WO2020039545A1 - 移動作業管理装置、移動型作業装置、実装システム及び管理方法 - Google Patents

移動作業管理装置、移動型作業装置、実装システム及び管理方法 Download PDF

Info

Publication number
WO2020039545A1
WO2020039545A1 PCT/JP2018/031147 JP2018031147W WO2020039545A1 WO 2020039545 A1 WO2020039545 A1 WO 2020039545A1 JP 2018031147 W JP2018031147 W JP 2018031147W WO 2020039545 A1 WO2020039545 A1 WO 2020039545A1
Authority
WO
WIPO (PCT)
Prior art keywords
mounting
feeder
unit
feeders
mobile work
Prior art date
Application number
PCT/JP2018/031147
Other languages
English (en)
French (fr)
Inventor
安井 義博
山下 幸宏
Original Assignee
株式会社Fuji
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社Fuji filed Critical 株式会社Fuji
Priority to PCT/JP2018/031147 priority Critical patent/WO2020039545A1/ja
Priority to US17/265,444 priority patent/US12063744B2/en
Priority to CN201880096682.7A priority patent/CN112586107A/zh
Priority to JP2020537959A priority patent/JP7133021B2/ja
Priority to EP18931184.8A priority patent/EP3843520A4/en
Publication of WO2020039545A1 publication Critical patent/WO2020039545A1/ja

Links

Images

Classifications

    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/02Feeding of components
    • H05K13/021Loading or unloading of containers
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/02Feeding of components
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/18Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
    • G05B19/4155Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by programme execution, i.e. part programme or machine function execution, e.g. selection of a programme
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/04Mounting of components, e.g. of leadless components
    • H05K13/0417Feeding with belts or tapes
    • HELECTRICITY
    • H05ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
    • H05KPRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
    • H05K13/00Apparatus or processes specially adapted for manufacturing or adjusting assemblages of electric components
    • H05K13/08Monitoring manufacture of assemblages
    • H05K13/085Production planning, e.g. of allocation of products to machines, of mounting sequences at machine or facility level
    • H05K13/0857Product-specific machine setup; Changeover of machines or assembly lines to new product type
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/50Machine tool, machine tool null till machine tool work handling
    • G05B2219/50391Robot

Definitions

  • This specification discloses a mobile work management device, a mobile work device, a mounting system, and a management method.
  • a mounting system in which a feeder storage is arranged on a production line, and which is provided with an exchange robot (movable working device) that moves between the mounting apparatus and the feeder storage and exchanges a feeder.
  • an exchange robot movable working device
  • the feeder is replaced by the mobile work device at the replacement timing of the feeder.
  • mounting processing may be performed while switching a plurality of mounting jobs (mounting condition information).
  • mounting system that performs such production, it is necessary to use a common arrangement in which a feeder is mounted at a common position in a plurality of mounting jobs in order to save the trouble of changing the arrangement position of a feeder holding components for each mounting job. is there.
  • this mounting system there is a problem that when the common arrangement of the feeders is used, it takes time to start the mounting process.
  • the present disclosure provides a mobile work management apparatus, a mobile work apparatus, a mounting system, and a management method that can further improve productivity when using a common arrangement for sharing a feeder arrangement position in a plurality of types of production. Its main purpose is to:
  • This disclosure employs the following means to achieve the above-mentioned main object.
  • the mobile work management device includes: A mounting unit that mounts a component on a mounting target; a supply unit that mounts a feeder including a holding member that holds the component to one or more mounting units; and a mounting control unit that causes the mounting unit to collect the component from the feeder.
  • a mobile work management device used for a mounting system including a mounting device having It corresponds to a plurality of mounting condition information for producing a plurality of types of mounting objects, respectively, and is created according to a common arrangement of mounting the feeder at a common position in the production of a plurality of types of mounting objects.
  • Management control unit that creates mounting order information including the mounting order of feeders to be mounted on the unit, It is provided with.
  • a feeder to be used in the current production is mounted on the mounting section in preference to a feeder to be used in the next and subsequent productions based on the plurality of feeder arrangement information and the order of use of the plurality of feeders.
  • the installation order information including the installation order of the feeders is created.
  • This feeder arrangement information corresponds to a plurality of mounting condition information for producing a plurality of types of mounting objects, respectively, and is created according to a common arrangement for mounting a feeder at a common position in the production of a plurality of types of mounting objects. Have been.
  • the feeder can be mounted on the mounting section based on the generated mounting order information, and the feeder used in the current production is mounted on the supply section first, so the feeder used in the next and subsequent times is used.
  • the mounting process can be started before mounting. In this mobile work management device, the productivity can be further improved by earlier start of the mounting process.
  • the “mounting object” include a substrate and a three-dimensionally shaped base material.
  • FIG. 1 is a schematic explanatory diagram illustrating an example of a mounting system 10.
  • FIG. 2 is an explanatory view schematically showing the configuration of a mounting device 15 and a loader 18.
  • FIG. 4 is an explanatory diagram illustrating an example of information stored in a storage unit 43. 9 is a flowchart illustrating an example of a mounting order information creation processing routine.
  • FIG. 4 is an explanatory diagram illustrating an example of a process of mounting a feeder 17 on a loader 18. Explanatory drawing which shows an example of the mounting order display screen 60.
  • FIG. 1 is a schematic explanatory diagram illustrating an example of a mounting system 10 according to the present disclosure.
  • FIG. 2 is an explanatory diagram schematically showing the configuration of the mounting device 15 and the loader 18 which is a mobile work device.
  • FIG. 3 is an explanatory diagram illustrating an example of the feeder arrangement information 45 and the mounting order information 46 stored in the storage unit 43 of the management PC 14.
  • the left-right direction (X-axis), the front-rear direction (Y-axis), and the up-down direction (Z-axis) are as shown in FIGS.
  • the mounting system 10 is configured as, for example, a production line in which devices for performing a process of mounting components on a substrate S as a mounting target are arranged in the transport direction of the substrate S.
  • the mounting object is described as the substrate S, but is not particularly limited as long as it mounts components, and may be a three-dimensional base material.
  • the mounting system 10 includes a printing apparatus 11, a print inspection apparatus 12, a feeder storage unit 13, a management PC 14, a mounting apparatus 15, an automatic transport vehicle 16, a loader 18, a host It is configured to include a PC 19 and the like.
  • the printing device 11 is a device that prints a solder paste or the like on the substrate S.
  • the print inspection device 12 is a device that inspects the state of printed solder.
  • the feeder storage unit 13 is a storage place for storing the feeder 17 used in the mounting device 15.
  • the feeder storage unit 13 is provided at a lower part of the transport device between the print inspection device 12 and the mounting device 15.
  • the mounting device 15 is a device that collects components and mounts them on the substrate S.
  • the mounting device 15 includes a mounting control unit 20, a storage unit 23, a substrate processing unit 26, a supply unit 27, a mounting unit 30, and a communication unit 35.
  • the mounting control unit 20 is configured as a microprocessor centered on a CPU 21, and controls the entire apparatus.
  • the mounting control unit 20 outputs a control signal to the substrate processing unit 26, the supply unit 27, and the mounting unit 30, and inputs signals from the substrate processing unit 26, the supply unit 27, and the mounting unit 30.
  • the storage unit 33 stores mounting condition information 24, feeder arrangement information 25, and the like.
  • the mounting condition information 24 is a production job, and includes information such as component information, an arrangement order in which the components are mounted on the board S, an arrangement position, a component collection position, and the like.
  • the mounting condition information 24 is created by the host PC 19 in a collection order and an arrangement order with high mounting efficiency, transmitted from the host PC 19, and stored in the storage unit 23.
  • the feeder arrangement information 25 is the same information as the feeder arrangement information 45, and will be described later in detail.
  • the mounting device 15 acquires the mounting condition information 24 and the feeder arrangement information 25 from the host PC 19.
  • the communication unit 35 is an interface for exchanging information with external devices such as the management PC 14 and the host PC 19.
  • the substrate processing unit 26 is a unit that carries in, transports, fixes and unloads the substrate S at the mounting position.
  • the substrate processing unit 26 has a pair of conveyor belts that are provided at an interval in front and rear of FIG. The substrate S is transported by this conveyor belt.
  • the supply unit 27 is a unit that supplies components to the mounting unit 30.
  • a feeder 17 including a reel around which a tape as a holding member holding components is wound is mounted on one or more mounting units.
  • the supply unit 27 has two upper and lower mounting portions to which the feeder 17 can be mounted in the front.
  • the upper part is a mounting part for mounting 28 from which the mounting part 30 can collect components
  • the lower part is a mounting part for buffer 29 from which the mounting part 30 cannot collect parts.
  • the mounting portion 28 for mounting and the mounting portion 29 for buffer are collectively referred to as a mounting portion.
  • the mounting units may be managed in units of modules grouped by a predetermined number (for example, 4 or 12).
  • the supply section 27 is provided with a plurality of slots 38 arranged at predetermined intervals in the X direction, into which rail members of the feeder 17 are inserted, and a connection section 39 into which a connector provided at the tip of the feeder 17 is inserted.
  • the feeder 17 includes a controller (not shown). This controller stores information such as the ID of the tape included in the feeder 17, the component type, the number of remaining components, and the like. When the feeder 17 is connected to the connection unit 39, the controller transmits information on the feeder 17 to the mounting control unit 20.
  • the mounting unit 30 is a unit that collects components from the supply unit 27 and places them on the substrate S fixed to the substrate processing unit 26.
  • the mounting unit 30 includes a head moving unit 31, a mounting head 32, and a nozzle 33.
  • the head moving unit 31 includes a slider that is guided by a guide rail and moves in the X and Y directions, and a motor that drives the slider.
  • the mounting head 32 collects one or more components and moves the head in the XY directions by the head moving unit 31.
  • the mounting head 32 is detachably mounted on the slider.
  • One or more nozzles 33 are detachably mounted on the lower surface of the mounting head 32.
  • the nozzle 33 is for collecting parts by using a negative pressure.
  • the sampling member for sampling the component may be a nozzle 33 or a mechanical chuck that mechanically holds the component.
  • the management PC 14 is a device that manages the feeder 17 and is a mobile work management device that creates execution data and the like executed by the loader 18.
  • the management PC 14 includes a management control unit 40, a storage unit 43, a communication unit 47, a display unit 48, and an input device 49.
  • the management control unit 40 is configured as a microprocessor centered on the CPU 41, and controls the entire apparatus.
  • the storage unit 43 is a device that stores various data such as a processing program, such as an HDD.
  • the communication unit 47 is an interface for exchanging information with external devices such as the mounting device 15 and the host PC 19.
  • the display unit 48 is a liquid crystal screen that displays various information.
  • the input device 49 includes a keyboard, a mouse, and the like for the operator to input various commands.
  • the storage unit 43 stores mounting condition information 44, feeder arrangement information 45, mounting order information 46, and the like.
  • the mounting condition information 44 is the same as the mounting condition information 24, and is acquired from the host PC 19.
  • the feeder arrangement information 45 is information used for production of the substrate S based on the mounting condition information 44, and is information including an arrangement position of the feeder 17.
  • the mounting condition information 44 and the feeder arrangement information 45 constitute production plan information including a production plan for producing a plurality of types of boards S.
  • the feeder arrangement information 45 is created according to a common arrangement in which the feeders 17 are mounted at positions common to the production of a plurality of types of substrates S.
  • mounting processing may be performed while switching a plurality of mounting condition information 44 (production jobs).
  • the feeder 17 may be mounted at a common position for a plurality of production jobs in order to save the trouble of changing the arrangement position of the feeder 17 holding the components for each production job (this is referred to as feeder 17). 17 common arrangement).
  • the feeder arrangement information 45 is created by the host PC 19 based on a common arrangement method so that the arrangement position of each feeder 17 is the most efficient. As shown in FIG. 3, the feeder arrangement information 45 holds the module number of the supply unit 27, the mounting unit number indicating the position of the mounting unit, the identification information (ID) of the feeder 17 mounted on the mounting unit, and the feeder 17.
  • the storage unit 43 stores feeder arrangement information 45a to 45c corresponding to the first to third production jobs.
  • the feeder A includes the mounting unit # 1
  • the feeder B includes the mounting unit # 2, and the like.
  • the feeder arrangement information 45 the feeders 17 of the same type are set so as to be mounted on the same mounting section.
  • the feeder arrangement information 45 may be managed separately from the mounting condition information 44, or may be included in the mounting condition information 44.
  • the mounting order information 46 is information created by the management PC 14 including the work order in which the loader 18 mounts the feeder 17 on the supply unit 27 before the start of the production of the substrate S.
  • the mounting order information 46 includes a work number indicating an order of receiving or mounting the feeder 17, a work target to which the feeder 17 is exchanged, and a mounting unit number indicating a position of the mounting unit of the supply unit 27 or the feeder storage unit 13.
  • the information includes information such as the number of the accommodating section 54 accommodating the feeder 17, the content of the collection or mounting operation, the ID of the feeder 17 to be operated, the name of the component held by the feeder 17, and the number of remaining components.
  • the work number 1 of the mounting order information 46 in FIG. 3 defines a work of collecting (receiving) the feeder A mounted on the mounting unit of the feeder storage unit 13 in the first slot of the storage unit 54.
  • the work number 5 specifies a work for mounting the feeder A housed in the first slot of the housing part 54 to the mounting part # 1 of the mounting part 28 for mounting.
  • the automatic transport vehicle 16 automatically transports the feeder 17 and members used in the mounting system 10 between a storage (not shown) and the feeder storage unit 13.
  • the loader 18 is a mobile work device that moves within a movement area in front of the mounting system 10 (see a dotted line in FIG. 1) and automatically collects and replenishes the feeder 17 of the mounting device 15.
  • the loader 18 includes a movement control unit 50, a storage unit 53, a storage unit 54, an exchange unit 55, a movement unit 56, and a communication unit 57.
  • the movement control unit 50 is configured as a microprocessor centered on the CPU 51, and controls the entire apparatus.
  • the storage unit 53 stores various data such as a processing program such as an HDD, and stores the placement execution information 45 and the like.
  • the storage section 54 has a storage space for storing the feeder 17.
  • the storage section 54 is configured to be able to store, for example, four feeders 17.
  • the exchange unit 55 is a mechanism for moving the feeder 17 in and out and moving the feeder 17 up and down (see FIG. 2).
  • the exchange unit 55 includes a clamp unit that clamps the feeder 17, a Y-axis slider that moves the clamp unit in the Y-axis direction (front-back direction), and a Z-axis slider that moves the clamp unit in the Z-axis direction (vertical direction).
  • the replacement unit 55 executes mounting and releasing of the feeder 17 in the mounting unit 28 for mounting and mounting and releasing of the feeder 17 in the mounting unit 29 for buffer.
  • the moving unit 56 is a mechanism that moves the loader 18 in the X-axis direction (left-right direction) along the X-axis rail 18a provided on the front of the mounting device 15.
  • the communication unit 57 is an interface for exchanging information with external devices such as the management PC 14 and the mounting device 15.
  • the loader 18 outputs the current position and the contents of the executed work to the management PC 14.
  • the host PC 19 (see FIG. 1) is configured as a server that manages information of each device of the mounting system 10.
  • the host PC 19 includes a control unit that controls the entire apparatus, a storage unit that stores various information, and a communication unit that performs two-way communication with external devices such as the mounting system 10, the automatic transport vehicle 16, and the loader 18. I have.
  • the host PC 19 creates and manages mounting condition information and feeder arrangement information used for component mounting processing, and acquires and manages information on the mounting system 10.
  • FIG. 4 is a flowchart illustrating an example of a mounting order information creation processing routine executed by the CPU 41 included in the management control unit 40 of the management PC 14. This routine is stored in the storage unit 43 of the management PC 14, and is executed based on an input by an operator sufficiently before a production plan including production of a plurality of substrates S is started to be mounted.
  • the CPU 41 reads and acquires a plurality of feeder arrangement information 45 included in the production plan and the order of use of the feeders 17 (S100), and determines the feeder 17 used in the current (current) production. The extraction is performed prior to the feeder 17 used in the next and subsequent productions (S110).
  • the use order of the feeders 17 may be included in the information of the production plan.
  • the order of use of the feeders 17 may be the order of use of the feeder arrangement information 45.
  • the CPU 41 divides the number of the accommodated portions 54 (here, four) in order from the mounting portion 28 on the end side of the supply portion 27 among the predetermined arrangement positions of the extracted feeders 17. Movement allocation for housing movement is performed (S120). For example, when the feeders 17 stored in the feeder storage unit 13 are mounted on the mounting device 15, the CPU 41 performs a process of dividing the feeders 17 into four sequentially from the feeder 17 mounted on the mounting mounting unit 28 near the feeder storage unit 13. Note that the “end side” may be a side close to or far from the feeder storage unit 13. Subsequently, the CPU 41 determines whether or not there is an empty space in the accommodation unit 54 to be finally moved (S130).
  • the third final movement involves three feeders 17, and the accommodation unit 54 has one slot.
  • the CPU 41 determines that if there is a feeder 17 to be used in the next and subsequent productions in addition to the feeder 17 to be used in the current production, the CPU 41 will use the empty slot for the next and subsequent productions.
  • the feeder 17 to be used is selected (S140). In this selection, it is preferable that the CPU 41 give priority to the feeder 17 used in the next production out of the production after the next production. In this way, the CPU 41 can complete the mounting of the feeder 17 to be used next time earlier.
  • the CPU 41 gives priority to the feeder 17 that can be mounted without the movement of the loader 18 with respect to the mounting portion of the currently used feeder 17 to be finally moved, and gives priority next to the feeder 17 that can be mounted with a shorter moving distance. It may be selected. In this case, the movement efficiency of the loader 18 can be further improved. Note that the selection in S140 is not particularly limited to the above, and the CPU 41 may sequentially select the feeders 17 to be used in the next and subsequent times from the end of the supply unit 27.
  • the CPU 41 determines which slot of the accommodation section accommodates the feeder 17 for each of the feeders 17 to which the movement has been allocated.
  • the storage section allocation to be set is performed (S150).
  • the CPU 41 may give priority to accommodation positions that can be simultaneously mounted without moving the loader 18, and then give priority to accommodation positions where the movement distance of the loader 18 is shorter.
  • the CPU 41 gives priority to the assignment of the two feeders 17 adjacent to the mounting unit 28 for mounting to the adjacent mounting unit 54, and the feeder 17 separated from the mounting unit 28 by two.
  • the accommodation section allocation is performed with priority given to accommodation in the accommodation section 54 apart from the two.
  • the CPU 41 sets a mounting order in which the feeder 17 used in the current production is mounted on the mounting mounting section 28 with priority over the feeder 17 used in the next and subsequent productions. In this way, the mounting of the feeder 17 used in the current production can be completed more quickly.
  • the CPU 41 determines whether or not there is a next production (S160), and when there is a next production, the CPU 41 repeatedly executes the processing from S110. That is, the feeder 17 is extracted with the next production as the current production, and the movement assignment and the accommodation section assignment are executed.
  • the mounting order information 46 including the set mounting order is created (S170), output to the loader 18 and the display unit 48 (S180), and this routine is ended.
  • the CPU 41 performs a work order, a work target, positions of a receiving destination and a mounting destination of the feeder 17, a storage position of the feeder 17, work contents (collection and mounting), and information of the feeder 17. Is generated.
  • the loader 18 that has acquired the mounting order information 46 executes the work specified in the mounting order information 46. Further, the work content of the mounting order information 46 may be displayed and output on the display unit 48 as a mounting order display screen.
  • FIG. 5 is an explanatory diagram showing an example of a process of mounting the feeder 17 by the loader 18.
  • FIG. 5A is a diagram of moving and mounting the feeder 17 used in the first production
  • FIGS. FIG. 3 is a view for moving and mounting a feeder 17 to be used.
  • FIG. 5 shows the contents of executing the mounting process of the mounting order information 46 in the arrangement of the feeders 17 specified in the feeder arrangement information 45 shown in FIG.
  • the feeders A, D, and H are used in the first production.
  • feeders A, B, E, and G are used in the second production and feeders C, D, F, and H are used in the third production will be described as a specific example.
  • the CPU 51 of the loader 18 executes the work specified by the work numbers 1 to 4 based on the contents of the mounting order information 46. That is, the CPU 51 collects the feeder 17 stored in the feeder storage unit 13. At this time, the feeders A, D, and H are accommodated in the accommodating portion 54, but since there is one slot available, a feeder to be used next time is also accommodated.
  • the first production feeder is prioritized for mounting on the mounting part 28, and since the last is the feeder H, the feeder G used in the second production that can be mounted simultaneously with this is selected.
  • the feeders H and G are accommodated in adjacent slots so that they can be mounted simultaneously (FIG. 5A).
  • the loader 18 executes the work specified by the work numbers 5 to 8. That is, the CPU 51 mounts the feeders A, D, H, and G on the # 1, 2, 4, and 3 of the mounting unit 28.
  • the mounting device 15 can start the mounting process of the first production.
  • the CPU 51 causes the work specified by the work numbers 9 to 12, that is, the feeders B, E, C, and F to be accommodated in the slots 2, 3, 1, and 4 of the accommodation unit 54.
  • the CPU 51 causes the feeders B and E to be mounted on # 2 and # 6 of the mounting unit 28 for mounting.
  • the mounting apparatus 15 can start the mounting process of the second production.
  • feeders C, E, and F are accommodated in the accommodating portion 54 of the loader 18 so that they can be simultaneously mounted.
  • the CPU 51 can attach the feeders C and F together with the attachment of the feeder E, and at this time, can also start the mounting process of the third production. It takes time to move and mount the feeder 17, and if the feeders 17 are sequentially mounted in ascending or descending order of the common arrangement, the waiting time until the start of the first production may become long. In this mounting system 10, the mounting process can be started as early as possible by giving priority to mounting the feeder 17 of the first production.
  • the mounting device 15 of the present embodiment corresponds to a mounting device
  • the management PC 14 corresponds to a mobile work management device
  • the loader 18 corresponds to a mobile work device.
  • the supply unit 27 corresponds to a supply unit
  • the mounting unit 28 and the buffer mounting unit 29 correspond to a mounting unit
  • the mounting unit 30 corresponds to a mounting unit
  • the mounting control unit 20 corresponds to a mounting control unit. I do.
  • the housing unit 54 corresponds to a housing unit
  • the movement control unit 50 corresponds to a movement control unit.
  • the mounting condition information 44 corresponds to the mounting condition information
  • the feeder 17 corresponds to the feeder
  • the mounting order information 46 corresponds to the mounting order information
  • the management control unit 40 corresponds to the management control unit.
  • the tape corresponds to a holding member
  • the substrate S corresponds to a mounting target.
  • the feeder 17 used in the current production is given priority over the feeder 17 used in the next and subsequent productions based on the plurality of feeder arrangement information 45 and the order in which the plurality of feeders 17 are used.
  • the mounting order information 46 including the mounting order of the feeders 17 to be mounted on the mounting unit is created.
  • the feeder arrangement information 46 corresponds to a plurality of mounting condition information 44 for producing a plurality of types of substrates S, respectively, and is created according to a common arrangement for mounting a feeder at a common position in the production of a plurality of types of substrates S. Have been. Then, in the mounting apparatus 15, the feeder 17 can be mounted on the mounting section based on the generated mounting order information 46.
  • the mounting system 10 also includes a loader 18 including a storage unit 54 that stores the feeder 17 and a movement control unit 50 that collects the feeder 17 from the supply unit 27 or attaches the feeder 17 to the supply unit 27 to move the feeder.
  • the management control unit 40 outputs the created mounting order information 46 to the loader 18.
  • the loader 18 uses the mounting order information 46, so that the productivity can be further improved.
  • the mounting system 10 includes a loader 18, and when a space is generated in the storage unit 54, the management control unit 40 stores the empty feeder 17 used in the next production in addition to the feeder 17 used in the current production.
  • the mounting order information 46 to be accommodated and moved in the unit 54 is created.
  • the management control unit 40 sets mounting order information 46 for mounting the feeders 17 used in the current production in order from the mounting mounting unit 28 on the end side of the supply unit 27 among the predetermined arrangement positions. create.
  • the moving efficiency of the loader 18 can be increased and the start of the mounting process can be further accelerated by mounting the feeders 17 on the mounting mounting portion 28 in order from the end.
  • the mounting system 10 includes the loader 18, and the loader 18 moves and mounts the feeder 17.
  • the present invention is not particularly limited thereto. Mounting may be performed. Alternatively, the mounting system 10 may not include the loader 18, and may allow the worker to check the mounting order display screen displayed on the display unit 48 and sequentially mount the feeders 17 to the mounting mounting unit 28.
  • FIG. 6 is an explanatory diagram showing an example of the mounting order display screen 60.
  • the mounting order display screen 60 includes a cursor 61, a mounting order display section 62, and a confirmation key 64.
  • the mounting order display section includes a work number, a device name and a position of a receiving destination, a mounting section of a mounting destination, information of a feeder 17, and the like.
  • the worker checks the mounting order display screen 60 and mounts the feeders 17 on the mounting unit 28 in the order of the displayed operations.
  • the mounting apparatus 15 starts mounting processing. Also in this mounting system 10, since the feeder 17 used in the current production is mounted on the supply unit 27 first, the mounting process can be started before mounting the feeder 17 to be used in the next and subsequent times.
  • the feeder arrangement information 45 is created by a common arrangement method, and the mounting apparatus 15 is described as having only the common arrangement feeder 17.
  • the present invention is not particularly limited to this.
  • Other feeders 17 may be used. That is, the mounting apparatus 15 may execute the mounting process using the individual feeders 17 corresponding to the mounting condition information 44.
  • the management control unit 40 further acquires individual arrangement information including an arrangement position at which a feeder is individually mounted on the mounting mounting unit 28, and stores the acquired individual arrangement information in the individual arrangement information.
  • the mounting order information 46 in which the feeder 17 used in the current production is given priority over the feeder 17 used in the next and subsequent productions. With this mobile work management device, productivity can be further improved even when individual arrangements are included in addition to the common arrangement.
  • the mounting order information 46 for storing the feeder 17 used in the next and subsequent productions in the empty storage unit 54 in addition to the feeder 17 used in the current production is described.
  • the present invention is not particularly limited to this.
  • the mounting order information 46 for mounting the feeder 17 from the mounting unit 28 on the end side is created.
  • the present invention is not particularly limited to this, and priority is given to the feeder 17 used in the current production.
  • the feeder 17 may be mounted from any position.
  • the feeder 17 that can be mounted without the movement of the loader 18 is given priority, and the feeder 17 that can be mounted with a shorter moving distance is given second priority.
  • the priority is not limited to this, and another priority may be set.
  • the feeder arrangement information 45 and the use order of the feeder 17 are acquired and the mounting order of the feeder 17 is set.
  • the present invention is not particularly limited thereto.
  • the mounting condition information 44 and the feeder arrangement It is also possible to acquire the information 45 and the production plan including the execution order thereof, and acquire these information, or acquire the mounting condition information 44 including the feeder arrangement information 45 and the execution order of the mounting condition information 44. Then, these may be obtained.
  • the mounting system 10 includes the printing device 11, the print inspection device 12, the feeder storage unit 13, the management PC 14, and the mounting device 15, but is not particularly limited thereto.
  • the above may be omitted, or a device other than the above may be added.
  • the management PC 14 installed in the feeder storage unit 13 has been described as managing the loader 18.
  • the present invention is not particularly limited to this.
  • the present disclosure has been described as applied to the form of the mounting system 10.
  • the present disclosure may be the management PC 14 (mobile work management device) or the loader 18 (mobile work device), or may be a mobile work management device. It is good also as a method.
  • the mobile work management device, the mobile work device, the mounting system, and the management method of the present disclosure may be configured as follows.
  • the mounting system includes a housing unit that houses the feeder, and a movement that collects the feeder from the supply unit or moves the feeder by attaching the feeder to the supply unit.
  • a mobile work device provided with a control unit, wherein the management control unit may output the created mounting order information to the mobile work device.
  • productivity can be further improved by using the mounting order information by the mobile work device.
  • the mounting system includes a housing unit that houses the plurality of feeders, and a movement that collects the feeders from the supply unit or attaches the feeders to the supply unit and moves the feeders.
  • a mobile work device having a control unit, wherein the management control unit, when a vacancy occurs in the storage unit, the feeder used in the next and subsequent productions in addition to the feeder used in the current production.
  • the mounting order information to be moved and accommodated in the empty accommodation section may be created. In this mobile work management device, the moving distance of the feeder of the mobile work device can be further reduced.
  • the management control unit further obtains individual arrangement information including an arrangement position at which the feeder is individually mounted in addition to the feeder arrangement information created by the common arrangement information, and In the feeder included in the arrangement information, the mounting order information may be created so that the feeder used in the current production is given priority over the feeder used in the next and subsequent productions.
  • the management control unit is configured to mount the feeder used in the current production in order from a mounting unit on an end side of the supply unit in a predetermined arrangement position.
  • the order information may be created.
  • this mobile work management device by mounting the feeders in order from the end, the movement of the mobile work device can be further suppressed, and the start of the mounting process can be further accelerated.
  • the mobile working device includes: A mounting unit that mounts a component on a mounting target; a supply unit that mounts a feeder including a holding member that holds the component to one or more mounting units; and a mounting control unit that causes the mounting unit to collect the component from the feeder.
  • a mobile working device used for a mounting system including a mounting device having A storage unit that stores the feeder, It corresponds to a plurality of mounting condition information for producing a plurality of types of mounting objects, respectively, and is created according to a common arrangement of mounting the feeder at a common position in the production of a plurality of types of mounting objects.
  • the mounting is performed by giving priority to the feeders used in the current production over the feeders used in the next and subsequent productions.
  • a movement control unit that accommodates and moves the feeder in the accommodation unit based on attachment order information including an attachment order of the feeder to be attached to the unit, and attaches the feeder to the attachment unit. It is provided with.
  • this mobile work device uses mounting order information for mounting a feeder used in the current production on a mounting portion in preference to a feeder used in the next and subsequent productions. Can be mounted on the mounting portion.
  • the mounting apparatus since the feeder used in the current production is mounted on the supply unit first, the mounting process can be started before mounting the feeder to be used in the next and subsequent times. In this mobile work apparatus, the productivity can be further improved by earlier start of the mounting process.
  • the mounting system of the present disclosure includes: A mounting unit that mounts a component on a mounting target; a supply unit that mounts a feeder including a holding member that holds the component to one or more mounting units; and a mounting control unit that causes the mounting unit to collect the component from the feeder.
  • a mounting device comprising: A mobile work management device according to any of the above, A mobile working device according to any of the above, It is provided with.
  • This mounting system mounts the feeder using mounting order information that causes the feeder used in the current production to be mounted on the mounting section in preference to the feeder used in the next and subsequent productions, similar to the above-described mobile work management device. Can be attached to the part.
  • the mounting apparatus since the feeder used in the current production is mounted on the supply unit first, the mounting process can be started before mounting the feeder to be used in the next and subsequent times. In this mounting system, the productivity can be further improved by accelerating the start of the mounting process.
  • the management method of the present disclosure includes: A mounting unit that mounts a component on a mounting target; a supply unit that mounts a feeder including a holding member that holds the component to one or more mounting units; and a mounting control unit that causes the mounting unit to collect the component from the feeder.
  • a management method used for a mounting system including a mounting apparatus having It corresponds to a plurality of mounting condition information for producing a plurality of types of mounting objects, respectively, and is created according to a common arrangement of mounting the feeder at a common position in the production of a plurality of types of mounting objects.
  • the mounting is performed so that the feeder used in the current production has a higher priority than the feeder used in the next and subsequent productions.
  • Creating mounting order information including the mounting order of the feeders to be mounted on the unit, Is included.
  • This management method is similar to the above-described mobile work management device, and uses the mounting order information for mounting the feeder used in the current production to the mounting section in preference to the feeder used in the next and subsequent productions, and mounting the feeder. Can be attached to the part.
  • the mounting apparatus since the feeder used in the current production is mounted on the supply unit first, the mounting process can be started before mounting the feeder to be used in the next and subsequent times. In this mobile work apparatus, the productivity can be further improved by earlier start of the mounting process. Note that, in this management method, various aspects of the above-described mobile work management apparatus may be employed, or steps for realizing each function of the above-described mobile work management apparatus may be added.
  • the present disclosure can be used in the technical field of an apparatus for collecting and mounting components.
  • 10 mounting system 11 printing device, 12 printing inspection device, 13 feeder storage unit, 14 management PC, 15 mounting device, 16 automatic transportation vehicle, 17 feeder, 18 loader, 18a X axis rail, 19 host PC, 20 mounting control unit , 21 CPU, 23 storage unit, 24 mounting condition information, 25 feeder arrangement information, 26 board processing unit, 27 supply unit, 28 mounting unit, 29 buffer mounting unit, 30 mounting unit, 31 head moving unit, 32 mounting Head, 33 nozzle, 35 communication unit, 38 slot, 39 connection unit, 40 management control unit, 41 CPU, 43 storage unit, 44 mounting condition information, 45, 45a to 45c feeder arrangement information, 46 mounting order information, 47 communication unit , 48 display unit, 49 input device, 50 movement control unit, 51 PU, 53 storage unit, 54 receiving unit, 55 exchange unit, 56 moving unit, 57 communication unit, 60 placement order display screen, 61 a cursor, 62 placement order display section, 64 confirmation key, S substrate.
  • 20 mounting control unit 21 CPU, 23 storage unit, 24 mounting condition information, 25 feeder arrangement information, 26 board processing unit, 27 supply unit,

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Manufacturing & Machinery (AREA)
  • Microelectronics & Electronic Packaging (AREA)
  • Strategic Management (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Operations Research (AREA)
  • General Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Primary Health Care (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • Quality & Reliability (AREA)
  • Human Computer Interaction (AREA)
  • Automation & Control Theory (AREA)
  • Supply And Installment Of Electrical Components (AREA)

Abstract

実装システムは、実装部と供給部と実装制御部とを備えた実装装置と、移動作業管理装置とを含む。移動作業管理装置は、複数種の前記実装対象物を生産する複数の実装条件情報にそれぞれ対応しており、複数種の実装対象物の生産において共通した位置にフィーダを装着する共通配置に応じて作成されたフィーダの配置位置を含む複数のフィーダ配置情報と、複数のフィーダの使用順と、に基づいて現在の生産で使用するフィーダを次回以降の生産で使用するフィーダよりも優先して装着部に装着させるフィーダの装着順序を含む装着順序情報を作成する。

Description

移動作業管理装置、移動型作業装置、実装システム及び管理方法
 本明細書では、移動作業管理装置、移動型作業装置、実装システム及び管理方法を開示する。
 従来、実装システムとしては、生産ラインにフィーダ保管庫を配置し、実装装置とフィーダ保管庫との間で移動しフィーダを交換する交換ロボット(移動型作業装置)を備えたものが提案されている(例えば、特許文献1参照)。この実装システムでは、フィーダの交換タイミングにおいて、移動型作業装置によりフィーダを交換する。
国際公開第2017/33268号パンフレット
 ところで、実装システムにおいては、例えば、他品種少量生産などにおいて、複数の実装ジョブ(実装条件情報)を切り替えながら実装処理することがある。このような生産を行う実装システムにおいては、部品を保持したフィーダの配置位置を実装ジョブごとに入れ替える手間を省くために、フィーダを複数の実装ジョブで共通の位置に装着させる共通配置を用いることがある。しかしながら、この実装システムでは、フィーダの共通配置を用いると、実装処理の開始までに時間がかかるという問題があった。
 本開示は、複数種の生産においてフィーダの配置位置を共通させる共通配置を利用する際に生産性をより向上することができる移動作業管理装置、移動型作業装置、実装システム及び管理方法を提供することを主目的とする。
 本開示は、上述の主目的を達成するために以下の手段を採った。
 本開示の移動作業管理装置は、
 部品を実装対象物に実装処理する実装部と、部品を保持する保持部材を含むフィーダを1以上の装着部に装着する供給部と、前記フィーダから前記部品を前記実装部に採取させる実装制御部とを備えた実装装置を含む実装システムに用いられる移動作業管理装置であって、
 複数種の前記実装対象物を生産する複数の実装条件情報にそれぞれ対応しており、複数種の前記実装対象物の生産において共通した位置に前記フィーダを装着する共通配置に応じて作成された前記フィーダの配置位置を含む複数のフィーダ配置情報と、複数の前記フィーダの使用順と、に基づいて現在の生産で使用する前記フィーダを次回以降の生産で使用する前記フィーダよりも優先して前記装着部に装着させるフィーダの装着順序を含む装着順序情報を作成する管理制御部、
 を備えたものである。
 この移動作業管理装置では、複数のフィーダ配置情報と、複数のフィーダの使用順とに基づいて現在の生産で使用するフィーダを次回以降の生産で使用するフィーダよりも優先して装着部に装着させるフィーダの装着順序を含む装着順序情報を作成する。このフィーダ配置情報は、複数種の実装対象物を生産する複数の実装条件情報にそれぞれ対応しており、複数種の実装対象物の生産において共通した位置にフィーダを装着する共通配置に応じて作成されている。そして、実装装置では、作成された装着順序情報に基づいてフィーダを装着部に装着させることができ、現在の生産で使用するフィーダが先に供給部に装着されるため、次回以降で使用するフィーダを装着する前に実装処理を開始することができる。この移動作業管理装置では、実装処理の開始を早めることによって、生産性をより向上することができる。ここで「実装対象物」としては、例えば、基板や3次元形状の基材などが挙げられる。
実装システム10の一例を示す概略説明図。 実装装置15及びローダ18の構成の概略を示す説明図。 記憶部43に記憶された情報の一例を示す説明図。 装着順序情報作成処理ルーチンの一例を示すフローチャート。 フィーダ17をローダ18が装着する処理の一例を示す説明図。 装着順序表示画面60の一例を示す説明図。
 本実施形態を図面を参照しながら以下に説明する。図1は、本開示である実装システム10の一例を示す概略説明図である。図2は、実装装置15及び移動型作業装置であるローダ18の構成の概略を示す説明図である。図3は、管理PC14の記憶部43に記憶されたフィーダ配置情報45及び装着順序情報46の一例を示す説明図である。なお、本実施形態において、左右方向(X軸)、前後方向(Y軸)及び上下方向(Z軸)は、図1、2に示した通りとする。
 実装システム10は、例えば、実装対象物としての基板Sに部品を実装する処理を行う装置が基板Sの搬送方向に配列された生産ラインとして構成されている。ここでは、実装対象物を基板Sとして説明するが、部品を実装するものであれば特に限定されず、3次元形状の基材としてもよい。この実装システム10は、図1に示すように、印刷装置11と、印刷検査装置12と、フィーダ保管部13と、管理PC14と、実装装置15と、自動搬送車16と、ローダ18と、ホストPC19などを含んで構成されている。印刷装置11は、基板Sにはんだペーストなどを印刷する装置である。印刷検査装置12は、印刷されたはんだの状態を検査する装置である。フィーダ保管部13は、実装装置15で用いられるフィーダ17を保管する保管場所である。フィーダ保管部13は、印刷検査装置12と実装装置15との間の搬送装置の下部に設けられている。
 実装装置15は、部品を採取して基板Sへ実装させる装置である。実装装置15は、実装制御部20と、記憶部23と、基板処理部26と、供給部27と、実装部30と、通信部35とを備える。実装制御部20は、図2に示すように、CPU21を中心とするマイクロプロセッサとして構成されており、装置全体の制御を司る。この実装制御部20は、基板処理部26や供給部27、実装部30へ制御信号を出力し、基板処理部26や供給部27、実装部30からの信号を入力する。記憶部33には、実装条件情報24やフィーダ配置情報25などが記憶されている。実装条件情報24は、生産ジョブであり、部品の情報や部品を基板Sへ実装する配置順、配置位置、部品を採取する位置などの情報が含まれている。この実装条件情報24は、実装効率が高い採取順及び配置順などをホストPC19が作成し、ホストPC19から送信されて記憶部23に記憶される。フィーダ配置情報25は、フィーダ配置情報45と同じ情報であり、詳しくは後述する。実装装置15は、実装条件情報24やフィーダ配置情報25をホストPC19から取得する。通信部35は、管理PC14やホストPC19などの外部機器と情報のやりとりを行うインタフェースである。
 基板処理部26は、基板Sの搬入、搬送、実装位置での固定、搬出を行うユニットである。基板処理部26は、図1の前後に間隔を開けて設けられ左右方向に架け渡された1対のコンベアベルトを有している。基板Sはこのコンベアベルトにより搬送される。
 供給部27は、実装部30へ部品を供給するユニットである。この供給部27は、部品を保持した保持部材としてのテープを巻き付けたリールを含むフィーダ17を1以上の装着部に装着している。供給部27は、図2に示すように、前方にフィーダ17を装着可能な上下2つの装着部を有する。上段は実装部30が部品を採取可能な実装用装着部28であり、下段は実装部30が部品を採取できないバッファ用装着部29である。なお、ここでは、実装用装着部28及びバッファ用装着部29を装着部と総称する。この装着部は、所定数(例えば4や12など)ごとにまとめられたモジュール単位で管理されているものとしてもよい。この供給部27は、所定間隔でX方向に複数配列されフィーダ17のレール部材が挿入されるスロット38と、フィーダ17の先端に設けられたコネクタが挿入される接続部39とが配設されている。フィーダ17は、図示しないコントローラを備えている。このコントローラは、フィーダ17に含まれるテープのIDや部品種別、部品残数などの情報を記憶している。フィーダ17が接続部39に接続されると、このコントローラはフィーダ17の情報を実装制御部20へ送信する。
 実装部30は、部品を供給部27から採取し、基板処理部26に固定された基板Sへ配置するユニットである。実装部30は、ヘッド移動部31と、実装ヘッド32と、ノズル33とを備えている。ヘッド移動部31は、ガイドレールに導かれてXY方向へ移動するスライダと、スライダを駆動するモータとを備えている。実装ヘッド32は、1以上の部品を採取してヘッド移動部31によりXY方向へ移動するものである。この実装ヘッド32は、スライダに取り外し可能に装着されている。実装ヘッド32の下面には、1以上のノズル33が取り外し可能に装着されている。ノズル33は、負圧を利用して部品を採取するものである。なお、部品を採取する採取部材は、ノズル33のほか部品を機械的に保持するメカニカルチャックなどとしてもよい。
 管理PC14は、フィーダ17の管理を行う装置であり、ローダ18が実行する実行データなどを作成する移動作業管理装置である。管理PC14は、管理制御部40と、記憶部43と、通信部47と、表示部48と、入力装置49とを備えている。管理制御部40は、CPU41を中心とするマイクロプロセッサとして構成されており、装置全体の制御を司る。記憶部43は、例えばHDDなど、処理プログラムなど各種データを記憶する装置である。通信部47は、実装装置15やホストPC19などの外部機器と情報のやりとりを行うインタフェースである。表示部48は、各種情報を表示する液晶画面である。入力装置49は、作業者が各種指令を入力するキーボード及びマウス等を含む。
 図1、3に示すように、記憶部43には、実装条件情報44や、フィーダ配置情報45、装着順序情報46などが記憶されている。実装条件情報44は、実装条件情報24と同じものであり、ホストPC19から取得される。フィーダ配置情報45は、実装条件情報44による基板Sの生産に用いられる情報であり、フィーダ17の配置位置を含む情報である。実装条件情報44やフィーダ配置情報45は、複数種の基板Sを生産する生産計画を含む生産計画情報を構成する。このフィーダ配置情報45は、複数種の基板Sの生産において共通した位置にフィーダ17を装着する共通配置に応じて作成されている。実装システム10では、例えば、他品種少量生産などにおいて、複数の実装条件情報44(生産ジョブ)を切り替えながら実装処理することがある。このような生産を行う場合、部品を保持したフィーダ17の配置位置を生産ジョブごとに入れ替える手間を省くために、フィーダ17を複数の生産ジョブで共通の位置に装着させることがある(これをフィーダ17の共通配置とも称する)。このフィーダ配置情報45は、共通配置の手法に基づいて最も効率のよい各フィーダ17の配置位置となるように、ホストPC19によって作成される。フィーダ配置情報45には、図3に示すように、供給部27のモジュール番号、装着部の位置を示す装着部番号、装着部に装着されるフィーダ17の識別情報(ID)、フィーダ17が保持している部品名、及びその部品残数などが含まれている。記憶部43には、第1~第3生産ジョブに対応するフィーダ配置情報45a~45cが記憶されており、各生産ジョブにおいて、フィーダAは装着部#1、フィーダBは装着部#2など、どのフィーダ配置情報45においても、同じ種別のフィーダ17が同じ装着部に装着されるように設定されている。なお、このフィーダ配置情報45は、実装条件情報44とは別に管理されてもよいし、実装条件情報44に含まれているものとしてもよい。装着順序情報46は、基板Sの生産開始前にローダ18がフィーダ17を供給部27へ装着する作業順を含み管理PC14で作成される情報である。この装着順序情報46には、フィーダ17を受取り又は装着する順番である作業番号、フィーダ17をやりとりする対象である作業対象、供給部27やフィーダ保管部13の装着部の位置である装着部番号、そのフィーダ17を収容する収容部54の番号、回収又は装着の作業内容、作業対象であるフィーダ17のID、フィーダ17が保持する部品名及びその部品残数などの情報が含まれている。例えば、図3の装着順序情報46の作業番号1では、フィーダ保管部13の装着部に装着されているフィーダAを収容部54の1番スロットに回収(受取り)する作業が規定されている。また、作業番号5では、収容部54の1番スロットに収容されたフィーダAを実装用装着部28の装着部#1に装着させる作業が規定されている。
 自動搬送車16は、フィーダ17や、実装システム10で用いられる部材などを図示しない保管庫とフィーダ保管部13との間で自動搬送するものである。
 ローダ18は、移動型作業装置であり、実装システム10の正面の移動領域内(図1の点線参照)で移動し、実装装置15のフィーダ17を自動で回収及び補給する装置である。このローダ18は、移動制御部50と、記憶部53と、収容部54と、交換部55と、移動部56と、通信部57とを備えている。移動制御部50は、CPU51を中心とするマイクロプロセッサとして構成されており、装置全体の制御を司る。記憶部53は、例えばHDDなど、処理プログラムなど各種データを記憶するものであり、配置実行情報45などが記憶される。収容部54は、フィーダ17を収容する収容空間を有する。この収容部54は、例えば、4つのフィーダ17を収容可能に構成されている。交換部55は、フィーダ17を出し入れすると共に上下段に移動させる機構である(図2参照)。交換部55は、フィーダ17をクランプするクランプ部と、クランプ部をY軸方向(前後方向)に移動させるY軸スライダと、クランプ部をZ軸方向(上下方向)に移動させるZ軸スライダとを有している。交換部55は、実装用装着部28でのフィーダ17の装着及び装着解除と、バッファ用装着部29でのフィーダ17の装着及び装着解除を実行する。移動部56は、実装装置15の正面に配設されたX軸レール18aに沿ってローダ18をX軸方向(左右方向)へ移動させる機構である。通信部57は、管理PC14や実装装置15などの外部機器と情報のやりとりを行うインタフェースである。このローダ18は、現在位置や実行した作業内容を管理PC14へ出力する。
 ホストPC19(図1参照)は、実装システム10の各装置の情報を管理するサーバとして構成されている。ホストPC19は、装置全体の制御を司る制御部と、各種情報を記憶する記憶部と、実装システム10や自動搬送車16、ローダ18などの外部装置と双方向通信を行う通信部とを備えている。ホストPC19は、部品の実装処理に用いられる実装条件情報やフィーダ配置情報を作成、管理するほか、実装システム10の情報を取得、管理する。
 次に、こうして構成された本実施形態の実装システム10の動作、特に基板Sの生産開始前にローダ18がフィーダ17を実装装置15へ装着させる際に用いる装着順序情報46を作成する処理について説明する。図4は、管理PC14の管理制御部40が有するCPU41により実行される装着順序情報作成処理ルーチンの一例を示すフローチャートである。このルーチンは、管理PC14の記憶部43に記憶され、複数の基板Sの生産を含む生産計画が実装開始される充分前に作業者の入力に基づいて実行される。このルーチンを開始すると、まず、CPU41は、生産計画に含まれる複数のフィーダ配置情報45とフィーダ17の使用順とを読み出して取得し(S100)、現在(今回)の生産で使用するフィーダ17を、次回以降の生産で使用するフィーダ17よりも優先して抽出する(S110)。フィーダ17の使用順は、生産計画の情報に含まれているものとしてもよい。また、フィーダ17の使用順は、フィーダ配置情報45の使用順としてもよい。
 次に、CPU41は、抽出したフィーダ17の予め定められた配置位置のうち供給部27の端部側の実装用装着部28から順に、収容部54の収容数(ここでは4)ごとに分けて収容移動させる移動割付けを行う(S120)。例えば、フィーダ保管部13に保管されたフィーダ17を実装装置15へ装着する場合、CPU41は、フィーダ保管部13に近い実装用装着部28に装着するフィーダ17から順に4つずつ分ける処理を行う。なお、「端部側」は、フィーダ保管部13に近い側でも遠い側でもよい。続いて、CPU41は、最終移動させる収容部54に空きがあるか否かを判定する(S130)。例えば、現在の基板Sの生産において、フィーダ17を11個使用する場合、3回目の最終移動はフィーダ17が3個であり、収容部54には1スロットの空きが生じる。最終移動の収容部54に空きがあるときには、CPU41は、現在の生産で使用するフィーダ17に加えて、次回以降の生産で使用するフィーダ17があれば、その空きスロットの分だけ次回以降の生産で使用するフィーダ17を選択する(S140)。この選択において、CPU41は、次回以降の生産のうち、次回の生産で使用するフィーダ17を優先することが好ましい。こうすれば、CPU41は、次回使用するフィーダ17の装着をより早く完成させることができる。また、CPU41は、最終移動させる現在使用のフィーダ17の装着部に対してローダ18の移動がなく装着可能なフィーダ17を優先し、移動距離がより短く装着可能なフィーダ17を次に優先して選択するものとしてもよい。こうすれば、ローダ18の移動効率をより向上することができる。なお、S140での選択は上記に特に限定されず、CPU41は、次回以降に使用するフィーダ17として供給部27の端部側から順に選択するものとしてもよい。
 S140のあと、または、S130で最終移動の収容部54に空きスロットがないときには、CPU41は、移動割付けを行った各々のフィーダ17に対して、フィーダ17を収容部のどのスロットに収容するかを設定する収容部割付けを行う(S150)。この収容部割付けにおいて、CPU41は、ローダ18の移動無しで同時装着可能な収容位置を優先し、次に、ローダ18の移動距離がより短い収容位置を優先するものとしてもよい。具体的には、CPU41は、例えば、実装用装着部28が隣である2つのフィーダ17は、収容部54で隣になる割り付けを優先し、実装用装着部28が2つ離れたフィーダ17では、2つ離して収容部54に収容することを優先して収容部割付を行う。なお、この収容部割付けにおいても、CPU41は、現在の生産で使用するフィーダ17を次回以降の生産で使用するフィーダ17よりも優先して実装用装着部28に装着させる装着順を設定する。こうすれば、今回の生産で使用するフィーダ17の装着をより早く完成させることができる。
 S150のあと、CPU41は、次回の生産があるか否かを判定し(S160)、次回の生産があるときには、CPU41は、S110以降の処理を繰り返し実行する。即ち、次回の生産を今回の生産としてフィーダ17を抽出し、移動割付け及び収容部割付けを実行する。一方、S160で次回の生産がないときには、上記設定した装着順を含む装着順序情報46を作成して(S170)、ローダ18や表示部48へ出力し(S180)、このルーチンを終了する。CPU41は、図3に示すように、作業順と、作業対象と、フィーダ17の受取り先及び装着先の位置と、フィーダ17の収容位置と、作業内容(回収及び装着)と、フィーダ17の情報とを含む装着順序情報46を作成する。この装着順序情報46を取得したローダ18は、装着順序情報46に規定されている作業内容を実行する。また、装着順序情報46の作業内容を装着順序表示画面として表示部48に表示出力するものとしてもよい。
 図5は、フィーダ17をローダ18が装着する処理の一例を示す説明図であり、図5Aが第1生産で使用するフィーダ17を移動装着する図、図5B、Cが第2、3生産で使用するフィーダ17を移動装着する図である。図5には、図3に示すフィーダ配置情報45に規定するフィーダ17の配置で、装着順序情報46の装着処理を実行する内容を示した。図5では、実装用装着部28の#1、2、4~7、9、10にフィーダA~Hを装着する共通配置の場合に、第1生産でフィーダA,D,Hを使用し、第2生産でフィーダA,B,E,Gを使用し、第3生産でフィーダC,D,F,Hを使用する場合を具体例として説明する。まず、ローダ18のCPU51は、装着順序情報46の内容に基づき、作業番号1~4に規定された作業を実行する。即ち、CPU51は、フィーダ保管部13に保管されたフィーダ17を回収する。このとき、収容部54には、フィーダA,D,Hが収容されるが、1スロット空きがあるので、次回使用されるフィーダも収容される。実装用装着部28への装着は、第1生産のフィーダが優先され、この最後がフィーダHであるので、これと同時装着可能な第2生産で用いるフィーダGが選択される。また、フィーダH,Gは、同時装着ができるように隣のスロットに収容される(図5A)。次に、ローダ18は、作業番号5~8に規定された作業を実行する。即ち、CPU51は、実装用装着部28の#1、2、4、3にフィーダA,D,H,Gを装着させる。フィーダA,D,Hが実装用装着部28に装着されると、実装装置15は、第1生産の実装処理を開始することができるようになる。続いて、CPU51は、作業番号9~12に規定された作業、即ち、フィーダB,E,C,Fを収容部54のスロット2、3、1、4に収容させる。そして、CPU51は、フィーダB,Eを実装用装着部28の#2、#6へ装着させる。フィーダB,Eが実装用装着部28に装着されると、実装装置15は、第2生産の実装処理を開始することができるようになる。なお、ローダ18の収容部54には、フィーダC,E,Fが同時装着可能に収容されている。CPU51は、フィーダEの装着と共にフィーダC,Fを装着することができ、この時点で第3生産の実装処理を開始することもできるようになる。フィーダ17の移動及び装着には時間がかかり、共通配置の昇順又は降順でフィーダ17を順次装着するものとすると、第1生産を開始するまで待ち時間が長くなる場合が生じうる。この実装システム10では、第1生産のフィーダ17の装着を優先することにより、できるだけ早期に実装処理を開始することができる。
 ここで、本実施形態の構成要素と本開示の構成要素との対応関係を明らかにする。本実施形態の実装装置15が実装装置に相当し、管理PC14が移動作業管理装置に相当し、ローダ18が移動型作業装置に相当する。また、供給部27が供給部に相当し、実装用装着部28及びバッファ用装着部29が装着部に相当し、実装部30が実装部に相当し、実装制御部20が実装制御部に相当する。また、収容部54が収容部に相当し、移動制御部50が移動制御部に相当する。また、実装条件情報44が実装条件情報に相当し、フィーダ17がフィーダに相当し、装着順序情報46が装着順序情報に相当し、管理制御部40が管理制御部に相当する。また、テープが保持部材に相当し、基板Sが実装対象物に相当する。
 以上説明した実装システム10では、複数のフィーダ配置情報45と、複数のフィーダ17の使用順とに基づいて現在の生産で使用するフィーダ17を次回以降の生産で使用するフィーダ17よりも優先して装着部に装着させるフィーダ17の装着順序を含む装着順序情報46を作成する。このフィーダ配置情報46は、複数種の基板Sを生産する複数の実装条件情報44にそれぞれ対応しており、複数種の基板Sの生産において共通した位置にフィーダを装着する共通配置に応じて作成されている。そして、実装装置15では、作成された装着順序情報46に基づいてフィーダ17を装着部に装着させることができ、現在の生産で使用するフィーダ17が先に供給部27に装着されるため、次回以降で使用するフィーダ17を装着する前に実装処理を開始することができる。この管理PC14では、実装処理の開始を早めることによって、生産性をより向上することができる。また、実装システム10は、フィーダ17を収容する収容部54と、フィーダ17を供給部27から回収し又はフィーダ17を供給部27へ装着させフィーダを移動させる移動制御部50とを備えたローダ18を含み、管理制御部40は、作成した装着順序情報46をローダ18へ出力する。この管理PC14では、ローダ18が装着順序情報46を利用することにより、生産性をより向上することができる。更に、実装システム10はローダ18を含み、管理制御部40は、収容部54に空きが生じる場合は、現在の生産で使用するフィーダ17に加えて次回の生産で使用するフィーダ17を空きの収容部54に収容させて移動させる装着順序情報46を作成する。この管理PC14では、ローダ18のフィーダの移動効率をより高めることができる。更にまた、管理制御部40は、現在の生産で使用するフィーダ17を、予め定められた配置位置のうち供給部27の端部側の実装用装着部28から順番に装着させる装着順序情報46を作成する。この管理PC14では、端部側から順番にフィーダ17を実装用装着部28に装着させることにより、ローダ18の移動効率を高め、実装処理の開始をより早めることができる。
 なお、本開示は上述した実施形態に何ら限定されることはなく、本発明の技術的範囲に属する限り種々の態様で実施し得ることはいうまでもない。
 例えば、上述した実施形態では、実装システム10は、ローダ18を備え、ローダ18がフィーダ17の移動、装着を行うものとしたが、特にこれに限定されず、自動搬送車16がフィーダ17の移動装着を行ってもよい。あるいは、実装システム10は、ローダ18を備えず、作業者が、表示部48に表示された装着順序表示画面を確認してフィーダ17を順次実装用装着部28へ装着させるものとしてもよい。図6は、装着順序表示画面60の一例を示す説明図である。この装着順序表示画面60には、カーソル61と、装着順序表示部62と、確認キー64とが含まれている。装着順序表示部には、作業番号や受取り先の装置名及び位置、装着先の装着部、フィーダ17の情報などが含まれる。作業者は、この装着順序表示画面60を確認し、表示された作業順にフィーダ17を実装用装着部28に装着させる。実装装置15は、現在の実装条件情報44及びフィーダ配置情報45で使用するフィーダ17が全て装着されると、実装処理を開始する。この実装システム10においても、現在の生産で使用するフィーダ17が先に供給部27に装着されるため、次回以降で使用するフィーダ17を装着する前に実装処理を開始することができる。
 上述した実施形態では、フィーダ配置情報45は、共通配置の手法により作成されており、実装装置15には、共通配置のフィーダ17のみあるものとして説明したが、特にこれに限定されず、共通配置以外のフィーダ17をも用いてもよい。即ち、実装装置15は、実装条件情報44に対応した個別フィーダ17をも用いて実装処理を実行するものとしてもよい。例えば、管理制御部40は、共通配置情報により作成されたフィーダ配置情報45に加え、個別にフィーダを実装用装着部28に装着する配置位置を含む個別配置情報を更に取得し、個別配置情報に含まれるフィーダ17においても現在の生産で使用するフィーダ17を次回以降の生産で使用するフィーダ17よりも優先する装着順序情報46を作成するものとしてもよい。この移動作業管理装置では、共通配置に加え個別配置を含む場合においても生産性をより向上することができる。
 上述した実施形態では、収容部54に空きが生じる場合は、現在の生産で使用するフィーダ17に加えて次回以降の生産で使用するフィーダ17を空きの収容部54に収容させる装着順序情報46を作成するものとして説明したが、特にこれに限定されず、次回以降のフィーダ17を収容部54に収容させなくてもよい。現在使用するフィーダ17が実装用装着部28に装着されれば、実装処理を開始することができる。
 上述した実施形態では、端部側の実装用装着部28からフィーダ17を装着させる装着順序情報46を作成するものとしたが、特にこれに限定されず、現在の生産で使用するフィーダ17を優先して装着させるものとすれば、どの位置からフィーダ17を装着させるものとしてもよい。また、上述した実施形態では、S140やS150において、ローダ18の移動がなく装着可能なフィーダ17を優先し、移動距離がより短く装着可能なフィーダ17を次に優先するものとしたが、特にこれに限定されず、他の優先順位としてもよい。
 上述した実施形態では、フィーダ配置情報45とフィーダ17の使用順とを取得してフィーダ17の装着順を設定するものとしたが、特にこれに限定されず、例えば、実装条件情報44やフィーダ配置情報45、これらの実施順などを含む生産計画を取得してこれらの情報を取得するものとしてもよいし、フィーダ配置情報45を含む実装条件情報44と、実装条件情報44の実施順とを取得してこれらを取得するものとしてもよい。
 上述した実施形態では、実装システム10は、印刷装置11、印刷検査装置12、フィーダ保管部13、管理PC14、実装装置15を備えるものとしたが、特にこれに限定されず、上記装置のうち1以上を省略してもよいし、上記以外の装置を加えるものとしてもよい。
 上述した実施形態では、フィーダ保管部13に設置された管理PC14が、ローダ18を管理するものとして説明したが、特にこれに限定されず、例えば、ホストPC19や実装装置15、ローダ18など、他の装置にこの機能を設けてもよい。
 上述した実施形態では、本開示を実装システム10の形態に適用して説明したが、本開示を管理PC14(移動作業管理装置)やローダ18(移動型作業装置)としてもよいし、移動作業管理方法としてもよい。
 ここで、本開示の移動作業管理装置、移動型作業装置、実装システム及び管理方法は、以下のように構成してもよい。例えば、本開示の移動作業管理装置において、前記実装システムは、前記フィーダを収容する収容部と、前記フィーダを前記供給部から回収し又は前記フィーダを前記供給部へ装着させ前記フィーダを移動させる移動制御部とを備えた移動型作業装置、を含み、前記管理制御部は、前記作成した装着順序情報を前記移動型作業装置へ出力するものとしてもよい。この移動作業管理装置では、移動型作業装置が装着順序情報を利用することにより、生産性をより向上することができる。
 本開示の移動作業管理装置において、前記実装システムは、複数の前記フィーダを収容する収容部と、前記フィーダを前記供給部から回収し又は前記フィーダを前記供給部へ装着させ前記フィーダを移動させる移動制御部を備えた移動型作業装置、を含み、前記管理制御部は、前記収容部に空きが生じる場合は、現在の生産で使用する前記フィーダに加えて次回以降の生産で使用する前記フィーダを前記空きの収容部に収容させて移動させる前記装着順序情報を作成するものとしてもよい。この移動作業管理装置では、移動型作業装置のフィーダの移動距離をより低減することができる。
 本開示の移動作業管理装置において、前記管理制御部は、前記共通配置情報により作成された前記フィーダ配置情報に加え個別に前記フィーダを装着する配置位置を含む個別配置情報を更に取得し、前記個別配置情報に含まれるフィーダにおいても現在の生産で使用する前記フィーダを次回以降の生産で使用する前記フィーダよりも優先する前記装着順序情報を作成するものとしてもよい。この移動作業管理装置では、共通配置に加え個別配置を含む場合においても生産性をより向上することができる。
 本開示の移動作業管理装置において、前記管理制御部は、現在の生産で使用する前記フィーダを、予め定められた配置位置のうち前記供給部の端部側の装着部から順番に装着させる前記装着順序情報を作成するものとしてもよい。この移動作業管理装置では、端部側から順番にフィーダを装着させることにより、移動型作業装置の移動をより抑制し、実装処理の開始をより早めることができる。
 本開示の移動型作業装置は、
 部品を実装対象物に実装処理する実装部と、部品を保持する保持部材を含むフィーダを1以上の装着部に装着する供給部と、前記フィーダから前記部品を前記実装部に採取させる実装制御部とを備えた実装装置を含む実装システムに用いられる移動型作業装置であって、
 前記フィーダを収容する収容部と、
 複数種の前記実装対象物を生産する複数の実装条件情報にそれぞれ対応しており、複数種の前記実装対象物の生産において共通した位置に前記フィーダを装着する共通配置に応じて作成された前記フィーダの配置位置を含む複数のフィーダ配置情報と、複数の前記フィーダの使用順と、に基づいて現在の生産で使用する前記フィーダを次回以降の生産で使用する前記フィーダよりも優先して前記装着部に装着させるフィーダの装着順序を含む装着順序情報に基づいて前記フィーダを前記収容部に収容して移動し、前記装着部に装着させる移動制御部、
 を備えたものである。
 この移動型作業装置は、上述した移動作業管理装置と同様に、現在の生産で使用するフィーダを次回以降の生産で使用するフィーダよりも優先して装着部に装着させる装着順序情報を用い、フィーダを装着部に装着させることができる。実装装置では、現在の生産で使用するフィーダが先に供給部に装着されるため、次回以降で使用するフィーダを装着する前に実装処理を開始することができる。この移動型作業装置では、実装処理の開始を早めることによって、生産性をより向上することができる。
 本開示の実装システムは、
 部品を実装対象物に実装処理する実装部と、部品を保持する保持部材を含むフィーダを1以上の装着部に装着する供給部と、前記フィーダから前記部品を前記実装部に採取させる実装制御部とを備えた実装装置と、
 上述したいずれかに記載の移動作業管理装置と、
 上述したいずれかに記載の移動型作業装置と、
 を備えたものである。
 この実装システムは、上述した移動作業管理装置と同様に、現在の生産で使用するフィーダを次回以降の生産で使用するフィーダよりも優先して装着部に装着させる装着順序情報を用い、フィーダを装着部に装着させることができる。実装装置では、現在の生産で使用するフィーダが先に供給部に装着されるため、次回以降で使用するフィーダを装着する前に実装処理を開始することができる。この実装システムでは、実装処理の開始を早めることによって、生産性をより向上することができる。
 本開示の管理方法は、
 部品を実装対象物に実装処理する実装部と、部品を保持する保持部材を含むフィーダを1以上の装着部に装着する供給部と、前記フィーダから前記部品を前記実装部に採取させる実装制御部とを備えた実装装置を含む実装システムに用いられる管理方法であって、
 複数種の前記実装対象物を生産する複数の実装条件情報にそれぞれ対応しており、複数種の前記実装対象物の生産において共通した位置に前記フィーダを装着する共通配置に応じて作成された前記フィーダの配置位置を含む複数のフィーダ配置情報と、複数の前記フィーダの使用順と、に基づいて現在の生産で使用する前記フィーダを次回以降の生産で使用する前記フィーダよりも優先して前記装着部に装着させるフィーダの装着順序を含む装着順序情報を作成するステップ、
 を含むものである。
 この管理方法は、上述した移動作業管理装置と同様に、現在の生産で使用するフィーダを次回以降の生産で使用するフィーダよりも優先して装着部に装着させる装着順序情報を用い、フィーダを装着部に装着させることができる。実装装置では、現在の生産で使用するフィーダが先に供給部に装着されるため、次回以降で使用するフィーダを装着する前に実装処理を開始することができる。この移動型作業装置では、実装処理の開始を早めることによって、生産性をより向上することができる。なお、この管理方法において、上述した移動作業管理装置の種々の態様を採用してもよいし、また上述した移動作業管理装置の各機能を実現するようなステップを追加してもよい。
 本開示は、部品を採取し実装する装置の技術分野に利用可能である。
10 実装システム、11 印刷装置、12 印刷検査装置、13 フィーダ保管部、14 管理PC、15 実装装置、16 自動搬送車、17 フィーダ、18 ローダ、18a X軸レール、19 ホストPC、20 実装制御部、21 CPU、23 記憶部、24 実装条件情報、25 フィーダ配置情報、26 基板処理部、27 供給部、28 実装用装着部、29 バッファ用装着部、30 実装部、31 ヘッド移動部、32 実装ヘッド、33 ノズル、35 通信部、38 スロット、39 接続部、40 管理制御部、41 CPU、43 記憶部、44 実装条件情報、45,45a~45c フィーダ配置情報、46 装着順序情報、47 通信部、48 表示部、49 入力装置、50 移動制御部、51 CPU、53 記憶部、54 収容部、55 交換部、56 移動部、57 通信部、60 装着順序表示画面、61 カーソル、62 装着順序表示部、64 確認キー、S 基板。

Claims (7)

  1.  部品を実装対象物に実装処理する実装部と、部品を保持する保持部材を含むフィーダを1以上の装着部に装着する供給部と、前記フィーダから前記部品を前記実装部に採取させる実装制御部とを備えた実装装置を含む実装システムに用いられる移動作業管理装置であって、
     複数種の前記実装対象物を生産する複数の実装条件情報にそれぞれ対応しており、複数種の前記実装対象物の生産において共通した位置に前記フィーダを装着する共通配置に応じて作成された前記フィーダの配置位置を含む複数のフィーダ配置情報と、複数の前記フィーダの使用順と、に基づいて現在の生産で使用する前記フィーダを次回以降の生産で使用する前記フィーダよりも優先して前記装着部に装着させるフィーダの装着順序を含む装着順序情報を作成する管理制御部、
     を備えた移動作業管理装置。
  2.  前記実装システムは、前記フィーダを収容する収容部と、前記フィーダを前記供給部から回収し又は前記フィーダを前記供給部へ装着させ前記フィーダを移動させる移動制御部とを備えた移動型作業装置、を含み、
     前記管理制御部は、前記作成した装着順序情報を前記移動型作業装置へ出力する、請求項1に記載の移動作業管理装置。
  3.  前記実装システムは、複数の前記フィーダを収容する収容部と、前記フィーダを前記供給部から回収し又は前記フィーダを前記供給部へ装着させ前記フィーダを移動させる移動制御部を備えた移動型作業装置、を含み、
     前記管理制御部は、前記収容部に空きが生じる場合は、現在の生産で使用する前記フィーダに加えて次回以降の生産で使用する前記フィーダを前記空きの収容部に収容させて移動させる前記装着順序情報を作成する、請求項1又は2に記載の移動作業管理装置。
  4.  前記管理制御部は、前記共通配置情報により作成された前記フィーダ配置情報に加え個別に前記フィーダを装着する配置位置を含む個別配置情報を更に取得し、前記個別配置情報に含まれるフィーダにおいても現在の生産で使用する前記フィーダを次回以降の生産で使用する前記フィーダよりも優先する前記装着順序情報を作成する、請求項1~3のいずれか1項に記載の移動作業管理装置。
  5.  部品を実装対象物に実装処理する実装部と、部品を保持する保持部材を含むフィーダを1以上の装着部に装着する供給部と、前記フィーダから前記部品を前記実装部に採取させる実装制御部とを備えた実装装置を含む実装システムに用いられる移動型作業装置であって、
     前記フィーダを収容する収容部と、
     複数種の前記実装対象物を生産する複数の実装条件情報にそれぞれ対応しており、複数種の前記実装対象物の生産において共通した位置に前記フィーダを装着する共通配置に応じて作成された前記フィーダの配置位置を含む複数のフィーダ配置情報と、複数の前記フィーダの使用順と、に基づいて現在の生産で使用する前記フィーダを次回以降の生産で使用する前記フィーダよりも優先して前記装着部に装着させるフィーダの装着順序を含む装着順序情報に基づいて前記フィーダを前記収容部に収容して移動し、前記装着部に装着させる移動制御部、
     を備えた移動型作業装置。
  6.  部品を実装対象物に実装処理する実装部と、部品を保持する保持部材を含むフィーダを1以上の装着部に装着する供給部と、前記フィーダから前記部品を前記実装部に採取させる実装制御部とを備えた実装装置と、
     請求項1~4のいずれか1項に記載の移動作業管理装置と、
     請求項5に記載の移動型作業装置と、
     を備えた実装システム。
  7.  部品を実装対象物に実装処理する実装部と、部品を保持する保持部材を含むフィーダを1以上の装着部に装着する供給部と、前記フィーダから前記部品を前記実装部に採取させる実装制御部とを備えた実装装置を含む実装システムに用いられる管理方法であって、
     複数種の前記実装対象物を生産する複数の実装条件情報にそれぞれ対応しており、複数種の前記実装対象物の生産において共通した位置に前記フィーダを装着する共通配置に応じて作成された前記フィーダの配置位置を含む複数のフィーダ配置情報と、複数の前記フィーダの使用順と、に基づいて現在の生産で使用する前記フィーダを次回以降の生産で使用する前記フィーダよりも優先して前記装着部に装着させるフィーダの装着順序を含む装着順序情報を作成するステップ、
     を含む管理方法。
PCT/JP2018/031147 2018-08-23 2018-08-23 移動作業管理装置、移動型作業装置、実装システム及び管理方法 WO2020039545A1 (ja)

Priority Applications (5)

Application Number Priority Date Filing Date Title
PCT/JP2018/031147 WO2020039545A1 (ja) 2018-08-23 2018-08-23 移動作業管理装置、移動型作業装置、実装システム及び管理方法
US17/265,444 US12063744B2 (en) 2018-08-23 2018-08-23 Moving work management device, moving work device, mounting system, and management method
CN201880096682.7A CN112586107A (zh) 2018-08-23 2018-08-23 移动作业管理装置、移动型作业装置、安装系统及管理方法
JP2020537959A JP7133021B2 (ja) 2018-08-23 2018-08-23 移動作業管理装置、実装システム及び管理方法
EP18931184.8A EP3843520A4 (en) 2018-08-23 2018-08-23 MOBILE WORK MANAGEMENT DEVICE, MOBILE WORK DEVICE, MOUNTING SYSTEM AND ADMINISTRATIVE PROCEDURE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2018/031147 WO2020039545A1 (ja) 2018-08-23 2018-08-23 移動作業管理装置、移動型作業装置、実装システム及び管理方法

Publications (1)

Publication Number Publication Date
WO2020039545A1 true WO2020039545A1 (ja) 2020-02-27

Family

ID=69592858

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2018/031147 WO2020039545A1 (ja) 2018-08-23 2018-08-23 移動作業管理装置、移動型作業装置、実装システム及び管理方法

Country Status (5)

Country Link
US (1) US12063744B2 (ja)
EP (1) EP3843520A4 (ja)
JP (1) JP7133021B2 (ja)
CN (1) CN112586107A (ja)
WO (1) WO2020039545A1 (ja)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023166627A1 (ja) * 2022-03-02 2023-09-07 ヤマハ発動機株式会社 部品交換システム及び部品実装システム
WO2023166622A1 (ja) * 2022-03-02 2023-09-07 ヤマハ発動機株式会社 部品交換システム及び部品実装システム

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003229697A (ja) * 2002-02-06 2003-08-15 Juki Corp 部品実装方法及びシステム
JP2007287932A (ja) * 2006-04-17 2007-11-01 Yamaha Motor Co Ltd 部品実装方法および同装置
JP2009111106A (ja) * 2007-10-30 2009-05-21 Juki Corp 部品実装機のフィーダ配置最適化方法
JP2012023112A (ja) * 2010-07-13 2012-02-02 Panasonic Corp 部品実装装置および部品実装方法
WO2014068712A1 (ja) * 2012-10-31 2014-05-08 富士機械製造株式会社 段取り替え方法および段取り替え装置
WO2017033268A1 (ja) 2015-08-25 2017-03-02 富士機械製造株式会社 部品実装ライン

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006253184A (ja) * 2005-03-08 2006-09-21 Yamagata Casio Co Ltd 基板ユニット生産方法その方法を用いる部品搭載装置
JP5085509B2 (ja) * 2008-10-31 2012-11-28 株式会社日立ハイテクインスツルメンツ 電子部品の装着方法、電子部品装着装置及び電子部品装着装置の電子部品装着順序決定方法
KR101694226B1 (ko) * 2012-06-29 2017-01-09 야마하하쓰도키 가부시키가이샤 피더와 피더 제어 방법 및 전자 부품 장착 장치
EP2897009B1 (en) * 2012-09-12 2023-03-01 FUJI Corporation Production-sequence-optimizing method and production-sequence-optimizing system
US9316247B2 (en) * 2013-01-18 2016-04-19 Gage Bilt, Inc. Feed mechanism for swagable lockbolt collars
CN105144862B (zh) * 2013-03-14 2018-10-09 株式会社富士 元件安装机的生产管理系统
JP6377746B2 (ja) * 2014-07-25 2018-08-22 株式会社Fuji フィーダ自動交換システム
EP3267780B1 (en) * 2015-03-06 2021-10-27 FUJI Corporation Method for optimizing arrangement of part types, and device for optimizing arrangement of part types
CN111465311B (zh) * 2015-11-17 2021-02-26 株式会社富士 安装处理方法、安装系统及元件安装机
US11582891B2 (en) * 2018-07-19 2023-02-14 Fuji Corporation Component mounting system
EP3833173B1 (en) * 2018-08-01 2023-09-20 Fuji Corporation Component mounting system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003229697A (ja) * 2002-02-06 2003-08-15 Juki Corp 部品実装方法及びシステム
JP2007287932A (ja) * 2006-04-17 2007-11-01 Yamaha Motor Co Ltd 部品実装方法および同装置
JP2009111106A (ja) * 2007-10-30 2009-05-21 Juki Corp 部品実装機のフィーダ配置最適化方法
JP2012023112A (ja) * 2010-07-13 2012-02-02 Panasonic Corp 部品実装装置および部品実装方法
WO2014068712A1 (ja) * 2012-10-31 2014-05-08 富士機械製造株式会社 段取り替え方法および段取り替え装置
WO2017033268A1 (ja) 2015-08-25 2017-03-02 富士機械製造株式会社 部品実装ライン

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3843520A4

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023166627A1 (ja) * 2022-03-02 2023-09-07 ヤマハ発動機株式会社 部品交換システム及び部品実装システム
WO2023166622A1 (ja) * 2022-03-02 2023-09-07 ヤマハ発動機株式会社 部品交換システム及び部品実装システム

Also Published As

Publication number Publication date
JP7133021B2 (ja) 2022-09-07
EP3843520A4 (en) 2021-09-29
JPWO2020039545A1 (ja) 2021-08-12
US12063744B2 (en) 2024-08-13
US20210235605A1 (en) 2021-07-29
EP3843520A1 (en) 2021-06-30
CN112586107A (zh) 2021-03-30

Similar Documents

Publication Publication Date Title
WO2020039544A1 (ja) 移動作業管理装置、移動型作業装置、実装システム及び移動作業管理方法
WO2020161827A1 (ja) 管理装置、移動型作業装置、実装システム及び管理方法
JP7163393B2 (ja) 移動作業管理装置、実装システム、移動型作業装置及び移動作業管理方法
WO2020183599A1 (ja) 管理装置、移動型作業装置、実装システム及び管理方法
WO2020039543A1 (ja) 実装システム、移動型作業装置及び移動作業管理方法
JP7220238B2 (ja) 管理装置、移動型作業装置、実装装置、実装システム及び管理方法
WO2020039545A1 (ja) 移動作業管理装置、移動型作業装置、実装システム及び管理方法
JP2024094429A (ja) 部品補給作業管理装置、実装システム及び部品補給作業管理方法
WO2021191968A1 (ja) 管理装置、実装システム及び管理方法
WO2020157856A1 (ja) 管理装置、実装装置、実装システム及び管理方法
WO2023067794A1 (ja) 情報処理装置、実装システム及び情報処理方法
WO2021186502A1 (ja) 管理装置、実装システム、管理方法
WO2021181576A1 (ja) 管理装置、実装関連装置、実装システム、管理方法及び実装関連装置の制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 18931184

Country of ref document: EP

Kind code of ref document: A1

ENP Entry into the national phase

Ref document number: 2020537959

Country of ref document: JP

Kind code of ref document: A

NENP Non-entry into the national phase

Ref country code: DE

ENP Entry into the national phase

Ref document number: 2018931184

Country of ref document: EP

Effective date: 20210323