WO2021005761A1 - 管路検査方法 - Google Patents

管路検査方法 Download PDF

Info

Publication number
WO2021005761A1
WO2021005761A1 PCT/JP2019/027404 JP2019027404W WO2021005761A1 WO 2021005761 A1 WO2021005761 A1 WO 2021005761A1 JP 2019027404 W JP2019027404 W JP 2019027404W WO 2021005761 A1 WO2021005761 A1 WO 2021005761A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipeline
section
airtightness
operator
water
Prior art date
Application number
PCT/JP2019/027404
Other languages
English (en)
French (fr)
Inventor
将志 新宅
義弘 杁山
憲宏 藤本
Original Assignee
日本電信電話株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電信電話株式会社 filed Critical 日本電信電話株式会社
Priority to US17/597,337 priority Critical patent/US12061134B2/en
Priority to JP2021530436A priority patent/JP7197818B2/ja
Priority to PCT/JP2019/027404 priority patent/WO2021005761A1/ja
Publication of WO2021005761A1 publication Critical patent/WO2021005761A1/ja

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/26Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors
    • G01M3/28Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds
    • G01M3/2807Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds for pipes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/26Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors
    • G01M3/28Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds
    • G01M3/2807Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds for pipes
    • G01M3/2815Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds for pipes using pressure measurements

Definitions

  • This disclosure relates to a pipeline inspection method.
  • Non-Patent Document 1 Maintenance technology that inspects and diagnoses the state of aging deterioration in underground pipeline (communication pipeline) equipment that houses communication cables, and repairs and regenerates it in a timely manner is indispensable for improving the responsiveness of optical services and prolonging the life of equipment.
  • FIG. 7 is a diagram showing an example of the pipeline inspection method described in Non-Patent Document 1.
  • the operator inserts a pipe camera 63 from the manhole 61 into the inside of the communication pipeline 62 and visually confirms the captured image to confirm the communication pipe. Inspect whether the road 62 is healthy.
  • the communication cable is laid in the communication line, and when it is confirmed that the communication line is damaged (for example, perforated), the lining technology or the like is used. Repair the entire communication line.
  • the purpose of the present disclosure made in view of such circumstances is to provide a pipeline inspection method capable of easily and highly accurately identifying a section in which repair of a pipeline is required.
  • the pipeline inspection method is a pipeline inspection method for inspecting a pipeline whose both ends are connected to two manholes, and is a pipeline inspection method for the pipeline connected to one manhole. Airtightness from the first specific step of identifying the section from one end to the first position of the pipeline as a normal section of the pipeline and the other end of the pipeline connected to the other manhole.
  • the section up to the second position of the pipeline, which can be confirmed, is specified as the normal section of the pipeline, and the section from the first position to the second position is the abnormal section of the pipeline. It is characterized by including a third specific step specified as.
  • the pipeline inspection method includes a first specific step (step S1), a second specific step (step S2), and a third specific step (step S3).
  • Step S1 As shown in FIG. 1A, the operator sets a section from one end Pa of the pipeline 10 connected to the manhole 201 to the position P1 (first position) of the pipeline 10 where the airtightness can be confirmed. It is specified as a normal section of 10. The level of airtightness is preset by the operator. A detailed description of the airtightness test will be described later with reference to FIG.
  • the operator closes one end Pa of the pipeline 10 with a water stop valve 21 (first water stop valve).
  • the water stopcock 21 may be a known water stopcock as long as it can block one end Pa of the pipeline 10.
  • the operator inserts the water stop valve 22 (second water stop valve) from the other end Pb of the pipeline 10 into the inside of the pipeline 10.
  • the water stop valve 22 may be configured so as to be able to close or open a predetermined position (first predetermined position) of the pipeline 10 and to move inside the pipeline 10. An example of the configuration of the water stop valve 22 will be described later with reference to FIGS. 2 to 4.
  • the operator attaches the rod 30 to the water stop valve 22 and pushes the rod 30 from the other end Pb of the pipeline 10 toward one end Pa of the pipeline 10 while pushing the rod 30 toward the pipeline 10.
  • the water stop valve 22 is inserted to the predetermined position of.
  • the operator closes the predetermined position of the pipeline 10 with the water stop valve 22.
  • the operator conducts an airtightness test in a section from one end Pa of the pipeline 10 to a predetermined position of the pipeline 10 to determine whether or not the airtightness of the section can be confirmed.
  • the operator may gradually push the water stop valve 22 from the other end Pb of the pipe line 10 to carry out the airtightness test, but for example, when a hole in the pipe line 10 can be clearly confirmed.
  • the airtightness test may be carried out after pushing the water stop valve 22 all at once to a position beyond the perforated portion of the pipeline 10.
  • the operator determines that the airtightness of the section from one end Pa of the pipeline 10 to the position Px1 of the pipeline 10 cannot be confirmed, the operator goes from the other end Pb of the pipeline 10 toward one end Pa of the pipeline 10. While pushing the rod 30, the water stop valve 22 is moved from the position Px1 of the pipeline 10 to the position Px2 of the pipeline 10. Next, the operator closes the position Px2 of the pipeline 10 with the water stop valve 22. Next, the operator conducts an airtightness test in a section from one end Pa of the pipeline 10 to the position Px2 of the pipeline 10 to determine whether or not the airtightness of the section can be confirmed. The operator repeats the movement of the water stop valve 22 and the execution of the airtightness test until it is determined that the airtightness of the section from one end Pa of the pipeline 10 to the predetermined position of the pipeline 10 can be confirmed.
  • the distance D1 from one end Pa of the pipeline 10 to the position P1 of the pipeline 10 To measure.
  • the operator takes out the water stop valve 22 from the other end Pb of the pipeline 10.
  • the operator temporarily closes or opens the predetermined position of the pipeline 10 while moving the water stop valve 22 from the other end Pb of the pipeline 10 to one end Pa of the pipeline 10.
  • the airtightness test is repeated to identify the normal section of the pipeline 10 with high accuracy.
  • Step S2 As shown in FIG. 1B, the operator pipes the section from the other end Pb of the pipeline 10 connected to the manhole 202 to the position P2 (second position) of the pipeline 10 where the airtightness can be confirmed. It is specified as a normal section of the road 10. The level of airtightness is preset by the operator. A detailed description of the airtightness test will be described later with reference to FIG.
  • the operator closes the other end Pb of the pipeline 10 with the water stop valve 21.
  • the water stopcock 21 may be a known water stopcock as long as it can close the other end Pb of the pipeline 10.
  • the operator inserts the water stop valve 22 from one end Pa of the pipeline 10 into the inside of the pipeline 10.
  • the water stop valve 22 may have a configuration that can close or open a predetermined position (second predetermined position) of the pipeline 10 and can move inside the pipeline 10. An example of the configuration of the water stop valve 22 will be described later with reference to FIGS. 2 to 4.
  • the operator attaches the rod 30 to the water stop valve 22, pushes the rod 30 from one end Pa of the pipeline 10 toward the other end Pb of the pipeline 10, and pushes the rod 30 toward the other end Pb of the pipeline 10.
  • the water stop valve 22 is inserted to the predetermined position of.
  • the operator closes the predetermined position of the pipeline 10 with the water stop valve 22.
  • the operator conducts an airtightness test in a section from the other end Pb of the pipeline 10 to a predetermined position of the pipeline 10 to determine whether or not the airtightness of the section can be confirmed.
  • the operator may gradually push the water stop valve 22 from one end Pa of the pipeline 10 to carry out the airtightness test.
  • the operator may perform the airtightness test.
  • the airtightness test may be performed after pushing the water stop valve 22 all at once to a position beyond the perforated portion of the pipeline 10.
  • the operator determines that the airtightness of the section from the other end Pb of the pipeline 10 to the position Py1 of the pipeline 10 cannot be confirmed, the operator heads from one end Pa of the pipeline 10 to the other end Pb of the pipeline 10. While pushing the rod 30, the water stop valve 22 is moved from the position Py1 of the pipeline 10 to the position Py2 of the pipeline 10. Next, the operator closes the position Py2 of the pipeline 10 with the water stop valve 22. Next, the operator conducts an airtightness test in the section from the other end Pb of the pipeline 10 to the position Py2 of the pipeline 10 to determine whether or not the airtightness of the section can be confirmed. The operator repeats the movement of the water stop valve 22 and the execution of the airtightness test until it is determined that the airtightness of the section from the other end Pb of the pipeline 10 to the predetermined position of the pipeline 10 can be confirmed.
  • the operator determines that the airtightness of the section from the other end Pb of the pipeline 10 to the position P2 of the pipeline 10 can be confirmed
  • the operator from the other end Pb of the pipeline 10 to the position P2 of the pipeline 10 Measure the distance D2.
  • the operator determines the position P2, which is separated from the other end Pb of the pipeline 10 by a distance D2, as a position where the airtightness can be confirmed. That is, as shown in the shaded portion of FIG. 1B, the operator specifies the section from the other end Pb of the pipeline 10 corresponding to the distance D2 to the position P2 of the pipeline 10 as a normal section of the pipeline 10.
  • the operator takes out the water stop valve 22 from one end Pa of the pipeline 10.
  • the operator temporarily closes or opens the predetermined position of the pipeline 10 while moving the water stop valve 22 from one end Pa of the pipeline 10 to the other end Pb of the pipeline 10.
  • the airtightness test is repeated to identify the normal section of the pipeline 10 with high accuracy.
  • the order of the process of step S1 and the process of step S2 may be interchanged.
  • Step S3 As shown in FIG. 1C, the operator sets the section from the position P1 of the line 10 to the position P2 of the line 10 which could not be identified as the normal section of the line 10 as an abnormal section of the line 10 ( Specify as a section that needs repair).
  • the operator identifies the section from one end Pa of the pipeline 10 to the position P1 of the pipeline 10 as a normal section of the pipeline 10, and the position of the pipeline 10 from the other end Pb of the pipeline 10.
  • the section up to P2 is specified as the normal section of the pipeline 10
  • the section excluding these normal sections is specified as the abnormal section of the pipeline 10.
  • the water stop valve 22 includes a telescopic member 221, a deforming member 222, a fixing member 223 (223a, 223b), a screw portion 224, and a joint portion (first joint portion) 225.
  • the rod 30 includes a rod portion 31 and a joint portion (second joint portion) 32.
  • the telescopic member 221 is provided in contact with the deformable member 222, and is sandwiched from both sides by the fixing members 223a and 223b via the deformable member 222.
  • the expansion / contraction member 221 expands / contracts in the radial direction of the pipeline 10.
  • the telescopic member 221 is compressed and extends outward in the radial direction of the pipeline 10.
  • the telescopic member 221 is expanded when the rod portion 31 is rotated counterclockwise by the operator and the screw portion 224 is loosened, and contracts inward in the radial direction of the pipeline 10.
  • the elastic member 221 is preferably formed of an elastic material, for example, a rubber material.
  • the rubber material include EPDM (ethylene propylene rubber), CR (chloroprene rubber), CSM (chlorosulfonated polyethylene), SBR (styrene butadiene rubber), NBR (acrylonitrile butadiene rubber), and silicone rubber.
  • the deformable member 222 is provided in contact with the telescopic member 221 and is sandwiched from both sides by the fixing members 223a and 223b via the telescopic member 221. As shown in FIGS. 2 and 4, the deformable member 222 is a pipe regardless of whether the stretchable member 221 in contact with the deformable member 222 is in a contracted state or the stretchable member 221 in contact with the deformable member 222 is in a stretched state. It is configured to be in contact with the inner wall surface of the road 10. That is, the deforming member 222 is configured to have a diameter equal to or larger than the diameter of the pipeline 10.
  • the deformable member 222 is preferably formed of a material having frictional resistance, for example, a rubber material, a resin material, or the like.
  • a rubber material for example, the same material as the elastic member 221 can be used.
  • the resin material include polyester, polyethylene terephthalate, polyethersulfone, polyetherketone, polysulfone, polyimide, polyimideamide, and polyamide.
  • the deformable member 222 may be configured separately from the telescopic member 221 or may be integrally configured with the telescopic member 221.
  • the deformable member 222 and the telescopic member 221 are integrally formed, for example, the deformable member 222 may be made of a rubber material having a protrusion or the like.
  • the fixing members 223a and 223b sandwich the telescopic member 221 and the deforming member 222 from both sides.
  • the fixing member 223 compresses the expansion / contraction member 221 in the direction perpendicular to the radial direction of the pipeline 10, and the diameter of the pipeline 10
  • the expansion / contraction member 221 is extended toward the outside in the direction.
  • the fixing member 223 extends the expansion / contraction member 221 in the direction perpendicular to the radial direction of the pipeline 10, and causes the conduit 10 to extend.
  • the telescopic member 221 is contracted inward in the radial direction.
  • the screw portion 224 is provided at the center of the water stop valve 22 and is configured so that the screw shaft coincides with the rotation shaft of the rod 30.
  • One end of the screw portion 224 is joined to the fixing member 223, and the other end is joined to the joint portion 225.
  • the screw portion 224 rotates clockwise in conjunction with the rotation of the rod 30 and is tightened to press the fixing member 223b.
  • the screw portion 224 rotates counterclockwise in conjunction with the rotation of the rod 30 and is loosened.
  • the operator attaches the water stop valve 22 from the other end Pb of the pipeline 10 toward one end Pa of the pipeline 10 or from the other end Pa of the pipeline 10 toward the other end Pb of the pipeline 10.
  • the water stop valve 22 can be arbitrarily moved inside the pipe line 10.
  • the rod portion 31 is configured by an operator connecting a plurality of rods. For example, as shown in FIG. 1A, the operator increases the number of rods to be connected from the other end Pb of the pipeline 10 toward one end Pa of the pipeline 10 in proportion to the distance into which the water stop valve 22 is inserted. Change. When the distance for inserting the water stop valve 22 is increased from the other end Pb of the pipeline 10 to one end Pa of the pipeline 10, the operator connects the water stop valve 22 while pushing it forward using the rod portion 31. The number of rods to be matched is increased, and the rod portion 31 is gradually lengthened. For example, as shown in FIG.
  • the operator increases the number of rods to be connected from one end Pa of the pipeline 10 to the other end Pb of the pipeline 10 in proportion to the distance for inserting the water stopcock 22. Change.
  • the operator connects the water stop valve 22 while pushing it forward using the rod portion 31.
  • the number of rods to be matched is increased, and the rod portion 31 is gradually lengthened.
  • the rod 30 is more likely to be formed as a whole as compared with the case where the rod portion 31 is composed of one rod.
  • the operator can insert the rod 30 to the depth of the pipeline 10 along the bending of the pipeline 10, so that the water stop that engages with the rod 30 is stopped.
  • the plug 22 can be smoothly moved to a desired position in the pipeline 10 to temporarily block or open the position.
  • the joint portion 225 of the water stop valve 22 has a groove portion 226, and the joint portion 32 of the rod 30 has a protrusion 33.
  • the operator aligns the water stop valve 22 and the rod 30 so that the groove 226 of the joint portion 225 and the protrusion 33 of the joint portion 32 mesh with each other.
  • the operator pushes the rod 30 in the direction of the arrow to engage the groove portion 226 of the joint portion 225 and the protrusion 33 of the joint portion 32 to engage the protrusion 33 of the joint portion 32 with the rod 30. Move in the direction of the arrow until it stops moving.
  • the operator rotates the rod 30 in the direction of the arrow to engage the groove portion 226 of the joint portion 225 and the protrusion 33 of the joint portion 32 to form the protrusion 33 of the joint portion 32.
  • the operator pushes the rod 30 in the direction of the arrow to engage the groove portion 226 of the joint portion 225 and the protrusion 33 of the joint portion 32 to engage the protrusion 33 of the joint portion 32 with the rod 30.
  • the rod 30 is attached to the water stop valve 22.
  • the operator rotates the rod 30 in the direction of the black arrow (clockwise) and tightens the screw portion 224.
  • the expansion / contraction member 221 is compressed in the direction perpendicular to the radial direction of the pipeline 10 and extends in the direction of the white arrow.
  • the telescopic member 221 is in close contact with the inner wall surface of the pipeline 10.
  • the deformable member 222 is fixed at a predetermined position of the pipeline 10 in a state of being in contact with the inner wall surface of the pipeline 10.
  • the water stop valve 22 temporarily closes the predetermined position of the pipeline 10.
  • Closing step S11 The operator closes one end Pa of the pipeline 10 connected to the manhole 201 with a water stop valve 21.
  • Closing step S13 The operator closes the predetermined position of the pipeline 10 with the water stop valve 22. That is, the operator tightens the screw portion 224 by rotating the rod 30 clockwise, extends the telescopic member 221 outward in the radial direction of the pipeline 10, and extends the telescopic member 221 inside the pipeline 10. Adhere to the wall.
  • Implementation step S14 The operator conducts an airtightness test in a section from one end Pa of the pipeline 10 to a predetermined position of the pipeline 10.
  • the airtightness test for example, water is sent from one end Pa of the pipeline 10 to a predetermined position of the pipeline 10, air is evacuated from the inside of the section to the outside of the pipeline 10, and the inside of the section is filled with water. Then stop the water supply. Then, after increasing the pressure inside the section where both ends are closed and filled with water, the pressure value inside the section at the end of pressurization and the pressure value inside the section after a predetermined time elapses are measured. The test may be to confirm the airtightness level by comparison (see FIG. 6).
  • Judgment step S15 Whether or not the section from one end Pa of the pipeline 10 to the predetermined position of the pipeline 10 is normal, that is, the operator determines whether the section from one end Pa of the pipeline 10 to the predetermined position of the pipeline 10 is normal. It is determined whether or not the airtightness of the section to the position can be confirmed.
  • step S15 ⁇ NO determines that there is an abnormality in the section from one end Pa of the pipeline 10 to a predetermined position of the pipeline 10 (step S15 ⁇ NO), that is, the operator is the pipeline from one end Pa of the pipeline 10.
  • step S16 is performed.
  • step S15 determines that there is no abnormality in the section from one end Pa of the pipeline 10 to the predetermined position of the pipeline 10 (step S15 ⁇ YES), that is, the operator is the pipeline from one end Pa of the pipeline 10.
  • step S17 is performed.
  • Movement step S16 The operator opens a predetermined position of the pipeline 10 by the water stop valve 22. That is, the operator loosens the screw portion 224 by rotating the rod 30 counterclockwise, contracts the expansion / contraction member 221 inward in the radial direction of the pipeline 10, and contracts the expansion / contraction member 221 in the pipeline 10. Peel off from the inner wall surface. Then, the operator moves the water stop valve 22 from a predetermined position of the pipeline 10 to the back of the pipeline 10 while pushing the rod 30 from the other end Pb of the pipeline 10 toward one end Pa of the pipeline 10. .. The operator repeats the processes from step S13 to step S16 until the position of the pipeline 10 where the airtightness can be confirmed is determined.
  • Take-out step S18 The operator takes out the water stop valve 22 from the other end Pb of the pipeline 10 to the outside of the pipeline 10.
  • the operator can identify the normal section of the pipeline 10 with higher accuracy than in the case of inspecting the pipeline using a pipe camera. Can be done.
  • step S25 When the operator determines that there is no abnormality in the section from the other end Pb of the pipeline 10 to the predetermined position of the pipeline 10 (step S25 ⁇ YES), that is, the operator is from the other end Pb of the pipeline 10.
  • step S27 When it is determined that the airtightness of the section up to the predetermined position of the pipeline 10 can be confirmed, the process of step S27 is performed.
  • the section from one end of the pipeline 10 connected to the manhole 201 to the position P1 of the pipeline 10 whose airtightness can be confirmed is specified as a normal section of the pipeline 10.
  • the airtightness test executing device 100 includes a tank 11, a pump 12, a hose 13, a pressure measuring device 14, and an air bleeding portion 15.
  • the pressure measuring device 14 includes a pressure gauge (pressure measuring unit) 141, a water supply valve 142, and a drain valve 143.
  • the air bleeding portion 15 includes an air bleeding pipe 151 and a valve 152.
  • the water supply unit is composed of, for example, a tank 11, a pump 12, a hose 13, a water supply valve 142, and the like.
  • the pressurizing section includes, for example, a tank 11, a pump 12, a hose 13, a pressure gauge 141, a water supply valve 142, an air bleeding section 15, and the like.
  • the tank 11 stores water supplied from a water source or the like provided outside, and supplies the stored water to the inside of the pipeline 10.
  • the tank 11 stores at least an amount of water that can fill the inside of the pipeline 10.
  • the tank 11 is connected to the pump 12 via a hose 13.
  • the pump 12 is connected to the tank 11 and the pipeline 10 via the hose 13.
  • the pump 12 is provided between the tank 11 and the pipeline 10, and is configured so that water can be sent from the tank 11 to the inside of the pipeline 10 via the hose 13.
  • the water supply valve 142 opens, the pump 12 starts water supply from the tank 11 to the inside of the pipeline 10, and when the water supply valve 142 closes, the pump 12 stops water supply from the tank 11 to the inside of the pipeline 10.
  • the pump 12 may be manually operated by an operator, or may be automatically operated by a control device or the like.
  • the water supply unit is composed of, for example, a tank 11, a pump 12, a hose 13, a water supply valve 142, and the like.
  • the water supply unit opens the water supply valve 142, drives the pump 12, and supplies water from the tank 11 to the inside of the pipeline 10 via the hose 13.
  • water gradually accumulates inside the pipeline 10.
  • the water supply unit continues to supply water to the inside of the pipe line 10 until water containing no air is discharged from the air bleeding pipe 151.
  • the inside of the pipe line 10 is filled with the water sent by the water feeding unit.
  • the valve 152 is provided in the middle of the air bleeding pipe 151 to control the opening or closing of the other end of the pipe line 10 on the downstream side.
  • the valve 152 opens, the other end of the pipeline 10 opens, and when the valve 152 closes, the other end of the pipeline 10 closes.
  • the valve 152 is closed after the water supply unit continues to supply water to the inside of the pipeline 10 and water containing no air is discharged from the air bleeding pipe 151, both ends of the pipeline 10 are closed and water is discharged. It becomes a state filled with.
  • the pressure measuring device 14 includes a pressure gauge 141, a water supply valve 142, and a drain valve 143.
  • the pressure measuring device 14 is connected to the hose 13 and is provided between the pipeline 10 and the pump 12.
  • the pressure gauge 141 measures the pressure value inside the pipeline 10. The operator can grasp the pressure value inside the pipeline 10 by checking the scale indicated by the pressure gauge 141.
  • the water supply valve 142 controls water supply or stop to the inside of the pipeline 10. When the water supply valve 142 opens and the pump 12 is driven, water supply from the tank 11 to the inside of the pipeline 10 starts via the hose 13. When the water supply valve 142 is closed, the water supply to the inside of the pipeline 10 is stopped.
  • the drain valve 143 controls drainage or stop from the inside of the pipeline 10. When the drain valve 143 is opened, drainage from the inside of the pipeline 10 starts, and when the drain valve 143 is closed, drainage from the inside of the pipeline 10 is stopped.
  • the pressurizing section is composed of, for example, a tank 11, a pump 12, a hose 13, a pressure gauge 141, a water supply valve 142, an air bleeding section 15, and the like.
  • a tank 11 a pump 12, a hose 13, a pressure gauge 141, a water supply valve 142, an air bleeding section 15, and the like.
  • the pressurizing unit closes the water supply valve 142 and stops the pump 12. Further, the pressurizing portion closes the valve 152 of the air bleeding portion 15 and closes the other end of the pipeline 10 on the downstream side. As a result, the inside of the pipeline 10 is in a state where both ends are closed and filled with water.
  • the operator can determine whether or not the pressure value inside the pipeline 10 has reached a predetermined pressure value by checking the scale indicated by the pressure gauge 141.
  • the scale indicated by the pressure gauge 141 is, for example, 49 kPa or more, the operator can determine that the pressure value inside the pipeline 10 has reached 49 kPa.
  • the scale indicated by the pressure gauge 141 is smaller than, for example, 49 kPa, the operator can determine that the pressure value inside the pipeline 10 has not reached 49 kPa. If the pressure value inside the pipeline 10 does not reach a predetermined pressure value even if the pressurizing unit continues to send water to the inside of the pipeline 10 for a long time, the pressurizing unit moves to the inside of the pipeline 10. Stop the water supply. In this case, the operator can determine that there is some abnormality in the pipeline 10 by checking the scale indicated by the pressure gauge 141.
  • the pressure gauge 141 measures the pressure value inside the pipeline 10 at the end of pressurization (for example, when the pressure value inside the pipeline 10 reaches 49 kPa). Further, the pressure gauge 141 measures the pressure value inside the pipeline 10 when a predetermined time elapses (for example, when 3 minutes have elapsed from the time when the pressure value inside the pipeline 10 reaches 49 kPa).
  • the operator determines that the pipeline 10 has an abnormality. That is, when the pressure value inside the pipeline 10 after the elapse of a predetermined time drops from the pressure value inside the pipeline 10 at the end of pressurization, the operator determines that the pipeline 10 has an abnormality.
  • the pressure value inside the pipeline 10 after a lapse of a predetermined time is the pressure value at the end of pressurization. It shall be regarded as equal to the pressure value inside the pipeline 10.
  • the operator can surely find an abnormality in the pipeline that cannot be confirmed from the image captured by the pipe camera. Can be done.
  • the operator is based on a quantitative index of whether or not the pressure value inside the pipeline 10 after a lapse of a predetermined time has decreased from the pressure value inside the pipeline 10 at the end of pressurization. Since it is possible to determine whether or not there is an abnormality in the pipeline 10, it is possible to solve the conventional problem that the inspection accuracy varies from worker to worker.
  • a method of temporarily closing or opening the predetermined position of the pipeline 10 by the water stop valve 22 has been described as an example, but the predetermined position of the pipeline 10 is temporarily closed or opened.
  • the method is not limited to the method described above.

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Pipe Accessories (AREA)
  • Examining Or Testing Airtightness (AREA)

Abstract

管路検査方法は、一方のマンホールに接続される管路の一端(Pa)から気密性が確認できる管路の第1位置(P1)までの区間を、管路の正常区間として特定する第1特定ステップ(S1)と、他方のマンホールに接続される管路の他端(Pb)から気密性が確認できる管路の第2位置(P2)までの区間を、管路の正常区間として特定する第2特定ステップ(S1)と、第1位置(P1)から第2位置(P2)までの区間を、管路の異常区間として特定する第3特定ステップ(S3)と、を含む。

Description

管路検査方法
 本開示は、管路検査方法に関する。
 通信ケーブルを収容する地下の管路(通信管路)設備における経年劣化の状況を点検診断し、タイムリに補修再生する維持管理技術は、光サービスの即応性向上および設備の長期的延命化に不可欠な技術である(例えば、非特許文献1参照)。
 図7は、非特許文献1に記載される管路検査方法の一例を示す図である。例えば、新規に空き管路に通信ケーブルを敷設する場合、作業者は、マンホール61から通信管路62の内部へパイプカメラ63を挿入し、撮影される映像を目視により確認することで、通信管路62が健全であるかを検査する。作業者は、通信管路が正常であることを確認した場合、通信管路に通信ケーブルを敷設し、通信管路に損傷(例えば、穴あき)があることを確認した場合、ライニング技術などにより通信管路全体を補修する。
山口ほか、「管路設備の点検診断および補修再生技術」、NTT技術ジャーナル、2006.3、P47-50、[online]、[2019年7月4日検索]、インターネット<URL:http://www.ntt.co.jp/journal/0603/files/jn200603047.pdf>
 しかしながら、従来の管路検査方法では、管路の補修が必要とされる区間を、簡易且つ高精度に特定することが困難であった。このため、作業者は、管路の一部に損傷があることを確認した場合、目視できない微細な異常まで確認できないため、管路全体を補修しなければならずコストがかかるという問題があった。
 かかる事情に鑑みてなされた本開示の目的は、管路の補修が必要とされる区間を、簡易且つ高精度に特定することが可能な管路検査方法を提供することにある。
 上記課題を解決するため、本開示に係る管路検査方法は、両端が2つのマンホールに接続される管路を検査する管路検査方法であって、一方のマンホールに接続される前記管路の一端から気密性が確認できる前記管路の第1位置までの区間を、前記管路の正常区間として特定する第1特定ステップと、他方のマンホールに接続される前記管路の他端から気密性が確認できる前記管路の第2位置までの区間を、前記管路の正常区間として特定する第2特定ステップと、前記第1位置から前記第2位置までの区間を、前記管路の異常区間として特定する第3特定ステップと、を含むことを特徴とする。
 本開示によれば、管路の補修が必要とされる区間を、簡易且つ高精度に特定することが可能となる。
一実施形態に係る管路検査方法の概念図の一例を示す図である。 一実施形態に係る管路検査方法の概念図の一例を示す図である。 一実施形態に係る管路検査方法の概念図の一例を示す図である。 一実施形態に係る止水栓およびロッドの構成の一例を示す図である。 止水栓にロッドを取り付ける方法の一例を示す図である。 止水栓にロッドを取り付ける方法の一例を示す図である。 止水栓にロッドを取り付ける方法の一例を示す図である。 止水栓にロッドを取り付ける方法の一例を示す図である。 管路を所定位置で一時的に閉塞又は開放する方法の一例を示す図である。 管路を所定位置で一時的に閉塞又は開放する方法の一例を示す図である。 管路を所定位置で一時的に閉塞又は開放する方法の一例を示す図である。 管路を所定位置で一時的に閉塞又は開放する方法の一例を示す図である。 一実施形態に係る管路検査方法の一例を示すフローチャートである。 一実施形態に係る気密試験の一例を示す図である。 従来の管路検査方法の一例を示す図である。
 以下、本開示の一実施形態について、図面を参照して詳細に説明する。
<管路検査方法>
 図1乃至図6を参照して、本開示の一実施形態に係る管路検査方法の一例について説明する。
 本実施形態に係る管路検査方法は、第1特定ステップ(ステップS1)と、第2特定ステップ(ステップS2)と、第3特定ステップ(ステップS3)と、を含む。
 ステップS1:図1Aに示すように、作業者は、マンホール201に接続される管路10の一端Paから気密性が確認できる管路10の位置P1(第1位置)までの区間を、管路10の正常区間として特定する。気密性のレベルは、作業者によって予め設定される。気密試験についての詳細な説明は、図6を参照して後述する。
 具体的には、作業者は、管路10の一端Paを、止水栓21(第1止水栓)により閉塞する。止水栓21は、管路10の一端Paを閉塞可能な構成であればよく、公知の止水栓であってよい。次に、作業者は、管路10の他端Pbから管路10の内部へ、止水栓22(第2止水栓)を挿入する。止水栓22は、管路10の所定位置(第1所定位置)を閉塞又は開放可能であり、且つ、管路10の内部を移動可能な構成であればよい。止水栓22の構成の一例については、図2乃至図4を参照して後述する。
 次に、作業者は、図3に示すように、止水栓22にロッド30を取り付け、管路10の他端Pbから管路10の一端Paへ向かってロッド30を押しながら、管路10の所定位置まで、止水栓22を挿入する。次に、作業者は、管路10の所定位置を、止水栓22により閉塞する。次に、作業者は、管路10の一端Paから管路10の所定位置までの区間において気密試験を実施し、該区間の気密性が確認できるか否かを判定する。なお、作業者は、管路10の他端Pbから徐々に止水栓22を押し進めて気密試験を実施してもよいが、例えば、管路10の穴あきなどを明らかに確認できる場合には、管路10の穴あき部分を越した位置まで、一気に止水栓22を押し進めてから、気密試験を実施してもよい。
 作業者は、例えば、管路10の一端Paから管路10の位置Px1までの区間の気密性が確認できないと判定する場合、管路10の他端Pbから管路10の一端Paへ向かってロッド30を押しながら、管路10の位置Px1から管路10の位置Px2まで、止水栓22を移動させる。次に、作業者は、管路10の位置Px2を、止水栓22により閉塞する。次に、作業者は、管路10の一端Paから管路10の位置Px2までの区間において気密試験を実施し、該区間の気密性が確認できるか否かを判定する。作業者は、管路10の一端Paから管路10の所定位置までの区間の気密性が確認できると判定するまで、止水栓22の移動および気密試験の実施を繰り返す。
 作業者は、例えば、管路10の一端Paから管路10の位置P1までの区間の気密性が確認できると判定する場合、管路10の一端Paから管路10の位置P1までの距離D1を測定する。次に、作業者は、管路10の一端Paから距離D1だけ離れた位置P1を、気密性が確認できる位置として決定する。すなわち、作業者は、図1Aの斜線部に示すように、距離D1に対応する管路10の一端Paから管路10の位置P1までの区間を、管路10の正常区間として特定する。次に、作業者は、管路10の他端Pbから、止水栓22を取り出す。
 上述のように、作業者は、管路10の他端Pbから管路10の一端Paへ向かって、止水栓22を移動させながら、管路10の所定位置を一時的に閉塞又は開放して気密試験を繰り返し、管路10の正常区間を高精度に特定する。
 ステップS2:図1Bに示すように、作業者は、マンホール202に接続される管路10の他端Pbから気密性が確認できる管路10の位置P2(第2位置)までの区間を、管路10の正常区間として特定する。気密性のレベルは、作業者によって予め設定される。気密試験についての詳細な説明は、図6を参照して後述する。
 具体的には、作業者は、管路10の他端Pbを、止水栓21により閉塞する。止水栓21は、管路10の他端Pbを閉塞可能な構成であればよく、公知の止水栓であってよい。次に、作業者は、管路10の一端Paから管路10の内部へ、止水栓22を挿入する。止水栓22は、管路10の所定位置(第2所定位置)を閉塞又は開放可能であり、且つ、管路10の内部を移動可能な構成であればよい。止水栓22の構成の一例については、図2乃至図4を参照して後述する。
 次に、作業者は、図3に示すように、止水栓22にロッド30を取り付け、管路10の一端Paから管路10の他端Pbへ向かってロッド30を押しながら、管路10の所定位置まで、止水栓22を挿入する。次に、作業者は、管路10の所定位置を、止水栓22により閉塞する。次に、作業者は、管路10の他端Pbから管路10の所定位置までの区間において気密試験を実施し、該区間の気密性が確認できるか否かを判定する。なお、作業者は、管路10の一端Paから徐々に止水栓22を押し進めて気密試験を実施してもよいが、例えば、管路10の穴あきなどを明らかに確認できる場合には、管路10の穴あき部分を越した位置まで、一気に止水栓22を押し進めてから、気密試験を実施してもよい。
 作業者は、例えば、管路10の他端Pbから管路10の位置Py1までの区間の気密性が確認できないと判定する場合、管路10の一端Paから管路10の他端Pbへ向かってロッド30を押しながら、管路10の位置Py1から管路10の位置Py2まで、止水栓22を移動させる。次に、作業者は、管路10の位置Py2を、止水栓22により閉塞する。次に、作業者は、管路10の他端Pbから管路10の位置Py2までの区間において気密試験を実施し、該区間の気密性が確認できるか否かを判定する。作業者は、管路10の他端Pbから管路10の所定位置までの区間の気密性が確認できると判定するまで、止水栓22の移動および気密試験の実施を繰り返す。
 作業者は、例えば、管路10の他端Pbから管路10の位置P2までの区間の気密性が確認できると判定する場合、管路10の他端Pbから管路10の位置P2までの距離D2を測定する。次に、作業者は、管路10の他端Pbから距離D2だけ離れた位置P2を、気密性が確認できる位置として決定する。すなわち、作業者は、図1Bの斜線部に示すように、距離D2に対応する管路10の他端Pbから管路10の位置P2までの区間を、管路10の正常区間として特定する。次に、作業者は、管路10の一端Paから、止水栓22を取り出す。
 上述のように、作業者は、管路10の一端Paから管路10の他端Pbへ向かって、止水栓22を移動させながら、管路10の所定位置を一時的に閉塞又は開放して気密試験を繰り返し、管路10の正常区間を高精度に特定する。なお、ステップS1の処理とステップS2の処理とは、順序が入れ替わってもよい。
 ステップS3:図1Cに示すように、作業者は、管路10の正常区間として特定できなかった管路10の位置P1から管路10の位置P2までの区間を、管路10の異常区間(補修が必要とされる区間)として特定する。
 具体的には、作業者は、ステップS1により測定された管路10の一端Paから管路10の位置P1までの距離D1、ステップS2により測定された管路10の他端Pbから管路10の位置P2までの距離D2、および、マンホール201とマンホール202との間の距離L(管路10全体の長さ)に基づいて、管路10の位置P1と管路10の位置P2との間の距離D3(=L-D1-D2)を算出する。次に、作業者は、管路10の位置P1と管路10の位置P2との間の距離D3に対応する管路10の位置P1から管路10の位置P2までの区間を、管路10の異常区間として特定する。
 上述のように、作業者は、管路10の一端Paから管路10の位置P1までの区間を、管路10の正常区間として特定し、管路10の他端Pbから管路10の位置P2までの区間を、管路10の正常区間として特定した後に、これらの正常区間を除いた区間を、管路10の異常区間として特定する。これにより、作業者は、管路の補修が必要とされる区間を、簡易且つ高精度に特定することができる。
<止水栓22およびロッド30の構成>
 図2乃至図4を参照して、止水栓22およびロッド30の構成の一例について説明する。
 止水栓22は、伸縮部材221と、変形部材222と、固定部材223(223a,223b)と、ネジ部224と、ジョイント部(第1ジョイント部)225と、を備える。ロッド30は、ロッド部31と、ジョイント部(第2ジョイント部)32と、を備える。
 伸縮部材221は、変形部材222に接して設けられ、変形部材222を介して、固定部材223a,223bにより両側から挟持される。伸縮部材221は、管路10の径方向に伸縮する。伸縮部材221は、作業者によってロッド部31が時計回りに回転させられてネジ部224が締められると圧縮されて、管路10の径方向外側に向かって伸びる。伸縮部材221は、作業者によってロッド部31が反時計回りに回転させられてネジ部224が緩められると伸張されて、管路10の径方向内側に向かって縮む。
 伸縮部材221は、弾性材料で形成されることが好ましく、例えば、ゴム材料で形成される。ゴム材料としては、例えば、EPDM(エチレンプロピレンゴム)、CR(クロロプレンゴム)、CSM(クロロスルホン化ポリエチレン)、SBR(スチレンブタジエンラバー)、NBR(アクリロニトリルブタジエンゴム)、シリコーンゴムなどが挙げられる。
 変形部材222は、伸縮部材221に接して設けられ、伸縮部材221を介して、固定部材223a,223bにより両側から挟持される。変形部材222は、図2および図4に示すように、変形部材222に接する伸縮部材221が縮んだ状態であっても、変形部材222に接する伸縮部材221が伸びた状態であっても、管路10の内壁面に接するように構成される。すなわち、変形部材222は、管路10の径以上の径を有するように構成される。変形部材222が管路10の径以上の径を有するように構成されることで、作業者がネジ部224を締める又は緩める際に、止水栓22自体も回転してしまうという供回りの発生を防ぐことができる。また、管路10の内部で管路10の径が変化しても、変形部材222と管路10の内壁面とを常に接触させることができるため、管路10の径に依らずに、作業者は管路10を所望の位置で、止水栓22により一時的に閉塞又は開放することができる。
 変形部材222は、摩擦抵抗を有する材料で形成されることが好ましく、例えば、ゴム材料、樹脂材料などで形成される。ゴム材料としては、例えば、伸縮部材221と同じ材料を用いることができる。樹脂材料としては、例えば、ポリエステル、ポリエチレンテレフタレート、ポリエーテルサルフォン、ポリエーテルケトン、ポリサルフォン、ポリイミド、ポリイミドアミド、ポリアミドなどが挙げられる。
 なお、変形部材222は、伸縮部材221と別々に構成されていてもよいし、伸縮部材221と一体化して構成されていてもよい。変形部材222と伸縮部材221とが一体化して構成される場合、例えば、変形部材222は、突起部を有するゴム材料などで構成されればよい。
 固定部材223a,223bは、伸縮部材221および変形部材222を、両側から挟持する。固定部材223は、作業者がロッド部31を時計回りに回転させ、ネジ部224を締めると、管路10の径方向に対して垂直な方向に伸縮部材221を圧縮させ、管路10の径方向外側に向かって伸縮部材221を伸ばす。固定部材223は、作業者がロッド部31を反時計回りに回転させ、ネジ部224を緩めると、管路10の径方向に対して垂直な方向に伸縮部材221を伸張させ、管路10の径方向内側に向かって伸縮部材221を縮める。
 ネジ部224は、止水栓22の中心に設けられ、ネジ軸がロッド30の回転軸と一致するように構成される。ネジ部224は、一端が固定部材223と接合され、他端がジョイント部225と接合される。ネジ部224は、作業者が、ロッド30を時計回りに回転させると、ロッド30の回転に連動して時計回りに回転し、締められることで、固定部材223bを押圧する。ネジ部224は、作業者が、ロッド30を反時計回りに回転させると、ロッド30の回転に連動して反時計回りに回転し、緩められる。
 図3に示すように、ジョイント部225は、溝部226を有し、ジョイント部32は、突起部33を有し、溝部226と突起部33とは、嵌合するように構成される。ジョイント部225の溝部226とジョイント部32の突起部33とが噛み合って互いに固定されることで、止水栓22は、ロッド30と係合する。これにより、ネジ部224は、ロッド30の回転に連動して時計回り又は反時計回りに回転することが可能になる。また、ジョイント部225とジョイント部32とは係合してジョイント部材を構成する。ネジ部224は、ジョイント部材の回転に連動して回転することにより、固定部材223bを押圧することが可能になる。また、作業者は、管路10の他端Pbから管路10の一端Paへ向かって、或いは、管路10の一端Paから管路10の他端Pbへ向かって、止水栓22に取り付けられたロッド30を押すことで、止水栓22を管路10の内部で任意に移動させることが可能になる。
 ロッド部31は、作業者が、複数の棒を繋ぎ合わせることで構成される。作業者は、例えば、図1Aに示すように、管路10の他端Pbから管路10の一端Paへ向かって、止水栓22を挿入する距離に比例させて、繋ぎ合わせる棒の数を変化させる。管路10の他端Pbから管路10の一端Paへ向かって、止水栓22を挿入する距離を長くする場合、作業者は、ロッド部31を用いて止水栓22を押し進めながら、繋ぎ合わせる棒の数を増やし、ロッド部31を徐々に長くしていく。作業者は、例えば、図1Bに示すように、管路10の一端Paから管路10の他端Pbへ向かって、止水栓22を挿入する距離に比例させて、繋ぎ合わせる棒の数を変化させる。管路10の一端Paから管路10の他端Pbへ向かって、止水栓22を挿入する距離を長くする場合、作業者は、ロッド部31を用いて止水栓22を押し進めながら、繋ぎ合わせる棒の数を増やし、ロッド部31を徐々に長くしていく。
 ロッド部31が複数の棒で構成される場合、ロッド部31が1つの棒で構成される場合と比較して、ロッド30は、全体的にしなり易くなる。これにより、管路10が屈曲していても、作業者は、管路10の屈曲に沿って、ロッド30を管路10の奥まで挿入することができるため、ロッド30と係合する止水栓22を、管路10の所望の位置まで滑らかに移動させて、該位置を一時的に閉塞又は開放することができる。
<止水栓にロッドを取り付ける方法の一例>
 図3A乃至図3Dを参照して、止水栓22にロッド30を取り付ける方法の一例について説明する。
 図3Aに示すように、止水栓22のジョイント部225は、溝部226を有し、ロッド30のジョイント部32は、突起部33を有する。作業者は、ジョイント部225の溝部226とジョイント部32の突起部33とが噛み合うように、止水栓22およびロッド30の位置合わせを行う。
 図3Bに示すように、作業者は、ロッド30を矢印方向に押して、ジョイント部225の溝部226とジョイント部32の突起部33とを噛み合わせて、ジョイント部32の突起部33を、ロッド30が矢印方向に動かなくなる位置まで移動させる。
 図3Cに示すように、作業者は、ロッド30を矢印方向に回転させて、ジョイント部225の溝部226とジョイント部32の突起部33とを噛み合わせて、ジョイント部32の突起部33を、ロッド30が矢印方向に動かなくなる位置まで移動させる。
 図3Dに示すように、作業者は、ロッド30を矢印方向に押して、ジョイント部225の溝部226とジョイント部32の突起部33とを噛み合わせて、ジョイント部32の突起部33を、ロッド30が矢印方向に動かなくなる位置まで移動させる。これにより、止水栓22にロッド30が取り付けられる。
<管路10を所定位置で一時的に閉塞又は開放する方法の一例>
 図4A乃至図4Dを参照して、管路10を所定位置で一時的に閉塞又は開放する方法の一例について説明する。
 図4Aに示すように、作業者は、ロッド30を黒色矢印方向(時計回り)に回転させ、ネジ部224を締める。これにより、伸縮部材221は、管路10の径方向に対して垂直な方向に圧縮し、白色矢印方向に向かって伸びる。
 図4Bに示すように、伸縮部材221は、管路10の内壁面に密着する。変形部材222は、管路10の内壁面に接した状態で、管路10の所定位置に固定される。これにより、止水栓22は、管路10の所定位置を、一時的に閉塞する。
 図4Cに示すように、作業者は、ロッド30を黒色矢印方向(反時計回り)に回転させ、ネジ部224を緩める。これにより、伸縮部材221は、管路10の径方向に対して垂直な方向に伸張し、白色矢印方向に向かって縮む。
 図4Dに示すように、伸縮部材221は、管路10の内壁面から剥離する。変形部材222は、管路10の内壁面に接した状態で、管路10の内部を移動可能になる。これにより、止水栓22は、管路10の所定位置を、一時的に開放する。
 なお、図4に示すように、変形部材222は、少なくとも管路10の径以上の径を有するように構成される必要がある。仮に、変形部材222の径が管路10の径より短い場合、作業者がネジ部224を締める又は緩める際に供回りが発生してしまう。このような供回りを防ぐために、例えば、ネジ部224にベアリングを取り付けて、止水栓22自体が回転するよりも弱い力で、作業者がネジ部224を締める又は緩める、或いは、止水栓22の径を管路10の径と一致させるなどの手段も考えられる。しかしながら、少なくとも管路10の径以上の径を有する変形部材222を備える止水栓22を利用することにより、簡易且つ安価な手段で、供回りを防ぎつつ、管路10を所望の位置で、精度良く閉塞又は開放することができる。
<フローチャート>
 図5を参照して、本発明の一実施形態に係る管路検査方法の一例について詳細に説明する。
 本実施形態に係る管路検査方法は、第1特定ステップ(ステップS1)と、第2特定ステップ(ステップS2)と、特定ステップ(ステップS3)と、を含む。
 ステップS1は、閉塞ステップ(ステップS11)と、挿入ステップ(ステップS12)と、閉塞ステップ(ステップS13)と、実施ステップ(ステップS14)と、判定ステップ(ステップS15)と、移動ステップ(ステップS16)と、測定ステップ(ステップS17)と、取り出しステップ(ステップS18)と、を含む。
 ステップS2は、閉塞ステップ(ステップS21)と、挿入ステップ(ステップS22)と、閉塞ステップ(ステップS23)と、実施ステップ(ステップS24)と、判定ステップ(ステップS25)と、移動ステップ(ステップS26)と、測定ステップ(ステップS27)と、取り出しステップ(ステップS28)と、を含む。
 閉塞ステップS11:作業者は、マンホール201に接続される管路10の一端Paを、止水栓21により閉塞する。
 挿入ステップS12:作業者は、管路10の他端Pbから管路10の内部へ、止水栓22を挿入する。
 閉塞ステップS13:作業者は、止水栓22により、管路10の所定位置を閉塞する。すなわち、作業者は、ロッド30を時計回りに回転させることで、ネジ部224を締めて、伸縮部材221を管路10の径方向外側に向かって伸ばして、伸縮部材221を管路10の内壁面に密着させる。
 実施ステップS14:作業者は、管路10の一端Paから管路10の所定位置までの区間において気密試験を実施する。
 気密試験は、例えば、管路10の一端Paから管路10の所定位置までの区間へ送水し、該区間の内部から管路10の外部へ空気を抜き、該区間の内部が水で満たされたら送水を停止する。そして、両端が閉塞され水で満たされた区間の内部の圧力を高めた後、加圧終了時における該区間の内部の圧力値および所定時間経過時における該区間の内部の圧力値を測定し、比較することで、気密性レベルを確認するという試験であってよい(図6参照)。
 気密試験は、例えば、管路10の一端Paから管路10の所定位置までの区間の両端を閉塞し、両端が閉塞され空気で満たされた区間の内部の圧力を高めた後、加圧終了時における該区間の内部の圧力値および所定時間経過時における該区間の内部の圧力値を測定し、比較することで、気密性レベルを確認するという試験であってよい。
 判定ステップS15:作業者は、管路10の一端Paから管路10の所定位置までの区間が正常であるか否か、すなわち、作業者は、管路10の一端Paから管路10の所定位置までの区間の気密性が確認できるか否かを判定する。
 作業者は、管路10の一端Paから管路10の所定位置までの区間に異常があると判定する場合(ステップS15→NO)、すなわち、作業者は、管路10の一端Paから管路10の所定位置までの区間の気密性が確認できないと判定する場合、ステップS16の処理が行われる。
 作業者は、管路10の一端Paから管路10の所定位置までの区間に異常がないと判定する場合(ステップS15→YES)、すなわち、作業者は、管路10の一端Paから管路10の所定位置までの区間の気密性が確認できると判定する場合、ステップS17の処理が行われる。
 移動ステップS16:作業者は、止水栓22により、管路10の所定位置を開放する。すなわち、作業者は、ロッド30を反時計回りに回転させることで、ネジ部224を緩めて、伸縮部材221を管路10の径方向内側に向かって縮めて、伸縮部材221を管路10の内壁面から剥離させる。そして、作業者は、管路10の他端Pbから管路10の一端Paへ向かってロッド30を押しながら、管路10の所定位置から管路10の奥へ、止水栓22を移動させる。作業者は、気密性が確認できる管路10の位置を決定するまで、ステップS13からステップS16までの処理を繰り返す。
 測定ステップS17:作業者は、管路10の一端Paから管路10の気密性が確認できる位置までの距離を測定する。例えば、作業者は、管路10の一端Paから管路10の位置P1までの距離D1を測定し、距離D1に対応する管路10の一端Paから気密性が確認できる管路10の位置P1までの区間を、管路10の正常区間として特定する。
 取り出しステップS18:作業者は、管路10の他端Pbから管路10の外部へ止水栓22を取り出す。上述の方法で、管路10の正常区間を特定することで、作業者は、パイプカメラを用いて管路を検査する場合と比較して、管路10の正常区間を高精度に特定することができる。
 閉塞ステップS21:作業者は、マンホール202に接続される管路10の他端Pbを、止水栓21により閉塞する。
 挿入ステップS22:作業者は、管路10の一端Paから管路10の内部へ、止水栓22を挿入する。
 閉塞ステップS23:作業者は、止水栓22により、管路10の所定位置を閉塞する。すなわち、作業者は、ロッド30を時計回りに回転させることで、ネジ部224を締めて、伸縮部材221を管路10の径方向外側に向かって伸ばして、伸縮部材221を管路10の内壁面に密着させる。
 実施ステップS24:作業者は、管路10の他端Pbから管路10の所定位置までの区間において気密試験を実施する。
 気密試験は、例えば、管路10の他端Pbから管路10の所定位置までの区間へ送水し、該区間の内部から管路10の外部へ空気を抜き、該区間の内部が水で満たされたら送水を停止する。そして、両端が閉塞され水で満たされた区間の内部の圧力を高めた後、加圧終了時における該区間の内部の圧力値および所定時間経過時における該区間の内部の圧力値を測定し、比較することで、気密性レベルを確認するという試験であってよい(図6参照)。
 気密試験は、例えば、管路10の他端Pbから管路10の所定位置までの区間の両端を閉塞し、両端が閉塞され空気で満たされた区間の内部の圧力を高めた後、加圧終了時における該区間の内部の圧力値および所定時間経過時における該区間の内部の圧力値を測定し、比較することで、気密性レベルを確認するという試験であってよい。
 判定ステップS25:作業者は、管路10の他端Pbから管路10の所定位置までの区間が正常であるか否か、すなわち、作業者は、管路10の他端Pbから管路10の所定位置までの区間の気密性が確認できるか否かを判定する。
 作業者は、管路10の他端Pbから管路10の所定位置までの区間に異常があると判定する場合(ステップS25→NO)、すなわち、作業者は、管路10の他端Pbから管路10の所定位置までの区間の気密性が確認できないと判定する場合、ステップS26の処理が行われる。
 作業者は、管路10の他端Pbから管路10の所定位置までの区間に異常がないと判定する場合(ステップS25→YES)、すなわち、作業者は、管路10の他端Pbから管路10の所定位置までの区間の気密性が確認できると判定する場合、ステップS27の処理が行われる。
 移動ステップS26:作業者は、止水栓22により、管路10の所定位置を開放する。すなわち、作業者は、ロッド30を反時計回りに回転させることで、ネジ部224を緩めて、伸縮部材221を管路10の径方向内側に向かって縮めて、伸縮部材221を管路10の内壁面から剥離させる。そして、作業者は、管路10の一端Paから管路10の他端Pbへ向かってロッド30を押しながら、管路10の所定位置から管路10の奥へ、止水栓22を移動させる。作業者は、気密性が確認できる管路10の位置を決定するまで、ステップS23からステップS26までの処理を繰り返す。
 測定ステップS27:作業者は、管路10の他端Pbから管路10の気密性が確認できる位置までの距離を測定する。例えば、作業者は、管路10の他端Pbから管路10の位置P2までの距離D2を測定し、距離D2に対応する管路10の他端Pbから気密性が確認できる管路10の位置P2までの区間を、管路10の正常区間として特定する。
 取り出しステップS28:作業者は、管路10の一端Paから管路10の外部へ止水栓22を取り出す。上述の方法で、管路10の正常区間を特定することで、作業者は、パイプカメラを用いて管路を検査する場合と比較して、管路10の正常区間を高精度に特定することができる。
 ステップS3:作業者は、管路10の異常区間を特定する。例えば、作業者は、マンホール201に接続される管路10の一端Paから気密性が確認できる管路10の位置P1と、マンホール202に接続される管路10の他端Pbから気密性が確認できる管路10の位置P2との間の距離D3を算出し、距離D3に対応する管路10の位置P1から管路10の位置P2までの区間を、管路10の異常区間として特定する。上述の方法で、管路10の異常区間を特定することで、作業者は、パイプカメラの撮影映像からは確認できない管路の異常が発生している区間を、簡易且つ高精度に特定することができる。
 本実施形態に係る管路検査方法によれば、マンホール201に接続される管路10の一端から気密性が確認できる管路10の位置P1までの区間を、管路10の正常区間として特定する第1特定ステップと、マンホール202に接続される管路10の他端から気密性が確認できる管路10の位置P2までの区間を、管路10の正常区間として特定する第2特定ステップと、位置P1から位置P2までの区間を、管路10の異常区間として特定する第3特定ステップと、を含む。これにより、管路10の補修が必要とされる区間を、簡易且つ高精度に特定することができる。
 本実施形態に係る管路検査方法を、管路の維持管理に適用することで、作業者は、管路10の補修が必要とされる最小限の区間を特定することができるため、管路全体を補修せずに済み、安価且つ効率的に管路10を補修することができる。
<気密試験の一例>
 図6を参照して、本開示の一実施形態に係る気密試験の一例について説明する。
 作業者は、例えば、図6に示すような気密試験実施装置100を用いて、管路10の所定区間(例えば、管路10の一端から管路10の位置P1までの区間、管路10の他端から管路10の位置P2までの区間など)において気密試験を実施する。気密試験実施装置100は、例えば、ケーブル20が収容された管路10に対して気密試験を実施する装置である。
 図6に示すように、気密試験実施装置100は、タンク11と、ポンプ12と、ホース13と、圧力測定装置14と、エア抜き部15と、を備える。圧力測定装置14は、圧力計(圧力測定部)141と、送水バルブ142と、排水バルブ143と、を備える。エア抜き部15は、エア抜き管151と、バルブ152と、を備える。送水部は、例えば、タンク11、ポンプ12、ホース13、送水バルブ142、などにより構成される。加圧部は、例えば、タンク11、ポンプ12、ホース13、圧力計141、送水バルブ142、エア抜き部15、などにより構成される。
 タンク11は、外部に設けられる水源などから供給された水を貯留し、貯留している水を管路10の内部へ供給する。タンク11は、少なくとも、管路10の内部を満たすことができる量の水を貯留している。タンク11は、ホース13を介して、ポンプ12と接続されている。
 ポンプ12は、ホース13を介して、タンク11および管路10と接続されている。ポンプ12は、タンク11と管路10との間に設けられ、ホース13を介して、タンク11から管路10の内部へ水を送ることができるように構成されている。ポンプ12は、送水バルブ142が開くと、タンク11から管路10の内部への送水を開始し、送水バルブ142が閉まると、タンク11から管路10の内部への送水を停止する。ポンプ12は、作業者により手動操作されてもよいし、制御装置などにより自動操作されてもよい。
 ホース13は、上流側における管路10の一端に設けられ、管路10の一端を閉塞する。ホース13は、タンク11、ポンプ12、および圧力測定装置14と接続され、タンク11とポンプ12とを相互に接続し、ポンプ12と圧力測定装置14とを相互に接続し、圧力測定装置14と管路10とを相互に接続している。ホース13は、例えば、可撓性ホースが採用される。
 送水部は、例えば、タンク11、ポンプ12、ホース13、送水バルブ142、などにより構成される。送水部は、送水バルブ142を開き、ポンプ12を駆動させて、ホース13を介して、タンク11から管路10の内部へ送水する。送水部が、管路10の内部への送水を続けることで、管路10の内部には、徐々に水が溜まっていく。送水部は、エア抜き管151から、空気を含まない水が排出されるまで、管路10の内部への送水を続ける。エア抜き管151から、空気を含まない水が排出されると、管路10の内部は、送水部により送水された水で満たされる。
 エア抜き部15は、エア抜き管151と、バルブ152と、を備える。エア抜き部15は、下流側における管路10の他端に設けられ、管路10の内部に流入した空気を、管路10の内部から管路10の外部へ排出する。
 エア抜き管151は、一端が下流側における管路10の他端に接続され、他端が外部へ向かって開放されている。作業者は、エア抜き管151から空気を含まない水が排出されていることを確認すると、管路10の内部は、水で満たされていると判定することができる。また、作業者は、エア抜き管151から空気を含む水が排出されていることを確認すると、管路10の内部は、空気および水が混在していると判定することができる。すなわち、作業者は、エア抜き管151から空気を含まない水が排出されているか、エア抜き管151から空気を含む水が排出されているか、を確認することにより、管路10の内部が水で満たされているか否かを判定することができる。
 バルブ152は、エア抜き管151の途中に設けられて、下流側における管路10の他端の開放又は閉塞を制御する。バルブ152が開くと、管路10の他端は開放し、バルブ152が閉まると、管路10の他端は閉塞する。送水部が、管路10の内部への送水を続け、エア抜き管151から、空気を含まない水が排出された後に、バルブ152が閉まると、管路10の内部は、両端が閉塞され水で満たされた状態となる。
 また、バルブ152は、管路10の内部から管路10の外部への排気を制御する。バルブ152が開いた状態で、送水部が管路10の内部への送水を開始すると、管路10の内部で水と混在する空気は、管路10の他端へ向かって押し出されて、管路10の外部へ排出される。一方、バルブ152が閉まった状態で、送水部が管路10の内部への送水を開始しても、空気は、管路10の外部へ排出されることなく、管路10の内部に滞る。
 圧力測定装置14は、圧力計141と、送水バルブ142と、排水バルブ143と、を備える。圧力測定装置14は、ホース13と連接され、管路10とポンプ12との間に設けられる。
 圧力計141は、管路10の内部の圧力値を測定する。作業者は、圧力計141が示す目盛りを確認することによって、管路10の内部の圧力値を把握することができる。送水バルブ142は、管路10の内部への送水又は停止を制御する。送水バルブ142が開き、ポンプ12が駆動すると、ホース13を介して、タンク11から管路10の内部への送水が開始する。送水バルブ142が閉まると、管路10の内部への送水が停止する。排水バルブ143は、管路10の内部からの排水又は停止を制御する。排水バルブ143が開くと、管路10の内部からの排水が開始し、排水バルブ143が閉まると、管路10の内部からの排水が停止する。
 加圧部は、例えば、タンク11、ポンプ12、ホース13、圧力計141、送水バルブ142、エア抜き部15、などにより構成される。送水部が、管路10の内部への送水を続けることで、エア抜き管151から、空気を含まない水が排出される。管路10の内部から管路10の外部へ全ての空気が抜かれると、加圧部は、送水バルブ142を閉め、ポンプ12を停止させる。更に、加圧部は、エア抜き部15のバルブ152を閉めて、下流側における管路10の他端を閉塞する。これにより、管路10の内部は、両端が閉塞され水で満たされた状態となる。この状態で、加圧部は、送水バルブ142を開き、ポンプ12を駆動させて、ホース13を介して、タンク11から管路10の内部へ送水する。加圧部が、管路10の内部への送水を続けることで、管路10の内部の圧力は、徐々に高まっていく。
 加圧部は、圧力計141によって測定された管路10の内部の圧力値が、所定の圧力値(例えば、49kPa)に到達するまで、管路10の内部への送水を続ける。加圧部は、圧力計141によって測定された管路10の内部の圧力値が、所定の圧力値に到達した場合、管路10の内部への送水を停止する。一方、加圧部は、圧力計141によって測定された管路10の内部の圧力値が、所定の圧力値に到達していない場合、管路10の内部への送水を続ける。所定の圧力値は、任意に設定される値であるが、一般的な通信管路の耐圧能力が、最大で98kPaであることを考慮すると、49kPa程度であることが好ましい。
 作業者は、圧力計141が示す目盛りを確認することによって、管路10の内部の圧力値が、所定の圧力値に到達したか否かを判定することができる。作業者は、圧力計141が示す目盛りが、例えば、49kPa以上となっている場合、管路10の内部の圧力値が、49kPaに到達したと判定することができる。作業者は、圧力計141が示す目盛りが、例えば、49kPaより小さい場合、管路10の内部の圧力値が、49kPaに到達していないと判定することができる。なお、加圧部が管路10の内部への送水を長時間続けても、管路10の内部の圧力値が所定の圧力値に到達しない場合、加圧部は、管路10の内部への送水を停止する。この場合、作業者は、圧力計141が示す目盛りを確認することによって、管路10に何らかの異常が有ると判定することができる。
 圧力計141は、加圧終了時(例えば、管路10の内部の圧力値が49kPaに到達した時)における管路10の内部の圧力値を測定する。また、圧力計141は、所定時間経過時(例えば、管路10の内部の圧力値が49kPaに到達した時から3分間が経過した時)における管路10の内部の圧力値を測定する。
 作業者は、加圧終了時における管路10の内部の圧力値と、所定時間経過時における管路10の内部の圧力値と、を比較し、所定時間経過時における管路10の内部の圧力値が、加圧終了時における管路10の内部の圧力値から低下したか否かを判定する。
 作業者は、所定時間経過時における管路10の内部の圧力値が、加圧終了時における管路10の内部の圧力値より小さい場合、管路10に異常が有ると判定する。すなわち、作業者は、所定時間経過時における管路10の内部の圧力値が加圧終了時における管路10の内部の圧力値から低下した場合、管路10に異常が有ると判定する。
 作業者は、所定時間経過時における管路10の内部の圧力値が、加圧終了時における管路10の内部の圧力値と等しい場合、管路10に異常が無いと判定する。すなわち、作業者は、所定時間経過時における管路10の内部の圧力値が加圧終了時における管路10の内部の圧力値から低下していない場合、管路10に異常が無いと判定する。なお、所定時間経過時における管路10の内部の圧力値が、加圧終了時における管路10の内部の圧力値と等しいとは、完全に等しいことを意味するものではなく、本開示の属する技術分野において、許容される範囲内の誤差を含むものとする。例えば、管路10が一般的な通信管路である場合、±1.96kPa未満の範囲内の誤差であれば、所定時間経過時における管路10の内部の圧力値は、加圧終了時における管路10の内部の圧力値と等しいとみなすものとする。
 作業者は、上述の気密試験実施装置100を用いて、管路10の所定区間において気密試験を実施することで、パイプカメラの撮影映像からは確認できない管路の異常を、確実に発見することができる。また、作業者は、所定時間経過時における管路10の内部の圧力値が、加圧終了時における管路10の内部の圧力値から低下したか否か、という定量的な指標に基づいて、管路10の異常の有無を判定することができるため、作業者ごとに点検精度がばらつくという従来の問題を解消できる。また、パイプカメラを挿入するスペースが不要となるため、管路10に太いケーブルや束ねられた複数のケーブルが収容されていても、管路10の径に依らずに管路10を高精度に点検することが可能になる。
<変形例>
 本実施形態では、管路10の所定位置を、止水栓22により一時的に閉塞又は開放する方法を一例に挙げて説明したが、管路10の所定位置を、一時的に閉塞又は開放する方法は、上述の方法に限定されない。
 上述の実施形態は代表的な例として説明したが、本開示の趣旨および範囲内で、多くの変更および置換ができることは当業者に明らかである。したがって、本発明は、上述の実施形態によって制限するものと解するべきではなく、特許請求の範囲から逸脱することなく、種々の変形や変更が可能である。例えば、実施形態のフローチャートに記載の各工程の順序は、上記に限定されず適宜変更可能である。また、複数の工程を1つに組み合わせたり、あるいは1つの工程を分割したりすることが可能である。
 10          管路
 11          タンク
 12          ポンプ
 13          ホース
 14          圧力測定装置
 15          エア抜き部
 20          ケーブル
 21,22       止水栓
 30          ロッド
 31          ロッド部
 32          ジョイント部
 33          突起部
 100         気密試験実施装置
 141         圧力計(圧力測定部)
 142         送水バルブ
 143         排水バルブ
 151         エア抜き管
 152         バルブ
 201,203     マンホール
 221         伸縮部材
 222         変形部材
 223a,223b   固定部材
 224         ネジ部
 225         ジョイント部
 226         溝部
 

Claims (7)

  1.  両端が2つのマンホールに接続される管路を検査する管路検査方法であって、
     一方のマンホールに接続される前記管路の一端から気密性が確認できる前記管路の第1位置までの区間を、前記管路の正常区間として特定する第1特定ステップと、
     他方のマンホールに接続される前記管路の他端から気密性が確認できる前記管路の第2位置までの区間を、前記管路の正常区間として特定する第2特定ステップと、
     前記第1位置から前記第2位置までの区間を、前記管路の異常区間として特定する第3特定ステップと、
     を含む、管路検査方法。
  2.  前記第1特定ステップは、
      前記管路の一端を、第1止水栓により閉塞するステップと、
      前記管路の他端から前記管路の第1所定位置まで、第2止水栓を挿入するステップと、
      前記第1所定位置を、前記第2止水栓により閉塞するステップと、
      前記一端から前記第1所定位置までの区間において気密試験を実施するステップと、
      該区間の気密性が確認できるか否かを判定する第1判定ステップと、
     を含み、
     前記第2特定ステップは、
      前記管路の他端を、前記第1止水栓により閉塞するステップと、
      前記管路の一端から前記管路の第2所定位置まで、前記第2止水栓を挿入するステップと、
      前記第2所定位置を、前記第2止水栓により閉塞するステップと、
      前記他端から前記第2所定位置までの区間において気密試験を実施するステップと、
      該区間の気密性が確認できるか否かを判定する第2判定ステップと、
     を含む、請求項1に記載の管路検査方法。
  3.  前記第1特定ステップは、
      前記第1判定ステップにおいて前記気密性が確認できると判定した場合に、前記一端から前記第1位置までの距離を測定し、前記他端から、前記第2止水栓を取り出すステップと、
      前記第1判定ステップにおいて前記気密性が確認できないと判定した場合に、前記第1所定位置から前記一端へ向かって、前記第2止水栓を移動させるステップと、
     を更に含み、
     前記第2特定ステップは、
      前記第2判定ステップにおいて前記気密性が確認できると判定した場合に、前記他端から前記第2位置までの距離を測定し、前記一端から、前記第2止水栓を取り出すステップと、
      前記第2判定ステップにおいて前記気密性が確認できないと判定した場合に、前記第2所定位置から前記他端へ向かって、前記第2止水栓を移動させるステップと、
     を更に含み、
     前記第3特定ステップは、
      前記一端から前記第1位置までの距離および前記他端から前記第2位置までの距離に基づいて、前記第1位置から前記第2位置までの距離を算出するステップ
     を更に含む、請求項2に記載の管路検査方法。
  4.  前記第2止水栓は、変形部材を備え、
     前記変形部材は、摩擦抵抗を有する材料で形成され、前記管路の径以上の径を有する、
     請求項2又は3に記載の管路検査方法。
  5.  前記第2止水栓は、前記変形部材に接する伸縮部材と、前記変形部材および前記伸縮部材を挟持して固定する固定部材と、を更に備え、
     前記第1所定位置を、前記第2止水栓により閉塞するステップ、又は、前記第2所定位置を、前記第2止水栓により閉塞するステップは、
     前記固定部材を押圧することにより前記伸縮部材が圧縮されて、前記管路の径方向外側に向かって伸びる伸張ステップを更に含む、請求項4に記載の管路検査方法。
  6.  前記第2止水栓は、前記固定部材に接合されるネジ部を更に備え、
     前記伸張ステップは、前記ネジ部により前記固定部材を押圧する、
     請求項5に記載の管路検査方法。
  7.  前記第2止水栓は、第1ジョイント部の溝部と第2ジョイント部の突起部とを嵌合させたジョイント部材を更に備え、
     前記ネジ部は前記第1ジョイント部に接合されており、
     前記伸張ステップは、前記ジョイント部材の回転に連動して前記ネジ部を回転させることにより前記固定部材を押圧する、
     請求項6に記載の管路検査方法。
     
     
PCT/JP2019/027404 2019-07-10 2019-07-10 管路検査方法 WO2021005761A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US17/597,337 US12061134B2 (en) 2019-07-10 2019-07-10 Pipeline inspection method for carrying out an airtightness inspection on a conduit
JP2021530436A JP7197818B2 (ja) 2019-07-10 2019-07-10 管路検査方法
PCT/JP2019/027404 WO2021005761A1 (ja) 2019-07-10 2019-07-10 管路検査方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/027404 WO2021005761A1 (ja) 2019-07-10 2019-07-10 管路検査方法

Publications (1)

Publication Number Publication Date
WO2021005761A1 true WO2021005761A1 (ja) 2021-01-14

Family

ID=74114438

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/027404 WO2021005761A1 (ja) 2019-07-10 2019-07-10 管路検査方法

Country Status (3)

Country Link
US (1) US12061134B2 (ja)
JP (1) JP7197818B2 (ja)
WO (1) WO2021005761A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022126368A (ja) * 2021-02-18 2022-08-30 東日本電信電話株式会社 設備位置特定装置及び設備位置特定システム

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020255266A1 (ja) * 2019-06-18 2020-12-24 日本電信電話株式会社 絶対座標取得方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08289446A (ja) * 1995-04-14 1996-11-01 Noji Tec Kk 防水栓
JPH09273975A (ja) * 1996-04-03 1997-10-21 Tokyo Gas Co Ltd 既設配管系の漏洩位置検知方法
JP2002257713A (ja) * 2001-02-27 2002-09-11 Igarashi Kogyo Kk 埋設管の異常発見方法並びにこの方法で用いられる異常発見用治具及びこの治具を備えた異常発見装置

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4373381A (en) * 1981-01-29 1983-02-15 Leon Kulp Manhole leakage indicator and method for using
JP3525005B2 (ja) * 1996-01-26 2004-05-10 東京瓦斯株式会社 既設配管系の漏洩検知方式
MXNL04000086A (es) * 2004-11-04 2006-05-09 Geo Estratos S A De C V Metodo de deteccion de fugas en tuberias subterraneas no metalicas.
JP7004915B2 (ja) * 2018-12-27 2022-02-10 日本電信電話株式会社 劣化予測方法
WO2020245992A1 (ja) * 2019-06-06 2020-12-10 日本電信電話株式会社 点検方法および点検装置

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08289446A (ja) * 1995-04-14 1996-11-01 Noji Tec Kk 防水栓
JPH09273975A (ja) * 1996-04-03 1997-10-21 Tokyo Gas Co Ltd 既設配管系の漏洩位置検知方法
JP2002257713A (ja) * 2001-02-27 2002-09-11 Igarashi Kogyo Kk 埋設管の異常発見方法並びにこの方法で用いられる異常発見用治具及びこの治具を備えた異常発見装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2022126368A (ja) * 2021-02-18 2022-08-30 東日本電信電話株式会社 設備位置特定装置及び設備位置特定システム
JP7133670B2 (ja) 2021-02-18 2022-09-08 東日本電信電話株式会社 設備位置特定装置及び設備位置特定システム

Also Published As

Publication number Publication date
US12061134B2 (en) 2024-08-13
JP7197818B2 (ja) 2022-12-28
JPWO2021005761A1 (ja) 2021-01-14
US20220268660A1 (en) 2022-08-25

Similar Documents

Publication Publication Date Title
WO2021005761A1 (ja) 管路検査方法
US10252405B2 (en) Bolt tensioning system
US5287730A (en) Plumbing leakage test apparatus and method of use
EA025782B1 (ru) Соединение труб, снабженных фланцами
KR20140015935A (ko) 배관 연결부 누설검사장치
JP2015534016A (ja) パイプ継手
KR20140004740U (ko) 닫힘 토크제어 모터구동 평형게이트 밸브용 누설검사 장치 및 검사방법
US7118137B2 (en) Testable pipe joint
KR101467744B1 (ko) 발전소 밸브 테스트 블록장치 및 방법
WO2020245992A1 (ja) 点検方法および点検装置
RU2343330C1 (ru) Способ ремонта повреждений действующих трубопроводов без их отключения
US9933103B1 (en) Apparatus and method for sealing a leak from a tubular member
RU2531126C2 (ru) Способ испытания композитно-муфтовой ремонтной конструкции для труб магистральных трубопроводов
CA3117590C (en) Flexible pipe for hydraulic fracturing applications
JP2006010713A (ja) 水圧試験器
RU2240468C1 (ru) Муфта для ремонта трубопровода и способ ее установки
Sirimanna et al. Fiber-reinforced polymer (FRP) repair systems for corroded steel pipelines
KR200489626Y1 (ko) 배관 커넥터 및 검사장치
US12092256B2 (en) Pressurized push rod system and device
KR102334207B1 (ko) 비굴착 관로 보수장치 및 관로 보수공법
CN117213743A (zh) 待试验阀门的压力试验装置及其使用方法
US20090102185A1 (en) Device for sealing untight couplings and press connections
RU2638895C2 (ru) Способ ремонта аварийного участка газопровода
CN105546271B (zh) 引流注脂补板工具
CN101571446A (zh) 带法兰管件安装质量在线试验结构

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19937354

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021530436

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19937354

Country of ref document: EP

Kind code of ref document: A1