WO2020239372A1 - Method for operating a rail vehicle - Google Patents

Method for operating a rail vehicle Download PDF

Info

Publication number
WO2020239372A1
WO2020239372A1 PCT/EP2020/062442 EP2020062442W WO2020239372A1 WO 2020239372 A1 WO2020239372 A1 WO 2020239372A1 EP 2020062442 W EP2020062442 W EP 2020062442W WO 2020239372 A1 WO2020239372 A1 WO 2020239372A1
Authority
WO
WIPO (PCT)
Prior art keywords
rail vehicle
block
information
rail
time
Prior art date
Application number
PCT/EP2020/062442
Other languages
German (de)
French (fr)
Inventor
Lothar Becke
Christian Bode
Steffen Ueckert
Original Assignee
Siemens Mobility GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Mobility GmbH filed Critical Siemens Mobility GmbH
Priority to EP20728403.5A priority Critical patent/EP3956194A1/en
Priority to CN202080049540.2A priority patent/CN114080342B/en
Publication of WO2020239372A1 publication Critical patent/WO2020239372A1/en

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L25/00Recording or indicating positions or identities of vehicles or vehicle trains or setting of track apparatus
    • B61L25/02Indicating or recording positions or identities of vehicles or vehicle trains
    • B61L25/025Absolute localisation, e.g. providing geodetic coordinates
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/30Trackside multiple control systems, e.g. switch-over between different systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/40Handling position reports or trackside vehicle data
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L3/00Devices along the route for controlling devices on the vehicle or vehicle train, e.g. to release brake, to operate a warning signal
    • B61L3/02Devices along the route for controlling devices on the vehicle or vehicle train, e.g. to release brake, to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control
    • B61L3/08Devices along the route for controlling devices on the vehicle or vehicle train, e.g. to release brake, to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control controlling electrically
    • B61L3/12Devices along the route for controlling devices on the vehicle or vehicle train, e.g. to release brake, to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control controlling electrically using magnetic or electrostatic induction; using radio waves
    • B61L3/125Devices along the route for controlling devices on the vehicle or vehicle train, e.g. to release brake, to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control controlling electrically using magnetic or electrostatic induction; using radio waves using short-range radio transmission
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L1/00Devices along the route controlled by interaction with the vehicle or vehicle train, e.g. pedals
    • B61L1/14Devices for indicating the passing of the end of the vehicle or vehicle train
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L1/00Devices along the route controlled by interaction with the vehicle or vehicle train, e.g. pedals
    • B61L1/16Devices for counting axles; Devices for counting vehicles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
    • B61L2027/202Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation using European Train Control System [ETCS]
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L27/00Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
    • B61L27/20Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation
    • B61L2027/204Trackside control of safe travel of vehicle or vehicle train, e.g. braking curve calculation using Communication-based Train Control [CBTC]
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L2205/00Communication or navigation systems for railway traffic
    • B61L2205/04Satellite based navigation systems, e.g. GPS

Definitions

  • a method for operating a rail vehicle is specified.
  • a device will be a
  • One problem to be solved consists in specifying a method for operating a rail vehicle with which safely between driving in a fixed spatial distance (English Fixed-Block-System) and driving in a moving one
  • the method is carried out while the first rail vehicle is traveling on a rail in a first direction of travel that is divided into n blocks, where n> 2 applies. Every two adjacent blocks are separated by a block boundary.
  • a second rail vehicle is also traveling on the rails, the second being
  • Rail vehicle travels in front of the first rail vehicle, seen along the first direction of travel.
  • Rail vehicle can go in the same direction or in
  • the rail vehicles preferably travel on one track with two rails.
  • the first and second rail vehicles are for Example of each rail vehicle of a train.
  • the first rail vehicle is one in the first
  • Front rail vehicle in a first train viewed in the direction of travel.
  • the second rail vehicle is, for example, a rear rail vehicle in a second train, seen in the first direction of travel.
  • the trains can be passenger and / or freight trains.
  • Rail vehicles are not related, so they are
  • the blocks are preferably each longer than the first and / or second rail vehicle or than the lengths of the associated trains, so that the first and / or second rail vehicle or the first and / or second train fit completely into one block.
  • the rail is divided into at least five or at least ten blocks, for example.
  • the block boundaries are, for example, virtual boundaries that are not visually perceptible and on which the
  • the block boundaries can be perceived optically, for example by optically perceptible signal transmitters, such as signals, at block boundaries.
  • the physical properties of the rail change on one
  • Block boundary For example, a circuit in the rail is interrupted at a block boundary.
  • the first and / or second rail vehicle is controlled, for example, by means of an automatic one
  • the method comprises a step A) in which a first piece of information
  • the first information is representative of the fact that at a first point in time a front end of the first with respect to the first direction of travel
  • Rail vehicle has crossed a block boundary between an i-th block and an i + l-th block following in the first direction of travel.
  • the first information is determined, for example, as a function of first measurement signals and then made available. The front end of the first
  • Rail vehicle is the front end seen in the first direction of travel.
  • the method comprises a step B) in which a second piece of information
  • the second information is representative of the fact that at a second point in time a rear end of the second with respect to the first direction of travel
  • Rail vehicle has crossed a block boundary between a j-th block and a j + l-th block following in the first direction of travel.
  • the second information is determined, for example, as a function of second measurement signals and then made available. The back end of the second
  • Rail vehicle is the rear end seen in the first direction of travel.
  • the method comprises a step C) in which a third piece of information in
  • the third information is representative of whether a block between and including the i + l-th and the j-th block is occupied by a further rail vehicle before and / or between the first and second points in time.
  • the first and second points in time are included between the first and second points in time. Before the first and second point in time means before both points in time.
  • the third information is determined, for example, as a function of third measurement signals.
  • the third piece of information is determined and made available with the aid of a track vacancy detection system.
  • the track vacancy detection system is based, for example, on at least one track circuit and / or on at least one audio frequency track circuit and / or on at least one axle counting circuit in order to determine the occupancy of a block, also called vacancy detection section.
  • the further rail vehicle is a rail vehicle that is different from the first and second rail vehicle and is not related to the first and second rail vehicles.
  • the other rail vehicle is, for example, a
  • the third information is, for example, representative of whether at a third point in time a block between and including the i + l-th and the j-th block is occupied by another rail vehicle.
  • the third point in time is for example at most 10 s or at most 5 s or at most 1 s before the earlier of the first and second
  • the third information is then preferably representative of whether before or at the first point in time another rail vehicle is on one of the blocks between and including the i + l-th and jl-th blocks, and whether at the second point in time another rail vehicle is on one of the blocks between including the i + 2-th block and the j-th block.
  • the first rail vehicle In the direction of travel, the first rail vehicle is not yet partially on the i + l-th block, while the second rail vehicle has already left the j-th block.
  • the third information is then, for example, representative of whether there is another rail vehicle on one of the blocks between the i + l-th block and the j block at the second point in time. If both rail vehicles are driving towards one another, the third piece of information is preferably representative of whether another rail vehicle is present before the first and second point in time.
  • step C) a third piece of information is determined which is representative of whether any block between the first and second rail vehicle, which is neither from the first nor from the second rail vehicle, before and / or between the first and second points in time
  • the method comprises a step D), in which a first operating state for the first rail vehicle as a function of the third
  • the third information is representative of that before and / or between the first and second
  • Releasing the first operating state means that the first operating state is permitted. For example, the first operating mode is switched on so that the first
  • Rail vehicle moves with changing spatial distance.
  • step D) another
  • Safety zones can be defined around each rail vehicle.
  • the rear / first rail vehicle must be a specified minimum distance from the next front / second
  • Rail vehicle This spatial distance moves with the first and second rail vehicles. In this case, several rail vehicles are allowed in one block of the rail. In order to ensure a safe spatial distance between the first rail vehicle and the second rail vehicle, the positions and preferably also the speeds of both rail vehicles should be determined continuously.
  • the first rail vehicle and the second rail vehicle can each have several block boundaries during travel
  • the third information is then preferably determined as a function of such first and second information in which the associated first and second
  • the first rail vehicle travels on a rail in a first direction of travel
  • the rail is divided into n blocks with n> 2,
  • Rail vehicle has crossed a block boundary between an i-th block and an i + l-th block following in the first direction of travel
  • Rail vehicle has crossed a block boundary between a j-th block and a j + l-th block following in the first direction of travel,
  • Information is representative of whether before and / or between the two points in time a block between including the i + l-th and the j-th block of another
  • Rail vehicle is occupied
  • D) Enabling a first operating state for the first rail vehicle as a function of the third information item if the third information item is representative of the fact that before and / or between the two points in time there was no block between and including the i + l-th and the j-th block is occupied by another rail vehicle, the first operating state being driving in a moving spatial distance.
  • the present invention is based inter alia on
  • Rail vehicles referred to. However, it can be on one
  • Rail also give non-communicating vehicles whose positions on the rail cannot be monitored. In order to switch to the first operating mode of the moving space distance, it must be ensured that between two communicating units traveling one behind the other
  • Rail vehicles is not another, non-communicating rail vehicle.
  • the route between two successive, communicating rail vehicles is free.
  • the blocks between the first and the second rail vehicle can be monitored, for example, by means of an existing track vacancy detection system.
  • Track vacancy detection systems react to both communicating and non-communicating rail vehicles.
  • track vacancy detection systems can usually only determine whether a block is occupied by a rail vehicle or not, but not how many rail vehicles are on a block. The problem therefore arises of how to find out whether there is a non-communicating rail vehicle immediately in front of the first rail vehicle on the same block or whether there is a non-communicating rail vehicle immediately behind the second rail vehicle on the same block.
  • Block border the shortest rail vehicle would no longer fit. If the track vacancy detection system then also indicates that all blocks between the first and second rail vehicles are free, it can be assumed that there are no other blocks between the first and second rail vehicles
  • Block boundary is not another rail vehicle.
  • Rail vehicle is not another rail vehicle.
  • Rail vehicle can be on the j + l-th block behind the second rail vehicle. Are now also the blocks between the first and second rail vehicles
  • a second operating state is dependent on the third
  • the operating state is driving at a fixed distance.
  • the first operating state is blocked under these conditions in step D).
  • the second operating state is referred to in English as the fixed block system. There is only one at a time
  • Blocks is recognized, for example, by means of a track vacancy detection system. If an i-th block is occupied by a rail vehicle, a rail vehicle behind it must not enter this i-th block. For example, the rear rail vehicle is shown a stop signal (red signal) at or in front of the block boundary to the i-th block. If the i-th block is not occupied, the rail vehicle closest to the i-th block may drive onto the i-th block, whatever it is
  • the first and the second information are each dependent on
  • Position information determined and provided is representative of the positions of the first and second rail vehicles on the rail.
  • the position information is preferably also representative of the speeds of the first and second
  • Rail vehicle In other words, they are Rail vehicles to communicating rail vehicles.
  • the positions and possibly the speeds of the first and second rail vehicles are determined, for example, at regular time intervals of, for example, a maximum of 1 second or a maximum of 0.1 seconds.
  • Position detection system is, for example, a GPS system that the positions of the first and second
  • the position detection system is a balise system.
  • several balises in the form of transponders, for example RFID transponders, are arranged along the rail.
  • Rail vehicles each have an antenna that can communicate with the transponders.
  • the position information is determined and provided.
  • this provides
  • Position detection system an accuracy for the positions of the rail vehicles of better than 30 m.
  • the position resolution of the position detection system is better than 30 m.
  • This can be achieved using a GPS system.
  • Such an accuracy can also be achieved by arranging balises along the rail with a distance between each two balises of at most 30 m.
  • the method is carried out on a computer.
  • steps A), B), C) and D) can only be carried out using a computer.
  • the first, second and third information as well as the position information are therefore preferably data on a computer.
  • the device comprises a processor which is set up here
  • the computer program comprises instructions which, when the computer program is executed by a computer with a processor, cause the latter, the method described here for controlling a first
  • a system is also specified.
  • the system is set up in particular to implement a system described here
  • the system comprises a first rail vehicle, a second rail vehicle, a rail that is divided into n blocks with n> 2, and a position detection system for determining the position of the first and second rail vehicles. Every two adjacent blocks are separated from one another by a block boundary.
  • the system is set up to carry out a method described here for controlling a first rail vehicle.
  • the system also includes a device as described here.
  • the device is for example part of the first rail vehicle or is, for example, an external device outside of the first and second rail vehicle.
  • the system preferably also includes a track vacancy detection system with which it can be determined during operation whether a block is occupied by a rail vehicle or not.
  • FIGS 1 to 4 embodiments of a system and a method for operating a first
  • FIG. 1 An exemplary embodiment of the system at a first point in time t1 is shown in FIG.
  • the system comprises a rail 4 on which a first rail vehicle 1 and a second rail vehicle 2 are arranged.
  • Rail vehicles 1, 2 travel from left to right.
  • the rail 4 is divided into a plurality of blocks 40, each of which is separated from one another by block boundaries 41.
  • a position detection system 5 is assigned to the rail 4.
  • the position detection system 5 is a balise system and comprises a plurality of balises which are distributed along the rail 4.
  • the first 1 and second 2 rail vehicles each include an antenna.
  • the first 1 and second 2 rail vehicles are communicating rail vehicles.
  • the front end of the first rail vehicle 1 seen in the first direction of travel 6 is just crossing the Block boundary 41 between the i-th block 40i and the i + l-th block 40i + i . This is done for example with the
  • Position detection system 5 recorded.
  • the time tl at which this happens is also recorded, for example
  • the accuracy with which the position measurement takes place is determined in the present case by the distance between two balises and is preferably better than 30 m. Depending on the
  • Measurement results of the position detection system 5 are then provided with a first piece of information II (FIGS. 5, 6) which is representative of the fact that at the first point in time tl the front end of the first rail vehicle 1 is the block boundary between the i-th block 40i and the i + l -th block 40i + i has crossed.
  • This first information II is provided, for example, in the form of computer data.
  • the fact that the front end of the first rail vehicle 1 is just crossing the block boundary 41 at the first point in time t1 means that no further rail vehicle can be present on the i-th block 40i between the front end of the first rail vehicle 1 and the block boundary 41.
  • FIG. 2 the system is shown at a later point in time t2. Both the first rail vehicle 1 and the second rail vehicle 2 have moved to the right along the rail 4 (first direction of travel 6).
  • Time t2 is the time at which the rear end of the second with respect to the first direction of travel 6
  • Rail vehicle 2 crosses the block boundary 41 between the j-th block 40 j and the j + l-th block 40 + i .
  • a second item of information 12 (FIGS. 5, 6) is then determined and provided therefrom, which is representative of the fact that at the second point in time t2 the rear end of the second rail vehicle 2 crosses the block boundary 41 between the jth block 40 j and the j + Crossed l-th block 40 + i .
  • a train detection system which is not shown in the figures can now be determined whether a block 40 40i + i and the j-th block 40 j between the including i + l-th block, that is, a block 40
  • first 1 and the second 2 rail vehicle which is not occupied by either the first 1 or the second 2 rail vehicle, is occupied by another rail vehicle.
  • third information 13 (FIGS. 5, 6) is then determined and provided as a function of the first II and second 12 information, the third information 13 being representative of whether before and / or between the first point in time t 1 and the second Time t2 a block 40 between and including the i + l-th 40i + i and the j-th block 40 j is occupied by a further rail vehicle. In the present case, there is no further rail vehicle between the first rail vehicle 1 and the second
  • a first operating state ZI for the first rail vehicle 1 is enabled as a function of the third information item 13.
  • Operating state ZI is driving in a migratory
  • FIG. 3 shows a situation in which the first operating state ZI should / must not be enabled for the first rail vehicle 1. As can be seen, is between the first rail vehicle 1 and the second
  • Rail vehicle 2 another rail vehicle 3 on the rail 4.
  • Time tl the front end of the first rail vehicle 1 the block boundary 41 between the i-th block 40i and the i + 1-th block 40i + i .
  • a first piece of information II which is representative of this crossing at time t1, is provided.
  • the second is at the first point in time tl
  • a track vacancy detection system can
  • a third item of information 13 can be determined and provided which is representative of the fact that a block between and including the i + l-th block 40i + i and the j-th block 40 j is occupied by a further rail vehicle 3.
  • the first operating state ZI for the first rail vehicle 1 is then blocked, for example.
  • a second operating state Z2 is activated for the first rail vehicle 1, the second
  • the operating state is driving at a fixed spacing (fixed-block operating state).
  • Rail vehicle is not a balise system, but a
  • Position detection system 5 in the form of a GPS system
  • Figure 5 is a flow chart for a first
  • FIGS. 1 and 2 Exemplary embodiment of the method for operating a first rail vehicle is shown.
  • the flowchart relates refer, for example, to the situation in FIGS. 1 and 2 or FIGS. 3 and 4.
  • the second information 12 is provided, which is representative of the fact that at the second point in time t2 a rear end of the second
  • Rail vehicle 2 has crossed a block boundary 41 between a j-th block 40 j and a j + l-th block 40 + i .
  • third information 13 is determined as a function of the first II and second 12 information, which is representative of whether before and / or between the two times t1, t2 a block 40 between and including the i + l- th 40i + i and the j-th block 40 j is occupied by another rail vehicle.
  • the first operating state ZI for the first rail vehicle 1 is then set as a function of the third
  • the third information 13 is representative of the fact that before and / or between the times t1, t2 no block 40 between and including the i + l-th 40i + i and the j-th block 40 j is occupied by another rail vehicle is released.
  • the first operating state ZI is enabled because there is no other
  • step B) is carried out before step A) because, for example, the second point in time t2 is before the first point in time t1.
  • Steps A) to D) are for example on a

Abstract

The invention relates to a method for operating a rail vehicle. A first (1) and a second (2) rail vehicle travel on a rail (4) subdivided into n blocks (40). The method comprises: A) providing a first item of information, which represents that the first rail vehicle crosses a block boundary (41) between an i-th block and an i+1-th block at a first time (t1), B) providing a second item of information, which represents that the second rail vehicle crosses a block boundary between a j-th block and a j+1-th block at a second time (t2), C) determining a third item of information, which represents whether a block between the i+1-th and the j-th block is occupied by a further rail vehicle before and/or between the two times, D) releasing a first operating state for the first rail vehicle subject to the third item of information, if the third item of information represents that no block is occupied, the first operating state being travelling at a moving spatial distance.

Description

Beschreibung description
Verfahren zum Betreiben eines Schienenfahrzeuges Method for operating a rail vehicle
Es wird ein Verfahren zum Betreiben eines Schienenfahrzeuges angegeben. Darüber hinaus werden eine Vorrichtung, ein A method for operating a rail vehicle is specified. In addition, a device will be a
Computerprogramm, ein computerlesbares Speichermedium und ein System angegeben. Computer program, a computer-readable storage medium and a system are specified.
Eine zu lösende Aufgabe besteht darin, ein Verfahren zum Betreiben eines Schienenfahrzeuges anzugeben, mit dem sicher zwischen einem Fahren im festen Raumabstand (Englisch Fixed- Block-System) und einem Fahren in einem wandernden One problem to be solved consists in specifying a method for operating a rail vehicle with which safely between driving in a fixed spatial distance (English Fixed-Block-System) and driving in a moving one
Raumabstand (Englisch Moving-Block-System) gewechselt werden kann. Weitere zu lösende Aufgaben bestehen darin, eine Spatial spacing (English moving block system) can be changed. Other tasks to be solved are to create a
Vorrichtung, ein Computerprogramm, ein computerlesbares Device, a computer program, a computer readable
Speichermedium und ein System zur Durchführung eines solchen Verfahrens anzugeben. Specify storage medium and a system for carrying out such a method.
Gemäß zumindest einer Ausführungsform des Verfahrens zum Betreiben eines ersten Schienenfahrzeuges wird das Verfahren ausgeführt, während das erste Schienenfahrzeug auf einer Schiene in eine erste Fahrtrichtung fährt, die in n Blöcke unterteilt ist, wobei n > 2 gilt. Je zwei benachbarte Blöcke sind durch eine Blockgrenze getrennt. Auf der Schiene fährt zudem ein zweites Schienenfahrzeug, wobei das zweite According to at least one embodiment of the method for operating a first rail vehicle, the method is carried out while the first rail vehicle is traveling on a rail in a first direction of travel that is divided into n blocks, where n> 2 applies. Every two adjacent blocks are separated by a block boundary. A second rail vehicle is also traveling on the rails, the second being
Schienenfahrzeug entlang der ersten Fahrtrichtung gesehen vor dem ersten Schienenfahrzeug fährt. Das zweite Rail vehicle travels in front of the first rail vehicle, seen along the first direction of travel. The second
Schienenfahrzeug kann in dieselbe Richtung oder in Rail vehicle can go in the same direction or in
entgegengesetzte Richtung zum ersten Schienenfahrzeug fahren. drive in the opposite direction to the first rail vehicle.
Bevorzugt fahren die Schienenfahrzeuge auf einem Gleis mit zwei Schienen. Das erste und zweite Schienenfahrzeug sind zum Beispiel jeweils Schienenfahrzeuge eines Zuges. Das erste Schienenfahrzeug ist zum Beispiel ein in der ersten The rail vehicles preferably travel on one track with two rails. The first and second rail vehicles are for Example of each rail vehicle of a train. For example, the first rail vehicle is one in the first
Fahrtrichtung gesehen vorderes Schienenfahrzeug in einem ersten Zug. Das zweite Schienenfahrzeug ist zum Beispiel ein in der ersten Fahrtrichtung gesehen hinteres Schienenfahrzeug in einem zweiten Zug. Die Züge können Personen- und/oder Gütertransportzüge sein. Das erste und das zweite Front rail vehicle in a first train viewed in the direction of travel. The second rail vehicle is, for example, a rear rail vehicle in a second train, seen in the first direction of travel. The trains can be passenger and / or freight trains. The first and the second
Schienenfahrzeug hängen nicht zusammen, sind also Rail vehicles are not related, so they are
insbesondere nicht einem gemeinsamen Zug zugeordnet. in particular not assigned to a common train.
Die Blöcke sind bevorzugt jeweils länger als das erste und/oder zweite Schienenfahrzeug beziehungsweise als die Längen der zugeordneten Züge, sodass das erste und/oder zweite Schienenfahrzeug beziehungsweise der erste und/oder zweite Zug vollständig in einen Block passen. Die Schiene ist beispielsweise in zumindest fünf oder zumindest zehn Blöcke unterteilt . The blocks are preferably each longer than the first and / or second rail vehicle or than the lengths of the associated trains, so that the first and / or second rail vehicle or the first and / or second train fit completely into one block. The rail is divided into at least five or at least ten blocks, for example.
Die Blockgrenzen sind beispielsweise virtuelle Grenzen, die optisch nicht wahrnehmbar sind und an denen sich die The block boundaries are, for example, virtual boundaries that are not visually perceptible and on which the
physikalischen Eigenschaften der Schiene nicht ändern. do not change the physical properties of the rail.
Alternativ sind die Blockgrenzen optisch wahrnehmbar, zum Beispiel durch optisch wahrnehmbare Signalgeber, wie Signale, an Blockgrenzen. Alternativ oder zusätzlich ändern sich die physikalischen Eigenschaften der Schiene an einer Alternatively, the block boundaries can be perceived optically, for example by optically perceptible signal transmitters, such as signals, at block boundaries. Alternatively or additionally, the physical properties of the rail change on one
Blockgrenze. Zum Beispiel ist ein Stromkreis in der Schiene an einer Blockgrenze unterbrochen. Block boundary. For example, a circuit in the rail is interrupted at a block boundary.
Die Steuerung des ersten und/oder zweiten Schienenfahrzeugs erfolgt beispielsweise mittels eines automatischen The first and / or second rail vehicle is controlled, for example, by means of an automatic one
Zugbeeinflussungssystems, Englisch Communication-Based Train Control, kurz CBTC. Die Steuerung des ersten und/oder zweiten Schienenfahrzeugs erfolgt beispielsweise mittels ETCS Level 3 Hybrid . Train control system, English Communication-Based Train Control, CBTC for short. The control of the first and / or second Rail vehicle is carried out using ETCS Level 3 Hybrid, for example.
Gemäß zumindest einer Ausführungsform umfasst das Verfahren einen Schritt A) , in dem eine erste Information According to at least one embodiment, the method comprises a step A) in which a first piece of information
bereitgestellt wird. Die erste Information ist repräsentativ dafür, dass zu einem ersten Zeitpunkt ein bezüglich der ersten Fahrtrichtung vorderes Ende des ersten provided. The first information is representative of the fact that at a first point in time a front end of the first with respect to the first direction of travel
Schienenfahrzeugs eine Blockgrenze zwischen einem i-ten Block und einem in der ersten Fahrtrichtung darauffolgenden i+l-ten Block überquert hat. Die erste Information wird zum Beispiel in Abhängigkeit von ersten Messsignalen ermittelt und dann bereitgestellt. Das vordere Ende des ersten Rail vehicle has crossed a block boundary between an i-th block and an i + l-th block following in the first direction of travel. The first information is determined, for example, as a function of first measurement signals and then made available. The front end of the first
Schienenfahrzeuges ist das in der ersten Fahrtrichtung gesehene vordere Ende. Rail vehicle is the front end seen in the first direction of travel.
Gemäß zumindest einer Ausführungsform umfasst das Verfahren einen Schritt B) , in dem eine zweite Information According to at least one embodiment, the method comprises a step B) in which a second piece of information
bereitgestellt wird. Die zweite Information ist repräsentativ dafür, dass zu einem zweiten Zeitpunkt ein bezüglich der ersten Fahrtrichtung hinteres Ende des zweiten provided. The second information is representative of the fact that at a second point in time a rear end of the second with respect to the first direction of travel
Schienenfahrzeugs eine Blockgrenze zwischen einem j-ten Block und einem in der ersten Fahrtrichtung darauffolgenden j+l-ten Block überquert hat. Die zweite Information wird zum Beispiel in Abhängigkeit von zweiten Messsignalen ermittelt und dann bereitgestellt. Das hintere Ende des zweiten Rail vehicle has crossed a block boundary between a j-th block and a j + l-th block following in the first direction of travel. The second information is determined, for example, as a function of second measurement signals and then made available. The back end of the second
Schienenfahrzeuges ist das in der ersten Fahrtrichtung gesehene hintere Ende. Rail vehicle is the rear end seen in the first direction of travel.
„Vor" und „hinter" sowie „vordere (s) (r)" und „hintere (s) (r)" beziehen sich, soweit räumliche Anordnungen gemeint sind, hier und im Folgenden auf Anordnungen in Bezug auf die erste Fahrtrichtung . Der erste Zeitpunkt liegt zum Beispiel vor oder nach dem zweiten Zeitpunkt. "In front of" and "behind" as well as "front (s)" and "rear (s)" refer, as far as spatial arrangements are meant, here and in the following to arrangements relating to the first direction of travel. The first point in time is before or after the second point in time, for example.
Gemäß zumindest einer Ausführungsform umfasst das Verfahren einen Schritt C) , in dem eine dritte Information in According to at least one embodiment, the method comprises a step C) in which a third piece of information in
Abhängigkeit von der ersten und zweiten Information ermittelt wird. Die dritte Information ist repräsentativ dafür, ob vor und/oder zwischen dem ersten und zweiten Zeitpunkt ein Block zwischen einschließlich dem i+l-ten und dem j-ten Block von einem weiteren Schienenfahrzeug besetzt ist. Zwischen dem ersten und zweiten Zeitpunkt schließt den ersten und zweiten Zeitpunkt ein. Vor dem ersten und zweiten Zeitpunkt meint vor beiden Zeitpunkten. Is determined depending on the first and second information. The third information is representative of whether a block between and including the i + l-th and the j-th block is occupied by a further rail vehicle before and / or between the first and second points in time. The first and second points in time are included between the first and second points in time. Before the first and second point in time means before both points in time.
Die dritte Information wird zum Beispiel in Abhängigkeit von dritten Messsignalen ermittelt. Beispielsweise wird die dritte Information mithilfe einer Gleisfreimeldeanlage ermittelt und bereitgestellt. Die Gleisfreimeldeanlage basiert zum Beispiel auf zumindest einem Gleisstromkreis und/oder auf zumindest einem Tonfrequenzgleisstromkreis und/oder auf zumindest einem Achszählkreis, um die Besetzung eines Blocks, auch Freimeldeabschnitt genannt, zu ermitteln. The third information is determined, for example, as a function of third measurement signals. For example, the third piece of information is determined and made available with the aid of a track vacancy detection system. The track vacancy detection system is based, for example, on at least one track circuit and / or on at least one audio frequency track circuit and / or on at least one axle counting circuit in order to determine the occupancy of a block, also called vacancy detection section.
Das weitere Schienenfahrzeug ist ein vom ersten und zweiten Schienenfahrzeug verschiedenes Schienenfahrzeug und hängt nicht mit dem ersten und zweiten Schienenfahrzeug zusammen. Das weitere Schienenfahrzeug ist zum Beispiel ein The further rail vehicle is a rail vehicle that is different from the first and second rail vehicle and is not related to the first and second rail vehicles. The other rail vehicle is, for example, a
Bausteilenfahrzeug . Component vehicle.
Die dritte Information ist beispielsweise repräsentativ dafür, ob zu einem dritten Zeitpunkt ein Block zwischen einschließlich dem i+l-ten und dem j-ten Block von einem weiteren Schienenfahrzeug besetzt ist. Der dritte Zeitpunkt liegt zum Beispiel höchstens 10 s oder höchstens 5 s oder höchstens 1 s vor dem früheren des ersten und zweiten The third information is, for example, representative of whether at a third point in time a block between and including the i + l-th and the j-th block is occupied by another rail vehicle. The third point in time is for example at most 10 s or at most 5 s or at most 1 s before the earlier of the first and second
Zeitpunkts . Point in time.
Ob für die dritte Information Zeitpunkte vor und/oder Whether for the third information point in time before and / or
zwischen dem ersten und zweiten Zeitpunkt betrachtet werden, kann auch abhängig von den Fahrtrichtungen der beiden between the first and second point in time can also be viewed depending on the directions of travel of the two
Schienenfahrzeuge gewählt werden. Rail vehicles are selected.
Liegt der erste Zeitpunkt zum Beispiel vor dem zweiten For example, if the first point in time is before the second
Zeitpunkt und fahren beide Schienenfahrzeuge in dieselbe erste Fahrtrichtung, so befindet sich zumindest ein Teil des ersten Schienenfahrzeugs schon auf dem i+l-ten Block, während das zweite Schienenfahrzeug zumindest teilweise noch auf dem j-ten Block ist. Die dritte Information ist dann bevorzugt repräsentativ dafür, ob vor oder zum ersten Zeitpunkt ein weiteres Schienenfahrzeug auf einem der Blöcke zwischen einschließlich dem i+l-ten und j-l-ten Block ist, und ob zum zweiten Zeitpunkt ein weiteres Schienenfahrzeug auf einem der Blöcke zwischen einschließlich dem i+2-ten Block und dem j- ten Block ist. Time and both rail vehicles are driving in the same first direction of travel, at least part of the first rail vehicle is already on the i + l-th block, while the second rail vehicle is at least partially still on the j-th block. The third information is then preferably representative of whether before or at the first point in time another rail vehicle is on one of the blocks between and including the i + l-th and jl-th blocks, and whether at the second point in time another rail vehicle is on one of the blocks between including the i + 2-th block and the j-th block.
Liegt der erste Zeitpunkt nach dem zweiten Zeitpunkt und fahren beide Schienenfahrzeuge in derselben ersten If the first point in time is after the second point in time and both rail vehicles travel in the same first time
Fahrtrichtung, so befindet sich das erste Schienenfahrzeug auch noch nicht teilweise auf dem i+l-ten Block, während das zweite Schienenfahrzeug den j-ten Block schon verlassen hat. Die dritte Information ist dann beispielsweise repräsentativ dafür, ob zum zweiten Zeitpunkt ein weiteres Schienenfahrzeug auf einem der Blöcke zwischen einschließlich dem i+l-ten Block und dem j -Block vorhanden ist. Fahren beide Schienenfahrzeuge aufeinander zu, so ist die dritte Information bevorzugt repräsentativ, ob vor dem ersten und zweiten Zeitpunkt ein weiteres Schienenfahrzeug vorhanden ist . In the direction of travel, the first rail vehicle is not yet partially on the i + l-th block, while the second rail vehicle has already left the j-th block. The third information is then, for example, representative of whether there is another rail vehicle on one of the blocks between the i + l-th block and the j block at the second point in time. If both rail vehicles are driving towards one another, the third piece of information is preferably representative of whether another rail vehicle is present before the first and second point in time.
Es ist möglich, dass j=i+l gilt. It is possible that j = i + l.
Anders ausgedrückt wird im Schritt C) eine dritte Information ermittelt, die repräsentativ dafür ist, ob vor und/oder zwischen dem ersten und zweiten Zeitpunkt irgendein Block zwischen dem ersten und zweiten Schienenfahrzeug, der weder von dem ersten noch von dem zweiten Schienenfahrzeug In other words, in step C) a third piece of information is determined which is representative of whether any block between the first and second rail vehicle, which is neither from the first nor from the second rail vehicle, before and / or between the first and second points in time
teilweise oder vollständig besetzt ist, von einem weiteren Schienenfahrzeug besetzt ist. is partially or fully occupied, is occupied by another rail vehicle.
Gemäß zumindest einer Ausführungsform umfasst das Verfahren einen Schritt D) , in dem ein erster Betriebszustand für das erste Schienenfahrzeug in Abhängigkeit von der dritten According to at least one embodiment, the method comprises a step D), in which a first operating state for the first rail vehicle as a function of the third
Information, falls die dritte Information repräsentativ dafür ist, dass vor und/oder zwischen dem ersten und zweiten Information if the third information is representative of that before and / or between the first and second
Zeitpunkt kein Block zwischen einschließlich dem i+l-ten und dem j-ten Block von einem weiteren Schienenfahrzeug besetzt ist, freigegeben wird, wobei der erste Betriebszustand ein Fahren in einem wandernden Raumabstand ist. Time no block between and including the i + l-th and the j-th block is occupied by a further rail vehicle, is released, the first operating state being driving in a moving spatial distance.
Anders ausgedrückt wird der erste Betriebszustand In other words, it is the first operating state
freigegeben, wenn die dritte Information vorliegt und wenn die dritte Information repräsentativ dafür ist, dass vor und/oder zwischen dem ersten und zweiten Zeitpunkt kein Block zwischen einschließlich dem i+l-ten und dem j-ten Block von einem weiteren Schienenfahrzeug besetzt ist. Freigeben des ersten Betriebszustandes meint, dass der erste Betriebszustand zugelassen wird. Zum Beispiel wird der erste Betriebszustand eingeschaltet, sodass das erste released when the third information is available and when the third information is representative of the fact that before and / or between the first and second times no block between and including the i + l-th and j-th blocks is occupied by another rail vehicle. Releasing the first operating state means that the first operating state is permitted. For example, the first operating mode is switched on so that the first
Schienenfahrzeug mit wanderndem Raumabstand fährt. Rail vehicle moves with changing spatial distance.
Insbesondere wird im Schritt D) dann von einem anderen In particular, in step D) another
Betriebszustand in den ersten Betriebszustand übergegangen oder der erste Betriebszustand wird beibehalten. Operating state changed to the first operating state or the first operating state is retained.
In der Eisenbahnsignaltechnik ist ein Betriebszustand des Fahrens im wandernden Raumabstand, Englisch Moving-Block- System, ein Signalblocksystem, bei dem in Echtzeit In the railway signaling technology is an operating state of driving in the moving distance, English moving block system, a signal block system in which in real time
Sicherheitszonen um jedes Schienenfahrzeug definiert werden. Das hintere/erste Schienenfahrzeug muss einen vorgegebenen Mindestabstand zu dem nächsten vorderen/ zweiten Safety zones can be defined around each rail vehicle. The rear / first rail vehicle must be a specified minimum distance from the next front / second
Schienenfahrzeug einhalten. Es gibt also einen Raumabstand zwischen dem hinteren Schienenfahrzeug und dem vorderen Comply with the rail vehicle. So there is a space between the rear rail vehicle and the front one
Schienenfahrzeug. Dieser Raumabstand wandert mit dem ersten und zweiten Schienenfahrzeug mit. In diesem Fall sind auch mehrere Schienenfahrzeuge in einem Block der Schiene erlaubt. Um einen sicheren Raumabstand des ersten Schienenfahrzeugs zum zweiten Schienenfahrzeug zu gewährleisten, sollten die Positionen und bevorzugt auch die Geschwindigkeiten beider Schienenfahrzeuge ständig ermittelt werden. Rail vehicle. This spatial distance moves with the first and second rail vehicles. In this case, several rail vehicles are allowed in one block of the rail. In order to ensure a safe spatial distance between the first rail vehicle and the second rail vehicle, the positions and preferably also the speeds of both rail vehicles should be determined continuously.
Das erste Schienenfahrzeug und das zweite Schienenfahrzeug können während der Fahrt jeweils mehrere Blockgrenzen The first rail vehicle and the second rail vehicle can each have several block boundaries during travel
überqueren. Bei dem Verfahren werden dann mehrere erste cross. In the process, several first
Informationen mit jeweils ersten Zeitpunkten und/oder mehrere zweite Informationen mit jeweils zweiten Zeitpunkten Information with first points in time and / or a plurality of second pieces of information each with second points in time
bereitgestellt. Die dritte Information wird dann bevorzugt in Abhängigkeit von solchen ersten und zweiten Informationen ermittelt, bei denen der zugehörige erste und zweite provided. The third information is then preferably determined as a function of such first and second information in which the associated first and second
Zeitpunkt am nächsten beieinander liegen. In Abhängigkeit von dieser dritten Information wird dann der Schritt D) Time are closest to each other. In dependence of this third information is then step D)
ausgeführt . executed.
In mindestens einer Ausführungsform des Verfahrens zum In at least one embodiment of the method for
Betreiben eines ersten Schienenfahrzeuges, wobei Operating a first rail vehicle, wherein
- das erste Schienenfahrzeug auf einer Schiene in eine erste Fahrtrichtung fährt, - the first rail vehicle travels on a rail in a first direction of travel,
- die Schiene in n Blöcke unterteilt ist mit n > 2, - the rail is divided into n blocks with n> 2,
- je zwei benachbarte Blöcke durch eine Blockgrenze getrennt sind, - every two neighboring blocks are separated by a block boundary,
- auf der Schiene ein zweites Schienenfahrzeug fährt, - a second rail vehicle is traveling on the rail,
- das zweite Schienenfahrzeug entlang der ersten - the second rail vehicle along the first
Fahrtrichtung gesehen vor dem ersten Schienenfahrzeug fährt, werden bei dem Verfahren folgende Schritte ausgeführt: Seen in the direction of travel before the first rail vehicle travels, the following steps are carried out in the method:
A) Bereitstellen einer ersten Information, die repräsentativ dafür ist, dass zu einem ersten Zeitpunkt ein bezüglich der ersten Fahrtrichtung vorderes Ende des ersten A) Providing a first piece of information which is representative of the fact that at a first point in time a with respect to the first direction of travel an end of the first
Schienenfahrzeugs eine Blockgrenze zwischen einem i-ten Block und einem in der ersten Fahrtrichtung darauffolgenden i+l-ten Block überquert hat, Rail vehicle has crossed a block boundary between an i-th block and an i + l-th block following in the first direction of travel,
B) Bereitstellen einer zweiten Information, die repräsentativ dafür ist, dass zu einem zweiten Zeitpunkt ein bezüglich der ersten Fahrtrichtung hinteres Ende des zweiten B) providing a second piece of information which is representative of the fact that at a second point in time a rear end of the second with respect to the first direction of travel
Schienenfahrzeugs eine Blockgrenze zwischen einem j-ten Block und einem in der ersten Fahrtrichtung darauffolgenden j+l-ten Block überquert hat, Rail vehicle has crossed a block boundary between a j-th block and a j + l-th block following in the first direction of travel,
C) Ermitteln einer dritten Information in Abhängigkeit von der ersten und zweiten Information, wobei die dritte C) determining a third piece of information as a function of the first and second pieces of information, the third
Information repräsentativ dafür ist, ob vor und/oder zwischen den beiden Zeitpunkten ein Block zwischen einschließlich dem i+l-ten und dem j-ten Block von einem weiteren Information is representative of whether before and / or between the two points in time a block between including the i + l-th and the j-th block of another
Schienenfahrzeug besetzt ist, D) Freigeben eines ersten Betriebszustands für das erste Schienenfahrzeug in Abhängigkeit von der dritten Information, falls die dritte Information repräsentativ dafür ist, dass vor und/oder zwischen den beiden Zeitpunkten kein Block zwischen einschließlich dem i+l-ten und dem j-ten Block von einem weiteren Schienenfahrzeug besetzt ist, wobei der erste Betriebszustand ein Fahren in einem wandernden Raumabstand ist . Rail vehicle is occupied, D) Enabling a first operating state for the first rail vehicle as a function of the third information item if the third information item is representative of the fact that before and / or between the two points in time there was no block between and including the i + l-th and the j-th block is occupied by another rail vehicle, the first operating state being driving in a moving spatial distance.
Die vorliegende Erfindung beruht unter anderem auf der The present invention is based inter alia on
Erkenntnis, dass der Betrieb von Schienenfahrzeugen im Realization that the operation of rail vehicles in
Betriebsmodus des wandernden Raumabstands möglich ist, wenn die Positionen der Schienenfahrzeuge und damit der Abstand zwischen ihnen bekannt sind und überwacht werden. Solche Schienenfahrzeuge werden als kommunizierende Operating mode of the moving spatial distance is possible if the positions of the rail vehicles and thus the distance between them are known and monitored. Such rail vehicles are called communicating
Schienenfahrzeuge bezeichnet. Jedoch kann es auf einer Rail vehicles referred to. However, it can be on one
Schiene auch nicht-kommunizierende Fahrzeuge geben, deren Positionen auf der Schiene nicht überwacht werden können. Um nun in den ersten Betriebsmodus des wandernden Raumabstands überzugehen, muss sichergestellt werden, dass zwischen je zwei hintereinanderfahrenden, kommunizierenden Rail also give non-communicating vehicles whose positions on the rail cannot be monitored. In order to switch to the first operating mode of the moving space distance, it must be ensured that between two communicating units traveling one behind the other
Schienenfahrzeugen kein weiteres, nicht-kommunizierendes Schienenfahrzeug ist. Rail vehicles is not another, non-communicating rail vehicle.
Dies kann zum Beispiel dadurch sichergestellt werden, dass vor dem Freigeben des ersten Betriebszustands alle nicht kommunizierenden Schienenfahrzeuge von der Schiene oder einem ganzen Schienennetzwerk entfernt werden. This can be ensured, for example, by removing all non-communicating rail vehicles from the rail or an entire rail network before the first operating state is released.
Möchte man das Entfernen aller nicht-kommunizierenden Would you like removing all non-communicating
Schienenfahrzeuge vermeiden, muss man ermitteln, ob die Avoid rail vehicles, one must determine whether the
Strecke zwischen zwei aufeinanderfolgenden, kommunizierenden Schienenfahrzeugen frei ist. Die Blöcke zwischen dem ersten und zweiten Schienenfahrzeug können zum Beispiel mittels einer vorhandenen Gleisfreimeldeanlage überwacht werden. The route between two successive, communicating rail vehicles is free. The blocks between the first and the second rail vehicle can be monitored, for example, by means of an existing track vacancy detection system.
Gleisfreimeldeanlagen reagieren ebenso auf kommunizierende wie auch auf nicht-kommunizierende Schienenfahrzeuge. Jedoch können Gleisfreimeldeanlagen üblicherweise nur ermitteln, ob ein Block mit einem Schienenfahrzeug besetzt ist oder nicht, nicht aber wie viele Schienenfahrzeuge auf einem Block sind. Daher stellt sich das Problem, wie man herausfindet, ob unmittelbar vor dem ersten Schienenfahrzeug auf demselben Block ein nicht-kommunizierendes Schienenfahrzeug ist oder ob unmittelbar hinter dem zweiten Schienenfahrzeug auf demselben Block ein nicht-kommunizierendes Schienenfahrzeug ist. Track vacancy detection systems react to both communicating and non-communicating rail vehicles. However, track vacancy detection systems can usually only determine whether a block is occupied by a rail vehicle or not, but not how many rail vehicles are on a block. The problem therefore arises of how to find out whether there is a non-communicating rail vehicle immediately in front of the first rail vehicle on the same block or whether there is a non-communicating rail vehicle immediately behind the second rail vehicle on the same block.
Eine Möglichkeit, dies alleine durch die Gleisfreimeldeanlage zu ermitteln, besteht darin, das vordere Ende des ersten Schienenfahrzeugs so nahe an die nächste Blockgrenze zu fahren, dass das kürzeste Schienenfahrzeug nicht mehr One possibility of determining this by the track vacancy detection system alone is to drive the front end of the first rail vehicle so close to the next block boundary that the shortest rail vehicle is no longer
zwischen das vordere Ende und die Blockgrenze passen würde. Dann ist sichergestellt, dass vor dem ersten Schienenfahrzeug kein weiteres Schienenfahrzeug vollständig auf demselben Block angeordnet sein kann. In analoger Weise kann das hintere Ende des zweiten Schienenfahrzeugs so nahe an die dahinterliegende Blockgrenze gebracht werden beziehungsweise maximal so weit von der dahinterliegenden Blockgrenze would fit between the front end and the block boundary. It is then ensured that no further rail vehicle can be arranged completely on the same block in front of the first rail vehicle. In an analogous manner, the rear end of the second rail vehicle can be brought as close to the block boundary behind it or at most as far from the block boundary behind it
weggefahren werden, dass zwischen das hintere Ende des zweiten Schienenfahrzeugs und die dahinterliegende be driven away that between the rear end of the second rail vehicle and the one behind it
Blockgrenze das kürzeste Schienenfahrzeug nicht mehr passen würde. Zeigt die Gleisfreimeldeanlage dann auch noch an, dass alle Blöcke zwischen dem ersten und zweiten Schienenfahrzeug frei sind, so kann davon ausgegangen werden, dass zwischen dem ersten und zweiten Schienenfahrzeug kein weiteres Block border the shortest rail vehicle would no longer fit. If the track vacancy detection system then also indicates that all blocks between the first and second rail vehicles are free, it can be assumed that there are no other blocks between the first and second rail vehicles
vorhanden ist. Dieses Verfahren erfordert im Allgemeinen, dass das erste und zweite Schienenfahrzeug langsam an die entsprechenden Blockgrenzen angenähert werden, denn die is available. This method generally requires the first and second rail vehicles to slowly approach the corresponding block boundaries are approximated because the
Signale von Gleisfreimeldeanlagen können erhebliche zeitliche Verzögerungen aufweisen. Signals from track vacancy detection systems can have considerable time delays.
Bei der vorliegenden Erfindung wird von der Idee Gebrauch gemacht, sich nicht oder nicht nur auf eine In the present invention, use is made of the idea of not focusing on one or only one
Gleisfreimeldeanlage zu verlassen, sondern zusätzlich die Kenntnis über Betriebsabläufe, wie die geltenden Regeln für das Annähern an eine Blockgrenze, auszunützen. Das vordere Ende eines Schienenfahrzeuges wird nämlich eine Blockgrenze nur überqueren, wenn zwischen dem vorderen Ende und der To leave the track vacancy detection system, but also to use the knowledge of operational processes, such as the applicable rules for approaching a block boundary. The front end of a rail vehicle will only cross a block boundary if between the front end and the
Blockgrenze kein weiteres Schienenfahrzeug ist. Das Block boundary is not another rail vehicle. The
Überqueren einer Blockgrenze zwischen einem i-ten und i+l-ten Block durch das vordere Ende des ersten Schienenfahrzeugs ist also ein sicheres Indiz dafür, dass zu diesem Zeitpunkt Crossing a block boundary between an i-th and i + l-th block by the front end of the first rail vehicle is therefore a sure indicator that at this point in time
(erster Zeitpunkt) auf dem i-ten Block vor dem ersten (first point in time) on the i-th block before the first
Schienenfahrzeug kein weiteres Schienenfahrzeug ist. Rail vehicle is not another rail vehicle.
Ebenso kann zum Zeitpunkt (zweiter Zeitpunkt) des Überquerens der Blockgrenze zwischen dem j-ten oder j+l-ten durch das hintere Ende des zweiten Schienenfahrzeugs davon ausgegangen werden, dass zu diesem Zeitpunkt kein weiteres Likewise, at the point in time (second point in time) when the block boundary is crossed between the jth or j + lth by the rear end of the second rail vehicle, it can be assumed that at this point in time no further
Schienenfahrzeug auf dem j+l-ten Block hinter dem zweiten Schienenfahrzeug sein kann. Sind nun auch noch die Blöcke zwischen den vom ersten und zweiten Schienenfahrzeug Rail vehicle can be on the j + l-th block behind the second rail vehicle. Are now also the blocks between the first and second rail vehicles
besetzten Blöcken frei von weiteren Schienenfahrzeugen, was zum Beispiel durch die Gleisfreimeldeanlage feststellbar ist, kann davon ausgegangen werden, dass zwischen dem ersten und zweiten Schienenfahrzeug kein weiteres Schienenfahrzeug vorhanden ist. Ein Freigeben des ersten Betriebszustands für das erste Schienenfahrzeug ist dann sicher. Das erste und zweite Schienenfahrzeug müssen dafür auch nicht extra langsam bewegt werden. Gemäß zumindest einer Ausführungsform wird im Schritt D) ein zweiter Betriebszustand in Abhängigkeit von der dritten occupied blocks free of further rail vehicles, which can be determined for example by the track vacancy detection system, it can be assumed that there is no further rail vehicle between the first and second rail vehicle. A release of the first operating state for the first rail vehicle is then certain. The first and second rail vehicles do not have to be moved extra slowly for this. According to at least one embodiment, in step D) a second operating state is dependent on the third
Information freigegeben, falls die dritte Information Information released if the third information
repräsentativ dafür ist, dass vor und/oder zwischen dem ersten und zweiten Zeitpunkt ein Block zwischen it is representative of the fact that before and / or between the first and second point in time a block between
einschließlich dem i+l-ten und dem j-ten Block von einem weiteren Schienenfahrzeug besetzt ist, wobei der zweite including the i + l-th and the j-th block is occupied by another rail vehicle, the second
Betriebszustand ein Fahren im festen Raumabstand ist. The operating state is driving at a fixed distance.
Alternativ oder zusätzlich wird unter diesen Voraussetzungen im Schritt D) der erste Betriebszustand gesperrt. Alternatively or additionally, the first operating state is blocked under these conditions in step D).
Der zweite Betriebszustand wird im Englischen als Fixed- Block-System bezeichnet. Dabei ist jeweils nur ein The second operating state is referred to in English as the fixed block system. There is only one at a time
Schienenfahrzeug pro Block erlaubt. Die Besetzung eines Rail vehicle allowed per block. The cast of a
Blocks wird beispielsweise mittels einer Gleisfreimeldeanlage erkannt. Ist ein i-ter Block durch ein Schienenfahrzeug besetzt, darf ein dahinterfährendes Schienenfahrzeug nicht in diesen i-ten Block eindringen. Zum Beispiel wird dem hinteren Schienenfahrzeug ein Stoppsignal (rotes Signal) an oder vor der Blockgrenze zum i-ten Block angezeigt. Ist der i-te Block nicht besetzt, so darf das dem i-ten Block nächstliegende Schienenfahrzeug auf den i-ten Block fahren, was ihm Blocks is recognized, for example, by means of a track vacancy detection system. If an i-th block is occupied by a rail vehicle, a rail vehicle behind it must not enter this i-th block. For example, the rear rail vehicle is shown a stop signal (red signal) at or in front of the block boundary to the i-th block. If the i-th block is not occupied, the rail vehicle closest to the i-th block may drive onto the i-th block, whatever it is
beispielsweise durch ein Freisignal (grünes Signal) angezeigt wird . is indicated, for example, by a clear signal (green signal).
Gemäß zumindest einer Ausführungsform werden die erste und die zweite Information jeweils in Abhängigkeit von According to at least one embodiment, the first and the second information are each dependent on
Positionsinformationen ermittelt und bereitgestellt. Die Positionsinformationen sind repräsentativ für die Positionen des ersten und zweiten Schienenfahrzeugs auf der Schiene. Bevorzugt sind die Positionsinformationen auch repräsentativ für die Geschwindigkeiten des ersten und zweiten Position information determined and provided. The position information is representative of the positions of the first and second rail vehicles on the rail. The position information is preferably also representative of the speeds of the first and second
Schienenfahrzeugs. Mit anderen Worten handelt es sich bei den Schienenfahrzeugen um kommunizierende Schienenfahrzeuge. Die Positionen und eventuell die Geschwindigkeiten des ersten und zweiten Schienenfahrzeugs werden beispielsweise jeweils in regelmäßigen zeitlichen Abständen von zum Beispiel höchstens 1 Sekunde oder höchstens 0,1 Sekunden ermittelt. Rail vehicle. In other words, they are Rail vehicles to communicating rail vehicles. The positions and possibly the speeds of the first and second rail vehicles are determined, for example, at regular time intervals of, for example, a maximum of 1 second or a maximum of 0.1 seconds.
Gemäß zumindest einer Ausführungsform werden die According to at least one embodiment, the
Positionsinformationen mithilfe eines Position information using a
Positionserfassungssystems bereitgestellt. Bei dem Position detection system provided. In which
Positionserfassungssystem handelt es sich zum Beispiel um ein GPS-System, das die Positionen des ersten und zweiten Position detection system is, for example, a GPS system that the positions of the first and second
Schienenfahrzeuges erfassen kann. Alternativ oder zusätzlich handelt es sich bei dem Positionserfassungssystem um ein Balisen-System. Dabei sind zum Beispiel mehrere Balisen in Form von Transpondern, zum Beispiel RFID-Transpondern, entlang der Schiene angeordnet. Das erste und zweite Can detect rail vehicle. Alternatively or additionally, the position detection system is a balise system. For example, several balises in the form of transponders, for example RFID transponders, are arranged along the rail. The first and second
Schienenfahrzeug weisen jeweils eine Antenne auf, die mit den Transpondern kommunizieren kann. Passiert ein Rail vehicles each have an antenna that can communicate with the transponders. Happened one
Schienenfahrzeug einen Transponder, so kommt es zu einem Informationsaustausch darüber, welcher Transponder soeben passiert wurde. Aus dieser Information werden dann Rail vehicle has a transponder, information is exchanged about which transponder has just passed. This information then becomes
beispielsweise die Positionsinformationen ermittelt und bereitgestellt. for example, the position information is determined and provided.
Gemäß zumindest einer Ausführungsform liefert das According to at least one embodiment, this provides
Positionserfassungssystem eine Genauigkeit für die Positionen der Schienenfahrzeuge von besser als 30 m. Mit anderen Worten ist die Positionsauflösung des Positionserfassungssystems besser als 30 m. Dies ist durch ein GPS-System realisierbar. Durch die Anordnung von Balisen entlang der Schiene mit einem Abstand zwischen je zwei Balisen von höchstens 30 m ist eine solche Genauigkeit ebenfalls realisierbar. Gemäß zumindest einer Ausführungsform wird das Verfahren auf einem Computer ausgeführt. Insbesondere die Schritte A) , B) , C) und D) können ausschließlich mithilfe eines Computers durchgeführt werden. Auch der Schritt des Ermittelns und Bereitstellens der ersten und zweiten Information in Position detection system an accuracy for the positions of the rail vehicles of better than 30 m. In other words, the position resolution of the position detection system is better than 30 m. This can be achieved using a GPS system. Such an accuracy can also be achieved by arranging balises along the rail with a distance between each two balises of at most 30 m. According to at least one embodiment, the method is carried out on a computer. In particular, steps A), B), C) and D) can only be carried out using a computer. The step of determining and providing the first and second information in
Abhängigkeit von Positionsinformationen kann auf einem Depending on position information can be on a
Computer durchgeführt werden. Die erste, zweite und dritte Information sowie die Positionsinformationen sind also bevorzugt Daten auf einem Computer. Computer. The first, second and third information as well as the position information are therefore preferably data on a computer.
Darüber hinaus wird eine Vorrichtung zum Betreiben eines ersten Schienenfahrzeugs angegeben. Die Vorrichtung umfasst einen Prozessor, der dazu eingerichtet ist, das hier In addition, a device for operating a first rail vehicle is specified. The device comprises a processor which is set up here
beschriebene Verfahren zur Steuerung eines ersten described method for controlling a first
Schienenfahrzeuges auszuführen. Run rail vehicle.
Ferner wird ein Computerprogramm zum Betreiben eines ersten Schienenfahrzeuges angegeben. Das Computerprogramm umfasst Befehle, die bei der Ausführung des Computerprogramms durch einen Computer mit einem Prozessor diesen veranlassen, das hier beschriebene Verfahren zur Steuerung eines ersten Furthermore, a computer program for operating a first rail vehicle is specified. The computer program comprises instructions which, when the computer program is executed by a computer with a processor, cause the latter, the method described here for controlling a first
Schienenfahrzeuges auszuführen. Run rail vehicle.
Außerdem wird ein computerlesbareres Speichermedium It also becomes a computer readable storage medium
angegeben, auf dem das hier beschriebene Computerprogramm gespeichert ist. on which the computer program described here is stored.
Darüber hinaus wird ein System angegeben. Das System ist insbesondere dazu eingerichtet, ein hier beschriebenes A system is also specified. The system is set up in particular to implement a system described here
Verfahren zur Steuerung eines ersten Schienenfahrzeuges auszuführen. Alle im Zusammenhang mit dem Verfahren zur Steuerung eines ersten Schienenfahrzeuges offenbarten Merkmale sind daher auch für das System offenbart und Execute method for controlling a first rail vehicle. All disclosed in connection with the method for controlling a first rail vehicle Features are therefore also disclosed for the system and
umgekehrt . vice versa .
Gemäß zumindest einer Ausführungsform umfasst das System ein erstes Schienenfahrzeug, ein zweites Schienenfahrzeug, eine Schiene, die in n Blöcke mit n > 2 unterteilt ist, sowie ein Positionserfassungssystem zur Positionsbestimmung des ersten und zweiten Schienenfahrzeuges. Je zwei benachbarte Blöcke sind durch eine Blockgrenze voneinander getrennt. Das System ist dazu eingerichtet, ein hier beschriebenes Verfahren zur Steuerung eines ersten Schienenfahrzeuges auszuführen. According to at least one embodiment, the system comprises a first rail vehicle, a second rail vehicle, a rail that is divided into n blocks with n> 2, and a position detection system for determining the position of the first and second rail vehicles. Every two adjacent blocks are separated from one another by a block boundary. The system is set up to carry out a method described here for controlling a first rail vehicle.
Beispielsweise umfasst das System außerdem noch eine wie hier beschriebene Vorrichtung. Die Vorrichtung ist zum Beispiel Teil des ersten Schienenfahrzeuges oder ist beispielsweise eine externe Vorrichtung außerhalb des ersten und zweiten Schienenfahrzeuges . For example, the system also includes a device as described here. The device is for example part of the first rail vehicle or is, for example, an external device outside of the first and second rail vehicle.
Bevorzugt umfasst das System noch eine Gleisfreimeldeanlage, mit der im Betrieb ermittelbar ist, ob ein Block von einem Schienenfahrzeug besetzt ist oder nicht. The system preferably also includes a track vacancy detection system with which it can be determined during operation whether a block is occupied by a rail vehicle or not.
Die oben genannten Eigenschaften, Merkmale und Vorteile der Erfindung und die Art und Weise, wie diese erreicht werden, werden durch die folgende Beschreibung der The above properties, features and advantages of the invention and the manner in which they are achieved will be apparent from the following description of the
Ausführungsbeispiele der Erfindung in Verbindung mit den entsprechenden Figuren weitergehend erläutert. Gleiche, gleichartige oder gleich wirkende Elemente sind in den Embodiments of the invention explained in more detail in conjunction with the corresponding figures. Identical, identical or identically acting elements are in the
Figuren mit den gleichen Bezugszeichen versehen. Die Figuren und die Größenverhältnisse der in den Figuren dargestellten Elemente untereinander sind nicht als maßstäblich zu Figures are provided with the same reference numerals. The figures and the proportions of the elements shown in the figures are not to be considered to be true to scale
betrachten. Vielmehr können einzelne Elemente zur besseren Darstellbarkeit und/oder für eine bessere Verständlichkeit übertrieben groß dargestellt sein. consider. Rather, individual elements can be used for the better Can be represented and / or shown in exaggerated size for better understanding.
Es zeigen: Show it:
Figuren 1 bis 4 Ausführungsbeispiele eines Systems sowie eines Verfahrens zum Betreiben eines ersten Figures 1 to 4 embodiments of a system and a method for operating a first
Schienenfahrzeuges , Rail vehicle,
Figuren 5 und 6 Ausführungsbeispiele des Verfahrens zum Figures 5 and 6 embodiments of the method for
Betreiben eines ersten Schienenfahrzeuges anhand von Operation of a first rail vehicle based on
Ablaufdiagrammen . Flow charts.
In der Figur 1 ist ein Ausführungsbeispiel des Systems zu einem ersten Zeitpunkt tl gezeigt. Das System umfasst eine Schiene 4, auf der ein erstes Schienenfahrzeug 1 und ein zweites Schienenfahrzeug 2 angeordnet sind. Die An exemplary embodiment of the system at a first point in time t1 is shown in FIG. The system comprises a rail 4 on which a first rail vehicle 1 and a second rail vehicle 2 are arranged. The
Schienenfahrzeuge 1, 2 fahren von links nach rechts. Die Schiene 4 ist in eine Mehrzahl von Blöcke 40 unterteilt, die jeweils durch Blockgrenzen 41 voneinander getrennt sind. Rail vehicles 1, 2 travel from left to right. The rail 4 is divided into a plurality of blocks 40, each of which is separated from one another by block boundaries 41.
Außerdem ist der Schiene 4 ein Positionserfassungssystem 5 zugeordnet. Das Positionserfassungssystem 5 ist vorliegend ein Balisen-System und umfasst eine Mehrzahl von Balisen, die entlang der Schiene 4 verteilt sind. Das erste 1 und zweite 2 Schienenfahrzeug umfassen jeweils eine Antenne. Beim In addition, a position detection system 5 is assigned to the rail 4. In the present case, the position detection system 5 is a balise system and comprises a plurality of balises which are distributed along the rail 4. The first 1 and second 2 rail vehicles each include an antenna. At the
Passieren einer Balise kommt es zum Informationsaustausch zwischen der Antenne und der Balise, wodurch die aktuelle Position eines Schienenfahrzeuges ermittelbar ist. Mit anderen Worten handelt es sich bei dem ersten 1 und zweiten 2 Schienenfahrzeug um kommunizierende Schienenfahrzeuge. When a balise is passed, information is exchanged between the antenna and the balise, whereby the current position of a rail vehicle can be determined. In other words, the first 1 and second 2 rail vehicles are communicating rail vehicles.
In der Figur 1 überquert das in der ersten Fahrtrichtung 6 gesehen vordere Ende des ersten Schienenfahrzeug 1 gerade die Blockgrenze 41 zwischen dem i-ten Block 40i und dem i+l-ten Block 40i+i. Dies wird zum Beispiel mit dem In FIG. 1, the front end of the first rail vehicle 1 seen in the first direction of travel 6 is just crossing the Block boundary 41 between the i-th block 40i and the i + l-th block 40i + i . This is done for example with the
Positionserfassungssystem 5 erfasst. Der Zeitpunkt tl, zu dem dies passiert, wird ebenfalls erfasst, beispielsweise Position detection system 5 recorded. The time tl at which this happens is also recorded, for example
ebenfalls mit dem Positionserfassungssystem 5. Die also with the position detection system 5. The
Genauigkeit, mit der die Positionsmessung erfolgt, ist vorliegend durch den Abstand zweier Balisen bestimmt und ist bevorzugt besser als 30 m. In Abhängigkeit von den The accuracy with which the position measurement takes place is determined in the present case by the distance between two balises and is preferably better than 30 m. Depending on the
Messergebnissen des Positionserfassungssystems 5 wird dann eine erste Information II (Fig. 5, 6) bereitgestellt, die repräsentativ dafür ist, dass zum ersten Zeitpunkt tl das vordere Ende des ersten Schienenfahrzeuges 1 die Blockgrenze zwischen dem i-ten Block 40i und dem i+l-ten Block 40i+i überquert hat. Diese erste Information II wird beispielsweise in Form von Computerdaten bereitgestellt. Measurement results of the position detection system 5 are then provided with a first piece of information II (FIGS. 5, 6) which is representative of the fact that at the first point in time tl the front end of the first rail vehicle 1 is the block boundary between the i-th block 40i and the i + l -th block 40i + i has crossed. This first information II is provided, for example, in the form of computer data.
Die Tatsache, dass zum ersten Zeitpunkt tl das vordere Ende des ersten Schienenfahrzeuges 1 gerade die Blockgrenze 41 überquert, bedeutet, dass auf dem i-ten Block 40i zwischen dem vorderen Ende des ersten Schienenfahrzeuges 1 und der Blockgrenze 41 kein weiteres Schienenfahrzeug vorhanden sein kann . The fact that the front end of the first rail vehicle 1 is just crossing the block boundary 41 at the first point in time t1 means that no further rail vehicle can be present on the i-th block 40i between the front end of the first rail vehicle 1 and the block boundary 41.
In der Figur 2 ist das System zu einem späteren Zeitpunkt t2 gezeigt. Sowohl das erste Schienenfahrzeug 1 als auch das zweite Schienenfahrzeug 2 haben sich entlang der Schiene 4 nach rechts bewegt (erste Fahrtrichtung 6) . Der zweite In FIG. 2, the system is shown at a later point in time t2. Both the first rail vehicle 1 and the second rail vehicle 2 have moved to the right along the rail 4 (first direction of travel 6). The second
Zeitpunkt t2 ist der Zeitpunkt, bei dem das bezüglich der ersten Fahrtrichtung 6 hintere Ende des zweiten Time t2 is the time at which the rear end of the second with respect to the first direction of travel 6
Schienenfahrzeuges 2 die Blockgrenze 41 zwischen dem j-ten Block 40j und dem j +l-ten block 40 +i überquert. Dieses Rail vehicle 2 crosses the block boundary 41 between the j-th block 40 j and the j + l-th block 40 + i . This
Ereignis, gegebenenfalls auch der Zeitpunkt dieses Event, possibly also the time of this
Ereignisses, werden wiederum mit dem Positionserfassungssystem 5 zur Positionsmessung erfasst. Daraus wird dann eine zweite Information 12 (Fig. 5, 6) ermittelt und bereitgestellt, die repräsentativ dafür ist, dass zum zweiten Zeitpunkt t2 das hintere Ende des zweiten Schienenfahrzeugs 2 die Blockgrenze 41 zwischen dem j-ten Block 40j und dem j +l-ten block 40 +i überquert hat. Event, are in turn with the Position detection system 5 detected for position measurement. A second item of information 12 (FIGS. 5, 6) is then determined and provided therefrom, which is representative of the fact that at the second point in time t2 the rear end of the second rail vehicle 2 crosses the block boundary 41 between the jth block 40 j and the j + Crossed l-th block 40 + i .
Die Tatsache, dass zum zweiten Zeitpunkt t2 das hintere Ende des zweiten Schienenfahrzeugs 2 die Blockgrenze 41 zwischen dem j-ten Block 40j und dem j +l-ten block 40 +i überquert, bedeutet, dass zu diesem zweiten Zeitpunkt t2 kein weiteres Schienenfahrzeug zwischen der überquerten Blockgrenze 41 und dem zweiten Schienenfahrzeug 2 auf dem j+l-ten Block The fact that at the second point in time t2 the rear end of the second rail vehicle 2 crosses the block boundary 41 between the j-th block 40 j and the j + l-th block 40 + i means that at this second point in time t2 there is no further rail vehicle between the crossed block boundary 41 and the second rail vehicle 2 on the j + l-th block
vorhanden ist. is available.
Mithilfe zum Beispiel einer Gleisfreimeldeanlage, die in den Figuren nicht dargestellt ist, kann nun noch festgestellt werden, ob ein Block 40 zwischen dem einschließlich i+l-ten Block 40i+i und dem j-ten Block 40j , also ein Block 40 Using, for example, a train detection system, which is not shown in the figures can now be determined whether a block 40 40i + i and the j-th block 40 j between the including i + l-th block, that is, a block 40
zwischen dem ersten 1 und zweiten 2 Schienenfahrzeug, der weder vom ersten 1 noch zweiten 2 Schienenfahrzeug besetzt ist, von einem weiteren Schienenfahrzeug besetzt ist. between the first 1 and the second 2 rail vehicle, which is not occupied by either the first 1 or the second 2 rail vehicle, is occupied by another rail vehicle.
Entsprechend wird dann eine dritte Information 13 (Fig. 5, 6) in Abhängigkeit von der ersten II und zweiten 12 Information ermittelt und bereitgestellt, wobei die dritte Information 13 repräsentativ dafür ist, ob vor und/oder zwischen dem ersten Zeitpunkt tl und dem zweiten Zeitpunkt t2 ein Block 40 zwischen einschließlich dem i+l-ten 40i+i und dem j-ten Block 40j von einem weiteren Schienenfahrzeug besetzt ist. Im vorliegenden Fall ist kein weiteres Schienenfahrzeug zwischen dem ersten Schienenfahrzeug 1 und dem zweiten Correspondingly, third information 13 (FIGS. 5, 6) is then determined and provided as a function of the first II and second 12 information, the third information 13 being representative of whether before and / or between the first point in time t 1 and the second Time t2 a block 40 between and including the i + l-th 40i + i and the j-th block 40 j is occupied by a further rail vehicle. In the present case, there is no further rail vehicle between the first rail vehicle 1 and the second
Schienenfahrzeug 2. In einem nun folgenden Verfahrensschritt wird in Abhängigkeit von der dritten Information 13 ein erster Betriebszustand ZI für das erste Schienenfahrzeug 1 freigegeben. Der erste Rail vehicle 2. In a method step that now follows, a first operating state ZI for the first rail vehicle 1 is enabled as a function of the third information item 13. The first
Betriebszustand ZI ist ein Fahren in einem wandernden Operating state ZI is driving in a migratory
Raumabstand (Moving-Block Betriebszustand) . Die geschieht beispielweise in einer dem ersten Schienenfahrzeug 1 Room distance (moving block operating status). This occurs, for example, in one of the first rail vehicle 1
zugeordneten Vorrichtung 10 mit einem Prozessor. associated device 10 with a processor.
In der Figur 3 ist eine Situation gezeigt, in der für das erste Schienenfahrzeug 1 der erste Betriebszustand ZI nicht freigeschaltet werden soll/darf. Wie zu erkennen ist, ist zwischen dem ersten Schienenfahrzeug 1 und dem zweiten FIG. 3 shows a situation in which the first operating state ZI should / must not be enabled for the first rail vehicle 1. As can be seen, is between the first rail vehicle 1 and the second
Schienenfahrzeug 2 ein weiteres Schienenfahrzeug 3 auf der Schiene 4. Rail vehicle 2 another rail vehicle 3 on the rail 4.
In der Position der Figur 3 überquert zu einem ersten In the position of Figure 3 crossed to a first
Zeitpunkt tl das vordere Ende des ersten Schienenfahrzeuges 1 die Blockgrenze 41 zwischen dem i-ten Block 40i und dem i+1- ten Block 40i+i. Entsprechend wird eine erste Information II, die für dieses Überqueren zum Zeitpunkt tl repräsentativ ist, bereitgestellt. Time tl the front end of the first rail vehicle 1 the block boundary 41 between the i-th block 40i and the i + 1-th block 40i + i . Correspondingly, a first piece of information II, which is representative of this crossing at time t1, is provided.
Zu dem ersten Zeitpunkt tl befinden sich das zweite The second is at the first point in time tl
Schienenfahrzeug 2 und das weitere Schienenfahrzeug 3 auf demselben Block 40j . Eine Gleisfreimeldeanlage kann Rail vehicle 2 and the further rail vehicle 3 on the same block 40j. A track vacancy detection system can
beispielsweise nur erkennen, dass der Block 40j besetzt ist, nicht aber dass dieser von zwei Schienenfahrzeugen besetzt ist. Um das weitere Schienenfahrzeug 3 unmittelbar hinter dem zweiten Schienenfahrzeug 2 zu erkennen, wird ein späterer, zweiter Zeitpunkt t2 abgewartet, der in der Figur 4 gezeigt ist . In der Figur 4 überquert gerade das hintere Ende des zweiten Schienenfahrzeuges 2 die Blockgrenze 41 zwischen dem j-ten Block 40j und dem j +l-ten Block 40j+i. Zu diesem Zeitpunkt ist sichergestellt, dass zwischen dem hinteren Ende des zweiten Schienenfahrzeugs 2 und der gerade überquerten Blockgrenze 41 kein weiteres Schienenfahrzeug 3 vorhanden sein kann. Die Information, dass zum zweiten Zeitpunkt t2 das hintere Ende des zweiten Schienenfahrzeuges 2 die Blockgrenze 41 überquert hat, wird als zweite Information 12 bereitgestellt. for example, only recognize that the block 40 j is occupied, but not that it is occupied by two rail vehicles. In order to recognize the further rail vehicle 3 immediately behind the second rail vehicle 2, a later, second point in time t2 is awaited, which is shown in FIG. In FIG. 4, the rear end of the second rail vehicle 2 is just crossing the block boundary 41 between the j-th block 40 j and the j + l-th block 40 j + i . At this point in time, it is ensured that no further rail vehicle 3 can be present between the rear end of the second rail vehicle 2 and the block boundary 41 just crossed. The information that the rear end of the second rail vehicle 2 crossed the block boundary 41 at the second point in time t2 is provided as second information 12.
Zu dem Zeitpunkt t2 kann darüber hinaus erkannt werden, beispielsweise mit der Gleisfreimeldeanlage, dass der j-te Block 40j von dem weiteren Schienenfahrzeug 3 besetzt ist. Entsprechend kann eine dritte Information 13 ermittelt und bereitgestellt werden, die repräsentativ dafür ist, dass ein Block zwischen einschließlich dem i+l-ten Block 40i+i und dem j-ten Block 40j von einem weiteren Schienenfahrzeug 3 besetzt ist. Daraufhin wird beispielsweise der erste Betriebszustand ZI für das erste Schienenfahrzeug 1 gesperrt. Alternativ oder zusätzlich wird ein zweiter Betriebszustand Z2 für das erste Schienenfahrzeug 1 freigeschaltet, wobei der zweite At time t2, it can also be recognized, for example with the track vacancy detection system, that the jth block 40 j is occupied by the further rail vehicle 3. Accordingly, a third item of information 13 can be determined and provided which is representative of the fact that a block between and including the i + l-th block 40i + i and the j-th block 40 j is occupied by a further rail vehicle 3. The first operating state ZI for the first rail vehicle 1 is then blocked, for example. Alternatively or additionally, a second operating state Z2 is activated for the first rail vehicle 1, the second
Betriebszustand ein Fahren im festen Raumabstand (Fixed-Block Betriebszustand) ist. The operating state is driving at a fixed spacing (fixed-block operating state).
In den Figuren 3 und 4 wird anders als in den Figuren 1 und 2 zur Positionsbestimmung des ersten 1 und zweiten 2 In FIGS. 3 and 4, unlike in FIGS. 1 and 2, the position of the first 1 and second 2 is used
Schienenfahrzeuges kein Balisen-System, sondern ein Rail vehicle is not a balise system, but a
Positionserfassungssystem 5 in Form eines GPS-Systems Position detection system 5 in the form of a GPS system
verwendet . used.
In der Figur 5 ist ein Ablaufdiagramm für ein erstes In Figure 5 is a flow chart for a first
Ausführungsbeispiel des Verfahrens zum Betreiben eines ersten Schienenfahrzeuges dargestellt. Das Ablaufdiagramm bezieht sich zum Beispiel auf die Situation der Figuren 1 und 2 oder der Figuren 3 und 4. Exemplary embodiment of the method for operating a first rail vehicle is shown. The flowchart relates refer, for example, to the situation in FIGS. 1 and 2 or FIGS. 3 and 4.
In einem Schritt A) wird die erste Information II In a step A) the first information II
bereitgestellt, die repräsentativ dafür ist, dass zu dem ersten Zeitpunkt tl das vordere Ende des ersten provided, which is representative of the fact that at the first point in time tl the front end of the first
Schienenfahrzeuges 1 die Blockgrenze 41 zwischen einem i-ten Block 40i und einem i+l-ten Block 40i+i überquert hat. In einem darauffolgenden Schritt B) wird die zweite Information 12 bereitgestellt, die repräsentativ dafür ist, dass zu dem zweiten Zeitpunkt t2 ein hinteres Ende des zweiten Rail vehicle 1 has crossed the block boundary 41 between an i-th block 40i and an i + l-th block 40i + i . In a subsequent step B), the second information 12 is provided, which is representative of the fact that at the second point in time t2 a rear end of the second
Schienenfahrzeuges 2 eine Blockgrenze 41 zwischen einem j-ten Block 40j und einem j +l-ten Block 40 +i überquert hat. Rail vehicle 2 has crossed a block boundary 41 between a j-th block 40 j and a j + l-th block 40 + i .
Außerdem wird in einem Schritt C) eine dritte Information 13 in Abhängigkeit von der ersten II und zweiten 12 Information ermittelt, die repräsentativ dafür ist, ob vor und/oder zwischen den beiden Zeitpunkten tl, t2 ein Block 40 zwischen einschließlich dem i+l-ten 40i+i und dem j-ten Block 40j von einem weiteren Schienenfahrzeug besetzt ist. In einem Schritt D) wird daraufhin der erste Betriebszustand ZI für das erste Schienenfahrzeug 1 in Abhängigkeit von der dritten In addition, in a step C) third information 13 is determined as a function of the first II and second 12 information, which is representative of whether before and / or between the two times t1, t2 a block 40 between and including the i + l- th 40i + i and the j-th block 40 j is occupied by another rail vehicle. In a step D), the first operating state ZI for the first rail vehicle 1 is then set as a function of the third
Information 13, falls die dritte Information 13 repräsentativ dafür ist, dass vor und/oder zwischen den Zeitpunkten tl,t2 kein Block 40 zwischen einschließlich dem i+l-ten 40i+i und dem j-ten Block 40j von einem weiteren Schienenfahrzeug besetzt ist, freigegeben. Im Falle der Figur 1 wird der erste Betriebszustand ZI freigegeben, weil kein weiteres Information 13, if the third information 13 is representative of the fact that before and / or between the times t1, t2 no block 40 between and including the i + l-th 40i + i and the j-th block 40 j is occupied by another rail vehicle is released. In the case of FIG. 1, the first operating state ZI is enabled because there is no other
Schienenfahrzeug vorhanden ist. Im Falle der Figur 2 wird der erste Betriebszustand ZI nicht freigegeben, weil ein weiteres Schienenfahrzeug 3 vorhanden ist. Eventuell wird der zweite Betriebszustand Z2 freigegeben und der erste Betriebszustand ZI gesperrt. In dem Ablaufdiagramm der Figur 6 ist ein zweites Ausführungsbeispiel des Verfahrens zum Betreiben eines ersten Schienenfahrzeuges 1 dargestellt. Die Schritte A) bis D) sind wie im Zusammenhang mit der Figur 5 erläutert. Hier wird jedoch der Schritt B) vor dem Schritt A) ausgeführt, weil zum Beispiel der zweite Zeitpunkt t2 vor dem ersten Zeitpunkt tl liegt . Rail vehicle is available. In the case of FIG. 2, the first operating state ZI is not released because another rail vehicle 3 is present. The second operating state Z2 may be enabled and the first operating state ZI blocked. A second exemplary embodiment of the method for operating a first rail vehicle 1 is shown in the flow diagram in FIG. Steps A) to D) are as explained in connection with FIG. Here, however, step B) is carried out before step A) because, for example, the second point in time t2 is before the first point in time t1.
Die Schritte A) bis D) werden zum Beispiel auf einem Steps A) to D) are for example on a
Prozessor ausgeführt, der in der Vorrichtung 10 der Figuren 1 und 2 sowie 3 und 4 enthalten ist. Processor executed, which is contained in the device 10 of Figures 1 and 2 and 3 and 4.
Obwohl die Erfindung anhand von Ausführungsbeispielen Although the invention based on exemplary embodiments
detailliert dargestellt und beschrieben wurde, ist die has been shown and described in detail, is the
Erfindung nicht auf die offenbarten Ausführungsbeispiele und die darin erläuterten konkreten Merkmalskombinationen Invention does not affect the disclosed exemplary embodiments and the specific combinations of features explained therein
beschränkt. Weitere Variationen der Erfindung können von einem Fachmann erhalten werden, ohne den Schutzumfang der beanspruchten Erfindung zu verlassen. limited. Further variations of the invention can be obtained by one skilled in the art without departing from the scope of the claimed invention.
Bezugszeichenliste List of reference symbols
1 erstes Schienenfahrzeug1 first rail vehicle
2 zweites Schienenfahrzeug2 second rail vehicle
3 weiteres Schienenfahrzeug3 more rail vehicles
4 Schiene 4 rail
5 Positionserfassungssystems 5 position detection system
6 erste Fahrtrichtung 6 first direction of travel
10 Vorrichtung 10 device
40 Block 40 block
41 Blockgrenze 41 Block boundary
tl erster Zeitpunkt tl first time
t2 zweiter Zeitpunkt t2 second point in time
11 erste Information 11 first information
12 zweite Information 12 second information
13 dritte Information 13 third information
ZI erster Betriebszustand ZI first operating status
Z2 zweiter BetriebszustandZ2 second operating state
A-D Verfahrensschritte A-D process steps

Claims

Patentansprüche Claims
1. Verfahren zum Betreiben eines ersten Schienenfahrzeuges ( 1 ) , wobei 1. A method for operating a first rail vehicle (1), wherein
- das erste Schienenfahrzeug (1) auf einer Schiene (4) in eine erste Fahrtrichtung (6) fährt, - the first rail vehicle (1) travels on a rail (4) in a first direction of travel (6),
- die Schiene (4) in n Blöcke ( 401 ... 40n) unterteilt ist mit n > 2 , - the rail (4) is divided into n blocks (401 ... 40 n ) with n> 2,
- je zwei benachbarte Blöcke (40k, 40k+i) durch eine - two adjacent blocks (40 k , 40 k + i ) by one
Blockgrenze (41) getrennt sind, Block boundaries (41) are separated,
- auf der Schiene (4) ein zweites Schienenfahrzeug (2) fährt, - A second rail vehicle (2) is traveling on the rail (4),
- das zweite Schienenfahrzeug (3) entlang der ersten - The second rail vehicle (3) along the first
Fahrtrichtung (6) gesehen vor dem ersten Schienenfahrzeug (1) fährt, The direction of travel (6) is in front of the first rail vehicle (1),
- das Verfahren die folgenden Schritte umfasst: - the procedure comprises the following steps:
A) Bereitstellen einer ersten Information (II), die A) Providing a first piece of information (II) that
repräsentativ dafür ist, dass zu einem ersten Zeitpunkt (tl) ein bezüglich der ersten Fahrtrichtung (6) vorderes Ende des ersten Schienenfahrzeuges (1) eine Blockgrenze (41) zwischen einem i-ten Block (40i) und einem in der ersten Fahrtrichtung (6) darauffolgenden i+ l-ten Block (40i+i) überquert hat, It is representative of the fact that at a first point in time (tl) a front end of the first rail vehicle (1) with respect to the first direction of travel (6) has a block boundary (41) between an i-th block (40i) and one in the first direction of travel (6 ) has crossed the following i + l-th block (40i + i ),
B) Bereitstellen einer zweiten Information (12), die B) providing a second piece of information (12) which
repräsentativ dafür ist, dass zu einem zweiten Zeitpunkt (t2) ein bezüglich der ersten Fahrtrichtung (6) hinteres Ende des zweiten Schienenfahrzeuges (2) eine Blockgrenze (41) zwischen einem j-ten Block ( 40j ) und einem in der ersten Fahrtrichtung (6) darauffolgenden j + l-ten Block (40j+i) überquert hat, It is representative that at a second point in time (t2) a rear end of the second rail vehicle (2) with respect to the first direction of travel (6) forms a block boundary (41) between a jth block (40 j ) and one in the first direction of travel ( 6) has crossed the next j + l-th block (40 j + i ),
C) Ermitteln einer dritten Information (13) in Abhängigkeit von der ersten (II) und zweiten (12) Information, wobei die dritte Information (13) repräsentativ dafür ist, ob vor und/oder zwischen den beiden Zeitpunkten (tl, t2) ein Block (40) zwischen einschließlich dem i+ l-ten (40i+i) und dem j-ten Block ( 40j ) von einem weiteren Schienenfahrzeug (3) besetzt ist, C) determining a third piece of information (13) as a function of the first (II) and second (12) pieces of information, the third piece of information (13) being representative of whether before and / or between the two times (t1, t2) Block (40) between and including the i + l-th (40i + i ) and the j-th Block (40 j ) is occupied by another rail vehicle (3),
D) Freigeben eines ersten Betriebszustands (ZI) für das erste Schienenfahrzeug (1) in Abhängigkeit von der dritten D) enabling a first operating state (ZI) for the first rail vehicle (1) as a function of the third
Information (13), falls die dritte Information repräsentativ dafür ist, dass vor und/oder zwischen den beiden Zeitpunkten (tl, t2) kein Block (40) zwischen einschließlich dem i+l-ten (40i+i) und dem j-ten Block ( 40j ) von einem weiteren Information (13), if the third information is representative of the fact that before and / or between the two times (tl, t2) no block (40) between and including the i + l-th (40i + i ) and the j-th Block (40 j ) from another
Schienenfahrzeug besetzt ist, wobei der erste Betriebszustand (ZI) ein Fahren in einem wandernden Raumabstand ist. Rail vehicle is occupied, the first operating state (ZI) being driving in a moving spatial distance.
2. Verfahren nach Anspruch 1, 2. The method according to claim 1,
wobei im Schritt D) ein zweiter Betriebszustand (Z2) in wherein in step D) a second operating state (Z2) in
Abhängigkeit von der dritten Information (13) freigegeben wird, falls die dritte Information (13) repräsentativ dafür ist, dass vor und/oder zwischen den beiden Zeitpunkten (tl, t2) ein Block (40) zwischen einschließlich dem i+ l-ten (40i+i) und dem j-ten Block ( 40j ) von einem weiteren Schienenfahrzeug (3) besetzt ist, wobei der zweite Betriebszustand (Z2) ein Fahren im festen Raumabstand ist. Depending on the third information (13) is released if the third information (13) is representative of the fact that before and / or between the two times (tl, t2) a block (40) between and including the i + lth (40i + i ) and the j-th block (40 j ) is occupied by a further rail vehicle (3), the second operating state (Z2) being driving at a fixed spatial distance.
3. Verfahren nach Anspruch 1 oder 2, wobei 3. The method of claim 1 or 2, wherein
- die erste (II) und die zweite (12) Information jeweils in Abhängigkeit von Positionsinformationen ermittelt und - The first (II) and the second (12) pieces of information are each determined as a function of position information and
bereitgestellt werden, to be provided,
- die Positionsinformationen repräsentativ für die Positionen des ersten (1) und zweiten (2) Schienenfahrzeugs auf der Schiene (4) sind. - The position information is representative of the positions of the first (1) and second (2) rail vehicles on the rail (4).
4. Verfahren nach Anspruch 3, 4. The method according to claim 3,
wobei die Positionsinformationen mithilfe eines the position information using a
Positionserfassungssystems (5) bereitgestellt werden. Position detection system (5) are provided.
5. Verfahren nach Anspruch 4, 5. The method according to claim 4,
wobei das Positionserfassungssystem (5) eine Genauigkeit für die Positionen der Schienenfahrzeuge von besser als 30 m liefert . wherein the position detection system (5) provides an accuracy for the positions of the rail vehicles of better than 30 m.
6. Verfahren nach einem der Ansprüche 1 bis 5, 6. The method according to any one of claims 1 to 5,
wobei das Verfahren auf einem Computer ausgeführt wird. wherein the method is carried out on a computer.
7. Vorrichtung (10) zum Betreiben eines ersten 7. Device (10) for operating a first
Schienenfahrzeuges (1), umfassend einen Prozessor, der dazu eingerichtet ist, das Verfahren nach einem der Ansprüche 1 bis 5 auszuführen. Rail vehicle (1), comprising a processor which is set up to carry out the method according to any one of claims 1 to 5.
8. Computerprogramm zum Betreiben eines ersten 8. Computer program for operating a first
Schienenfahrzeuges (1), umfassend Befehle, die bei der Rail vehicle (1), comprising commands that are used in the
Ausführung des Computerprogramms durch einen Computer mit einem Prozessor diesen veranlassen, das Verfahren nach einem der Ansprüche 1 bis 5 auszuführen. Execution of the computer program by a computer with a processor causing the latter to carry out the method according to one of Claims 1 to 5.
9. Computerlesbares Speichermedium, auf dem das 9. Computer-readable storage medium on which the
Computerprogramm nach Anspruch 8 gespeichert ist. Computer program according to claim 8 is stored.
10. System, umfassend: 10. System comprising:
- ein erstes Schienenfahrzeug (1), - a first rail vehicle (1),
- ein zweites Schienenfahrzeug (2), - a second rail vehicle (2),
- eine Schiene (4), die in n Blöcke ( 401 ... 40n) mit n > 2 unterteilt ist, - a rail (4) which is divided into n blocks (401 ... 40 n ) with n> 2,
- ein Positionserfassungssystem (5) zur Positionsbestimmung des ersten (1) und zweiten (2) Schienenfahrzeuges, wobei - A position detection system (5) for determining the position of the first (1) and second (2) rail vehicle, wherein
- je zwei benachbarte Blöcke (40) durch eine Blockgrenze (41) getrennt sind, - two adjacent blocks (40) are separated by a block boundary (41),
- das System eingerichtet ist, ein Verfahren nach einem der Ansprüche 1 bis 6 auszuführen. - The system is set up to carry out a method according to one of claims 1 to 6.
PCT/EP2020/062442 2019-05-29 2020-05-05 Method for operating a rail vehicle WO2020239372A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP20728403.5A EP3956194A1 (en) 2019-05-29 2020-05-05 Method for operating a rail vehicle
CN202080049540.2A CN114080342B (en) 2019-05-29 2020-05-05 Method for operating a rail vehicle

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102019207948.2A DE102019207948A1 (en) 2019-05-29 2019-05-29 Method for operating a rail vehicle
DE102019207948.2 2019-05-29

Publications (1)

Publication Number Publication Date
WO2020239372A1 true WO2020239372A1 (en) 2020-12-03

Family

ID=70857134

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/EP2020/062442 WO2020239372A1 (en) 2019-05-29 2020-05-05 Method for operating a rail vehicle

Country Status (4)

Country Link
EP (1) EP3956194A1 (en)
CN (1) CN114080342B (en)
DE (1) DE102019207948A1 (en)
WO (1) WO2020239372A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113085961A (en) * 2021-04-12 2021-07-09 重庆交通职业学院 Intelligent scheduling control method and system for railway vehicle

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015180902A1 (en) * 2014-05-28 2015-12-03 Siemens Aktiengesellschaft Movement authority for a rail vehicle

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102653278A (en) * 2011-07-27 2012-09-05 徐菲 Range-based train control train-mounted moving block system and method
CN102941865B (en) * 2012-11-14 2015-04-08 东南大学 System and method for rail train collision prevention based on wireless sensor network
CN104192171B (en) * 2014-08-28 2017-01-11 同济大学 Rail transit train detecting method and device
DE102015204769A1 (en) * 2015-03-17 2016-09-22 Siemens Aktiengesellschaft Method and device for automatically influencing track-bound vehicles
CN106672018B (en) * 2016-12-09 2018-09-04 交控科技股份有限公司 The movement across lines method of two class train control systems
CN107380212A (en) * 2017-05-19 2017-11-24 中国神华能源股份有限公司 Movable block degraded running system and method
DE102017209926A1 (en) * 2017-06-13 2018-12-13 Siemens Aktiengesellschaft Method for operating a track-bound traffic system
CN109398424B (en) * 2017-08-16 2020-09-25 交控科技股份有限公司 Detection system for intrusion of non-communication vehicle
CN109552367B (en) * 2017-09-26 2020-12-18 交控科技股份有限公司 Train running protection system and method based on combination of communication and active identification
CN109664918B (en) * 2017-10-13 2020-10-23 交控科技股份有限公司 Train tracking early warning protection system and method based on train-to-vehicle communication and active identification

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015180902A1 (en) * 2014-05-28 2015-12-03 Siemens Aktiengesellschaft Movement authority for a rail vehicle

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
MAARTEN BARTHOLOMEUS AND MARTIN ZWEERS: "A recipe for a fast nationwide migration to robust ERTMS L3", SIGNAL UND DRAHT: SIGNALLING & DATACOMMUNICATION, EURAILPRESS, DE, vol. 105, no. 9, 1 September 2013 (2013-09-01), pages 43 - 48, XP001583680, ISSN: 0037-4997 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113085961A (en) * 2021-04-12 2021-07-09 重庆交通职业学院 Intelligent scheduling control method and system for railway vehicle

Also Published As

Publication number Publication date
CN114080342B (en) 2024-01-12
DE102019207948A1 (en) 2020-12-03
CN114080342A (en) 2022-02-22
EP3956194A1 (en) 2022-02-23

Similar Documents

Publication Publication Date Title
DE112016004373B4 (en) Procedure for controlling hybrid operation of trains with different formation lengths and train control system
DE102016102143A1 (en) The vehicle drive assist system
EP0662898B1 (en) Device for correcting axle counting errors in railway layouts
DE102014210190A1 (en) Driving license for a rail vehicle
DE102011005844A1 (en) Method for automatic controlling of vehicle, involves processing transverse movement of vehicle by decision tree and processing longitudinal movement of vehicle by another decision tree
EP1097077A2 (en) Method for reducing data in railway operation
WO2020239372A1 (en) Method for operating a rail vehicle
EP4079600A1 (en) Method for optimising occupancy assessment when issuing permission for a railway vehicle / train to proceed with a train ahead
DE102015218971A1 (en) Safety procedure for a rail network
EP3795451B1 (en) Method for locating a vehicle on a station provided for the vehicle stopping
DE102010048675A1 (en) Method for prognosticating phase transitions into traffic jam phases on traffic route system traveled by vehicles, involves determining phase zone of traffic jam phases depending on number of phase transition parameters
EP3075626A2 (en) Method and system for operating a railway system
EP3328706B1 (en) Safety method and safety system for a railway network
WO2015090933A1 (en) Controlling a rail vehicle
DE102014223197A1 (en) Method for carrying out an automatic train service and train system for carrying out an automatic train service
EP0988207B1 (en) Device for controlling level crossings
EP3331745A1 (en) Protection method and protection system for a rail network
DE2543089C2 (en) Circuit arrangement for securing track vacancy detection information
DE1605430C3 (en) Procedure for train sequence protection with linear information transmission between the train and the route
EP3194243B1 (en) Method for implementing automatic railway traffic, and railway traffic system for implementing automatic railway traffic
DE102015011310A1 (en) Method and system for starting a vehicle of a vehicle convoy
DE102019125817A1 (en) Method for planning one or more trajectories of a vehicle and system for carrying out the method
EP2117904B1 (en) Method for displaying relevant control status information about components in a manner incorporating all sections
DE4429403C2 (en) Process for treating overlapping slipping paths
DE102015011272A1 (en) Method and system for operating doors of a vehicle convoy

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20728403

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2020728403

Country of ref document: EP

Effective date: 20211118