the maintenance work cost, running cost, and opportunity loss amount.
  • the cycle cost of the first candidate is lower than the cycle cost of the second candidate.
  • FIG. 5 is a chart comparing the costs of the first candidate and the costs of the second candidate for the maintenance work and the operation of the equipment 2 during the maintenance planning period.
  • running costs are incurred from April to May, and at the end of May, costs for updating equipment 2 and costs due to opportunity loss are incurred. After that, the running cost after the update is incurred.
  • running costs are incurred from April to March of the following year, and at the end of March, costs for updating equipment 2 and costs due to opportunity loss are incurred.
  • the costs incurred during the maintenance planning period differ greatly depending on the time when the equipment 2 is updated (the time when the maintenance work is carried out).
  • the factors that cause such a difference are the difference in labor costs, the difference in the amount of opportunity loss, and the difference in running costs per month.
  • the update of the equipment maintenance plan will be described with reference to FIG.
  • the maintenance support system 1 reviews the equipment maintenance plan several times during the maintenance plan period and updates the equipment maintenance plan.
  • the maintenance support system 1 updates the equipment maintenance plan four times during the maintenance planning period.
  • the update time is set in advance.
  • step S11 the maintenance support system 1 determines whether or not the equipment 2 is normally performing high-load operation at the time of updating the equipment maintenance plan. For example, when the equipment 2 is an air conditioner, the maintenance support system 1 normally performs high-load operation based on the daily operation time of the equipment 2 as operation data or the power consumption for the air conditioning capacity. Determine if it is time. In another example, the time during which the normal high load operation is normally performed may be set in advance. For example, the period during normal high-load operation is set from July to September and from December to March.
  • step S12 the maintenance support system 1 acquires operation data from the equipment 2. Then, in step S13, the maintenance support system 1 updates the equipment maintenance plan based on the operation data.
  • the maintenance support system 1 When the equipment 2 is not normally performing high-load operation, the maintenance support system 1 issues a diagnostic operation command to the equipment 2 in step S14. Alternatively, the operator may input a diagnostic command signal to the equipment 2 based on the notification of the maintenance support system 1. Then, in step S15, the maintenance support system 1 acquires operation data from the equipment 2 on which the diagnostic operation has been executed. Next, in step S13, the maintenance support system 1 updates the equipment maintenance plan based on the operation data.
  • the maintenance support system 1 calculates the labor cost related to the maintenance work as a value according to the content and the implementation time of the maintenance work.
  • the maintenance support system 1 outputs the implementation time of the maintenance work and the equipment maintenance plan including the maintenance work cost including the labor cost.
  • maintenance work costs including labor costs that vary depending on the time can be provided to the user of the maintenance support system 1.
  • the maintenance support system 1 includes at least a maintenance work cost calculation unit 14 and a maintenance plan output unit 15.
  • the maintenance work cost calculation unit 14 calculates the maintenance work cost according to the content and the implementation time of the maintenance work by using the maintenance work cost data.
  • the maintenance plan output unit 15 creates an equipment maintenance plan including information associated with the content of the maintenance work, the implementation time, and the maintenance work cost. According to the maintenance support system 1, it is possible to create an equipment maintenance plan including maintenance work costs according to the time when the maintenance work is carried out.
  • the maintenance plan output unit 15 outputs the equipment maintenance plan for each of the plurality of preset setting conditions. According to this configuration, it is possible to create an equipment maintenance plan according to each of various setting conditions.
  • the maintenance work planning unit 13 plans the implementation time of the maintenance work based on the maintenance work available time information.
  • the maintenance support system 1 can create an equipment maintenance plan in which the maintenance work implementation time is set at the maintenance work possible time.
  • the running cost calculation unit 16 predicts the running cost over the maintenance planning period based on at least one of the operation data, the characteristic information of the equipment 2, and the content of the maintenance work.
  • the maintenance plan output unit 15 creates an equipment maintenance plan including running costs. According to this configuration, the maintenance support system 1 can create an equipment maintenance plan including running costs.
  • Opportunity loss amount calculation unit 17 calculates the opportunity loss amount according to at least one of the property information regarding the property where the equipment 2 is installed and the maintenance work implementation time.
  • the maintenance plan output unit 15 creates an equipment maintenance plan including the amount of opportunity loss, and outputs the equipment maintenance plan. According to this configuration, the maintenance support system 1 can create an equipment maintenance plan including the amount of opportunity loss.
  • the cycle cost calculation unit 18 calculates the cycle cost including the total of the maintenance work cost in the predetermined period, the running cost in the predetermined period, and the opportunity loss amount in the predetermined period.
  • the maintenance plan output unit 15 creates an equipment maintenance plan including a cycle cost, and outputs the equipment maintenance plan. According to this configuration, the maintenance support system 1 can create an equipment maintenance plan including a cycle cost in a predetermined period.
  • the adjustment unit 19 adjusts at least one of the content and implementation time of the maintenance work so that the cycle cost is smaller than the initially calculated value of the cycle cost.
  • the maintenance plan output unit 15 creates an equipment maintenance plan including the content of the maintenance work after adjustment, the implementation time of the maintenance work after adjustment, and the cycle cost, and outputs the equipment maintenance plan. According to this configuration, the maintenance support system 1 can create an equipment maintenance plan in which the cycle cost is adjusted.
  • the adjustment unit 19 adjusts at least one of the content and the implementation time of the maintenance work so that the cycle cost takes the minimum value within the range of the value that the cycle cost can take. With this configuration, it is possible to create an equipment maintenance plan with the lowest cycle cost.
  • the adjustment unit 19 adjusts at least one of the content and implementation time of the maintenance work so that the cycle cost is smaller than the designated cost specified from the outside. According to this configuration, it is possible to create an equipment maintenance plan in which the cycle cost is smaller than the specified cost.
  • the contents of the maintenance work include the maintenance target and the maintenance method of the maintenance target. According to this configuration, it is possible to create an equipment maintenance plan including maintenance targets and maintenance methods as the contents of maintenance work.
  • the maintenance work planning unit 13 determines the degree of deterioration of the component parts based on the operation data acquired during the high load operation of the equipment 2. According to this configuration, the maintenance work planning unit 13 can output the determination result of the degree of deterioration of the component parts or use the determination result. For example, the maintenance support system 1 can use the degree of deterioration to update the equipment maintenance plan, propose parts replacement, create a report on maintenance, and the like.
  • the maintenance work planning unit 13 can determine the degree of deterioration of the component parts by the high load operation of at least one of the operation based on the operation control and the operation based on the diagnostic command.
  • the equipment 2 includes at least one of an air conditioner 4, a ventilator, a total heat exchanger, and a refrigerator. According to this configuration, it is possible to create an equipment maintenance plan for the air conditioner 4, the ventilator, the total heat exchanger, and the refrigerator.
  • the maintenance support system 1 of the present disclosure may be a combination of, for example, the following modifications and at least two modifications that do not contradict each other.
  • the maintenance support system 1 may create a fixed-rate equipment maintenance plan in which the monthly maintenance work cost is constant, in addition to the equipment maintenance plan according to the time when the maintenance work is carried out.
  • the maintenance support system 1 preferably displays the equipment maintenance plan according to the implementation time of the maintenance work and the fixed-price equipment maintenance plan in a manner that can be visually recognized at the same time or in a manner that can be compared.
  • the content and implementation time of the maintenance work are set in advance based on the characteristic information of the equipment 2.
  • the fixed-price equipment maintenance plan limits the involvement of businesses operating in properties where equipment 2 is installed.
  • the maintenance work based on the fixed-price equipment maintenance plan is executed by the business operator operating the maintenance support system 1 and its related parties.
  • the maintenance support system 1 updates the equipment 2 in the fixed-price equipment maintenance plan
  • the maintenance support system 1 updates the equipment 2 to the business operator operating in the property where the equipment 2 is installed, regarding the timing of the maintenance work. It is preferable to report to that effect.
  • the labor cost data may include the labor cost unit price in the time zone in one day, the labor cost unit price in the daytime on holidays, and the labor cost unit price in the nighttime on holidays. In this case, an accurate labor cost can be calculated.
  • the maintenance equipment cost is a fixed value that does not change depending on the time, but the maintenance equipment cost may change depending on the time.
  • the maintenance equipment cost is calculated based on the parts cost data and the member cost data.

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

保守支援システム(1)は設備機器の設備保守計画を出力する。保守支援システム(1)は、設備機器の運転データを取得する取得部(11)と、設備機器の保守作業の内容および実施時期に応じた保守作業費用データを記憶する記憶部(12)と、設備機器の運転データに基づいて、運転データの取得時以降において必要となる保守作業の内容および実施時期を計画する保守作業計画部(13)と、記憶部(12)に記憶された保守作業費用データを用いて、計画した保守作業の内容および実施時期に応じた保守作業費用を算出する保守作業費用算出部(14)と、保守作業の内容、実施時期、および保守作業費用を関連付けた情報を含む設備保守計画を作成し、設備保守計画を出力する保守計画出力部(15)と、を備える。

Description

保守支援システム
 本開示は、保守支援システムに関する。
 保守支援システムに関する技術として、特許文献1に記載の技術が知られている。特許文献1に記載の技術では、計算された保守時期、故障リスク、保守費用情報、工賃、ダウンタイムロス等に基づいて、対象機器の保守計画を作成する。
特開2009-217718号公報
 ところで、保守作業の実施時期によって保守作業のコストが変動するが、従来技術では、保守作業の実施時期に関する観点が欠如しているため、保守作業の実施時期に応じた保守作業費用を把握できる設備保守計画を作成することが難しい。
 本開示は、保守作業の実施時期に応じた保守作業費用を含む設備保守計画を作成できる保守支援システムを提供する。
 この課題を解決する保守支援システムは、設備機器の設備保守計画を出力する保守支援システムであって、前記設備機器の運転データを取得する取得部と、前記設備機器の保守作業の内容および実施時期に応じた保守作業費用データを記憶する記憶部と、前記設備機器の運転データに基づいて、前記運転データの取得時以降において必要となる保守作業の内容および実施時期を計画する保守作業計画部と、前記記憶部に記憶された前記保守作業費用データを用いて、計画した前記保守作業の内容および実施時期に応じた保守作業費用を算出する保守作業費用算出部と、前記保守作業の内容、実施時期、および前記保守作業費用を関連付けた情報を含む設備保守計画を作成し、前記設備保守計画を出力する保守計画出力部と、を備える。この構成によれば、保守作業の実施時期に応じた保守作業費用を含む設備保守計画を作成できる。
 上記保守支援システムにおいて、前記保守計画出力部は、予め設定された複数の設定条件それぞれについて設備保守計画を出力する。この構成によれば、各種の設定条件それぞれに応じた設備保守計画を作成できる。
 上記保守支援システムにおいて、前記取得部は、前記保守作業が実施可能な保守作業可能時期情報を取得し、前記保守作業計画部は、前記保守作業可能時期情報に基づいて前記保守作業の実施時期を計画する。この構成によれば、保守作業可能時期に保守作業の実施時期が設定された設備保守計画を作成できる。
 上記保守支援システムにおいて、前記設備機器のランニングコストを算出するランニングコスト算出部をさらに備え、前記ランニングコスト算出部は、取得された前記運転データ、前記設備機器の特性情報、および、計画された前記保守作業の内容のうち少なくとも一つに基づいて、保守計画期間にわたって前記ランニングコストを予測し、前記保守計画出力部は、前記ランニングコストを含む前記設備保守計画を作成し、前記設備保守計画を出力する。この構成によれば、ランニングコストを含む設備保守計画を作成できる。
 上記保守支援システムにおいて、保守作業の実施による前記設備機器の稼働停止に伴う機会損失額を算出する機会損失額算出部をさらに備え、前記機会損失額算出部は、前記設備機器が設置される物件に関する物件情報および前記保守作業の実施時期の少なくとも一方に応じた前記機会損失額を算出し、前記保守計画出力部は、前記機会損失額をさらに含む前記設備保守計画を作成し、前記設備保守計画を出力する。この構成によれば、機会損失額を含む設備保守計画を作成できる。
 上記保守支援システムにおいて、予め設定される所定期間における前記保守作業費用、前記所定期間におけるランニングコスト、および前記所定期間における機会損失額の総和を含むサイクルコストを算出するサイクルコスト算出部をさらに備え、前記保守計画出力部は、前記サイクルコストを含む前記設備保守計画を作成し、前記設備保守計画を出力する。この構成によれば、所定期間におけるサイクルコストを含む設備保守計画を作成できる。
 上記保守支援システムにおいて、前記サイクルコスト算出部によって算出される前記サイクルコストの初回算出値よりも前記サイクルコストが小さくなるように、前記保守作業の内容および実施時期のうち少なくとも一方を調整する調整部をさらに備え、前記保守計画出力部は、調整後の前記保守作業の内容、調整後の前記保守作業の実施時期、および、前記サイクルコストを含む前記設備保守計画を作成し、前記設備保守計画を出力する。この構成によれば、サイクルコストが調整された設備保守計画を作成できる。
 上記保守支援システムにおいて、前記調整部は、前記サイクルコストが取り得る値の範囲内で前記サイクルコストが最小値をとるように、前記保守作業の内容および実施時期のうち少なくとも一方を調整する。この構成によれば、サイクルコストが最小である設備保守計画を作成できる。
 上記保守支援システムにおいて、前記調整部は、外部から指定される指定コストよりも前記サイクルコストが小さくなるように、前記保守作業の内容および実施時期のうち少なくとも一方を調整する。この構成によれば、サイクルコストが指定コストよりも小さい設備保守計画を作成できる。
 上記保守支援システムにおいて、前記保守作業の内容は、保守対象と、前記保守対象の保守方法とを含む。
 この構成によれば、保守作業の内容として、保守対象および保守方法を含む設備保守計画を作成できる。
 上記保守支援システムにおいて、前記保守作業計画部は、前記設備機器の高負荷運転時に取得された前記運転データに基づいて構成部品の劣化度を判定する。
 この構成によれば、保守作業計画部は、構成部品の劣化度の判定結果を出力し、または判定結果を用いることができる。例えば、保守支援システムは、劣化度を用いて、設備保守計画の更新、部品交換の提案、保守に関するレポート等を作成できる。
 上記保守支援システムにおいて、前記高負荷運転は、前記設備機器が有する運転制御に基づいて所定の負荷率以上で前記設備機器が運転するときの運転、および、診断指令に基づいて所定の負荷率以上で前記設備機器が運転するときの運転の少なくとも一方である。この構成によれば、保守作業計画部は、運転制御に基づく運転、および、診断指令に基づく運転の少なくとも一方の高負荷運転によって構成部品の劣化度を判定できる。
 上記保守支援システムにおいて、前記設備機器は、空気調和機、換気装置、全熱交換機、および、冷凍機の少なくとも1つを含む。この構成によれば、空気調和機、換気装置、全熱交換機、および、冷凍機について設備保守計画を作成できる。
保守支援システムの模式図。 保守支援システムのブロック図。 設備保守計画の第1の図。 設備保守計画の第2の図。 設備保守計画の第3の図。 部品在庫の状況を示す図。 設備保守計画の更新のフローチャート。
 図1~図7を参照して、以下、本実施形態に係る保守支援システムについて説明する。
 保守支援システム1は、設備機器2の設備保守計画を出力する。保守作業は、洗浄、部品交換、部品修理、設備機器2一式の更新、および、設備機器2の一部の更新を含む。設備機器2一式の更新は、設備機器2全部を、新しい設備機器2または別の設備機器2に取り替えることを意味する。設備機器2の一部の更新は、設備機器2を構成する主要な機器を更新することを意味する。
 事業者の工場、営業所、学校などの施設、オフィスビル、輸送船、等に設置される設備機器2が保守支援システム1によって支援される対象となる。保守支援システム1の支援対象となる設備機器2の例は、空気調和機、換気装置、全熱交換機、および、冷凍機である。設備機器2は、空気調和機、換気装置、全熱交換機、および、冷凍機の少なくとも1つを含む空調システムであってもよい。設備機器2は、ヒートポンプであってもよい。保守支援システム1は、保守作業の内容、実施時期、保守作業費用、および、サイクルコスト(ライフサイクルコストとも呼ばれる)に関して保守支援システム1の使用者に情報を提供する。
 保守支援システム1は、設備機器2と通信可能に構成される。一例では、保守支援システム1は、ネットワークNを介して設備機器2と通信する。ネットワークNは、インターネット、ローカルネットワーク、電話回線網、および、専用回線網の少なくとも1つによって構成される。
 図1を参照して、保守支援システム1の一例を説明する。本実施形態では、施設3に設置される設備機器2の保守作業を支援する保守支援システム1について説明する。図1は、保守支援システム1の模式図である。保守支援システム1は、ネットワークNを介して設備機器2と通信する。本実施形態では、設備機器2は、空気調和機4である。空気調和機4は、複数の室内機5と、室外機6と、管理装置7とを備える。管理装置7は、室内機5の運転および室外機6の運転を制御する。管理装置7は、室内機5および室外機6から運転データを収集する。管理装置7は、保守支援システム1と通信可能に構成される。管理装置7は、通信装置を備える。管理装置7は、保守支援システム1の要求または所定の条件に基づいて、保守支援システム1に運転データを送信する。
 運転データとして、室内機5の累積運転時間、室外機6の圧縮機の発停頻度、室外機6の圧縮機の累積運転時間、室外機6の累積運転時間、室内機5の連続運転時間が閾値を超えた回数、室外機6の連続運転時間が閾値を超えた回数、診断運転によって検出される診断データ、各種の異常データ、等が挙げられる。
 図2に示されるように、保守支援システム1は、取得部11と、記憶部12と、保守作業計画部13と、保守作業費用算出部14と、保守計画出力部15とを含む。保守支援システム1は、さらに、ランニングコスト算出部16を備えることが好ましい。保守支援システム1は、さらに、機会損失額算出部17を備えることが好ましい。保守支援システム1は、さらに、サイクルコスト算出部18を備えることが好ましい。保守支援システム1は、さらに、調整部19を備えることが好ましい。
 保守作業計画部13、保守作業費用算出部14、保守計画出力部15、ランニングコスト算出部16、機会損失額算出部17、サイクルコスト算出部18、および、調整部19のそれぞれは、CPU(Central Processing Unit)、MPU(Micro Processing Unit)などの演算回路および演算回路上で動作するプログラムによって構成される。また、保守作業計画部13、保守作業費用算出部14、保守計画出力部15、ランニングコスト算出部16、機会損失額算出部17、サイクルコスト算出部18、および、調整部19の少なくとも2つは、1つの演算回路および演算回路上で動作するプログラムによって構成されてもよい。
 取得部11は、設備機器2の運転データを取得する。取得部11は、設備保守計画の作成のための計画作成用情報を取得する。計画作成用情報は、保守作業費用データ、および、設備機器2が設置される物件に関する物件情報を含む。例えば、取得部11は、ネットワークNを介して設備機器2と通信する通信装置、および、入力装置の少なくとも1つを備える。例えば、入力装置は、キーボードである。
 保守作業費用は、時期に応じて変動する。保守作業費用データは、保守作業費用の算出のために用いられる。保守作業費用データは、人件費データ、および、保守備品費用データを含む。保守備品費用データは、少なくとも、部品費用データおよび部材費用データを含む。人件費データは、1日あたりの人件費単価と、人件費の値上がり比とを含む(図5参照)。専門技術を要する保守作業にかかる人件費単価と、専門技術を要しない保守作業にかかる人件費単価とは、異なる値に設定される。専門技術を要する保守作業の人件費単価は、専門技術を要しない保守作業の人件費単価よりも高い。例えば、保守作業の専門技術に関する技術レベルは、ランクAと、ランクAよりも技術レベルが低いランクBとに区分される。ランクAの人件費単価は、ランクBの人件費単価よりも高く設定される。図4に示される例では、人件費単価がランクAに設定されている。
 人件費の値上がり比は、時期に応じて異なった値をとる。人件費の値上がり比は、基準とされる年月の人件費に対する所定の年月の人件費の比である。人件費の値上がり比は、年月ごとに予め予測される値である(図3参照)。人件費の値上がり比は、設備機器2の保守作業の閑散期と繁忙期とで異なる値になる。例えば、空気調和機4の保守に関する人件費の値上がり比は、季節によって変わる。空気調和機4の稼働率が高い夏季および冬季において故障および修理が頻発するため、夏季および冬季の人件費の値上がり比は、春季および秋季の人件費の値上がり比よりも高い(図3参照)。また、オリンピック開催、高層ビルの建設ラッシュなどの社会状況によって人件費が高騰する場合もある。本実施形態の保守支援システム1では、図3に示されるように、月ごとに人件費の値上がり比が予め設定される。値上がり比は、社会情勢や気候の変動によって大きく変化するため、値上がり比は、変更可能であることが好ましい。人件費データは、一例では、保守支援システム1を運営する事業者によって設定される。
 保守備品費用データは、上述のように、部品費用データおよび部材費用データを含む。部品費用データは、保守で使用される部品に関するデータである。部品は、保守対象である設備機器2を構成する物である。部品は、消耗、故障、性能向上の理由で交換される。部材費用データは、保守で使用される部材に関するデータである。部材は、設備機器2の部品以外の物であって、保守対象である設備機器2の保守に用いられる物である。例えば、部材として、設備機器2を補強するための補強部材、設備機器2を風雨から保護するために用いられる保護部材が挙げられる。設備機器2一式を更新する場合、設備機器2一式のそれぞれの部品は、上記の部品に該当し、設備機器2一式を施工するために必要となる物は、部材に該当する。
 部品費用データは、部品単価と、雑費とを含む。部材費用データは、部材単価と、雑費とを含む。部品単価および部材単価は、時期に応じて変動する。例えば、保守対象となる設備機器2の需要が増大し、生産の繁忙期になると、部品および部材が入手し難くなり、部品単価および部材単価が高騰する。部品の雑費および部材の雑費は、時期に応じて変動する。例えば、部品または部材の在庫が少なく、保守対象の設備機器2の設置場所から遠い工場から部品または部材を取り寄せることが必要になると、保守作業の実施時期までの期間の長さに応じて輸送費が変わる。具体的には、保守作業の実施時期までの期間が短い場合、部品または部材の空輸が必要となり、雑費が増大する。
 物件情報は、設備機器2が設置されている物件で営業する事業者の営業情報を含む。営業情報は、設備機器2を停止した場合の営業上損失を計算するための情報である。例えば、営業情報は、月ごとの予想売上額、および、月ごとの予想利益率を含む(図3参照)。営業情報は、設備機器2を使用している事業者によって設定可能な情報である。
 さらに、取得部11は、保守作業の可能な保守作業可能時期情報を取得する。保守作業可能時期情報は、設備機器2を使用している事業者にとって好都合な保守作業の実施時期を示す(図3参照)。例えば、保守支援システム1の支援対象がホテルの設備機器2である場合、設備機器2の更新は、事業者にとって、観光シーズンではない閑散期に行われることが好ましい。保守作業可能時期情報は、保守作業の実施時期が適切な時期に設定されることを目的として使用される。保守作業可能時期情報は、設備機器2を使用している事業者によって設定可能な情報である。
 記憶部12は、取得部11が取得した情報を記憶する。記憶部12は、保守作業費用データを記憶する。記憶部12は、設備機器2の運転データを記憶することが好ましい。記憶部12は、営業情報を記憶する。さらに、記憶部12は、保守作業可能時期情報を記憶する。さらに、記憶部12は、保守計画出力部15によって作成された設備保守計画を記憶する。記憶部12は、半導体メモリ、光学ディスク、磁気ディスク、および、磁気テープの少なくとも1つによって構成される。
 保守作業計画部13は、設備機器2の運転データに基づいて、運転データの取得時以降において必要となる保守作業の内容および実施時期を計画する。保守作業の実施時期は、保守作業を行う時期を示す。保守作業の内容は、保守対象と、保守対象の保守方法とを含む。保守対象は、設備機器2一式、設備機器2を構成する機器、および、設備機器2を構成する構成部品である。保守方法は、洗浄、部品交換、部品修理、設備機器2一式の更新、および、設備機器2の一部の更新を含む。
 例えば、保守作業計画部13は、保守支援システム1の支援対象が空気調和機4の場合、圧縮機の発停頻度に基づいて保守作業の内容を設定する。保守作業計画部13は、圧縮機の発停頻度が予め設定された値よりも大きい場合、保守作業の内容として圧縮機の交換を設定する。他の例では、保守作業計画部13は、室内機5の累積運転時間および室外機6の累積運転時間に基づいて保守作業の内容を設定する。保守作業計画部13は、室内機5の累積運転時間および室外機6の累積運転時間が予め設定された値よりも大きい場合、保守作業の内容として設備機器2一式の更新を設定する。
 保守作業計画部13は、設備機器2の高負荷運転時に取得された運転データに基づいて構成部品の劣化度を判定してもよい。保守作業計画部13は、設備機器2の構成部品の劣化度に基づいて保守作業の内容を設定する。例えば、保守作業計画部13は、圧縮機の発停頻度に対する劣化度の判定表を有する。保守作業計画部13は、設備機器2から運転データとして発停頻度を取得し、判定表を参照して、発停頻度に基づいて劣化度を判定し、劣化度の判定結果に基づいて故障予知を行い、保守作業の必要性を判定する。
 空気調和機4の場合、高負荷運転は、2通りある。第1は、空気調和機4が有する運転制御に基づいて所定の負荷率以上で空気調和機4が運転するときの運転(以下、通常高負荷運転という。)である。第2は、診断指令に基づいて所定の負荷率以上で空気調和機4が運転するときの運転(以下、診断運転という。)である。通常高負荷運転、および、診断運転の少なくとも一方の高負荷運転の運転データが劣化度の判定の目的で保守作業計画部13によって使用される。高負荷運転によれば、低負荷運転の場合に比べて、保守作業の要否判定に対して精度の高い運転データが得られる。
 空気調和機4の場合、冷房運転および暖房運転が通常高負荷運転に該当する。冷房運転および暖房運転が行われている場合、空気調和機4から出力される運転データは、保守作業計画部13によって高負荷運転における運転データとして取り扱われる。送風運転は、高負荷運転ではない。春季や秋季では、高負荷運転が行われないことから、取得部11は、この時期において劣化度を判定するために有効な運転データを取得し難い。このようなことから、春季や秋季において診断運転が行われる。診断運転は、実質的に、暖房運転または冷房運転と同じ運転であってもよい。診断運転は、春季や秋季以外の時期に行われてもよい。診断運転は、保守支援システム1が運転データを必要する場合にその必要に応じて行われてもよい。例えば、季節に関係なく夜間において診断運転が行われてもよい。診断運転中の運転データは、保守作業計画部13によって高負荷運転における運転データとして取り扱われる。診断運転を行わせるための診断指令は、保守作業計画部13が行ってもよい。診断運転は、設備機器2において予め設定されたスケジュールによって行われてもよい。設備機器2は、診断運転の実行とともに運転データをネットワークNを介して保守支援システム1に出力するように構成されていることが好ましい。
 診断運転の例として、空気調和機4において電子膨張弁の診断、サーミスタの動作診断、および、高負荷運転における異常判定が挙げられる。これら診断を行うための診断プログラムは、空気調和機4の制御部に予め設定されていることが好ましい。これら診断を行うための診断プログラムは、保守作業計画部13が有してもよい。電子膨張弁の診断では、空気調和機4は、電子膨張弁の開閉指令の前後における冷媒温度の変化を取得し、冷媒温度の変化に基づいて、電子膨張弁の開閉動作異常を判定する。サーミスタの動作診断では、空気調和機4は、冷媒温度および空気調和機4の運転状態の少なくとも1つとサーミスタの出力値とを同時に取得し、両者を比較することに基づいてサーミスタの動作異常を判定する。空気調和機は、診断運転によって検出された診断データを運転データとして記憶し、保守支援システム1の要求に基づいて出力する。
 保守作業計画部13は、保守作業可能時期情報に基づいて保守作業の実施時期を計画する。好ましくは、保守作業計画部13は、保守作業の内容および保守作業可能時期情報に基づいて保守作業の実施時期を計画する。保守作業計画部13は、保守作業の内容に基づいて保守作業推奨時期を設定する。保守作業の内容が設備機器2全体の更新の場合、更新に要する日数を加味して、保守作業推奨時期を設定する。さらに、保守作業計画部13は、保守作業推奨時期および保守作業可能時期情報に基づいて、1または複数の保守作業の実施時期(図3の候補日を参照)を設定する。
 保守作業計画部13は、部品在庫管理システムの情報を参照して、保守作業の実施時期を設定してもよい。部品在庫管理システムは、設備機器2の構成部品の在庫を管理するシステムである。保守作業計画部13は、保守作業の内容から保守に必要な部品を特定し、部品在庫管理システムを参照して、保守に必要な部品の在庫の有無を調べて、在庫の有無に基づいて保守作業の実施時期を設定する。
 図6は、部品在庫管理システムが管理する表の一例である。部品在庫管理システムは、設備機器2について複数の機種の構成部品の在庫を管理する。さらに、部品在庫管理システムは、構成部品の調達に要する納期を管理する。
 保守作業費用算出部14は、記憶部12に記憶された保守作業費用データを用いて、計画した保守作業の内容および実施時期に応じた保守作業費用を算出する。好ましくは、保守作業費用算出部14は、人件費、および、保守備品費用を含めた保守作業費用を算出する。保守備品費用は、保守作業の内容に基づいて算出される。例えば、空気調和機4の全体を更新する場合、保守備品費用は、空気調和機4一式の費用と施工費用(人件費と別に発生する設備の設置のための工事費用)である。保守備品費用は、部品費用データおよび部材費用データに基づいて算出されてもよい。人件費は、保守作業を行う保守作業期間の日数と、人件費単価と、単位期間あたりの作業者の平均人数との乗算によって算出される(図4参照)。
 ランニングコスト算出部16は、設備機器2のランニングコストを算出する。具体的には、ランニングコスト算出部16は、取得部11によって取得された運転データ、設備機器2の特性情報、および、計画された保守作業の内容のうち少なくとも一つに基づいて、保守計画期間にわたってランニングコストを予測する。
 設備機器2の特性情報は、設備機器2の運転コストに関する情報である。例えば、設備機器2の特性情報として、設備機器2の消費電力、設備機器2の所定期間あたりの運転時間、設備機器2の使用頻度、電力料金単価、が挙げられる。ランニングコスト算出部16は、運転データに基づいて所定期間あたりの運転時間を算出してもよい。ランニングコスト算出部16は、運転データに基づいて設備機器2の使用頻度を算出してもよい。
 ランニングコスト算出部16は、保守作業の内容のうちランニングコストに関する情報を参照する。ランニングコスト算出部16は、保守作業の内容のうち消耗品を特定し、消耗品の単価を記憶部12から取得する。
 ランニングコストは、設備機器2を運転させるときにかかるコストである。ランニングコストは、設備機器2を運転させるための電力料金および消耗品の費用を含む。ランニングコストは、設備機器2の劣化および使用期間の長さとともに増大する。
 例えば、保守支援システム1の支援対象が空気調和機4である場合、ランニングコスト算出部16は、空気調和機4の運転時間、使用頻度、および、電力料金単価に基づいて、ランニングコストを算出する。また、ランニングコスト算出部16は、室内機5の累積運転時間および室外機6の累積運転時間に対するランニングコストを示すランニングコスト表を有してもよい。ランニングコスト算出部16は、ランニングコスト表を参照して、室内機5の累積運転時間および室外機6の累積運転時間に基づいて所定時期において1月ずつランニングコストを設定してもよい。
 ランニングコスト算出部16は、保守計画期間の各月のランニングコストを予測する(図3)。設備機器2の更新が行われる場合、設備機器2の更新までの月のランニングコストと、設備機器2の更新後の月のランニングコストとは異なる値になり、後者は、前者よりも低い値になる。
 ランニングコスト算出部16は、保守計画期間にわたるランニングコストを算出してもよい。例えば、保守計画期間は、12か月である。保守計画期間において設備機器2の更新がある場合、ランニングコスト算出部16は、更新前のランニングコストと更新後のランニングコストとに基づいて保守計画期間にわたるランニングコスト(トータルランニングコスト)を算出する(図4参照)。保守計画期間にわたるランニングコスト(トータルランニングコスト)は、保守計画期間の各月のランニングコストの総和として定義される。
 機会損失額算出部17は、保守作業の実施による設備機器2の稼働停止に伴う機会損失額を算出する。例えば、機会損失額算出部17は、設備機器2が設置される物件に関する物件情報および保守作業の実施時期の少なくとも一方に応じた機会損失額を算出する。例えば、機会損失額算出部17は、1月あたりの予想利益率および予想売上額と、保守作業期間と、利益減少率(図4の「0.5」)との乗算によって機会損失額として算出する(図4参照)。
 サイクルコスト算出部18は、予め設定される所定期間における保守作業費用、所定期間におけるランニングコスト、および所定期間における機会損失額の総和を含むサイクルコストを算出する。サイクルコストは、「ライフサイクルコスト」とも呼ばれることもある。予め設定される所定期間は、例えば、設備保守計画を作成する時点から1年間として定義される。本実施形態では、予め設定される所定期間は、保守計画期間と同じ期間である。
 サイクルコスト算出部18は、保守作業費用算出部14から保守作業費用を取得する。サイクルコスト算出部18は、ランニングコスト算出部16からランニングコストを取得する。サイクルコスト算出部18は、機会損失額算出部17から機会損失額を取得する。サイクルコスト算出部18は、保守作業費用、ランニングコスト、および機会損失額の総和をとって、この総和をサイクルコストとして出力する(図4参照)。
 調整部19は、サイクルコスト算出部18によって算出されるサイクルコストの初回算出値よりもサイクルコストが小さくなるように、保守作業の内容および実施時期のうち少なくとも一方を調整する。好ましくは、調整部19によって保守作業の内容および実施時期の少なくとも一方が調整された場合、保守計画出力部15は、調整前の設備保守計画と、調整後の設備保守計画とを出力する。
 例えば、保守作業の内容が固定されている場合、調整部19は、保守作業の実施時期を、初回算出時よりも人件費が低い時期に変更することによって、サイクルコストを小さくする。保守作業の実施時期が固定されている場合、調整部19は、保守作業の内容から急を要しない事項を削除し、新たな保守作業の内容を作成することによって、サイクルコストを小さくする。調整部19は、サイクルコストが取り得る値の範囲内でサイクルコストが最小値をとるように、保守作業の内容および実施時期のうち少なくとも一方を調整してもよい。調整部19は、外部から指定される指定コストよりもサイクルコストが小さくなるように、保守作業の内容および実施時期のうち少なくとも一方を調整してもよい。指定コストは、設備機器2が設置されている物件で営業する事業者によって指定される値である。指定コストは、入力装置を介して取得部11によって取得される。
 保守計画出力部15は、保守作業の内容、実施時期、および保守作業費用を関連付けた情報(以下、関連付け情報)を含む設備保守計画を作成し、設備保守計画を出力する。例えば、保守計画出力部15は、図4に示されるように、保守計画期間にわたって保守作業の実施時期としての候補と保守作業の内容および保守作業費用とが関連づけられた表を形成する。表が関連付け情報に該当する。また、保守計画出力部15は、図5に示されるように、保守計画期間にわたって保守作業の実施時期としての候補と費用とが関連づけられたチャートを形成する。チャートが関連付け情報に該当する。
 保守計画出力部15は、ランニングコストを含む設備保守計画を作成し、設備保守計画を出力する。保守計画出力部15は、さらに、機会損失額を含む設備保守計画を作成し、設備保守計画を出力してもよい。保守計画出力部15は、さらに、サイクルコストを含む設備保守計画を作成し、設備保守計画を出力してもよい。
 保守計画出力部15は、予め設定された複数の設定条件それぞれについて設備保守計画を出力してもよい。例えば、設定条件として、保守作業可能時期、各月の人件費の値上がり比、各月の予想売上額、および、各月の予想利益率が挙げられる。保守支援システム1は、これらの設定条件のうち少なくとも1つの項目について、複数の値が入力可能に構成され、保守計画出力部15は、これら複数の値それぞれに対して設備保守計画を作成し、設備保守計画を出力する。これによって、設定条件が異なる場合において、どのように設備保守計画が変わるかを保守支援システム1の使用者に提示できる。一例では、保守作業可能時期として、複数の時期が指定される。保守計画出力部15は、複数の保守作業可能時期それぞれについて、設備保守計画を作成し、出力する。図3~図5に示される設備保守計画の例では、保守作業可能時期として第1候補および第2候補が設定され、第1候補および第2候補それぞれについて設備保守計画が作成される。
 保守計画出力部15は、調整部19によってサイクルコストが調整されている場合、調整部19によって調整された後の保守作業の内容および調整後の保守作業の実施時期、および、サイクルコストを含む設備保守計画を作成し、設備保守計画を出力する。
 図3~図5を参照して、設備保守計画の一例を説明する。設備保守計画は、図3~図5に示されるような図表によって構成される。図3~図5は、設備機器2の更新が行われる時期の設備保守計画を示す。この例では、保守計画期間は、1年である。設備機器2の更新のための保守作業期間は、1か月である。
 図3は、保守計画期間における、事業者の保守作業可能時期、予想売上額、予想利益率、人件費の値上がり比、設備機器2の更新前のランニングコスト、および、保守作業の実施時期の候補日を示す図である。事業者の保守作業可能時期、予想売上額、予想利益率、および、人件費の値上がり比は、保守支援システム1に入力される値である。
 図3に示されるように、この例では、保守作業の実施時期の候補日は、保守計画期間において複数の期間に設定される。各候補日は、事業者の保守作業可能時期の範囲に設定される。この例では、保守計画期間において保守作業の実施時期として第1候補と第2候補とが設定されている。第1候補は、5月である。第2候補は、翌年の3月である。
 図4には、各候補について、人件費関連情報、保守作業期間、保守作業期間において保守作業に携わる作業者の1日あたりの平均人数、設備機器2の更新の納期、予想売上額、予想利益率、保守作業費用、ランニングコスト、機会損失額、および、サイクルコストが示される。
 この例では、保守作業の技術レベルがランクAに設定されている。値上がり比が反映されていない人件費単価は、第1候補と第2候補との間で変わらず、ともにランクAの単価である。第1候補は、閑散期であるため人件費の値上がり比が1である。第2候補は、繁忙期であるため人件費の値上がり比が1.5である。保守作業費用の内訳の人件費は、値上がり比が反映された人件費単価と、保守作業期間と、平均人数との乗算によって算出される。第2候補の人件費は、第1候補の人件費よりも高い。保守作業費用は、人件費と、保守備品費用との足し算によって算出される。この例の場合、保守備品費用は、設備機器2の更新に要する費用であり、時期に応じて変動しない見積価格であり、概ね新たな設備機器2の導入費用に等しい。
 第1候補では、4月から5月までの期間、設備機器2の更新前のランニングコストがかかる。6月から翌年の3月までの期間、設備機器2の更新後のランニングコストがかかる。第2候補では、4月から翌年の3月までの期間、設備機器2の更新前のランニングコストがかかる。保守計画期間にわたるランニングコスト(トータルランニングコスト)については、第1候補のランニングコストが第2候補のランニングコストよりも安い。
 この例では、設備機器2の更新の工事期間において通常営業の半分程度の営業を行うことができることを前提として、利益減少率は0.5(図4参照)に設定される。機会損失額は、予想利益と利益減少率との乗算値として算出される。第1候補は、第2候補よりも予想利益が少ない。このため、第1候補の機会損失額は、第2候補の機会損失額よりも少ない。
 サイクルコストは、上述のように、保守作業費用、ランニングコスト、および機会損失額の総和である。
 第1候補のサイクルコストは、第2候補のサイクルコストよりも安い。
 図5は、保守計画期間において保守作業および設備機器2の運転にかかる第1候補の費用と第2候補の費用とを比較したチャートである。第1候補では、費用として、4月から5月までランニングコストがかかり、5月末に、設備機器2の更新のための費用と機会損失に起因する費用とが発生する。その後、更新後のランニングコストがかかる。第2候補では、費用として、4月から翌年の3月までランニングコストがかかり、3月末に、設備機器2の更新のための費用と機会損失に起因する費用とが発生する。このように、設備機器2の更新を行う時期(保守作業の実施時期)によって、保守計画期間において発生する費用が大きく異なる。この例では、このような差が生じる要因は、人件費の差、機会損失額の差、および1月あたりランニングコストの差である。
 図7を参照して、設備保守計画の更新について説明する。保守支援システム1は、保守計画期間において数回、設備保守計画を見直し、設備保守計画を更新する。一例では、保守支援システム1は、保守計画期間において4回、設備保守計画を更新する。更新の時期は、予め設定されている。
 ステップS11において、保守支援システム1は、設備保守計画の更新の時期において、設備機器2が通常高負荷運転を行っている時期であるか否かを判定する。例えば、設備機器2が空気調和機の場合、保守支援システム1は、運転データとしての1日あたりの設備機器2の運転時間または空調能力に対する消費電力に基づいて、通常高負荷運転を行っている時期であるか否かを判定する。他の例では、通常高負荷運転を行っている時期は、予め設定されてもよい。例えば、通常高負荷運転を行っている時期は、7月から9月まで、および12月から3月までと設定される。
 設備機器2が通常高負荷運転を行っている時期である場合、ステップS12において、保守支援システム1は、設備機器2から運転データを取得する。そして、ステップS13において、保守支援システム1は、運転データに基づいて設備保守計画を更新する。
 設備機器2が通常高負荷運転を行っていない時期である場合、ステップS14において、保守支援システム1は、設備機器2に対して診断運転の指令を出す。または、保守支援システム1の報知に基づいて作業者が設備機器2に診断指令の信号を入力してもよい。そして、ステップS15において、保守支援システム1は、診断運転が実行された設備機器2から運転データを取得する。次いで、ステップS13において、保守支援システム1は、運転データに基づいて設備保守計画を更新する。
 保守支援システム1の作用を説明する。保守支援システム1は、保守作業に関する人件費を、保守作業の内容および実施時期に応じた値として算出する。保守支援システム1は、保守作業の実施時期、および、人件費を含む保守作業費用を含む設備保守計画を出力する。保守支援システム1によれば、時期によって変動する人件費を含む保守作業費用を保守支援システム1の使用者に提供できる。また、保守支援システム1によれば、時期によって変動する保守備品費用を含む保守作業費用を保守支援システム1の使用者に提供できる。使用者は、保守支援システム1を使用することによって、保守作業費用が少なくなる保守作業の実施時期を選択できる。
 本実施形態の効果を説明する。
 (1)保守支援システム1は、少なくとも、保守作業費用算出部14と、保守計画出力部15と、を備える。保守作業費用算出部14は、保守作業費用データを用いて、保守作業の内容および実施時期に応じた保守作業費用を算出する。保守計画出力部15は、保守作業の内容、実施時期、および保守作業費用を関連付けた情報を含む設備保守計画を作成する。保守支援システム1によれば、保守作業の実施時期に応じた保守作業費用を含む設備保守計画を作成できる。
 (2)保守計画出力部15は、予め設定された複数の設定条件それぞれについて設備保守計画を出力する。この構成によれば、各種の設定条件それぞれに応じた設備保守計画を作成できる。
 (3)保守作業計画部13は、保守作業可能時期情報に基づいて保守作業の実施時期を計画する。この構成によれば、保守支援システム1は、保守作業可能時期に保守作業の実施時期が設定された設備保守計画を作成できる。
 (4)ランニングコスト算出部16は、運転データ、設備機器2の特性情報、および、保守作業の内容のうち少なくとも一つに基づいて、保守計画期間にわたってランニングコストを予測する。保守計画出力部15は、ランニングコストを含む設備保守計画を作成する。この構成によれば、保守支援システム1は、ランニングコストを含む設備保守計画を作成できる。
 (5)機会損失額算出部17は、設備機器2が設置される物件に関する物件情報および保守作業の実施時期の少なくとも一方に応じた機会損失額を算出する。保守計画出力部15は、機会損失額をさらに含む設備保守計画を作成し、設備保守計画を出力する。この構成によれば、保守支援システム1は、機会損失額を含む設備保守計画を作成できる。
 (6)サイクルコスト算出部18は、予め設定される所定期間における保守作業費用、所定期間におけるランニングコスト、および所定期間における機会損失額の総和を含むサイクルコストを算出する。保守計画出力部15は、サイクルコストを含む設備保守計画を作成し、設備保守計画を出力する。この構成によれば、保守支援システム1は、所定期間におけるサイクルコストを含む設備保守計画を作成できる。
 (7)調整部19は、サイクルコストの初回算出値よりもサイクルコストが小さくなるように、保守作業の内容および実施時期のうち少なくとも一方を調整する。保守計画出力部15は、調整後の保守作業の内容および調整後の保守作業の実施時期、および、サイクルコストを含む設備保守計画を作成し、設備保守計画を出力する。この構成によれば、保守支援システム1は、サイクルコストが調整された設備保守計画を作成できる。
 (8)調整部19は、サイクルコストが取り得る値の範囲内でサイクルコストが最小値をとるように、保守作業の内容および実施時期のうち少なくとも一方を調整する。この構成によれば、サイクルコストが最小である設備保守計画を作成できる。
 (9)調整部19は、外部から指定される指定コストよりもサイクルコストが小さくなるように、保守作業の内容および実施時期のうち少なくとも一方を調整する。この構成によれば、サイクルコストが指定コストよりも小さい設備保守計画を作成できる。
 (10)保守作業の内容は、保守対象と、保守対象の保守方法とを含む。この構成によれば、保守作業の内容として、保守対象および保守方法を含む設備保守計画を作成できる。
 (11)保守作業計画部13は、設備機器2の高負荷運転時に取得された運転データに基づいて構成部品の劣化度を判定する。この構成によれば、保守作業計画部13は、構成部品の劣化度の判定結果を出力し、または判定結果を用いることができる。例えば、保守支援システム1は、劣化度を用いて、設備保守計画の更新、部品交換の提案、保守に関するレポート等を作成できる。
 (12)劣化度を判定するときの用いられる高負荷運転時の運転データについて、高負荷運転は、設備機器2が有する運転制御に基づいて所定の負荷率以上で設備機器2が運転するときの運転、および、診断指令に基づいて所定の負荷率以上で設備機器2が運転するときの運転の少なくとも一方である。この構成によれば、保守作業計画部13は、運転制御に基づく運転、および、診断指令に基づく運転の少なくとも一方の高負荷運転によって構成部品の劣化度を判定できる。
 (13)上記保守支援システム1において、設備機器2は、空気調和機4、換気装置、全熱交換機、および、冷凍機の少なくとも1つを含む。この構成によれば、空気調和機4、換気装置、全熱交換機、および、冷凍機について設備保守計画を作成できる。
 <変形例>
 本開示の保守支援システム1は、上記各実施の形態以外に、例えば以下に示される変形例、及び相互に矛盾しない少なくとも二つの変形例を組み合わせた形態としてもよい。
 ・保守支援システム1は、保守作業の実施時期に応じた設備保守計画のほか、月ごとにかかる保守作業費用が一定となる定額の設備保守計画を作成してもよい。保守支援システム1は、保守作業の実施時期に応じた設備保守計画と、定額の設備保守計画とを同時視認できる態様に、または比較できる態様で、表示することが好ましい。定額の設備保守計画は、設備機器2の特性情報に基づいて保守作業の内容および実施時期が予め設定されている。定額の設備保守計画では、設備機器2が設置されている物件で営業する事業者の関与が制限される。定額の設備保守計画に基づく保守作業は、保守支援システム1を運営する事業者およびその関係者によって実行される。保守支援システム1は、定額の設備保守計画において設備機器2の更新を行う場合、保守作業の実施時期について、設備機器2が設置されている物件で営業する事業者に、設備機器2を更新する旨を通報することが好ましい。
 ・人件費データは、月ごとの人件費単価に加えて、1日における時間帯における人件費単価、休日の昼間における人件費単価、および、休日の夜間における人件費単価を含んでもよい。この場合、精確な人件費を算出できる。
 ・本実施形態の図3および図4で示される例では、保守備品費用は、時期によって変動しない固定値になっているが、保守備品費用は、時期に応じて変動するものとしてもよい。この場合、保守備品費用は、部品費用データおよび部材費用データに基づいて算出される。
 ・以上、保守支援システム1の実施形態を説明したが、特許請求の範囲に記載された保守支援システム1の趣旨及び範囲から逸脱することなく、形態や詳細の多様な変更が可能なことが理解されるであろう。

Claims (13)

  1.  設備機器の設備保守計画を出力する保守支援システム(1)であって、
     前記設備機器の運転データを取得する取得部(11)と、
     前記設備機器の保守作業の内容および実施時期に応じた保守作業費用データを記憶する記憶部(12)と、
     前記設備機器の運転データに基づいて、前記運転データの取得時以降において必要となる保守作業の内容および実施時期を計画する保守作業計画部(13)と、
     前記記憶部(12)に記憶された前記保守作業費用データを用いて、計画した前記保守作業の内容および実施時期に応じた保守作業費用を算出する保守作業費用算出部(14)と、
     前記保守作業の内容、実施時期、および前記保守作業費用を関連付けた情報を含む設備保守計画を作成し、前記設備保守計画を出力する保守計画出力部(15)と、を備える
     保守支援システム。
  2.  前記保守計画出力部(15)は、予め設定された複数の設定条件それぞれについて設備保守計画を出力する
     ことを特徴とする請求項1に記載の保守支援システム。
  3.  前記取得部(11)は、前記保守作業が実施可能な保守作業可能時期情報を取得し、
     前記保守作業計画部(13)は、前記保守作業可能時期情報に基づいて前記保守作業の実施時期を計画する
     ことを特徴とする請求項1または2に記載の保守支援システム。
  4.  前記設備機器のランニングコストを算出するランニングコスト算出部をさらに備え、
     前記ランニングコスト算出部は、取得された前記運転データ、前記設備機器の特性情報、および、計画された前記保守作業の内容のうち少なくとも一つに基づいて、保守計画期間にわたって前記ランニングコストを予測し、
     前記保守計画出力部(15)は、前記ランニングコストを含む前記設備保守計画を作成し、前記設備保守計画を出力する
     ことを特徴とする請求項1~3のいずれか一項に記載の保守支援システム。
  5.  保守作業の実施による前記設備機器の稼働停止に伴う機会損失額を算出する機会損失額算出部(17)をさらに備え、
     前記機会損失額算出部(17)は、前記設備機器が設置される物件に関する物件情報および前記保守作業の実施時期の少なくとも一方に応じた前記機会損失額を算出し、
     前記保守計画出力部は、前記機会損失額をさらに含む前記設備保守計画を作成し、前記設備保守計画を出力する
     ことを特徴とする請求項1~4のいずれか一項に記載の保守支援システム。
  6.  予め設定される所定期間における前記保守作業費用、前記所定期間におけるランニングコスト、および前記所定期間における機会損失額の総和を含むサイクルコストを算出するサイクルコスト算出部(18)をさらに備え、
     前記保守計画出力部(15)は、前記サイクルコストを含む前記設備保守計画を作成し、前記設備保守計画を出力する
     ことを特徴とする請求項1~5のいずれか一項に記載の保守支援システム。
  7.  前記サイクルコスト算出部(18)によって算出される前記サイクルコストの初回算出値よりも前記サイクルコストが小さくなるように、前記保守作業の内容および実施時期のうち少なくとも一方を調整する調整部(19)をさらに備え、
     前記保守計画出力部(15)は、調整後の前記保守作業の内容、調整後の前記保守作業の実施時期、および、前記サイクルコストを含む前記設備保守計画を作成し、前記設備保守計画を出力する
     ことを特徴とする請求項6に記載の保守支援システム。
  8.  前記調整部(19)は、前記サイクルコストが取り得る値の範囲内で前記サイクルコストが最小値をとるように、前記保守作業の内容および実施時期のうち少なくとも一方を調整する
     ことを特徴とする請求項7に記載の保守支援システム。
  9.  前記調整部(19)は、外部から指定される指定コストよりも前記サイクルコストが小さくなるように、前記保守作業の内容および実施時期のうち少なくとも一方を調整する
     ことを特徴とする請求項7に記載の保守支援システム。
  10.  前記保守作業の内容は、保守対象と、前記保守対象の保守方法とを含む
     ことを特徴とする請求項1~9のいずれか一項に記載の保守支援システム。
  11.  前記保守作業計画部(13)は、前記設備機器の高負荷運転時に取得された前記運転データに基づいて構成部品の劣化度を判定する
     ことを特徴とする請求項1~10のいずれか一項に記載の保守支援システム。
  12.  前記高負荷運転は、前記設備機器が有する運転制御に基づいて所定の負荷率以上で前記設備機器が運転するときの運転、および、診断指令に基づいて所定の負荷率以上で前記設備機器が運転するときの運転の少なくとも一方である
     請求項11に記載の保守支援システム。
  13.  前記設備機器は、空気調和機、換気装置、全熱交換機、および、冷凍機の少なくとも1つを含む
     ことを特徴とする請求項1~12のいずれか一項に記載の保守支援システム。
PCT/JP2020/039927 2019-12-10 2020-10-23 保守支援システム WO2021117357A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US17/783,188 US20230024909A1 (en) 2019-12-10 2020-10-23 Maintenance assistance system
EP20899902.9A EP4075349A4 (en) 2019-12-10 2020-10-23 MAINTENANCE ASSISTANCE SYSTEM
CN202080084905.5A CN114766025A (zh) 2019-12-10 2020-10-23 保养辅助系统

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2019222903 2019-12-10
JP2019-222903 2019-12-10

Publications (1)

Publication Number Publication Date
WO2021117357A1 true WO2021117357A1 (ja) 2021-06-17

Family

ID=76312560

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2020/039927 WO2021117357A1 (ja) 2019-12-10 2020-10-23 保守支援システム

Country Status (5)

Country Link
US (1) US20230024909A1 (ja)
EP (1) EP4075349A4 (ja)
JP (1) JP6955231B2 (ja)
CN (1) CN114766025A (ja)
WO (1) WO2021117357A1 (ja)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20240015094A (ko) 2021-06-02 2024-02-02 토요잉크Sc홀딩스주식회사 열가소성 수지 조성물 및 성형체

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002352024A (ja) * 2001-05-29 2002-12-06 Mitsubishi Electric Corp 駆動装置の保守管理システム
JP2009048384A (ja) * 2007-08-20 2009-03-05 Hitachi Ltd 設備管理支援システム
JP2009217718A (ja) 2008-03-12 2009-09-24 Toshiba Corp 保守計画支援システム
JP2009251822A (ja) * 2008-04-03 2009-10-29 Toshiba Corp 複合診断・保守計画支援システム及びその支援方法
JP6301791B2 (ja) * 2014-09-17 2018-03-28 株式会社東芝 配電網の故障予兆診断システムおよびその方法

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7380213B2 (en) * 2001-12-28 2008-05-27 Kimberly-Clark Worldwide, Inc. User interface for reporting event-based production information in product manufacturing
US7584165B2 (en) * 2003-01-30 2009-09-01 Landmark Graphics Corporation Support apparatus, method and system for real time operations and maintenance
US8332178B2 (en) * 2004-04-13 2012-12-11 Honeywell International Inc. Remote testing of HVAC systems
JP4776590B2 (ja) * 2007-06-19 2011-09-21 株式会社日立製作所 保守管理支援装置およびその表示方法、保守管理支援システム
JP2013061819A (ja) * 2011-09-14 2013-04-04 Hitachi Ltd 保守計画システム、保守計画システムサーバ、及び保守計画システムクライアント端末
US9741023B2 (en) * 2012-02-28 2017-08-22 Emerson Electric Co. HVAC system remote monitoring and diagnosis
WO2014061080A1 (ja) * 2012-10-15 2014-04-24 株式会社日立製作所 保守計画立案支援システム、保守計画立案支援方法、保守計画立案支援プログラム
US20140249882A1 (en) * 2012-10-19 2014-09-04 The Curators Of The University Of Missouri System and Method of Stochastic Resource-Constrained Project Scheduling
US10094585B2 (en) * 2013-01-25 2018-10-09 Honeywell International Inc. Auto test for delta T diagnostics in an HVAC system
US11055450B2 (en) * 2013-06-10 2021-07-06 Abb Power Grids Switzerland Ag Industrial asset health model update
US10371400B2 (en) * 2013-11-04 2019-08-06 Ademco Inc. Remote contractor system with site specific energy audit capability
CN107614217B (zh) * 2015-05-29 2020-01-14 日产自动车株式会社 故障诊断装置及故障诊断方法
JP6676445B2 (ja) * 2016-04-07 2020-04-08 株式会社日立製作所 発電ユニット群の保守計画支援システム
US10724752B2 (en) * 2016-05-24 2020-07-28 Gridpoint, Inc. Methods and systems for automated HVAC testing
CN109311488B (zh) * 2016-06-10 2021-04-09 三菱电机株式会社 车辆用空调装置及列车通信系统
US20180032969A1 (en) * 2016-07-27 2018-02-01 Johnson Controls Technology Company Systems and methods for automated diagnostics of hvac systems
JP6966857B2 (ja) * 2017-03-29 2021-11-17 三菱重工業株式会社 運転保守管理方法、プログラム、及び運転保守管理システム
US11416955B2 (en) * 2017-05-25 2022-08-16 Johnson Controls Tyco IP Holdings LLP Model predictive maintenance system with integrated measurement and verification functionality
CN109019211B (zh) * 2018-08-02 2020-10-20 深圳爱梯物联网控股有限公司 一种电梯维修保养作业辅助装置
US11754307B2 (en) * 2019-09-19 2023-09-12 Motili, Inc. System and method for heating and cooling system maintenance

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002352024A (ja) * 2001-05-29 2002-12-06 Mitsubishi Electric Corp 駆動装置の保守管理システム
JP2009048384A (ja) * 2007-08-20 2009-03-05 Hitachi Ltd 設備管理支援システム
JP2009217718A (ja) 2008-03-12 2009-09-24 Toshiba Corp 保守計画支援システム
JP2009251822A (ja) * 2008-04-03 2009-10-29 Toshiba Corp 複合診断・保守計画支援システム及びその支援方法
JP6301791B2 (ja) * 2014-09-17 2018-03-28 株式会社東芝 配電網の故障予兆診断システムおよびその方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP4075349A4

Also Published As

Publication number Publication date
US20230024909A1 (en) 2023-01-26
JP6955231B2 (ja) 2021-10-27
EP4075349A4 (en) 2023-01-04
EP4075349A1 (en) 2022-10-19
JP2021093138A (ja) 2021-06-17
CN114766025A (zh) 2022-07-19

Similar Documents

Publication Publication Date Title
US11900287B2 (en) Model predictive maintenance system with budgetary constraints
US11747800B2 (en) Model predictive maintenance system with automatic service work order generation
US11636429B2 (en) Model predictive maintenance systems and methods with automatic parts resupply
US11847617B2 (en) Model predictive maintenance system with financial analysis functionality
US11120411B2 (en) Model predictive maintenance system with incentive incorporation
US9869481B2 (en) Method of controlling ventilation and chilling systems to conserve energy in commercial buildings
US20140249876A1 (en) Adaptive Stochastic Controller for Energy Efficiency and Smart Buildings
US10663939B2 (en) Development of certain building data profiles and their use in an automated optimization method to reduce thermal energy consumption in commercial buildings during the heating season
US20160195887A1 (en) Development of certain mechanical heat profiles and their use in an automated optimization method to reduce energy consumption in commercial buildings during the heating season
Fernandez et al. Energy savings potential from improved building controls for the US commercial building sector
US20210097565A1 (en) Facility Smart Energy Management
US20120150509A1 (en) Continuous optimization energy reduction process in commercial buildings
US20160334126A1 (en) Method of reducing heating energy consumption in commercial buildings
US20180216842A1 (en) Systems and methods for monitoring and controlling an energy plant
JP6955231B2 (ja) 保守支援システム
Chan et al. An integrated model for the design of air-cooled chiller plants for commercial buildings
JPH0816914B2 (ja) 設備更新時期評価アドバイス装置
JP2024506252A (ja) 方法
JP7478792B2 (ja) ビルディング機器のためのモデル予測的メンテナンスシステム、同メンテナンスを実施する方法及び非一時的コンピュータ可読媒体
KR102090281B1 (ko) 데이터 센터 건물의 냉방 에너지 성능 평가 시스템 및 방법
JP2006350920A (ja) エネルギー需要予測システム及び需要予測方法
US20220341610A1 (en) Remaining value calculation system for air conditioner and assistance system for air conditioner
JP7054719B2 (ja) ビルディング機器のためのモデル予測的メンテナンスシステム及び同メンテナンスを実施する方法
Fryer-Stein et al. What network building control can do for end users
Fenaughty et al. An Integrated Control Method for Supplemental Minisplit Heat Pumps in Existing Homes

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20899902

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2020899902

Country of ref document: EP

Effective date: 20220711