WO2020192811A1 - Poteau de garde-corps pour un garde-corps avant d'un échafaudage, échafaudage comprenant un garde-corps avant et procédé pour installer un garde-corps avant sur un échafaudage - Google Patents

Poteau de garde-corps pour un garde-corps avant d'un échafaudage, échafaudage comprenant un garde-corps avant et procédé pour installer un garde-corps avant sur un échafaudage Download PDF

Info

Publication number
WO2020192811A1
WO2020192811A1 PCT/DE2020/000050 DE2020000050W WO2020192811A1 WO 2020192811 A1 WO2020192811 A1 WO 2020192811A1 DE 2020000050 W DE2020000050 W DE 2020000050W WO 2020192811 A1 WO2020192811 A1 WO 2020192811A1
Authority
WO
WIPO (PCT)
Prior art keywords
post
railing
vertical
connection device
scaffolding
Prior art date
Application number
PCT/DE2020/000050
Other languages
German (de)
English (en)
Inventor
Wolf Christian BEHRBOHM
Original Assignee
Wilhelm Layher Verwaltungs-Gmbh
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wilhelm Layher Verwaltungs-Gmbh filed Critical Wilhelm Layher Verwaltungs-Gmbh
Priority to EP20715665.4A priority Critical patent/EP3947851A1/fr
Priority to DE112020001497.5T priority patent/DE112020001497A5/de
Publication of WO2020192811A1 publication Critical patent/WO2020192811A1/fr

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G5/147Railings specially adapted for mounting prior to the mounting of the platform
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/06Stiff scaffolding clamps for connecting scaffold members of common shape
    • E04G7/08Clamps for parallelly-arranged members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/06Stiff scaffolding clamps for connecting scaffold members of common shape
    • E04G7/08Clamps for parallelly-arranged members
    • E04G7/10Self-tightening clamps, e.g. stirrups

Definitions

  • the present invention relates to a railing post for a scaffold with scaffolding levels with vertical posts / vertical frames running in the longitudinal / vertical direction, cross bars running in the transverse / horizontal direction, railing posts, decks for the assembly of a so-called leading railing, by means of which at least one temporary, telescopic railing post is removed from an existing one lower scaffolding shelf can be assembled from for an upper scaffolding shelf to be mounted above, with a first connection device, a second connection device, a third connection device, the first connection device being arranged in the upper end region of the railing post, to which at least one temporary railing stile can be detachably connected third connection unit is arranged in the lower end of the scaffold post, which is detachable with existing components of the scaffolding, in particular with the vertical post with connected railing bars or a rosette of the Vertical post, is connectable, the second connection device is arranged at a distance in the longitudinal direction above the third connection device, which is releasably lockable on the vertical post of the scaffold
  • Railing post connected form-fit unit and one above or below or within the fixed form-fitting unit
  • e i n usede movable, in particular rotatable, comprises form-fitting unit, the maximum from a closed position to an
  • Closing position a positive locking of an inserted railing post on a vertical post of the scaffolding is given.
  • the present invention further relates to a scaffold with a leading railing with such railing beams and a
  • Such leading railings consist of a total of three individual components per scaffold bay, namely two identical railing posts that are connected to existing vertical posts of the scaffolding and to which at least one, in particular two telescopic railing bars are connected.
  • the guardrail posts with the connected guardrail bars are assembled from the scaffolding level below and, due to their length, provide at least one-piece side protection in the next, upper scaffolding level.
  • another guardrail post of the leading guardrail is gradually moved upwards in order to secure the upper scaffolding level for further assembly work. The dismantling is done in reverse order.
  • leading railing known, which has two scissor-like claws that have to be actively opened and closed for connection.
  • a pin is used to lock and secure the lower area of the scissor-like claws.
  • the outer tube of the railing post must be moved vertically, then rotated and then lowered again. The unlocking takes place in reverse order.
  • Leading railing here is that during the assembly and dismantling of the leading railing an uncomfortable vertical as well
  • EP 1 338 723 A2 discloses a device for assembling a temporarily existing handrail of a scaffolding, in which the third lower connection device is hung on the existing handrail and the second connection device is connected to the handrail by means of a U-shaped receiving unit with a wedge unit.
  • EP 1 571 275 A2 discloses a device for assembling a temporarily existing handrail post with connected telescopic handrail rails on existing vertical posts of a scaffolding according to the features of the preamble of claim 1.
  • the handrail post has claws with an automatic clamping function, with a continuous rotatable shaft inside of the railing post is used, which can be rotatably actuated via actuation units and is connected to the claws via a relatively complex mechanism.
  • the actuating unit must be actively opened and closed to connect the vertical post to the railing post. To do this, the actuation unit is rotated accordingly.
  • a disadvantage of this solution is that a rotary movement has to be actively carried out during assembly and disassembly of the leading railing.
  • the internal mechanism is relatively complex and prone to damage.
  • it must be ensured during assembly that the upper and lower claws are fully connected and locked into place on the vertical frame or vertical post to be attached.
  • the present invention is based on the object or the technical problem of specifying a railing post for a leading one that provides secure side protection in the next upper scaffolding level, while being able to be quickly and easily assembled from the underlying scaffolding level, a durable and robust construction with permanent reliable functionality is guaranteed and can be produced economically.
  • the invention is also based on the object or the technical problem of specifying a scaffolding with a leading railing that ensures high safety standards and enables simple and quick and thus economical assembly and dismantling of the leading railing.
  • the present invention is also based on the object of specifying a method for converting a leading railing from an existing scaffolding to a scaffolding that is still to be assembled above, which ensures quick and easy assembly while at the same time ensuring a permanently reliable function of the leading railing.
  • the railing post according to the invention is given by the features of independent claim 1.
  • Advantageous embodiments and Further training is the subject of the independent claim.
  • the railing post according to the invention is accordingly characterized in that the movable interlocking unit, in particular directly, is connected to the rotatable shaft, there is an elastic element that acts on the moveable interlocking unit and holds it in the closed position under its sole effect, the moveable interlocking unit is designed in its front end area so that it initially opens in the opening direction when pressed against a vertical stem of the Ge and after exceeding a predeterminable position / displacement of the vertical stem, that is, when it reaches the maximum opening position, due to the effect of the spring force of the elastic Elements moves into the closed position and thus at least partially encloses the vertical stem in a form-fitting manner and locks it securely.
  • the upper or lower rotary actuating device is rotated in the direction of rotation so that the movable form-fit unit moves in the opening direction or rotates in the direction of rotation and releases the railing post.
  • a particularly advantageous development which is designed to be particularly simple in terms of construction and which functions reliably over the long term. ensures, is characterized in that the elastic element is designed as a torsion spring.
  • the fixed form-fitting unit is designed as a fork construction, in particular U-shaped, which is open towards its free end region.
  • the rotatable form-fitting unit is designed as a hook unit which has an inclined front end contour in its free end region.
  • the inclined front end contour ensures in an advantageous manner that an automatic connection process is made possible in a simple manner by simply pressing against the vertical post of the existing scaffolding, in that the rotatable form-fitting unit initially expands by pressing on the vertical post and upon reaching the opening position Further movement of the railing post due to the elastic element returns to the closed position or "snaps" and thereby secures the railing post positively on the vertical post.
  • a particularly preferred embodiment with regard to permanently reliable functionality which also ensures high connection security, is characterized in that the fixed form-fit unit and the rotatable form-fit unit have, at least in some areas, a part-circular inner contour course which corresponds to the outer contour course of the vertical stem, being in a
  • a particularly preferred structurally simple embodiment is characterized in that the rotatable form-fitting unit is connected to the rotatable shaft via a connecting means that is guided within a slot of the railing post.
  • an advantageous development is characterized in that the upper rotary actuation device is arranged below the first connection device and / or the lower rotary actuation device is arranged above the third connection device.
  • the rotary actuating devices are easily accessible for the assembly person with regard to the respective assembly process.
  • a particularly preferred embodiment which ensures the functional safety of a leading railing, is characterized in that the second connection device is arranged within the railing post in such a way that, when the railing post is connected to the vertical post, it is directly below a protruding component of the scaffolding, in particular one Gusset plate, is arranged so that displacement in the longitudinal direction is blocked.
  • connection reliability of the baluster particularly when used in the context of a known Layher round scaffold ® (registered trademark) - ensured system is characterized in that the railing post above the second connecting means includes a projecting from the railing posts, in particular in the transverse direction, Has safety stop unit which is arranged within the scaffold post so that it is arranged in the connected state of the railing post to the vertical post directly below a protruding component, in particular a rosette, of the vertical post and blocks a displacement in the longitudinal direction.
  • a particularly preferred embodiment of the railing post according to the invention ensures particularly small distances from the inner edge of the temporary railing to the outer edge of the covering or the toe board with regard to the arrangement of the temporary railing rail in the connected state of the leading railing to the scaffolding in a top view characterized in that the first connection device is designed as a protrusion device with two horizontally spaced apart protruding protrusion units, the clear inner distance of which is greater than the outer diameter of the vertical post and in each of its end areas a connection unit for the temporary telescopic handrail, the first connection device With regard to an advantageous geometry, it is characterized in that the length of the projection of the first connection device is so great that when the railing post is connected to the vertical post, the A Connection units are present next to the vertical standard in its immediate vicinity or protruding beyond the vertical standard into the interior of the scaffolding. As a result, for example, a distance of less than or equal to 80 mm between the temporary handrail and toe board is easily possible when viewed from above.
  • connection units each have a tilting pin.
  • the Third connection device is designed as a projection device running in the transverse direction with a first connection area connected to the railing post or a second connection area or a second connection area connected to the first connection area in the transverse direction, the first connection area being a downwardly pointing, in particular curved, projection unit and / or the second connection area has a recess that is open downward in the longitudinal direction.
  • An alternative, particularly advantageous railing post according to the invention which is designed independently of the first and second connection devices described above, for a scaffolding with scaffolding floors with vertical posts / vertical frames running in the longitudinal / vertical direction, transverse bars, railing rails, decks, for mounting a so-called leading handrail, by means of which at least one temporary, telescopic handrail can be mounted from an existing lower scaffolding level for an upper scaffolding level to be mounted above, with a first connection device, a second connection device, a third connection device, the first connection device in the upper
  • the third connection unit is arranged in the lower end area of the scaffolding post, which is releasably connectable to existing components of the scaffolding, in particular to the vertical post with connected railing posts or a rosette of the vertical post , the second connection device is arranged at a distance in the longitudinal direction above the third connection device, which can be releasably locked to the vertical post of the scaffolding, is characterized in that the third connection device is designed as a protrusion device running in the transverse direction with a first connection area connected to the railing post or a second connection area or a two- connected to the first connection area in the transverse direction th connection area, wherein the first connection area has a downwardly pointing projection unit and / or the second connection area has a recess open downward in the longitudinal direction.
  • a preferred embodiment of the railing post according to the invention is characterized in that the second connection area has an outwardly open receiving unit with two spaced apart legs, on each of which the downwardly open recess is formed.
  • a particularly advantageous embodiment of the railing post according to the invention which can preferably be used in a modular framework, is characterized in that the projection unit is designed as a profile unit that is curved, in particular towards the railing post.
  • the design as a curved profile unit ensures both simple assembly and disassembly by simply threading or unmounting the profile unit in / out of the recess of a rosette of the vertical stem and, in the assembled state, there is a safeguard against displacements in the longitudinal direction, since in the vertical assembly end position of the Ge Land post the curvature of the profile unit blocks lifting in the vertical direction (longitudinal direction) upwards.
  • the railing post according to the invention ensures a particularly simple and functionally safe assembly or dismantling or relocation of the leading railing.
  • the railing post enables the leading railing to be secured automatically, with the leading railing only being able to be released actively by actuating the rotary actuating devices.
  • the invention railing post a robust mechanism in comparison to the known systems, and is used for scaffolding module (eg Layher Allround scaffolding ® (registered trademark) - System) and facade scaffolding (eg Layher scaffolding ® (registered trademark) system).
  • scaffolding module eg Layher Allround scaffolding ® (registered trademark) - System
  • facade scaffolding eg Layher scaffolding ® (registered trademark) system.
  • the structural configuration shown reliably prevents vertical displacement and horizontal displacement from being possible when the leading railing is connected, but rather the leading railing can only be actively released by actuating the rotary actuation device.
  • a facade scaffolding according to the invention (for example Layher Blitz Gerüst ® (registered trademark)) with a leading railing is described by the following features:
  • the third connection device is available via its downwardly open recesses of the second connection area in the connection area of the existing railing bars on the vertical post in the existing railing posts, the vertical post runs through the open recess of the second connection area and the second connection device to the vertical post directly below the gusset plate is connected and thus a shift in the longitudinal direction upwards is blocked.
  • a modular scaffold e.g. Layher Allroundgerüst ® (registered trademark) is described by the following features:
  • Connection device is inserted into a recess of the rosette via its, in particular curved, projection unit pointing downwards in the longitudinal direction, on which the existing
  • Railing bars are connected so that a displacement in the longitudinal direction is blocked by the safety stop unit or by the curved contour of the projection unit, the second connecting device is connected to the vertical post.
  • a quick-to-assemble and robust railing post is available for a leading railing, which in a first construction has a second connection device with a wedge-shaped or U-shaped pipe receptacle for the vertical post, which has a simple mechanism ( Snap mechanism with torsion spring) automatically opens when pressure is pressed against the vertical stem and then closes again immediately as soon as the vertical stem has reached its end position and is completely enclosed by the rotatable form-fitting unit.
  • the second connection device with its rotatable form-fit unit is opened by a simple rotary movement of the rotary actuation device and the railing post can be moved.
  • the rotatable interlocking unit is connected to the two rotary actuation devices by the rotatable shaft in the outer tube of the scaffold post, so that the guardrail post can be secured and unlocked on both actuation devices in both the upper and lower areas.
  • the existing elastic element (torsion spring) guarantees reliable locking of the railing post via the second connection device on the vertical post.
  • the third connection device in the lower part of the guardrail post is used for optimal assembly to the guardrail connection of a system frame, for example a Layher SpeedyScaf ® (registered trademark) system and / or to the rosette of a vertical standard, for example a Layher Allroundgerüst ® (registered trademark) system .
  • the third connection device is simply put on or hooked in and is secured against displacement by precisely fitting recesses.
  • railing post for a module frame has a third connection device in which only a first terminal area in front of hands, the lower side has a curved profile unit.
  • the first and second connection devices can be designed in any way and only need to fulfill the desired functionality, i.e. temporary handrails must be releasably connectable to the first connection device and the second connection device must be releasably lockable on the vertical post.
  • FIG. 1 perspective view of a first exemplary embodiment of a railing post for a leading railing, suitable for use on a facade scaffolding, for example Layher Blitz Gerüst® (registered trademark) system, with a first connection device and a second Connection device and a third connection device and rotary actuation device for releasing the second connection device,
  • a facade scaffolding for example Layher Blitz Gerüst® (registered trademark) system
  • Fig. 2 is perspective view of a second embodiment of a railing post for a voreilendes railing, suitable for use in a modular scaffolding, for example Layher round scaffold ® (registered trademark) - system comprising a first connection means, second connection means and a third connecting mechanism and rotary actuator to release the second connection device,
  • Layher round scaffold ® registered trademark
  • FIG. 3 is a schematic perspective illustration of a third
  • FIG. 4 shows a schematic detail side view of the second connection device of the handrail post according to FIG. 1 to a facade scaffolding
  • FIG. 5 shows a schematic detailed view of the third connection device of a railing post according to FIG. 1 to a facade scaffolding
  • connection device of the railing post according to FIGS. 1 and 2 in the closed state, without connection to a vertical post, 9 is a schematic perspective view of the second
  • Figure 12 is a schematic side view of the second connector
  • FIG. 13 shows a schematic perspective illustration of the first connection device of the handrail post according to FIG. 1,
  • FIG. 15 shows a schematic detailed perspective view of the connection of the railing post according to FIG. 1 to a facade scaffolding in the final assembled state
  • FIG. 16 shows a schematic detailed perspective representation of a scaffolding field of a facade scaffolding in an intermediate assembly state
  • Facade scaffolding with mounted railing posts according to Fig. 16 in the final state, 18 a schematic perspective illustration of three scaffolding fields of a facade scaffolding with mounted leading railings,
  • FIG. 19 shows a schematic perspective illustration of three scaffolding fields with a mounted leading railing with already mounted scaffolding decks and assembly frames in the scaffolding level arranged above,
  • FIG. 21 is perspective view of a third embodiment of a railing post for a voreilendes railing, suitable for use on a facade scaffold, for example Layher SpeedyScaf ® (registered trademark) - System, as well as for use on a modular scaffolding, for example Layher round scaffold ® (registered trademark ) - System with a first connection device, a second connection device and a third connection device and rotary actuation device for releasing the second connection device,
  • FIG. 23 shows a schematic detailed view of the second connection device according to FIG. 21 on a modular frame
  • FIG. 25 is perspective view of a fourth embodiment of a railing post for a voreilendes railing, suitable for use in a modular scaffolding, for example Layher round scaffold ® (registered trademark) - system comprising a first connection means, second connection means and a third connecting means having a curved projection unit and Rotary actuating device for releasing the second connecting device.
  • Layher round scaffold ® registered trademark
  • a first embodiment of a railing post 10.1 is shown, which is part of a leading railing on a facade scaffolding, such as the Layher SpeedyScaf ®
  • the railing post 10.1 is designed as a round tube.
  • the longitudinal direction of the railing post 10.1 is indicated in FIG. 1 with the reference character L and the transverse direction running perpendicular to the longitudinal direction L is indicated in FIG. 1 with the reference character Q.
  • the railing post 10.1 has a first connection device 12.1 at a distance from the end face, to which two telescopic temporary railing bars can be detachably connected on both sides.
  • an upper rotary actuation device 22.1 designed as a rotary handle, which can be rotated in the direction of rotation D about the longitudinal direction L and is connected to a continuous, rotatably mounted shaft which is arranged on the inside in the railing post 10.1, which is shown in FIG. 1 is not visible.
  • the rotatable shaft 18 can be seen in detail from the illustration in FIG. 11.
  • a further first connection device 12.1 is connected below the upper rotary actuation device 22.1. Both first
  • Connection units 12.1 protrude in the transverse direction Q.
  • a third connection device 16 is spaced apart from the lower end face
  • connection device 16 Above the third connection device 16 is a lower rotary actuation device 22.2, which is designed as a rotary handle, rotatable in the direction of rotation D and connected to the rotatable shaft not shown in FIG. 1 (reference number 18 see FIG. 11).
  • a second connection device 14 is connected above the lower rotary actuation device 22.2, which also protrudes in the transverse direction Q and has a non-rotatably connected form-fit unit 24 and a rotatable form-fit unit 26 connected to the rotatable shaft 18.
  • Fig. 2 is a second embodiment of a railing post
  • This railing post 10.2 which is used as part of a leading railing in modular scaffolding, in particular a Layher Allround Scaffolding ® (registered trademark) system.
  • This railing post 10.2 has essentially the same lower and upper rotary actuation device 22.1, 22.2, the same second connection device 14 and the same third connection device 16 as is also present in the railing post 10.1 according to FIG. 1.
  • the same components have the same reference symbols and are not explained again.
  • a difference to the railing post 10.1 is that the first connection device 12.2 is designed as a projection unit 76 with a tilting pin 74 for the detachable connection of the telescopic temporary railing bars.
  • Connection device 14 has a connected safety stop unit 32 running in the transverse direction Q.
  • the third connection device 16 is shown in more detail in FIG. 3.
  • a first connection area 34 running in the transverse direction Q is formed on the railing post 10.1 or 10.2 and has a downwardly pointing projection unit 38.
  • a second connection area 36 running in the transverse direction Q is connected to the first connection area 34 and has a U-shaped receiving unit 48 with two legs when viewed from above, both legs having a downwardly open U-shaped recess 40 on the underside.
  • the U-shaped receiving unit 48 has a semicircular inner contour in its receiving base.
  • the second connection device 14 is shown in more detail in FIGS. 8 to 12.
  • the second connection device 14 has a fixedly connected to the railing post 10.1, 10.2 in the transverse direction Q
  • This inner contour 25 has a radius of curvature which essentially corresponds to the radius of curvature of the outer circumferential contour of a vertical post of a frame to be connected.
  • a rotatable form-fit unit 26 is connected which, as shown in Fig. 10, is connected to the rotatable shaft 18 (see Fig. 10) via a connecting pin 44 which is guided in a slot 42 of the outer wall of the railing post 10.1, 10.2. 11) connected.
  • the rotatable interlocking unit 26 is in its front end area as a hook unit with a part-circular inner contour 27
  • the radius of curvature of the outer contour of the railing post 10.1, 10.2 corresponds. In the front end region of the hook unit, it has an inclined end contour 51.
  • Form-fit unit 26 an elastic element 28 is arranged, which is designed as a torsion spring and is connected to both form-fit units 24, 26.
  • a stop unit 30 is formed on the fixed form-fit unit 24, against which the rotatable form-fit unit 26 strikes in the closed position according to FIG. 8 and as a result of the action of the elastic element 28.
  • the rotatable form-locking device opens against the action of the elastic element 28 the pressed vertical stem has reached the base of the U-shaped recess 35, that is, the part-circular contour 35, the rotatable form-locking unit 26 snaps back into the closed position due to the action of the elastic element 28, whereby the inserted vertical stem is positively encompassed and securely in its
  • FIG. 4 shows in detail the connection of the second connection device 14 of the railing post 10.1 to a facade scaffolding with a vertical post 58.1, on which a crossbar is provided via a gusset plate 64
  • Connection device 14 is connected to vertical post 58.1 directly below gusset plate 64, so that upward movement of railing post 10.1 in longitudinal direction L is prevented by second connection device 14 striking against gusset plate 64 on the underside.
  • FIG. 5 shows the connection of the third connection device 16 to the vertical post 58.1 of a facade scaffolding, which can be, for example, the well-known Layher SpeedyScaf® (registered trademark) system.
  • a handrail box 78 is connected to the vertical post 58.1, in which, in turn, existing handrail bars 68 of the scaffolding are detachably connected.
  • the third connection device 16 is with its second connection area 36 over the U-shaped
  • FIG. 6 shows the connection of the second connection device 14 to a vertical post 58.2 of a modular frame. On the vertical handle
  • Such a modular scaffold can for example be the well-known Layher Allround scaffold ®
  • the safety stop unit 32 is arranged in such a way that it is present directly below a rosette 66, that is, the railing post 10.2 practically cannot be moved upward in the longitudinal direction L, since the safety stop unit 32 strikes the rosette 66.
  • Fig. 7 the connection of the third connection device 16 to the vertical post 58.2 is shown.
  • the first connection area 34 is suspended with its downwardly pointing projection unit 28 in a recess in the rosette 66 and the vertical post 58.2 runs through the U-shaped receiving unit 48.
  • the first connection device 12.1 is shown in greater detail in FIG.
  • the first connection device 12.1 is designed as a fork-shaped construction with two parallel spaced apart projection units 76, each of which has a connection unit 72 with a tilting pin 74 in its free end area for the detachable connection of a temporary, telescopic handrail of a leading handrail.
  • the clear inner distance A of the projection unit 76 is greater than the outer diameter of the vertical post 58.1, 58.2 of the frame.
  • the projection units 76 are additionally connected to one another by a transverse web 75 offset inward.
  • Connection units 72 of the first connection device 12.1 can be arranged significantly closer to the scaffolding or scaffold decking when the railing post 10.1 is connected, in contrast to the known connection devices in which the temporary guardrail is connected on the outside in front of the vertical post. It can thereby be achieved that, in the connected state, the distance between the inner contour of the temporary handrail spar 20 and the outer contour of the covering or a toe board does not exceed a permissible dimension of, for example, 80 mm when viewed from above.
  • Figures 14 to 19 show the use of the handrail post 10.1 in the context of a leading handrail in different assembly positions in a facade scaffolding such as the Layher Blitz Gerüst® (registered trademark) system.
  • the facade scaffolding 50 here has vertical frames 56 with parallel in the transverse direction
  • spaced vertical posts 58.1 which are each connected in the upper end area via a gusset plate 64 to a crossbar 60.1.
  • the two vertical posts 58.1 are connected by a transverse profile 70.
  • the railing post 10.1 is first hung with its third connection device 16 from above in the connection area of the existing railing rails 16 on the vertical post 58.1 in the existing railing rails 68 and is initially in an outwardly inclined position in which the second connection device 14 rests with its rotatable form-fit unit 26 on the outer contour of the vertical post 58.1.
  • connection situation of the handrail post 10.1 to the vertical post 58.1 shown in FIG. 15 corresponds to the detail illustration according to FIG. 4 with regard to the connection of the second connection device 14 and to the detail illustration according to FIG. 5 with regard to the third connection device 16.
  • Figures 16 to 19 show the use of the railing post 10.1 in the context of a leading railing with first two connection devices 12.1 connected telescopic handrail rails 20 in different assembly positions in a scaffolding field
  • 16 shows an intermediate assembly state of a scaffolding bay of a lower tier 54 of the scaffolding 50, in which the left handrail post 10.1 is still in a lower assembly position and the right handrail post 10.1 is already connected in its end position to secure an upper scaffold tier 52.
  • 17 shows the state in which the left handrail post 10.1 is also connected in the (temporary) upper position.
  • FIG. 18 shows the state of a connected leading railing with three scaffolding fields of the scaffolding 50 according to the assembly state of FIG. 17.
  • Fig. 20 is the connection of a railing post 10.2 to the
  • Allroundgerüst ® registered trademark
  • the connection situation of the second connection device 14 shown in FIG. 20 corresponds to the detailed illustration of FIG. 6 and the connection situation the third connection device 16 corresponds to the detailed illustration of FIG. 7.
  • the modular frame consists of two parallel spaced vertical posts 58.2 with rosettes 66 arranged in a grid pattern in the longitudinal direction L and with recesses in the upper and lower
  • End areas are connected to one another via cross bars 60.2 via a wedge head connection, with longitudinal bars 63 being connected to the rosettes 66 in the upper and lower end areas of the vertical post 58.2 in the longitudinal direction of the frame 50.
  • longitudinal bars 63 being connected to the rosettes 66 in the upper and lower end areas of the vertical post 58.2 in the longitudinal direction of the frame 50.
  • middle area 66 existing handrails 68 are connected to the rosettes.
  • FIG. 21 shows a third embodiment of a railing post 10.3, which in principle has the same structural design as the railing post 10.2 according to FIG. 2, but with the following differences.
  • the railing post 10.3 does not have a safety stop unit 32 and the third connection device 16 - shown in more detail in FIG. 22 - differs from the third connection device according to FIG. 3 in that a projection unit 38.1 is formed on the first connection area 34 in the longitudinal direction L pointing downwards , which is designed as a curved profile unit, the curvature contour being designed so that the free end area of the projection unit 38.1 is curved towards the railing post 10.3.
  • the same components have the same reference symbols and are not explained again.
  • the railing post 10.3 has the advantage that it can be used both with facade scaffolding (Layher SpeedyScaf ® (registered trademark) system) and with modular scaffolding (Layher Allroundgerüst ® (registered trademark) system).
  • facade scaffolding Layher SpeedyScaf ® (registered trademark) system
  • modular scaffolding Layher Allroundgerüst ® (registered trademark) system
  • Connection device 14 connected to the vertical post 58.1. In this final assembly position, the railing post 10.3 is against
  • the railing post can only be lifted out of the rosette 66 if the second connection device 14 is actively released and the railing post is inclined accordingly, so that the curved contour of the projection unit can be moved out of the recess of the rosette.
  • a fourth embodiment of a railing post 10.4 is shown, which basically has the same structure as the railing post 10.3 according to FIG. 21, but with the difference that there is no second connection area 36 on the third connection device 16, but only from the first connection area 34 having a curved projection formed on the underside unit 38.1.
  • Such a handrail post 10.4 is to be suited to a vertical post 58.2 a modular scaffold (registered Layher Allround scaffolding ® (brand)) connected.
  • the assembly process is analogous to that described above
  • An embodiment variant, not shown, relates to an alternative, structurally different configuration of the railing post 10.3, the first connection device 12.2 and second connection device 14 shown in FIG. 25 not being used and with respect to the second connection device 14 on the Drehbe actuating devices 22.1 or 22.2 and the rotatable shaft is dispensed with.
  • the structural design of the first and second connection devices 12.2, 14 only has to be designed in such a way that they meet the required functionality, i.e. that temporary handrails can be detachably connected to the first connection device 12.2 and the second connection device 14 can be detachably locked to a vertical post .

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

L'invention concerne un poteau de garde-corps (10.1) pour un échafaudage (50) comprenant des étages d'échafaudage (52, 54), des barres verticales (58.1) avec un premier dispositif de raccordement (12.1), un deuxième dispositif de raccordement (16), un troisième dispositif de raccordement (18), le deuxième dispositif de raccordement (14) présentant une première unité d'engagement par correspondance géométrique (24) raccordée fixement au poteau de garde-corps (10.1) et une unité d'engagement par correspondance géométrique déplaçable (26), qui peut être déplacée d'une position de fermeture dans une position d'ouverture maximale et inversement, un blocage par engagement par correspondance géométrique d'un poteau de garde-corps inséré (10.1) sur une barre verticale (58.1) de l'échafaudage (50) étant réalisé dans la position de fermeture, caractérisé en ce que l'unité d'engagement par correspondance géométrique déplaçable (26) est raccordée à un arbre (18) rotatif actionnable, un élément élastique (28) est prévu, lequel agit sur l'unité d'engagement par correspondance géométrique déplaçable (26) et la retient dans la position de fermeture sous l'effet de sa seule action, l'unité d'engagement par correspondance géométrique déplaçable (26), dans sa région d'extrémité frontale, est réalisée de telle sorte qu'elle s'ouvre d'abord dans la direction d'ouverture lors de l'application d'une pression sur une barre verticale (58.1) de l'échafaudage (50) et après dépassement d'une position prédéfinissable/déplacement de la barre verticale (58.1), c'est-à-dire à l'obtention de la position d'ouverture maximale, se déplace sous l'effet de l'action de la force de ressort de l'élément élastique (28) dans la position de fermeture et entoure et bloque ainsi fermement la barre verticale (58.1) au moins en partie par engagement par correspondance géométrique.
PCT/DE2020/000050 2019-03-25 2020-03-11 Poteau de garde-corps pour un garde-corps avant d'un échafaudage, échafaudage comprenant un garde-corps avant et procédé pour installer un garde-corps avant sur un échafaudage WO2020192811A1 (fr)

Priority Applications (2)

Application Number Priority Date Filing Date Title
EP20715665.4A EP3947851A1 (fr) 2019-03-25 2020-03-11 Poteau de garde-corps pour un garde-corps avant d'un échafaudage, échafaudage comprenant un garde-corps avant et procédé pour installer un garde-corps avant sur un échafaudage
DE112020001497.5T DE112020001497A5 (de) 2019-03-25 2020-03-11 Geländerpfosten für ein voreilendes Geländer für ein Gerüst, Gerüst mit einem voreilenden Geländer und Verfahren zum Umsetzen eines voreilenden Geländers an einem Gerüst

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE102019002078.2A DE102019002078A1 (de) 2019-03-25 2019-03-25 Geländerpfosten für ein voreilendes Geländer für ein Gerüst, Gerüst mit einem voreilenden Geländer und Verfahren zum Umsetzen eines voreilenden Geländers an einem Gerüst
DE102019002078.2 2019-03-25

Publications (1)

Publication Number Publication Date
WO2020192811A1 true WO2020192811A1 (fr) 2020-10-01

Family

ID=70058060

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/DE2020/000050 WO2020192811A1 (fr) 2019-03-25 2020-03-11 Poteau de garde-corps pour un garde-corps avant d'un échafaudage, échafaudage comprenant un garde-corps avant et procédé pour installer un garde-corps avant sur un échafaudage

Country Status (3)

Country Link
EP (1) EP3947851A1 (fr)
DE (2) DE102019002078A1 (fr)
WO (1) WO2020192811A1 (fr)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022124890A1 (fr) 2020-12-07 2022-06-16 Scafom Holding B.V. Ensemble rail pour un échafaudage, échafaudage, ensemble de parties d'échafaudage, et procédés
WO2023003462A1 (fr) * 2021-07-20 2023-01-26 Scafom Holding B.V. Ensemble rail de pliage, combinaison d'ensemble rail de pliage et échasse, système d'échafaudage et procédé

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021053358A1 (fr) * 2019-09-20 2021-03-25 Turner Access Limited Support d'échafaudage temporaire
NL2027055B1 (nl) 2020-12-07 2022-07-07 Scafom Holding B V Koppelsamenstel voor het onderling evenwijdig aan elkaar koppelen van steigerbuizen, stel van koppelsamenstellen, steigerleuningsamenstel, stel van steigerleuningsamenstellen, steigerconstructie, en werkwijzen

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1338723A2 (fr) 2002-02-20 2003-08-27 Wilhelm Layher Vermögensverwaltungs-GmbH Dispositif de montage d'un garde-corps temporaire d'échafaudage
WO2004029382A1 (fr) * 2002-09-27 2004-04-08 Pluseight Safety Ab Dispositif de protection des personnes sur des echafaudages
JP2005188275A (ja) * 2003-12-02 2005-07-14 Sugikou:Kk 仮設足場の先行手摺
EP1571275A2 (fr) 2004-03-05 2005-09-07 Wilhelm Layher Vermögensverwaltungs-GmbH Dispositif pour le montage d'un garde-corps provisoire d'échafaudage
DE102009024816A1 (de) 2008-08-19 2010-02-25 Altrad Baumann Gmbh Geländervorrichtung für ein Baugerüst

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1338723A2 (fr) 2002-02-20 2003-08-27 Wilhelm Layher Vermögensverwaltungs-GmbH Dispositif de montage d'un garde-corps temporaire d'échafaudage
WO2004029382A1 (fr) * 2002-09-27 2004-04-08 Pluseight Safety Ab Dispositif de protection des personnes sur des echafaudages
JP2005188275A (ja) * 2003-12-02 2005-07-14 Sugikou:Kk 仮設足場の先行手摺
EP1571275A2 (fr) 2004-03-05 2005-09-07 Wilhelm Layher Vermögensverwaltungs-GmbH Dispositif pour le montage d'un garde-corps provisoire d'échafaudage
DE102009024816A1 (de) 2008-08-19 2010-02-25 Altrad Baumann Gmbh Geländervorrichtung für ein Baugerüst

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022124890A1 (fr) 2020-12-07 2022-06-16 Scafom Holding B.V. Ensemble rail pour un échafaudage, échafaudage, ensemble de parties d'échafaudage, et procédés
NL2027056B1 (nl) * 2020-12-07 2022-07-07 Scafom Holding B V Leuningsamenstel voor een steiger, steiger, set van steigeronderdelen, en werkwijzen
WO2023003462A1 (fr) * 2021-07-20 2023-01-26 Scafom Holding B.V. Ensemble rail de pliage, combinaison d'ensemble rail de pliage et échasse, système d'échafaudage et procédé
NL2028793B1 (nl) * 2021-07-20 2023-01-27 Scafom Holding B V Uitklapleuningsamenstel, combinatie van uitklapleuningsamenstel en staander, steigersysteem, en werkwijze

Also Published As

Publication number Publication date
EP3947851A1 (fr) 2022-02-09
DE112020001497A5 (de) 2021-12-09
DE102019002078A1 (de) 2020-10-01

Similar Documents

Publication Publication Date Title
EP1571275B1 (fr) Dispositif pour le montage d'un garde-corps provisoire d'échafaudage
WO2020192811A1 (fr) Poteau de garde-corps pour un garde-corps avant d'un échafaudage, échafaudage comprenant un garde-corps avant et procédé pour installer un garde-corps avant sur un échafaudage
EP0918912B1 (fr) Echafaudage de facade demontable
DE102007018314A1 (de) Stütze für ein Raumtragwerk sowie Verbindungsanordnung für eine Geländereinrichtung und Verfahren zum Befestigen einer Geländereinrichtung an einer Stütze
EP1338723B1 (fr) Dispositif de montage d'un garde-corps temporaire d'échafaudage
DE10111976A1 (de) Zerlegbares Gerüst, Geländerelement dafür und Verfahren zum Anbringen mehrerer Geländerelemente
DE102009024816B4 (de) Geländervorrichtung für ein Baugerüst und Baugerüst
DE19651901C2 (de) Sicherheitsschutzgeländerelement, insbesondere für in verschiedenen Richtungen verlaufende Gerüstbauten
EP4028610A1 (fr) Dispositif de garde-corps, à savoir un garde-corps d'attaque destiné à un échafaudage, et procédé de montage d'un tel dispositif de garde-corps
WO2020192812A1 (fr) Dispositif de garde-corps, notamment garde-corps avancé pour un échafaudage
DE10243356A1 (de) Zerlegbares Gerüst
DE102011014614B4 (de) Baugerüst sowie Verfahren zur Erstellung eines Baugerüstes
DE19703558B4 (de) Stabeinrichtung für ein Gerüstsystem
EP3947852A1 (fr) Dispositif de garde-corps, à savoir garde-corps pour un échafaudage et procédé de montage d'un dispositif de garde-corps
WO2002077396A1 (fr) Systeme de composants pour podiums/plates-formes et/ou tribunes et/ou estrades
WO2002101177A2 (fr) Garde-corps pour face
EP1134331A2 (fr) Ensemble d'éléments pour un coffrage
DE10128039B4 (de) Geländerholm für Gerüstgeländer
EP3705660B1 (fr) Main courante frontale, échafaudage doté d'une telle main courante frontale et procédé de fixation côté frontal d'un échafaudage
EP0238680A1 (fr) Platelage pour échafaudages
DE102019115567A1 (de) Sicherungspfosten, Montagesicherungsgeländer und Verfahren zum Auf-, Ab- und Umbau eines Gerüsts
DE10112369A1 (de) Anschlussvorrichtung für Gerüste
EP1445399A2 (fr) Module d'escalier d'échafaudage
DE202024100688U1 (de) Vorrichtung zur Anbringung von Absturzsicherungen an Baugerüsten
DE10304089A1 (de) Seitenschutz für ein Baugerüst

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 20715665

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020715665

Country of ref document: EP

Effective date: 20211025

REG Reference to national code

Ref country code: DE

Ref legal event code: R225

Ref document number: 112020001497

Country of ref document: DE