WO2020217300A1 - 配線情報作成システム及び配線情報作成方法 - Google Patents

配線情報作成システム及び配線情報作成方法 Download PDF

Info

Publication number
WO2020217300A1
WO2020217300A1 PCT/JP2019/017180 JP2019017180W WO2020217300A1 WO 2020217300 A1 WO2020217300 A1 WO 2020217300A1 JP 2019017180 W JP2019017180 W JP 2019017180W WO 2020217300 A1 WO2020217300 A1 WO 2020217300A1
Authority
WO
WIPO (PCT)
Prior art keywords
communication
port
information
connection
physical
Prior art date
Application number
PCT/JP2019/017180
Other languages
English (en)
French (fr)
Inventor
拓弥 原田
智也 秦野
鈴木 裕生
Original Assignee
日本電信電話株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 日本電信電話株式会社 filed Critical 日本電信電話株式会社
Priority to US17/602,805 priority Critical patent/US11825247B2/en
Priority to PCT/JP2019/017180 priority patent/WO2020217300A1/ja
Priority to JP2021515341A priority patent/JP7089211B2/ja
Publication of WO2020217300A1 publication Critical patent/WO2020217300A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • H04Q11/0066Provisions for optical burst or packet networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0803Configuration setting
    • H04L41/0806Configuration setting for initial configuration or provisioning, e.g. plug-and-play
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L12/00Data switching networks
    • H04L12/28Data switching networks characterised by path configuration, e.g. LAN [Local Area Networks] or WAN [Wide Area Networks]
    • H04L12/46Interconnection of networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/12Discovery or management of network topologies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0005Switch and router aspects
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0005Switch and router aspects
    • H04Q2011/0007Construction
    • H04Q2011/0026Construction using free space propagation (e.g. lenses, mirrors)
    • H04Q2011/003Construction using free space propagation (e.g. lenses, mirrors) using switches based on microelectro-mechanical systems [MEMS]
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0005Switch and router aspects
    • H04Q2011/0037Operation
    • H04Q2011/0039Electrical control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0005Switch and router aspects
    • H04Q2011/0037Operation
    • H04Q2011/0043Fault tolerance
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04QSELECTING
    • H04Q11/00Selecting arrangements for multiplex systems
    • H04Q11/0001Selecting arrangements for multiplex systems using optical switching
    • H04Q11/0062Network aspects
    • H04Q2011/0079Operation or maintenance aspects
    • H04Q2011/0081Fault tolerance; Redundancy; Recovery; Reconfigurability
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D30/00Reducing energy consumption in communication networks

Definitions

  • the present invention relates to a wiring information creation system and a wiring information creation method.
  • the optical communication network has redundant communication ports, packages, and devices in case the communication ports, packages, and devices that communicate with each other fail, or when the packages and devices are updated or replaced.
  • the optical communication network switches the communication port, package and device used for communication by using a communication protocol or a communication control method to continue communication.
  • Specific examples of the redundancy and communication control method are as follows. In the layer 2 protocol, link aggregation is widely used as a route redundancy-device redundancy-package redundancy method. Device Redundancy-The Spanning Tree Protocol is widely used as a device redundancy method.
  • the access section connecting the device installed on the user side using the optical communication network and the accommodation device accommodating the device is redundant. Often not. This is because the number of communication ports, packages, and devices to be redundant is very large in the access section, and the cost of redundancy is high.
  • redundancy is not applied, when a failure occurs or a package or device is updated or replaced, a technician goes to the site to deal with the failure, update or replacement.
  • a technician may manually wire between communication devices.
  • RPP Robot Patch Panel
  • the operator remotely perform the wiring between the communication devices without the engineer going to the communication station building.
  • the operator switches the wiring inside the switching device, which is pre-connected to the communication device, by operating the wiring remotely.
  • the operator must know the information of the physical wiring between the physical port of the switching device and the communication port of the communication device in advance.
  • the engineer who went to the communication station building correctly obtained the information on the physical wiring between the physical port of the switching device and the communication port of the communication device based on the contents of the wiring work in the communication station building. Need to create.
  • the system creates information on the physical wiring between the physical port of the switching device and the communication port of the communication device on behalf of the technician. Is desirable.
  • the conventional system has not been able to create information on the physical wiring between the physical port of the switching device and the communication port of the communication device.
  • the present invention provides a wiring information creation system and a wiring information creation method capable of creating information on physical wiring between a physical port of a switching device and a communication port of a communication device. I am aiming.
  • One aspect of the present invention is a switching device that switches the transmission line of an optical signal between the upper network and the lower network in units of a combination of physical ports, and an instruction to switch the transmission line so as to pass through the selected physical port. It is determined whether or not the switching control device that outputs the above to the switching device, the communication port of the intermediate communication device that relays the communication between the upper network and the lower network, and the selected physical port are connected. , Creates a connection control device that acquires the number of the communication port connected to the selected physical port from the medium communication device, and connection information representing the communication port connected to the selected physical port. , A wiring information creation system including an information creation device that updates wiring information that represents connection information for each physical port of the switching device.
  • connection control device selects whether or not the communication port of the medium communication device and the selected physical port are connected. The determination is made based on the measurement result of the light intensity of the optical signal in the transmission line of the physical port.
  • connection control device sets the communication port number in the above by executing communication based on LLDP (Link Layer Discovery Protocol) or loopback. Obtained from the communication device.
  • LLDP Link Layer Discovery Protocol
  • connection control device acquires information on the communication standard of the optical transceiver connected to the selected physical port, and the information creation device acquires the information. Based on the information of the communication standard of the optical transceiver, the connection information that further represents the communication standard of the communication port of the medium communication device for each physical port of the switching device is created, and the connection information is the connection information of the switching device. The wiring information represented for each physical port is updated.
  • One aspect of the present invention is the wiring information creation system, wherein when the link down of the communication port of the medium communication device is detected, the information creation device detects the link down. Include error information in the connection information of.
  • One aspect of the present invention is the wiring information creation system, wherein when the link-up of the communication port that has been linked down is detected, the information creation device of the communication port in which the link-up is detected.
  • the connection information is newly created and the connection information of the communication port that has been linked down is the same as the newly created connection information
  • the error information of the connection information of the communication port in which the link down is detected is displayed. Erase or overwrite.
  • One aspect of the present invention is the wiring information creation system, wherein when the link-up of the communication port that has been linked down is detected, the information creation device of the communication port in which the link-up is detected.
  • the wiring information is updated based on the newly created connection information.
  • One aspect of the present invention is the above-mentioned wiring information creation system, which detects at least one of an increase in the intensity of an optical signal and a decrease in the intensity of an optical signal between an upper network and an lower network. Further including a device, the connection control device acquires the number of the communication port of the medium communication device connected to the physical port in which an increase in the intensity of an optical signal is detected.
  • One aspect of the present invention is the wiring information creation system, in which the information creation device periodically selects the physical port of the switching device.
  • One aspect of the present invention is a wiring information creation method executed by a wiring information creation system, which is selected as a switching device for switching an optical signal transmission path between an upper network and an lower network in units of physical port combinations.
  • a switching control step that outputs an instruction to switch the transmission line so as to pass through the physical port, a communication port of a medium communication device that relays communication between the upper network and the lower network, and the selected physical port.
  • the connection control step of determining whether or not is connected and acquiring the number of the communication port connected to the selected physical port from the medium communication device, and the connection to the selected physical port.
  • This is a wiring information creation method including a step of creating connection information representing the communication port and updating wiring information representing the connection information for each physical port of the switching device.
  • FIG. 1 is a diagram showing a configuration example of the optical communication network 100.
  • the optical communication network 100 includes an upper network 1, a communication system 110, and a lower network 4.
  • the communication system 110 relays an optical signal used in communication between the upper network 1 and the lower network 4.
  • the communication system 110 makes it possible to make the communication between the upper network 1 and the lower network 4 redundant and reduce the operating cost of the optical communication network 100.
  • the communication system 110 is provided in a communication station building accommodating a communication line with the user-side network. Relays communication between the backbone network and the user's network.
  • the communication system is used.
  • the 110 is provided in a communication station building accommodating a communication line between each RRH and BBU, and relays communication between BBU and RRH.
  • the upper network 1 includes a communication line 12 connected to a backbone network or another optical communication network, and M upper communication devices 11 (11-1, ..., 11-M) connected to the communication line 12.
  • the host communication device 11 includes a plurality of one communication port 111, a plurality of communication ports 112, and a setting port 113.
  • the communication port 112 is connected to the communication line 12.
  • the communication port 111 is connected to the communication system 110.
  • the setting port 113 is connected to the communication system 110 and receives device setting information.
  • the device setting information supplied to the setting port 113 defines the operation of the host communication device 11 regarding the relay and signal processing of the optical signal between the communication port 112 and the communication port 111.
  • the host communication device 11 relays the communication between the communication line 12 and the communication system 110 based on the device setting information.
  • the number of communication ports 111 and 112 included in the host communication device 11 may be one.
  • the lower network 4 includes P lower communication devices 41 (41-1, ..., 41-P) connected to the device on the user side.
  • the lower communication device 41 includes a plurality of communication ports 411, a plurality of communication ports 412, and a setting port 413.
  • the communication port 412 is connected to the communication system 110.
  • the communication port 411 is connected to the device on the user side.
  • the setting port 413 is connected to the communication system 110 and receives device setting information.
  • the device setting information supplied to the setting port 413 defines the operation of the lower communication device 41 regarding relaying and signal processing of an optical signal between the communication port 412 and the communication port 411.
  • the lower communication device 41 relays communication between the communication system 110 and the device on the user side based on the device setting information.
  • the number of communication ports 411 and communication ports 412 included in the lower communication device 41 may be one.
  • M and P represent the numbers of the upper communication device 11 and the lower communication device 41, respectively, and are integers of 1 or more. In the configuration example shown in FIG. 1, the case where the number of the upper communication device 11 and the lower communication device 41 is two or more is shown, but one or both of the number of the upper communication device 11 and the lower communication device 41 is one. There may be.
  • the communication system 110 includes N intermediate communication devices 2 (2-2, ..., 2-N), a switching device 3, a switching control device 5, a communication control device 6, a network management device 7, a host control device 8, and a terminal.
  • the device 9 is provided.
  • the intermediate communication device 2 has at least one communication port 22 used for communication with the upper network 1, at least one communication port 21 used for communication with the lower network 4, and a setting port 23 for inputting device setting information.
  • the device setting information defines the operation of the intermediate communication device 2 regarding the relay of the optical signal between the communication port 22 and the communication port 21.
  • the communication port 22 is also referred to as an upper port of the intermediate communication device 2.
  • the communication port 21 is also referred to as a lower port of the intermediate communication device 2.
  • the medium communication device 2 outputs an optical signal input from the communication port 22 from any communication port 21 based on the device setting information supplied from the communication control device 6 to the setting port 23.
  • the optical signal input from the communication port 22 may be output from one communication port 21 or may be output from a plurality of communication ports 21.
  • the optical signal includes signals of a plurality of wavelengths divided and multiplexed by wavelength division multiplexing
  • the signals of each wavelength separated from the optical signal are transmitted to a plurality of communication ports based on the output destination determined for each wavelength in the device setting information. It may be output to 21.
  • the intermediate communication device 2 outputs an optical signal input from the communication port 21 from any communication port 22 according to the device setting information.
  • the medium communication device 2 synthesizes optical signals having different wavelengths among the optical signals input from the communication port 21, and synthesizes the optical signals.
  • One obtained optical signal is output from the communication port 22.
  • the signal processing for the optical signals input from the communication port 21 and the communication port 22 is not limited to the above example.
  • At least one of the plurality of intermediate communication devices 2 is an upper network in case the other intermediate communication device 2 fails or the communication ports 21 and 22 of the other intermediate communication device 2 fail. It has communication ports 21 and 22 that do not relay communication between 1 and the lower network 4. Further, in at least one of the plurality of intermediate communication devices 2, all communication ports 21 and 22 do not have to relay the communication between the upper network 1 and the lower network 4.
  • Such a medium communication device 2 is a spare device provided in preparation for failure, renewal, or replacement of another medium communication device 2.
  • the communication system 110 may include one or more intermediate communication devices 2 as spare devices.
  • the switching device 3 includes a plurality of physical ports 31 and a control port 32.
  • Each physical port 31 is connected to any one of the communication port 111 provided in the upper communication device 11, the communication ports 21 and 22 provided in the middle communication device 2, and the communication port 412 provided in the lower communication device 41. ..
  • the physical port 31 has a connector having a shape corresponding to the connector attached to the optical fiber cable, and inputs and outputs an optical signal.
  • the switching device 3 receives the control information from the switching control device 5 via the control port 32.
  • the switching device 3 connects two physical ports out of a plurality of physical ports to enable transmission of an optical signal between the two physical ports according to control information.
  • the switching device 3 has a configuration in which a robot arm switches an optical fiber cable connecting a physical port 31 and another physical port 31.
  • the switching device 3 has a MEMS (Micro-Electro-Mechanical Systems) mirror device that enables transmission of an optical signal between the two physical ports 31 via a controlled MEMS mirror.
  • the switching device 3 may have a configuration in which the transmission path of the optical signal can be changed by selecting a pair of two physical ports 31.
  • the switching control device 5 controls the switching device 3 in response to an instruction received from the host control device 8.
  • the instruction received from the host control device 8 indicates that the two physical ports 31 are connected.
  • the instructions may indicate connecting a plurality of pairs of physical ports 31.
  • the communication control device 6 supplies device setting information to the upper communication device 11, the intermediate communication device 2, and the lower communication device 41 in response to an instruction received from the upper control device 8, and supplies the upper communication device 11, the intermediate communication device 2 And the operation of each of the lower communication devices 41 is controlled.
  • the device setting information supplied to the upper communication device 11 is the signal processing for the optical signal input from the communication port 111 and the communication port 112 of the upper communication device 11, and the communication port 111 or the communication port 111 for outputting the optical signal obtained by the signal processing.
  • the communication port 112 is defined.
  • the device setting information supplied to the lower communication device 41 is the signal processing for the optical signal input from the communication port 411 and the communication port 412, and the communication port 411 or the communication port for outputting the optical signal obtained by the signal processing. Establish 412.
  • the network management device 7 includes an allocation management unit 71 and a physical wiring management unit 75.
  • the allocation management unit 71 stores and updates the allocation information.
  • the allocation information includes information indicating the connection between the communication port 111 of the upper communication device 11 connected via the switching device 3 and the communication port 22 of the intermediate communication device 2, and the intermediate information connected via the switching device 3. Includes information indicating the connection between the communication port 21 of the communication device 2 and the communication port 412 of the lower communication device 41.
  • the allocation information indicates the intermediate communication device 2 assigned to the communication between the upper network 1 and the lower network 4, and the communication ports 21 and 22 thereof.
  • the physical wiring management unit 75 stores and updates the physical wiring information.
  • the physical wiring information includes information indicating the connection between the communication port 111 of the upper communication device 11 and the physical port 31 of the switching device 3, and the connection between the switching device 3 and the communication port 21 and the communication port 22 of the intermediate communication device 2.
  • the information shown and the information indicating the connection between the physical port 31 of the switching device 3 and the communication port 412 of the lower communication device 41 are included.
  • the physical wiring information indicates the connection between each communication port of the upper communication device 11, the middle communication device 2, and the lower communication device 41, and the physical port 31 of the switching device 3.
  • the host control device 8 supplies the switching control device 5 with an instruction to switch the connection of the physical port 31 in response to an instruction received from the terminal device 9 connected via another network.
  • the terminal device 9 receives an input from an engineer who operates and maintains the optical communication network 100, and supplies an instruction to the host control device 8.
  • the terminal device 9 is provided at a location different from the communication station building where the intermediate communication device 2 and the switching device 3 are installed, and the technician operates the switching device 3 by remote control.
  • the communication system 110 acquires state information regarding a communication state between the upper network 1 and the lower network 4 via the terminal device 9.
  • the status information is, for example, a communication interruption in the optical communication network 100, a failure of the medium communication device 2, a failure of the communication ports 21 and 22 of the medium communication device 2, or a communication line provided to a user who uses the optical communication network 100. Indicates a change in.
  • the technician operates the switching device 3 in response to a failure notification in the medium communication device 2 and a communication interruption notification from a user who uses the optical communication network 100.
  • the engineer operates the switching device 3 to switch the medium communication device 2 assigned to the communication and the communication ports 21 and 22 thereof, thereby recovering from the failure or the communication interruption.
  • the engineer operates the switching device 3 in response to a request from a user who uses the optical communication network 100.
  • the request from the user includes changing the bandwidth of the communication line provided to the user, suspending the use of the communication line, adding a new communication line, and the like.
  • the optical communication network 100 changes the intermediate communication device 2 connected to the lower communication device 41, changes the communication port 21 of the intermediate communication device 2 connected to the lower communication device 41, or changes the communication port 21 of the intermediate communication device 41.
  • the number of communication ports 21 connected to the lower communication device 41 is increased or decreased.
  • the communication system 110 switches between the intermediate communication device 2 assigned to relay the communication between the upper network 1 and the lower network 4 and its communication ports 21 and 22 by using the switching device 3.
  • the failure of the medium communication device 2 can be recovered without the technician going to the communication station building where the medium communication device 2 is installed.
  • the medium communication device 2 can be updated or replaced.
  • the communication system 110 can reduce the operating cost of the optical communication network 100 and shorten the period during which communication is not possible by eliminating the work of engineers in the communication station building.
  • the communication system 110 can freely change the intermediate communication device 2 connected to the upper network 1 and the lower network 4, it is not necessary to provide a spare device for each intermediate communication device 2 used for communication. Redundancy of each medium communication device 2 can be realized. By providing the communication system 110 with a number of intermediate communication devices 2 according to the degree of redundancy, the cost required for redundancy of the intermediate communication devices 2 can be reduced. Further, the communication system 110 can change the communication line provided to the user by switching the connection by the switching device 3 in a shorter time than when the engineer goes to the communication station building.
  • FIG. 2 is a diagram showing an example of connection between each of the upper communication device 11, the middle communication device 2, and the lower communication device 41 and the switching device 3.
  • the upper network 1 includes the upper communication device 11-1 “# A”
  • the communication system 110 has the intermediate communication device 2-1 “# B” and the intermediate communication device 2-2 “# A”.
  • the lower network 4 is provided with the lower communication device 41-1 "#C”.
  • the host communication device 11-1 "#A” includes two communication ports 111 "# 1" and “# 2".
  • the medium communication devices 2-1 “# B” and 2-2 “# D” have two communication ports 22 “# 1” and “# 2" and two communication ports 21 “# 3" and “# 4". ".
  • the lower communication device 41-1 "# C” includes two communication ports 412 "# 1" and "# 2". Communication ports and physical ports that are assigned the same name and code are distinguished by combining "#" and numbers.
  • the physical ports 31 "# 11" and “# 12" are connected to the communication ports 111 "# 1" and “# 2" of the host communication device 11-1 "# A”, respectively.
  • the physical ports 31 "# 21" and “# 22" are connected to the communication ports 22 “# 1" and “# 2" of the medium communication device 2-1 "# B", respectively.
  • the physical ports 31 "# 23" and “# 24" are connected to the communication ports 22 “# 1" and "# 2" of the medium communication device 2-2 “# D", respectively.
  • the physical ports 31 "# 31” and “# 32" are connected to the communication ports 21 “# 3" and "# 4" of the medium communication device 2-1 "# B", respectively.
  • the physical ports 31 "# 33" and “# 34" are connected to the communication ports 21 “# 3" and “# 4" of the medium communication device 2-2 "# D", respectively.
  • the physical ports 31 "# 41” and “# 42” are connected to the communication ports 412 "# 1" and "# 2" of the lower communication device 41-1 "# C", respectively.
  • the physical ports 31 "# 11" and “# 12" are connected to the physical ports 31 "# 21" and "# 22", respectively.
  • the physical ports 31 "# 31" and “# 32" are connected to the physical ports 31 "# 41" and "# 42", respectively.
  • the connection between the physical ports 31 in the switching device 3 can be switched as described above.
  • FIG. 3 is a block diagram showing a configuration example of the switching control device 5.
  • the switching control device 5 includes an interface 51, a wiring information acquisition unit 52, a switching device wiring information storage unit 53, a wiring availability determination unit 54, a wiring instruction unit 55, a response reception unit 56, and a wiring information update unit 57.
  • the interface 51 performs input / output with the host control device 8.
  • the interface 51 receives the connection change information and the request information as control information from the host control device 8.
  • the connection change information indicates an instruction to change the connection between the physical ports 31 in the switching device 3.
  • the request information indicates a request for switching device wiring information stored in the switching device wiring information storage unit 53.
  • the interface 51 notifies the host control device 8 of a response indicating the completion or inability of the connection change based on the connection change information. Further, the interface 51 supplies the switching device wiring information and the switching device wiring information to the host control device 8 as a response to the request information.
  • the wiring information acquisition unit 52 reads out the switching device wiring information stored in the switching device wiring information storage unit 53, and supplies the read switching device wiring information to the interface 51.
  • the switching device wiring information storage unit 53 stores the switching device wiring information.
  • the switching device wiring information indicates the connection between the physical ports 31 in the switching device 3.
  • the switching device wiring information includes information indicating a pair of physical port numbers that identify the two connected physical ports 31.
  • FIG. 4 is a diagram showing an example of switching device wiring information.
  • the switching device wiring information shown in FIG. 4 represents the connection between the physical ports 31 in the connection example shown in FIG.
  • the switching device wiring information shown in FIG. 4 includes a pair of physical port numbers “# 11” and “# 21”, and indicates that the physical port 31 indicated by the physical port number is connected.
  • the switching device wiring information includes that the physical ports 31 "# 12" and “# 22" are connected, that the physical ports 31 “# 41” and “# 23” are connected, and that the physical ports 31 "# 23" are connected. , Indicates that the physical ports 31 "# 42" and "# 24" are connected.
  • the switching device wiring information includes upper wiring information indicating a pair of physical port numbers relating to the connection between the upper network 1 and the communication port 22, and lower level information indicating a pair of physical port numbers relating to the connection between the lower network 4 and the communication port 22. It may be divided into wiring information.
  • the wiring availability determination unit 54 determines whether or not the connection can be changed indicated by the connection change information based on the switching device wiring information.
  • the wiring possibility determination unit 54 supplies the connection change information to the wiring instruction unit 55.
  • the wiring possibility determination unit 54 notifies the interface 51 of a response indicating that the connection cannot be changed. For example, when the connection change information indicates a change instruction for connecting the physical port 31 "# 23" to the physical port 31 "# 12" that is already connected to the physical port 31 "# 22", it is determined whether or not wiring is possible.
  • the unit 54 determines that a plurality of physical ports cannot be connected to the physical port 31 "# 12", and determines that the connection is impossible. At this time, the wiring possibility determination unit 54 supplies the interface 51 with a response indicating that the connection cannot be changed.
  • the wiring instruction unit 55 supplies a connection change instruction based on the connection change information to the control port 32 of the switching device 3.
  • the response receiving unit 56 receives a response indicating the completion of the connection change according to the connection change information from the control port 32 of the switching device 3.
  • the response receiving unit 56 notifies the wiring information updating unit 57 of the acceptance of the response.
  • the wiring information updating unit 57 updates the switching device wiring information according to the connection change indicated by the connection change information.
  • the wiring information updating unit 57 finishes updating the switching device wiring information
  • the wiring information updating unit 57 notifies the interface 51 of a response indicating the completion of the connection change based on the connection change information.
  • the interface 51 supplies the host control device 8 with a response indicating the completion of the connection change based on the connection change information.
  • FIG. 5 is a block diagram showing a configuration example of the allocation management unit 71.
  • the allocation management unit 71 includes an interface 72, an information creation unit 73, and an allocation information storage unit 74.
  • the interface 72 receives a request for allocation information and an instruction for updating from the host control device 8.
  • the interface 72 Upon receiving the instruction requesting the allocation information, the interface 72 reads the allocation information stored in the allocation information storage unit 74 and supplies the read allocation information to the host control device 8.
  • the interface 72 When the interface 72 receives the instruction to update the allocation information, the interface 72 notifies the information creation unit 73 of the instruction to update the allocation information.
  • the information creation unit 73 requests the switching device wiring information and the physical wiring information from the host control device 8 via the interface 72.
  • the interface 72 supplies the switching device wiring information and the physical wiring information received as a response to the request to the information creation unit 73.
  • the information creation unit 73 creates allocation information based on the switching device wiring information and the physical wiring information, and updates the allocation information stored in the allocation information storage unit 74 with the created allocation information.
  • FIG. 6 is a diagram showing an example of allocation information.
  • the allocation information includes communication device information regarding each of the upper communication device 11, the middle communication device 2, and the lower communication device 41 provided in the optical communication network 100.
  • the communication device information includes identification information that identifies each of the upper communication device 11, the middle communication device 2, and the lower communication device 41, and a communication port number that identifies each of the communication ports of those devices. That is, the communication device information uniquely identifies the communication port in the communication system 110.
  • the allocation information indicates the intermediate communication device 2 assigned to the communication between the upper network 1 and the lower network 4, and the communication ports 21 and 22 thereof.
  • the serial of the device is used as the identification information of the upper communication device 11-1 “# A”, the middle communication device 2-1 “# B”, and the lower communication device 41-1 “# C”.
  • the numbers “AAAA”, “BBBB” and “CCCC” are used.
  • "# 1", “# 2", “# 3” and “# 4" are used as communication port numbers indicating the communication ports of each device.
  • the serial number is used as the identification information will be described, the upper communication device 11, the middle communication device 2, and the lower communication device 41 may be identified by using other than the serial number.
  • the identification information any one of the MAC (Media Access Control) address, host name, device name, IP (Internet Protocol) address, etc. assigned to the upper communication device 11, the middle communication device 2, and the lower communication device 41.
  • MAC Media Access Control
  • IP Internet Protocol
  • the allocation information representing the connection example shown in FIG. 2 is that of the communication port 111 “# 1” of the upper communication device 11-1 “# A” and the intermediate communication device 2-1 “# B”. It indicates that the communication ports 22 “# 1” correspond to each other, indicating that those communication ports are connected. Similarly, as for the allocation information, the communication port 111 "# 2" of the upper communication device 11-1 “# A” and the communication port 22 "# 2" of the middle communication device 2-1 “# B” are connected. Indicates that you are. Further, as for the allocation information, the communication port 21 "# 3" of the intermediate communication device 2-1 "# B” and the communication port 42 "# 1" of the lower communication device 41-1 “# C” are connected. That, and that the communication port 21 "# 4" of the intermediate communication device 2-1 "# B” and the communication port 42 "# 2” of the lower communication device 41-1 “# C” are connected. Represents.
  • FIG. 7 is a block diagram showing a configuration example of the physical wiring management unit 75.
  • the physical wiring management unit 75 includes an interface 76, a physical wiring information acquisition unit 77, a physical wiring information update unit 78, and a physical wiring information storage unit 79.
  • the interface 76 receives a request for physical wiring information or an instruction for updating from the host control device 8. Upon receiving the instruction requesting the physical wiring information, the interface 76 notifies the physical wiring information acquisition unit 77 of the instruction.
  • the interface 76 receives the physical wiring information from the physical wiring information acquisition unit 77 as a response to the instruction, and supplies the physical wiring information to the host control device 8.
  • the interface 76 requests the physical wiring change information from the upper control device 8.
  • the physical wiring change information indicates a change in the connection between the upper communication device 11, the middle communication device 2, the lower communication device 41, and the switching device 3.
  • the interface 76 supplies the physical wiring change information to the physical wiring information updating unit 78.
  • the physical wiring information acquisition unit 77 reads the physical wiring information from the physical wiring information storage unit 79 in response to the instruction from the interface 76, and supplies the read physical wiring information to the interface 76.
  • the physical wiring information updating unit 78 receives the physical wiring change information from the interface 76, the physical wiring information updating unit 78 updates the physical wiring information stored in the physical wiring information storage unit 79 based on the connection change indicated by the physical wiring change information.
  • FIG. 8 is a diagram showing an example of physical wiring information.
  • the physical wiring information includes switching device information or a physical port number indicating the physical port 31 of the switching device 3, and communication device information relating to each of the upper communication device 11, the intermediate communication device 2, and the lower communication device 41.
  • the physical wiring information indicates a communication port of any one of the upper communication device 11, the middle communication device 2, and the lower communication device 41 connected to each of the physical ports 31.
  • the empty (NULL) information in the physical wiring information becomes the physical port number of the physical port 31. Be associated.
  • the physical wiring information showing the connection example shown in FIG. 2 corresponds to the physical port 31 “# 11” and the communication port 111 “# 1” of the host communication device 11-1 “# A”. Indicates that these ports are connected. Similarly, the physical wiring information indicates that the physical port 31 “# 12” and the communication port 111 “# 2” of the host communication device 11-1 are connected.
  • the physical wiring information includes physical ports 31 "# 21", “# 22", “# 23" and "# 24", communication port 22 "# 1" of the medium communication device 2-1 and communication port 22. This indicates that "# 2", communication port 21 "# 3", and communication port 21 "# 4" are connected to each other.
  • the physical wiring information includes physical ports 31 "# 31", “# 32", “# 33” and “# 34", communication port 22 "# 1" of the medium communication device 2-2, and communication port 22. It indicates that "# 2", the communication port 21 "# 3", and the communication port "# 4" are connected to each other. Further, the physical wiring information indicates that the physical ports 31 "# 41" and "# 42" and the communication ports 412 "# 1" and "# 2" of the lower communication device 41-1 are connected, respectively. ing.
  • FIG. 9 is a diagram showing a configuration example of the wiring information creation system 10.
  • the wiring information creation system 10 is a device that creates physical wiring information (physical wiring information) between the physical port of the switching device 3 of the communication system 110 and the communication port of the intermediate communication device 2.
  • the wiring information creation system 10 creates, for example, the physical wiring information shown in FIG.
  • the measuring devices 13-1 to 13-R may be a single device. That is, the measuring devices 13-1 to 13-R may be integrated in the same housing.
  • a part or all of the switching control device 5, the intermediate communication device 2, the communication control device 6, the upper control device 8, the terminal device 9, the measuring device 13, and the connection control device 14 is a CPU (Central Processing Unit).
  • the processor is realized as software by reading and executing a program stored in a memory which is a non-volatile recording medium (non-temporary recording medium).
  • the program may be recorded on a computer-readable recording medium.
  • Computer-readable recording media include, for example, flexible disks, optomagnetic disks, portable media such as ROM (ReadOnlyMemory) and CD-ROM (CompactDiscReadOnlyMemory), and storage of hard disks built into computer systems. It is a non-temporary storage medium such as a device.
  • the program may be transmitted over a telecommunication line.
  • a part or all of the switching control device 5, the intermediate communication device 2, the communication control device 6, the upper control device 8, the terminal device 9, the measuring device 13, and the connection control device 14 may be, for example, an LSI (Large Scale Integration).
  • the switching control device 5, the communication control device 6, the upper control device 8, and the connection control device 14 communicate with each other using, for example, an API (Application Programming Interface).
  • API Application Programming Interface
  • the intermediate communication device 2 relays the communication between the upper network 1 and the lower network 4.
  • the intermediate communication device 2 is, for example, an accommodation device that accommodates communication between the upper network 1 and the lower network 4.
  • the serial number address assigned to the intermediate communication device 2-1 is, for example, "BBBB”.
  • the serial number assigned to the intermediate communication device 2-N is, for example, "DDDD”.
  • the medium communication device 2 includes a plurality of communication ports 21, a plurality of communication ports 22, and a setting port 23.
  • the communication port 21 and the communication port 22 may be connected in advance in the intermediate communication device 2 based on the device setting information.
  • the communication port 21 and the communication port 22 of the medium communication device 2 and the physical port 31 of the switching device 3 are connected in advance by using an optical fiber.
  • the physical port 31 “# 1” and the communication port 22 “# 1” of the intermediate communication device 2-1 are connected in advance.
  • the physical port 31 “# 2” and the communication port 22 “# 2” of the medium communication device 2-1 are connected in advance.
  • the physical port 31 “# 4” and the communication port 22 “# 2” of the medium communication device 2-N are connected in advance.
  • the physical port 31 “# 5” and the communication port 22 “# 3” of the medium communication device 2-N are connected in advance.
  • the setting port 23 of the intermediate communication device 2 and the communication control device 6 are connected in advance by using a communication cable.
  • the setting port 23 transmits and receives signals between the intermediate communication device 2 and the communication control device 6.
  • the switching device 3 includes a plurality of physical ports 31 and a control port 32.
  • the switching device 3 is, for example, an RPP or a crossbar switch.
  • the physical port 31 transmits and receives an optical signal between the intermediate communication device 2 and the switching device 3. Further, the physical port 31 transmits and receives an optical signal between the measuring device 13 and the switching device 3.
  • the control port 32 transmits and receives a signal between the switching device 3 and the switching control device 5.
  • the switching device 3 switches the transmission path of the optical signal between the upper network 1 and the lower network 4 in units of combinations of physical ports 31 according to the control by the switching control device 5.
  • the switching control device 5 outputs an instruction to switch the transmission line so that the transmission line passes through the physical port 31 selected by the host control device 8 to the switching device 3. For example, when the physical port 31 "# 1" is selected, the transmission line passes through the physical port 31 connected to the measuring device 13 and the physical port 31 "# 1" selected by the host control device 8. , The transmission line in the switching device 3 is switched.
  • the communication control device 6 is a device that controls the operation of the medium communication device 2.
  • the communication control device 6 notifies the upper control device 8 that the new intermediate communication device 2 is connected to the switching device 3.
  • the host control device 8 selects the physical port 31 of the switching device 3 which is "unused" in the physical wiring information. ..
  • FIG. 10 is a diagram showing an example of physical wiring information.
  • the physical wiring information shown in FIG. 10 is information representing physical wiring in the communication system 110.
  • the switching device information, the measurement information, and the communication device information are associated with each other for each physical port of the switching device.
  • connection information represents a row in the physical wiring information in tabular form.
  • the switching device information is information related to the switching device 3.
  • the switching device information includes the physical port number of the switching device 3.
  • the measurement information is information regarding the measurement result.
  • the measurement information includes connection status information.
  • the connection status information is information indicating the connection status between the intermediate communication device 2, the communication port, and the physical port of the switching device 3.
  • the information indicating the connection state is, for example, information indicating link-up, error, or unused.
  • error means that the link is up and not communicated, that is, the link is down.
  • "Unused" indicates that the physical port is not connected to the communication port.
  • the communication device information is information about the medium communication device 2.
  • the communication device information includes, for example, the serial number of the medium communication device 2 and the communication port number.
  • the measuring device 13 is a device that measures an optical signal.
  • the measuring device 13 includes an intensity detection unit 131, an optical transceiver 132, an optical transceiver 133, an optical transceiver 134, and an interface 135.
  • the intensity detection unit 131 and the physical port 31 of the switching device 3 are connected by an optical fiber
  • the optical transceiver 134 selected in advance and the physical port 31 of the switching device 3 are connected by an optical fiber.
  • the intensity detection unit 131 is an optical power meter.
  • the optical transceiver 132, the optical transceiver 133, the optical transceiver 134, and the interface 135 are optical transceivers that support Ethernet (registered trademark) communication standards such as 10GBASE-SX and 10GBASE-LR.
  • the optical transceiver 132 corresponds to the communication standard "10GBASE-SX" as an example.
  • the optical transceiver 133 corresponds to the communication standard "10GBASE-LR" as an example.
  • the optical transceiver 134 corresponds to the communication standard "10GBASE-LX4".
  • the communication speed of each optical transceiver can be changed within the range specified in the communication standard.
  • the physical port 31 "# 1" When, for example, the physical port 31 "# 1" is selected by the host control device 8, the physical port 31 "# 1" and the intensity detection unit 131 are connected by the switching device 3.
  • the measuring device 13 measures the optical signal (port state) of the connected physical port 31 according to the control by the connection control device 14.
  • the intensity detection unit 131 measures the intensity of the optical signal of the physical port 31 “# 1” connected to the intensity detection unit 131 while changing the communication speed.
  • the intensity of the optical signal at the physical port 31 "# 1” is the physical port 31 "# 1".
  • the measuring device 13 are not linked up or communicated with each other. Therefore, the connection control device 14 can detect the physical port 31 connected to the communication port 21 or the communication port 22 via the optical fiber based on the measurement result of the intensity of the optical signal at the physical port 31. ..
  • connection control device 14 determines that the intensity of the optical signal of, for example, the physical port 31 "# 1" connected to the intensity detection unit 131 is equal to or higher than the threshold value, the physical port 31 "# 1" is described in advance.
  • the selected optical transceiver 134 is connected by the switching device 3.
  • the optical transceiver 134 connected to the physical port 31 "# 1" executes communication with the physical port 31 "# 1" based on the communication standard "10GBASE-LX4". Based on whether or not the communication by the optical transceiver 134 is successful, it is determined whether or not the physical port 31 "# 1" is linked up.
  • connection control device 14 determines that the intensity of the optical signal of the physical port 31 "# 2" connected to the intensity detection unit 131 is equal to or higher than the threshold value
  • the physical port 31 "# 2" is next.
  • a preselected optical transceiver 134 is connected by the switching device 3.
  • the optical transceiver 134 also executes communication for the physical port 31 “# 2” whose optical signal intensity is equal to or higher than the threshold value.
  • the optical transceiver 134 also executes communication on the physical ports 31 "# 4" and "# 5" for which the intensity of the optical signal is determined to be equal to or higher than the threshold value. Based on whether or not the communication by the optical transceiver 134 is successful, it is determined whether or not the physical ports 31 "# 4" and "# 5" are linked up or communicated with each other.
  • the connection control device 14 acquires information on the communication standard of the optical transceiver connected to the selected physical port 31 from the measuring device 13.
  • the connection control device 14 acquires the number (for example, serial number) of the medium communication device 2 connected to the selected physical port 31 from the medium communication device 2.
  • the connection control device 14 acquires the number of the communication port 22 connected to the selected physical port 31 from the intermediate communication device 2.
  • the connection control device 14 acquires the communication port number of the medium communication device 2 from the medium communication device 2 when the measuring device 13 executes a loopback command.
  • the connection control device 14 acquires the communication port number of the medium communication device 2 from the medium communication device 2 by transmitting the LLDP (Link Layer Discovery Protocol) packet to the multicast address by the measurement device 13. You may. After the measuring device 13 transmits the LLDP packet to the multicast address, the intermediate communication device 2 acquires predetermined information such as an interface number from the LLDP packet. After the intermediate communication device 2 transmits the LLDP packet to the multicast address, the connection control device 14 may acquire predetermined information such as an interface number from the LLDP packet.
  • LLDP Link Layer Discovery Protocol
  • the connection control device 14 determines whether or not the communication port of the intermediate communication device 2 and the selected physical port 31 are connected.
  • the connection control device 14 determines whether or not the communication port 21 or the communication port 22 of the medium communication device 2 and the selected physical port 31 are connected by the light of the optical signal in the transmission line of the selected physical port 31. Judgment is made based on the measurement result of strength.
  • the connection control device 14 can detect the physical port 31 connected to the communication port 21 or the communication port 22 via the optical fiber based on the measurement result of the intensity of the optical signal.
  • the connection control device 14 determines whether or not the intermediate communication device 2 and the measurement device 13 are linked up or communicated with each other at the selected physical port 31.
  • linking up means that the measuring device 13 and the intermediate communication device 2 (opposite device) are connected, and the measuring device 13 and the intermediate communication device 2 can communicate with each other.
  • the measuring device 13 communicates using the Ethernet (registered trademark) protocol
  • the physical layer (layer 1) of the measuring device 13 and the physical layer of the intermediate communication device 2 are connected, and the data link layer (layer 2) is connected.
  • Communicating means successful execution of a test signal or data transfer such as "Ping" or Loopback.
  • FIG. 11 is a flowchart showing an operation example of the wiring information creation system 10.
  • the switching control device 5 switches the wiring (route) inside the switching device 3 in units of combinations of the physical ports 31 according to the control by the connection control device 14 (step S101).
  • the connection control device 14 determines whether or not the communication port 22 of the intermediate communication device 2 and the optical transceiver 134 of the measurement device 13-2 are linked up or communicated (step S102).
  • step S102 When the communication port 22 of the intermediate communication device 2 and the optical transceiver 134 of the measurement device 13-2 are not linked up or communicated (step S102: NO), the upper control device 8 is not used in the switching device 3. It is determined whether or not the remaining physical ports 31 of the above are present (step S103). When the remaining unused physical port 31 exists (step S103: YES), the switching control device 5 outputs an instruction to switch the route to the remaining unused physical port 31 to the switching device 3 (step S104). .. The wiring information creation system 10 returns the process to step S101.
  • step S103 NO
  • the host control device 8 sets the connection status “error” in the physical wiring information to the physical port not connected to the communication port 22.
  • the connection state is changed to "unused", which indicates that the value is 31 (step S105).
  • the connection control device 14 goes through the measuring device 13-2. Then, the communication device information is acquired from the medium communication device 2 (step S106).
  • the connection control device 14 notifies the upper control device 8 of the communication device information of the intermediate communication device 2 and the physical port number of the switching device 3 (step S107).
  • the host control device 8 creates connection information related to the physical port number based on the communication device information and the physical port number of the switching device 3.
  • the host control device 8 updates the physical wiring information using the connection information.
  • the host control device 8 may transmit physical wiring information to the terminal device 9 (step S108).
  • connection state in the physical wiring information is determined by steps S101 to S104.
  • step S106 "communication device information" in the physical wiring information is determined.
  • the wiring information creation system 10 operates in the same manner as the operation shown in FIG. 11 between the communication port 21 of the intermediate communication device 2 and the optical transceiver 134 of the measurement device 13-1.
  • FIG. 12 is a sequence diagram showing an operation example of the wiring information creation system 10.
  • the intermediate communication device 2 notifies the communication control device 6 that it is connected to the switching device 3 (step S201).
  • the communication control device 6 notifies the host control device 8 that the new intermediate communication device 2 is connected to the switching device 3 (step S202).
  • the host control device 8 selects the physical port 31 that is "unused" in the physical wiring information.
  • the host control device 8 stores the number of the selected physical port 31 (step S203).
  • the host control device 8 outputs an instruction to switch the route to the physical port 31 of the stored number to the switching control device 5 (step S204).
  • the switching control device 5 outputs an instruction to switch the route to the selected physical port 31 to the switching device 3 (step S205).
  • the switching device 3 switches the route to the selected physical port 31.
  • the physical port 31 whose optical signal intensity is equal to or higher than the threshold value is, for example, the physical ports 31 “# 1”, “# 2”, “# 4”, and “# 5”.
  • the connection between the selected physical port 31 and the optical transceiver 134 preselected in the measuring device 13-2 is completed (step S206).
  • the switching device 3 notifies the switching control device 5 that the process of switching the route to the selected physical port 31 is completed (step S207).
  • the switching control device 5 notifies the host control device 8 that the process of switching the route is completed (step S208).
  • the host control device 8 outputs an instruction for confirming the connection state (whether link-up or communication) to the connection control device 14 (step S209).
  • the connection control device 14 outputs an instruction for confirming the connection state to the measuring device 13-2 (step S210).
  • the measuring device 13-2 notifies the connection control device 14 of the connection status of the selected physical port 31 (step S211).
  • the connection control device 14 notifies the host control device 8 of the connection status of the selected physical port 31 (step S212).
  • the host control device 8 stores the measurement information (connection state) of the physical port 31, which is "unused” in the physical wiring information (step S213).
  • the host control device 8 outputs an instruction to acquire the communication device information of the medium communication device 2 connected to the physical port 31 in which the measurement information is stored to the connection control device 14 (step S214).
  • the connection control device 14 outputs an instruction to acquire the communication device information to the measurement device 13-2 (step S215).
  • the measuring device 13-2 outputs an instruction to transmit the communication device information to the medium communication device 2 connected to the physical port 31 in which the measurement information is stored (step S216).
  • the intermediate communication device 2 notifies the measurement device 13-2 of the communication device information (step S217).
  • the measuring device 13-2 notifies the connection control device 14 of the communication device information (step S218).
  • the connection control device 14 notifies the host control device 8 of the communication device information (step S219).
  • the host control device 8 creates connection information for the selected physical port 31 by associating the number of the physical port 31 stored in step S203 with the notified communication device information (step S220).
  • the host control device 8 updates the physical wiring information based on the created connection information (step S221).
  • the wiring information creation system 10 operates in the same manner as the operation shown in FIG. 12 between the communication port 21 of the intermediate communication device 2 and the optical transceiver 134 of the measurement device 13-1.
  • the wiring information creation system 10 of the first embodiment includes a switching device 3, a switching control device 5, a connection control device 14, and a host control device 8 (information creation device).
  • the switching device 3 switches the transmission path of the optical signal between the upper network 1 and the lower network 4 in units of a combination of physical ports 31.
  • the switching control device 5 outputs an instruction to switch the transmission line to the switching device so as to pass through the selected physical port.
  • the connection control device 14 determines whether or not the communication port of the intermediate communication device that relays the communication between the upper network and the lower network and the selected physical port are connected.
  • the connection control device 14 acquires the number of the communication port 21 or the communication port 22 connected to the selected physical port from the intermediate communication device 2.
  • the host control device 8 (information creation device) creates connection information representing the communication port 21 or the communication port 22 connected to the selected physical port 31.
  • the host control device 8 updates the physical wiring information representing the connection information for each physical port 31 of the switching device 3.
  • the wiring information creation system 10 of the first embodiment can create information on the physical wiring between the physical port 31 of the switching device 3 and the communication port 21 or the communication port 22 of the intermediate communication device 2. Is.
  • the operator When the operator switches the physical connection between the switching device 3 and the intermediate communication device 2 in the communication station building from a remote location, the operator can grasp the physical wiring information.
  • the operator can remotely perform wiring between the intermediate communication devices 2 provided in the communication station building such as a data center by using the switching device 3 based on the physical wiring information. Therefore, in the communication station building, the engineer does not have to perform the wiring between the intermediate communication devices 2 specified in the instruction sheet. In addition, there is no risk that the technician will make a mistake in wiring due to human error.
  • the host control device 8 may select the physical port 31 of the switching device 3 periodically (for example, every hour).
  • the upper control device 8 includes error information in the connection information of the communication port in which the link down is detected.
  • the wiring information creation system 10 re-executes the process shown in the first embodiment (for example, the operation shown in FIGS. 11 and 12). You may.
  • the host control device 8 newly creates connection information of the communication port in which the link-up is detected.
  • the host control device 8 updates the physical wiring information based on the created connection information.
  • the host control device 8 erases or overwrites the error information of the connection information of the communication port in which the link down is detected. ..
  • the wiring information creation system 10 re-executes the process shown in the first embodiment (for example, the operation shown in FIGS. 11 and 12). You may.
  • the host control device 8 newly creates connection information of the communication port in which the link-up is detected.
  • the host control device 8 updates the physical wiring information based on the newly created connection information.
  • the second embodiment differs from the first embodiment in that the physical wiring information includes speed information and communication standard information.
  • the differences from the first embodiment will be described.
  • FIG. 13 is a diagram showing a configuration example of the wiring information creation system 10.
  • the measuring device 13 includes an intensity detection unit 131, an optical transceiver 132, an optical transceiver 133, an optical transceiver 134, and an interface 135.
  • the intensity detection unit 131 and the physical port 31 of the switching device 3 are connected by an optical fiber
  • the optical transceiver 132 and the physical port 31 of the switching device 3 are connected by an optical fiber.
  • the optical transceiver 133 and the physical port 31 of the switching device 3 are connected by an optical fiber
  • the optical transceiver 134 and the physical port 31 of the switching device 3 are connected by an optical fiber.
  • connection control device 14 determines that the intensity of the optical signal of, for example, the physical port 31 "# 1" connected to the intensity detection unit 131 is equal to or higher than the threshold value, then the physical port 31 "# 1" and the light
  • the transceiver 132 is connected by the switching device 3.
  • the optical transceiver 132 connected to the physical port 31 "# 1" executes communication with the physical port 31 "# 1" based on the communication standard "10GBASE-SX".
  • the connection control device 14 determines that the communication standard of the optical signal at the physical port 31 "# 1" is the communication standard "10GBASE-SX" of the optical transceiver 132.
  • the connection control device 14 determines that the communication standard of the optical signal at the physical port 31 "# 1" is the communication standard "10GBASE-LR" of the optical transceiver 133.
  • the optical transceiver 134 executes communication with the physical port 31 "# 1" based on the communication standard "10GBASE-LX4".
  • the communication standard of the optical signal at the physical port 31 "# 1" is the communication standard "10GBASE-LX4" of the optical transceiver 133. If the communication by the optical transceiver 134 is not successful, it is determined that the communication standard of the optical signal at the physical port 31 "# 1" is "error".
  • FIG. 14 is a diagram showing an example of physical wiring information.
  • the measurement information includes connection status information, speed information, and communication standard information.
  • the speed information is information representing a determination result of the communication speed by the connection control device 14.
  • the communication standard information is information representing a determination result of the communication standard by the connection control device 14.
  • FIG. 15 is a flowchart showing an operation example of the wiring information creation system 10.
  • the switching control device 5 switches the wiring (route) inside the switching device 3 in units of combinations of the physical ports 31 according to the control by the connection control device 14 (step S301).
  • the connection control device 14 determines whether or not the communication port 22 of the intermediate communication device 2 and the optical transceiver 134 of the measurement device 13-2 are linked up or communicated (step S302).
  • connection control device 14 When the communication port 22 of the intermediate communication device 2 and the optical transceiver 134 of the measuring device 13-2 are not linked up or communicated (step S302: NO), the connection control device 14 is linked up or communicated. It is determined whether or not it has been confirmed under all the communication speed conditions in the measuring device 13 (step S303). When it is confirmed that there is no link-up or communication under all communication speed conditions (step S303: YES), the connection control device 14 notifies the host control device 8 of the connection status "error" (step S304). .. The host control device 8 determines whether or not there is an unused remaining physical port 31 in the switching device 3 (step S305).
  • step S305 When there is an unused remaining physical port 31 in the switching device 3 (step S305: YES), the switching control device 5 outputs an instruction to switch the route to the unused remaining physical port 31 to the switching device 3. (Step S306).
  • the wiring information creation system 10 returns the process to step S301.
  • step S303: NO When it is not confirmed under any of the communication speed conditions that there is no link-up or communication (step S303: NO), the switching control device 5 switches the instruction to switch the route to the optical transceiver under the unconfirmed speed condition. Output to the device 3 (step S307). The wiring information creation system 10 returns the process to step S301.
  • step S305: NO the host control device 8 sets the connection status “error” in the physical wiring information to the physical port not connected to the communication port 22.
  • the connection state is changed to “unused”, which indicates that the value is 31 (step S308).
  • connection control device 14 transmits the physical port number and the speed information. , Notify the host control device 8 (step S309).
  • the connection control device 14 requests the measurement device 13 for information on the communication standard of the optical transceiver linked up or communicated (step S310).
  • the connection control device 14 determines whether or not the communication standard of the optical transceiver has been specified based on the acquired communication standard information (step S311).
  • the connection control device 14 notifies the host control device 8 of the communication standard of the optical transceiver linked up or communicated (step S312).
  • the connection control device 14 notifies the higher control device 8 of the communication standard "error" (step S313).
  • the connection control device 14 acquires communication device information from the intermediate communication device 2 via the measurement device 13-2 (step S314).
  • the connection control device 14 notifies the upper control device 8 of the communication device information of the intermediate communication device 2 and the physical port number of the switching device 3 (step S315).
  • the host control device 8 creates connection information related to the physical port number based on the communication device information and the physical port number of the switching device 3.
  • the host control device 8 updates the wiring information using the connection information (step S316).
  • step S301 From step S301 to step S307, the "connection state" and “speed” in the physical wiring information are determined. From step S310 to step S313, the "communication standard” in the physical wiring information is determined. In step S314, "communication device information" in the physical wiring information is determined.
  • the wiring information creation system 10 operates in the same manner as the operation shown in FIG. 15 between the communication port 21 of the intermediate communication device 2 and the optical transceivers 132 to 134 of the measurement device 13-1.
  • FIG. 16 is a sequence diagram showing an operation example of the wiring information creation system 10.
  • the operation from step S401 to step S412 is the same as the operation from step S201 to step S212 shown in FIG.
  • the host control device 8 determines whether or not the connection state of the selected physical port 31 is link-up or communication. When the connection state is link-up or communication, the host control device 8 stores the measurement information (connection state) of the physical port 31 which is "unused" in the physical wiring information. If the connection state is neither link-up nor communication, the host controller 8 returns to step S404 and gives an instruction to switch the route to the physical port 31 of the stored number and the remaining optical transceiver in the measuring device 13. , Output to the switching control device 5 (step S413).
  • step S404 to step S413 is repeated until this is done.
  • step S414 to step S422 is the same as the operation from step S214 to step S222 shown in FIG.
  • the wiring information creation system 10 operates in the same manner as the operation shown in FIG. 16 between the communication port 21 of the intermediate communication device 2 and the optical transceivers 132 to 134 of the measurement device 13-1.
  • the upper control device 8 of the second embodiment changes the communication standard of the communication port of the intermediate communication device 2 for each physical port 31 of the switching device 3 based on the acquired communication standard information of the optical transceiver. Create connection information that is further represented in.
  • the host control device 8 updates the physical wiring information by using the connection information including the speed information and the communication standard information.
  • the wiring information creation system 10 of the second embodiment can create physical wiring information including speed information and communication standard information in the communication system 110.
  • the third embodiment is different from the first embodiment and the second embodiment in that an intensity detecting device for detecting the intensity of the optical signal is provided between the switching device and the intermediate communication device.
  • an intensity detecting device for detecting the intensity of the optical signal is provided between the switching device and the intermediate communication device.
  • the differences from the first embodiment and the second embodiment will be described.
  • the optical power meter measures the intensity of the optical signal at each physical port 31 of the switching device 3 in real time.
  • FIG. 17 is a diagram showing a configuration example of the wiring information creation system 10.
  • the wiring information creating system 10 shown in the third embodiment further includes an intensity detecting device 15 (optical power meter) as compared with the wiring information creating system 10 shown in the first embodiment or the second embodiment. ..
  • the intensity detection device 15 includes a plurality of detection ports for detecting light intensity.
  • the intensity detection device 15 is provided between the medium communication device 2 and the switching device 3 as an in-line multiport optical power meter.
  • the intensity detection device 15 is connected to the medium communication device 2 and the switching device 3 by using an optical fiber.
  • the intensity detection device 15 detects at least one of an increase in the intensity of the optical signal and a decrease in the intensity of the optical signal between the upper network 1 and the lower network 4.
  • the intensity detection device 15 detects at least one of an increase in the intensity of the optical signal and a decrease in the intensity of the optical signal between the upper network 1 and the lower network 4. An increase in the intensity of the optical signal indicates that a new path of the optical signal has been linked up.
  • the connection control device 14 increases the intensity of the optical signal.
  • the number of the communication port 22 of the medium communication device 2 connected to the detected physical port 31 is acquired from the medium communication device 2 via the optical transceiver of the measuring device 13.
  • the connection control device 14 increases the intensity of the optical signal.
  • the number of the communication port 22 of the medium communication device 2 connected to the detected physical port 31 may be obtained from the medium communication device 2 via the optical transceiver of the measuring device 13.
  • the connection control device 14 reduces the intensity of the optical signal.
  • the error information is included in the connection information of the communication port 22 of the medium communication device 2 connected to the detected physical port 31.
  • the connection control device 14 reduces the intensity of the optical signal.
  • Error information may be included in the connection information of the communication port 22 of the medium communication device 2 connected to the detected physical port 31.
  • the wiring information creation system 10 of the third embodiment further includes the strength detection device 15 (in-line power meter).
  • the intensity detection device 15 detects at least one of an increase in the intensity of the optical signal and a decrease in the intensity of the optical signal between the upper network 1 and the lower network 4.
  • the connection control device 14 acquires the communication port number of the medium communication device connected to the physical port in which the increase in the intensity of the optical signal is detected.
  • the wiring information creation system 10 of the third embodiment creates information on the physical wiring between the physical port 31 of the switching device 3 and the communication port 21 or the communication port 22 of the intermediate communication device 2 in real time. It is possible.
  • the present invention is applicable to an optical communication system.

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Small-Scale Networks (AREA)

Abstract

配線情報作成システムは、上位ネットワーク及び下位ネットワークの間の光信号の伝送路を、物理ポートの組み合わせの単位で切り替える切替装置と、選択された物理ポートを通るように伝送路を切り替える指示を切替装置に出力する切替制御装置と、上位ネットワーク及び下位ネットワークの間の通信を中継する中位通信装置の通信ポートと選択された物理ポートとが接続されたか否かを判定し、選択された物理ポートに接続された通信ポートの番号を中位通信装置から取得する接続制御装置と、選択された物理ポートに接続された通信ポートを表す接続情報を作成し、接続情報を切替装置の物理ポートごとに表す配線情報を更新する情報作成装置とを備える。

Description

配線情報作成システム及び配線情報作成方法
 本発明は、配線情報作成システム及び配線情報作成方法に関する。
 光通信ネットワークは、通信を行う通信ポート、パッケージ及び装置が故障した場合、又は、パッケージ及び装置が更新又は交換される場合に備えて、通信ポート、パッケージ及び装置の冗長化が施されている。故障が発生したり、装置が更新又は交換されたりする場合、光通信ネットワークは、通信プロトコルや通信制御方式を用いて、通信に利用する通信ポート、パッケージ及び装置を切り替えて、通信を継続させる。冗長化及び通信制御方式の具体的な例として、以下のものがある。レイヤ2プロトコルでは、経路冗長-装置冗長-パッケージ冗長方式として、リンクアグリゲーションが広く普及している。装置冗長-装置冗長方式として、スパニングツリープロトコルが広く普及している。
 上記のような冗長化が普及している一方で、光通信ネットワークを利用するユーザ側に設置される装置と、それらの装置を収容する収容装置とを接続するアクセス区間では冗長化が施されていない場合が多い。アクセス区間では、冗長化の対象となる通信ポート、パッケージ及び装置の数がとても多く、冗長化のコストが高くなるためである。冗長化が施されていないアクセス区間では、故障が発生したり、パッケージ及び装置が更新又は交換されたりする場合、技術者が現地に赴いて故障、更新又は交換の対応を行っている。
 冗長化が施されてない光通信ネットワークでは、技術者が現地に赴いて故障、更新又は交換の対応を行う必要があるため、通信システムの運用に要するコストが増加する要因の一つとなっている。また、技術者が現地で故障、更新又は交換の対応が完了するまで、通信断が継続するため、ユーザの利便性が低下する要因の一つとなっている。
「技術基礎講座[GE-PON]第1回PONとは」、日本電信電話株式会社、NTT技術ジャーナル、2005年8月、pp.71-74
 データセンタ等の通信局舎内で、技術者が通信装置の間の配線を手作業で行うことがある。通信局舎に赴いた技術者は、通信装置の特定の通信ポートとRPP(Robot Patch Panel)等の切替装置の物理ポートとを、光ファイバ又は通信ケーブルを用いて、指示書に基づいて正しく配線しなければならない。この場合、ヒューマンエラーが発生し得るというリスクがある。仮に、現地の技術者が配線を間違えてしまった場合、再度の配線が必要となる。
 そこで、通信局舎に技術者が赴くことなく、通信装置の間の配線をオペレータが遠隔から行うことが求められている。オペレータは、通信装置に予め接続された切替装置の内部の配線を、遠隔から操作することによって切り替える。
 この場合、切替装置の物理ポートと通信装置の通信ポートとの物理的な配線の情報を、オペレータは事前に知らなければならない。このためには、通信局舎に赴いた技術者が、切替装置の物理ポートと通信装置の通信ポートとの物理的な配線の情報を、通信局舎内での配線作業の内容に基づいて正しく作成する必要がある。ここで、技術者の負担軽減とヒューマンエラーの発生防止との観点とから、切替装置の物理ポートと通信装置の通信ポートとの物理的な配線の情報を、技術者の代わりにシステムが作成することが望ましい。しかしながら、従来のシステムは、切替装置の物理ポートと通信装置の通信ポートとの物理的な配線の情報を作成することができなかった。
 上記事情に鑑み、本発明は、切替装置の物理ポートと通信装置の通信ポートとの物理的な配線の情報を作成することが可能である配線情報作成システム及び配線情報作成方法を提供することを目的としている。
 本発明の一態様は、上位ネットワーク及び下位ネットワークの間の光信号の伝送路を、物理ポートの組み合わせの単位で切り替える切替装置と、選択された前記物理ポートを通るように前記伝送路を切り替える指示を前記切替装置に出力する切替制御装置と、前記上位ネットワーク及び前記下位ネットワークの間の通信を中継する中位通信装置の通信ポートと選択された前記物理ポートとが接続されたか否かを判定し、選択された前記物理ポートに接続された前記通信ポートの番号を前記中位通信装置から取得する接続制御装置と、選択された前記物理ポートに接続された前記通信ポートを表す接続情報を作成し、接続情報を前記切替装置の前記物理ポートごとに表す配線情報を更新する情報作成装置とを備える配線情報作成システムである。
 本発明の一態様は、上記の配線情報作成システムであって、前記接続制御装置は、前記中位通信装置の前記通信ポートと選択された前記物理ポートとが接続されたか否かを、選択された前記物理ポートの前記伝送路における光信号の光強度の測定結果に基づいて判定する。
 本発明の一態様は、上記の配線情報作成システムであって、前記接続制御装置は、LLDP(Link Layer Discovery Protocol)又はループバックに基づく通信を実行することによって、前記通信ポートの番号を前記中位通信装置から取得する。
 本発明の一態様は、上記の配線情報作成システムであって、接続制御装置は、選択された前記物理ポートに接続された光トランシーバの通信規格の情報を取得し、前記情報作成装置は、取得された光トランシーバの通信規格の情報に基づいて、前記中位通信装置の前記通信ポートの通信規格を前記切替装置の前記物理ポートごとに更に表す接続情報を作成し、接続情報を前記切替装置の前記物理ポートごとに表す配線情報を更新する。
 本発明の一態様は、上記の配線情報作成システムであって、前記情報作成装置は、前記中位通信装置の前記通信ポートのリンクダウンが検出された場合、リンクダウンが検出された前記通信ポートの接続情報に、エラー情報を含める。
 本発明の一態様は、上記の配線情報作成システムであって、前記情報作成装置は、リンクダウンしていた前記通信ポートのリンクアップが検出された場合、リンクアップが検出された前記通信ポートの接続情報を新たに作成し、リンクダウンしていた前記通信ポートの接続情報と新たに作成された接続情報とが同じである場合、リンクダウンが検出された前記通信ポートの接続情報のエラー情報を消去又は上書きする。
 本発明の一態様は、上記の配線情報作成システムであって、前記情報作成装置は、リンクダウンしていた前記通信ポートのリンクアップが検出された場合、リンクアップが検出された前記通信ポートの接続情報を新たに作成し、リンクダウンしていた前記通信ポートの接続情報と新たに作成された接続情報とが異なっている場合、新たに作成された接続情報に基づいて配線情報を更新する。
 本発明の一態様は、上記の配線情報作成システムであって、上位ネットワーク及び下位ネットワークの間における、光信号の強度の増加と光信号の強度の減少とのうちの少なくとも一方を検出する強度検出装置を更に備え、前記接続制御装置は、光信号の強度の増加が検出された前記物理ポートに接続された前記中位通信装置の前記通信ポートの番号を取得する。
 本発明の一態様は、上記の配線情報作成システムであって、前記情報作成装置は、前記切替装置の前記物理ポートを定期的に選択する。
 本発明の一態様は、配線情報作成システムが実行する配線情報作成方法であって、上位ネットワーク及び下位ネットワークの間の光信号の伝送路を物理ポートの組み合わせの単位で切り替える切替装置に、選択された前記物理ポートを通るように前記伝送路を切り替える指示を出力する切替制御ステップと、前記上位ネットワーク及び前記下位ネットワークの間の通信を中継する中位通信装置の通信ポートと選択された前記物理ポートとが接続されたか否かを判定し、選択された前記物理ポートに接続された前記通信ポートの番号を前記中位通信装置から取得する接続制御ステップと、選択された前記物理ポートに接続された前記通信ポートを表す接続情報を作成し、接続情報を前記切替装置の前記物理ポートごとに表す配線情報を更新する情報作成ステップとを含む配線情報作成方法である。
 本発明により、切替装置の物理ポートと通信装置の通信ポートとの物理的な配線の情報を作成することが可能である。
光通信ネットワークの構成例を示す図である。 上位通信装置、中位通信装置及び下位通信装置それぞれと、切替装置との接続例を示す図である。 切替制御装置の構成例を示すブロック図である。 切替装置配線情報の一例を示す図である。 割当管理部の構成例を示すブロック図である。 割当情報の一例を示す図である。 物理配線管理部の構成例を示すブロック図である。 物理配線情報の一例を示す図である。 第1実施形態における、配線情報作成システムの構成例を示す図である。 第1実施形態における、物理配線情報の例を示す図である。 第1実施形態における、配線情報作成システムの動作例を示すフローチャートである。 第1実施形態における、配線情報作成システムの動作例を示すシーケンス図である。 第2実施形態における、配線情報作成システムの構成例を示す図である。 第2実施形態における、物理配線情報の例を示す図である。 第2実施形態における、配線情報作成システムの動作例を示すフローチャートである。 第2実施形態における、配線情報作成システムの動作例を示すシーケンス図である。 第3実施形態における、配線情報作成システムの構成例を示す図である。
 以下、図面を参照して、本発明の実施形態における配線情報作成システム及び配線情報作成方法を説明する。なお、以下の実施形態では、同一の符号を付した構成要素は同様の動作を行うものとして、重複する説明を適宜省略する。
 図1は、光通信ネットワーク100の構成例を示す図である。光通信ネットワーク100は、上位ネットワーク1、通信システム110及び下位ネットワーク4を備える。通信システム110は、上位ネットワーク1と下位ネットワーク4との間の通信で使用される光信号を中継する。通信システム110は、上位ネットワーク1と下位ネットワーク4との間の通信に対する冗長化と、光通信ネットワーク100の運用コストの低減とを可能にする。
 例えば、上位ネットワーク1がバックボーンネットワークに接続するネットワークであり、下位ネットワーク4がユーザ側のネットワークである場合、通信システム110は、ユーザ側のネットワークとの通信回線を収容する通信局舎に備えられ、バックボーンネットワークとユーザ側のネットワークとの間の通信を中継する。また、上位ネットワーク1が移動体通信システムのベースバンドユニット(BBU)及びバックホール(Backhaul)と接続するネットワークであり、下位ネットワーク4が複数のアンテナ装置(RRH)を含むネットワークである場合、通信システム110は、各RRHとBBUとの間の通信回線を収容する通信局舎に備えられ、BBUとRRHとの間の通信を中継する。以下、実施形態では、通信システム110が、バックボーンネットワークとユーザ側のネットワークとの間の通信を中継する場合について説明するが、通信システム110の適用対象はこれに限定されない。
 上位ネットワーク1は、バックボーンネットワーク又は他の光通信ネットワークと接続する通信回線12と、通信回線12に接続されたM個の上位通信装置11(11-1,…,11-M)を備える。上位通信装置11は、複数の1個の通信ポート111、複数の通信ポート112、及び設定ポート113を備える。通信ポート112は、通信回線12と接続される。通信ポート111は、通信システム110と接続される。設定ポート113は、通信システム110と接続され、装置設定情報を受け付ける。設定ポート113に供給される装置設定情報は、通信ポート112と通信ポート111との間における光信号の中継と信号処理とに関する上位通信装置11の動作を定義する。上位通信装置11は、装置設定情報に基づいて、通信回線12と通信システム110との通信を中継する。上位通信装置11が備える通信ポート111及び通信ポート112の数は1個であってもよい。
 下位ネットワーク4は、ユーザ側の装置に接続されるP個の下位通信装置41(41-1,…,41-P)を備える。下位通信装置41は、複数の通信ポート411、複数の通信ポート412、及び設定ポート413を備える。通信ポート412は、通信システム110と接続される。通信ポート411は、ユーザ側の装置と接続される。設定ポート413は、通信システム110と接続され、装置設定情報を受け付ける。設定ポート413に供給される装置設定情報は、通信ポート412と通信ポート411との間における光信号の中継と信号処理とに関する下位通信装置41の動作を定義する。下位通信装置41は、装置設定情報に基づいて、通信システム110とユーザ側の装置との通信を中継する。下位通信装置41が備える通信ポート411及び通信ポート412の数は1個であってもよい。
 M及びPは、上位通信装置11及び下位通信装置41の数それぞれを表し、1以上の整数である。図1に示す構成例では、上位通信装置11及び下位通信装置41の数が2個以上の場合を示しているが、上位通信装置11及び下位通信装置41の数の一方又は両方が1個であってもよい。
 通信システム110は、N個の中位通信装置2(2-2,…,2-N)、切替装置3、切替制御装置5、通信制御装置6、ネットワーク管理装置7、上位制御装置8及び端末装置9を備える。中位通信装置2は、上位ネットワーク1との通信に用いられる少なくとも一つの通信ポート22と、下位ネットワーク4との通信に用いられる少なくとも一つの通信ポート21と、装置設定情報を入力する設定ポート23とを備える。装置設定情報は、通信ポート22と通信ポート21との間における光信号の中継に関する中位通信装置2の動作を定義する。通信ポート22は、中位通信装置2の上位ポートともいう。また、通信ポート21は、中位通信装置2の下位ポートともいう。
 中位通信装置2は、通信制御装置6から設定ポート23に供給される装置設定情報に基づいて、通信ポート22から入力される光信号をいずれかの通信ポート21から出力する。通信ポート22から入力される光信号は、1個の通信ポート21から出力されてもよいし、複数の通信ポート21から出力されてもよい。例えば、光信号が波長分割多重された複数の波長の信号を含む場合、装置設定情報において波長ごとに定められた出力先に基づいて、光信号から分離された各波長の信号を複数の通信ポート21へ出力してもよい。また、中位通信装置2は、装置設定情報に応じて、通信ポート21から入力される光信号をいずれかの通信ポート22から出力する。例えば、上位ネットワーク1との通信に波長分割多重された光信号が用いられる場合、中位通信装置2は、通信ポート21から入力される光信号のうち波長の異なる光信号を合成し、合成により得られる1個の光信号を通信ポート22から出力する。通信ポート21及び通信ポート22から入力される光信号に対する信号処理は、上記の例に限定されない。
 複数の中位通信装置2のうち少なくとも一つは、他の中位通信装置2が故障した場合、又は他の中位通信装置2の通信ポート21、22が故障した場合に備えて、上位ネットワーク1と下位ネットワーク4との通信を中継していない通信ポート21、22を有する。また、複数の中位通信装置2のうち少なくとも一つにおいて、全ての通信ポート21、22が上位ネットワーク1と下位ネットワーク4との通信を中継せずともよい。このような中位通信装置2は、他の中位通信装置2の故障、更新、又は交換に備えて設けられた予備装置である。通信システム110は、予備装置としての1台以上の中位通信装置2を備えてもよい。
 切替装置3は、複数の物理ポート31と、制御ポート32とを備える。各物理ポート31は、上位通信装置11に備えられる通信ポート111、中位通信装置2に備えられる通信ポート21、22、又は下位通信装置41に備えられる通信ポート412のいずれか一つと接続される。物理ポート31は、光ファイバケーブルに取り付けられるコネクタに応じた形状のコネクタを有し、光信号の入出力を行う。切替装置3は、切替制御装置5による制御情報を、制御ポート32を介して受け付ける。切替装置3は、制御情報に応じて、複数の物理ポートのうち2個の物理ポートを接続して2個の物理ポート間での光信号の伝送を可能にする。例えば、切替装置3は、物理ポート31と、他の物理ポート31との間を接続する光ファイバケーブルをロボットアームにて切り替える構成を有する。あるいは、切替装置3は、MEMS(Micro-Electro-Mechanical Systems)ミラー・デバイスを有し、制御されたMEMSミラーを介して2個の物理ポート31間で光信号の伝送を可能にする。上記の例に限定されることなく、切替装置3は、2個の物理ポート31の対を選択することで、光信号の伝送経路を変更できる構成を有していればよい。
 切替制御装置5は、上位制御装置8から受け付ける指示に応じて、切替装置3を制御する。上位制御装置8から受け付ける指示は、2個の物理ポート31を接続することを示す。指示は、複数の対の物理ポート31を接続することを示してもよい。
 通信制御装置6は、上位制御装置8から受け付ける指示に応じて、上位通信装置11、中位通信装置2及び下位通信装置41に装置設定情報を供給し、上位通信装置11、中位通信装置2及び下位通信装置41それぞれの動作を制御する。上位通信装置11に供給される装置設定情報は、上位通信装置11の通信ポート111及び通信ポート112から入力される光信号に対する信号処理と、信号処理により得られる光信号を出力する通信ポート111又は通信ポート112を定める。同様に、下位通信装置41に供給される装置設定情報は、通信ポート411及び通信ポート412から入力される光信号に対する信号処理と、信号処理により得られる光信号を出力する通信ポート411又は通信ポート412を定める。
 ネットワーク管理装置7は、割当管理部71と、物理配線管理部75とを備える。割当管理部71は、割当情報の記憶及び更新を行う。割当情報は、切替装置3を介して接続される上位通信装置11の通信ポート111と中位通信装置2の通信ポート22との接続を示す情報と、切替装置3を介して接続される中位通信装置2の通信ポート21と下位通信装置41の通信ポート412との接続を示す情報とを含む。割当情報は、上位ネットワーク1と下位ネットワーク4との間の通信に割り当てられた中位通信装置2及びその通信ポート21、22を示す。
 物理配線管理部75は、物理配線情報の記憶及び更新を行う。物理配線情報は、上位通信装置11の通信ポート111と切替装置3の物理ポート31との接続を示す情報と、切替装置3と中位通信装置2の通信ポート21及び通信ポート22との接続を示す情報と、切替装置3の物理ポート31と下位通信装置41の通信ポート412との接続を示す情報とを含む。物理配線情報は、上位通信装置11、中位通信装置2及び下位通信装置41の各通信ポートと、切替装置3の物理ポート31との接続を示す。
 上位制御装置8は、他のネットワークを介して接続される端末装置9から受信する指示に応じて、物理ポート31の接続を切り替える指示を切替制御装置5に供給する。端末装置9は、光通信ネットワーク100を運用、保守する技術者による入力を受け付け、上位制御装置8へ指示を供給する。端末装置9は、中位通信装置2及び切替装置3が設置される通信局舎と異なる場所に設けられ、技術者は遠隔操作により切替装置3を操作する。通信システム110は、端末装置9を介して、上位ネットワーク1と下位ネットワーク4との間の通信状態に関する状態情報を取得する。状態情報は、例えば、光通信ネットワーク100における通信断、中位通信装置2の故障、中位通信装置2の通信ポート21、22の故障、又は光通信ネットワーク100を利用するユーザに提供する通信回線の変更を示す。
 例えば、技術者は、中位通信装置2における故障の連絡や、光通信ネットワーク100を利用するユーザからの通信断の連絡を受けて、切替装置3を操作する。技術者が切替装置3を操作して、通信に割り当てる中位通信装置2及びその通信ポート21、22を切り替えることにより、故障や通信断からの復旧を図る。また、技術者は、光通信ネットワーク100を利用するユーザからの要求に応じて、切替装置3を操作する。例えば、ユーザからの要求として、ユーザに対して提供される通信回線の帯域変更や、通信回線の利用停止、新しい通信回線の増設などが含まれる。このような要求を受けた場合、光通信ネットワーク100は、下位通信装置41に接続する中位通信装置2の変更、下位通信装置41に接続する中位通信装置2の通信ポート21の変更、又は下位通信装置41に接続する通信ポート21の増減を行う。
 通信システム110は、上位ネットワーク1と下位ネットワーク4との通信の中継に割り当てる中位通信装置2と、その通信ポート21、22とを、切替装置3を用いて切り替える。切替装置3による中位通信装置2又は通信ポート21、22の切り替えにより、中位通信装置2が設置されている通信局舎に技術者が赴くことなく、中位通信装置2の故障の復旧や、中位通信装置2の更新又は交換が可能となる。通信システム110は、通信局舎における技術者の作業を不要とすることで、光通信ネットワーク100の運用コストを削減し、通信が不能な期間を短くできる。
 また、通信システム110は、上位ネットワーク1及び下位ネットワーク4に接続する中位通信装置2の変更を自由に行えるため、通信に利用している中位通信装置2ごとに予備装置を設けずとも、各中位通信装置2の冗長化を実現できる。通信システム110は、冗長化の度合いに応じた数の中位通信装置2を備えることで、中位通信装置2の冗長化に要するコストも削減できる。また、通信システム110は、切替装置3による接続の切り替えにより、ユーザに提供する通信回線の変更も技術者が通信局舎に赴く場合に比べ短い時間で行える。
 以下、切替制御装置5、割当管理部71及び物理配線管理部75の構成について説明する。ここで、上位通信装置11、中位通信装置2及び下位通信装置41それぞれと、切替装置3との接続を、具体的に説明するために、図2に示す接続例を用いる。図2は、上位通信装置11、中位通信装置2及び下位通信装置41それぞれと、切替装置3との接続例を示す図である。図2に示す接続例では、上位ネットワーク1が上位通信装置11-1「#A」を備え、通信システム110が中位通信装置2-1「#B」と中位通信装置2-2「#D」とを備え、下位ネットワーク4が下位通信装置41-1「#C」を備える。更に、上位通信装置11-1「#A」は2個の通信ポート111「#1」及び「#2」を備える。中位通信装置2-1「#B」及び2-2「#D」は2個の通信ポート22「#1」及び「#2」と2個の通信ポート21「#3」及び「#4」とを備える。下位通信装置41-1「#C」は2個の通信ポート412「#1」及び「#2」を備える。同じ名称及び符号が割り当てられている通信ポート及び物理ポートを、「#」と数字とを組み合わせて区別する。
 切替装置3に備えられる複数の物理ポート31のうち、12個の物理ポート31「#11」、「#12」、「#21」、「#22」、「#23」、「#24」、「#31」、「#32」、「#33」、「#34」、「#41」及び「#42」が、上位通信装置11、中位通信装置2及び下位通信装置41との接続に用いられる。図2に示す接続例は、切替装置3に備えられる複数の物理ポート31のうち、接続に用いられる物理ポート31を示している。
 物理ポート31「#11」及び「#12」は、上位通信装置11-1「#A」の通信ポート111「#1」及び「#2」にそれぞれ接続されている。物理ポート31「#21」及び「#22」は、中位通信装置2-1「#B」の通信ポート22「#1」及び「#2」それぞれに接続されている。物理ポート31「#23」及び「#24」は、中位通信装置2-2「#D」の通信ポート22「#1」及び「#2」それぞれに接続されている。物理ポート31「#31」及び「#32」は、中位通信装置2-1「#B」の通信ポート21「#3」及び「#4」それぞれに接続されている。物理ポート31「#33」及び「#34」は、中位通信装置2-2「#D」の通信ポート21「#3」及び「#4」それぞれに接続されている。物理ポート31「#41」及び「#42」は、下位通信装置41-1「#C」の通信ポート412「#1」及び「#2」それぞれに接続されている。
 切替装置3において、物理ポート31「#11」及び「#12」が、物理ポート31「#21」及び「#22」それぞれと接続されている。物理ポート31「#31」及び「#32」が、物理ポート31「#41」及び「#42」それぞれに接続されている。切替装置3における物理ポート31間の接続は、前述のように、切替可能である。
 図3は、切替制御装置5の構成例を示すブロック図である。切替制御装置5は、インタフェース51、配線情報取得部52、切替装置配線情報記憶部53、配線可否判定部54、配線指示部55、応答受付部56及び配線情報更新部57を備える。インタフェース51は、上位制御装置8との入出力を行う。
 インタフェース51は、接続変更情報と要求情報とを制御情報として上位制御装置8からを受け付ける。接続変更情報は、切替装置3における物理ポート31間の接続変更の指示を示す。要求情報は、切替装置配線情報記憶部53が記憶する切替装置配線情報の要求を示す。インタフェース51は、接続変更情報に基づいた接続変更の完了又は不能を示す応答を上位制御装置8に通知する。また、インタフェース51は、要求情報への応答として切替装置配線情報とを上位制御装置8に供給する。
 配線情報取得部52は、インタフェース51が要求情報を受け付けると、切替装置配線情報記憶部53に記憶されている切替装置配線情報を読み出し、読み出した切替装置配線情報をインタフェース51に供給する。
 切替装置配線情報記憶部53は、切替装置配線情報を記憶する。切替装置配線情報は、切替装置3における物理ポート31間の接続を示す。切替装置配線情報は、接続された2個の物理ポート31を識別する物理ポート番号の対を示す情報を含む。図4は、切替装置配線情報の一例を示す図である。図4に示す切替装置配線情報は、図2に示す接続例における物理ポート31間の接続を表している。図4に示す切替装置配線情報は、物理ポート番号「#11」と「#21」との対を含み、物理ポート番号で示される物理ポート31が接続されていることを表している。同様に、切替装置配線情報は、物理ポート31「#12」と「#22」とが接続されていること、物理ポート31「#41」と「#23」とが接続されていること、及び、物理ポート31「#42」と「#24」とが接続されていることを表している。なお、切替装置配線情報は、上位ネットワーク1と通信ポート22との接続に関する物理ポート番号の対を示す上位配線情報と、下位ネットワーク4と通信ポート22との接続に関する物理ポート番号の対を示す下位配線情報とに分けてもよい。
 配線可否判定部54は、インタフェース51が接続変更情報を受け付けると、接続変更情報が示す接続の変更が可能か否かを切替装置配線情報に基づいて判定する。接続の変更が可能な場合、配線可否判定部54は、接続変更情報を配線指示部55へ供給する。接続先の変更が不可能な場合、配線可否判定部54は、接続の変更が不可能なことを示す応答をインタフェース51に通知する。例えば、既に物理ポート31「#22」に接続されている物理ポート31「#12」に対して、物理ポート31「#23」を接続する変更の指示を接続変更情報が示す場合、配線可否判定部54は、物理ポート31「#12」に複数の物理ポートを接続できないと判定し、当該接続を不可能と決定する。このとき、配線可否判定部54は、接続の変更が不可能なことを示す応答をインタフェース51に供給する。
 配線指示部55は、接続変更情報に基づいた接続変更の指示を、切替装置3の制御ポート32に供給する。応答受付部56は、接続変更情報に応じた接続変更の完了を示す応答を、切替装置3の制御ポート32から受け付ける。応答受付部56は、接続変更の完了を示す応答を受け付けると、応答の受け付けを配線情報更新部57に通知する。配線情報更新部57は、切替装置配線情報を、接続変更情報が示す接続の変更に応じて更新する。配線情報更新部57は、切替装置配線情報の更新を終えると、接続変更情報に基づいた接続変更の完了を示す応答をインタフェース51に通知する。インタフェース51は、当該通知に応じて、接続変更情報に基づいた接続変更の完了を示す応答を上位制御装置8に供給する。
 図5は、割当管理部71の構成例を示すブロック図である。割当管理部71は、インタフェース72、情報作成部73及び割当情報記憶部74を備える。インタフェース72は、上位制御装置8から割当情報の要求及び更新の指示を受け付ける。割当情報を要求する指示を受け付けると、インタフェース72は、割当情報記憶部74に記憶されている割当情報を読み出し、読み出した割当情報を上位制御装置8へ供給する。
 インタフェース72は、割当情報の更新の指示を受け付けると、割当情報を更新する指示を情報作成部73へ通知する。情報作成部73は、割当情報を更新する指示を受け付けると、インタフェース72を介して上位制御装置8に切替装置配線情報と物理配線情報とを要求する。インタフェース72は、当該要求への応答として受け付けた切替装置配線情報と物理配線情報とを情報作成部73に供給する。情報作成部73は、切替装置配線情報と物理配線情報とに基づいて割当情報を作成し、作成した割当情報で割当情報記憶部74に記憶されている割当情報を更新する。
 図6は、割当情報の一例を示す図である。割当情報は、光通信ネットワーク100に備えられる上位通信装置11、中位通信装置2及び下位通信装置41それぞれに関する通信装置情報を含む。通信装置情報は、上位通信装置11、中位通信装置2及び下位通信装置41それぞれを識別する識別情報と、それらの装置が有する通信ポートそれぞれを識別する通信ポート番号とを含む。すなわち、通信装置情報は、通信システム110において通信ポートを一意に特定する。また、割当情報は、上位ネットワーク1と下位ネットワーク4との間の通信に割り当てられた中位通信装置2及びその通信ポート21、22を示す。
 図6に示す割当情報では、上位通信装置11-1「#A」、中位通信装置2-1「#B」及び下位通信装置41-1「#C」それぞれの識別情報として、装置のシリアル番号「AAAA」、「BBBB」及び「CCCC」が用いられている。また、各装置の通信ポートを示す通信ポート番号として、「#1」、「#2」、「#3」及び「#4」が用いられている。識別情報としてシリアル番号が用いられる場合について説明するが、シリアル番号以外を用いて上位通信装置11、中位通信装置2及び下位通信装置41を識別してもよい。例えば、識別情報として、上位通信装置11、中位通信装置2及び下位通信装置41に割り当てられたMAC(Media Access Control)アドレス、ホスト名、装置名、IP(Internet Protocol)アドレスなどのいずれか一つ又はそれらの組み合わせを用いてもよい。
 図2に示す接続例を表す割当情報は、図6に示すように、上位通信装置11-1「#A」の通信ポート111「#1」と中位通信装置2-1「#B」の通信ポート22「#1」とが対応することを示し、それらの通信ポートが接続されていることを表している。同様に、割当情報は、上位通信装置11-1「#A」の通信ポート111「#2」と中位通信装置2-1「#B」の通信ポート22「#2」とが接続されていることを表している。更に、割当情報は、中位通信装置2-1「#B」の通信ポート21「#3」と下位通信装置41-1「#C」の通信ポート42「#1」とが接続されていること、及び、中位通信装置2-1「#B」の通信ポート21「#4」と下位通信装置41-1「#C」の通信ポート42「#2」とが接続されていることを表している。
 図7は、物理配線管理部75の構成例を示すブロック図である。物理配線管理部75は、インタフェース76、物理配線情報取得部77、物理配線情報更新部78及び物理配線情報記憶部79を備える。インタフェース76は、上位制御装置8から物理配線情報の要求又は更新の指示を受け付ける。物理配線情報を要求する指示を受け付けると、インタフェース76は、指示を物理配線情報取得部77に通知する。インタフェース76は、指示への応答として物理配線情報取得部77から物理配線情報を受け付け、物理配線情報を上位制御装置8に供給する。インタフェース76は、物理配線情報の更新を受け付けると、インタフェース76は、物理配線変更情報を上位制御装置8に要求する。物理配線変更情報は、上位通信装置11、中位通信装置2及び下位通信装置41と、切替装置3との接続の変更を示す。物理配線変更情報を受け付けると、インタフェース76は、物理配線変更情報を物理配線情報更新部78に供給する。
 物理配線情報取得部77は、インタフェース76からの指示に応じて、物理配線情報記憶部79から物理配線情報を読み出し、読み出した物理配線情報をインタフェース76に供給する。物理配線情報更新部78は、インタフェース76から物理配線変更情報を受け付けると、物理配線情報記憶部79に記憶されている物理配線情報を、物理配線変更情報が示す接続の変更に基づいて更新する。
 図8は、物理配線情報の一例を示す図である。物理配線情報は、切替装置3の物理ポート31を示す切替装置情報又は物理ポート番号と、上位通信装置11、中位通信装置2及び下位通信装置41それぞれに関する通信装置情報とを含む。物理配線情報は、物理ポート31それぞれに接続される、上位通信装置11、中位通信装置2及び下位通信装置41いずれかの通信ポートを示す。物理ポート31に上位通信装置11、中位通信装置2及び下位通信装置41いずれの通信ポートも接続されていない場合、物理配線情報において空(NULL)の情報が当該物理ポート31の物理ポート番号に対応付けられる。
 図8に示す物理配線情報では、図6に示した例と同様に、上位通信装置11-1「#A」、中位通信装置2-1「#B」及び下位通信装置41-1「#C」それぞれの識別情報として、シリアル番号「AAAA」、「BBBB」及び「CCCC」が用いられている。また、各装置の通信ポートを示す通信ポート番号として、「#1」、「#2」、「#3」及び「#4」が用いられている。また、物理ポート31を示す物理ポート番号として、「#11」、「#12」、「#21」、「#22」、「#23」、「#24」、「#31」、「#32」、「#33」、「#34」、「#41」及び「#42」が用いられている。
 図2に示す接続例を表す物理配線情報は、図8に示すように、物理ポート31「#11」と上位通信装置11-1「#A」の通信ポート111「#1」とが対応することを示し、それらのポートが接続されていることを表している。同様に、物理配線情報は、物理ポート31「#12」と上位通信装置11-1の通信ポート111「#2」が接続されていることを表している。また、物理配線情報は、物理ポート31「#21」、「#22」、「#23」及び「#24」と、中位通信装置2-1の通信ポート22「#1」、通信ポート22「#2」、通信ポート21「#3」及び通信ポート21「#4」とがそれぞれ接続されていることを表している。また、物理配線情報は、物理ポート31「#31」、「#32」、「#33」及び「#34」と、中位通信装置2-2の通信ポート22「#1」、通信ポート22「#2」、通信ポート21「#3」及び通信ポート「#4」とがそれぞれ接続されていることを表している。また、物理配線情報は、物理ポート31「#41」及び「#42」と、下位通信装置41-1の通信ポート412「#1」及び「#2」とがそれぞれ接続されていることを表している。
 次に、配線情報作成システムの構成例を説明する。
 (第1実施形態)
 図9は、配線情報作成システム10の構成例を示す図である。配線情報作成システム10は、通信システム110の切替装置3の物理ポートと中位通信装置2の通信ポートとの物理的な配線の情報(物理配線情報)を作成する装置である。配線情報作成システム10は、例えば、図8に示された物理配線情報を作成する。
 配線情報作成システム10は、切替装置3と、切替制御装置5と、中位通信装置2-1~2-N(「N」は、2以上の整数。以下では、「N=2」。)と、通信制御装置6と、端末装置9と、測定装置13-1~13-R(「R」は、2以上の整数。以下では、「R=2」。)と、接続制御装置14と、上位制御装置8とを備える。
 これらの装置は、単体の装置、例えば制御装置として設けられてもよい。例えば、測定装置13-1~13-Rは、単体の装置でもよい。すなわち、測定装置13-1~13-Rは、同一の筐体内に統合されてもよい。切替制御装置5と中位通信装置2と通信制御装置6と上位制御装置8と端末装置9と測定装置13と接続制御装置14ととのうちの一部又は全部は、CPU(Central Processing Unit)等のプロセッサが、不揮発性の記録媒体(非一時的な記録媒体)であるメモリに記憶されたプログラムを読み取って実行することにより、ソフトウェアとして実現される。プログラムは、コンピュータ読み取り可能な記録媒体に記録されてもよい。コンピュータ読み取り可能な記録媒体とは、例えばフレキシブルディスク、光磁気ディスク、ROM(Read Only Memory)、CD-ROM(Compact Disc Read Only Memory)等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置などの非一時的な記憶媒体である。プログラムは、電気通信回線を介して送信されてもよい。切替制御装置5と中位通信装置2と通信制御装置6と上位制御装置8と端末装置9と測定装置13と接続制御装置14とのうちの一部又は全部は、例えば、LSI(Large Scale Integration circuit)、ASIC(Application Specific Integrated Circuit)、PLD(Programmable Logic Device)又はFPGA(Field Programmable Gate Array)等を用いた電子回路(electronic circuit又はcircuitry)を含むハードウェアとして実現されてもよい。
 切替制御装置5と通信制御装置6と上位制御装置8と接続制御装置14とは、例えばAPI(Application Programming Interface)を用いて互いに通信する。
 中位通信装置2は、上位ネットワーク1及び下位ネットワーク4の間の通信を中継する。中位通信装置2は、例えば、上位ネットワーク1及び下位ネットワーク4の間の通信を収容する収容装置である。中位通信装置2-1に割り当てられたシリアル番号アドレスは、一例として、「BBBB」である。中位通信装置2-Nに割り当てられたシリアル番号は、一例として、「DDDD」である。
 中位通信装置2は、複数の通信ポート21と、複数の通信ポート22と、設定ポート23とを備える。通信ポート21と通信ポート22とは、中位通信装置2において装置設定情報に基づいて予め接続されていてもよい。
 中位通信装置2の通信ポート21及び通信ポート22と、切替装置3の物理ポート31とは、光ファイバを用いて、予め接続される。図9では、一例として、物理ポート31「#1」と中位通信装置2-1の通信ポート22「#1」とが、予め接続される。物理ポート31「#2」と中位通信装置2-1の通信ポート22「#2」とが、予め接続される。物理ポート31「#4」と中位通信装置2-Nの通信ポート22「#2」とが、予め接続される。物理ポート31「#5」と中位通信装置2-Nの通信ポート22「#3」とが、予め接続される。中位通信装置2の設定ポート23と、通信制御装置6とは、通信ケーブルを用いて、予め接続される。設定ポート23は、中位通信装置2と通信制御装置6との間の信号を送信及び受信する。
 切替装置3は、複数の物理ポート31と、制御ポート32とを備える。切替装置3は、例えば、RPP、クロスバースイッチである。物理ポート31は、中位通信装置2と切替装置3との間の光信号を送信及び受信する。また、物理ポート31は、測定装置13と切替装置3との間の光信号を送信及び受信する。
 制御ポート32は、切替装置3と切替制御装置5との間の信号を送信及び受信する。切替装置3は、上位ネットワーク1及び下位ネットワーク4の間の光信号の伝送路を、切替制御装置5による制御に応じて、物理ポート31の組み合わせの単位で切り替える。
 切替制御装置5は、上位制御装置8によって選択された物理ポート31を伝送路が通るように伝送路を切り替える指示を、切替装置3に出力する。例えば、物理ポート31「#1」が選択された場合、測定装置13に接続された物理ポート31と、上位制御装置8によって選択された物理ポート31「#1」とを伝送路が通るように、切替装置3における伝送路を切り替える。
 通信制御装置6は、中位通信装置2の動作を制御する装置である。通信制御装置6は、新規の中位通信装置2が切替装置3に接続されたことを、上位制御装置8に通知する。
 上位制御装置8(情報作成装置)は、新規の中位通信装置2が切替装置3に接続された場合、物理配線情報において「未使用」とされている切替装置3の物理ポート31を選択する。
 図10は、物理配線情報の例を示す図である。図10に示された物理配線情報は、通信システム110における物理的な配線を表す情報である。物理配線情報では、切替装置情報と、測定情報と、通信装置情報とが、切替装置の物理ポートごとに互いに対応付けられている。以下、物理配線情報における単一の物理ポートと、測定情報と、通信装置情報との対応付けを「接続情報」という。図10では、接続情報は、表形式の物理配線情報における行を表す。
 切替装置情報は、切替装置3に関する情報である。切替装置情報は、切替装置3の物理ポート番号を含む。測定情報は、測定結果に関する情報である。測定情報は、接続状態情報を含む。接続状態情報とは、中位通信装置2と通信ポートと切替装置3の物理ポートとの接続状態を表す情報である。接続状態を表す情報とは、例えば、リンクアップ、エラー又は未使用を表す情報である。ここで、「エラー」は、リンクアップ及び疎通していないこと、すなわち、リンクダウンしていることを表す。「未使用」は、通信ポートに接続されていない物理ポートであることを表す。通信装置情報は、中位通信装置2に関する情報である。通信装置情報は、例えば、中位通信装置2のシリアル番号と、通信ポート番号とを含む。
 図9に戻り、配線情報作成システム10の構成例の説明を続ける。測定装置13は、光信号を測定する装置である。測定装置13は、強度検出部131と、光トランシーバ132と、光トランシーバ133と、光トランシーバ134と、インタフェース135とを備える。図9では、一例として、強度検出部131と切替装置3の物理ポート31とが光ファイバで接続され、予め選択された光トランシーバ134と切替装置3の物理ポート31とが光ファイバで接続されている。
 強度検出部131は、光パワーメータである。光トランシーバ132と、光トランシーバ133と、光トランシーバ134と、インタフェース135とは、例えば、10GBASE-SX、10GBASE-LR等のイーサネット(登録商標)の通信規格に対応している光トランシーバである。以下では、光トランシーバ132は、一例として、通信規格「10GBASE-SX」に対応している。光トランシーバ133は、一例として、通信規格「10GBASE-LR」に対応している。光トランシーバ134は、一例として、通信規格「10GBASE-LX4」に対応している。各光トランシーバの通信速度は、通信規格において定められた範囲内で変更可能である。
 上位制御装置8によって例えば物理ポート31「#1」が選択された場合、物理ポート31「#1」と強度検出部131とが、切替装置3によって接続される。測定装置13は、接続制御装置14による制御に応じて、接続された物理ポート31の光信号(ポート状態)を測定する。
 強度検出部131は、強度検出部131に接続された物理ポート31「#1」の光信号の強度を、通信速度を変更しながら測定する。中位通信装置2の物理ポート31「#1」と測定装置13との間がリンクアップ又は疎通している場合、物理ポート31「#1」における光信号の強度は、物理ポート31「#1」と測定装置13との間がリンクアップ又は疎通していない場合と比較して増加する。したがって、接続制御装置14は、光ファイバを経由して通信ポート21又は通信ポート22に接続されている物理ポート31を、物理ポート31における光信号の強度の測定結果に基づいて検出することができる。
 強度検出部131に接続された例えば物理ポート31「#1」の光信号の強度が閾値以上であると接続制御装置14によって判定された場合、次に、物理ポート31「#1」と、予め選択された光トランシーバ134とが、切替装置3によって接続される。物理ポート31「#1」に接続された光トランシーバ134は、通信規格「10GBASE-LX4」に基づいて、物理ポート31「#1」との通信を実行する。光トランシーバ134による通信が成功したか否かに基づいて、物理ポート31「#1」がリンクアップしているか否かが判定される。
 同様に、強度検出部131に接続された物理ポート31「#2」の光信号の強度が閾値以上であると接続制御装置14によって判定された場合、次に、物理ポート31「#2」と、予め選択された光トランシーバ134とが、切替装置3によって接続される。光トランシーバ134は、光信号の強度が閾値以上である物理ポート31「#2」についても同様に通信を実行する。
 光トランシーバ134は、光信号の強度が閾値以上であると判定された物理ポート31「#4」「#5」についても同様に通信を実行する。光トランシーバ134による通信が成功したか否かに基づいて、物理ポート31「#4」「#5」がそれぞれリンクアップ又は疎通しているか否かが判定される。
 接続制御装置14は、選択された物理ポート31に接続された光トランシーバの通信規格の情報を、測定装置13から取得する。接続制御装置14は、選択された物理ポート31に接続された中位通信装置2の番号(例えば、シリアル番号)を、中位通信装置2から取得する。接続制御装置14は、選択された物理ポート31に接続された通信ポート22の番号を、中位通信装置2から取得する。接続制御装置14は、測定装置13がループバック(Loopback)のコマンドを実行することによって、中位通信装置2の通信ポートの番号を、中位通信装置2から取得する。
 接続制御装置14は、LLDP(Link Layer Discovery Protocol)のパケットを測定装置13がマルチキャスト・アドレス宛に送信することによって、中位通信装置2の通信ポートの番号を、中位通信装置2から取得してもよい。LLDPのパケットを測定装置13がマルチキャスト・アドレス宛て送信した後で、中位通信装置2は、インターフェース番号等の所定の情報を、LLDPのパケットから取得する。LLDPのパケットを中位通信装置2がマルチキャスト・アドレス宛て送信した後で、接続制御装置14は、インターフェース番号等の所定の情報を、LLDPのパケットから取得してもよい。
 接続制御装置14は、中位通信装置2の通信ポートと、選択された物理ポート31とが接続されたか否かを判定する。接続制御装置14は、中位通信装置2の通信ポート21又は通信ポート22と、選択された物理ポート31とが接続されたか否かを、選択された物理ポート31の伝送路における光信号の光強度の測定結果に基づいて判定する。中位通信装置2の物理ポート31と測定装置13との間がリンクアップ又は疎通している場合、光信号の強度は、物理ポート31と測定装置13との間がリンクアップ又は疎通していない場合と比較して増加する。したがって、光ファイバを経由して通信ポート21又は通信ポート22に接続されている物理ポート31を、接続制御装置14は光信号の強度の測定結果に基づいて検出することができる。
 接続制御装置14は、選択された物理ポート31において中位通信装置2と測定装置13との間がリンクアップ又は疎通したか否かを判定する。ここで、リンクアップしたとは、測定装置13と中位通信装置2(対向装置)とが接続され、測定装置13と中位通信装置2とが通信可能な状態になることである。例えば、測定装置13がイーサネット(登録商標)のプロトコルを用いて通信する場合、測定装置13の物理層(レイヤ1)と中位通信装置2の物理層とが接続され、データリンク層(レイヤ2)においてプロトコルを用いた通信が可能な状態である。疎通したとは、「Ping」又はループバック(Loopback)等の試験信号又はデータ転送の実行が成功したことである。
 次に、配線情報作成システム10の動作例を説明する。
 図11は、配線情報作成システム10の動作例を示すフローチャートである。切替制御装置5は、接続制御装置14による制御に応じて、物理ポート31の組み合わせの単位で、切替装置3の内部の配線(経路)を切り替える(ステップS101)。接続制御装置14は、中位通信装置2の通信ポート22と測定装置13-2の光トランシーバ134との間がリンクアップ又は疎通したか否かを判定する(ステップS102)。
 中位通信装置2の通信ポート22と測定装置13-2の光トランシーバ134との間がリンクアップ又は疎通していない場合(ステップS102:NO)、上位制御装置8は、切替装置3において未使用の残りの物理ポート31が存在するか否かを判定する(ステップS103)。未使用の残りの物理ポート31が存在する場合(ステップS103:YES)、切替制御装置5は、未使用の残りの物理ポート31に経路を切り替える指示を、切替装置3に出力する(ステップS104)。配線情報作成システム10は、ステップS101に処理を戻す。
 切替装置3において未使用の残りの物理ポート31が存在しない場合(ステップS103:NO)、上位制御装置8は、物理配線情報における接続状態「エラー」を、通信ポート22に接続されていない物理ポート31であることを表す接続状態「未使用」に変更する(ステップS105)。
 中位通信装置2の通信ポート22と測定装置13-2の光トランシーバ134との間がリンクアップ又は疎通した場合(ステップS102:YES)、接続制御装置14は、測定装置13-2を経由して、通信装置情報を中位通信装置2から取得する(ステップS106)。接続制御装置14は、中位通信装置2の通信装置情報と、切替装置3の物理ポート番号とを、上位制御装置8に通知する(ステップS107)。上位制御装置8は、通信装置情報と切替装置3の物理ポート番号とに基づいて、その物理ポート番号に関する接続情報を作成する。上位制御装置8は、接続情報を用いて、物理配線情報を更新する。上位制御装置8は、物理配線情報を端末装置9に送信してもよい(ステップS108)。
 ステップS101からステップS104までによって、物理配線情報における「接続状態」が定まる。ステップS106によって、物理配線情報における「通信装置情報」が定まる。
 配線情報作成システム10は、中位通信装置2の通信ポート21と測定装置13-1の光トランシーバ134との間についても、図11に示された動作と同様に動作する。
 図12は、配線情報作成システム10の動作例を示すシーケンス図である。中位通信装置2は、切替装置3に接続されたことを、通信制御装置6に通知する(ステップS201)。通信制御装置6は、新規の中位通信装置2が切替装置3に接続されたことを、上位制御装置8に通知する(ステップS202)。上位制御装置8は、物理配線情報において「未使用」とされている物理ポート31を選択する。上位制御装置8は、選択された物理ポート31の番号を記憶する(ステップS203)。上位制御装置8は、記憶された番号の物理ポート31に経路を切り替える指示を、切替制御装置5に出力する(ステップS204)。切替制御装置5は、選択された物理ポート31に経路を切り替える指示を、切替装置3に出力する(ステップS205)。
 切替装置3は、選択された物理ポート31に、経路を切り替える。図9では、光信号の強度が閾値以上である物理ポート31は、一例として、物理ポート31「#1」「#2」「#4」「#5」である。これによって、選択された物理ポート31と、測定装置13-2において予め選択された光トランシーバ134との間の接続が完了する(ステップS206)。
 切替装置3は、選択された物理ポート31に経路を切り替える処理が完了したことを、切替制御装置5に通知する(ステップS207)。切替制御装置5は、経路を切り替える処理が完了したことを、上位制御装置8に通知する(ステップS208)。
 上位制御装置8は、接続状態(リンクアップ又は疎通したか否か)を確認する指示を、接続制御装置14に出力する(ステップS209)。接続制御装置14は、接続状態を確認する指示を、測定装置13-2に出力する(ステップS210)。測定装置13-2は、選択された物理ポート31の接続状態を、接続制御装置14に通知する(ステップS211)。接続制御装置14は、選択された物理ポート31の接続状態を、上位制御装置8に通知する(ステップS212)。
 上位制御装置8は、物理配線情報において「未使用」とされている物理ポート31の測定情報(接続状態)を記憶する(ステップS213)。上位制御装置8は、測定情報が記憶された物理ポート31に接続された中位通信装置2の通信装置情報を取得する指示を、接続制御装置14に出力する(ステップS214)。接続制御装置14は、通信装置情報を取得する指示を、測定装置13-2に出力する(ステップS215)。
 測定装置13-2は、通信装置情報を送信する指示を、測定情報が記憶された物理ポート31に接続された中位通信装置2に出力する(ステップS216)。中位通信装置2は、通信装置情報を測定装置13-2に通知する(ステップS217)。測定装置13-2は、通信装置情報を接続制御装置14に通知する(ステップS218)。接続制御装置14は、通信装置情報を上位制御装置8に通知する(ステップS219)。
 上位制御装置8は、ステップS203において記憶された物理ポート31の番号と、通知された通信装置情報とを対応付けることによって、選択された物理ポート31の接続情報を作成する(ステップS220)。上位制御装置8は、作成された接続情報に基づいて、物理配線情報を更新する(ステップS221)。
 配線情報作成システム10は、中位通信装置2の通信ポート21と測定装置13-1の光トランシーバ134との間についても、図12に示された動作と同様に動作する。
 以上のように、第1実施形態の配線情報作成システム10は、切替装置3と、切替制御装置5と、接続制御装置14と、上位制御装置8(情報作成装置)とを備える。切替装置3は、上位ネットワーク1及び下位ネットワーク4の間の光信号の伝送路を、物理ポート31の組み合わせの単位で切り替える。切替制御装置5は、選択された物理ポートを通るように伝送路を切り替える指示を切替装置に出力する。接続制御装置14は、上位ネットワーク及び下位ネットワークの間の通信を中継する中位通信装置の通信ポートと選択された物理ポートとが接続されたか否かを判定する。接続制御装置14は、選択された物理ポートに接続された通信ポート21又は通信ポート22の番号を、中位通信装置2から取得する。上位制御装置8(情報作成装置)は、選択された物理ポート31に接続された通信ポート21又は通信ポート22を表す接続情報を作成する。上位制御装置8は、接続情報を切替装置3の物理ポート31ごとに表す物理配線情報を更新する。
 これによって、第1実施形態の配線情報作成システム10は、切替装置3の物理ポート31と中位通信装置2の通信ポート21又は通信ポート22との物理的な配線の情報を作成することが可能である。
 通信局舎内の切替装置3と中位通信装置2との間の物理的な接続を、オペレータが遠隔地から切り替える際に、物理配線情報をオペレータが把握することが可能になる。オペレータは、データセンタ等の通信局舎に備えられた中位通信装置2の間の配線を、物理配線情報に基づいて、切替装置3を用いて遠隔から行うことが可能である。このため、通信局舎において、技術者は、指示書において決められた中位通信装置2の間の配線を行わなくてもよい。また、技術者がヒューマンエラーによって配線を間違えるというリスクがない。
 切替装置3と中位通信装置2とを接続する際の技術者の確認作業手順を削減することが可能となる。通信システム110の可用性を向上させることが可能となる。中位通信装置2を通信局舎内に設置する際の接続作業を簡易化することが可能となる。
 (変形例)
 上位制御装置8は、切替装置3の物理ポート31を、定期的(例えば、1時間ごと)に選択してもよい。上位制御装置8は、中位通信装置2の故障等による中位通信装置2の通信ポートのリンクダウンが検出された場合、リンクダウンが検出された通信ポートの接続情報に、エラー情報を含める。リンクダウンしていた通信ポートのリンクアップが検出された場合、配線情報作成システム10は、第1実施形態に示された処理(例えば、図11及び図12に示された動作)を再実行してもよい。上位制御装置8は、リンクダウンしていた通信ポートのリンクアップが検出された場合、リンクアップが検出された通信ポートの接続情報を新たに作成する。上位制御装置8は、作成された接続情報に基づいて、物理配線情報を更新する。
 上位制御装置8は、リンクダウンしていた通信ポートの接続情報と新たに作成された接続情報とが同じである場合、リンクダウンが検出された通信ポートの接続情報のエラー情報を消去又は上書きする。リンクダウンしていた通信ポートのリンクアップが検出された場合、配線情報作成システム10は、第1実施形態に示された処理(例えば、図11及び図12に示された動作)を再実行してもよい。上位制御装置8は、リンクダウンしていた通信ポートのリンクアップが検出された場合、リンクアップが検出された通信ポートの接続情報を新たに作成する。上位制御装置8は、リンクダウンしていた通信ポートの接続情報と新たに作成された接続情報とが異なっている場合、新たに作成された接続情報に基づいて、物理配線情報を更新する。
 (第2実施形態)
 第2実施形態では、物理配線情報が速度情報及び通信規格情報を含む点が、第1実施形態と相違する。第2実施形態では、第1実施形態との相違点を説明する。
 図13は、配線情報作成システム10の構成例を示す図である。測定装置13は、強度検出部131と、光トランシーバ132と、光トランシーバ133と、光トランシーバ134と、インタフェース135とを備える。図13では、一例として、強度検出部131と切替装置3の物理ポート31とが光ファイバで接続され、光トランシーバ132と切替装置3の物理ポート31とが光ファイバで接続されている。また、光トランシーバ133と切替装置3の物理ポート31とが光ファイバで接続され、光トランシーバ134と切替装置3の物理ポート31とが光ファイバで接続されている。
 強度検出部131に接続された例えば物理ポート31「#1」の光信号の強度が閾値以上であると接続制御装置14によって判定された場合、次に、物理ポート31「#1」と、光トランシーバ132とが、切替装置3によって接続される。物理ポート31「#1」に接続された光トランシーバ132は、通信規格「10GBASE-SX」に基づいて、物理ポート31「#1」との通信を実行する。光トランシーバ132による通信が成功した場合、物理ポート31「#1」における光信号の通信規格が光トランシーバ132の通信規格「10GBASE-SX」であると、接続制御装置14によって判定される。
 光トランシーバ132による通信が成功しなかった場合、物理ポート31「#1」と、光トランシーバ133とが、切替装置3によって接続される。物理ポート31「#1」に接続された光トランシーバ133は、通信規格「10GBASE-LR」に基づいて、物理ポート31「#1」との通信を実行する。光トランシーバ133による通信が成功した場合、物理ポート31「#1」における光信号の通信規格が光トランシーバ133の通信規格「10GBASE-LR」であると、接続制御装置14によって判定される。
 光トランシーバ133による通信が成功しなかった場合、物理ポート31「#1」と、残りの光トランシーバ134とが、切替装置3によって接続される。物理ポート31「#1」に接続された光トランシーバ134は、通信規格「10GBASE-LX4」に基づいて、物理ポート31「#1」との通信を実行する。光トランシーバ134による通信が成功した場合、物理ポート31「#1」における光信号の通信規格が光トランシーバ133の通信規格「10GBASE-LX4」であると判定される。光トランシーバ134による通信が成功しなかった場合、物理ポート31「#1」における光信号の通信規格が「エラー」であると判定される。
 図14は、物理配線情報の例を示す図である。測定情報は、接続状態情報と、速度情報と、通信規格情報とを含む。速度情報は、接続制御装置14による通信速度の判定結果を表す情報である。通信規格情報は、接続制御装置14による通信規格の判定結果を表す情報である。
 図15は、配線情報作成システム10の動作例を示すフローチャートである。切替制御装置5は、接続制御装置14による制御に応じて、物理ポート31の組み合わせの単位で、切替装置3の内部の配線(経路)を切り替える(ステップS301)。接続制御装置14は、中位通信装置2の通信ポート22と測定装置13-2の光トランシーバ134との間がリンクアップ又は疎通したか否かを判定する(ステップS302)。
 中位通信装置2の通信ポート22と測定装置13-2の光トランシーバ134との間がリンクアップ又は疎通していない場合(ステップS302:NO)、接続制御装置14は、リンクアップ又は疎通していないことが測定装置13における全ての通信速度の条件で確認されたか否かを判定する(ステップS303)。リンクアップ又は疎通していないことが全ての通信速度の条件で確認された場合(ステップS303:YES)、接続制御装置14は、接続状態「エラー」を上位制御装置8に通知する(ステップS304)。上位制御装置8は、切替装置3において未使用の残りの物理ポート31が存在するか否かを判定する(ステップS305)。
 切替装置3において未使用の残りの物理ポート31が存在する場合(ステップS305:YES)、切替制御装置5は、未使用の残りの物理ポート31に経路を切り替える指示を、切替装置3に出力する(ステップS306)。配線情報作成システム10は、ステップS301に処理を戻す。
 リンクアップ又は疎通していないことがいずれかの通信速度の条件で確認されていない場合(ステップS303:NO)、切替制御装置5は、未確認の速度条件の光トランシーバに経路を切り替える指示を、切替装置3に出力する(ステップS307)。配線情報作成システム10は、ステップS301に処理を戻す。
 切替装置3において未使用の残りの物理ポート31が存在しない場合(ステップS305:NO)、上位制御装置8は、物理配線情報における接続状態「エラー」を、通信ポート22に接続されていない物理ポート31であることを表す接続状態「未使用」に変更する(ステップS308)。
 中位通信装置2の通信ポート22と測定装置13-2の光トランシーバ134との間がリンクアップ又は疎通した場合(ステップS302:YES)、接続制御装置14は、物理ポート番号と速度情報とを、上位制御装置8に通知する(ステップS309)。接続制御装置14は、リンクアップ又は疎通した光トランシーバの通信規格の情報を測定装置13に要求する(ステップS310)。
 接続制御装置14は、取得された通信規格の情報に基づいて、光トランシーバの通信規格が特定されたか否かを判定する(ステップS311)。光トランシーバの通信規格が特定された場合(ステップS311:YES)、接続制御装置14は、リンクアップ又は疎通した光トランシーバの通信規格を、上位制御装置8に通知する(ステップS312)。光トランシーバの通信規格が特定されていない場合(ステップS311:NO)、接続制御装置14は、通信規格「エラー」を、上位制御装置8に通知する(ステップS313)。
 接続制御装置14は、測定装置13-2を経由して、通信装置情報を中位通信装置2から取得する(ステップS314)。接続制御装置14は、中位通信装置2の通信装置情報と、切替装置3の物理ポート番号とを、上位制御装置8に通知する(ステップS315)。上位制御装置8は、通信装置情報と切替装置3の物理ポート番号とに基づいて、その物理ポート番号に関する接続情報を作成する。上位制御装置8は、接続情報を用いて、配線情報を更新する(ステップS316)。
 ステップS301からステップS307までによって、物理配線情報における「接続状態」及び「速度」が定まる。ステップS310からステップS313までによって、物理配線情報における「通信規格」が定まる。ステップS314によって、物理配線情報における「通信装置情報」が定まる。
 配線情報作成システム10は、中位通信装置2の通信ポート21と測定装置13-1の光トランシーバ132~134との間についても、図15に示された動作と同様に動作する。
 図16は、配線情報作成システム10の動作例を示すシーケンス図である。ステップS401からステップS412までの動作は、図12に示されたステップS201からステップS212までの動作と同様である。
 上位制御装置8は、選択された物理ポート31の接続状態がリンクアップ又は疎通であるか否かを判定する。接続状態がリンクアップ又は疎通である場合、上位制御装置8は、物理配線情報において「未使用」とされている物理ポート31の測定情報(接続状態)を記憶する。接続状態がリンクアップ又は疎通のいずれでもない場合、上位制御装置8は、ステップS404に処理を戻し、記憶された番号の物理ポート31と測定装置13における残りの光トランシーバとに経路を切り替える指示を、切替制御装置5に出力する(ステップS413)。
 このようにして、上位制御装置8は、中位通信装置2と光トランシーバとがリンクアップ若しくは疎通するまで、又は、測定装置13における全ての光トランシーバが光トランシーバごとに中位通信装置2に接続されるまで、ステップS404からステップS413までの動作を繰り返す。
 ステップS414からステップS422までの動作は、図12に示されたステップS214からステップS222までの動作と同様である。
 配線情報作成システム10は、中位通信装置2の通信ポート21と測定装置13-1の光トランシーバ132~134との間についても、図16に示された動作と同様に動作する。
 以上のように、第2実施形態の上位制御装置8は、取得された光トランシーバの通信規格の情報に基づいて、中位通信装置2の通信ポートの通信規格を切替装置3の物理ポート31ごとに更に表す接続情報を作成する。上位制御装置8は、速度情報及び通信規格情報を含む接続情報を用いて、物理配線情報を更新する。これによって、第2実施形態の配線情報作成システム10は、通信システム110における速度情報及び通信規格情報を含む物理配線情報を作成することが可能である。
 (第3実施形態)
 第3実施形態では、光信号の強度を検出する強度検出装置が切替装置及び中位通信装置の間に備えられる点が、第1実施形態及び第2実施形態と相違する。第3実施形態では、第1実施形態及び第2実施形態との相違点を説明する。
 切替装置3の物理ポート31ごとに経路が切り替えられる場合、切り替えの開始から完了までの時間は長い。したがって、切替装置3の物理ポート31の数が多い場合には、物理ポート31に接続された通信ポートの特定に必要とされる時間は長い。通信ポートの特定に必要とされる時間を短縮するために、切替装置3の各物理ポート31における光信号の強度を、光パワーメータがリアルタイムに測定する。
 図17は、配線情報作成システム10の構成例を示す図である。第3実施形態に示された配線情報作成システム10は、第1実施形態又は第2実施形態に示された配線情報作成システム10と比較して、強度検出装置15(光パワーメータ)を更に備える。強度検出装置15は、光強度を検出する検出用ポートを複数備える。強度検出装置15は、インラインのマルチポート・光パワーメータとして、中位通信装置2及び切替装置3の間に備えられる。強度検出装置15は、光ファイバを用いて、中位通信装置2及び切替装置3に接続される。強度検出装置15は、上位ネットワーク1及び下位ネットワーク4の間における、光信号の強度の増加と光信号の強度の減少とのうちの少なくとも一方を検出する。
 強度検出装置15は、上位ネットワーク1及び下位ネットワーク4の間における、光信号の強度の増加と光信号の強度の減少とのうちの少なくとも一方を検出する。光信号の強度の増加は、光信号の新たな経路がリンクアップしたことを表す。
 強度検出装置15の各検出用ポートに接続された各物理ポート31の光信号の強度の合計が増加した(リンクアップが検出された)場合、接続制御装置14は、光信号の強度の増加が検出された物理ポート31に接続された中位通信装置2の通信ポート22の番号を、測定装置13の光トランシーバを経由して、中位通信装置2から取得する。
 強度検出装置15の各検出用ポートに接続された少なくとも一つの物理ポート31の光信号の強度が増加した(リンクアップが検出された)場合、接続制御装置14は、光信号の強度の増加が検出された物理ポート31に接続された中位通信装置2の通信ポート22の番号を、測定装置13の光トランシーバを経由して、中位通信装置2から取得してもよい。
 強度検出装置15の各検出用ポートに接続された各物理ポート31の光信号の強度の合計が減少した(リンクダウンが検出された)場合、接続制御装置14は、光信号の強度の減少が検出された物理ポート31に接続された中位通信装置2の通信ポート22の接続情報に、エラー情報を含める。
 強度検出装置15の各検出用ポートに接続された少なくとも一つの物理ポート31の光信号の強度が減少した(リンクダウンが検出された)場合、接続制御装置14は、光信号の強度の減少が検出された物理ポート31に接続された中位通信装置2の通信ポート22の接続情報に、エラー情報を含めてもよい。
 以上のように、第3実施形態の配線情報作成システム10は、強度検出装置15(インラインパワーメータ)を更に備える。強度検出装置15は、上位ネットワーク1及び下位ネットワーク4の間における、光信号の強度の増加と光信号の強度の減少とのうちの少なくとも一方を検出する。接続制御装置14は、光信号の強度の増加が検出された物理ポートに接続された中位通信装置の通信ポートの番号を取得する。
 これによって、第3実施形態の配線情報作成システム10は、切替装置3の物理ポート31と中位通信装置2の通信ポート21又は通信ポート22との物理的な配線の情報を、リアルタイムに作成することが可能である。
 以上、この発明の実施形態について図面を参照して詳述してきたが、具体的な構成はこの実施形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計等も含まれる。
 上記の各実施形態は、互いに組み合わされてもよい。上記の各実施形態と上記の変形例とは、互いに組み合わされてもよい。
 本発明は、光通信システムに適用可能である。
 1…上位ネットワーク、2…中位通信装置、3…切替装置、4…下位ネットワーク、5…切替制御装置、6…通信制御装置、7…ネットワーク管理装置、8…上位制御装置、9…端末装置、10…配線情報作成システム、11…上位通信装置、12…通信回線、13…測定装置、14…接続制御装置、15…強度検出装置、21…通信ポート、22…通信ポート、23…設定ポート、31…物理ポート、32…制御ポート、41…下位通信装置、42…通信ポート、51…インタフェース、52…配線情報取得部、53…切替装置配線情報記憶部、54…配線可否判定部、55…配線指示部、56…応答受付部、57…配線情報更新部、71…割当管理部、72…インタフェース、73…情報作成部、74…割当情報記憶部、75…物理配線管理部、76…インタフェース、77…物理配線情報取得部、78…物理配線情報更新部、79…物理配線情報記憶部、100…光通信ネットワーク、110…通信システム、111…通信ポート、112…通信ポート、113…設定ポート、131…強度検出部、132…光トランシーバ、133…光トランシーバ、134…光トランシーバ、135…インタフェース、411…通信ポート、412…通信ポート、413…設定ポート

Claims (10)

  1.  上位ネットワーク及び下位ネットワークの間の光信号の伝送路を、物理ポートの組み合わせの単位で切り替える切替装置と、
     選択された前記物理ポートを通るように前記伝送路を切り替える指示を前記切替装置に出力する切替制御装置と、
     前記上位ネットワーク及び前記下位ネットワークの間の通信を中継する中位通信装置の通信ポートと選択された前記物理ポートとが接続されたか否かを判定し、選択された前記物理ポートに接続された前記通信ポートの番号を前記中位通信装置から取得する接続制御装置と、
     選択された前記物理ポートに接続された前記通信ポートを表す接続情報を作成し、接続情報を前記切替装置の前記物理ポートごとに表す配線情報を更新する情報作成装置と
     を備える配線情報作成システム。
  2.  前記接続制御装置は、前記中位通信装置の前記通信ポートと選択された前記物理ポートとが接続されたか否かを、選択された前記物理ポートの前記伝送路における光信号の光強度の測定結果に基づいて判定する、
     請求項1に記載の配線情報作成システム。
  3.  前記接続制御装置は、LLDP(Link Layer Discovery Protocol)又はループバックに基づく通信を実行することによって、前記通信ポートの番号を前記中位通信装置から取得する、
     請求項1又は請求項2に記載の配線情報作成システム。
  4.  前記接続制御装置は、選択された前記物理ポートに接続された光トランシーバの通信規格の情報を取得し、
     前記情報作成装置は、取得された光トランシーバの通信規格の情報に基づいて、前記中位通信装置の前記通信ポートの通信規格を前記切替装置の前記物理ポートごとに更に表す接続情報を作成し、接続情報を前記切替装置の前記物理ポートごとに表す配線情報を更新する、
     請求項1から請求項3のいずれか一項に記載の配線情報作成システム。
  5.  前記情報作成装置は、前記中位通信装置の前記通信ポートのリンクダウンが検出された場合、リンクダウンが検出された前記通信ポートの接続情報に、エラー情報を含める、
     請求項1から請求項4のいずれか一項に記載の配線情報作成システム。
  6.  前記情報作成装置は、リンクダウンしていた前記通信ポートのリンクアップが検出された場合、リンクアップが検出された前記通信ポートの接続情報を新たに作成し、リンクダウンしていた前記通信ポートの接続情報と新たに作成された接続情報とが同じである場合、リンクダウンが検出された前記通信ポートの接続情報のエラー情報を消去又は上書きする、
     請求項5に記載の配線情報作成システム。
  7.  前記情報作成装置は、リンクダウンしていた前記通信ポートのリンクアップが検出された場合、リンクアップが検出された前記通信ポートの接続情報を新たに作成し、リンクダウンしていた前記通信ポートの接続情報と新たに作成された接続情報とが異なっている場合、新たに作成された接続情報に基づいて配線情報を更新する、
     請求項5に記載の配線情報作成システム。
  8.  上位ネットワーク及び下位ネットワークの間における、光信号の強度の増加と光信号の強度の減少とのうちの少なくとも一方を検出する強度検出装置を更に備え、
     前記接続制御装置は、光信号の強度の増加が検出された前記物理ポートに接続された前記中位通信装置の前記通信ポートの番号を取得する、
     請求項1から請求項7のいずれか一項に記載の配線情報作成システム。
  9.  前記情報作成装置は、前記切替装置の前記物理ポートを定期的に選択する、
     請求項1から請求項8のいずれか一項に記載の配線情報作成システム。
  10.  配線情報作成システムが実行する配線情報作成方法であって、
     上位ネットワーク及び下位ネットワークの間の光信号の伝送路を物理ポートの組み合わせの単位で切り替える切替装置に、選択された前記物理ポートを通るように前記伝送路を切り替える指示を出力する切替制御ステップと、
     前記上位ネットワーク及び前記下位ネットワークの間の通信を中継する中位通信装置の通信ポートと選択された前記物理ポートとが接続されたか否かを判定し、選択された前記物理ポートに接続された前記通信ポートの番号を前記中位通信装置から取得する接続制御ステップと、
     選択された前記物理ポートに接続された前記通信ポートを表す接続情報を作成し、接続情報を前記切替装置の前記物理ポートごとに表す配線情報を更新する情報作成ステップと
     を含む配線情報作成方法。
PCT/JP2019/017180 2019-04-23 2019-04-23 配線情報作成システム及び配線情報作成方法 WO2020217300A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
US17/602,805 US11825247B2 (en) 2019-04-23 2019-04-23 Wiring information generation system, and wiring information generation method
PCT/JP2019/017180 WO2020217300A1 (ja) 2019-04-23 2019-04-23 配線情報作成システム及び配線情報作成方法
JP2021515341A JP7089211B2 (ja) 2019-04-23 2019-04-23 配線情報作成システム及び配線情報作成方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2019/017180 WO2020217300A1 (ja) 2019-04-23 2019-04-23 配線情報作成システム及び配線情報作成方法

Publications (1)

Publication Number Publication Date
WO2020217300A1 true WO2020217300A1 (ja) 2020-10-29

Family

ID=72941042

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2019/017180 WO2020217300A1 (ja) 2019-04-23 2019-04-23 配線情報作成システム及び配線情報作成方法

Country Status (3)

Country Link
US (1) US11825247B2 (ja)
JP (1) JP7089211B2 (ja)
WO (1) WO2020217300A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4084439A1 (en) 2021-04-28 2022-11-02 Fujitsu Limited Network map creation support program, information processing apparatus, and network map creation support method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008154171A (ja) * 2006-12-20 2008-07-03 Nakayo Telecommun Inc 通信システム、配線情報収集方法、および中継装置
JP2008236070A (ja) * 2007-03-16 2008-10-02 Fujitsu Ltd 光伝送装置
JP2011004037A (ja) * 2009-06-17 2011-01-06 Nippon Telegr & Teleph Corp <Ntt> 光通信網、スイッチ制御装置、スイッチ制御方法およびプログラム
JP2018023075A (ja) * 2016-08-05 2018-02-08 日本電信電話株式会社 通信装置、通信方法及び通信プログラム

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6980736B1 (en) * 2002-01-03 2005-12-27 Mci, Inc. Verification of path integrity in optical switch network
JP7099272B2 (ja) * 2018-11-19 2022-07-12 富士通株式会社 情報処理装置、ネットワークシステム及びチーミングプログラム

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008154171A (ja) * 2006-12-20 2008-07-03 Nakayo Telecommun Inc 通信システム、配線情報収集方法、および中継装置
JP2008236070A (ja) * 2007-03-16 2008-10-02 Fujitsu Ltd 光伝送装置
JP2011004037A (ja) * 2009-06-17 2011-01-06 Nippon Telegr & Teleph Corp <Ntt> 光通信網、スイッチ制御装置、スイッチ制御方法およびプログラム
JP2018023075A (ja) * 2016-08-05 2018-02-08 日本電信電話株式会社 通信装置、通信方法及び通信プログラム

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4084439A1 (en) 2021-04-28 2022-11-02 Fujitsu Limited Network map creation support program, information processing apparatus, and network map creation support method

Also Published As

Publication number Publication date
US11825247B2 (en) 2023-11-21
US20220159358A1 (en) 2022-05-19
JP7089211B2 (ja) 2022-06-22
JPWO2020217300A1 (ja) 2021-12-23

Similar Documents

Publication Publication Date Title
US7233568B2 (en) System and method for selection of redundant control path links in a multi-shelf network element
CN101884208B (zh) 在多个适配器间同时支持多个虚拟ip地址的主机中的故障转移
NO326029B1 (no) System og metode for oppbygging av rutingstabeller og for ruting av signaler i et automatiseringssystem
JP2002135410A (ja) アクセスネットワークシステム
US20060013248A1 (en) Switching device interfaces
US20070127435A1 (en) Nms corba listener for ems signals
JP2008228150A (ja) スイッチ装置及びフレーム交換方法とそのプログラム
JP7161135B2 (ja) 通信システム及び制御方法
KR100425560B1 (ko) 단말기의 액티브 포트를 쉽게 변경할 수 있는 랜 경로제어 시스템 및 방법
JP7089211B2 (ja) 配線情報作成システム及び配線情報作成方法
US5347271A (en) Network switching contorol method and system
WO2007022183A2 (en) Apparatus and methods for managing nodes on a fault tolerant network
JP2001186159A (ja) リング伝送システム及びそのスケルチ方法
US7158477B2 (en) Data communication apparatus with distributed traffic protection switching system
US11876555B2 (en) Failure determination system and failure determination method
US7962595B1 (en) Method and apparatus for diagnosing host to storage data path loss due to FibreChannel switch fabric splits
JP5993353B2 (ja) 光ネットワークシステム
JP2001237889A (ja) データ通信網における迂回経路制御方法及び装置
JP2003087279A (ja) 伝送装置
JP2018160874A (ja) 光通信応急復旧方法及び装置
JPH0828737B2 (ja) 通信システムおよび該システムに用いる中継装置
KR20050058622A (ko) 통신경로 이중화장치 및 이중화된 통신경로의 운용방법
US20240064097A1 (en) Transfer device, transfer method, transfer system, and program
WO2023286266A1 (ja) 光線路を切り替える光ノード及び方法
JP2001156849A (ja) 通信ネットワークシステム及び無線通信端末並びに通信制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19926381

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2021515341

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19926381

Country of ref document: EP

Kind code of ref document: A1