WO2020122351A1 - 용융도금강판의 제조방법 및 장치 - Google Patents

용융도금강판의 제조방법 및 장치 Download PDF

Info

Publication number
WO2020122351A1
WO2020122351A1 PCT/KR2019/009983 KR2019009983W WO2020122351A1 WO 2020122351 A1 WO2020122351 A1 WO 2020122351A1 KR 2019009983 W KR2019009983 W KR 2019009983W WO 2020122351 A1 WO2020122351 A1 WO 2020122351A1
Authority
WO
WIPO (PCT)
Prior art keywords
steel sheet
cooling chamber
dip galvanized
hot
galvanized steel
Prior art date
Application number
PCT/KR2019/009983
Other languages
English (en)
French (fr)
Inventor
김상호
Original Assignee
김상호
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 김상호 filed Critical 김상호
Publication of WO2020122351A1 publication Critical patent/WO2020122351A1/ko

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/003Apparatus
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B1/00Nozzles, spray heads or other outlets, with or without auxiliary devices such as valves, heating means
    • B05B1/02Nozzles, spray heads or other outlets, with or without auxiliary devices such as valves, heating means designed to produce a jet, spray, or other discharge of particular shape or nature, e.g. in single drops, or having an outlet of particular shape
    • B05B1/10Nozzles, spray heads or other outlets, with or without auxiliary devices such as valves, heating means designed to produce a jet, spray, or other discharge of particular shape or nature, e.g. in single drops, or having an outlet of particular shape in the form of a fine jet, e.g. for use in wind-screen washers
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/04Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the coating material
    • C23C2/06Zinc or cadmium or alloys based thereon
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/14Removing excess of molten coatings; Controlling or regulating the coating thickness
    • C23C2/16Removing excess of molten coatings; Controlling or regulating the coating thickness using fluids under pressure, e.g. air knives
    • C23C2/18Removing excess of molten coatings from elongated material
    • C23C2/20Strips; Plates
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/26After-treatment
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01TSPARK GAPS; OVERVOLTAGE ARRESTERS USING SPARK GAPS; SPARKING PLUGS; CORONA DEVICES; GENERATING IONS TO BE INTRODUCED INTO NON-ENCLOSED GASES
    • H01T19/00Devices providing for corona discharge
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01TSPARK GAPS; OVERVOLTAGE ARRESTERS USING SPARK GAPS; SPARKING PLUGS; CORONA DEVICES; GENERATING IONS TO BE INTRODUCED INTO NON-ENCLOSED GASES
    • H01T23/00Apparatus for generating ions to be introduced into non-enclosed gases, e.g. into the atmosphere

Definitions

  • the present invention relates to a method and an apparatus for manufacturing a hot-dip galvanized steel sheet for cooling a hot-dip galvanized steel sheet with high efficiency in manufacturing a hot-dip galvanized steel sheet, and in particular, to minimize the occurrence of defects on the surface of the hot-dip galvanized steel, the hot dip galvanized surface It relates to a method and apparatus for manufacturing a hot-dip galvanized steel sheet capable of stably producing a steel sheet.
  • the surplus hot-dip plating solution is removed using an air knife so that the plating solution in the molten state excessively attached to the surface of the steel sheet is a target plating amount, and then the steel sheet is cooled by a cooling device. Is manufactured.
  • the plating layer In order to reduce defects in the comb pattern, the plating layer must be solidified quickly, and a high-efficiency cooling device is required for this.
  • the known technology using high voltage in the plating layer cooling device is as follows.
  • U.S. Patent 4500561 (1985.2.19) and Patent Publication No. 2000-0045528 are directed to a method of forming an electric field and attaching droplets to the surface of a steel sheet by the formed electric field, with the aim of minimizing the sequin of the plating layer.
  • Fitting mark defects in FIG. 2 are likely to occur when spraying droplets onto the molten plating layer. That is, the fitting mark is a dent in the plating layer generated when the sprayed droplets collide with the molten zinc plating, and the higher the temperature of the steel sheet, the higher the probability of occurrence.
  • Patent Publication No. 2001-0061451 relates to a method of attaching to a steel plate after an aqueous solution droplet penetrates between charged electrodes made of multiple wires to which high voltage is applied.
  • an aqueous solution droplet inevitably collides with the charged electrode, causing large water droplets to form on the wire, and when it comes off the wire and gets on the surface of the steel sheet, a drop mark defect may occur. This is high.
  • Patent Publication No. 10-2006-0076214 relates to a hot-dip galvanized steel sheet without sequins, a method for manufacturing the same, and an apparatus used therein, so that a droplet of aqueous solution sprayed toward the steel sheet is attached to the steel sheet after passing through a mesh-type high voltage charged electrode.
  • the device By configuring the device, it relates to a method of increasing injection efficiency. Also, in this case, the drop mark defect is not solved as in JP 2001-0061451 A.
  • the plating layer should be sprayed just before solidification, but a specific method has not been suggested.
  • a non-contact photometer is installed to measure the temperature of the steel sheet.
  • the temperature can be accurately measured only by setting the correct emissivity of the object to be measured. If the set emissivity is wrong, the measurement error becomes large.
  • the phase change occurs, so the emissivity value has no choice but to change.
  • the emissivity value is also changed by air wiping conditions and the surface state of the plating after solidification, it is very difficult to accurately measure the steel sheet temperature in the temperature range where the solidification of the plating layer occurs using an optical thermometer.
  • Patent Publication No. 10-2006-0076214 describes that the solution must be sprayed immediately before the plating layer solidifies, but for the above reasons, it may be difficult to stably produce a product in actual production. Depending on the operator's experience, quality variations can occur.
  • Patented Patent Application No. 10-1778457 relates to an apparatus for trailing cooling of a plated steel sheet and an apparatus including the same, and a charging unit is integrally installed in a cooling water injection unit in a trailing body unit facility to provide charging to the cooling water.
  • a charging unit is integrally installed in a cooling water injection unit in a trailing body unit facility to provide charging to the cooling water.
  • the present invention has been devised to solve the above problems, and it stably stabilizes a hot-dip galvanized steel sheet having a beautiful surface free of fitting defects, drop mark defects, and comb pattern defects by cooling the plating layer with high efficiency in the manufacturing process of the hot-dip galvanized steel sheet. It is an object of the present invention to provide a hot dip galvanizing production apparatus and a manufacturing method.
  • the cooling chamber for solidifying the plating layer is precisely positioned at the point at which the plating layer solidifies, and for this purpose, the cooling means is moved according to the temperature of the steel sheet, and air outside the cooling chamber is blown inside to increase the cooling efficiency.
  • the solution atomization part is sprayed from various angles, and the details are as follows.
  • the cooling chamber (4) is vertically moved by a cooling chamber driving device (10). It is characterized in that it is provided with a solution atomizing unit (6) for spraying a solution, and an ion wind generator (5) for driving and generating an ion wind.
  • An optical thermometer (8) installed on the upper and lower ends of the cooling chamber (4), an air blowing device (7) installed at the rear end of the ion wind generator (5), and the gas wiping device (2) and a bottom cooler (3) installed between the cooling chamber (4), and a control unit (12) for controlling the vertical flow of the cooling chamber driving device (10) and the air volume of the bottom cooler (3) are further It is characterized by being provided,
  • the length of the cooling chamber 4 is based on the traveling speed of the steel sheet, so that the cooling chamber passing time becomes at least 1 second or more, so that the solidification of the plating layer starts and solidification is terminated,
  • the ion wind generating device 5 is made of a high voltage charging electrode connected to the high voltage generating device 16, wherein the high voltage charging electrode is composed of a wire 15 and a support 14,
  • the wire 15 is installed in a number of directions in the direction of the steel plate, the needle 17 is formed with the end toward the steel plate,
  • the solution atomization part 6 is installed on the top or bottom of the ion wind generator 5, and is composed of a solution injection nozzle 11 and a solution supply device 9,
  • the solution injection nozzle 11 is installed in two or more rows in the direction of the steel sheet,
  • the photometer 10 has the same emissivity value
  • the air blowing device (7) is installed at the rear of the ion wind generator (5), has an air outlet for supplying air outside the cooling chamber to the inside, and the distance between the air outlet and the steel plate is It has a value greater than twice between the charging electrodes,
  • the bottom cooler (3) is provided with a slit nozzle 18, the slit nozzle 18 is installed in one or two or more rows toward the large surface of the steel sheet,
  • the control unit 12 compares the temperature measured by the photometer 8 with the temperature of the plating layer input to the control unit to control the vertical flow of the cooling chamber and the amount of air blown by the bottom cooler.
  • Cooling of the plating layer in the cooling chamber is performed by the ionic wind generated by the ion wind generator and the spraying solution sprayed from the solution atomization unit, and the cooling chamber is adjusted in position according to the temperature of the plating layer measured by the optical thermometer. Characterized by,
  • Cooling of the plating layer is further cooled by air blown from the bottom cooler 3 installed between the plating port 1 and the gas wiping device 2,
  • Cooling of the plating layer is performed by increasing the flow rate of the ion wind by air supplied from the air blowing device 7 installed at the rear of the ion wind generator 5,
  • the temperature when the steel sheet enters the cooling chamber is 419°C or higher, and the temperature when exiting the cooling chamber is 418°C or lower,
  • the ion wind generated by the ion generating device is generated by superimposing a pulse high voltage on a DC high voltage
  • the solution injected from the solution atomization part has an injection pressure of 1 to 5 kg/cm 2 of the air injected from the solution injection nozzle, a spray pressure of 0 to 4 kg/cm 2 of the solution, and a size of the injected droplets of 100 ⁇ m or less. More than 99%, the average droplet size is 30 ⁇ 60 ⁇ m,
  • T pt is the temperature measured by the photometer installed in the upper part of the cooling chamber
  • T pb is the temperature measured by the photometer installed under the cooling chamber
  • Tl is the reference temperature of the molten state plating layer input to the control unit
  • Ts means the reference temperature of the solid-state plating layer input to the control unit.
  • FIG. 1 is a photograph showing an example of a comb pattern defect on the surface of a hot dip galvanized layer
  • FIG. 2 is a photograph showing an example of a defect of a fitting mark on the surface of a hot dip plating layer
  • Figure 4 is a front view of the wire type charging electrode of the ion wind generator of the present invention
  • FIG. 5 is a front view of the needle-type charging electrode of the ion wind generator of the present invention
  • Figure 10 is an example of the temperature measurement value of the photometer by location of the cooling chamber
  • Fig. 12 shows the control logic of the upper and lower driving of the cooling chamber when the emissivity is set to 0.12 (when Ts>Tl)
  • Figure 14 is the upper and lower driving control logic of the cooling chamber when the emissivity set value is 0.093 (when Tl>Ts)
  • the cooling chamber 4 is divided into an ion wind generation value 5 and a solution atomization unit 6 for spraying a solution, and the cooling ability of the cooling chamber has a cooling ability to start solidification of the plating layer and end solidification. .
  • the ion wind generator 5 includes a high voltage charged electrode as illustrated in Figs. 4 or 5.
  • the charging electrode is fixed by a support (14), facing a wide surface of the steel plate and fixed to a plurality of wires (15) or support plates installed in parallel in the width direction of the steel plate, or a plurality of needles with their ends toward the steel plate (17) These are lined in parallel in the width direction of the steel sheet, and the tip of the needle is fixed toward the wide surface of the steel sheet.
  • the row of wires or needles is composed of one or two or more rows in the direction of the steel plate, and is connected to a high voltage generator 16 capable of supplying a high voltage with a maximum voltage of -10 to -60 kV.
  • corona discharge occurs at the charged electrode to generate an ion wind, and the direction of the ion wind is directed toward the steel sheet, and the steel sheet is cooled by the ion wind.
  • an air blowing device 7 may be attached to supply air from the outside of the cooling chamber to the cooling chamber.
  • air blowing device 7 When air is blown from the air blowing device 7 toward the steel sheet, the flow of air toward the steel sheet increases, thereby increasing the flow rate of the ion wind generated by the charging electrode, which is effective for cooling.
  • the air blowing device is installed behind the charging electrode, and the distance between the steel plate and the air blowing device should be greater than twice the distance between the steel plate and the charging electrode.
  • the transaction of the air blowing device is smaller than 2 times, the ion wind does not face the steel sheet, resulting in a problem that the cooling effect is reduced.
  • the air blowing ports are positioned in parallel in the width direction of the steel sheet, and one or two or more slit type nozzles can be used. Also, as the air blowing device of the present invention, a device that causes the flow of air toward the steel sheet by a rotating motor and a rotating fan can be used.
  • a solution atomizing part 6 is installed at the top or bottom or the top and bottom of the ion wind generator 5.
  • the solution atomizing part is composed of a plurality of solution spray nozzles 11 whose spray angles are adjusted so as to spray the solution into the space between the charged electrode and the steel plate, but do not penetrate the charged electrode. That is, the solution atomization unit may be configured such that two or more solution spray nozzles 11 are horizontally aligned in the width direction of the steel sheet, and one or two or more rows of nozzles are vertically arranged.
  • the solution spray nozzle of the solution atomization unit 6 installed on the top or bottom or top and bottom of the corona charging electrode sprays the solution into the space between the charging electrode and the steel plate, but does not contact or penetrate the charging electrode.
  • the solution is sprayed at an angle.
  • the droplets of the aqueous solution sprayed into the space between the steel plate and the charging electrode are moved toward the steel plate by ion wind, thereby further increasing the cooling effect.
  • the spray angle of each nozzle is within 0 to 45 degrees with respect to the steel plate traveling direction, and the solution spray angle of each nozzle row may be different.
  • the injection pressure of air is 1 to 5 kgf/cm 2 , and the solution is sprayed according to the principle of siphon, but if the size of the droplet is 100 ⁇ m or less, the nozzle can be used if it is more than 99%. Do.
  • the injection pressure of air is 1 to 5 kgf/cm 2
  • the injection pressure of the solution has a range of 1 to 4 kgf/cm 2 and the size of the injected droplets
  • a pressurized spray nozzle with 99% or more that is 100 ⁇ m or less. If the size is less than 99% when the size is 100 ⁇ m or less, the risk of fitting marks caused by large droplets increases. It is sufficient that the solution pressurization device and the solution storage tank required for solution injection are used for general pressurized solution injection without special restrictions.
  • the intensity of the high voltage increases, so that the intensity of the ion wind directed to the surface of the steel sheet increases, so that the adhesion efficiency of the droplets attached to the steel sheet increases.
  • the amount of the aqueous solution droplets attached to the steel sheet by the ionic wind increases, thereby increasing the cooling effect.
  • the peak high voltage is -60 kV or more, there is a problem in that the cost of insulating the device is increased.
  • a problem of partial discharge may occur due to sensitive reaction to irregularities such as protrusions on the electrode surface, and thus there is a possibility that the generation of ion wind becomes uneven.
  • a high voltage for generating an ion wind if -1 to -30 kV is superimposed on a DC high voltage of -1 to -30 kV and a high voltage in the form of a pulse is used, a more stable ion wind can be generated. That is, when superimposed pulse electricity is used on DC electricity, a discharge current is evenly formed on the electrode surface, so that the flow velocity of the ion wind is stably maintained.
  • the pulsed high voltage generator when using only the pulsed high voltage, there is a problem in that the pulsed high voltage generator must be large to supply all of the necessary current.
  • the size of the pulse high voltage device can be reduced by superimposing the pulse high voltage on the DC high voltage.
  • Fig. 6 shows the effect when the pulse power is superimposed on the DC power. Since the ionic wind intensity is determined by the amount of ions emitted from the charged electrode, it is possible to indirectly measure the intensity of the ionic wind by measuring the amount of current flowing between the steel plate and the charged current when the applied high voltage changes.
  • the discharge current amount was about 4 mA at a voltage intensity of 50 kV.
  • the discharge current amount was increased by 4 times over the peak voltage of 40 kV, and the discharge current amount was 17 mA, which increased the flow rate of the ion wind from this. It can be seen that it is more effective to use a pulse high voltage for DC voltage.
  • the pulse power is characterized by the frequency of pulse generation (frequency) and the application time (pulse width).
  • the characteristics of the pulse high voltage proposed in the present invention is 10 to 1000 times/second, and it is sufficient if the width of pulse electricity is 10 to 100 ms.
  • the high voltage intensity increased from -30 kV to -40 kV
  • the number of droplets increased from 60 to 80.
  • the pulse peak voltage of 100 ⁇ s and the frequency of pulse generation is 100 Hz and the peak voltage of the pulse high voltage is -15 kV is superimposed on the DC high voltage of -30 kV
  • the total number of droplets attached is -45 kV.
  • the pulse power was superimposed than 130 when DC power supply -40 kV was applied, the droplet adhesion effect was improved by 60%.
  • the flow rate of the ion wind is increased, and at the same time, the cooling efficiency is increased by increasing the adhesion efficiency of the aqueous solution droplets sprayed into the space between the charged electrode and the steel plate. There is an effect that the cooling capacity of the chamber is increased.
  • the steel sheet starts solidifying and ends while the steel sheet passes through the cooling device. That is, in the case of molten zinc, which usually contains 0.2 to 0.3% by weight of aluminum, solidification is performed at about 419 to 418 o C, so it is good to make the above temperature range when passing through the cooling chamber. That is, if the temperature when the steel sheet enters the cooling chamber is 418°C or less, or when it exits the cooling chamber, the effect of the present invention is reduced.
  • the height at which the plated layer in the molten state solidifies when the steel sheet exiting the plating port proceeds to the top changes depending on the steel sheet temperature, plating port temperature, steel sheet thickness, plating adhesion amount, and air temperature in the factory, and the steel sheet thickness is thick.
  • a non-contact photometer is installed to measure the temperature of the steel sheet and move the cooling chamber up and down. Order.
  • the emissivity of the hot-dip galvanized layer is 0.23
  • the emissivity of mirror-polished zinc is known to be 0.05
  • the actual emissivity in the plating process it may be measured to be between 0.09 and 0.12. This is because the emissivity varies depending on the state of the plating layer, and measurement errors inevitably occur when measuring the temperature of the steel sheet with an optical thermometer.
  • 8 is a first example of measuring the temperature of the steel sheet. 8 is a result of measuring the steel sheet temperature over time after adjusting the zinc plating adhesion amount to 140 g/m 2 on both sides after depositing a 1 mm thick steel sheet in a hot-dip zinc bath containing 0.22% aluminum. 8(1) is an example measured with a thermocouple, and FIG. 8(2) is a result measured with an optical thermometer having an emissivity set to 0.093.
  • the temperature of the steel sheet measured by a thermocouple coated on the steel sheet is the actual steel sheet temperature in terms of measuring principle.
  • the actual temperature of the steel plate measured by the thermocouple changes similarly, but below 419 °C, the temperature at which the plating layer starts to solidify, the temperature measurement value of the photometer rapidly decreases and the thermocouple There is a big difference from the actual temperature value measured with.
  • Fig. 9 is another example of measuring the temperature of the steel sheet.
  • 9 is a steel sheet having a thickness of 1.2mm, 0.22% aluminum is included, and after immersing in a hot-dip zinc bath having a temperature of 440°C, the zinc plating adhesion amount is adjusted to 140 g/m 2 on both sides, and then the steel sheet temperature over time. It is an example of measuring.
  • Fig. 9 (1) is an example of measuring with a thermocouple
  • Fig. 9 (2) is a result of measurement with an optical thermometer with an emissivity set to 0.12.
  • the actual steel sheet temperature is about 435°C, and solidification occurs at 419°C, and after solidification, the temperature of the steel sheet decreases.
  • the steel plate temperature after adjusting the plating adhesion amount was 330°C, and after solidification was completed, it increased to about 380°C.
  • the reason for the difference between the temperature measured by the photometer and the actual temperature measured by the thermocouple in FIGS. 8 and 9 is that the emissivity of the galvanized layer changes in the molten state and in the solid state. Therefore, when the cooling chamber is driven up and down based on the temperature value measured by the photometer, it is very likely that the product quality will be uneven.
  • the present invention proposes a new method of driving the cooling chamber up and down.
  • the function of the photometer is not to measure the exact steel sheet temperature, but to find an accurate solidification point where the solidification reaction of the plating layer occurs.
  • one or two or more photometers 10 are installed on the upper and lower portions of the cooling chamber, and the photometers are set to the same emissivity value in a range between 0.04 and 0.30.
  • the solidification of the plating layer in the cooling chamber starts and solidification can be terminated, a difference occurs between the emissivity of the steel sheet when entering the cooling chamber and the emissivity of the steel sheet when exiting the cooling chamber. Is done. Due to this change in emissivity, the temperature values measured by the upper and lower photometers are greatly increased even though the actual steel sheet temperature is not significantly different. Therefore, if a point having a large temperature difference measured in the photometers located at the upper and lower parts is found, the position becomes a point where solidification occurs.
  • the cooling chamber can be automatically driven up and down without operator intervention.
  • the present invention is a temperature value measured in the photometer installed at the top, T pt and the temperature value measured at the pyrometer installed at the bottom, T pb is at least 20 degrees difference between the upper and lower driving devices to locate the cooling chamber It includes a cooling device characterized in that it consists of a control unit 12 to operate and the cooling chamber up and down driving device 10.
  • Tpt When the temperature measured by the upper photometer is Tpt and the temperature measured by the lower photometer is Tpb, when Tpt-Tpb differs by 20 degrees or more, it means that the solidification of the plating layer starts and ends in the cooling chamber.
  • the steel plate exiting the plating port (1) from the continuous hot-dip plating line proceeds to the upper portion and is cooled to reduce the temperature.
  • the emissivity of the photometer is set to 0.12, it can be measured that the temperature increases. That is, when the plating layer is melted, it is measured lower than 340°C, and when solidification is finished, it is measured at 380°C or higher. Therefore, the reference temperature value Tl indicating the molten state from FIG. 10 Silver 340 °C, the reference temperature value Ts indicating the solidification state can be set to 380 °C.
  • FIG. 10(3-1) shows a case where the cooling chamber position is low and the plating layer passes through the cooling chamber in a molten state.
  • (T pb1 -T pt1 ) values are 20° C. or less, and T pb1 and T pt1 values are measured lower than 340 degrees.
  • the cooling chamber should be moved upward.
  • 10(3-3) shows a cooling chamber positioned higher than the height proposed by the present invention. That is, this case shows a case where the plating layer has already solidified before passing through the cooling chamber.
  • (T pb3 -T pt3 ) values are less than 10 °C
  • T pb1 and T pt1 values are measured higher than 380 °C.
  • the cooling chamber should be moved downward.
  • FIG. 10 (3-2) shows a cooling chamber positioned at a height proposed by the present invention. That is, this case shows a case where the plating layer is solidified while the steel sheet passes through the cooling chamber.
  • the value of (T pb2 -T pt2 ) is about 40 °C, T pb2 ⁇ Tl, T pt2 > The condition of Ts is satisfied. At this time, there is no need to move the cooling chamber up and down.
  • control logic 12 is an example of a control logic for moving the cooling chamber upward or downward when the temperature after solidification is higher than when the temperature of the steel sheet is measured when measuring the temperature of the steel sheet with an optical thermometer.
  • T pt -T pb when T pt -T pb is 20 degrees or less, and T pb and T pt are greater than Ts, the cooling chamber is moved downward.
  • T pb -T pb is 20 degrees or less, and T pb is smaller than Ts, but when T pt is larger than Ts, the cooling chamber is further moved downward.
  • T pb -T pb is greater than 20 degrees, T pb is less than Tl, and T pt is between Ts and Tl, it means that the cooling chamber has moved too far downward, in this case moving the cooling chamber upward. .
  • T pb -T pb is greater than 20 degrees, T pb is less than Tl, and T pt is greater than Ts, it means that solidification is achieved in the cooling chamber, in which case the cooling chamber position is fixed to cool the steel sheet.
  • the position of the cooling chamber is fixed, and the air volume of the bottom cooler 3 of FIG. 3 positioned between the cooling chamber and the air knife can be adjusted to cause solidification of the plating layer to occur in the cooling chamber.
  • control logic 13 is an example of a control logic for controlling the air volume of the bottom cooler when the temperature after solidification is higher than when the temperature of the steel sheet is measured when measuring the temperature of the steel sheet with an optical thermometer.
  • T pt -T pb is 20 degrees or less, and T pb and T pt are greater than Ts
  • the bottom cooler air volume is reduced.
  • T pb -T pb is 20 degrees or less, and T pb is smaller than Ts, but T pt is larger than Ts
  • the bottom cooler air volume is further increased.
  • T pb -T pb is larger than 20 degrees, T pb is smaller than Tl, and T pt is between Ts and Tl, the air volume of the bottom cooler is excessive, and thus the air volume of the bottom cooler is reduced.
  • T pb -T pb is larger than 20 degrees, T pb is smaller than Tl, and T pt is larger than Ts, it means that solidification is performed in the cooling chamber, and in this case, the air volume of the bottom cooler is maintained.
  • the control logic is constructed when the temperature measurement result of Tl>Ts is obtained as shown in FIG. 8.
  • control logic 14 is an example of a control logic for moving the cooling chamber upward or downward when the temperature Ts after solidification when the temperature of the steel sheet is measured by the optical thermometer is lower than when the temperature Ts is in a molten state.
  • T pt -T pb is 20 degrees or less, and T pb and T pt are greater than Tl
  • the cooling chamber is moved downward.
  • T pb -T pb is 20 degrees or less, and T pb is lower than Tl, but when T pt is larger than Tl, the cooling chamber is further moved downward.
  • T pb -T pb is greater than 20 degrees, T pb is less than Ts, and T pt is between Ts and Tl, it means that the cooling chamber has moved too far downward, in which case the cooling chamber is moved upward.
  • T pb -T pb is larger than 20 degrees, T pb is smaller than Ts, and T pt is larger than Tl, it means that solidification is achieved in the cooling chamber, in which case the cooling chamber is fixed to cool the steel sheet.
  • the position of the cooling chamber is fixed, and the air volume of the bottom cooler 3 of FIG. 3 positioned between the cooling chamber and the air knife can be adjusted to cause solidification of the plating layer to occur in the cooling chamber.
  • control logic 15 is an example of a control logic for controlling the air volume of the bottom cooler when the temperature Ts after solidification when the temperature of the steel sheet is measured by the photometer is lower than when the temperature Ts is melted.
  • T pt -T pb is 20 degrees or less and T pb and T pt are greater than Tl
  • the air volume of the bottom cooler is reduced. If T pb -T pb is 20 degrees or less, and T pb is lower than Tl, but T pt is larger than Tl, the air volume of the bottom cooler is further increased. If T pb -T pb is larger than 20 degrees, T pb is smaller than Ts, and T pt is between Ts and Tl, the air volume of the bottom cooler is excessively increased. In this case, the air volume of the bottom cooler is reduced. If T pb -T pb is greater than 20 degrees, T pb is less than Ts, and T pt is greater than Tl, this means that solidification is achieved in the cooling chamber, in which case the airflow of the bottom cooler is maintained.
  • Tpt-Tpb reference values Tl and Ts described in FIGS. 12, 13, 14 and 15 may vary depending on emissivity set values or characteristics of the pyrometer, but the membership of the control logic same.
  • T pt -T pb reference value may be set to about 20.
  • the Tl and Ts values may be set based on the temperature values measured by the photometer before and after solidification, while visually confirming the state of the plating layer.
  • Tpt Temperature measured by the photometer installed in the upper part of the cooling chamber
  • Tpb Temperature measured by a photometer installed under the cooling chamber
  • Tl Reference temperature of the molten state plating layer input to the control unit
  • Ts Reference temperature of the solid-state plating layer input to the control unit

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Coating With Molten Metal (AREA)

Abstract

본 발명은 용융아연도금강판을 제조함에 있어서 용융상태의 도금층을 고효율로 냉각시키기 위한 용융도금강판의 제조방법 및 장치에 관한 것으로, 용융도금강판의 제조공정에 있어서 도금층을 고효율로 냉각시킴으로서 피팅 결함, 드롭마크 결함 및 선상의 빗살무늬 결함이 없는 표면이 미려한 용융아연도금강판을 안정적으로 얻을 수 있는 용융아연도금 제조장치 및 제조방법을 제공하고자 하는데 그 목적이 있고, 도금포트(1), 가스와이핑장치(2), 냉각챔버(4)로 구성되는 용융아연도금강판의 제조장치에 있어서, 상기 냉각챔버(4)는 냉각챔버구동장치(10)에 의해 상하로 구동하며, 이온풍을 발생하는 이온풍발생장치(5)와 용액을 분사하는 용액무화부(6)를 구비하는 용융아연도금강판의 제조장치를 특징으로 한다.

Description

용융도금강판의 제조방법 및 장치
본 발명은 용융아연도금강판을 제조함에 있어서 용융상태의 도금층을 고효율로 냉각시키기 위한 용융도금강판의 제조방법 및 장치에 관한 것으로, 특히, 도금강판 표면의 결함 발생을 최소화하여 표면이 미려한 용융아연도금강판을 안정적으로 생산할 수 있는 용융도금강판의 제조방법 및 장치에 관한 것이다.
용융도금강판은 용융 도금욕조를 강판이 통과한 후에, 강판 표면에 과도하게 부착된 용융상태의 도금액을 목표 도금량이 되도록 에어나이프를 이용하여 잉여의 용융 도금액을 제거 한 후에 냉각 장치로 강판을 냉각시켜서 제조된다.
이때 도금 부착량이 많은 경우에 냉각속도가 느리게 되면 강판 표면에 도 1에서 예시한 선상 빗살 무늬 결함이 발생하게 되어 외관이 불량하게 된다. 도금부착량이 많을수록, 또한 강판의 두께가 두꺼울수록 냉각 속도가 느려지므로 발생할 가능성이 높다.
상기 빗살무늬 선상 결함을 감소시키기 위해서는 도금층을 빨리 응고시켜야 하며, 이를 위해 고효율의 냉각장치가 필요하다.
도금층 냉각 장치에 있어서 고전압을 사용하는 공지기술은 다음과 같다.
미국특허 4500561 (1985.2.19) 및 특허 공개 특2000-0045528 은 전기장을 형성하고 형성된 전기장에 의해 액적을 강판 표면에 부착시키는 방법에 대한 것으로 도금층의 스팽글을 미세화 시키는 것을 목적으로 한다. 용융상태의 도금층에 액적을 분사할 때 도 2의 피팅 마크 결함이 발생하기 쉽다. 즉 피팅마크는 분사된 액적이 용융상태의 아연도금과 충돌하여 발생하는 도금층의 파임 흠으로서, 강판의 온도가 높을수록 발생 가능성이 높아지게 된다.
공개특허 특2001-0061451은 고전압이 인가된 다수 와이어로 이루어진 대전전극 사이를 수용액 액적이 관통한 후에 강판에 부착되는 방법에 대한 것이다. 이 경우는 액적이 대전전극을 통과하는 과정 중에 불가피하게 대전전극에 수용액 액적이 충돌하게 되어, 와이어에 큰 물방울이 맺히게 되고, 이것이 와이어로 부터 떨어져 나와 강판 표면에 묻게 되면 드롭 마크 결함이 발생될 가능성이 높다.
공개특허 10-2006-0076214는 스팽글이 없는 용융아연도금강판, 그 제조 방법 및 이에 사용되는 장치에 대한 것으로, 강판을 향해 분사된 수용액 액적이 메쉬형태의 고전압 대전전극을 관통한 후에 강판에 부착되게 장치를 구성하여, 분사효율을 높이는 방법에 대한 것이다. 또한 이 경우도 공개특허 특2001-0061451에서와 같이 드롭 마크 결함은 해결되지 못한다. 또한 상기 발명에서는 도금층이 응고되기 직전에 분사되어야 한다고 기재되어 있으나 구체적인 방법이 제시되지 않았다.
일반적으로는 연속 용융도금공정에서는 비접촉식 광온도계를 설치하여 강판의 온도를 측정한다. 광온도계를 이용할 때는 측정대상 물체의 정확한 방사율을 설정해야만 온도를 정확히 측정할 수 있다. 설정된 방사율이 잘못되면 측정 오차는 커지게 된다.
도금층이 응고되면 상변화가 일어나므로 방사율 값은 변화될 수 밖에 없다. 또한 에어 와이핑 조건, 응고후의 도금 표면 상태등에 의해서도 방사율 값이 변화되므로, 광온도계를 이용하여 도금층의 응고가 일어나는 온도 영역에서 강판온도를 정확히 측정하는 것은 매우 어렵다.
공개특허 10-2006-0076214에서는 도금층이 응고되기 직전에 용액을 분사해야 한다고 기재되어 있으나, 상기의 이유로 인해 실제 생산에서 안정적으로 제품을 생산하기 어려울 수 있다. 작업자의 경험에 의존하게 되면 품질 편차가 발생할 수 있다.
등록특허 10-1778457 도금강판 후행냉각장치 및 이를 포함하는 장치에 대한 것으로 후행 바디 유닛 설비에 냉각수 분사 유닛에 일체형으로 대전 유닛이 설치되어 있어서 냉각수에 대전을 부여하는 장치에 대한 것이다. 상기 특허에서는 분사 노즐과 대전설비가 일체형으로 되어 있어 전기 누전의 위험이 있고, 누전되면 고전압 사용 효과가 감소되는 문제가 있다.
즉, 용융아연도금강판을 제조함에 있어서, 도금층의 냉각속도를 느리게 하면 빗살무늬 결함이 발생하고, 냉각속도를 빠르게 하면 피팅마크, 드롭마크 등의 결함이 발생되는 문제가 있다. 이를 해결하기 위하여는 도금층이 응고되기 직전에 냉각액이 분사되는 것이 바람직하다. 그러나 이 응고영역을 정확히 측정하는 것이 곤란하여 작업자의 경험에 의존할 수밖에 없고 이에 따라 제품의 불량이 높아지는 문제가 있다.
본 발명은 상기 문제점을 해결하기 위하여 안출된 것으로, 용융도금강판의 제조공정에 있어서 도금층을 고효율로 냉각시킴으로서 피팅 결함, 드롭마크 결함 및 선상의 빗살무늬 결함이 없는 표면이 미려한 용융아연도금강판을 안정적으로 얻을 수 있는 용융아연도금 제조장치 및 제조방법을 제공하고자 하는데 그 목적이 있다.
상기 목적을 달성하기 위한 본 발명은,
강판의 도금영역에서 도금층을 응고시키기 위한 냉각 챔버를 도금층이 응고되는 지점에 정확하게 위치시키고, 이를 위해 강판 온도에 따라 냉각수단을 이동하며, 냉각효율을 높이기 위하여 냉각챔버 외부의 공기를 내부로 취입하고, 용액무화부의 용액분사를 다양한 각도에서 행하는 것을 특징으로 하며, 구체적인 내용은 다음과 같다.
본 발명의 제조장치는,
도금포트(1), 가스와이핑장치(2), 냉각챔버(4)로 구성되는 용융아연도금강판의 제조장치에 있어서, 상기 냉각챔버(4)는 냉각챔버구동장치(10)에 의해 상하로 구동하며, 이온풍을 발생하는 이온풍발생장치(5)와 용액을 분사하는 용액무화부(6)를 구비하는 것을 특징으로 한다.
또한, 상기 용융아연도금강판의 제조장치는,
상기 냉각챔버(4)의 상,하단부에 각각 설치되는 광온도계(8)와, 상기 이온풍발생장치(5) 후단에 설치되어 공기를 취입하는 공기취입장치(7)와, 상기 가스와이핑장치(2)와 냉각챔버(4) 사이에 설치되는 버텀쿨러(3)와, 상기 냉각챔버구동장치(10)의 상하구동 및 상기 버텀쿨러(3)의 풍량을 제어하기 위한 제어부(12)가 더 구비되어 있는 것을 특징으로 하며,
상기 냉각챔버(4)의 길이는 강판의 진행속도를 기준으로 냉각챔버 통과시간이 최소 1초 이상이 되게 하여 도금층의 응고가 시작되어 응고가 종료될 수 있는 냉각능력을 가지며,
상기 이온풍발생장치(5)는 고전압발생장치(16)와 연결되는 고전압대전전극으로 이루어지되, 상기 고전압대전전극은 와이어(15)와 지지대(14)로 구성되며,
상기 와이어(15)는 강판 진행방향으로 다수 설치되며, 끝단이 강판을 향해 있는 바늘(17)이 형성되어 있으며,
상기 용액무화부(6)는 상기 이온풍발생장치(5)의 상단 또는 하단에 설치되며, 용액분사노즐(11)과 용액공급장치(9)로 구성되며,
상기 용액분사노즐(11)은 강판 진행방향으로 2열 이상 설치되며,
상기 광온도계(10)는 동일한 방사율 값을 가지며,
상기 공기취입장치(7)는 상기 이온풍발생장치(5)의 후방에 설치되며, 상기 냉각챔버 외부의 공기를 내부로 공급하기 위한 공기토출구를 구비하고, 상기 공기토출구와 강판 사이의 거리는 강판과 대전전극 사이의 2배보다 큰 값을 가지며,
상기 버텀쿨러(3)는 슬리트노즐(18)을 구비하되, 상기 슬리트노즐(18)은 강판의 넓은 면을 향해 1열 혹은 2열 이상 설치되며,
상기 제어부(12)는 상기 광온도계(8)에서 측정된 온도와 제어부에 입력된 도금층의 온도를 비교하여 상기 냉각챔버의 상하구동 및 상기 버텀쿨러의 송풍량을 제어하는 것을 특징으로 한다.
본 발명의 제조방법은,
강판이 도금포트(1)를 통과하면서 강판 표면에 도금층을 형성하고, 가스와이핑장치를 통과하면서 상기 도금층의 두께를 조절하고, 냉각챔버를 통과하면서 도금층을 냉각시키는 용융아염도금강판의 제조방법에 있어서,
상기 냉각챔버에서의 도금층 냉각은 이온풍발생장치에서 발생하는 이온풍 및 용액무화부에서 분사되는 분사용액에 의하여 이루어지되, 상기 냉각챔버는 광온도계로 측정한 도금층의 온도에 따라 그 위치가 조정되는 것을 특징으로 하며,
상기 도금층의 냉각은 상기 도금포트(1)와 상기 가스와이핑장치(2) 사이에 설치된 버텀쿨러(3)에서 송풍되는 공기에 의해 냉각이 더 이루어지며,
상기 도금층의 냉각은 상기 이온풍발생장치(5)의 후방에 설치되는 공기취입장치(7)에서 공급되는 공기에 의해 상기 이온풍의 유속을 증가시킴으로서 수행되며,
상기 강판이 상기 냉각챔버 내로 들어올 때의 온도는 419 ℃ 이상이고, 냉각챔버를 빠져나갈 때의 온도는 418℃ 이하이며,
상기 이온발생장치에서 발생되는 이온풍은 직류고전압에 펄스고전압을 중첩시켜 발생되는 것이고,
상기 용액무화부에서 분사되는 용액은 용액분사노즐에서 분사되는 공기의 분사압력이 1~5kg/cm2 이고, 용액의 분사압력은 0~4kg/cm2이고, 분사된 액적 중 크기가 100μm이하인 것이 99% 이상이며, 평균 액적의 크기가 30~60μm이며,
상기 냉각챔버의 위치 조정은, Tpt-Tpb<20℃ 이면서 Tpb>Ts and Tpt>Ts 이거나, Tpb<Ts and Tpt>Ts 일 경우, 냉각챔버가 하부로 이동하고,
Tpt-Tpb>20℃ 이면서 Tpb<Tl 이거나 Tl<Tpt<Ts 일 경우, 냉각챔버가 상부로 이동하고,
Tpt-Tpb>20℃ 이면서 Tpb<Tl이거나 Tpt>Ts 일 경우, 냉각챔버의 위치가 고정되는 것을 특징으로 하며,
또한, 상기 버텀쿨러에서 송풍되는 공기는,
Tpt-Tpb<20℃ 이면서 Tpb>Ts, Tpt>Ts 이거나, Tpb<Ts and Tpt>Ts 일 경우, 버텀쿨러의 풍량이 감소하고,
Tpt-Tpb>20℃ 이면서 Tpb>Tl 이고, Tl<Tpt>Ts 일 경우, 버텀쿨러의 풍량이 증가하고,
Tpt-Tpb>20℃ 이면서 Tpb<Tl 이고, Tpt>Ts 일 경우, 버텀쿨러의 풍량이 고정되는 것을 특징으로 한다.
여기에서 Tpt는 냉각챔버 상부에 설치된 광온도계에서 측정된 온도이고,
Tpb는 냉각챔버 하부에 설치된 광온도계에서 측정된 온도이고,
Tl는 제어부에 입력된 용융 상태 도금층의 기준온도이고,
Ts는 제어부에 입력된 고체 상태 도금층의 기준온도를 의미한다.
본 발명에 따르면, 표면결함의 발생을 최소화할 수 있어 표면품질이 우수한 용융도금강판을 제조하는 것이 가능하다.
도 1은 용융도금층 표면의 빗살무늬 결함 예를 나타내는 사진
도 2는 용융도금층 표면의 피팅 마크 결함 예를 나타내는 사진
도 3은 본 발명 도금장치의 개념도
도 4는 본 발명 이온풍 발생 장치의 와이어 타입 대전전극 전면도
도 5는 본 발명 이온풍 발생장치의 바늘 타입 대전전극 전면도
도 6은 본 발명의 직류 및 펄스 고전압 사용효과를 나타낸 그래프
도 7은 본 발명의 고전압 사용에 따른 용액 분사 효율 향상 예를 나타낸 도표
도 8은 용융도금 후의 강판 온도를 측정한 결과치 (광온도계 방사율 0.093 설정)
도 9는 용융도금 후의 강판 온도를 측정한 결과예 (광온도계 방사율 0.12 설정)
도 10은 냉각 챔버의 위치별 광온도계의 온도 측정 값 예
도 11은 본 발명의 버텀 쿨러의 3차원 개략도
도 12는 방사율 설정값이 0.12일때 냉각 챔버 상하부 구동 제어 로직 (Ts>Tl인 경우)
도 13은 방사율 설정값이 0.12일때 버텀쿨러 풍량 제어 로직 (Ts>Tl인 경우)
도 14는 방사율 설정값이 0.093일때 냉각챔버 상하부 구동 제어 로직 (Tl>Ts인 경우)
도 15는 방사율 설정값이 0.093일때 버텀 쿨러 풍량 제어 로직 (Tl>Ts인 경우)
본 발명은 도 3에 기재된 것과 같은 용융도금공정에 있어서 소둔로에서 열처리된 강판이 도금포트(1)에 침적된 후 포트를 통과하고, 가스와이핑(2) 장치에 의해 도금부착량이 조절된 후에 상부에 있는 진행되는 경로중에 설치되는 도금층 냉각장치에 있어서,
냉각 챔버(4), 챔버 상하 이동 장치(10) 및 버텀 쿨러(3)로 구성되며,
냉각 챔버(4)는 이온 풍 발생치(5)와 용액을 분사하는 용액 무화부(6)로 구분되며, 냉각 챔버의 냉각 능력은 도금층의 응고가 시작되어 응고가 종료될 수 있는 냉각 능력을 갖는다.
이온풍 발생장치(5)는 도4 혹은 도5에 예시한 바와 같은 고전압 대전전극을 포함한다. 대전전극은 지지대 (14)에 의해 고정되며, 강판의 넓은 면과 마주보며 강판 폭 방향으로 평행하게 설치된 다수의 와이어(15) 혹은 지지대에 고정되어 그 끝이 끝 단이 강판을 향해 있는 다수의 바늘(17)이 강판 폭 방향 평행하게 열을 지어 있으며, 바늘의 끝이 강판의 넓은 면을 향해 고정되어 있다. 와이어 혹은 바늘의 열은 강판의 진행 방향으로 1열 혹은 2열 이상 구성되며, 최대전압이 -10~-60 kV 세기의 고전압을 공급할 수 있는 고전압 발생기(16)에 연결되어 있다.
대전전극에 전기를 인가하면 대전전극에서 코로나 방전이 일어나서 이온풍이 발생하며, 이온풍의 방향은 강판을 향하게 되어, 강판은 이온 풍에 의해 냉각된다.
이온풍은 공기 중에서 코로나 방전이 일어나면, 전기에너지의 1~2% 가 기체입자의 운동에너지로 변환되어 공기의 흐름이 발생한다. 즉, 코로나 방전시 방출된 이온들이 공기분자의 충돌을 통하여 공기 분자들도 이온들과 같은 방향으로 이동하게 되고, 이러한 공기분자들의 운동이 모여 최종적으로 송풍력으로 이용되는 것이다.
이온풍의 냉각 효과를 증가시키기 위하여 공기를 냉각챔버의 외부로 부터 냉각챔버로 내부로 공급하기 위해서 공기 취입장치(7)이 부착될 수 있다. 공기 취입장치(7)로부터 강판을 향해 공기를 취입하면 강판을 향한 공기의 흐름이 증가하게 되어 대전전극에서 발생한 이온풍의 유속이 증가되어 냉각에 효과적이다.
공기취입장치는 대전 전극 후방에 설치되며, 강판과 공기 취입장치와의 거리는 강판과 대전전극과의 거리의 2배 보다 커야 한다. 공기 취입 장치의 거래가 2배 보다 작게 되면 이온풍이 강판을 향하지 않게 되어 냉각 효과가 감소되는 문제가 발생한다.
공기 취입 장치(7)는 공기 취입구가 강판 폭방향으로 평행하게 위치하며 1개 혹은 2개 이상의 슬리트 타입 노즐이 사용 가능하다. 또한 본 발명의 공기취입 장치로서 회전 모터 및 회전팬에 의해 강판을 향해 공기의 유동을 일으키는 장치도 사용 가능하다.
이온풍 발생장치(5)의 상단 혹은 하단 혹은 상단 및 하단에는 용액 무화부(6)가 설치된다. 용액 무화부는 대전전극과 강판 사이의 공간으로 용액을 분사하되, 대전전극을 관통하지 않도록 분사 각도가 조절된 다수의 용액 분사 노즐(11)로 구성된다. 즉, 용액 무화부는 2개 이상의 용액 분사 노즐(11)이 강판 폭방향으로 수평되게 정렬되어 있는 노즐단이 1열 혹은 2열 이상이 수직 방향으로 구성될 수 있다.
코로나 대전전극의 상단 혹은 하단 혹은 상단 및 하단에 설치되어 용액을 분사하는 용액무화부(6)의 용액 분사 노즐은 대전전극과 강판 사이의 공간으로 용액을 분사하되, 대전전극과 접촉 혹은 관통하지 않는 각도로 용액을 분사하게 된다. 분사된 용액 액적이 대전전극과 접촉 혹은 관통하지 않도록 분사 방향을 조절함으로써 용액이 대전전극에 맺혀서 큰 물방울로 성장한 후에 강판 표면에 부착되는 드롭 마크 결함을 방지할 수 있다.
또한 강판과 대전전극 사이의 공간으로 분사된 수용액 액적은 이온풍에 의해 강판을 향하여 이동하게 되어 냉각 효과가 더욱 증가하게 된다.
용액분사장치에 있어서 분사 노즐(11)이 2열 이상일 경우에 각 노즐의 분사의 분사되는 각도가 강판 진행방향에 대하여 0도에서 45도 이내에 있으며, 각 노즐 열의 용액 분사 각도는 다를 수 있다.
본 발명의 용액 분사 노즐(11)에 있어서 공기의 분사압력은 1~5 kgf/cm2이며, 싸이펀의 원리에 의해 용액을 분사하되 액적 중 크기가 100μm이하인 것이 99% 이상인 노즐이면 사용이 가능하다.
또한 본 발명의 냉각장치에 사용되는 용액 분사 노즐에 있어서 공기의 분사압력은 1~5 kgf/cm2 이고, 용액의 분사압력은 1~4 kgf/cm2의 범위를 갖으며 분사된 액적 중 크기가 100μm이하인 것이 99% 이상인 가압식 분사노즐도 사용이 가능하다. 크기가 100μm이하인 것이 99 % 보다 적게 되면 큰 액적들에 의해 피팅 마크가 발생할 위험이 증가하게 된다. 용액분사에 필요한 용액 가압장치 및 용액 저장탱크는 특별한 제약없이 일반적인 가압식 용액 분사에 사용되는 것이면 충분하다.
본 발명자들의 실험에 의하면 고전압의 세기가 증가할수록 강판 표면으로 향한 이온풍의 세기가 증가하여 강판에 부착되는 액적의 부착효율은 증가하게 된다. 또한 이온풍에 의해 강판에 부착되는 수용액 액적의 양이 증가하여 냉각 효과가 커진다.
본 발명에서 이온풍을 발생시키기 위한 전압으로 대전전극에 -2~- 60 kV세기의 고전압을 인가하면 대전전극으로부터 강판을 향한 이온풍이 발생된다.
전압의 세기가 -2kV 미만일 때는 이온풍을 일으키기 위하여 강판과 대전전극를 매우 근접시켜야 하므로 냉각 장치 설계에 어려움이 있다.
피크 고전압이 -60 kV 이상이면 장치를 절연시키는데 비용이 증가되는 문제가 있다. 또한 직류전원만을 사용해도 통상의 조건에서 이온풍 발생에 문제가 없지만 경우에 따라서 전극표면의 돌기와 같은 요철부에 민감하게 반응하여 부분 방전되는 문제가 발생할 수 있어 이온풍의 발생이 불균일 해질 가능성이 있다.
이온풍을 발생시키기 위한 고전압으로 -1~-30 kV 의 직류 고전압에 -1~-30 kV를 펄스 형태의 고전압을 중첩하여 사용하면 보다 안정적인 이온풍을 발생 시킬 수 있다. 즉, 직류 전기에 펄스전기를 중첩하여 사용하면 전극 표면에 고르게 방전전류를 형성하여 이온풍의 유속이 안정되게 유지되는 효과가 있다.
또한 펄스 고전압 만을 사용할 때는 필요한 전류를 모두 공급하기에는 펄스고전압 발생장치가 커져야 하는 문제가 있다. 직류 고전압에 펄스 고전압을 중첩하여 사용함으로써 펄스 고전압 장치의 크기를 줄일 수가 있다.
펄스전원을 직류전원에 중첩하여 사용할 때의 효과를 도 6에 나타내었다. 이온풍 세기는 대전전극에서 방출된 이온의 양에 의해 결정되므로 인가 고전압 변화 시 강판과 대전전류 사이에 흐르는 전류량을 측정하면 이온풍의 세기를 간접적으로 측정이 가능하다. 직류 고전압을 사용하였을 때는 50 kV의 전압세기에서 방전 전류량은 4 mA 정도 였다. 직류 전압 16 kV에 주파수가 20 Hz인 고전압을 사용할 경우에는 peak 전압이 40 kV 에서 방전 전류량은 17 mA로 직류 전압만을 사용했을 경우보다 방전전류량은 4배 이상 증가하였고, 이로부터 이온풍의 유속을 증가시키는데 직류전압에 펄스 고전압을 사용하는 것이 보다 효과적임을 알 수가 있다.
펄스전원은 펄스 발생빈도(주파수), 인가시간(펄스폭)으로 특성 지어진다. 본 발명에서 제안하는 펄스 고전압의 특성은 발생 주기가 10~1000회/초이며, 펄스 전기의 폭이 10~100 ms이면 충분하다.
도 7은 본 발명의 장치를 사용하여 강판을 냉각시킬때 고전압을 인가함에 따른 액적이 강판에 부착효율이 향상되는 효과를 측정하기 위하여 고전압이 변화될 때 강판 표면 1mm2의 면적당 부착된 액적의 개수를 측정한 예이다. 고전압의 세기가 -30 kV에서 -40 kV로 증가함에 따라 액적의 개수는 60에서 80개로 증가하였다. 펄스 폭 100 μs, 펄스 발생빈도 100 Hz이며 펄스 고전압의 피크 전압이 -15 kV 인 펄스 고전압을 직류 고전압 -30 kV에 중첩하여 인가하여 총 피크 전압이 -45 kV인 경우는 부착된 액적의 개수가 130개로서 직류 전원 -40 kV를 인가하였을 때보다 펄스전원을 중첩하여 사용한 경우 액적의 부착효과가 60 % 향상되었다.
이상으로부터 본 발명에서 제안하는 직류 전기에 펄스전기를 중첩시킨 전기를 사용하므로써 이온풍의 유속을 증가시킴과 동시에 대전전극과 강판 사이의 공간으로 분사된 수용액 액적들이 강판에 부착되는 부착효율을 증가시켜 냉각챔버의 냉각능력이 증가되는 효과가 있다.
상기 냉각장치에 의해 선상형의 빗살 무늬 결함을 감소시키기 위해서는 강판이 냉각장치를 강판이 통과하는 동안에 응고가 시작되어 끝나게 하는 것이 좋다. 즉, 통상 알루미늄이 0.2~0.3 중량 % 포함된 용융 아연의 경우는 약 419~418 oC에서 응고가 이루어지므로, 냉각 챔버를 통과할 때 상기의 온도 범위가 되게 하는 것이 좋다. 즉, 강판이 냉각챔버 내로 들어올 때 온도가 418 ℃이하 이거나, 냉각 챔버를 빠져나올때 419℃이상이 되면 본 발명의 효과가 감소하게 된다.
도금포트에서 빠져나온 강판이 상부로 진행될 때 용융 상태의 도금층이 응고되는 높이는 도금욕에 침적되는 강판 온도, 도금포트 온도, 강판 두께, 도금부착량 및 공장 내 공기 온도 등에 따라 변화되며, 강판 두께가 두꺼울수록, 도금량이 많을수록, 도금포트 온도가 높을수록 응고지점은 도금 포트로 부터 높아지게 된다. 따라서 냉각챔버의 상부 하부에 여유 공간이 있게 하고, 동력 발생 모터로 냉각 챔버를 용융도금층이 응고되는 높이로 이동시키면 보다 효과적이다.
도금강판을 생산 중에 응고지점을 작업자의 경험으로 찾는 것은 매우 번거롭고, 도금층의 품질 차이가 발생할 위험이 크므로, 용융도금공정에서는 비접촉식 광온도계를 설치하여 강판의 온도를 측정하여 냉각챔버를 상하로 이동시킨다.
강판 온도를 광온도계로 정확하게 측정하기 위해서는 측정대상 물체의 정확한 방사율을 아는 것이 중요하나, 불명확한 점이 많다. 예를 들면, 일반적으로 용융아연도금층의방사율 값은 0.23, 경면 연마된 아연의 방사율은 0.05로 알려져 있으나, 도금공정에서 실제 방사율을 측정해보면 0.09~0.12 사이의 값으로 측정되기도 한다. 이는 방사율이 도금층의 상태에 따라 변화되기 때문이며 광온도계로 강판 온도를 측정할때 측정오차는 불가피하게 발생한다.
도 8은 강판의 온도를 측정한 첫번째 예시이다. 도 8은 두께가 1mm 인 강판을 알루미늄이 0.22% 포함된 용융아연욕조에 침적한 후에 아연도금부착량이 양면합계가 140g/m2 되도록 조정한 후에 시간 경과에 따라 강판온도를 측정한 결과이다. 도 8의 (1)는 열전대로 측정한 예이며, 도 8의 (2)는 방사율이 0.093으로 설정된 광온도계로 측정한 결과이다.
강판에 피복된 열전대로 측정한 강판의 온도는 측정원리상 실제 강판 온도이다. 광온도계로 온도를 측정할 때 강판온도가 419 ℃이상에서는 열전대로 측정한 실제 강판온도 유사하게 변화되지만, 도금층의 응고가 시작되는 온도인 419 ℃이하에서는 광온도계의 온도 측정값은 급격하게 낮아져서 열전대로 측정한 실제 온도값과 큰 차이가 있다.
도 9는 강판의 온도를 측정한 또 다른 예이다. 도 9는 두께가 1.2mm 인 강판을 알루미늄이 0.22% 포함되며, 온도가 440 ℃ 인 용융아연욕조에 침적한 후에 아연 도금부착량이 양면합계가 140g/m2 되도록 조정한 후에 시간 경과에 따라 강판온도를 측정한 예이다. 도 9의 (1)는 열전대로 측정한 예이며, 도 9의 (2)는 방사율이 0.12으로 설정된 광온도계로 측정한 결과이다.
열전대로 측정한 도 9의 (1) 로 부터 도금 부착량을 조절한 후 실제 강판온도는 약 435℃이며, 응고는 419 ℃도에서 일어나며, 응고가 끝나면 강판의 온도는 하락한다. 그러나 광온도계에서는 도금부착량을 조절한 후의 강판온도는 330 ℃도이며, 응고가 종료된 후에는 약 380 ℃로 증가하였다.
도 8 및 도 9에서 광온도계로 측정한 온도값과 열전대로 측정한 실제 온도 값과의 차이가 나는 이유는 아연도금층의 방사율이 용융상태에서와 고체상태일 때 변화되기 때문이다. 따라서 광온도계로 측정한 온도값을 기준으로 냉각챔버를 상하 구동하는 것은 제품의 품질이 불균일해질 가능성이 매우 높다.
본 발명에서는 이러한 문제를 해결하기 위해 냉각 챔버를 상하로 구동시키는 새로운 방법을 제안한다.
본 발명에서는 광온도계의 기능은 정확한 강판온도를 측정하는데 있는 것이 아니라, 도금층의 응고반응이 일어나는 정확한 응고지점을 찾는데 그 목적이 있다.
즉, 아연도금층의 응고에 전후의 방사율 차이에 의해 광온도계에서 측정된 온도값의 오차가 크게 나타나게 되며, 이 지점이 도금층이 응고되는 지점이 된다.
본 발명에서는 도 3에 예시한 바와 같이 냉각 챔버의 상 및 하부에 광온도계(10)가 각각 1개 혹은 2개 이상 설치되며, 광온도계들은 0.04 이상 0.30 사이 범위에서 동일한 방사율 값으로 설정된다.
본 발명에서는 냉각 챔버 내에서 도금층의 응고가 시작되어 응고가 종료될 수 있는 냉각 능력을 가지고 있으므로, 냉각 챔버로 진입할 때의 강판의 방사율과 냉각 챔버를 빠져 나올 때의 강판의 방사율은 차이가 발생하게 된다. 이러한 방사율의 변화에 의해 실제 강판 온도는 크게 차이가 나지 않아도 상부와 하부의 광온도계에서 측정된 온도값이 크게 나게 된다. 따라서 상부 및 하부에 위치한 광온도계에서 측정된 온도차이가 큰 지점을 찾으면, 그 위치가 응고가 일어나는 지점이 된다.
상기의 현상을 이용하여 도 1의 구동모터 제어부(12)를 구성하면 작업자의 개입 없이 자동으로 냉각 챔버를 상하 구동시킬 수 있다.
보다 상세히 구동 모터제어부(12)의 제어 원리를 설명하면 다음과 같다.
본 발명은 상부에 설치된 광온도계에서 측정된 온도 값, Tpt과 하부에 설치된 파이로 메터에서 측정된 온도 값, Tpb 이 최소 20도 이상 차이가 나는 구간에 냉각 챔버가 위치하도록 상하 구동장치를 작동시키는 제어부(12)와 냉각챔버 상하 구동장치(10)로 구성된 것이 특징인 냉각 장치를 포함한다.
상부 광온도계에서 측정된 온도값을 Tpt 및 하부 광온도계에서 측정된 온도값을 Tpb로 했을 때 Tpt-Tpb가 20도 이상 차이가 나면 도금층의 응고는 냉각챔버내에서 시작되고 끝나는 것을 의미한다.
본 발명에서 제안하는 냉각챔버의 상하 구동제어 방법을 광온도계의 방사율을 0.12를 설정한 경우를 도 10를 이용하여 설명하면 다음과 같다.
연속용융도금 라인에서 도금 포트 (1)를 나온 강판은 상부로 진행하게 되며 냉각되어 온도가 감소된다. 그러나 광온도계의 방사율을 0.12로 설정할 때는 오히려 온도가 증가하는 것으로 측정될 수 있다. 즉 도금층이 용융상태에서는 340 ℃ 보다 낮게 측정되며, 응고가 종료된 경우는 380 ℃ 이상으로 측정된다. 따라서 도 10으로부터 용융상태를 나타내는 기준 온도값 Tl 은 340 ℃, 응고상태를 나타내는 기준 온도값 Ts는 380 ℃로 설정할 수 있다.
도 10의 (3-1)은 냉각 챔버 위치가 낮아서 도금층이 용융된 상태로 냉각챔버를 통과하는 경우를 나타낸다. 이때 (Tpb1 - Tpt1) 값은 20 ℃ 이하이며, Tpb1 및 Tpt1값은 340도 보다 낮게 측정된다. 이때는 냉각챔버를 상부로 이동시켜야 한다.
도 10의 (3-3)은 본 발명에서 제안하는 높이보다 높은 곳에 위치한 냉각 챔버를 나타낸다. 즉, 이 경우는 냉각챔버를 통과하기 전에 이미 도금층이 응고된 경우를 나타낸다. 이때 (Tpb3 - Tpt3) 값은 10 ℃ 보다 작으며, Tpb1 및 Tpt1값은 380 ℃ 보다 높게 측정된다. 이때는 냉각챔버를 하부로 이동시켜야 한다.
도 10 (3-2)은 본 발명에서 제안하는 높이에 위치한 냉각 챔버를 나타낸다. 즉, 이 경우는 강판이 냉각챔버를 통과하는 동안에 도금층의 응고가 이루어진 경우를 나타낸다. 이때 (Tpb2- Tpt2) 값은 약 40 ℃ 정도로 나타내며, Tpb2 < Tl , Tpt2 > Ts 의 조건을 만족하게 된다. 이때는 냉각챔버를 상하로 이동시킬 필요가 없다.
도 11에 기재된 내용을 참고로하여 제어로직을 구성하면 다음과 같다.
도 12는 광온도계로 강판의 온도를 측정할때 응고후의 온도가 용융상태일때 보다 온도가 높게 나타났을 경우에 냉각챔버를 상부 혹은 하부로 이동시키기 위한 제어로직 예이다.
즉, Tpt-Tpb가 20 도 이하이고, Tpb 및 Tpt가 Ts보다 크면 냉각챔버를 하부로 이동시킨다. 하부로 이동시켜서 Tpb-Tpb가 20 도 이하이고, Tpb 가 Ts보다 작으나, Tpt가 Ts보다 크면 냉각챔버를 하부로 더 이동시킨다. Tpb-Tpb가 20 도 보다 커지고, Tpb 가 Tl보다 작고, Tpt가 Ts와 Tl의 사이에 있게되면 냉각 챔버가 너무 많이 하부로 이동한 것을 의미하며 이 경우 냉각챔버를 상부로 이동시킨다. Tpb-Tpb가 20 도 보다 커지고, Tpb 가 Tl보다 작고, Tpt가 Ts보다 커지게 되면 응고가 냉각챔버 내에서 이루어지는 것을 의미하며 이경우는 냉각챔버위치를 고정하여 강판을 냉각시킨다.
또한 냉각 챔버의 위치를 고정하고, 냉각 챔버와 에어 나이프 사이에 위치한 도 3의 버텀 쿨러 (3)의 풍량을 조절하여 도금층의 응고를 냉각챔버내에서 일어나게 할 수 있다.
도 13은 광온도계로 강판의 온도를 측정할 때 응고후의 온도가 용융상태일 때 보다 온도가 높게 나타났을 경우에 버텀쿨러의 풍량을 조절하기 위한 제어로직 예이다.
버텀 쿨러의 풍량을 조절하여 제어 로직을 나타낸다. Tpt-Tpb가 20 도 이하이고, Tpb 및 Tpt가 Ts보다 크면 버텀쿨러 풍량을 감소시킨다. Tpb-Tpb가 20 도 이하이고, Tpb 가 Ts보다 작으나, Tpt가 Ts보다 크면 버텀 쿨러 풍량을 더욱 증가시킨다. Tpb-Tpb가 20 도 보다 커지고, Tpb 가 Tl보다 작고, Tpt가 Ts와 Tl의 사이에 있게되면 버텀 쿨러의 풍량이 지나치게 많은 것이므로 버텀 쿨러의 풍량을 감소시킨다. Tpb-Tpb가 20 도 보다 커지고, Tpb 가 Tl보다 작고, Tpt가 Ts보다 커지게 되면 응고가 냉각챔버 내에서 이루어지는 것을 의미하며 이 경우는 버텀 쿨러의 풍량을 유지한다.
또한 광온도계의 방사율을 0.093으로 설정하여 도 8과 같이 Tl>Ts의 온도측정결과가 얻어질 경우에 제어로직을 구성하면 다음과 같다.
도 14는 광온도계로 강판의 온도를 측정할때 응고후의 온도 Ts가 용융상태일때 보다 온도 Tl가 낮게 나타났을 경우에 냉각챔버를 상부 혹은 하부로 이동시키기 위한 제어로직 예이다.
즉, Tpt-Tpb가 20 도 이하이고, Tpb 및 Tpt가 Tl보다 크면 냉각챔버를 하부로 이동시킨다. 하부로 이동시켜서 Tpb-Tpb가 20 도 이하이고, Tpb 가 Tl보다 낮으나, Tpt가 Tl보다 크면 냉각챔버를 하부로 더 이동시킨다. Tpb-Tpb가 20 도 보다 커지고, Tpb 가 Ts보다 작고, Tpt가 Ts와 Tl의 사이에 있게되면 냉각 챔버가 너무 많이 하부로 이동한 것을 의미하며 이경우 냉각챔버를 상부로 이동시킨다. Tpb-Tpb가 20 도 보다 커지고, Tpb 가 Ts보다 작고, Tpt가 Tl보다 커지게 되면 응고가 냉각챔버 내에서 이루어지는 것을 의미하며 이경우는 냉각챔버위치를 고정하여 강판을 냉각시킨다.
또한 냉각 챔버의 위치를 고정하고, 냉각 챔버와 에어 나이프 사이에 위치한 도 3의 버텀 쿨러 (3)의 풍량을 조절하여 도금층의 응고를 냉각챔버내에서 일어나게 할 수 있다.
도 15는 광온도계로 강판의 온도를 측정할때 응고후의 온도 Ts가 용융상태일때 보다 온도 Tl가 낮게 나타났을 경우에 버텀쿨러의 풍량을 조절하기 위한 제어로직 예이다.
즉, Tpt-Tpb가 20 도 이하이고, Tpb 및 Tpt가 Tl보다 크면 버텀쿨러의 풍량을 감소시킨다. Tpb-Tpb가 20 도 이하이고, Tpb 가 Tl보다 낮으나, Tpt가 Tl보다 크면 버텀쿨러의 풍량을 더욱 증가시킨다. Tpb-Tpb가 20 도 보다 커지고, Tpb 가 Ts보다 작고, Tpt가 Ts와 Tl의 사이에 있게되면 버텀쿨러의 풍량을 지나치게 증가시킨 것으로 이경우 버텀쿨러의 풍량을 감소시킨다. Tpb-Tpb가 20 도 보다 커지고, Tpb 가 Ts보다 작고, Tpt가 Tl보다 커지게 되면 응고가 냉각챔버 내에서 이루어지는 것을 의미하며 이경우는 버텀쿨러의 풍량을 유지한다.
도 12도, 도 13, 도 14 및 도 15에 기재된 "Tpt-Tpb의 기준값" , Tl 및 Ts의 기준 온도는 방사율 설정값 혹은 파이로메타의 특성에 따라 변화될 수 있지만 제어로직의 구성원리는 동일하다.
또한 방사율이 0.04이상 0.3 이하의 범위내에서 임의의 값으로 설정될 경우 "Tpt-Tpb의 기준값" 은 20 정도로 설정될 수 있다.
또한 Tl 및 Ts값은 도금층의 상태를 육안으로 확인하면서, 응고전후에 광온도계에서 측정되는 온도값을 기준으로 설정하면 된다. "Tpt-Tpb의 기준값" 및 Tl 및 Ts값은 한번 설정되면 광온도계가 고장나기 전에는 변경할 필요가 없다.
[부호의 설명]
1: 도금포트, 2: 가스와이핑 장치, 3: 버텀쿨러 4: 냉각챔버, 5: 이온풍 발생장치, 6: 용액 무화부, 7: 공기 취입장치, 8: 파이로메타, 9: 용액 공급장치, 10: 냉각챔버 상하 구동장치, 11: 용액 분사 노즐, 12: 제어부, 13: 강판, 14: 지지대 15: 와이어, 16: 고전압 발생장치, 17: 대전전극 바늘, 18: 슬릿 타입 노즐
Tpt: 냉각챔버 상부에 설치된 광온도계에서 측정된 온도
Tpb: 냉각 챔버 하부에 설치된 광온도계에서 측정된 온도
Tl: 제어부에 입력된 용융 상태 도금층의 기준온도
Ts: 제어부에 입력된 고체 상태 도금층의 기준온도

Claims (18)

  1. 도금포트(1), 가스와이핑장치(2), 냉각챔버(4)로 구성되는 용융아연도금강판의 제조장치에 있어서,
    상기 냉각챔버(4)는 냉각챔버구동장치(10)에 의해 상하로 구동하며, 이온풍을 발생하는 이온풍발생장치(5)와 용액을 분사하는 용액무화부(6)를 구비하는 것을 특징으로 하는 용융아연도금강판의 제조장치.
  2. 제1항에 있어서,
    상기 용융아연도금강판의 제조장치는,
    상기 냉각챔버(4)의 상,하단부에 각각 설치되거나 모두 설치되는 광온도계(8)와,
    상기 이온풍발생장치(5) 후단에 설치되어 공기를 취입하는 공기취입장치(7)와,
    상기 가스와이핑장치(2)와 냉각챔버(4) 사이에 설치되는 버텀쿨러(3) 와,
    상기 냉각챔버구동장치(10)의 상하구동 및 상기 버텀쿨러(3)의 풍량을 제어하기 위한 제어부(12)가 더 구비되어 있는 것을 특징으로 하는 용융아연도금강판의 제조장치.
  3. 제1항 또는 제2항에 있어서,
    상기 냉각챔버(4)의 길이는 강판의 진행속도를 기준으로 냉각챔버 통과시간이 최소 1초 이상이 되게하여 도금층의 응고가 시작되어 응고가 종료될 수 있는 냉각능력을 갖는 것을 특징으로 하는 용융아연도금강판의 제조장치.
  4. 제1항 또는 제2항에 있어서,
    상기 이온풍발생장치(5)는 고전압발생장치(16)와 연결되는 고전압대전전극으로 이루어지되, 상기 고전압대전전극은 와이어(15)와 지지대(14)로 구성되는 것을 특징으로 하는 용융아연도금강판의 제조장치.
  5. 제4항에 있어서,
    상기 와이어(15)는 강판 진행방향으로 다수 설치되며, 끝단이 강판을 향해 있는 바늘(17)이 형성되어 있는 것을 특징으로 하는 용융아연도금강판의 제조장치.
  6. 제1항 또는 제2항에 있어서,
    상기 용액무화부(6)는 상기 이온풍발생장치(5)의 상단 또는 하단에 설치되며, 용액분사노즐(11)과 용액공급장치(9)로 구성되는 것을 특징으로 하는 용융아연도금강판의 제조장치.
  7. 제6항에 있어서,
    상기 용액분사노즐(11)은 강판 진행방향으로 2열 이상 설치되는 것을 특징으로 하는 용융아연도금강판의 제조장치.
  8. 제2항에 있어서,
    상기 광온도계(10)는 동일한 방사율 값을 가지며,
    상기 공기취입장치(7)는 상기 이온풍발생장치(5)의 후방에 설치되며, 상기 냉각챔버 외부의 공기를 내부로 공급하기 위한 공기토출구를 구비하고, 상기 공기토출구와 강판 사이의 거리는 강판과 대전전극 사이의 2배보다 큰 값을 갖는 것을 특징으로 하는 용융아연도금강판의 제조장치.
  9. 제2항에 있어서,
    상기 버텀쿨러(3)는 슬리트노즐(18)을 구비하되, 상기 슬리트노즐(18)은 강판의 넓은 면을 향해 1열 혹은 2열 이상 설치되는 것을 특징으로 하는 용융아연도금강판의 제조장치.
  10. 제2항에 있어서,
    상기 제어부(12)는 상기 광온도계(8)에서 측정된 온도와 제어부에 입력된 도금층의 온도를 비교하여 상기 냉각챔버의 상하구동 및 상기 버텀쿨러의 송풍량을 제어하는 것에 특징이 있는 용융아연도금강판의 제조장치.
  11. 강판이 도금포트(1)를 통과하면서 강판 표면에 도금층을 형성하고, 가스와이핑장치를 통과하면서 상기 도금층의 두께를 조절하고, 냉각챔버를 통과하면서 도금층을 냉각시키는 용융아염도금강판의 제조방법에 있어서,
    상기 냉각챔버에서의 도금층 냉각은 이온풍발생장치에서 발생하는 이온풍 및 용액무화부에서 분사되는 분사용액에 의하여 이루어지되, 상기 냉각챔버는 광온도계로 측정한 도금층의 온도에 따라 그 위치가 조정되는 것을 특징으로 하는 용융아연도금강판의 제조방법.
  12. 제11항에 있어서,
    상기 도금층의 냉각은 상기 도금포트(1)와 상기 가스와이핑장치(2) 사이에 설치된 버텀쿨러(3)에서 송풍되는 공기에 의해 냉각이 더 이루어지는 것을 특징으로 하는 용융아연도금강판의 제조방법.
  13. 제11항 또는 제12항에 있어서,
    상기 도금층의 냉각은 상기 이온풍발생장치(5)의 후방에 설치되는 공기취입장치(7)에서 공급되는 공기에 의해 상기 이온풍의 유속을 증가시킴으로서 수행되는 것을 특징으로 하는 용융아연도금강판의 제조방법.
  14. 제11항 또는 제12항에 있어서,
    상기 강판이 상기 냉각챔버 내로 들어올 때의 온도는 419℃ 이상이고,냉각챔버를 빠져나갈 때의 온도는 418℃ 이하인 것을 특징으로 하는 용융아연도금강판의 제조방법.
  15. 제11항 또는 제12항에 있어서,
    상기 이온발생장치에서 발생되는 이온풍은 직류고전압에 펄스고전압을 중첩시켜 발생되는 것을 특징으로 하는 용융아연도금강판의 제조방법.
  16. 제11항 또는 제12항에 있어서,
    상기 용액무화부에서 분사되는 용액은 용액분사노즐에서 분사되는 공기의 분사압력이 1~5kg/cm2이고, 용액의 분사압력이 1~4kg/cm2이고, 분사된 액적 중 크기가 100μm이하인 것이 99% 이상이며, 평균 액적의 크기가 30~60μm인 것을 특징으로 하는 용융아연도금강판의 제조방법.
  17. 제11항 또는 제12항에 있어서,
    상기 냉각챔버의 위치 조정은,
    Tpt-Tpb<20℃ 이면서
    Tpb>Ts and Tpt>Ts 이거나, Tpb<Ts and Tpt>Ts 일 경우, 냉각챔버가 하부로 이동하고,
    Tpt-Tpb>20℃ 이면서
    Tpb<Tl 이거나 Tl<Tpt<Ts 일 경우, 냉각챔버가 상부로 이동하고,
    Tpt-Tpb>20℃ 이면서
    Tpb<Tl이거나 Tpt>Ts 일 경우, 냉각챔버의 위치가 고정되는 것을 특징으로 하는 용융아연도금강판의 제조방법.
    (여기에서 Tpt는냉각챔버 상부에 설치된 광온도계에서 측정된 온도이고,
    Tpb는 냉각 챔버 하부에 설치된 광온도계에서 측정된 온도이고,
    Tl는 제어부에 입력된 용융 상태 도금층의 기준온도이고,
    Ts는 제어부에 입력된 고체 상태 도금층의 기준온도를 의미한다.)
  18. 제12항에 있어서,
    상기 버텀쿨러에서 송풍되는 공기는
    Tpt-Tpb<20℃ 이면서
    Tpb>Ts, Tpt>Ts 이거나, Tpb<Ts and Tpt>Ts 일 경우, 버텀쿨러의 풍량이 감소하고,
    Tpt-Tpb>20℃ 이면서
    Tpb>Tl 이고, Tl<Tpt>Ts 일 경우, 버텀쿨러의 풍량이 증가하고,
    Tpt-Tpb>20℃ 이면서
    Tpb<Tl 이고, Tpt>Ts 일 경우, 버텀쿨러의 풍량이 고정되는 것을 특징으로 하는 용융아연도금강판의 제조방법.
    (여기에서 Tpt는냉각챔버 상부에 설치된 광온도계에서 측정된 온도이고,
    Tpb는 냉각 챔버 하부에 설치된 광온도계에서 측정된 온도이고,
    Tl는 제어부에 입력된 용융 상태 도금층의 기준온도이고,
    Ts는 제어부에 입력된 고체 상태 도금층의 기준온도를 의미한다.)
PCT/KR2019/009983 2018-12-11 2019-08-08 용융도금강판의 제조방법 및 장치 WO2020122351A1 (ko)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1020180158942A KR102004971B1 (ko) 2018-12-11 2018-12-11 용융도금강판의 제조방법 및 장치
KR10-2018-0158942 2018-12-11

Publications (1)

Publication Number Publication Date
WO2020122351A1 true WO2020122351A1 (ko) 2020-06-18

Family

ID=68207778

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/KR2019/009983 WO2020122351A1 (ko) 2018-12-11 2019-08-08 용융도금강판의 제조방법 및 장치

Country Status (2)

Country Link
KR (1) KR102004971B1 (ko)
WO (1) WO2020122351A1 (ko)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP4130328A1 (en) 2021-08-06 2023-02-08 John Cockerill S.A. Device for cooling a metal strip with a hot dip coating of high thickness

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100504370B1 (ko) * 2000-12-27 2005-07-28 주식회사 포스코 합금화 용융아연 도금강판의 제조방법 및 제조장치
US20160304984A1 (en) * 2013-12-05 2016-10-20 Fives Stein Method and apparatus for continuous thermal treatment of a steel strip
KR101795965B1 (ko) * 2016-09-09 2017-11-09 주식회사 포스코 도금설비 및 도금방법
KR101879084B1 (ko) * 2016-12-22 2018-08-16 주식회사 포스코 선행냉각장치 및 이를 포함하는 도금 설비

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100504370B1 (ko) * 2000-12-27 2005-07-28 주식회사 포스코 합금화 용융아연 도금강판의 제조방법 및 제조장치
US20160304984A1 (en) * 2013-12-05 2016-10-20 Fives Stein Method and apparatus for continuous thermal treatment of a steel strip
KR101795965B1 (ko) * 2016-09-09 2017-11-09 주식회사 포스코 도금설비 및 도금방법
KR101879084B1 (ko) * 2016-12-22 2018-08-16 주식회사 포스코 선행냉각장치 및 이를 포함하는 도금 설비

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
"The characteristics of the ionic wind generation with corona electrodes installed in the form of a wind", JOURNAL OF THE KOREAN INSTITUTE OF ILLUMINATING AND ELECTRICAL INSTALLATION ENGINEERS, vol. 28, no. 2, 2014, pages 54 - 59 *

Also Published As

Publication number Publication date
KR102004971B1 (ko) 2019-10-01

Similar Documents

Publication Publication Date Title
WO2020122351A1 (ko) 용융도금강판의 제조방법 및 장치
WO2018164491A1 (ko) 선택적 전기화학 전착을 이용한 3d 프린팅 장치
WO2020122352A1 (ko) 용융아연도금강판의 제조방법
KR101795965B1 (ko) 도금설비 및 도금방법
CN107520444A (zh) 沉积设备与沉积方法
WO2017111523A1 (ko) 도금 장치 및 도금 방법
KR102004965B1 (ko) 용융아연도금강판의 제조방법
KR100415677B1 (ko) 스팽글이 없는 용융도금강판 제조방법
CN110860691A (zh) 等离子体炬熔融金属丝耗材沉积挤出3d打印喷头
WO2020040360A1 (ko) Mg이 포함된 용융아연도금강판의 제조방법 및 제조장치
KR100380134B1 (ko) 표면외관이우수한미니스팡글용융도금강판제조방법
WO2016167479A1 (ko) 유도 가열 선형 증발 증착 장치
KR0146887B1 (ko) 폭방향 스팡글 균일도 및 표면광택도가 우수한 미니스팡글 형성장치
JP6590110B2 (ja) 連続溶融金属めっき処理装置及び該装置を用いた溶融金属めっき処理方法
KR20130084475A (ko) 아크용사 코팅장치
JP3532549B2 (ja) 溶融亜鉛めっき鋼帯の製造方法および製造装置
WO2018012950A1 (ko) 도금강판 선행냉각장치 및 이를 포함하는 도금설비
WO2016137025A1 (ko) 아크 용사 시스템
WO2012165679A1 (ko) 강판 안정화 장치
WO2018062860A2 (ko) 균일처리장치 및 산세장치
WO2018021898A1 (ko) 도금강판 제1냉각장치, 도금설비 및 도금강판 냉각방법
KR101953608B1 (ko) 복수의 노즐을 포함하는 플라즈마 용사 코팅 장치
KR960003818Y1 (ko) 파우더 분사법에 의한 제로스팽글(zero-spangle) 제조 모사실험장치
CN113769911A (zh) 一种可视化高温喷涂设备
WO2020130566A2 (ko) 금속소재 냉각장치

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 19894500

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 19894500

Country of ref document: EP

Kind code of ref document: A1